KR101515441B1 - Construction method of stone mat for river - Google Patents

Construction method of stone mat for river Download PDF

Info

Publication number
KR101515441B1
KR101515441B1 KR1020130068409A KR20130068409A KR101515441B1 KR 101515441 B1 KR101515441 B1 KR 101515441B1 KR 1020130068409 A KR1020130068409 A KR 1020130068409A KR 20130068409 A KR20130068409 A KR 20130068409A KR 101515441 B1 KR101515441 B1 KR 101515441B1
Authority
KR
South Korea
Prior art keywords
net
binding
stone
line
overlapping portion
Prior art date
Application number
KR1020130068409A
Other languages
Korean (ko)
Other versions
KR20140145803A (en
Inventor
주정숙
우한식
Original Assignee
주식회사 한원이엔씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한원이엔씨 filed Critical 주식회사 한원이엔씨
Priority to KR1020130068409A priority Critical patent/KR101515441B1/en
Publication of KR20140145803A publication Critical patent/KR20140145803A/en
Application granted granted Critical
Publication of KR101515441B1 publication Critical patent/KR101515441B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

본 발명은 호안, 하상보호공 및 세굴방지공 등 각종 하천 공사에 활용되는 돌매트에 관한 것으로, 금속제 망체(網體) 사이에 사석, 쇄석 또는 호박돌 등의 석재(10)가 포설되어 구성되는 돌매트를 시공함에 있어서, 포설된 석재(10) 상부 및 하부에 각각 전개되는 상부망(22)과 하부망(21)을 다수의 선회링(41)이 형성된 결속선(40)을 통하여 결속함으로써, 공구 사용이 필수적으로 요구되는 체결나사(39) 등의 연결수단 없이도 상부망(22)과 하부망(21)을 신속하고 견고하게 결속할 수 있도록 한 것이다.
본 발명을 통하여, 하천 공사용 돌매트의 시공 편의성을 획기적으로 향상시킬 수 있으며, 이로써 해당 공사의 공기를 단축하고 공사비를 절감하는 효과를 얻을 수 있다.
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a stone mat for use in various river constructions such as a revetment, a bed protection hole, and a scour prevention ball, and more particularly to a stone mat comprising a stone 10 made of stones, The upper net 22 and the lower net 21 deployed on the top and the bottom of the laid stone 10 are bound together through the binding line 40 in which the plurality of turning rings 41 are formed, So that the upper net 22 and the lower net 21 can be quickly and firmly connected without a connecting means such as a fastening screw 39 required to use a tool.
According to the present invention, it is possible to remarkably improve the ease of installation of the stone mat for river construction, thereby reducing the air of the construction and reducing the construction cost.

Description

하천 공사용 돌매트의 시공방법{CONSTRUCTION METHOD OF STONE MAT FOR RIVER}Technical Field [0001] The present invention relates to a method of constructing a stone mat for a river construction,

본 발명은 호안, 하상보호공 및 세굴방지공 등 각종 하천 공사에 활용되는 돌매트에 관한 것으로, 금속제 망체(網體) 사이에 사석, 쇄석 또는 호박돌 등의 석재(10)가 포설되어 구성되는 돌매트를 시공함에 있어서, 포설된 석재(10) 상부 및 하부에 각각 전개되는 상부망(22)과 하부망(21)을 다수의 선회링(41)이 형성된 결속선(40)을 통하여 결속함으로써, 공구 사용이 필수적으로 요구되는 체결나사(39) 등의 연결수단 없이도 상부망(22)과 하부망(21)을 신속하고 견고하게 결속할 수 있도록 한 것이다.
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a stone mat for use in various river constructions such as a revetment, a bed protection hole, and a scour prevention ball, and more particularly to a stone mat comprising a stone 10 made of stones, The upper net 22 and the lower net 21 deployed on the top and the bottom of the laid stone 10 are bound together through the binding line 40 in which the plurality of turning rings 41 are formed, So that the upper net 22 and the lower net 21 can be quickly and firmly connected without a connecting means such as a fastening screw 39 required to use a tool.

