KR101505778B1 - Z-Type Grouting Line Terminal Equipment - Google Patents

Z-Type Grouting Line Terminal Equipment Download PDF

Info

Publication number
KR101505778B1
KR101505778B1 KR1020140057196A KR20140057196A KR101505778B1 KR 101505778 B1 KR101505778 B1 KR 101505778B1 KR 1020140057196 A KR1020140057196 A KR 1020140057196A KR 20140057196 A KR20140057196 A KR 20140057196A KR 101505778 B1 KR101505778 B1 KR 101505778B1
Authority
KR
South Korea
Prior art keywords
grouting
grout
fluid flow
solution
shaped fluid
Prior art date
Application number
KR1020140057196A
Other languages
Korean (ko)
Inventor
김미현
Original Assignee
김미현
오장섭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김미현, 오장섭 filed Critical 김미현
Priority to KR1020140057196A priority Critical patent/KR101505778B1/en
Application granted granted Critical
Publication of KR101505778B1 publication Critical patent/KR101505778B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • E02D3/126Consolidating by placing solidifying or pore-filling substances in the soil and mixing by rotating blades
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1671Shapes helical or spiral
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to a Z-type grouting front end apparatus, and includes: a grouting inlet part (1) of a double pipe structure where a chemical grouting inlet pipe (5) is inserted inside a cement solution inlet pipe (4); a fixing rod (9) connected to the lower side of the grouting inlet part (1) to mix chemical grouting and cement solution and vertically installed inside the grouting inlet part; a plurality of Z-type fluid flow plates (8) attached to the fixing rod (9) in a zigzag shape; a grout mixing part (2) installed in the upper side and the lower side of the fixing rod (9) and where stirring parts (16) each of which has a support (15) to support the fixing rod and the Z-type fluid flow plates (8), are installed; and a grout supply part (3) connected to the lower side of the grout mixing part (2) and wherein grout formed by mixing the chemical grouting and the cement solution to be applied to the ground.

Description

Z형 그라우팅 선단 장치{Z-Type Grouting Line Terminal Equipment}Z-type grouting line terminal equipment}

본 발명은 Z형 그라우팅 선단 장치에 관한 것으로서, 더욱 상세하게는, 건축 및 토목공사에서 제일 우선적으로 착공하는 기초 공사로서, 작업하고자하는 땅속에서 물의 흐름을 막아주는 차수벽을 형성시키는 경우나 연약지반을 보다 견고하게 하는 기초기반 등의 그라우팅 시공에서 그라우트의 성능을 보다 높이기 위하여 그라우팅 장비 중 선단장치의 내부에 설치한 혼합부를 사용하여 케미컬 그라우팅 중 케미컬 그라우팅 약액(졸)과 시멘트 수용액과의 혼합성을 보다 더 증대시켜, 그라우팅의 품질을 향상시키고, 다단으로 형성된 Z형 혼합부를 장착하여 시공함으로써, 그라우팅의 겔타임을 보다 더 효율적으로 조절하며, 그라우팅 시공을 할 수 있도록 하였고, 혼합부의 구조를 간단하게 설치하여 낮은 주입 압력으로도 그라우팅 시공을 가능케하여 비용을 절감할 수 있는 그라우팅 선단 장치에 관한 것이다.
The present invention relates to a Z-shaped grouting tip device, and more particularly, to a Z-type grouting tip device, and more particularly, to a construction work for construction and civil engineering, In order to improve the performance of the grouting in the grouting construction such as foundation foundation, it is necessary to mix the chemical grouting solution (sol) with the cement aqueous solution during the chemical grouting by using the mixing part provided inside the end device of the grouting equipment. By improving the quality of the grouting, and by installing the multi-stage Z-shaped mixer, it is possible to more effectively control the gel time of the grouting and to make the grouting work. So that grouting can be performed even at a low injection pressure It relates to a grouting tip device that can reduce the dragon.

일반적으로 건축 및 토목공사에서 제일 우선적으로 착공하는 기초공사로서, 공사하고자 하는 땅속에서 물의 흐름을 막기 위한 차수벽이나 연약지반을 보다 견고하게 하는 기초기반 등을 하기 위하여 그라우팅이란 시공을 실행한다. In general, it is the foundation work to start construction in the first place in construction and civil engineering work. In order to prevent the flow of water in the ground to be constructed, grouting is carried out in order to make the foundation wall for strengthening the water wall and soft ground.

그라우팅(Grouting) 시공법은 시공 목적에 따라 차수 그라우팅, 기초기반 그라우팅, 충진 그라우팅, 보강그라우팅 등으로 분류할 수 있다.Grouting method can be classified into order grouting, foundation-based grouting, filled grouting, and reinforced grouting depending on the construction purpose.

최근 들어, 상기와 같은 그라우팅은 대부분이 케미컬 그라우팅으로 실행되고 있다. 이러한 케미컬 그라우팅에 사용되는 그라우트는 크게 두 가지 성분으로 분류할 수 있다. In recent years, most of the above grouting is performed by chemical grouting. The grout used for such chemical grouting can be roughly divided into two components.

상기 첫 번째 성분은 주성분이 물유리(규산나트륨), 벤토나이트 등이 있으며, 이러한 주성분에 특정반응물-1이란 성분을 첨가하여, 목적하고자 하는 그라우트의 한 부분으로서 케미컬 그라우팅 약액(졸상태 : Sol)을 만들 수 있다. The first component is composed of water glass (sodium silicate), bentonite, etc., and a specific reactant-1 component is added to the main component to make a chemical grouting chemical solution (sol state: Sol) as a part of the desired grout .

또한, 상기 두 번째 성분은 시멘트에 물을 첨가하고, 이곳에 특정반응물-2를 첨가하여, 목적하고자하는 그라우트의 또 다른 부분으로써 시멘트수용액을 만들 수 있다. In addition, the second component may be prepared by adding water to the cement and adding a specific reactant-2 to another portion of the grout to be cemented.

상기 케미컬 그라우팅 약액과 시멘트수용액은 모두가 펌핑이 잘 될 수 있는 졸상태이다. 따라서, 상기 케미컬 그라우팅 약액과 시멘트수용액은 하루 이틀 정도는 제조해 놓고도 다시 사용할 수 있다. Both the chemical grouting solution and the aqueous cement solution are in a sol state in which pumping can be performed well. Therefore, the chemical grouting solution and the aqueous cement solution can be used again after being manufactured for about one day or two.

그러나 상기 케미컬 그라우팅 약액(졸상태)과 시멘트수용액(졸상태)을 한 공간(용기) 안에서 혼합하게 되면, 짧은 시간 안에 응결되어, 겔 상태 이상의 고형화 된다. However, when the chemical grouting solution (sol state) and the cement aqueous solution (sol state) are mixed in a space (vessel), they are solidified in a short time and solidified more than the gel state.

상기 케미컬 그라우팅 약액과 시멘트수용액이 혼합된 후 응결되어 겔(Gel)상태 이상으로 고형화(Solid) 되는 시간을 "겔타임(Gel-time)"이라고 한다.The time at which the chemical grouting solution and the aqueous cement solution are mixed and then solidified to a gel state or more is referred to as "gel time ".

상기 "겔타임"에 따라 급결재와 완결재로 그라우트를 분류한다. 급결재의 겔타임은 보통 5∼15초 정도이고, 완결재의 겔타임은 보통 40∼120초 정도이나 용도에 따라 그 이상의 겔타임을 갖는 것도 있다. According to the "gel time", the grout is classified by the filler and the finished material. The gel time of the sorbent material is usually about 5 to 15 seconds, and the gel time of the finished material is usually about 40 to 120 seconds, but it may have a gel time further depending on the application.

또한, 이러한 겔타임이 지난 후 "얼마나 단단한 고형물로 형성되었느냐?"에 따라 그라우팅 시공의 성공 여부가 좌우된다. Also, after such a gel time, the success of the grouting construction depends on how hard solid is formed.

