KR101459603B1 - Blasting means convenient and safe to connect leading line with leg line - Google Patents

Blasting means convenient and safe to connect leading line with leg line Download PDF

Info

Publication number
KR101459603B1
KR101459603B1 KR1020130162101A KR20130162101A KR101459603B1 KR 101459603 B1 KR101459603 B1 KR 101459603B1 KR 1020130162101 A KR1020130162101 A KR 1020130162101A KR 20130162101 A KR20130162101 A KR 20130162101A KR 101459603 B1 KR101459603 B1 KR 101459603B1
Authority
KR
South Korea
Prior art keywords
seconds
blasting
line
busbars
lines
Prior art date
Application number
KR1020130162101A
Other languages
Korean (ko)
Other versions
KR20140006754A (en
Inventor
윤지선
배상훈
배용철
Original Assignee
에스에이치지오블래스텍 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=50141624&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR101459603(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 에스에이치지오블래스텍 주식회사 filed Critical 에스에이치지오블래스텍 주식회사
Priority to KR1020130162101A priority Critical patent/KR101459603B1/en
Publication of KR20140006754A publication Critical patent/KR20140006754A/en
Application granted granted Critical
Publication of KR101459603B1 publication Critical patent/KR101459603B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/02Arranging blasting cartridges to form an assembly
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/04Arrangements for ignition
    • F42D1/045Arrangements for electric ignition
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/04Arrangements for ignition
    • F42D1/06Relative timing of multiple charges
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

본 발명에 따른 발파수단은 각선과 모선의 연결작업이 편리하고 안전하게 이루어질 수 있다는 장점을 가진다. The blasting means according to the present invention has the advantage that the connecting operation between each line and the bus can be carried out conveniently and safely.

Description

모선과 각선의 연결작업이 편리하고 안전한 발파수단{Blasting means convenient and safe to connect leading line with leg line}[0001] The present invention relates to a method of blasting a blasting device,

본 발명은 발파수단에 관한 것으로서, 더욱 구체적으로는 각선과 모선의 연결작업이 편리하고 안전하게 이루어질 수 있는 발파수단에 대한 것이다. The present invention relates to a blasting means, and more particularly, to a blasting means which can be conveniently and safely connected to each other.

일반적으로, 발파수단은 건설 및 토목공사 현장에서 지반 파쇄, 터널 굴착 등을 위해 수행되는데, 암반이나 기타 장애물을 폭약의 폭발력을 이용하여 빠른 시간에 손쉽게 제거한다는 장점이 있기 때문에 널리 이용되고 있다.In general, blasting means are used for ground breaking and tunnel excavation in construction and civil engineering sites, and are widely used because they have the advantage of easily removing rocks and other obstacles in a short time by using explosive power of explosives.

상기 발파수단은 발파대상 지반에 발파공들을 천공하는 단계, 각각의 발파공에 폭약을 설치하는 단계, 폭약들의 뇌관들을 전기적으로 서로 연결하는 단계 및, 뇌관들을 기폭하는 단계를 포함한다.The blasting means includes the steps of perforating blasters on the ground to be blasted, installing explosives on each blast hole, electrically connecting primers of explosives with each other, and detonating primers.

상기 단계 중에서 뇌관들을 전기적으로 서로 연결하는 단계는 각선(leg line)을 이용하여 이루어지고, 이러한 다수의 각선들은 모선(leading line)에 전기적으로 연결되며, 모선은 발파제어기에 전기적으로 연결된다. 그리고, 각선과 모선의 상기 연결작업은 작업 현장에서 이루어진다. The steps of electrically connecting the primers in the above steps are performed by using leg lines, which are electrically connected to the leading line, and the bus lines are electrically connected to the blasting controller. And, the above connection work of each line and bus line is performed at the work site.

