KR101356273B1 - Stern tube center target - Google Patents

Stern tube center target Download PDF

Info

Publication number
KR101356273B1
KR101356273B1 KR1020120059248A KR20120059248A KR101356273B1 KR 101356273 B1 KR101356273 B1 KR 101356273B1 KR 1020120059248 A KR1020120059248 A KR 1020120059248A KR 20120059248 A KR20120059248 A KR 20120059248A KR 101356273 B1 KR101356273 B1 KR 101356273B1
Authority
KR
South Korea
Prior art keywords
center
target
stern tube
support
target body
Prior art date
Application number
KR1020120059248A
Other languages
Korean (ko)
Other versions
KR20130135565A (en
Inventor
최창기
Original Assignee
주식회사 현대미포조선
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 현대미포조선 filed Critical 주식회사 현대미포조선
Priority to KR1020120059248A priority Critical patent/KR101356273B1/en
Publication of KR20130135565A publication Critical patent/KR20130135565A/en
Application granted granted Critical
Publication of KR101356273B1 publication Critical patent/KR101356273B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B7/00Measuring arrangements characterised by the use of electric or magnetic techniques
    • G01B7/30Measuring arrangements characterised by the use of electric or magnetic techniques for measuring angles or tapers; for testing the alignment of axes
    • G01B7/31Measuring arrangements characterised by the use of electric or magnetic techniques for measuring angles or tapers; for testing the alignment of axes for testing the alignment of axes

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • A Measuring Device Byusing Mechanical Method (AREA)
  • Earth Drilling (AREA)

Abstract

본 발명은 스턴튜브의 센터를 계측하는 타겟에 관한 것으로, 더욱 상세하게는 스턴튜브의 개구공에 설치되어 중심에 형성된 센터홀로 스턴튜브의 중심점이 확인되는 타겟몸체와, 상기 스턴튜브 내주면에 지지되어 상기 스턴튜브 중심에 상기 타겟몸체가 위치되게 상기 타겟몸체의 외주면에 방사상으로 결합되는 4개의 지지고정대로 구성되고, 상기 지지고정대들은 상기 타겟몸체에 방사상으로 결합될 시 상기 타겟몸체를 기준으로 상기 타겟몸체의 좌,우측에 위치하는 상기 지지고정대들의 사이 내각은 35°~45°이루고, 상기 타겟몸체의 상,하측에 위치하는 상기 지지고정대들의 사이 내각은 135°~145˚를 이루도록 결합되어, 상기 스턴튜브의 센터를 계측함은 물론, 본 발명이 상기 스턴튜브에 설치된 상태에서 보링 작업을 실시하는 작업자가 개구공을 용이하게 드나들 수 있도록 하는 스턴튜브 센터 타겟을 제공한다.The present invention relates to a target for measuring the center of a stern tube, and more particularly, a center hole provided at the center of the stern tube and formed in the center of the target body to confirm the center point of the stern tube, and is supported on the inner circumferential surface of the stern tube. Comprising four support fixtures that are radially coupled to the outer peripheral surface of the target body so that the target body is located in the center of the stern tube, the support fixtures when the target body is radially coupled to the target body relative to the target body The internal angle between the support fixing rods located on the left and right sides of the body is 35 ° to 45 °, and the internal angle between the support fixing rods located on the upper and lower sides of the target body is combined to form 135 ° to 145 °. As well as measuring the center of the stern tube, the operator who performs boring work in the state in which the present invention is installed in the stern tube, Provide a stern tube target center to allow the less it and out.

Figure R1020120059248
Figure R1020120059248

Description

스턴튜브 센터 타겟{Stern tube center target}Stern tube center target {Stern tube center target}

