KR101555948B1 - Method of expose to submarine cables that were laid under ocean floor or water floor - Google Patents

Method of expose to submarine cables that were laid under ocean floor or water floor Download PDF

Info

Publication number
KR101555948B1
KR101555948B1 KR1020140061577A KR20140061577A KR101555948B1 KR 101555948 B1 KR101555948 B1 KR 101555948B1 KR 1020140061577 A KR1020140061577 A KR 1020140061577A KR 20140061577 A KR20140061577 A KR 20140061577A KR 101555948 B1 KR101555948 B1 KR 101555948B1
Authority
KR
South Korea
Prior art keywords
air lift
lift unit
submarine cable
air
submarine
Prior art date
Application number
KR1020140061577A
Other languages
Korean (ko)
Inventor
윤종문
문충현
Original Assignee
오션씨엔아이 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 오션씨엔아이 주식회사 filed Critical 오션씨엔아이 주식회사
Priority to KR1020140061577A priority Critical patent/KR101555948B1/en
Application granted granted Critical
Publication of KR101555948B1 publication Critical patent/KR101555948B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/02Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile
    • H02G9/025Coverings therefor, e.g. tile
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • H02G1/10Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle in or under water

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The present invention provides a method to expose a submarine cable laid under an ocean floor which sucks in an ocean floor material covering a submarine cable to discharge the ocean floor material towards an ocean surface to expose the submarine cable to provide a pleasant work environment. The method to expose a submarine cable laid under an ocean floor comprises: a ship moving step of moving a ship comprising an air lift unit to suck in an ocean floor material covering a submarine cable to discharge the ocean floor material towards an ocean surface to expose the submarine cable, a compressor to supply high-pressure air to the air lift unit, and a lifting means to move the air lift unit to a target location; an air lift unit lowering preparation step of connecting the compressor and the lifting means to the air lift unit in the ship which has undergone the ship moving step; an air lift lowering step of operating the lifting means which has undergone the air lift unit lowering preparation step to lower the air lift unit towards the submarine cable; and a submarine cable exposing step of operating the air lift unit which has undergone the air lift lowering step, the compressor, and the lifting means to expose the submarine cable.

Description

매설된 해저케이블을 노출시키는 방법 {Method of expose to submarine cables that were laid under ocean floor or water floor}A method of exposing buried submarine cables is disclosed in US Pat.

본 발명은 매설된 해저케이블을 노출시키는 방법에 관한 것으로, 더욱 상세하게는 수저면 또는 해저면에 매설된 해저케이블의 유지보수 및 교체를 위해 해저면으로부터 해저케이블을 노출시키기 위한 매설된 해저케이블을 노출시키는 방법에 관한 것이다.The present invention relates to a method of exposing a buried submarine cable, and more particularly, to a method of exposing an undersea cable from an undersea surface to maintenance and replacement of a submarine cable buried in a water surface or a sea bed As well as a method of exposing it.

일반적으로, 전력 및 통신이 공급되지 않는 도서지역 등과 같이 여건상 지상으로 케이블을 연결 설치할 수 없는 경우 전력 및 통신을 공급하기 위해서 육지의 전력계통에서 도서지역 간의 전력선을 해저케이블을 이용하여 연결한다.Generally, when cables can not be connected to the ground due to circumstances such as power and communication-free book areas, power lines between island areas are connected by submarine cable to power and communication.

상기한 해저케이블은 전기, 통신의 공급 또는 전달을 목적으로 강, 호수, 바다에 설치되는 케이블로서 강과 호수에 설치되는 수저케이블과 바다에 설치되는 해저케이블을 통칭한다.The above-mentioned submarine cable is a cable installed in a river, lake, or sea for the purpose of supplying electricity or communication, and refers to a submarine cable installed in a river and a lake and a submarine cable installed in the sea.

이러한 해저케이블은 해저면에 노출된 상태로 포설되면 선박의 닻이나 양식장의 말목 등에 의해 손상을 입을 우려가 크다.Such submarine cable is likely to be damaged by the anchor of the ship or by the spike of the farm when it is installed in the state exposed to the sea floor.

따라서 해저케이블은 해저면의 해저물질의 표면상에 해저케이블을 단순히 놓이기보다는 이들을 해저물질 속에 물리적으로 매설하는 것이 더욱 바람직하다. 이는 해저케이블을 위해 더욱 안정적이면서 보호할 수 있는 환경을 제공하며, 특히 상업적인 어로활동으로 가해질 해저케이블의 손상 또는 절단을 방지한다. 그리고 해저물질의 표면 아래의 매설깊이는 해저케이블의 기능과 위치 및 해저에 형성된 해저물질의 종류에 따라 결정되는데, 그 작업환경은 최대수심 50미터 내지 60미터의 해저에서 해저케이블을 1미터 내지 4미터로 매설하게 된다.Thus, it is more desirable that the submarine cables physically embed them in the seabed material, rather than merely laying the submarine cables on the surface of the seabed material on the seabed. This provides a more stable and protectable environment for submarine cables, and in particular prevents damage or disconnection of submarine cables caused by commercial fishing activities. And the depth of burial beneath the surface of the seabed material is determined by the function and location of the submarine cable and the type of seabed material formed on the seabed, Meters.