상기 그라우트의 물성을 측정하는 인자인 압축강도와 투수계수가 좋아지려면, 그라우팅 시공 시 그라우팅 장비에서 혼합을 충분히하여 지반에 주입되어야 한다. 상기 혼합을 충분이 할 수 있는 곳이 그라우팅 장비에서 주입장치 끝 부분인 50cm정도(길이)의 선단장치 이다. 그러나 기존의 선단장치는 매우 복잡한 구조 형성되어 선단장치 이전까지는 유체 이동을 위한 펌핑의 압력을 저압으로 공급할 수 있으나 이곳 선단장치를 통과하기 위하여 고압으로 펌핑하여야 통과할 수 있으며, 이로 인한 운영비가 많이 드는 문제점이 있으며, 유출되는 그라우트의 량도 크게 줄어들어 작업시간도 많이 소요되는 문제점이 있다.In order to improve the compressive strength and the permeability coefficient, which are the factors for measuring the physical properties of the grout, the grouting equipment must be sufficiently mixed and injected into the ground during the grouting. It is the end device of about 50cm (length) which is the end of the injection device in the grouting equipment where the mixing can be sufficient. However, the conventional tip device is formed with a very complicated structure, and the pumping pressure for fluid movement can be supplied at a low pressure before the tip device, but it can be pumped at high pressure to pass through the tip device, There is a problem, and the amount of the grout to be drained is greatly reduced, and the operation time is also long.

따라서, 현재 현장에서는 선단장치의 복잡한 내부 구조물을 제거하고 그라우팅 시공을 하는 형편이며, 이로 인하여 케미컬 그라우팅 약액과 시멘트수용액의 혼합이 잘 이뤄지지 못하여, 원하는 만큼의 그라우트의 성상이 되지못하고 있는 상황이다.Therefore, at present, it is possible to remove the complicated inner structure of the end device and perform the grouting, and as a result, the chemical grouting solution and the aqueous cement solution can not be mixed well and the grout is not formed as much as desired.

본 발명은 상기 종래 기술의 문제점을 해결하기 위한 것으로서, 본 발명의 목적은, 그라우팅 시공 장비 중 그라우팅 주입장치 끝 부분인 선단장치 내부에 혼합부를 설치하여, 케미컬 그라우팅 약액과 시멘트수용액의 혼합을 보다 더 원활하게 하여, 견고하고 차수성이 높은 그라우팅공법으로 시공하는데 있다.SUMMARY OF THE INVENTION It is an object of the present invention to provide a mixing unit for mixing a chemical grouting chemical solution and an aqueous cement solution in a grouting apparatus, Smoothly, and is constructed by a grouting method having high rigidity and high water flowability.

본 발명의 다른 목적은, 상기 그라우팅 선단 장치에 그라우팅 시공 현장의 필요에 따라 1단, 2단, 3단으로 설치하여 케미컬 그라우팅 약액과 시멘트수용액이 완전 혼합하여 그라우트 자체의 화학적 반응으로 겔상태 이상이 되는 것을 1단, 2단, 3단으로 설치된 길이와 혼합부의 혼합비에 따라 다양한 겔타임과 혼합성을 부과하여, 보다 견고하고 차수성이 높은 그라우팅공법으로 시공하는데 있다. Another object of the present invention is to provide a grouting tip apparatus which is provided with a first stage, a second stage and a third stage in the grouting operation site as required, and the chemical grouting solution and the cement aqueous solution are mixed thoroughly, And the mixture is mixed with the mixing ratio of the length of the first stage, the stage of the second stage and the stage of the mixing, and the mixing is effected. Thus, the grouting method is more robust and water-repellent.

본 발명의 또 다른 목적은, 케미컬 그라우팅 약액과 시멘트수용액을 혼합하기 위하여 상기 주입장치의 선단장치를 제외하고, 별도의 혼합부가 필요 없도록 함으로써, 시공비를 절감하는데 있다.Another object of the present invention is to reduce the construction cost by eliminating the need for a separate mixing unit, except for the tip unit of the injection apparatus, for mixing the chemical grouting solution and the aqueous cement solution.

본 발명의 또 다른 목적은, 이중관 형상으로 설치된 그라우트 주입배관에서 케미컬 그라우팅 약액이 유입되는 내관과 시멘트수용액이 유입되는 외관이 모아지는 곳의 유속과 상기 선단장치 내부에 설치된 혼합부를 통과하는 유속의 변화가 거의 없도록 설치하여 그라우트를 저압으로 펌핑할 수 있도록 함으로써 그라우트의 혼합성과 투입량을 높여, 시공기간을 단축시키고, 인력을 줄일 수 있는, 보다 경제적이고, 실용성이 높은 그라우팅공법으로 시공하는데 있다.It is a further object of the present invention to provide a method for producing a grout injection pipe in which the flow rate of the inner pipe into which the chemical grouting chemical solution flows and the outer pipe into which the aqueous cement solution flows are collected and the flow rate So that the grout can be mixed with the grout, the amount of the grout can be increased, the construction period can be shortened, and the manpower can be reduced, which is a more economical and practical application of the grouting method.

본 발명의 또 다른 목적은, 차수 그라우팅, 지반개량 그라우팅, 충전 그라우팅 및 보강 그라우팅 등을 간편하고 신속하게 시공할 수 있도록 하는 데 있다. It is still another object of the present invention to provide a method for easily and rapidly constructing the order grouting, the ground improvement grouting, the filling grouting, and the reinforcing grouting.

상기 목적을 달성하기 위하여 본 발명은 시멘트수용액 유입관(4) 내부에 케미컬 그라우팅 약액 유입관(5)이 삽입된 이중관 형태의 그라우트 유입부(1)와; 상기 그라우트 유입부(1)의 하부에 연결되어 케미컬 그라우팅 약액과 시멘트수용액을 혼합하며, 그 내부에 수직방향으로 구비되는 고정대(9)와; 상기 고정대(9)에 지그재그로 부착되는 복수의 Z형 유체흐름판(8)과; 상기 고정대(9)의 상부 및 하부에 구비되어 상기 고정대(9)와 Z형 유체흐름판(8)을 지지하는 받침대(15)로 이루어진 교반부(16)가 장착되는 그라우트 혼합부(2)와; 상기 그라우트 혼합부(2)의 하부에 연결되어 케미컬 그라우팅 약액과 시멘트수용액을 혼합하여 형성된 그라우트가 지반에 투입될 수 있는 그라우트 투입부(3)되는 것을 특징으로 한다.In order to accomplish the above object, the present invention provides a cement aqueous solution inflow pipe (4) having a double-tube type grout inflow part (1) having a chemical grouting solution inflow pipe (5) inserted therein; A fixing table 9 connected to a lower portion of the grout inlet portion 1 to mix the chemical grouting chemical solution and the cement aqueous solution and vertically disposed therein; A plurality of Z-shaped fluid flow plates (8) attached in a zigzag manner to the fixing table (9); A grout mixing section 2 provided at an upper portion and a lower portion of the fixing table 9 and equipped with a stirring section 16 composed of a fixing table 9 and a pedestal 15 for supporting the Z-shaped fluid flow plate 8; ; And a grout charging unit 3 connected to a lower portion of the grout mixing unit 2, wherein the grout formed by mixing the chemical grouting solution and the aqueous cement solution can be introduced into the ground.

또한, 상기 받침대는 링 형상으로 이루어지며, 중앙에 지지대가 교차 형성되어 상기 지지대 중앙에 상기 고정대가 위치하게 되는 것을 특징으로 한다.In addition, the pedestal may be formed in a ring shape, and a support bar may be formed at the center of the support bar so that the support bar is positioned at the center of the support bar.

또한, 상기 그라우트 혼합부는 복수 개 구비되어 상호 연결되는 것을 특징으로 한다.In addition, a plurality of grout mixing parts are provided and interconnected.

또한, 상기 교반부는 상기 그라우트 혼합부에 장착과 탈착이 용이하도록 분리형으로 구비되는 것을 특징으로 한다.In addition, the agitating part is provided separately from the grout mixing part so as to facilitate attachment and detachment.

또한, 상기 Z형 유체흐름판은 반원이상의 면적으로 이루어진 평면형, 오목형 또는 볼록형으로 구비되어 상기 고정대에 부착되는 것을 특징으로 한다.The Z-shaped fluid flow plate may have a flat, concave or convex shape having an area of more than a half circle, and may be attached to the fixing table.

또한, 상기 고정대에 부착된 상기 Z형 유체흐름판 사이의 간격은 0.5cm ~ 10cm로 설정하는 것을 특징으로 한다.In addition, the interval between the Z-shaped fluid flow plates attached to the fixing table is set to be 0.5 cm to 10 cm.

또한, 상기 그라우트 투입부의 내부에는 케미컬 그라우팅 약액과 시멘트수용액을 혼합하여 형성된 그라우트가 빠른 유속으로 지반에 투입될 수 있도록 단면감소부재가 설치되는 것을 특징으로 한다.In addition, a section reducing member is installed in the grout injection unit so that the grout formed by mixing the chemical grouting solution and the cement aqueous solution can be injected into the ground at a high flow rate.