호안(護岸), 하상보호공(河床保護工) 및 세굴방지공(洗掘防止工) 등 각종 하천 공사에 활용되는 돌매트는 도 1에서와 같이, 금속제 망체인 하부망(21)이 설치 지점 지면에 전개되어 고정핀(29) 등으로 고정되고, 하부망(21) 상면에 다수의 석재(10)가 포설되며, 포설된 석재(10) 상면에 금속제 망체인 상부망(22)이 적층되어 포설된 석재(10)를 지지하도록 구성된다.As shown in FIG. 1, a stone mat used for various river constructions such as a revetment, a riverbed protection, and a scour prevention work is constructed such that a metal net chain lower net 21 is installed at an installation point A plurality of stones 10 are installed on the upper surface of the lower net 21 and a metal net upper net 22 is stacked on the upper side of the installed stones 10 And is configured to support the laid stone 10.

즉, 금속제 망체인 상부망(22) 및 하부망(21) 사이에 다수의 석재(10)가 충전되어 매트형태로 설치되는 구조물로서, 도 1에 도시되지는 않았으나, 하부망(21)과 지면 사이에 부직포 등의 기반재가 추가될 수도 있으며, 하부망(21)의 외곽부 및 하부망(21) 내부에 간헐적으로 고정핀(29)이 타입(打入)되어 하부망(21)이 지면에 고정되고, 석재(10)를 덮는 상부망(22)과 하부망(21) 사이에는 도 1의 타원내 확대부에서와 같이, 체결나사(39) 등의 결속수단이 체결되어 석재(10)의 이탈 및 유실을 방지하고 돌매트의 형태 및 구조를 유지하게 된다.That is, a structure in which a plurality of stones 10 are filled between a metal mesh upper network 22 and a lower mesh 21 and is installed in a mat form. Although not shown in FIG. 1, A fixing pin 29 is intermittently inserted into the outer frame of the lower net 21 and the lower net 21 to form the lower net 21 on the ground, A binding means such as a fastening screw 39 is fastened between the upper net 22 and the lower net 21 which cover the stone 10 and the like in the enlarged part of the ellipse of Fig. Escape and loss, and maintain the shape and structure of the stone mat.

이러한 돌매트 관련 종래기술로는 특허 제754979호를 들 수 있다.
A related art related to such a stone mat is a patent No. 754979.

전술한 바와 같이, 특허 제754979호를 비롯하여 하천 구조물에 적용되는 종래의 돌매트에서는 돌매트를 구성하는 석재(10)가 상부망(22)에 의하여 지면에 고정되는 구조로서, 상부망(22)과 하부망(21)은 체결나사(39)를 통하여 상호 결속되게 된다.As described above, in the conventional stone mat applied to the river structure including the patent 754979, the stone 10 constituting the stone mat is fixed to the ground by the upper net 22, And the lower net 21 are fastened to each other through the fastening screws 39.

즉, 도 1의 타원내 확대부에서와 같이, 상부망(22)과 하부망(21)에 결합되는 클립 또는 와셔 등의 부착물을 체결나사(39)를 통하여 체결하는 방식으로서, 하부망(21) 상부에 이미 석재(10)가 포설된 상태에서 극히 협소한 석재(10)간 공극에 체결나사(39)를 투입하여 체결나사(39)의 두부(頭部)를 하부망(21)에 결속하고, 상부망(22) 상측으로 돌출된 체결나사(39)의 상단에 너트를 결합하는 방식으로 시공이 진행되는 바, 그 공정이 지극히 복잡할 뿐 아니라 고도로 숙련된 인력이 다수 소요될 수 밖에 없어 장기간의 공기와 막대한 공사비가 소요되는 문제점이 있었다.That is, as in the case of the enlarged portion in the ellipse of FIG. 1, as a method of fastening the attachment such as a clip or a washer to the upper net 22 and the lower net 21 through the fastening screw 39, The fastening screw 39 is inserted into the gap between the extremely small stone 10 in the state where the stone 10 is already placed on the upper portion of the lower portion 21 of the lower portion 21, And the nut is joined to the upper end of the fastening screw 39 protruding above the upper web 22. The process is extremely complicated and requires a large number of highly skilled human labor. Air and an enormous construction cost.

특히, 도 1의 타원내 확대부에 도시된 바와 같이, 시공이 완료된 후 체결나사(39)의 상단 일부가 돌출될 수 밖에 없는 구조로서, 안전사고의 위험이 있을 뿐 아니라, 돌매트로 구축된 구조물의 경관을 심각하게 훼손하는 문제점이 있었다.Particularly, as shown in an enlarged portion in an ellipse in FIG. 1, there is a risk of a safety accident as a structure in which a part of the upper end of the fastening screw 39 is forced to protrude after the completion of construction, There has been a problem of severely damaging the landscape of the structure.