상기한 바와 같이 매설된 해저케이블의 유지보수 시에는 해저케이블을 해저면 외부로 노출시키는 작업이 선행되고 있다.In maintenance of the submarine cable buried as described above, the operation of exposing the submarine cable to the outside of the sea floor has been preceded.

이러한 해저케이블 노출작업은 무인 로봇을 사용하는 포설작업등과 달리 잠수부가 위험요소를 안고 해저면에서 해저케이블 노출 작업을 수행하고 있으며, 워터젯트 방식으로 고압의 물을 해저물질에 분사하게 되는데 이는 해저환경을 혼탁하게 함으로써, 잠수부의 시야를 흐리게 하여 잠수부의 작업환경을 악화시키는 문제점이 있어왔다.This submarine cable exposure work, unlike an installation work using an unmanned robot, is exposed to the undersea cable underwater by the diver, and the high pressure water is sprayed on the submarine material by the water jet method, The visibility of the diver is blurred and the working environment of the diver is deteriorated.

상기한 문제점은 해저케이블의 노출 구간이 연장될수록 잠수부들의 잠수기간과 주변환경 등을 포함한 노출작업 여건을 매우 악화시켜 공정을 지연시키게 되는 다른 문제점들을 파생시키고 있어 이를 개선할 수 있는 해저케이블의 노출 방법이 필요한 실정이다.The problem is that as the exposure section of the submarine cable is extended, the exposure operation conditions including the diving period and the surrounding environment of the divers are greatly deteriorated, thereby deriving other problems that the process is delayed. .

대한민국 공개특허 제10-2004-0048418호 (2004.06.09)Korean Patent Publication No. 10-2004-0048418 (June, 2004) 대한민국 공개특허 제10-2012-0039827호 (2012.04.26)Korean Patent Publication No. 10-2012-0039827 (2012.04.26)

본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로, 해저케이블을 덮고 있는 해저물질을 흡입하여 해수면을 향해 토출시킴으로써 해저케이블을 노출 작업 환경을 쾌적하게 할 수 있는 매설된 해저케이블을 노출시키는 방법을 제공하는데 그 목적이 있다.SUMMARY OF THE INVENTION The present invention has been conceived to solve the problems described above, and it is an object of the present invention to provide a method of exposing an embedded submarine cable that sucks a submarine material covering a submarine cable and discharges the submarine material toward the sea surface, The purpose is to provide.

상기 목적을 달성하기 위한 본 발명에 따른 매설된 해저케이블을 노출시키는 방법은, 해저면에 매설된 해저케이블을 노출시키기 위한 방법에 있어서, 상기 해저케이블을 덮고 있는 해저물질을 흡입하여 해수면 측으로 토출시켜 해저케이블의 노출을 가능케 하는 에어리프트 유닛, 상기 에어리프트 유닛에 고압공기를 공급하는 콤프레셔 및, 상기 에어리프트 유닛을 이동시키기 위한 인양수단이 구비되는 선박을 목적지로 이동시키는 선박이동단계; 상기 선박이동단계를 거친 선박에서 에어리프트 유닛에 콤프레셔와 인양수단을 연결하는 에어리프트 유닛 하강준비단계; 상기 에어리프트 유닛 하강준비단계를 거친 인양수단을 운용하여 에어리프트 유닛을 해저케이블 측으로 하강시키는 에어리프트 유닛 하강단계; 및, 상기 에어리프트 유닛 하강단계를 거친 에어리프트 유닛과 콤프레셔 및 인양수단을 운용하여 해저케이블을 노출시키는 해저케이블 노출단계;를 포함하는 것을 특징으로 한다.According to another aspect of the present invention, there is provided a method of exposing a submarine cable embedded in a seabed surface, the method comprising: sucking a submarine material covering the submarine cable and discharging the submarine material to the sea surface side A ship moving step of moving a ship having an air lift unit for allowing the submarine cable to be exposed, a compressor for supplying high-pressure air to the air lift unit, and a lifting means for moving the air lift unit to a destination; An air lift unit descent preparation step for connecting the compressor and the lifting means to the air lift unit in the ship after the ship moving step; An air lift unit lowering step of lowering the air lift unit to the submarine cable side by operating a lifting means that has been prepared for lowering the air lift unit; And a submarine cable exposure step of exposing the submarine cable by operating the air lift unit, the compressor, and the lifting means through the air lift unit descending step.

이러한, 상기 에어리프트 유닛은, 해저물질이 흡입되는 흡입구가 비스듬히 형성되고, 일단부가 상기 콤프레셔에 연결된 공기호스와 연결되며 타단부가 내부에 관통설치되는 연결관이 구비된 파이프 및, 상기 파이프의 토출구와 연결되어 고압공기에 의해 토출되는 해저물질을 해수면 측으로 안내하는 튜브로 구성되는 에어리프트가 적어도 하나 이상 조립되어 이루어지는 것을 특징으로 한다.The air lift unit may include a pipe having an intake port formed at an angle to intake the seabed material and connected at one end to an air hose connected to the compressor and at the other end through a pipe, And at least one air lift, which is connected to the sea surface and is configured to guide the sea bed material discharged by the high-pressure air to the sea surface side, is assembled.