상기 그라우트 투입부의 하부에는 지반을 천공할 수 있는 천공날이 부착되는 것을 특징으로 한다.
And a perforation blade for perforating the ground is attached to the lower part of the grout injection part.

본 발명에 의하면, 그라우트 혼합부에 장착된 Z형 유체흐름판에 의하여, 케미컬 그라우팅 약액과 시멘트수용액은 마치 한 용기안에서 또 다른 용기로 옮겨지면서 충분히 혼합되고, 이러한 혼합의 행위가 Z형 유체흐름판의 숫자만큼 연속해서 혼합이 이루어져 완전 혼합의 효과가 있다. According to the present invention, by means of the Z-shaped fluid flow plate mounted on the grout mixing section, the chemical grouting chemical solution and the aqueous cement solution are sufficiently mixed while being transferred to another container in a single vessel, The mixing is effected successively by the number of the number of the mixing units.

또한, 그라우트 유입부에 유입되는 케미컬 그라우팅 약액이 유입되는 유입속도와 시멘트수용액이 유입되는 유입속도가 줄어들지 않고, 그라우트 혼합부에서 Z형 유체흐름판의 안내에 따라 유입된 유체가 완전 혼합되어 그라우트 투입부를 통하여 유출되므로 저압으로 펌핑하고, 많은 양의 그라우트를 적은 시간에 투입할 수 있어, 그라우팅 시공 품질을 향상시킬 수 있으며, 그라우팅 시공기간을 줄일 수 있고, 그라우팅 시공을 경제적으로 저렴하게 이행할 수 있는 효과가 있다.Further, the inflow speed at which the chemical grouting solution flowing into the grout inflow portion flows and the inflow speed at which the cement aqueous solution flows are not reduced, and the fluid introduced in accordance with the guide of the Z-shaped fluid flow plate in the grout mixing portion is mixed thoroughly, It is possible to pump a large amount of grout in a short period of time, to improve the quality of grouting construction, to reduce the grouting construction period, to make the grouting construction economically inexpensive, It is effective.

또한, Z형 유체흐름판이 부착된 그라우트 혼합부가 직렬로 연속적으로 2단 또는 3단으로 연결되어 케미컬 그라우팅 약액과 시멘트수용액은 보다 더 완전혼합이 이루어지며, 연장된 그라우트 혼합부의 길이만큼의 그라우트의 겔 타임을 줄일 수 있는 효과가 있다. In addition, the grout mixing portion with the Z-shaped fluid flow plate is continuously connected in two or three stages in series, so that the chemical grouting solution and the cement aqueous solution are more thoroughly mixed and the grout gel of the length of the extended grout mixing portion It has the effect of reducing time.

또한, 그라우팅 시공 장비 중 그라우트 투입배관의 선단장치내에 케미컬 그라우팅 약액과 시멘트수용액을 혼합하기 때문에 또 다른 고가의 혼합 장비가 필요 없도록 함으로써, 시공의 편리성을 향상시키고, 경제적으로 시공할 수 있는 효과가 있다.In addition, since the chemical grouting chemical solution and the cement aqueous solution are mixed in the tip end of the grouting pipe in the grouting installation equipment, there is no need for another expensive mixing equipment, thereby improving the convenience of construction and effecting economical construction have.

또한, 차수 그라우팅, 지반개량 그라우팅, 충전 그라우팅 및 보강 그라우팅 등을 편리하고, 신속하게 시공할 수 있는 효과가 있다.
In addition, there is an advantageous effect that it is possible to conveniently and quickly construct the order grouting, the ground improvement grouting, the filling grouting and the reinforcing grouting.

도 1은 본 발명의 실시 예에 따른 Z형 그라우팅 선단 장치를 개략적으로 나타낸 사시도,
도 2a는 본 발명의 실시 예에 따른 Z형 그라우팅 선단 장치의 유입부, 혼합부 및 투입부를 도시하는 사시도,
도 2b는 본 발명의 실시 예에 따른 Z형 그라우팅 선단 장치 내부에 장착되는 교반부를 도시하는 사시도,
도 3a 내지 도 3c는 본 발명의 실시 예에 따른 그라우팅 선단 장치의 1단 혼합부 선단장치, 2단 혼합부 선단장치, 및 3단 혼합부 선단 장치를 도시하는 사시도,
도 4a 내지 도 4b 내지 도 4c는 본발명의 실시 예에 따른 그라우팅 선단 장치 내부에 장착한 Z형 유체흐름판 중 평면형, 오목형 및 볼록형 Z형 유체흐름판을 도시하는 사시도.
1 is a perspective view schematically showing a Z-shaped grouting tip apparatus according to an embodiment of the present invention,
FIG. 2A is a perspective view showing an inlet portion, a mixing portion, and a charging portion of a Z-shaped grouting tip apparatus according to an embodiment of the present invention;
FIG. 2B is a perspective view showing an agitating unit mounted inside the Z-shaped grouting tip apparatus according to the embodiment of the present invention, FIG.
Figs. 3A to 3C are perspective views showing a first-stage mixer front end apparatus, a second-stage mixer front-end apparatus, and a third-stage mixer front-end apparatus in a grouting tip apparatus according to an embodiment of the present invention,
FIGS. 4A to 4C are perspective views showing planar, concave, and convex Z-shaped fluid flow plates among Z-shaped fluid flow plates installed in a grouting tip apparatus according to an embodiment of the present invention;

이하 본 발명에 따른 바람직한 실시 예를 첨부된 도면을 참고로 하여 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

<실시 예><Examples>

도 1, 도 2, 도 3, 도 4는 본 발명에 따른 실시 예를 도시한 것이다.1, 2, 3, and 4 illustrate embodiments of the present invention.

본 발명에 따른 실시 예는,In an embodiment according to the present invention,

건축 및 토목공사에서 제일 우선적으로 착공하는 기초공사로써, 작업하고자하는 땅속에서 물의 흐름을 막아주는 차수벽을 형성시키는 경우나 연약지반을 보다 견고하게 하는 기초기반이나 터널을 파기 위하여 강관을 보강하는 등의 그라우팅 시공에서 그라우트의 성능을 보다 높이기 위하여 케미컬 그라우팅 약액과 시멘트수용액을 혼합하는데 사용되는 그라우팅 선단 장치가 케미컬 그라우팅 약액 유입관(5)과 시멘트수용액 유입관(4)을 포함하고 있는 그라우트 유입부(1)와, 교반부(9)가 장착된 그라우트 혼합부(2)와, 천공날(14)이 부착되어 있는 그라우트 투입부(3)를 포함하여 구성된다.It is the foundation construction that is the first construction work in the construction and civil engineering works. It forms a water wall that prevents the water flow in the ground to be worked, and reinforces the foundation to strengthen the soft ground and the steel pipe to destroy the tunnel. A grouting tip apparatus used for mixing the chemical grouting chemical solution and the cement aqueous solution to improve the grouting performance in the grouting construction comprises a grouting inlet 1 containing the chemical grouting chemical inflow pipe 5 and the cement aqueous solution inlet pipe 4 A grout mixing section 2 in which a stirring section 9 is mounted and a grout injection section 3 in which a drilling blade 14 is attached.

이때, 그라우트 유입부(1)는 외관과 외관안에 내관이 있는 이중관으로 설치되어 있으며, 내관으로는 케미컬 그라우팅 약액이 졸(sol : 수용액) 상태로 케미컬 그라우팅 약액 유입관(5)으로 유입되고, 외관으로는 시멘트수용액이 졸 상태로 시멘트수용액 유입관(4)으로 유입된다. 일반적으로 기존의 그라우팅 장비들도 여기까지는 낮은 압력의 펌핑으로 케미컬 그라우팅 약액과 시멘트수용액을 공급하고 있다. 상기 그라우트 유입부(1)는 일반적으로 약 3m의 이중관으로 제작하여 사용하고 있으며, 그라우팅 하고자하는 깊이가 더 깊을 경우에는 상기 그라우트 유입부(1)를 다수 연결하여 사용한다.At this time, the grout inlet portion 1 is provided with a double pipe having an inner pipe in an outer appearance and an outer pipe, a chemical grouting chemical liquid flows into the chemical grouting chemical inlet pipe 5 in a state of sol (aqueous solution) The aqueous cement solution flows into the cement aqueous solution inlet pipe 4 in a sol state. Conventional grouting equipment has been supplying chemical grouting solution and cement aqueous solution with low pressure pumping up to this point. Generally, the grout inlet 1 is made of a double tube of about 3 m. When the depth of the grout is deeper, the grout inlet 1 is connected to a plurality of grooves.