또한, 돌매트가 적용된 구조물의 노출면이 석재(10)와 금속제 상부망(22)으로만 구성되는 바, 수변식물의 신속한 활착에 적합한 환경을 제공할 수 없는 심각한 문제점이 있었다.
In addition, since the exposed surface of the structure to which the stone mat is applied is composed only of the stone 10 and the metal upper net 22, there is a serious problem that it is not possible to provide an environment suitable for rapid establishment of a waterside plant.

본 발명은 전술한 문제점을 감안하여 창안된 것으로, 지면에 전개된 하부망(21) 상부에 석재(10)가 포설되고 석재(10) 상부에 상부망(22)이 전개되며 상부망(22)과 하부망(21)이 결속되는 하천 공사용 돌매트의 시공방법에 있어서, 돌매트 설치 계획 지점에 하부망(21)을 전개하고 석재(10)를 포설하는 포설단계(S10)와, 포설된 석재(10) 상부에 상부망(22)을 전개하여 적층하는 적층단계(S21)와, 금속제 탄성 선재(線材)로서 선재가 원형으로 절곡되고 중첩부(42)가 밀착되는 선회링(41) 다수가 형성된 결속선(40)을 하부망(21)에 결속하되, 결속선(40) 하측 선회링(41)의 중첩부(42)를 벌려 하부망(21)을 선회링(41) 내부로 투입함으로써 결속선(40)과 하부망(21)을 결속하는 하부결속단계(S22)와, 상기 결속선(40)을 상부망(22)에 결속하되, 결속선(40) 상측 선회링(41)의 중첩부(42)를 벌려 상부망(22)을 선회링(41) 내부로 투입함으로써 결속선(40)과 상부망(22)을 결속하는 상부결속단계(S30)로 이루어짐을 특징으로 하는 하천 공사용 돌매트의 시공방법이다.SUMMARY OF THE INVENTION The present invention has been made in view of the above problems and has an object of providing a method of manufacturing a stonewall 10 in which a stone 10 is installed on an upper portion of a lower net 21 spread on a ground, (10) is laid out at a point where a stone mat is to be installed and a lower wall (21) is laid at a point where a stone mat is to be installed, and a step (S10) A lamination step S21 for spreading and laminating the upper web 22 on the upper side of the base 10 and a plurality of turning rings 41 in which the wire rod is bent as a metallic elastic wire material and the overlapping portion 42 is closely contacted The binding wire 40 formed is bound to the lower net 21 and the overlapping portion 42 of the lower binding ring 41 of the binding line 40 is opened to inject the lower net 21 into the orbiting ring 41 A lower binding step S22 for binding the binding line 40 and the lower web 21 and a lower binding step S22 for binding the binding line 40 to the upper web 22, The overlapping portion 42 And an upper binding step (S30) for binding the upper net (22) to the binding line (40) by injecting the upper net (22) into the swirling ring (41) .

또한, 상기 결속선(40)의 하단에는 후크(43)가 형성되고, 결속선(40)과 하부망(21)을 결속하는 하부결속단계(S22)는 결속선(40) 하단의 후크(43)로 하부망(21)을 포착함으로써 수행됨을 특징으로 하는 하천 공사용 돌매트의 시공방법이자, 상기 결속선(40)은 내경이 결속선(40)의 직경과 일치하는 관체(管體)인 결합관(44)에 결합되되, 결속선(40)의 일 단부에 나사선이 형성되고, 결합관(44)의 내주면에 나사선이 형성되어, 결합관(44)의 양단에 각각 결속선(40)이 나사 결합되고, 결합관(44)을 회전함에 따라 결속선(40)이 삽입 및 돌출됨을 특징으로 하는 하천 공사용 돌매트의 시공방법이며, 상기 상부망(22)은 금속제 심선(25) 외주면을 천연섬유제 피복(26)이 포위하여 구성된 강화천연로프(24)로 편성됨을 특징으로 하는 하천 공사용 돌매트의 시공방법이다.
A hook 43 is formed at the lower end of the binding line 40 and a lower binding step S22 for binding the binding line 40 and the lower net 21 is provided with hooks 43 (40) having a diameter equal to the diameter of the bundling line (40), and the binding line (40) is formed by capturing the lower net (21) A screw thread is formed at one end of the binding wire 40 and a screw thread is formed on the inner circumferential surface of the coupling pipe 44 so that a binding wire 40 is wound on both ends of the coupling pipe 44 And the coupling line (44) is inserted and protruded as the coupling line (44) is rotated. The upper net (22) is formed by inserting the outer peripheral surface of the metal core wire (25) And a reinforcing natural rope (24) formed by surrounding the fibrous covering (26).