본 발명은 스턴튜브의 센터를 계측하는 타겟에 관한 것으로, 더욱 상세하게는 스턴튜브의 개구공에 설치되어 중심에 형성된 센터홀로 스턴튜브의 중심점이 확인되는 타겟몸체와, 상기 스턴튜브 내주면에 지지되어 상기 스턴튜브 중심에 상기 타겟몸체가 위치되게 상기 타겟몸체의 외주면에 방사상으로 결합되는 4개의 지지고정대로 구성되어, 상기 스턴튜브의 센터를 계측함은 물론, 본 발명이 상기 스턴튜브에 설치된 상태에서 보링 작업을 실시하는 작업자가 개구공을 용이하게 드나들 수 있도록 하는 스턴튜브 센터 타겟에 관한 것이다.
The present invention relates to a target for measuring the center of a stern tube, and more particularly, a center hole provided at the center of the stern tube and formed in the center of the target body to confirm the center point of the stern tube, and is supported on the inner circumferential surface of the stern tube. Consists of four support fixtures that are radially coupled to the outer circumferential surface of the target body so that the target body is located in the center of the stern tube, the center of the stern tube, as well as the present invention is installed in the stern tube The present invention relates to a stern tube center target that allows an operator performing a boring operation to easily enter and exit an aperture hole.

일반적으로 선박은 엔진의 구동력이 추진축을 통해 프로펠러에 전달되고, 전달되는 동력에 의해 프로펠러가 회전함으로써 발생되는 추진력을 이용해 운항하도록 되어 있다. In general, the ship is driven to the driving force of the engine is transmitted to the propeller through the propulsion shaft, the propulsion generated by the propeller rotation by the transmitted power.

이때 상기 추진축은 선박의 후미에 구비된 스턴튜브에 베어링 지지됨과 동시에 스턴튜브를 관통하도록 설치되어 있다. At this time, the propulsion shaft is supported so as to support the stern tube provided at the rear of the ship and penetrate the stern tube.

즉 선미를 구성하는 블록을 관통하게 스턴튜브가 설치되고, 이 스턴튜브 내에 추진축이 설치되어 프로펠러와 엔진을 연결하도록 한다.That is, a stern tube is installed to penetrate the block forming the stern, and a propulsion shaft is installed in the stern tube to connect the propeller and the engine.

한편 상기 추진축과 스턴튜브의 중심이 일치하지 못할 경우, 추진축에는 매우 큰 부하가 발생됨과 더불어 선박의 원활한 운항이 어렵기 때문에 선박의 건조시 스턴튜브와 추진축의 중심이 일치하는지에 대한 정확도를 체크하는 작업이 필수적으로 요구된다.On the other hand, when the center of the propulsion shaft and the stun tube does not match, very large loads are generated on the propulsion shaft and smooth operation of the ship is difficult, so it is necessary to check the accuracy of whether the center of the stern tube and the propulsion shaft coincides during the construction of the vessel. Work is essential.

상기와 같이 스턴튜브와 추진축의 중심을 체크하기 위해 종래에는 현장에서 임의의 철판조각을 제작하여 스턴튜브에 붙이고 이를 기준으로 하여 스턴튜브와 추진축의 중심선을 체크하였다. In order to check the center of the stern tube and the propulsion shaft as described above, in the prior art, a random steel plate was produced and attached to the stern tube, and based on this, the centerline of the stern tube and the propulsion shaft was checked.

그러나 이와 같은 방법은 임의의 철판조각을 매번 제작하여 붙이고 떼어내는데 많은 노동력이 요구되며, 또한 정확한 측정이 어려운 문제점이 있었다.However, such a method requires a lot of labor to produce, attach and detach an arbitrary sheet metal every time, and also has a problem that accurate measurement is difficult.

상기한 문제점을 해소하기 위해 다음과 같은 방안이 제안되었다.In order to solve the above problems, the following methods have been proposed.