또한, 상기 그라우트 유입부(1)의 하부에 연결되는 그라우트 혼합부(2)는 상기 그라우트 유입부(1) 하부의 그라우트 유입부와 혼합부 연결 암나사(6)과 그라우트 혼합부(2) 상부의 그라우트 유입부와 혼합부 연결 수나사(7)과 연결하여 고정시키고, 상기 그라우트 유입부(1) 내부에 설치된 내관인 케미컬 그라우팅 약액 유입관(5)에서 케미컬 그라우팅 약액이 유입되고, 그라우트 유입부(1) 내부에 설치된 외관인 시멘트수용액 유입관(4)에서 시멘트수용액이 유입된다. The grout mixing portion 2 connected to the lower portion of the grout inlet portion 1 is connected to the grout inlet portion of the lower portion of the grout inlet portion 1 and the mixing portion connecting female screw 6 and the upper portion of the grout mixing portion 2 The chemical grouting chemical liquid is introduced into the grouting inlet portion 5 and the grouting inlet portion 1 to be connected to the grouting inlet portion and the mixing portion coupling thread 7. The chemical grouting chemical fluid is introduced into the grouting inlet portion 1, The cement aqueous solution is introduced into the cement aqueous solution inlet pipe 4,

한편, 상기 케미컬 그라우팅 약액과 시멘트수용액은 상기 그라우트 혼합부에서 "얼마나 잘 혼합이 되느냐?"가 지반에 투입된 그라우트의 성능을 좌우한다. 일반적으로 현장에서 그라우팅하는 현장의 조건에 따라 그라우트를 제조한다. 상기 현장 조건에 맞는 그라우트를 제조하기 위하여, 케미컬 그라우팅 약액이 들어 있는 종이컵(A 종이컵)과 시멘트수용액이 들어있는 종이컵(B 종이컵)을 서로 번갈아가며, 즉, 한쪽(A 종이컵)으로 옮기고, 또 다른 종이컵(B 종이컵)에 옮기고, 다시 A 종이컵에 옮기며, 겔(Gel) 상태가 될 때(겔 타임 : Gel Time)까지 서로 번갈아가며 옮기며, 간이 시험을 한다.On the other hand, the performance of the grout injected into the ground depends on how well the chemical grouting solution and the aqueous cement solution are mixed in the grouting portion. Generally, grout is manufactured according to the conditions of the grouting in the field. (A paper cup) containing the chemical grouting solution and a paper cup (B paper cup) containing the aqueous cement solution are alternately transported to each other, that is, to one side (A paper cup) Transfer them to paper cups (B paper cups), transfer them to paper cups A again, and alternately transfer them to each other until gel state (Gel Time).

상기 두 개의 종이컵으로 서로 번갈아가며 옮기면서, 두 개의 수용액을 혼합 하듯이 본 발명에서는 그라우트 혼합부(2) 내부에 설치된 교반부(16)를 통하여, 케미컬 그라우팅 약액과 시멘트수용액이 지그재그(Z형)로 이동하면서 자연스럽게 완전히 혼합 할 수 있게 된다.In the present invention, the chemical grouting solution and the aqueous cement solution are zigzag (Z-shaped) through the agitating part 16 provided inside the grout mixing part 2, as in mixing the two aqueous solutions while alternately moving the two paper cups. It is possible to mix completely naturally while moving.

이때, 상기 교반부(16)는 바 형상으로 이루어져 수직방향으로 구비되는 고정대(9)와, 상기 고정대(9)에 지그재그로 부착되는 복수의 Z형 유체흐름판(8)과, 상기 고정대(9)의 상부 및 하부에 구비되어 상기 고정대(9)와 Z형 유체흐름판(8)을 지지하는 받침대(15)로 이루어진다.
한편, z형 유체흐름판(8)과 그라우트 혼합부(2)의 내벽 사이에는 공간이 형성되도록 하여 케미컬 그라우팅 약액과 시멘트수용액이 z형 유체흐름판(8)을 따라 이동할 때 그라우트 혼합부(2)의 내벽에 부딪히면서 혼합이 이루어질 수 있게 하며, 이때 충돌에 의해 혼합된 케미컬 그라우팅 약액과 시멘트수용액은 z형 유체흐름판(8)과 그라우트 혼합부(2) 내벽 사이의 공간으로 낙하되어 하부에 위치하는 다른 z형 유체흐름판(8)으로 이동하게 되거나 그라우트 투입부(3)로 투입될 수 있게 한다.
또한, 본원발명의 z형 유체흐름판(8)은 도 1에 도시된 바와 같이 복수의 z형 유체흐름판(8) 중 최상단에 위치하는 하나의 z형 유체흐름판(8) 일단이 타단을 향해 경사지게 고정대(9)에 구비되며, 상기 하나의 z형 유체흐름판(8)으로부터 소정간격 하부에 위치하는 다른 하나의 z형 유체흐름판(8)은 일단이 타단을 향해 상기 하나의 z형 유체흐름판(8)과는 반대방향으로 경사지게 고정대(9)에 구비되어 상기 하나의 z형 유체흐름판(8) 타단이 상기 다른 하나의 z형 유체흐름판(8) 일단 상부에 위치하도록 하여 케미컬 그라우팅 약액과 시멘트수용액이 상기 하나의 z형 유체흐름판(8)을 따라 이동한 다음 하부에 위치하는 다른 하나의 z형 유체흐름판(8)으로 낙하되도록 한다.
이러한 구조의 복수의 z형 유체흐름판(8)이 고정대(9)에 지그재그 형상으로 장착됨으로 인해 케미컬 그라우팅 약액과 시멘트수용액이 공간을 통해 낙하되면서 복수의 z형 유체흐름판(8)에 충돌된 후 혼합되는 과정을 반복하여 자연스러운 완전 혼합이 가능하게 한다.
The stirring unit 16 includes a bar 9 and a plurality of Z-shaped fluid flow plates 8 stably attached to the fixing base 9, And a pedestal 15 provided at the upper and lower portions of the fixed bed 9 and the Z-shaped fluid flow plate 8.
On the other hand, a space is formed between the z-shaped fluid flow plate 8 and the inner wall of the grout mixing portion 2, so that when the chemical grouting solution and the cement aqueous solution move along the z-shaped fluid flow plate 8, The chemical grouting solution mixed with the cement solution and the cement solution are dropped into the space between the z-shaped fluid flow plate 8 and the inner wall of the grouting portion 2, To be moved to the other z-shaped fluid flow plate (8) or to be introduced into the grout charging part (3).
1, the z-shaped fluid flow plate 8 of the present invention has one z-shaped fluid flow plate 8 located at the uppermost one of the plurality of z-shaped fluid flow plates 8, The other z-shaped fluid flow plate (8) located below the predetermined gap from the one z-shaped fluid flow plate (8) is provided on the fixing table (9) at an angle to the one z- And the other end of the one z-shaped fluid flow plate 8 is positioned on one upper end of the other z-shaped fluid flow plate 8 by being provided on the fixing base 9 so as to be inclined in the opposite direction to the fluid flow plate 8 The chemical grouting chemical solution and the aqueous cement solution are moved along the one z-shaped fluid flow plate 8 and then fall to the other z-shaped fluid flow plate 8 located at the bottom.
Since the plurality of z-shaped fluid flow plates 8 having such a structure are mounted in a staggered manner on the fixing table 9, the chemical grouting chemical solution and the aqueous cement solution fall through the space and collide with the plurality of z-shaped fluid flow plates 8 And then the mixing process is repeated so that natural mixing is possible.

또한, 상기 Z형 유체흐름판(8)은 표준형인 평평한 면으로 되어 있는 도 4a에 나타낸 것과 같이 판형 Z형 유체흐름판(도 4a)이 있으나, 흐름의 유속을 보다 더 양호하게 하기 위하여 도 4b와 4c에 나타낸 것과 같이 오목형 Z형 유체흐름판(도 4b)과 볼록형 Z형 유체흐름판(도 4c)으로 장착한다.In addition, the Z-shaped fluid flow plate 8 has a plate-shaped Z-shaped fluid flow plate (FIG. 4A) as shown in FIG. 4A having a standard flat surface, but, in order to further improve the flow rate of the flow, (Fig. 4B) and a convex Z-shaped fluid flow plate (Fig. 4C) as shown in Figs. 4A and 4C.

또한, 받침대(15)는 링 형상으로 이루어지며, 중앙에 지지대(17)가 십자가 형상으로 교차 형성되어 상기 지지대(17) 중앙에 상기 고정대(9)가 위치하는 것이 가능하게 한다.The pedestal 15 is formed in a ring shape so that a support base 17 is crosswise formed at the center so that the support base 9 can be positioned at the center of the support base 17.