한편, 상기 에어리프트 유닛 하강단계 이전에는 상기 에어리프트 유닛을 해저케이블 측으로 안내하는 가이드로프와 연결된 무게추를 하강시키고, 상기 가이드로프와 에어리프트 유닛을 연결하는 무게추 하강단계가 수행되는 것을 특징으로 한다.In the meantime, before the step of lowering the air lift unit, a weight drop connected to the guide rope for guiding the air lift unit to the submarine cable is lowered, and a weight dropping step for connecting the guide rope and the air lift unit is performed. do.

그리고, 상기 에어리프트 유닛은 인양수단에 연결된 인양로프와 연결되되, 상기 인양로프는 에어리프트 유닛의 둘레에 길이방향으로 복수의 매듭을 형성하면서 연결되는 것을 특징으로 한다.The air lift unit is connected to a lifting rope connected to the lifting means, wherein the lifting rope is connected to the air lift unit while forming a plurality of knots in the longitudinal direction.

아울러, 상기 인양로프의 일측에는 부이가 설치되는 것을 특징으로 한다.In addition, a buoy is installed on one side of the lifting rope.

상술한 바와 같이 본 발명에 따르면 다음과 같은 효과를 기대할 수 있을 것이다.As described above, according to the present invention, the following effects can be expected.

에어리프팅 방식을 이용하여 해저케이블의 노출 작업을 더욱 효율적이고 안전하게 수행할 수 있게 됨으로써, 노출 작업공정을 단축시킬 수 있을 뿐만 아니라 해저 작업환경을 쾌적하게 조성하여 잠수부에게 발생할 수 있는 안전사고를 미연에 방지할 수 있는 이점이 있다.By using the air lifting method, it is possible to perform the exposure work of the submarine cable more efficiently and safely, thereby not only shortening the exposure work process but also comfortably creating the submarine working environment, There is an advantage that it can be prevented.

도 1은 본 발명에 따른 실시예를 나타낸 도면이다.
도 2는 본 발명에 따른 에어리프트를 나타낸 도면이다.
도 3은 본 발명에 따른 에어리프트 유닛을 나타낸 도면이다.
1 is a view showing an embodiment according to the present invention.
2 is a view showing an air lift according to the present invention.
3 is a view showing an air lift unit according to the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

설명에 앞서, 본 발명은 해저에 매설된 해저케이블의 유지보수를 위해 선행되어야 하는 해저물질로 덮혀진 해저케이블의 노출작업을 수행함에 있어, 잠수부가 본 발명에 따른 에어리프트 유닛을 운용하여 해저물질을 흡입하고, 흡입된 해저물질이 해수면을 향해 토출됨으로써 해저케이블을 노출시킬 수 있는 방법을 제공하기 위한 것임을 주지하여 본 명세의 이해를 돕고자 한다.Prior to the description, in the present invention, in performing an exposure operation of a submarine cable covered with a seabed material that should be preceded for maintenance of a submarine cable embedded in the seabed, the diver operates the air lift unit according to the present invention, And exposing the submarine material to the sea surface, thereby providing a way to expose the submarine cable.

본 발명에 따른 실시예와 에어리프트 및 에어리프트 유닛을 도시한 도 1과 도 2 및 도 3에 도시된 바와 같이, 본 발명은 선박이동단계, 에어리프트 유닛 하강준비단계, 에어리프트 유닛 하강단계 및 해저케이블 노출단계를 포함하여 이루어진다.1, 2 and 3 showing an embodiment according to the present invention and an air lift and an air lift unit, the present invention can be applied to a ship moving step, an air lift unit descent preparation step, an air lift unit descent step, And a submarine cable exposure step.

먼저, 상기 선박이동단계는 해저케이블(C)을 노출시키는데 필요한 장비들이 구비된 선박을 노출시켜야 할 해저케이블(C)의 위치한 목적 해상으로 이동시키는 단계이다. 이러한, 상기 선박에는 에어리프트 유닛(100), 콤프레셔(200) 및 인양수단(300)이 구비된다.First, the ship moving step is a step of moving the ship having the equipment necessary for exposing the submarine cable (C) to the target sea in which the submarine cable (C) to be exposed is located. The ship is provided with an air lift unit 100, a compressor 200, and a lifting means 300.

상기 에어리프트 유닛(100)은 해저케이블(C)을 덮고 있는 해저물질을 흡입하여 해저케이블(C)의 노출을 가능케 하고, 상기 콤프레셔(200)는 에어리프트 유닛(100)에 고압공기를 공급하며, 상기 인양수단(300) 및 권취수단(400)은 에어리프트 유닛(100)과 연결되어 에어리프트 유닛(100)을 이동 가능케 한다.The air lift unit 100 sucks a submarine material covering the submarine cable C to enable exposure of the submarine cable C and the compressor 200 supplies high pressure air to the air lift unit 100 The lifting means 300 and the winding means 400 are connected to the air lift unit 100 to allow the air lift unit 100 to move.