등록실용신안 제20-0411896호(2006.03.14)에서는 3차원 계측기를 이용한 측정시 기준을 제공하는 몸체와, 상기 몸체의 일면에 부착되며, 십자형의 타켓용 선이 구비된 타켓시트와, 상기 몸체의 상/하/좌/우 측면으로 각각 연장되게 설치되고, 그의 내부가 빈 중공형으로 형성되며, 내외부를 연통하도록 그의 길이방향으로 길게 연장되게 형성된 가이드홀이 구비된 다수개의 고정용 파이프들과, 상기 각 고정용 파이프에 삽입되며, 상기 각 고정용 파이프의 가이드홀을 통해 삽입되는 볼트와 체결되어 고정용 파이프에 고정되는 다수개의 이동용 파이프들 및 상기 각 이동용 파이프의 끝단에 설치되어 스턴튜브에 부착되는 다수개의 마그네틱블록들을 구비하는 스턴튜브 위치 체크용 지그를 제공하였다.In the Utility Model Registration No. 20-0411896 (March 14, 2006), a target sheet provided with a body for providing a reference when measuring using a three-dimensional measuring instrument, a target sheet attached to one surface of the body, and having a cross-shaped target line, and the body A plurality of fixing pipes installed to extend on the upper / lower / left / right sides of the inner side, each having an inner hollow shape, and a guide hole formed to extend in the longitudinal direction to communicate the inside and the outside; And a plurality of moving pipes inserted into the fixing pipes and fastened to the bolts inserted through the guide holes of the fixing pipes and fixed to the fixing pipes, and installed at the ends of the moving pipes to the stern tube. A jig for stern tube position checking was provided having a plurality of magnetic blocks to which it was attached.

하지만 상술한 종래의 스턴튜브 위치 체크용 지그(스턴튜브 센터 타겟)는 '+'열십자형으로 구성되어 있어, 상기 스턴튜브를 내에서 보링과 같은 작업을 할 시 작업자가 스턴튜브의 개구공을 드나들기 매우 힘들뿐만 아니라, 자칫 상기 스턴튜브의 개구공에 설치된 스턴튜브 위치 체크용 지그(스턴튜브 센터 타겟)를 개구공에서 이탈시켜 다시 재설치해야 문제점이 발생하였다.However, the above-described conventional stern tube position check jig (stern tube center target) is composed of a '+' crisscross shape. Not only very hard to lift, but also the problem of having to reinstall the stern tube position check jig (stern tube center target) installed in the opening hole of the stun tube again from the opening hole.

또한 종래의 스턴튜브 위치 체크용 지그(스턴튜브 센터 타겟)의 과녁중심점이 기준점과 일직선을 이루어야 하는데, 과녁중심점의 미세조정이 힘들어 생산성 저하의 문제점이 발생하였다.
In addition, the target center point of the conventional stern tube position check jig (stern tube center target) should be in line with the reference point, the fine adjustment of the target center point is difficult to reduce the productivity.

본 발명은 타겟몸체를 기준으로 개구공의 상,하측으로 작업자가 용이하게 드나들 수 있어 작업자의 편의성이 증대되고, 타겟홀이 형성된 타겟프레임의 미세조정이 가능하여 스턴튜브의 센터(중심)를 신속하고 정확하게 를 계측할 수 있는 스턴튜브 센터 타겟을 제공함에 그 목적이 있다.
According to the present invention, the operator can easily enter the upper and lower sides of the opening body based on the target body, thereby increasing the convenience of the operator and finely adjusting the target frame in which the target hole is formed. The goal is to provide a stun tube center target that can measure quickly and accurately.

본 발명은 스턴튜브의 개구공에 설치되어 중심에 형성된 센터홀로 스턴튜브의 중심점이 확인되는 타겟몸체와, 상기 스턴튜브 내주면에 지지되어 상기 스턴튜브 중심에 상기 타겟몸체가 위치되게 상기 타겟몸체의 외주면에 방사상으로 결합되는 4개의 지지고정대가 포함되는데, 상기 타겟몸체는 중심부가 원형으로 천공된 고리형의 바디프레임과, 상기 바디프레임의 내주연을 따라 상,하,좌,우측면에 각각 결합되는 복수의 가이드와, 상기 바디프레임의 상,하,좌,우측 외주연에서 내주연으로 향하게 각각 체결되고, 볼트단이 상기 가이드를 관통하는 복수의 조절볼트와, 상기 바디프레임의 천공 중심에 위치되고, 중심에는 타겟홀이 형성되며, 상기 조절볼트들을 조작함에 따라 상기 가이드들을 따라 상,하,좌,우로 이동되는 정사각형의 타겟프레임이 포함된다. The present invention is a center hole formed in the center of the opening hole of the stern tube is formed in the center of the target body and the center point of the stern tube, the outer peripheral surface of the target body is supported on the inner circumferential surface of the stern tube so that the target body is located in the center of the stern tube Four support fixtures are coupled radially to the target body, and the target body is a plurality of coupled to the upper, lower, left, right sides along the inner periphery of the annular body frame and the inner frame of the body is circularly perforated; The guide and the upper, lower, left and right outer periphery of the body frame are fastened to the inner periphery, respectively, a plurality of bolts are adjusted through the guide, and the center of the perforation of the body frame, A target hole is formed at the center, and a square target frame is moved up, down, left, and right along the guides by manipulating the adjusting bolts. Respectively.