또한, 상기 그라우트 혼합부(2)의 일반적인 크기(길이)는 대략 50cm 정도이다. 기존의 방법으로는 이렇게 짧은 길이를 통과하면서 케미컬 그라우팅 약액과 시멘트수용액이 원하는 만큼 혼합이 되지 않는다. 따라서, 본 발명에서는 그라우트 혼합부(2)에서 케미컬 그라우팅 약액과 시멘트수용액의 혼합의 효과를 더욱 더 높이기 위하여, 그라우트 혼합부(2) 내부에 장착되는 Z형 유체흐름판(8)의 개수를 조절하면서 유체의 유속과 혼합의 정도를 조절한다.The general size (length) of the grout mixing portion 2 is about 50 cm. In the conventional method, the chemical grouting chemical solution and the cement aqueous solution are not mixed as much as desired while passing through such a short length. Therefore, in the present invention, in order to further enhance the effect of mixing the chemical grouting solution and the aqueous cement solution in the grout mixing portion 2, the number of the Z-shaped fluid flow plates 8 mounted in the grout mixing portion 2 is adjusted While controlling the flow rate of the fluid and the degree of mixing.

예를 들어, Z형 유체흐름판(8)과 또 다른 Z형 유체흐름판(8) 사이의 간격을 5cm로 하고, 교반부(16)는 10개의 Z형 유체흐름판(8)이 장착되게 하면, 이런 경우에는 케미컬 그라우팅 약액과 시멘트수용액이 10번이나 지그재그(Z형)로 이동하면서 혼합과정이 일어난다. 또한, 상기 Z형 유체흐름판(8)과 또 다른 Z형 유체흐름판(8)과의 간격을 1cm로 하고, 교반부(16)는 50개의 Z형 유체흐름판(8)이 장착되게 하면, 이런 경우에는 케미컬 그라우팅 약액과 시멘트수용액이 50번이나 지그재그(Z형)로 이동하면서 혼합과정이 일어난다.For example, the interval between the Z-shaped fluid flow plate 8 and another Z-shaped fluid flow plate 8 is set to 5 cm, and the agitating portion 16 is set so that ten Z-shaped fluid flow plates 8 are mounted In this case, the mixing process takes place while the chemical grouting solution and the aqueous cement solution move to zigzag (Z type) 10 times. The Z-shaped fluid flow plate 8 and another Z-shaped fluid flow plate 8 are spaced apart from each other by 1 cm and the agitating section 16 is provided with 50 Z-shaped fluid flow plates 8 In this case, the chemical grouting chemical solution and the aqueous cement solution move to the zigzag (Z type) 50 times, and the mixing process takes place.

또한, 도 3b에서 나타낸 것과 같이 그라우트 혼합부(2)를 두 개를 직렬로 연결하면, 상기 Z형 유체흐름판(8)과 또 다른 Z형 유체흐름판(8) 사이의 간격을 5cm로 하고, 각각의 교반부(16)에 10개씩의 Z형 유체흐름판(8)이 장착되게 하면, 이런 경우에는 케미컬 그라우팅 약액과 시멘트수용액이 20번이나 지그재그(Z형)로 이동하면서 혼합과정이 일어난다. 또한, 상기 Z형 유체흐름판(8)과 또 다른 Z형 유체흐름판(8) 사이의 간격을 1cm로 하고, 각각의 교반부(16)에 50개씩의 Z형 유체흐름판(8)이 장착되게 하면, 이런 경우에는 케미컬 그라우팅 약액과 시멘트수용액이 100번이나 지그재그(Z형)로 이동하면서 혼합과정이 일어난다.3 (b), when the two grout mixing portions 2 are connected in series, the interval between the Z-shaped fluid flow plate 8 and another Z-shaped fluid flow plate 8 is set to 5 cm , And 10 Z-shaped fluid flow plates 8 are mounted on each of the agitating parts 16, in this case, the chemical grouting chemical solution and the aqueous cement solution are moved 20 times in a zigzag manner (Z type) . The distance between the Z-shaped fluid flow plate 8 and another Z-shaped fluid flow plate 8 is 1 cm, and 50 Z-shaped fluid flow plates 8 are provided in each of the stirring portions 16 In this case, the chemical grouting chemical solution and the cement aqueous solution move to zigzag (Z type) 100 times, and the mixing process is performed.

또한, 도 3c에서 나타낸 것과 같이 그라우트 혼합부(2)를 세 개를 직렬로 연결하면, 상기 Z형 유체흐름판(8)과 또 다른 Z형 유체흐름판(8) 사이의 간격을 5cm로 하고, 각각의 교반부(16)에 10개씩의 Z형 유체흐름판(8)이 장착되게 하면, 이런 경우에는 케미컬 그라우팅 약액과 시멘트수용액이 30번이나 지그재그(Z형)로 이동하면서 혼합과정이 일어난다. 또한, 상기 Z형 유체흐름판(8)과 또 다른 Z형 유체흐름판(8) 사이의 간격을 1cm로 하고, 각각의 교반부(16)에 50개씩의 Z형 유체흐름판(8)이 장착되게 하면, 이런 경우에는 케미컬 그라우팅 약액과 시멘트수용액이 150번이나 지그재그(Z형)로 이동하면서 혼합과정이 일어난다. When three grout mixing portions 2 are connected in series as shown in Fig. 3C, the interval between the Z-shaped fluid flow plate 8 and another Z-shaped fluid flow plate 8 is set to 5 cm , And 10 Z-shaped fluid flow plates 8 are mounted on each of the agitating parts 16, in this case, the chemical grouting chemical solution and the cement aqueous solution move 30 times to the zigzag (Z type) . The distance between the Z-shaped fluid flow plate 8 and another Z-shaped fluid flow plate 8 is 1 cm, and 50 Z-shaped fluid flow plates 8 are provided in each of the stirring portions 16 In this case, the chemical grouting chemical solution and the cement aqueous solution move 150 times to the zigzag (Z type), and the mixing process takes place.

따라서, 상기 경우의 수로 그라우트 혼합부(2) 내부에 Z형 유체흐름판(8)이 구비된 교반부(16)를 장착하고, 그라우트 혼합부(2)를 연결하여 사용하면, 케미컬 그라우팅 약액과 시멘트수용액이 충분히 혼합되어 완전 혼합이 이루어질 수 있다.Therefore, when the agitating portion 16 equipped with the Z-shaped fluid flow plate 8 is mounted in the grout mixing portion 2 in the above case and the grout mixing portion 2 is used in connection, the chemical grouting solution The cement aqueous solution may be sufficiently mixed to complete mixing.

또한, 그라우트 혼합부(2)에서 케미컬 그라우팅 약액(졸상태)과 시멘트수용액(졸상태)의 혼합하여 겔(Gel) 상태가 될 때까지의 소요시간인 겔타임(Gel Time)을 기존의 그라우트의 화학적 반응에서 기본적으로 갖는 겔타임 이외에 케미컬 그라우팅 약액과 시멘트수용액이 그라우트 혼합부(2)에 통과하면서 지연되는 겔타임을 감안하여 지반에 그라우트를 투여한다면, 보다 효과적인 그라우팅 시공이 된다. The gel time (Gel Time) required for mixing the chemical grouting solution (sol state) with the aqueous cement solution (sol state) until the gel grout state is obtained in the grout mixing part (2) If grouting is applied to the ground in consideration of the gel time in which the chemical grouting solution and the aqueous cement solution are delayed while passing through the grouting portion 2 in addition to the gel time basically possessed in the chemical reaction, grouting is more effective.