자세하게, 상기 에어리프트 유닛(100)은 해저케이블(C)을 덮고 있는 해저물질에 고압의 공기 또는 물을 직접 분사하여 잠수부의 노출작업 환경을 오염시켰던 구조가 아닌, 해저물질을 흡입하여 해수면 측으로 토출시킴으로써 노출작업 환경을 오염시키지 않고 쾌적한 환경에서보다 안전하게 수행할 수 있게 하기 위한 것으로, 적어도 하나 이상의 에어리프트(110)가 조립되어 이루어진다.In detail, the air lift unit 100 sucks the seabed material and discharges the seabed material to the sea surface by not directly injecting high pressure air or water into the seabed material covering the submarine cable (C) At least one air lift 110 is assembled so as to be able to perform safely in a pleasant environment without polluting the exposed work environment.

이러한, 상기 에어리프트(110)는 파이프(111)와 튜브(112)를 포함하여 이루어져 고압공기를 파이프(111)의 내부에 공급하여 파이프(111)를 통해 해저물질을 흡입한 후 튜브(112)를 통해 해수면 측으로 토출 가능케 하는 것이다.The air lift 110 includes a pipe 111 and a tube 112 to supply high pressure air to the interior of the pipe 111 to suck seabed material through the pipe 111, To the sea surface side.

자세하게, 상기 파이프(111)는 스틸(steel) 재질의 단면이 원형인 관 형태로 이루어지는 것으로, 해저물질이 흡입되는 흡입구(111a)가 수평이 아닌 비스듬히 형성되어 해저물질 측으로 흡입구(111a)를 접근시킬 시에 흡입구(111a)가 해저물질에 덮혀 막히는 것을 방지할 수 있도록 하고, 상기 흡입구(111a)에는 빗살(111a-1)이 십자형으로 용접 결합되어 파이프(111)의 내경보다 상대적으로 큰 물체가 흡입되는 것을 방지토록 한다.In detail, the pipe 111 is formed in a tube shape having a circular cross-section of steel material. The inlet 111a through which the seabed material is sucked is formed obliquely rather than horizontally to approach the suction port 111a toward the sea floor material So that the suction port 111a can be prevented from being clogged by the seabed material so that the suction port 111a is welded to the comb 111a-1 in a cruciform shape so that an object relatively larger than the inner diameter of the pipe 111 is sucked .

그리고, 상기 파이프(111)에는 연결관(111b)이 관통 설치된다. 상기 연결관(111b)은 일단부가 상기 콤프레셔(200)에 연결된 공기호스(210)와 연결되며 타단부가 파이프(111)의 내에 관통설치됨으로써, 상기 콤프레셔(200)로부터 고압공기를 공급받아 파이프(111) 내부로 공급하여 해저물질을 흡입시켜 파이프(111)의 토출구(111c) 측으로 토출 가능케 한다. 여기에서, 상기 연결관(111b)으로 공급되는 고압공기는 파이프(111)의 내벽에 부딪혀 파이프(111)의 흡입구(111a)측과 토출구(111c)으로 유동되는데 흡입구(111a)측으로 분출되는 고압공기는 뻘 등의 점착성물질로 이루어진 해저물질을 혼탁하게 만들어 파이프(111)로의 흡입을 용이하게 하며, 고압공기는 해수면 방향으로 상승하게 되어 있으므로 혼탁하게 된 해저물질은 자연스럽게 흡입구(111a) 측으로 흡입되어 토출구(111c) 측으로 토출된다. 아울러, 상기 파이프(111) 외주면의 양측에는 잠수부가 파지할 수 있는 핸들(111d)이 구비되어 수중에서 에어리프트(110)의 운용을 용이하게 하는 것이 바람직할 것이다.The pipe 111 is provided with a coupling pipe 111b. The connecting pipe 111b is connected at one end to the air hose 210 connected to the compressor 200 and at the other end through the pipe 111 to receive high pressure air from the compressor 200, 111 to suck the seabed material and discharge it to the discharge port 111c side of the pipe 111. [ The high pressure air supplied to the connecting pipe 111b hits the inner wall of the pipe 111 and flows to the suction port 111a side of the pipe 111 and the discharge port 111c so that the high pressure air discharged to the suction port 111a side And the high pressure air rises in the direction of the sea surface, so that the turbid sea material is naturally sucked into the suction port 111a side, (111c). In addition, it is preferable that a handle 111d capable of being held by a diver is provided on both sides of the outer circumferential surface of the pipe 111 to facilitate the operation of the air lift 110 in the water.

이와 함께, 상기 튜브(112)는 플렉시블(flexible)한 재질로 이루어져 상기 파이프(111)의 토출구(111c)와 연결되어 토출되는 해저물질을 해수면 측으로 안내하게 된다. 여기서, 상기 파이프(111)의 토출구(111c)측 외주면에는 외주를 따라 복수개로 형성되는 튜브결속고리를 설치하고 토출구(111c)를 튜브(112) 측에 삽입하여 연결시킨 후, 상기 튜브(112)와 토출구(111c)의 연결부위를 밧줄 등으로 묶어 결속한 후 튜브결속고리에 결속시켜 튜브(112)와 토출구(111c)가 분리되는 것을 방지토록 한다. In addition, the tube 112 is made of a flexible material and connected to the discharge port 111c of the pipe 111 to guide the discharged sea bed material to the sea surface side. A plurality of tube coupling rings are formed along the outer circumference of the pipe 111 at the discharge port 111c side and the discharge port 111c is connected to the tube 112 side. And the discharge port 111c are connected to each other by a sling or the like and then bound to the tube coupling ring to prevent the tube 112 and the discharge port 111c from being separated from each other.