이때 본 발명에 따른 상기 지지고정대들은 상기 타겟몸체에 방사상으로 결합될 시 상기 타겟몸체를 기준으로 상기 타겟몸체의 좌,우측에 위치하는 상기 지지고정대들의 사이 내각은 35°~45°이루고, 상기 타겟몸체의 상,하측에 위치하는 상기 지지고정대들의 사이 내각은 135°~145˚를 이루도록 결합된다.At this time, when the support fixtures according to the present invention are radially coupled to the target body, an internal angle between the support holders located on the left and right sides of the target body is 35 ° to 45 ° based on the target body. The interior angles of the support fixtures located on the upper and lower sides of the body are combined to form 135 ° to 145 °.

그리고 본 발명에 따른 상기 지지고정대는 상기 타겟몸체에 일단이 나사결합되고, 타단에는 나사공이 형성되는 외관체와, 상기 외관체의 나사공에 내측단이 나사결합되어 나사산으로 따라 회전되어 길이가 신축되는 지지관체와, 상기 지지관체의 외측단에 결합되고, 상기 스턴튜브의 내주단에 걸쳐지도록 걸림턱이 형성된 고정블럭이 포함될 수 있다.In addition, the support fixture according to the present invention has one end screwed to the target body, the other end is the outer body is formed with a screw hole, the inner end screwed into the screw hole of the outer body is rotated along the screw thread length is stretched It may be included in the support tube, and a fixed block coupled to the outer end of the support tube, the locking step is formed so as to span the inner circumferential end of the stern tube.

삭제delete

본 발명에 따른 스턴튜브 센터 타겟은 다음과 같은 효과를 가진다.The stern tube center target according to the present invention has the following effects.

첫째, 4개의 지지고정대들을 타겟몸체를 기준으로 상기 타겟몸체의 좌,우측에 위치하는 상기 지지고정대들의 사이 내각은 35°~45°이루고, 상기 타겟몸체의 상,하측에 위치하는 상기 지지고정대들의 사이 내각은 135°~145˚로 상기 타겟몸체에 방사상으로 결합 구성한 본 발명을 스턴튜브의 개구공에 설치하면, 상기 타겟몸체를 기준으로 개구공의 상,하측으로 작업자가 용이하게 드나들 수 있어 작업자의 편의성이 증대된다.First, the internal angle between the four support guides on the left and right of the target body to the left and right of the target body relative to the target body is 35 ° ~ 45 °, the upper and lower of the support body of the support When the internal angle between 135 ° and 145 ° between the target body is installed in the opening hole of the stun tube, the operator can easily move up and down the opening hole based on the target body. The operator's convenience is increased.

둘째, 상기 타겟몸체에는 타겟홀이 형성된 타겟프레임을 상,하,좌,우로 이동시키는 조절볼트가 구성되어, 상기 조절볼트를 조작해 타겟홀이 형성된 타겟프레임의 미세조정이 가능하여, 신속하고 정확하게 스턴튜브의 센터(중심)를 계측할 수 있다.
Second, the target body is configured with a control bolt for moving the target frame formed with the target hole up, down, left, right, fine adjustment of the target frame formed with the target hole by operating the adjustment bolt, can be quickly and accurately The center of the stern tube can be measured.

도 1은 본 발명 스턴튜브 센터 타겟의 구성을 보인 예시도이다.
도 2는 본 발명 스턴튜브 센터 타겟의 구성을 보인 사시도이다.
도 3은 본 발명 스턴튜브 센터 타겟의 사용상태를 보인 예시도이다.
1 is an exemplary view showing the configuration of the present invention stern tube center target.
Figure 2 is a perspective view showing the configuration of the present stun tube center target.
Figure 3 is an exemplary view showing a state of use of the stern tube center target of the present invention.