그런데, 발파대상 지반의 높이가 높은 경우, 예를 들어 터널의 경우에는 모선과 각선을 서로 연결하기 위해서 작업자가 받침대 예를 들어, 사다리 같은 것을 이용하여 높은 곳에 위치한 발파공의 뇌관에 연결된 각선을 모선에 연결해야 한다. 따라서, 이러한 경우에는 작업시간이 많이 걸리고 받침대도 필요하기 때문에 비효율적이고 불편하며 작업자가 받침대로부터 추락할 위험성도 있다는 문제점이 있으나, 노천 및 수직구등의 발파 경우는 평지 또는 경사면에서 이루어 지기 때문에 터널의 경우와 같이 추락의 위험은 없으므로 평지에서 적정한 위치에서 발파공의 뇌관에 연결된 각 선을 모선에 연결해야 한다.However, in the case of a tunnel having a high height of the ground to be blasted, for example, in order to connect the busbars and the bridges to each other, the worker uses a pedestal, such as a ladder, You must connect. Therefore, in such a case, it takes a lot of time and requires a pedestal, which is inefficient and inconvenient, and there is a risk that the operator may fall from the pedestal. However, since blasting cases such as open- As there is no risk of falling, as is the case, each line connected to the primer's primer should be connected to the busbars at the proper location on the flat ground.

본 발명은 상기 문제점들을 해결하기 위해서 제안된 것으로서, 각선과 모선의 연결작업이 편리하고 안전하게 이루어질 수 있는 발파수단을 제공하는 것에 그 목적이 있으며 각 선과 모선의 경우는 2선 또는 1개의 선으로 이루어진다.SUMMARY OF THE INVENTION The present invention has been proposed in order to solve the above problems, and it is an object of the present invention to provide a blasting means that can be conveniently and safely connected between each line and a bus line, and each line and a bus line is composed of two lines or one line .

본 발명에 따른 발파수단은, (a) 발파대상 지반에 천공된 다수의 발파공들을 발파순서와 지연시간을 고려하여 소정 개수씩 그룹으로 묶은 후, 각 그룹의 발파공에 설치된 폭약의 뇌관을 각선(43)(45)을 이용하여 전기적으로 서로 연결하는 단계; 및, (b) 각 그룹의 뇌관을 전기적으로 연결하는 각선(43)(45)을 전기적으로 모선(11)(13)에 연결하는 단계;를 포함한다. 이 때, 상기 (b) 단계에서 모선과 각선의 연결지점은 일방향, 바람직하게는 횡방향으로 배열된다.The blasting means according to the present invention comprises: (a) grouping a plurality of blast holes perforated in the ground to be blasted into groups in consideration of blasting order and delay time, (45) to electrically connect to each other; And (b) electrically connecting each of the lines 43 and 45 electrically connecting the primers of the respective groups to the bus wires 11 and 13. At this time, in the step (b), connection points of the busbars and the respective lines are arranged in one direction, preferably in the lateral direction.

상기 터널 노천 및 수직구 발파작업에서의 연결지점은 작업자가 상기 연결작업을 하는 경우에 별도의 받침대를 이용하지 않고서도 손으로 각선 및 모선을 잡을 수 있는 높이나, 평지의 적정한 곳에 위치하는 것이 바람직하다. It is preferable that the connecting points in the tunnel openings and the vertical blasting operations are located at a suitable height or at a suitable place on the flat ground so that the operator can hold the respective lines and bus lines by hand without using a separate pedestal when the operator performs the connecting operation .

상기 발파대상 지반은 터널일 수 있고 노천, 수직구 등의 경우가 있을 수 있는데, 이 때, 각 그룹의 발파공들은 종방향으로 배열되고, 모선과 각선의 연결지점은 횡방향으로 배열될 수도 있다. The blasting target ground may be a tunnel, and there may be an open space, a vertical hole, etc. In this case, the blast holes of each group may be arranged in the longitudinal direction and the connecting point of the bus and the line may be arranged in the lateral direction.

상기 터널의 막장면이 중심선(CL)을 기준으로 좌측과 우측으로 구획되고, 상기 좌측과 우측이 교대로 발파될 수 있다.The surface of the tunnel is divided into left and right sides with respect to the center line CL, and the left and right sides can be alternately blasted.

각각의 각선(43)(45)에는 지연시간을 부여하기 위해 바코드(30)가 부착되는데, 상기 바코드는 상기 연결지점의 부근에 위치하는 것이 바람직하다. A bar code 30 is attached to each of the legs 43 and 45 so as to give a delay time, and the bar code is located near the connection point.