본 발명을 통하여, 하천 공사용 돌매트의 시공 편의성을 획기적으로 향상시킬 수 있으며, 이로써 해당 공사의 공기를 단축하고 공사비를 절감하는 효과를 얻을 수 있다.According to the present invention, it is possible to remarkably improve the ease of installation of the stone mat for river construction, thereby reducing the air of the construction and reducing the construction cost.

특히, 돌매트를 구성하는 상부망(22) 및 하부망(21)간 결속지점을 대폭 증설할 수 있으므로 돌매트 적용 시설물의 견고한 구축이 가능할 뿐 아니라, 완공 후 돌매트 상측으로 체결나사(39)가 노출될 수 밖에 없는 종래기술의 문제점을 해결함으로써, 돌출물로 인한 안전사고를 예방하고 돌매트 적용 시설물의 경관을 개선하는 효과를 얻을 수 있다.
In particular, since the binding points between the upper net 22 and the lower net 21 constituting the stone mat can be greatly enlarged, it is possible to firmly construct the facilities for applying the stone mat, It is possible to prevent safety accidents caused by protrusions and to improve the appearance of a stone mat applying facility.

도 1은 종래의 돌매트 시공상태 예시도
도 2는 본 발명을 통하여 시공되는 돌매트의 분해사시도
도 3은 본 발명을 통하여 시공된 돌매트의 대표 단면도
도 4는 본 발명에 적용되는 결속선의 부분절단 사시도
도 5는 본 발명의 흐름도
도 6은 후크가 형성된 본 발명의 결속선 일 실시예 사시도
도 7은 결합관이 적용된 본 발명 결속선 일 실시예 사시도
도 8은 강화천연로프가 적용된 본 발명의 상부망 일 실시예 사시도
FIG. 1 is a drawing showing an example of a state of a conventional stone mat construction
Fig. 2 is an exploded perspective view of a stone mat applied through the present invention. Fig.
Figure 3 is a representative cross-sectional view of a stone mat constructed through the present invention
Fig. 4 is a partially cutaway perspective view of a binding line used in the present invention. Fig.
5 is a flow chart
FIG. 6 is a perspective view of a binding wire according to the present invention,
FIG. 7 is a perspective view of a binding wire according to the present invention to which a coupling tube is applied.
Figure 8 is a top view of the present invention with reinforced natural rope applied.

본 발명의 상세한 구성 및 수행과정을 첨부된 도면을 통하여 설명하면 다음과 같다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

우선, 도 2는 본 발명을 통하여 시공되는 돌매트의 분해사시도로서, 도시된 바와 같이, 본 발명이 적용된 돌매트는 설치지점에 전개되는 하부망(21), 하부망(21) 상부에 포설되는 석재(10), 석재(10) 상부에 적층되는 상부망(22) 및 상부망(22)과 하부망(21)을 결속하는 결속선(40)으로 구성된다.2 is an exploded perspective view of a stone mat constructed through the present invention. As shown in FIG. 2, a stone mat to which the present invention is applied includes a lower net 21 deployed at an installation site, A stone 10, an upper net 22 stacked on the stone 10, and a binding line 40 binding the upper net 22 and the lower net 21. [

즉, 도 3에서와 같이, 본 발명에 있어서, 상부망(22)과 하부망(21)을 결속하는 결속선(40)은 다수의 선회링(41)이 형성된 금속제 탄성 선재(線材)로서, 선회링(41)에 상부망(22) 및 하부망(21)이 투입되는 방식으로 상부망(22) 및 하부망(21)간 결속이 이루어진다.3, the binding wire 40 for binding the upper web 22 and the lower web 21 is a metal elastic wire formed of a plurality of pivot rings 41, The binding between the upper net 22 and the lower net 21 is performed in such a manner that the upper net 22 and the lower net 21 are inserted into the turning ring 41. [