예를 들어, Z형 유체흐름판(8)과 또 다른 Z형 유체흐름판(8) 사이의 간격을 5cm로 하고, 교반부(16)는 10개의 Z형 유체흐름판(8)이 장착되게 하면, 이런 경우에는 케미컬 그라우팅 약액과 시멘트수용액이 10번이나 지그재그(Z형)로 이동하며, Z형 유체흐름판(8)의 길이가 3cm이고, 유체가 좌로 또는 우로 이동하는 거리를 3cm(최대 4cm : 그라우트 혼합부(2) 내경이 4cm)씩 이동한다고 한다면, 30cm가 더 늘어난 이동거리가 되면, 이에 따라 그라우트의 겔타임이 증가하게 되어 그라우트가 지반에 투입되는 시간을 감소시킬 수 있게 한다. 또한, 상기 Z형 유체흐름판(8)과 또 다른 Z형 유체흐름판(8)과의 간격을 1cm로 하고, 교반부(16)는 50개의 Z형 유체흐름판(8)이 장착되게 하면, 이런 경우에는 케미컬 그라우팅 약액과 시멘트수용액이 50번이나 지그재그(Z형)로 이동하며, 150cm가 더 늘어난 이동거리가 되면, 이에 따른 그라우트의 겔타임이 증가하게 되어 그라우트가 지반에 투입되는 시간을 상기 방법 보다 5배 더 감소시킬 수 있게 한다.For example, the interval between the Z-shaped fluid flow plate 8 and another Z-shaped fluid flow plate 8 is set to 5 cm, and the agitating portion 16 is set so that ten Z-shaped fluid flow plates 8 are mounted In this case, the chemical grouting solution and the aqueous cement solution are moved to zigzag (Z-shaped) 10 times, the Z-shaped fluid flow plate 8 has a length of 3 cm, and the distance that the fluid moves left or right is 3 cm 4cm: If the inner diameter of the grout mixing part (2) is 4cm), when the moving distance is increased by 30cm, the gel time of the grout increases, thereby reducing the time for the grout to be put into the ground. The Z-shaped fluid flow plate 8 and another Z-shaped fluid flow plate 8 are spaced apart from each other by 1 cm and the agitating section 16 is provided with 50 Z-shaped fluid flow plates 8 In this case, the chemical grouting solution and the aqueous cement solution are moved to zigzag (Z type) 50 times, and when the travel distance is increased by 150 cm, the gel time of the grout is increased, It is possible to reduce it five times more than the above method.

또한, 도 3b에서 나타낸 것과 같이 그라우트 혼합부(2)를 두 개를 직렬로 연결한 상태에서, 상기 Z형 유체흐름판(8)과 또 다른 Z형 유체흐름판(8)과의 간격을 5cm로 하고, 각각의 교반부(16)에 10개씩의 Z형 유체흐름판(8)이 장착되게 하면, 이런 경우에는 케미컬 그라우팅 약액과 시멘트수용액이 20번이나 지그재그(Z형)로 이동하며, 60cm가 더 늘어난 이동거리가 되면, 이에 따른 그라우트의 겔타임이 증가하게 되어 그라우트가 지반에 투입되는 시간을 상기 방법 보다 2배 더 감소시킬 수 있게 한다. 3, the gap between the Z-shaped fluid flow plate 8 and another Z-shaped fluid flow plate 8 is set to 5 cm (2 inches) in a state where two grout mixing units 2 are connected in series, And 10 Z flow-flow plates 8 are mounted on each of the stirring portions 16, in this case, the chemical grouting chemical solution and the aqueous cement solution move 20 times in a zigzag (Z-shape) The increase in the gel time of the grout caused by the increase in the travel distance allows the time for the grout to be put on the ground to be reduced by two times as compared with the above method.

또한, 상기 Z형 유체흐름판(8)과 또 다른 Z형 유체흐름판(8)과의 간격을 1cm로 하고, 각각의 교반부(16)에 50개씩의 Z형 유체흐름판(8)이 장착되게 하면, 이런 경우에는 케미컬 그라우팅 약액과 시멘트수용액이 100번이나 지그재그(Z형)로 이동하며, 300cm가 더 늘어난 이동거리가 되면, 이에 따른 그라우트의 겔타임이 증가하게 되어 그라우트가 지반에 투입되는 시간을 상기 방법 보다 10배 더 감소시킬 수 있게 한다. The distance between the Z-shaped fluid flow plate 8 and another Z-shaped fluid flow plate 8 is 1 cm, and 50 Z-shaped fluid flow plates 8 are arranged in each of the stirring portions 16 In this case, the chemical grouting solution and the aqueous cement solution are moved to zigzag (Z type) 100 times, and when the moving distance is increased by 300 cm, the gel time of the grout is increased, and the grout is introduced into the ground To be reduced 10 times more than the above method.

또한, 도 3c에서 나타낸 것과 같이 그라우트 혼합부(2)를 세 개를 직렬로 연결한 상태에서, 상기 Z형 유체흐름판(8)과 또 다른 Z형 유체흐름판(8)과의 간격을 5cm로 하고, 각각의 교반부(16)에 10개씩의 Z형 유체흐름판(8)이 장착되게 하면, 이런 경우에는 케미컬 그라우팅 약액과 시멘트수용액이 30번이나 지그재그(Z형)로 이동하며, 90cm가 더 늘어난 이동거리가 되면, 이에 따른 그라우트의 겔타임이 증가하게 되어 그라우트가 지반에 투입되는 시간을 상기 방법 보다 3배 더 감소시킬 수 있게 한다.3, the gap between the Z-shaped fluid flow plate 8 and another Z-shaped fluid flow plate 8 is set to 5 cm in a state where three grout mixing units 2 are connected in series, And 10 Z-shaped fluid flow plates 8 are mounted on each of the stirring portions 16, in this case, the chemical grouting chemical solution and the aqueous cement solution move 30 times in a zigzag (Z shape) The increase in the gel time of the grout caused by the increase in the travel distance allows the time for the grout to be put on the ground to be reduced by three times as compared with the above method.

또한, 상기 Z형 유체흐름판(8)과 또 다른 Z형 유체흐름판(8)과의 간격을 1cm로 하고, 각각의 교반부(16)에 50개씩의 Z형 유체흐름판(8)이 장착되게 하면, 이런 경우에는 케미컬 그라우팅 약액과 시멘트수용액이 150번이나 지그재그(Z형)로 이동하며, 450cm가 더 늘어난 이동거리가 되면, 이에 따른 그라우트의 겔타임이 증가하게 되어 그라우트가 지반에 투입되는 시간을 상기 방법 보다 15배 더 감소시킬 수 있게 한다.The distance between the Z-shaped fluid flow plate 8 and another Z-shaped fluid flow plate 8 is 1 cm, and 50 Z-shaped fluid flow plates 8 are arranged in each of the stirring portions 16 In this case, the chemical grouting solution and the cement aqueous solution move 150 times in zigzag (Z type), and when the movement distance is increased by 450 cm, the gel time of the grout increases, and the grout is put into the ground To be reduced by 15 times as compared with the above method.

따라서, 상기 경우의 수로 그라우트 혼합부(2)내부에 Z형 유체흐름판(8)이 구비된 교반부(16)를 장착하고, 그라우트 혼합부(2)를 연결하여 사용하면, 케미컬 그라우팅 약액과 시멘트수용액이 충분히 혼합되며, 그라우트의 물리적인 겔타임도 확보할 수 있어, 그라우팅 시공하는데 많은 도움을 준다.Therefore, when the agitating portion 16 equipped with the Z-shaped fluid flow plate 8 is mounted in the grout mixing portion 2 in the above case and the grout mixing portion 2 is used in connection, the chemical grouting solution The cement aqueous solution is sufficiently mixed, and the physical gel time of the grout can be secured, which is very helpful for the grouting construction.

한편, 상기 그라우트 혼합부(2)는 대략 50cm 정도로 제작되며, 그라우트 혼합부(2)와 교반부(16)는 분리형으로 이루어져 작업 종료 후 상기 그라우트 혼합부(2)로부터 상기 교반부(16)를 분리하여 청소할 수 있게 한다.The grout mixing section 2 and the stirring section 16 are separated from each other so that the grout mixing section 2 and the stirring section 16 are separated from each other. Separate and clean it.

이때, 상기 교반부(16)는 그라우트 혼합부(2)에 볼트 체결을 통해 장착되어 작업 시에는 교반부(16)가 그라우트 혼합부(2)에 고정된 상태를 유지하며, 작업 종류 후에는 볼트를 해체하여 교반부(16)를 그라우트 혼합부(2)로부터 분리할 수 있게 하는 것이 바람직하다.At this time, the agitating portion 16 is mounted to the grout mixing portion 2 through bolting so that the agitating portion 16 is fixed to the grout mixing portion 2 at the time of work, So that the agitating portion 16 can be separated from the grout mixing portion 2.

한편, 상기 교반부(16)의 청소가 불필요한 경우 그라우트 혼합부(2)에 교반부(16)를 용접을 통해 장착시킬 수도 있게 한다.On the other hand, when the agitating part 16 is not required to be cleaned, the agitating part 16 can be mounted to the grout mixing part 2 through welding.

또한, 상기 그라우트 혼합부(2)의 하부에는 케미컬 그라우팅 약액과 시멘트수용액이 혼합되어 지반에 그라우트를 투입할 수 있는 그라우트 투입부(3)와 연결한다.In addition, a chemical grouting solution and a cement aqueous solution are mixed in the lower part of the grout mixing part 2 and connected to the grout charging part 3 which can inject grout into the ground.