본 발명에 따른 발파수단은 각선과 모선의 연결작업이 편리하고 안전하게 이루어질 수 있도록 한다. 이에 따라, 작업시간이 단축되고 작업자가 추락할 위험성을 없앨 수 있다.The blasting means according to the present invention makes it possible to make the connecting operation between each line and the bus line convenient and safe. Accordingly, the working time can be shortened and the risk of the worker falling can be eliminated.

도 1은 본 발명의 바람직한 실시예에 따라 터널을 발파하기 위해 천공된 발파공과 발파순서와 지연시간 및 발파된 암반의 이동방향을 보여주는 도면.
도 2는 도 1의 H-H' 선에 따른 발파공과, 발파공에 설치된 폭약과, 각선과 모선의 연결을 보여주는 단면 구성도.
도 3은 도 1의 도 1의 V-V' 선에 따른 발파공과, 발파공에 설치된 폭약과, 각선의 연결을 보여주는 단면 구성도.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view showing a blast hole drilled to blast a tunnel, a blasting order, a delay time, and a moving direction of a blasted rock bed according to a preferred embodiment of the present invention.
FIG. 2 is a cross-sectional view showing a connection of a blast hole according to line HH 'in FIG. 1, explosives installed in a blast hole, and a line and a bus.
FIG. 3 is a cross-sectional view showing a blasting hole according to line VV 'in FIG. 1 of FIG. 1, explosives installed on a blasting hole, and connection of each line.

이하, 첨부된 도면들을 참조로 본 발명에 대해서 상세히 설명하기로 한다. 이에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다. 따라서, 본 명세서에 기재된 실시예와 도면에도시된 구성은 본 발명의 실시예들에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings. Prior to this, terms and words used in the present specification and claims should not be construed as limited to ordinary or dictionary terms, and the inventor should appropriately interpret the concepts of the terms appropriately It should be construed in accordance with the meaning and concept consistent with the technical idea of the present invention based on the principle that it can be defined. Therefore, the embodiments described in the present specification and the configurations shown in the drawings are merely examples of the present invention and are not intended to represent all of the technical ideas of the present invention, so that various equivalents And variations are possible.

도 1은 본 발명의 바람직한 실시예에 따라 터널을 발파하기 위해 천공된 발파공과, 발파순서와, 지연시간 및, 발파된 암반의 이동방향을 보여주는 도면이고, 도 2는 도 1의 H-H' 선에 따른 발파공과, 발파공에 설치된 폭약과, 각선과 모선의 연결을 보여주는 단면 구성도이며, 도 3은 도 1의 도 1의 V-V' 선에 따른 발파공과, 발파공에 설치된 폭약과, 각선의 연결을 보여주는 단면 구성도이다. 아래에서는 상기 도면들을 참조하여 본 발명에 따른 발파수단을 설명하기로 한다. FIG. 1 is a view showing a blasting hole punctured for blasting a tunnel according to a preferred embodiment of the present invention, a blasting order, a delay time, and a moving direction of the blasted rock mass. FIG. 3 is a cross-sectional view showing a connection between a blasting hole formed in a blasting hole, a blasting hole provided in a blasting hole, and a connection between each line and a bus line. Fig. The blasting means according to the present invention will be described below with reference to the drawings.

먼저, 발파대상 지반에 천공된 다수의 발파공들을 발파순서와 지연시간을 고려하여 소정 개수씩 그룹으로 묶은 후, 각 그룹의 발파공에 설치된 폭약(1)의 뇌관을 각선(43)(45)을 이용하여 전기적으로 서로 연결한다. First, a plurality of blast holes punctured in the ground to be blasted are grouped into a predetermined number in consideration of the blasting order and delay time, and then the primer of the explosive (1) And electrically connected to each other.