도 4는 본 발명에 적용되는 결속선(40)을 상세히 도시한 부분절단 사시도로서, 동 도면에 도시된 바와 같이, 금속제 탄성 선재인 결속선(40)은 원형으로 절곡되어 중첩부(42)가 밀착되는 일종의 이형스프링(異形spring)으로서, 선회링(41)을 형성하는 중첩부(42)가 밀착된 상태로 제작되며, 중첩부(42) 상, 하측에 역방향의 외력이 작용하면 중첩부(42)가 이격되고, 외력이 제거되면 선회링(41) 및 중첩부(42)의 탄성에 의하여 중첩부(42)가 밀착상태로 복원된다.4 is a partially cutaway perspective view showing the binding wire 40 applied to the present invention in detail. As shown in the figure, the binding wire 40, which is a metal elastic wire, is bent in a circular shape so that the superposed portion 42 The overlapping portion 42 forming the swing ring 41 is in close contact with the overlapping portion 42. When a reverse external force acts on the overlapping portion 42 in the downward direction, 42 are separated from each other. When the external force is removed, the overlapping portion 42 is restored to the close contact state by the elasticity of the turning ring 41 and the overlapping portion 42.

따라서, 결속선(40)과 상부망(22) 또는 하부망(21)의 결속 작업시, 작업자가 중첩부(42) 주변의 결속선(40)을 벌려 선회링(41)을 개방하고, 상부망(22) 또는 하부망(21)을 구성하는 망선(網線)을 선회링(41) 내부로 투입한 후 중첩부(42)를 밀착상태로 복원시킴으로써, 별도의 공구 없이도 신속하고 간편하게 결속선(40)과 상부망(22) 또는 하부망(21)을 결속할 수 있게 된다.Therefore, in the binding operation of the binding line 40 and the upper web 22 or the lower web 21, the operator opens the binding line 40 around the overlapping portion 42 to open the vortex ring 41, The mesh line 22 constituting the mesh 22 or the mesh 21 is put into the orbiting ring 41 and the overlapped portion 42 is restored to the close contact state. (40) and the upper network (22) or the lower network (21).

이렇듯 결속선(40)을 통하여 돌매트의 신속하고 간편한 시공이 가능하며, 이러한 본 발명의 수행과정이 도 5에 도시되어 있다.The quick and easy construction of the stone mat is possible through the binding line 40, and the process of the present invention is shown in FIG.

도 5에서와 같이, 본 발명은 우선 돌매트 설치 계획 지점에 하부망(21)을 전개하고 석재(10)를 포설하는 포설단계(S10)로 개시된다.As shown in FIG. 5, the present invention starts with an installation step S10 in which a lower net 21 is expanded at a stone mat installation planning point and a stone 10 is installed.

돌매트 설치 계획 지점에 전개된 하부망(21)은 도 3에서와 같이, 고정핀(29)을 타입하는 방식 등으로 지면에 고정될 수 있으며, 이러한 고정핀(29)은 추후 상부망(22)이 적층된 후에도 상부망(22)과 하부망(21)이 중첩되는 돌매트의 외곽부에 추가로 타입될 수도 있다.3, the lower net 21 deployed on the stone mat installation planning point can be fixed to the ground by a method of using a fixing pin 29, The upper net 22 and the lower net 21 may be further added to the outer portion of the overlapping stone mat.

석재(10)의 포설이 완료되면 포설된 석재(10) 상부에 상부망(22)을 전개하여 적층하는 적층단계(S21)가 수행된다.When the installation of the stone 10 is completed, a laminating step S21 is performed in which the upper net 22 is laid over the laid stone 10 and laminated.

석재(10) 상부에 밀착되는 상부망(22)으로는 석재(10)의 유실 또는 이탈을 방지할 수 있도록 석재(10)의 직경 이하의 망목(網目)을 가지는 망체를 적용하는 것이 바람직하다.It is preferable to apply a net having a mesh smaller than the diameter of the stone 10 so as to prevent the stone 10 from leaking or escaping to the upper net 22 adhered to the upper portion of the stone 10.