이러한, 상기 에어리프트(110)는 하나로 운용될 수 있으나 해저물질의 흡입량을 증가시키 위해 상기 파이프(111)의 내경을 크게 하면 에어리프팅의 효율이 저감되므로 상기 에어리프트(110)를 복수개로 운용하는 것이 바람직하다.The air lift 110 can be operated as one, but if the inner diameter of the pipe 111 is increased to increase the suction amount of the submarine material, the efficiency of air lifting is reduced. Therefore, .

이와 같은 이유로, 상기 선박이동단계는 상기와 같이 이루어지는 에어리프트(110)를 복수개를 조립하여 에어리프트 유닛(100)으로 완성하는 에어리프트 유닛 조립단계를 더 포함할 수 있다. 자세하게, 상기 에어리프트 유닛 조립단계는 도 3에 도시된 바와 같이 복수의 에어리프트(110)를 에어리프트 유닛(100)으로 조립하는 단계이다. 각 에어리프트(110) 간의 간격 유지를 위한 원통형상의 간격유지부재(130) 외주면에 일정 간격으로 복수의 에어리프트(110)를 용접 결합하고 각 에어리프트(110) 상호 간에는 보조간격유지부재(140)를 용접 결합하여 에어리프트 유닛(100)을 이루게 한다. 이와 같이 이루어지는 상기 에어리프트 유닛(100)의 둘레에는 에어리프트 유닛(100)의 둘레를 감싸는 고정부재(150)를 밀착되게 용접 결합하여 각 에어리프트(110) 간의 결합을 견고히 한다. 이와 함께, 상기 간격유지부재(130)의 일단면에는 가이드고리(131)가 설치된다.For this reason, the ship moving step may further include an air lift unit assembling step of assembling a plurality of air lifts 110 as described above to complete the air lift unit 100. In detail, the air lift unit assembling step is a step of assembling a plurality of air lifts 110 into the air lift unit 100 as shown in FIG. A plurality of air lifts 110 are welded at regular intervals to the outer circumferential surface of a cylindrical gap holding member 130 for maintaining a gap between the air lifts 110 and an auxiliary gap holding member 140 is interposed between the air lifts 110, Thereby forming the air lift unit 100. The fixing member 150 surrounding the air lift unit 100 is tightly welded to the periphery of the air lift unit 100 so as to firmly couple the air lifts 110 to each other. At the same time, a guide ring 131 is provided on one end surface of the gap holding member 130.

한편, 상기 인양수단(300)은 에어리프트 유닛(100)을 해저면으로 하강시키거나 선박으로 인양하기 위한 것으로, 상기 인양수단(300)은 에어리프트 유닛(100)을 매달고 이동할 수 있으며 선박에서 에어리프트 유닛(100)을 하강 또는 인양하면서 이동 가능한 크롤러 크레인(crawler crane)을 적용하는 것이 바람직할 것이다.The lifting means 300 is for lifting or lowering the air lift unit 100 to the sea floor or lifting the ship by the ship. The lifting means 300 can hang and move the air lift unit 100, It may be desirable to apply a movable crawler crane while lowering or lifting the lift unit 100.

이와 함께, 상기 선박에는 잠수부들이 최대 50미터 내지 60미터 깊이의 심해 해저면에서 해저케이블(C)을 노출시키기 위한 준비 작업을 수행해야하므로 잠수부들에게 산소를 공급하기 위한 산소탱크와 잠수부의 포터블산소탱크를 연결시키는 산소탱크연결호스 및 잠수부들과의 통신을 위한 통신수단과 통신케이블이 더 구비될 수 있다.In addition, since the divers are required to prepare for exposing the submarine cable (C) to the deep sea floor of a depth of 50 to 60 meters at maximum, the oxygen tank for supplying oxygen to the diver and the portable oxygen An oxygen tank connecting hose for connecting the tank, and communication means for communicating with the diver and a communication cable.

다음으로, 상기 에어리프트 유닛 하강준비단계는 선박이동단계를 거친 선박에서 에어리프트 유닛(100)에 콤프레셔(200) 및 인양수단(300)을 연결하는 단계이다. 자세하게, 상기 콤프레셔(200)에 연결된 공기호스(210)를 에어리프트 유닛(100)에 조립된 각 에어리프트(110)의 연결관(111b) 일단부와 연결한다.Next, the air lift unit descent preparation step is a step of connecting the compressor 200 and the lifting means 300 to the air lift unit 100 in a ship having been subjected to the ship moving step. The air hose 210 connected to the compressor 200 is connected to one end of the coupling pipe 111b of each air lift 110 assembled in the air lift unit 100. [