예를 들어, 도 3은 발파대상 지반이 터널인 경우에 발파순서와 지연시간을 고려하여 종방향(V-V' 선에 따른 방향)으로 배열된 발파공에 설치된 폭약(1)의 뇌관을 각선(43)(45)을 이용하여 전기적으로 연결한 것을 보여준다. For example, in FIG. 3, when the ground to be blasted is a tunnel, the primer of the explosive (1) installed on the blast hole arranged in the longitudinal direction (direction along the VV 'line) (45). ≪ / RTI >

한편, 각 그룹의 뇌관을 각선(43)(45)을 이용하여 전기적으로 서로 연결하는 작업은 현장에서 이루어질 수도 있지만, 공장에서 미리 이루어질 수도 있다. 상기 연결작업이 공장에서 미리 이루어지는 경우에는 현장 작업시간을 줄일 수 있다는 장점이 있다. Meanwhile, the operation of electrically connecting the primers of the respective groups using the lines 43 and 45 may be performed in the field, but may be performed in advance in the factory. If the connecting operation is carried out in advance at the factory, it is possible to reduce the field work time.

본 명세서에서 '종방향'은 반드시 수직방향을 의미하는 것이 아니라 수평보다는 수직에 가까운 방향을 의미하는 것으로 해석되어야 하고, '횡방향'은 반드시 수평방향을 의미하는 것이 아니라 수직보다는 수평에 가까운 방향을 의미하는 것으로 해석되어야 한다. In the present specification, 'longitudinal direction' does not necessarily mean vertical direction but should be interpreted to mean a direction closer to vertical than horizontal, and 'lateral direction' does not necessarily mean horizontal direction, Should be construed as meaning.

이어서, 각 그룹의 뇌관을 전기적으로 연결한 각선(43)(45)의 끝단을 모선(11)(13)에 전기적으로 연결한다. 도 2에 나타난 바와 같이, 각 그룹의 각선(43)(45)을 모선(11)(13)에 연결하는 연결지점은 일방향, 바람직하게 발파대상 지반이 터널과 같은 수직 단면인 경우에는 횡방향으로 배열된다. Then, the ends of the legs 43 and 45 electrically connected to the primers of the respective groups are electrically connected to the busbars 11 and 13. As shown in FIG. 2, the coupling points connecting the respective lines 43 and 45 of the respective groups to the buses 11 and 13 are unidirectional, preferably, when the ground to be blasted is a vertical section such as a tunnel, .

더욱 바람직하게, 상기 연결지점은 작업자가 상기 연결작업을 하는 경우에 별도의 받침대 예를 들어, 사다리 등을 이용하지 않고서도 손으로 각선 및 모선을 잡을 수 있는 높이에 위치한다. 따라서, 상기 연결지점은 바닥면으로부터 대략 2m 이하에 위치하는 것이 바람직하고, 더욱 바람직하게는 바닥면으로부터 대략 1m∼1.5m에 위치한다. More preferably, the connection point is located at a height where the operator can grasp the legs and the bus bar without using a separate pedestal, for example, a ladder or the like, when the operator performs the connecting operation. Therefore, the connection point is preferably located at about 2 m or less from the floor, more preferably at about 1 m to 1.5 m from the floor.

상기 연결작업은 연결커넥터(20)에 의해서 이루어질 수 있다. 연결 커넥터(20)는 회동축을 중심으로 회동하여 서로 결합되는 상부부재와 하부부재로 이루어진다. 하부부재에 모선(11)(13)과 각선(43)(45)을 각각 끼워서 고정한 후, 상부부재를 회동시켜서 하부부재에 결합시키면 모선(11)과 각선(43)이 전기적으로 서로 연결되고 모선(13)과 각선(45)이 전기적으로 서로 연결된다.The connecting operation may be performed by the connecting connector 20. The connecting connector 20 is composed of an upper member and a lower member which are pivoted about the pivot shaft to be coupled to each other. When the upper and lower members are pivoted and coupled to the lower member after the busbars 11 and 13 and the legbreaks 43 and 45 are respectively fitted and fixed to the lower member, the busbars 11 and 43 are electrically connected to each other, (13) and the legs (45) are electrically connected to each other.

모선(10)과 각선(43)(45)의 연결작업이 완료된 후에는 모선(10)과 발파제어기(C)를 전기적으로 연결한다. 이어서, 바코드 리더기(도면에 미도시)를 이용하여 각각의 각선(43)(45)에 설치된 바코드(30)를 읽어 들이고, 읽어 들인 바코드(30)가 설치된 뇌관에 지연시간을 부여한다.After the connecting operation between the bus bar 10 and the angled lines 43 and 45 is completed, the bus bar 10 and the blasting controller C are electrically connected. Subsequently, the bar code reader 30 (not shown) reads the bar code 30 installed on each of the lines 43 and 45, and gives a delay time to the primer provided with the read bar code 30.