이하, 첨부된 도면을 참조하여 본 발명에 따른 바람직한 실시 예를 상세히 설명하기로 한다. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

이에 앞서 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여, 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.Prior to this, the terms or words used in this specification and claims should not be construed as being limited to the ordinary or dictionary meanings, and the inventors properly define the concept of terms in order to explain their invention in the best way. Based on the principle that it can, it should be interpreted as meaning and concept corresponding to the technical idea of the present invention.

따라서 본 명세서에 기재된 실시 예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시 예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원 시점에 있어서 이들을 대체할 수 있는 균등한 변형 예들이 있을 수 있음을 이해하여야 한다.Therefore, the embodiments described in the present specification and the configurations shown in the drawings are merely the most preferred embodiments of the present invention and are not intended to represent all of the technical ideas of the present invention. Therefore, It should be understood that there may be variations.

이하, 첨부된 도면을 참조하여 본 발명에 따른 바람직한 실시 예를 상세히 설명하면,Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명 스턴튜브 센터 타겟의 구성을 보인 예시도이고, 도 2는 본 발명 스턴튜브 센터 타겟의 구성을 보인 사시도이며, 도 3은 본 발명 스턴튜브 센터 타겟의 사용상태를 보인 예시도이다.1 is an exemplary view showing the configuration of the stern tube center target of the present invention, Figure 2 is a perspective view showing the configuration of the stern tube center target of the present invention, Figure 3 is an exemplary view showing a state of use of the stern tube center target of the present invention. .

본 발명은 스턴튜브(T)의 개구공에 설치되어 상기 스턴튜브(T)의 센터(중심)를 계측함은 물론, 스턴튜브(T)의 보링 작업을 실시하는 작업자가 스턴튜브(T)의 개구공을 용이하게 드나들 수 있도록 하는 스턴튜브 센터 타겟에 관한 것으로, 그 구성은 크게 타겟몸체(10)와, 상기 타겟몸체(10)에 방사상으로 결합되는 지지고정대(20)로 구성된다.The present invention is installed in the opening hole of the stern tube (T) to measure the center (center) of the stern tube (T), as well as to perform the boring operation of the stern tube (T) by the operator of the stern tube (T) Stern tube center target for easily entering and exiting the opening hole, the configuration is largely composed of the target body 10, the support fixture 20 is radially coupled to the target body (10).

먼저 상기 타겟몸체(10)는 스턴튜브(T)의 개구공에 설치되어 중심에 형성된 센터홀(14a)로 스턴튜브(T)의 센터(중심)점을 계측할 수 있다.First, the target body 10 may be installed in the opening hole of the stern tube T to measure the center (center) point of the stern tube T with the center hole 14a formed at the center thereof.

상기한 타겟몸체(10)를 도면을 참조하여 보다 상세하게 살펴보면, 도 1에 도시한 바와 같이 상기 타겟몸체(10)는 바디프레임(11)과, 복수의 가이드(12)와, 복수의 조절볼트(13)와, 타겟프레임(14)으로 구성되는데, 상기 바디프레임(11)은 중심부가 원형으로 천공된 고리형을 이룬다. Looking at the target body 10 in more detail with reference to the drawings, as shown in Figure 1, the target body 10 is a body frame 11, a plurality of guides 12, a plurality of adjustment bolts 13 and the target frame 14, the body frame 11 is formed in a ring shape with a central perforated circle.

그리고 상기 바디프레임(11)의 내주연을 따라 복수의 가이드(12)가 상,하,좌,우측면에 각각 배치되어 결합되는데, 상기 가이드(12)들은 상기 바디프레임(11)의 내주연과 맞닿는 면은 상기 바디프레임(11)의 내주연을 따라 외향으로 볼록한 만곡부로 형성되고, 타향면은 일직선으로 형성되어, 상기 바디프레임(11)의 내주연에 상기 가이드(12)들을 배치하면 정사각형의 유동공간이 형성된다. The plurality of guides 12 are disposed on the upper, lower, left, and right sides of the body frame 11 to be coupled to each other, and the guides 12 are in contact with the inner circumference of the body frame 11. The surface is formed as an outwardly convex curved portion along the inner circumference of the body frame 11, the other surface is formed in a straight line, when the guide 12 is disposed on the inner circumference of the body frame 11, the flow of a square Space is formed.