이와 함께, 상기 인양수단(300)에 연결된 인양로프(310)를 에어리프트 유닛(100)에 연결한다. 자세하게, 상기 인양로프(310)는 복수의 밧줄을 꼬아서 제작되는 일반적인 로프 형태로 이루어지며, 상기 인양로프(310)의 일단을 인양수단(300)의 후크와 연결하고 타단을 에어리프트 유닛(100)을 연결하되, 상기 에어리프트 유닛(100)의 둘레에 길이방향으로 복수의 매듭을 형성하면서 연결한다. 즉, 상기 인양로프(310)의 타단을 파이프(111) 하부에서 튜브(112)의 상부까지 매듭을 순차적으로 일정 간격을 이루게 묶어 가면서 상기 인양수단(300)과 연결시킨다. 여기에서, 상기 인양로프(310)의 일측에는 부이(buoy)를 설치하여 해수면 상에 부유할 수 있게 함으로써 인양수단(300)과 인양로프(310) 간의 풀림 또는 절단에 따른 안전사고를 미연에 방지하는 것이 바람직할 것이다.At the same time, the lifting rope 310 connected to the lifting means 300 is connected to the air lift unit 100. In detail, the lifting rope 310 is formed in a general rope shape formed by twisting a plurality of ropes. One end of the lifting rope 310 is connected to the hook of the lifting means 300 and the other end is connected to the air lift unit 100 The air lift unit 100 is connected to the air lift unit 100 while forming a plurality of knots in the longitudinal direction. That is, the other end of the lifting rope 310 is connected to the lifting means 300 while sequentially knotting the knot from the lower portion of the pipe 111 to the upper portion of the tube 112 at predetermined intervals. A buoy can be installed on one side of the lifting rope 310 to float on the sea surface to prevent a safety accident due to loosening or cutting between the lifting means 300 and the lifting rope 310. [ .

이어서, 상기 에어리프트 유닛 하강단계는 인양수단(300)을 운용하여 에어리프트 유닛(100)을 해저케이블(C)이 위치된 목표 해저면으로 하강시키는 단계이다. 여기에서, 상기 에어리프트 유닛(100)이 해저면으로 하강될 시 조류의 영향에 의해 목표 해저면에서 이탈되는 것을 방지하고 잠수부의 잠수를 가이드하기 위해 상기 에어리프트 유닛 하강단계 이전에는 무게추 하강단계가 수행되는 것이 바람직하다Next, the air lift unit descending step is a step of lowering the air lift unit 100 to the target bottom surface where the submarine cable C is located by operating the lifting means 300. [ In order to prevent the air lift unit 100 from being detached from the target seabed surface due to the influence of algae when the air lift unit 100 descends to the sea floor and to guide the diving of the diver, Is preferably performed

상기 무게추 하강단계는 에어리프트 유닛(100)을 목표 해저면 까지 안내하는 무게추연결로프에 연결된 무게추를 하강시키는 단계이다. 여기서, 상기 선박(100)에는 무게추연결로프 풀어주거나 감을 수 있도록 무게추권취윈치가 더 구비될 수 있음은 당연하다. 이와 함께, 상기 에어리프트 유닛(100)과 무게추연결로프를 상기 가이드고리(131) 또는 고정부재(150)에 샤클(shackle)을 연결하여 에어리프트 유닛(100)이 무게추연결로프를 타고 목표 해저면으로 하강되게 하는 것이 바람직할 것이다. 그리고, 상기 목표 해저면으로 하강된 에어리프트 유닛(100)은 잠수부에 의해 무게추 연결로프와 분리되어 운용된다.The weight descending step is a step of descending the weight connected to the weight connecting rope that guides the air lift unit 100 to the target bottom surface. Herein, it is natural that the ship 100 is further provided with a weight winch winch so that the weight rope can be loosened or wound. The air lift unit 100 is connected to the guide loop 131 or the fixing member 150 by a shackle so that the air lift unit 100 can be mounted on the weight rope connecting rope It may be desirable to descend to the sea floor. Then, the air lift unit 100 descended to the target bottom surface is separated from the weight rope connecting rope by the diver.

다음으로, 상기 해저케이블 노출단계는 에어리프트 유닛 하강단계를 거친 에어리프트 유닛(100)과 콤프레셔(200) 및 인양수단(300)을 운용하여 해저케이블(C)을 노출시키는 단계이다.Next, the submarine cable exposure step is a step of exposing the submarine cable C by operating the air lift unit 100, the compressor 200, and the lifting means 300 through the air lift unit descending step.

자세하게, 상기 해저케이블 노출단계에서는 콤프레셔(200)를 구동시켜 에어리프트 유닛(100)으로 해저물질을 흡입하게 되며, 상기 에어리프트 유닛(100)은 잠수부에 의해 운용되는데 잠수부는 에어리프트 유닛(100)의 운용 시에 선박의 작업자들과 통신수단을 통해 지속적으로 작업상황을 보고하면서 에어리프트 유닛(100)을 운용하게 됨으로 잠수부의 동선에 따라 인양수단(300)을 운용하여 인양로프(310)의 장력을 적절히 조절하여 잠수부가 에어리프트 유닛(100)을 이동시키면서 목표한 해저케이블(C)의 길이만큼 노출작업을 수행할 수 있게 한다.In detail, in the submarine cable exposure step, the compressor 200 is driven to suck seabed material into the air lift unit 100. The air lift unit 100 is operated by a diver, and the diver is operated by the air lift unit 100, The operation of the lifting unit 300 is performed along the copper line of the diver so that the tensile force of the lifting rope 310 is transmitted to the lifting rope 310. [ So that the diver can move the air lift unit 100 and perform the exposure work by the length of the desired submarine cable C.