바코드(30)는 각선(43)(45)에 부착되어 있는데, 작업의 편리성 및 안전을 위해서 모선과 각선의 연결지점 부근에 위치하는 것이 바람직하다. The barcode 30 is attached to each of the legs 43 and 45. It is preferable that the barcode 30 is located near the connection point between the busbar and the legs for convenience of operation and safety.

본 발명에 따른 발파수단을 이용하여 터널과 같은 수직 단면을 발파하는 경우에는 심빼기 영역을 중심으로 막장면을 좌측과 우측으로 구획하고, 좌측과 우측을 교대로 발파할 수 있다. 도 1은 발파순서를 나타내는 붉은색 숫자가 중심선(CL)을 기준으로 좌측과 우측에 교대로 배치된 것을 보여준다. 한편, 도 1에서 검은 숫자는 각 발파공의 지연시간을 나타내고, 초록색 화살표는 발파가 이루어진 경우에 발파된 암반이 이동하는 방향을 나타낸다. In the case of blasting a vertical section such as a tunnel using the blasting means according to the present invention, it is possible to divide the blind side into the left side and the right side and to alternately blast the left side and the right side around the deepening region. FIG. 1 shows that red numbers indicating the order of blasting are alternately arranged on the left and right sides with respect to the center line CL. In FIG. 1, the black numbers indicate the delay time of each blast hole, and the green arrow indicates the direction in which the blasted rock is moved when the blasting is performed.

한편, 본 발명에 따른 발파수단에는 전기뇌관과 전자뇌관이 이용될 수 있지만, 전자뇌관이 더욱 바람직하다.On the other hand, an electric primer and an electronic primer can be used for the blasting means according to the present invention, but an electronic primer is more preferable.

1 : 폭약 10, 11, 13 : 모선 [0028]
20 : 연결 커넥터 30 : 바코드
43, 45 : 각선 C : 발파 제어기
CL : 터널 막장면의 중심선
1: Explosives 10, 11, 13: Mothership [0028]
20: connection connector 30: bar code
43, 45: Each line C: Blasting controller
CL: Centerline of tunnel surface

Claims (4)