상부망(22)의 전개 및 적층이 완료되면, 전술한 바와 같이 금속제 탄성 선재(線材)로서 선재가 원형으로 절곡되고 중첩부(42)가 밀착되는 선회링(41) 다수가 형성된 결속선(40)을 하부망(21)에 결속하되, 결속선(40) 하측 선회링(41)의 중첩부(42)를 벌려 하부망(21)을 선회링(41) 내부로 투입함으로써 결속선(40)과 하부망(21)을 결속하는 하부결속단계(S22)가 수행된다.When the development and stacking of the upper net 22 is completed, the wire bundle 40 is bent as a metal elastic wire material as described above, and the bundle 42 is brought into close contact with the bundling line 40 And the lower net 21 is inserted into the turning ring 41 by opening the overlapping portion 42 of the lower turning ring 41 of the binding line 40, And a lower binding step (S22) for binding the lower net (21) are performed.

이러한 하부결속단계(S22)에 있어서, 본 발명에서는 종래기술에서와 같은 체결나사(39)의 두부(頭部) 체결 및 클립 등 부속 금구의 부착 공정이 일체 필요하지 않으며, 결속선(40)의 선회링(41)을 하부망(21)에 결속하는 간단한 조작만으로 작업이 가능하므로, 시공 편의성 및 작업 속도를 획기적으로 개선할 수 있다.In this lower binding step S22, in the present invention, it is not necessary to completely fasten the head of the fastening screw 39 and to attach the fitting such as a clip as in the prior art, It is possible to work with only a simple operation of binding the revolving ring 41 to the lower net 21, thereby making it possible to drastically improve the convenience of the construction and the operation speed.

이렇듯, 본 발명에서는 하부망(21)과 결속선(40)간 간편한 결속이 가능하나, 결속선(40)의 결속작업이 포설된 석재(10) 사이의 협소한 공간에서 진행되는 바, 도 6에서와 같이, 하단에 후크(hook)(43)가 형성된 결속선(40)을 적용하여, 후크(43)에 하부망(21)의 망선을 거는 동작만으로 결속이 가능하도록 하부결속단계(S22)를 수행할 수도 있다.As described above, in the present invention, it is possible to easily bind the lower net 21 and the binding line 40, but the binding operation of the binding line 40 proceeds in a narrow space between the installed stones 10, A binding line 40 having a hook 43 at the lower end thereof is applied to the lower binding step S22 so as to bind the hook of the lower net 21 only to the hook 43, .

하단에 후크(43)가 형성된 결속선(40)을 적용하여 하부망(21)을 포착하는 경우에도, 최종적으로 결속선(40)의 상부가 상부망(22)에 결속되는 과정에서 결속선(40)에 인장력이 작용하여 긴장상태가 유지되므로, 결속선(40)의 하부망(21) 이탈이 효과적으로 억제될 수 있다.Even when the binding wire 40 having the hook 43 at the lower end is applied to catch the lower web 21, the upper end of the binding wire 40 is finally bound to the upper web 22, 40, tension is maintained, so that the release of the binding wire 40 from the lower web 21 can be effectively suppressed.

하부결속단계(S22)가 완료되면, 상기 결속선(40)을 상부망(22)에 결속하되, 결속선(40) 상측 선회링(41)의 중첩부(42)를 벌려 상부망(22)을 선회링(41) 내부로 투입함으로써 결속선(40)과 상부망(22)을 결속하는 상부결속단계(S30)가 수행되고, 이로써 상부망(22)과 하부망(21)이 견고하게 결속된다.When the lower binding step S22 is completed, the binding line 40 is bound to the upper web 22, and the overlapping portion 42 of the upper binding ring 41 of the binding line 40 is opened to form the upper web 22, An upper binding step S30 for binding the binding wire 40 and the upper web 22 is carried out by injecting the upper web 22 and the lower web 21 into the revolving ring 41. As a result, do.

또한, 도 7은 결속선(40)의 전체 길이를 조절할 수 있도록 한 것으로, 결속선(40)과 나사결합되는 결합관(44)을 구성하여, 결속선(40) 또는 결합관(44)을 회전시킴에 따라 전체 결속선(40)이 신축될 수 있도록 한 것이다.7 is a perspective view showing a state in which the coupling line 44 is screwed with the coupling line 40 so that the coupling line 44 or the coupling line 44 And the entire binding line 40 can be stretched and contracted by rotating.