이상과 같이, 본 발명의 기본적인 기술적 사상은 해저케이블을 덮고 있는 해저물질을 흡입하여 해수면을 향해 토출시켜 해저케이블을 노출 작업 환경을 쾌적하게 할 수 있는 매설된 해저케이블을 노출시키는 방법을 제공하는 것임을 알 수 있다.As described above, the basic technical idea of the present invention is to provide a method of exposing an embedded submarine cable that sucks a submarine material covering the submarine cable and discharges the submarine material toward the sea surface, Able to know.

이러한 본 발명의 기본적인 기술적 사상 범주내에서 당업계의 통상적인 지식을 가진 자에 의해 다양한 변형이 가능함은 물론이며, 따라서 본 발명의 범주는 다양한 변형 예들을 포함하도록 기술된 특허청구범위 내에서 해석되어야 할 것이다.It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims. something to do.

100: 에어리프트 유닛 110: 에어리프트
111: 파이프 111a: 흡입구
111a-1: 빗살 111b: 연결관
111c: 토출구 111d: 핸들
112: 튜브
200: 콤프레셔 210: 공기호스
300: 인양수단 310: 인양로프
C: 해저케이블
100: Air lift unit 110: Air lift
111: pipe 111a: inlet
111a-1: comb 111b: connector
111c: discharge port 111d: handle
112: tube
200: compressor 210: air hose
300: lifting means 310: lifting rope
C: Submarine cable

Claims (5)

해저면에 매설된 해저케이블을 노출시키기 위한 방법에 있어서,
상기 해저케이블을 덮고 있는 해저물질을 흡입하여 해수면 측으로 토출시켜 해저케이블의 노출을 가능케 하는 에어리프트 유닛(100), 상기 에어리프트 유닛(100)에 고압공기를 공급하는 콤프레셔(200) 및, 상기 에어리프트 유닛(100)을 이동시키기 위한 인양수단(300)이 구비되는 선박을 목적지로 이동시키는 선박이동단계; 상기 선박이동단계를 거친 선박에서 에어리프트 유닛(100)에 콤프레셔(200)와 인양수단(300)을 연결하는 에어리프트 유닛 하강준비단계; 상기 에어리프트 유닛 하강준비단계를 거친 인양수단(300)을 운용하여 에어리프트 유닛(100)을 해저케이블 측으로 하강시키는 에어리프트 유닛 하강단계; 및, 상기 에어리프트 유닛 하강단계를 거친 에어리프트 유닛(100)과 콤프레셔(200) 및 인양수단(300)을 운용하여 해저케이블을 노출시키는 해저케이블 노출단계;를 포함하여 이루어지고,
상기 에어리프트 유닛(100)은, 해저물질이 흡입되는 흡입구(111a)가 비스듬히 형성되고, 일단부가 상기 콤프레셔(200)에 연결된 공기호스(210)와 연결되며 타단부가 내부에 관통설치되는 연결관(111b)이 구비된 파이프(111) 및, 상기 파이프(111)의 토출구(111c)와 연결되어 고압공기에 의해 토출되는 해저물질을 해수면 측으로 안내하는 튜브(112)로 구성되는 에어리프트(110)가 적어도 하나 이상 조립되어 이루어지되,
복수의 상기 에어리프트(110)는 간격유지부재(130) 외주면에 용접 결합되고, 각 에어리프트(110) 상호 간에는 보조간격유지부재(140)에 의해 용접 결합되어 에어리프트 유닛(100)이 형성되고, 상기 에어리프트 유닛(100)의 둘레에는 에어리프트 유닛(100)의 둘레를 감싸는 고정부재(150)가 결합되며, 흡입구(111a)에는 빗살(111a-1)이 십자형으로 용접 결합됨을 특징으로 하는 매설된 해저케이블을 노출시키는 방법.
A method for exposing a submarine cable embedded in a seabed surface,
An air lift unit (100) for sucking the seabed material covering the submarine cable and discharging the submarine material to the sea surface side to enable exposure of the submarine cable, a compressor (200) for supplying high pressure air to the air lift unit (100) A ship moving step of moving a ship having a lifting means (300) for moving the lift unit (100) to a destination; An air lift unit descent preparation step for connecting the compressor (200) and the lifting means (300) to the air lift unit (100) in the ship after the vessel moving step; An air lift unit lowering step of lowering the air lift unit 100 to the submarine cable side by operating lifting means 300 after the air lift unit lowering preparation step; And a submarine cable exposure step of exposing the submarine cable by operating the air lift unit (100), the compressor (200), and the lifting means (300) through the air lift unit descending step,
The air lift unit 100 includes a suction pipe 111a having a suction port 111a for sucking seabed material and having one end connected to the air hose 210 connected to the compressor 200 and the other end connected to the inside An air lift 110 connected to the discharge port 111c of the pipe 111 and configured to guide a sea bed material discharged by the high pressure air to the sea level side, At least one of which is assembled,
A plurality of the air lifts 110 are welded to the outer circumferential surface of the gap maintaining member 130 and the air lift units 100 are formed by being welded to each other between the air lifts 110 by an auxiliary gap holding member 140 A fixing member 150 surrounding the periphery of the air lift unit 100 is coupled to the air lift unit 100 and a comb 111a-1 is welded to the air inlet 111a in a cross shape. A method of exposing buried submarine cables.
삭제delete 제1항에 있어서,
상기 에어리프트 유닛 하강단계 이전에는,
상기 에어리프트 유닛(100)을 해저케이블 측으로 안내하는 가이드로프와 연결된 무게추를 하강시키고, 상기 가이드로프와 에어리프트 유닛(100)을 연결하는 무게추 하강단계가 수행되는 것을 특징으로 하는 매설된 해저케이블을 노출시키는 방법.
The method according to claim 1,
Prior to the step of descending the air lift unit,
Wherein the weighing descent step of lowering the weight connected to the guide rope for guiding the air lift unit (100) to the submarine cable side and connecting the guide rope to the air lift unit (100) is performed. How to expose cables.
제1항에 있어서,
상기 에어리프트 유닛(100)은 인양수단(300)에 연결된 인양로프(310)와 연결되되, 상기 인양로프(310)는 에어리프트 유닛(100)의 둘레에 길이방향으로 복수의 매듭을 형성하면서 연결되는 것을 특징으로 하는 매설된 해저케이블을 노출시키는 방법.
The method according to claim 1,
The air lift unit 100 is connected to a lifting rope 310 connected to the lifting means 300. The lifting rope 310 forms a plurality of knots in the longitudinal direction around the air lift unit 100, Wherein the exposed submarine cable is exposed.
제4항에 있어서
상기 인양로프(310)의 일측에는 부이가 설치되는 것을 특징으로 하는 매설된 해저케이블을 노출시키는 방법.
The method of claim 4, wherein
And a buoy is installed on one side of the lifting rope (310).
KR1020140061577A 2014-05-22 2014-05-22 Method of expose to submarine cables that were laid under ocean floor or water floor KR101555948B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140061577A KR101555948B1 (en) 2014-05-22 2014-05-22 Method of expose to submarine cables that were laid under ocean floor or water floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140061577A KR101555948B1 (en) 2014-05-22 2014-05-22 Method of expose to submarine cables that were laid under ocean floor or water floor