또한, 상기 그라우트 투입부(3)에는 케미컬 그라우팅 약액과 시멘트수용액이 그라우트 혼합부(2)에서 충분히 혼합된 그라우트가 지반으로 조금 더 빠른 유속으로 투입될 수 있도록 단면감소부재(12)가 설치되어 있으며, 하부에는 지반을 천공할 수 있는 천공날(14)이 부착되어 있다.In addition, the grout injecting section 3 is provided with a cross sectional reducing member 12 so that the grout mixed with the chemical grouting solution and the cement aqueous solution can be injected into the ground at a higher flow rate And a perforated blade 14 for perforating the ground is attached to the lower portion.

이하 본 발명에 따른 그라우팅 선단 장치의 작용 효과를 설명한다.Hereinafter, the operation and effect of the grouting tip apparatus according to the present invention will be described.

케미컬 그라우팅 약액 유입관(5)을 통하여 케미컬 그라우팅 약액이 수용액(졸 : Sol)상태로 유입됨과 동시에 시멘트수용액 유입관(4)을 통하여 시멘트수용액이 (졸 : Sol)상태로 유입된다.The chemical grouting chemical liquid flows into the sol state through the chemical grouting chemical inflow pipe 5 and the cement aqueous solution flows into the sol state through the cement aqueous solution inlet pipe 4.

상기 졸 상태로 유입되는 케미컬 그라우팅 약액과 시멘트수용액은 그라우트 혼합부(2)에 유입되면서 혼합된다. 특히, 상기 케미컬 그라우팅 약액과 시멘트수용액은 그라우트 혼합부(2) 내부에 장착된 Z형 유체흐름판(8)을 통하여 지그재그(Z형)로 이동하면서 완전히 혼합된다.The chemical grouting solution and the aqueous cement solution, which are introduced into the sol state, are mixed while being introduced into the grouting portion (2). Particularly, the chemical grouting solution and the aqueous cement solution are completely mixed while moving in a zigzag (Z-shape) through the Z-shaped fluid flow plate 8 mounted in the grout mixing portion 2.

케미컬 그라우팅 약액과 시멘트수용액은 완전 혼합되어 형성된 급결제 그라우트 또는 완결제 그라우트가 그라우트 투입부(3)의 아래부분에 장착된 그라우트 투입구(13)를 통하여 천공된 구역에 분사된다.The chemical grout chemical solution and the cement aqueous solution are injected into the perforated area through the grout inlet port 13 mounted on the lower portion of the grout injection section 3.

본 발명에 의하면, 간단한 구조된 Z형 그라우팅 선단 장치를 사용하여, 케미컬 그라우팅 약액과 시멘트수용액을 완전히 혼합하여 급결제 그라우트와 완결제 그라우트의 성능을 현저히 향상시킬 수 있다.According to the present invention, it is possible to remarkably improve the performance of the quick-setting grout and the finished grout by thoroughly mixing the chemical grouting solution and the aqueous cement solution using a simple structured Z-shaped grouting tip device.

또한, 상기 Z형 그라우팅 선단 장치를 사용하여 형성된 급결제 그라우트와 완결재 그라우트의 화학적 겔타임 이외의 그라우트의 이동하면서 발생되는 물리적 겔타임을 이용할 수 있어 보다 견고하고 차수성이 강한 그라우팅 시공을 할 수 있으며, 이에 따른 경제적인 그라우팅 시공을 할 수가 있다.In addition, the physical gel time generated during the movement of the grout other than the chemical gel time of the quick-setting grout and the complete grout formed by using the Z-shaped grouting tip apparatus can be utilized, so that the grouting construction having a stronger water- Therefore, economical grouting construction can be achieved.

또한, 그라우트 혼합부(2)의 크기를 소형화 할 수 있으므로, 취급이 간편하고, 시공비용 절감할 수 있다.
Further, since the size of the grout mixing portion 2 can be reduced, it is easy to handle and the construction cost can be reduced.

이상에서는 본 발명의 바람직한 실시 예를 예시적으로 설명한 것으로서 본 발명의 범위는 상기 특정 실시 예에 한정되지 아니한다. 해당 기술분야에서 통상의 지식을 가진 자라면 본 발명의 기술적 사상의 범위를 벗어남이 없이 다양한 변경 및 수정이 가능하다는 것을 이해할 수 있을 것이다.
While the present invention has been described with reference to exemplary embodiments, it is to be understood that the invention is not limited to the disclosed exemplary embodiments. It will be understood by those skilled in the art that various changes and modifications may be made without departing from the scope of the present invention.

1: 그라우트 유입부
2: 그라우트 혼합부
3: 그라우트 투입부
4: 시멘트수용액 유입관
5: 케미컬 그라우팅 약액 유입관
6: 그라우트 유입부와 혼합부 연결 너트
7: 그라우트 유입부와 혼합부 연결 볼트
8: Z형 유체흐름판
9: Z형 유체흐름판 고정대
10: 그라우트 혼합부와 투입부 연결 너트
11: 그라우트 혼합부와 투입부 연결 볼트
12: 단면 감소부
13: 그라우트 투입구
14: 천공 날
15 : 받침대
16 : 교반부
1: grout inlet
2: grout mixing portion
3: Grout input part
4: Cement aqueous solution inlet pipe
5: chemical grouting fluid inlet pipe
6: Grout inlet and mixing section connection nut
7: grout inlet and mixing bolt connecting bolt
8: Z-shaped fluid flow plate
9: Z-shaped fluid flow plate holder
10: grout mixing part and input part connecting nut
11: grout mixing part and input part connecting bolt
12:
13: Grout inlet
14: Perforated blade
15: Stand
16:

Claims (8)