발파대상인 터널에 천공된 다수의 발파공에 설치되는 폭약;
발파 제어기로부터 상기 폭약에 인접하여 연장된 모선;
상기 모선과 상기 폭약의 뇌관을 전기적으로 연결하는 각선;
상기 모선과 각선을 연결하며, 회동축을 중심으로 회동하여 서로 결합되는 상부부재와 하부부재로 이루어지고, 상기 하부부재에 상기 모선과 상기 각선을 각각 끼워서 고정한 후 상기 상부부재를 회동시켜서 상기 하부부재에 결합시키면 상기 모선과 상기 각선이 전기적으로 서로 연결되는 연결커넥터; 및
상기 각선(43)(45)에 부착되고, 작업의 편리성 및 안전을 위해서 모선과 각선의 연결지점 부근에 위치하는 바코드(30);
를 포함하며,
상기 모선과 상기 각선의 연결지점은 일 방향으로 배열되고, 바닥면으로부터 1m~1.5m에 위치하며,
발파대상 지반은 터널이고, 각 그룹의 발파공들은 종방향으로 배열되며, 모선과 각선의 연결지점은 횡방향으로 배열되며,
각각의 각선(43, 45)에는 서로 다른 지연시간을 부여하기 위해 바코드(30)가 부착되고, 상기 바코드는 상기 연결지점의 부근에 위치하고, 중심선(CL)을 기준으로 좌측 영역에 위치한 발파공과 우측 영역에 위치한 발파공에서 교대로 발파가 진행되도록 지연시간을 부여하고,
상기 모선 및 상기 각선은 각각 두 개의 선을 포함하며, 횡방향에서 상기 각선의 두 선들은 상기 모선의 두 선에 각각 병렬로 연결되고,종방향에서 각기 각선의 두 선들은 상하에 위치한 폭약과 서로 연결되는 것을 특징으로 하는 발파장치를 이용한 발파공법으로,
(a) 발파대상인 터널에 천공된 다수의 발파공들을 발파순서와 지연시간을 고려하여 소정 개수씩 그룹으로 묶은 후, 각 그룹의 발파공에 설치된 폭약의 뇌관을 상기 각선(43)(45)을 이용하여 전기적으로 서로 연결하는 단계; 및
(b) 각 그룹의 뇌관을 전기적으로 연결하는 상기 각선(43)(45)을 전기적으로 모선(11)(13)에 연결하되, 상기 모선과 상기 각선의 연결지점은 일방향으로 배열되며, 바코드 리더기를 이용하여 상기 각각의 각선(43)(45)에 설치된 바코드(30)를 읽어 들이고, 읽어 들인 바코드(30)가 설치된 뇌관에 지연시간을 부여하는 단계;
를 포함하며,
상기 중심선(CL)을 기준으로 좌측 영역의 발파공과 우측 영역의 발파공에서 교대로 발파되는 지연시간은,
상기 좌측 영역에서 0초, 50초, 100초, 150초, 200초, 250초, 350초, 400초, 450초, 500초, ...., 4000초
상기 우측 영역에서 25초, 75초, 125초, 175초, 225초, 275초, 375초, 425초, 475초, 525초, ...., 4025초
인 것을 특징으로 하는 발파공법.
Explosives installed in a number of blasting holes drilled in the tunnel to be blasted;
A bus extending from the blasting controller adjacent the explosive;
Each line electrically connecting the busbars with the primer of the explosives;
The upper member and the lower member which are connected to each other by connecting the busbars and the legs and pivot about the pivot axis so as to be coupled with each other, and fixing the busbars and the legs to the lower member and then rotating the upper member, A connecting connector in which the busbars and the legs are electrically connected to each other; And
A barcode 30 attached to each of the lines 43 and 45 and located near the connection point of the busline and the line for convenience of operation and safety;
/ RTI >
The connection points of the busbars and the respective lines are arranged in one direction and are located at 1m to 1.5m from the bottom surface,
The blasting target ground is a tunnel, the blast holes of each group are arranged in the longitudinal direction, the connection points of the bus and each line are arranged in the lateral direction,
A bar code 30 is attached to each of the corners 43 and 45 so as to give different delay times. The bar code is located near the connection point, and a blurring hole located in the left area with respect to the center line CL, A delay time is provided so that blasting alternately proceeds in the blast holes located in the region,
The two lines of each line are connected in parallel to the two lines of the busbars in the lateral direction and the two lines of each line in the longitudinal direction are connected to the upper and lower explosives, The blasting method using the blasting device,
(a) A plurality of blast holes perforated in a tunnel to be blasted are grouped into a predetermined number in consideration of blasting order and delay time, Electrically connecting each other; And
(b) electrically connecting the legs (43) and (45) electrically connecting the primers of the respective groups to the busbars (11) and (13), the connecting points of the busbars and the legs being arranged in one direction, Reading the bar code 30 installed on each of the lines 43 and 45 using the bar code 30 and giving a delay time to the primer provided with the read bar code 30;
/ RTI >
The delay time, which is alternately blasted in the blasting hole of the left area and the blasting hole of the right area with respect to the center line CL,
50 seconds, 100 seconds, 150 seconds, 200 seconds, 250 seconds, 350 seconds, 400 seconds, 450 seconds, 500 seconds, ...., 4000 seconds
75 seconds, 125 seconds, 175 seconds, 225 seconds, 275 seconds, 375 seconds, 425 seconds, 475 seconds, 525 seconds, ...., 4025 seconds
And the blasting method.
삭제delete 삭제delete 삭제delete
KR1020130162101A 2013-12-24 2013-12-24 Blasting means convenient and safe to connect leading line with leg line KR101459603B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130162101A KR101459603B1 (en) 2013-12-24 2013-12-24 Blasting means convenient and safe to connect leading line with leg line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130162101A KR101459603B1 (en) 2013-12-24 2013-12-24 Blasting means convenient and safe to connect leading line with leg line