Publications (1)

Publication Number Publication Date
KR101555948B1 true KR101555948B1 (en) 2015-09-25

Family

ID=54249172

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140061577A KR101555948B1 (en) 2014-05-22 2014-05-22 Method of expose to submarine cables that were laid under ocean floor or water floor

Country Status (1)

Country Link
KR (1) KR101555948B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108879491A (en) * 2018-06-28 2018-11-23 武汉船用机械有限责任公司 A kind of sea cable laying method and cloth cable system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100882397B1 (en) * 2000-09-07 2009-02-05 글로발 마린 시스템즈 리미티드 Method and apparatus for accessing underwater cables or pipes

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100882397B1 (en) * 2000-09-07 2009-02-05 글로발 마린 시스템즈 리미티드 Method and apparatus for accessing underwater cables or pipes

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108879491A (en) * 2018-06-28 2018-11-23 武汉船用机械有限责任公司 A kind of sea cable laying method and cloth cable system

Similar Documents

Publication Publication Date Title
CN109790697B (en) Assembly and method for installing subsea cables
KR101551888B1 (en) Method and apparatus for salvage submerged ship
CN105638532A (en) Submerged net cage
KR101712514B1 (en) Structure for working of sunken vessel
CN110185057B (en) Tool and construction method for lifting and erecting steel pipe piles of offshore wind power single pile foundation
KR101555948B1 (en) Method of expose to submarine cables that were laid under ocean floor or water floor
KR101555953B1 (en) Method of expose to submarine cables that were laid under ocean floor or water floor
EP2348825B1 (en) A device for treatment of fish in net cages
KR101643730B1 (en) Apparatus for salvage submerged ship
KR101411946B1 (en) Vessel stopping device
DK2898351T3 (en) PROCEDURE AND APPARATUS FOR SHIELDING OF UNDERWEAR NOISE
KR101555957B1 (en) Method of recover to submarine cables that were laid under ocean floor or water floor
KR101281652B1 (en) Offshore plant anchoring method using vessel with caisson pipe
KR101281654B1 (en) Anchoring method of vessel with caisson pipe
KR101324118B1 (en) Ice management method using vessel with caisson pipe
CN101169196A (en) Waterborne bionic grass mat installation method
KR100365260B1 (en) A pulling up method of sunken body under the sea , and the pulling up apparatus thereof
CN104092153A (en) Method for allowing plurality of submarine cables to penetrate through same J-shaped pipe
KR101576852B1 (en) Jack up rig towing gear installation method, and system thereof
CN216601283U (en) Net body lifting structure of flexible deep sea ocean farming equipment
CN216689417U (en) Scalable flexible accurate delivery device
JPH11180393A (en) Diving apparatus system
KR101346258B1 (en) Vessel with caisson pipe
NO347962B1 (en) Fish farm
JP2009174196A (en) Dredging apparatus

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20180619

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20190618

Year of fee payment: 5