즉, 결속선(40)을 내경이 결속선(40)의 직경과 일치하는 관체(管體)인 결합관(44)에 결합하되, 결속선(40)의 일 단부에 나사선을 형성하고, 결합관(44)의 내주면에도 나사선을 형성하여, 결합관(44)의 양단에 각각 결속선(40)이 나사 결합되고, 결합관(44)을 회전함에 따라 결속선(40)이 삽입 및 돌출될 수 있도록 한 것이다.That is, the binding wire 40 is bonded to the coupling pipe 44, which is a tube whose inner diameter coincides with the diameter of the binding wire 40, in which a screw thread is formed at one end of the binding wire 40, The inner circumferential surface of the pipe 44 is threaded so that the binding wire 40 is screwed to both ends of the coupling pipe 44 and the binding wire 40 is inserted and protruded as the coupling pipe 44 rotates .

한편, 도 8은 상부망(22)을 구성함에 있어서 상부망(22)의 망선을 천연섬유로 피복(26)하여 수변식물의 활착을 촉진한 것으로, 도 8의 발췌 확대부에서와 같이, 금속제 심선(25) 외주면을 천연섬유제 피복(26)이 포위하여 구성된 강화천연로프(24)로 상부망(22)이 편성된다.8 is a view showing a state in which the mesh of the upper net 22 is coated with natural fibers 26 to facilitate the activation of the waterside plant in constructing the upper net 22, The upper net 22 is knitted with the reinforcing natural rope 24 formed by surrounding the outer circumferential surface of the core wire 25 with the natural fiber cloth 26.

이러한 강화천연로프(24)에 있어서 피복(26)의 소재로는 황마(黃麻) 또는 코이어(coir) 등의 천연섬유가 적용되며, 이로써 석재(10)를 지지하는 상부망(22)의 강도는 유지하면서도 상부망(22)에 보습성 및 다공성을 부여하고 식물의 활착을 촉진할 수 있다.Natural fibers such as jute or coir are applied to the reinforcing natural rope 24 as a material of the covering 26 so that the upper nets 22 supporting the stone 10 It is possible to impart moisture retention and porosity to the upper net 22 while promoting strength, and promote planting.

특히, 천연섬유 피복(26)에 식생 대상 식물의 종자를 식재함으로써, 별도의 파종 또는 이식 작업 없이도 식생 식물종을 선택하여 적용할 수 있을 뿐 아니라 활착률 및 녹화 효과를 제고할 수 있다.
In particular, by planting the seeds of the plants to be planted in the natural fiber covering 26, it is possible to select and apply vegetation plant species without additional seeding or transplanting work, and to increase the survival rate and greening effect.

10 : 석재
21 : 하부망
22 : 상부망
24 : 강화천연로프
25 : 심선
26 : 피복
29 : 고정핀
39 : 체결나사
40 : 결속선
41 : 선회링
42 : 중첩부
43 : 후크
44 : 결합관
10: Stone
21:
22: upper network
24: Reinforced natural rope
25: core wire
26: Cloth
29: Fixing pin
39: Clamping screw
40: Bond line
41: turning ring
42:
43: Hook
44: Coupling tube

Claims (4)