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020110133062A Division KR20130066295A (en) 2011-12-12 2011-12-12 Blasting methods convenient and safe to connect leading line with leg line

Publications (2)

Publication Number Publication Date
KR20140006754A KR20140006754A (en) 2014-01-16
KR101459603B1 true KR101459603B1 (en) 2014-11-12

Family

ID=50141624

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130162101A KR101459603B1 (en) 2013-12-24 2013-12-24 Blasting means convenient and safe to connect leading line with leg line

Country Status (1)

Country Link
KR (1) KR101459603B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781560B (en) * 2016-04-18 2018-04-13 中建交通建设集团有限公司 A kind of construction method of the remote base tunnel look-ahead explosion in super low coverage superimposing thread tunnel

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002522745A (en) * 1998-08-13 2002-07-23 エクスパート エクスプローシブス(プロプライアタリー)リミティド Blasting device
KR200410147Y1 (en) * 2005-11-16 2006-03-07 주식회사 한화 Wire Connector for Electric Detonator
KR20060021569A (en) * 2004-09-03 2006-03-08 서동렬 Tunnel blasting method by controling the shot crack and the shaking of tunnel using pre-splitting

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002522745A (en) * 1998-08-13 2002-07-23 エクスパート エクスプローシブス(プロプライアタリー)リミティド Blasting device
KR20060021569A (en) * 2004-09-03 2006-03-08 서동렬 Tunnel blasting method by controling the shot crack and the shaking of tunnel using pre-splitting
KR200410147Y1 (en) * 2005-11-16 2006-03-07 주식회사 한화 Wire Connector for Electric Detonator

Also Published As

Publication number Publication date
KR20140006754A (en) 2014-01-16

Similar Documents

Publication Publication Date Title
CN105822313B (en) The method and device that dyskinetic foreign matter in shield section is removed based on interconnection
CN107060795B (en) A kind of underground mine TBM assembly construction methods
CN108386007B (en) Construction method for directionally dismantling large-volume reinforced concrete by using wire saw
CN103061771A (en) Remining mine fully-mechanized coal mining face open-off cut tunneling process and supporting method
KR101459603B1 (en) Blasting means convenient and safe to connect leading line with leg line
CN103233589B (en) Method for dismantling chimney by means of rope sawing and cutting method
CN105088979B (en) Demolition blasting method for large bridge
CN110332861B (en) Blasting construction method for controlling urban subway complex environment
CN106337687A (en) Convenient segmented support method for mine slant chute
RU2005139092A (en) METHOD FOR UNDERGROUND DEVELOPMENT OF POWERFUL ORE BODIES
CN103982184B (en) Underground mine oper cylinler caved stopes falls the directed landing control method of ore
CN103422871B (en) A kind of girders anchorage cable method for arranging of extra-large cross-section open-off cut Roof Control
KR20130066295A (en) Blasting methods convenient and safe to connect leading line with leg line
CN204060743U (en) Coal mining digging laneway gas buttress formula forestope temporary support device
JP6248420B2 (en) Anti-diffusion device for tunnel
CN104121022A (en) Coal mine roadway opening tunneling process
CN204691766U (en) One is driving system fast and safely
CN204238536U (en) Safety protection operation platform
CN103336304B (en) There is remote multiple shot central control detection system and the method for advance geology exploration instrument
CN203324484U (en) Advanced geological detection remote multi-shot concentrated control system
KR20160056670A (en) Low pollution blasting equipment and method using a delay nonelectric detonator and connector detonator
CN208488020U (en) A kind of powder charge platform for big cross section explosion
CN104179126A (en) Municipal overhead anti-collision wall construction equipment and construction method
CN104101269A (en) Shock-conducing tube four-way connecting explosion propagation operating method
Baiden Telerobotics for hang-up assessment and removal–an idea whose time has come

Legal Events

Date Code Title Description
A107 Divisional application of patent
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J202 Request for trial (for correction)
J301 Trial decision

Free format text: TRIAL NUMBER: 2017105000081; TRIAL DECISION FOR CORRECTION REQUESTED 20170809

Effective date: 20171017

FPAY Annual fee payment

Payment date: 20171102

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20181105

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20191104

Year of fee payment: 6