시멘트수용액 유입관(4) 내부에 케미컬 그라우팅 약액 유입관(5)이 삽입된 이중관 형태의 그라우트 유입부(1)와;
상기 그라우트 유입부(1)의 하부에 연결되어 케미컬 그라우팅 약액과 시멘트수용액을 혼합하며, 그 내부에 수직방향으로 구비되는 고정대(9)와; 상기 고정대(9)에 부착되는 복수의 Z형 유체흐름판(8)과; 상기 고정대(9)의 상부 및 하부에 구비되어 상기 고정대(9)와 Z형 유체흐름판(8)을 지지하는 받침대(15)로 이루어진 교반부(16)가 장착되는 그라우트 혼합부(2)와;
상기 그라우트 혼합부(2)의 하부에 연결되어 케미컬 그라우팅 약액과 시멘트수용액을 혼합하여 형성된 그라우트가 지반에 투입될 수 있는 그라우트 투입부(3);를 포함하되;
상기 Z형 유체흐름판(8)은 반원이상의 면적으로 이루어진 평면형, 오목형 또는 볼록형으로 구비되어 상기 고정대(9)에 부착되고,
상기 z형 유체흐름판(8)과 상기 그라우트 혼합부(2)의 내벽 사이에 공간이 형성되어, 케미컬 그라우팅 약액과 시멘트수용액이 상기 z형 유체흐름판(8)을 따라 이동할 때 상기 그라우트 혼합부(2)의 내벽에 충돌되면서 혼합되어 상기 공간으로 이동하고,
상기 복수의 z형 유체흐름판(8) 중 하나의 z형 유체흐름판(8)은 일단이 타단을 향해 경사지게 상기 고정대(9)에 구비되며, 상기 하나의 z형 유체흐름판(8)으로부터 소정간격 하부에 위치하는 다른 하나의 z형 유체흐름판(8)은 일단이 타단을 향해 상기 하나의 z형 유체흐름판(8)과는 반대방향으로 경사지게 상기 고정대(9)에 구비되어 상기 복수의 z형 유체흐름판(8)이 상기 고정대(9)에 지그재그 형상으로 장착되어 케미컬 그라우팅 약액과 시멘트수용액이 상기 공간을 통해 낙하되면서 상기 z형 유체흐름판(8)에 충돌되면서 혼합되는 것을 특징으로 하는 Z형 그라우팅 선단 장치.
A grout inlet (1) of a double tube type in which a chemical grouting solution inlet pipe (5) is inserted into a cement aqueous solution inlet pipe (4);
A fixing table 9 connected to a lower portion of the grout inlet portion 1 to mix the chemical grouting chemical solution and the cement aqueous solution and vertically disposed therein; A plurality of Z-shaped fluid flow plates (8) attached to the fixing table (9); A grout mixing section 2 provided at an upper portion and a lower portion of the fixing table 9 and equipped with a stirring section 16 composed of a fixing table 9 and a pedestal 15 for supporting the Z-shaped fluid flow plate 8; ;
And a grout charging part (3) connected to a lower part of the grout mixing part (2), wherein a grout formed by mixing a chemical grouting solution and an aqueous cement solution can be inputted to the ground;
The Z-shaped fluid flow plate 8 is provided in a flat, concave or convex shape having an area of more than a half circle and attached to the fixing table 9,
A space is formed between the z-shaped fluid flow plate 8 and the inner wall of the grout mixing portion 2 so that when the chemical grouting solution and the aqueous cement solution move along the z-shaped fluid flow plate 8, Is mixed with the inner wall of the chamber (2) and moved to the space,
One of the z-shaped fluid flow plates (8) of the plurality of z-shaped fluid flow plates (8) is provided on the fixed base (9) with one end inclined toward the other end, The other z-shaped fluid flow plate 8 located below the predetermined gap is provided on the fixing table 9 so that one end thereof is inclined in the direction opposite to the one z-shaped fluid flow plate 8 toward the other end, The z-shaped fluid flow plate 8 of the zigzag fluid flow plate 8 is attached to the fixing table 9 in a staggered manner and the chemical grouting chemical solution and the aqueous cement solution are mixed while being collided with the z- Z-shaped grouting tip device.
청구항 1에 있어서,
상기 받침대(15)는 링 형상으로 이루어지며, 중앙에 지지대(17)가 교차 형성되어 상기 지지대(17) 중앙에 상기 고정대(9)가 위치하게 되는 것을 특징으로 하는 Z형 그라우팅 선단 장치.
The method according to claim 1,
Characterized in that the pedestal (15) has a ring shape and a support base (17) is crossed at the center so that the support base (9) is positioned at the center of the support base (17).
청구항 1에 있어서,
상기 그라우트 혼합부(2)는 복수 개 구비되어 상호 연결되는 것을 특징으로 하는 Z형 그라우팅 선단 장치.
The method according to claim 1,
And a plurality of grout mixing parts (2) are provided and connected to each other.
청구항 1에 있어서,
상기 교반부(16)는 상기 그라우트 혼합부(2)에 장착과 탈착이 용이하도록 분리형으로 구비되는 것을 특징으로 하는 Z형 그라우팅 선단 장치.
The method according to claim 1,
Wherein the agitating part (16) is provided separately from the grout mixing part (2) so as to be easily attached and detached.
삭제delete 청구항 1에 있어서,
상기 고정대(9)에 부착된 상기 Z형 유체흐름판(8) 사이의 간격은 0.5cm ~ 10cm로 설정하는 것을 특징으로 하는 Z형 그라우팅 선단 장치.
The method according to claim 1,
And the distance between the Z-shaped fluid flow plates (8) attached to the fixing table (9) is set to 0.5 cm to 10 cm.
청구항 1에 있어서,
상기 그라우트 투입부(3)의 내부에는 케미컬 그라우팅 약액과 시멘트수용액을 혼합하여 형성된 그라우트가 빠른 유속으로 지반에 투입될 수 있도록 단면감소부재(12)가 설치되는 것을 특징으로 하는 Z형 그라우팅 선단 장치.
The method according to claim 1,
Wherein the grouting part (3) is provided with a section reducing member (12) so that the grout formed by mixing the chemical grouting solution and the cement aqueous solution can be introduced into the ground at a high flow rate.
청구항 1 또는 청구항 7에 있어서,
상기 그라우트 투입부(3)의 하부에는 지반을 천공할 수 있는 천공날(13)이 부착되는 것을 특징으로 하는 Z형 그라우팅 선단 장치.
The method of claim 1 or claim 7,
And a perforation blade (13) for perforating the ground is attached to the lower part of the grouting part (3).
KR1020140057196A 2014-05-13 2014-05-13 Z-Type Grouting Line Terminal Equipment KR101505778B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140057196A KR101505778B1 (en) 2014-05-13 2014-05-13 Z-Type Grouting Line Terminal Equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140057196A KR101505778B1 (en) 2014-05-13 2014-05-13 Z-Type Grouting Line Terminal Equipment

Publications (1)

Publication Number Publication Date
KR101505778B1 true KR101505778B1 (en) 2015-03-24

Family

ID=53028509

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140057196A KR101505778B1 (en) 2014-05-13 2014-05-13 Z-Type Grouting Line Terminal Equipment

Country Status (1)

Country Link
KR (1) KR101505778B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101619952B1 (en) * 2015-09-23 2016-05-11 김선우 Grouting Tip Equipment Having Ring-type and Ball-type Member
KR101750862B1 (en) * 2016-03-24 2017-06-29 (주)도담이앤씨 Grout Pretreatment Apparatus Using Soundwave
KR102164145B1 (en) * 2020-04-23 2020-10-12 광성지엠(주) Double type grouting material injection device and tunnel reinforcing method using the same
CN116876763A (en) * 2023-09-05 2023-10-13 湖南省第三工程有限公司 Concrete pouring device and concrete pouring method for upper opening of parapet arc flashing mold

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200255708Y1 (en) * 2001-09-04 2001-12-13 최제인 Apparatus for GIM injecting grout for improving the soft ground
KR200319531Y1 (en) * 2003-04-03 2003-07-12 홍지기술산업주식회사 Front Device for Ground Grouting
KR20040034967A (en) * 2002-10-17 2004-04-29 (주)진양비지엠텍 grouting apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200255708Y1 (en) * 2001-09-04 2001-12-13 최제인 Apparatus for GIM injecting grout for improving the soft ground
KR20040034967A (en) * 2002-10-17 2004-04-29 (주)진양비지엠텍 grouting apparatus
KR200319531Y1 (en) * 2003-04-03 2003-07-12 홍지기술산업주식회사 Front Device for Ground Grouting

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101619952B1 (en) * 2015-09-23 2016-05-11 김선우 Grouting Tip Equipment Having Ring-type and Ball-type Member
KR101750862B1 (en) * 2016-03-24 2017-06-29 (주)도담이앤씨 Grout Pretreatment Apparatus Using Soundwave
KR102164145B1 (en) * 2020-04-23 2020-10-12 광성지엠(주) Double type grouting material injection device and tunnel reinforcing method using the same
CN116876763A (en) * 2023-09-05 2023-10-13 湖南省第三工程有限公司 Concrete pouring device and concrete pouring method for upper opening of parapet arc flashing mold
CN116876763B (en) * 2023-09-05 2023-11-24 湖南省第三工程有限公司 Concrete pouring device and concrete pouring method for upper opening of parapet arc flashing mold

Similar Documents

Publication Publication Date Title
KR101505778B1 (en) Z-Type Grouting Line Terminal Equipment
CN204825890U (en) Novel composite pile machine
CN109541182A (en) A kind of Visual retrieval crack grouting simulation test device and test method
CN205714026U (en) A kind of water injection type drilling machine drilling rod
CN103990410A (en) Blending system of fracturing fluid and blending technology of system
CN204357127U (en) The monolateral formwork erecting structure of a kind of ultra-deep pre-buried Screw arbor with nut at both-ends of outer wall of basement narrow space
CN107755421A (en) A kind of contaminated site original position is rapidly injected repair system
CN206465264U (en) A kind of concrete production feeding agitating device
AU2015326129B2 (en) Ground improving method
CN204174610U (en) Compartment multi-shaft cement mixing pile machine
CN108119182B (en) The construction method of artificial ore pillar based on coagulation handwoven cloth coagulating property
CN106050303A (en) Underground roadway plugging method and device
CN105600918B (en) A kind of hydrophobic membrane aerator
JP2008127864A (en) Fiber-reinforced cement-based soil improvement method
JP6466101B2 (en) Soil cement underground continuous wall construction method
CN201098954Y (en) Cement foaming machine
KR20070050275A (en) Instillation matter agitator for supplementing the ground and stagnant water
CN206143761U (en) Sand device is mixed in cement stirring stake
CN208347744U (en) Simple well-flushing utensil suitable for ultra-deep pipe well compressed air method well-flushing
CN210969395U (en) Concrete mixing device
CN103926392A (en) Testing device for working performance of self-compacting concrete
CN207176687U (en) A kind of cut-pff wall built-in slip casting pipe positioner
CN205127775U (en) A blending device for water base fracturing fluid
CN204224306U (en) A kind of ecological purification reaction tank column
CN109707342A (en) One kind scrapping the porous continuous grouting plugging device of layer-through drilling

Legal Events

Date Code Title Description
AMND Amendment
AMND Amendment
X701 Decision to grant (after re-examination)
FPAY Annual fee payment

Payment date: 20180320

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20190319

Year of fee payment: 5