지면에 전개된 하부망(21) 상부에 석재(10)가 포설되고 석재(10) 상부에 상부망(22)이 전개되며 상부망(22)과 하부망(21)이 결속되는 하천 공사용 돌매트의 시공방법으로서, 돌매트 설치 계획 지점에 하부망(21)을 전개하고 석재(10)를 포설하는 포설단계(S10)와, 포설된 석재(10) 상부에 상부망(22)을 전개하여 적층하는 적층단계(S21)가 포함되는 하천 공사용 돌매트의 시공방법에 있어서,
금속제 탄성 선재(線材)로서 선재가 원형으로 절곡되고 중첩부(42)가 밀착되는 선회링(41) 다수가 형성된 결속선(40)을 하부망(21)에 결속하되, 결속선(40) 하측 선회링(41)의 중첩부(42)를 벌려 하부망(21)을 선회링(41) 내부로 투입하고 중첩부(42)의 탄성에 의하여 중첩부(42)가 밀착상태로 복원되도록 함으로써 결속선(40)과 하부망(21)을 결속하는 하부결속단계(S22)와;
상기 결속선(40)을 상부망(22)에 결속하되, 결속선(40) 상측 선회링(41)의 중첩부(42)를 벌려 상부망(22)을 선회링(41) 내부로 투입하고 중첩부(42)의 탄성에 의하여 중첩부(42)가 밀착상태로 복원되도록 함으로써 결속선(40)과 상부망(22)을 결속하는 상부결속단계(S30)를 통하여;
하부망(21)과 상부망(22)이 연결됨을 특징으로 하는 하천 공사용 돌매트의 시공방법.
A stone 10 is installed on the upper part of the lower net 21 spread on the ground and the upper net 22 is spread on the stone 10 and the upper net 22 and the lower net 21 are bound together. (10) is laid out by deploying a lower net (21) at a location where the stone mat is to be installed, and a step (10) of spreading the upper net (22) And a laminating step (S21) for making a stone mat for a river construction,
The wire bundle is bent into a circular shape as a metallic elastic wire material and the binding wire 40 having a plurality of revolving rings 41 in which the overlapping portions 42 are closely contacted is bound to the lower net 21, The overlapped portion 42 of the revolving ring 41 is opened and the lower net 21 is put into the revolving ring 41 so that the overlapping portion 42 is restored to the close state by the elasticity of the overlapping portion 42, A lower binding step S22 for binding the line 40 and the lower net 21;
The upper net 22 is inserted into the orbiting ring 41 by opening the overlapping portion 42 of the upper turn ring 41 of the binding line 40 while binding the binding line 40 to the upper net 22 Through an upper binding step S30 for binding the binding line 40 and the upper web 22 so that the overlapping portion 42 is restored to the close state by the elasticity of the overlapping portion 42;
Wherein the lower net (21) and the upper net (22) are connected to each other.
삭제delete 삭제delete 청구항 1에 있어서, 상부망(22)은 금속제 심선(25) 외주면을 천연섬유제 피복(26)이 포위하여 구성된 강화천연로프(24)로 편성됨을 특징으로 하는 하천 공사용 돌매트의 시공방법.The method of claim 1, wherein the upper net (22) is knitted with a reinforced natural rope (24) formed by surrounding the outer surface of the metal core wire (25) with a natural fibrous covering (26).
KR1020130068409A 2013-06-14 2013-06-14 Construction method of stone mat for river KR101515441B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130068409A KR101515441B1 (en) 2013-06-14 2013-06-14 Construction method of stone mat for river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130068409A KR101515441B1 (en) 2013-06-14 2013-06-14 Construction method of stone mat for river

Publications (2)

Publication Number Publication Date
KR20140145803A KR20140145803A (en) 2014-12-24
KR101515441B1 true KR101515441B1 (en) 2015-05-04

Family

ID=52675429

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130068409A KR101515441B1 (en) 2013-06-14 2013-06-14 Construction method of stone mat for river

Country Status (1)

Country Link
KR (1) KR101515441B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12043973B2 (en) 2017-08-31 2024-07-23 Wilkinson Ecological Design Erosion control apparatus
CN114622519B (en) * 2022-03-23 2024-07-12 湖北三峡职业技术学院 River side slope concrete ecological slope protection anti-slip system and paving equipment and method

Also Published As

Publication number Publication date
KR20140145803A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
JP6680461B2 (en) Slope protection tool and slope protection method
KR20150108404A (en) Load transfer or connector device for expanded cell confinement structures and methods for doing the same
KR101515441B1 (en) Construction method of stone mat for river
KR101200663B1 (en) Apparatus for supporting a tree capable of adjusting its length
JP5918199B2 (en) Erosion prevention method
KR200481883Y1 (en) Detachable connecting clip detachably attached to post supporting crops
KR101373904B1 (en) Floor form of construction work method using folding mat and folding mat
JP2011244755A (en) Wall surface greening structure
JP2017225430A (en) Greening mat
KR20110003537U (en) Tree Branch Supporting Device
JPH02219527A (en) Method for supporting and planting tree
JP4351183B2 (en) Supporting method for tree and fixing tool for root pot used in supporting method
JP3159897U (en) Temporary enclosure greening panel
JP2005307572A (en) Protective fence and construction method thereof
JP2006328717A (en) Grating crib constructing method and sod for use therein
JP4461126B2 (en) Earth retaining material for slope planting
US20160183479A1 (en) Vegetation protection systems
JP5861147B2 (en) Coating equipment
JP2003221818A (en) Revetment material
JP4814915B2 (en) Roof structure and planting roof formation method
KR200485322Y1 (en) Support tool for Fruit tree
CN208956556U (en) A kind of fruit tree seedlings cultivation protective fence
JP3053376U (en) Seawall
KR20180061815A (en) Vegetation Mat Structure for Reinforcing Slope
JP3209914U (en) Greening sheet

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20180410

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20190408

Year of fee payment: 5

R401 Registration of restoration