또한 상기 바디프레임(11)의 상,하,좌,우측면에는 외주연에서 내주연으로 향하는 복수의 조절볼트(13)가 각각 체결되는데, 상기 조절볼트(13)는 그 볼트단이 상기 바디프레임(11)을 관통해 상기 가이드(12)들과 연결된다.In addition, the upper, lower, left and right sides of the body frame 11 are fastened to the plurality of adjustment bolts 13 from the outer circumference to the inner circumference, respectively, the adjustment bolt 13 is the bolt end of the body frame ( It is connected to the guides 12 through the 11.

즉 다시 말해 상기 바디프레임(11)의 상측면에 결합되는 상기 조절볼트(13)는 상기 바디프레임(11)의 상측 내주연에 배치된 상기 가이드(12)와 연결되고, 상기 바디프레임(11)의 하측면에 결합되는 상기 조절볼트(13)는 상기 바디프레임(11)의 하측 내주연에 배치된 상기 가이드(12)와 연결되며, 상기 바디프레임(11)의 좌측면에 결합되는 상기 조절볼트(13)는 상기 바디프레임(11)의 좌측 내주연에 배치된 상기 가이드(12)와 연결되고, 상기 바디프레임(11)의 우측면에 결합되는 상기 조절볼트(13)는 상기 바디프레임(11)의 우측 내주연에 배치된 상기 가이드(12)와 연결된다.In other words, the adjustment bolt 13 coupled to the upper side of the body frame 11 is connected to the guide 12 disposed on the upper inner circumference of the body frame 11, the body frame 11 The adjustment bolt 13 is coupled to the lower side of the control bolt is connected to the guide 12 disposed on the lower inner circumference of the body frame 11, the adjustment bolt is coupled to the left side of the body frame 11 13 is connected to the guide 12 disposed on the left inner circumference of the body frame 11, the control bolt 13 is coupled to the right side of the body frame 11 is the body frame 11 It is connected with the guide 12 disposed on the right inner circumference of the.

그리고 상기 바디프레임(11)의 천공 중심인 상기 가이드(12)들에 의해 생성된 유동공간에 정사각형의 타겟프레임(14)이 구성되어 상기 조절볼트(13)들을 조작함에 따라 상기 가이드(12)에 의해 상,하,좌,우로 이동된다.In addition, a square target frame 14 is formed in the flow space generated by the guides 12, which are the centers of the perforations of the body frame 11, to manipulate the adjustment bolts 13 to the guide 12. To move up, down, left and right.

상기 타겟프레임(14)의 중심에는 타겟홀(14a)이 형성되어, 상기 스턴튜브(T)의 중심 센터를 계측할 수 있다.A target hole 14a is formed at the center of the target frame 14 to measure the center of the stern tube T.

그리고 상기 지지고정대(20)는 모두 4개로 구성되고, 상기 타겟몸체(10)의 외주면에 방사상으로 결합되며, 상기 지지고정대(20)들이 상기 스턴튜브(T) 내주면에 지지되어 상기 스턴튜브(T) 중심에 상기 타겟몸체(10)가 위치하게 된다. And the support fixture 20 is composed of all four, is coupled radially to the outer peripheral surface of the target body 10, the support fixture 20 is supported on the inner circumferential surface of the stern tube (T) the stern tube (T) The target body 10 is located at the center.

상기 지지고정대(20)들을 보다 상세하게 살펴보면, 상기 지지고정대(20)들은 외관체(21), 지지관체(22), 고정블럭(23)으로 구성되는데, 상기 외관체(21)의 일측단에는 결합볼트부(도시하지 않음)가 형성되어, 상기 타겟몸체(10)의 외주연에 결합볼트부(도시하지 않음)로 나사결합되고, 대향진 타단에는 나사공(21a)이 형성된다.Looking at the support fixture 20 in more detail, the support fixture 20 is composed of the outer body 21, the support tube 22, the fixed block 23, at one end of the outer body 21 A coupling bolt portion (not shown) is formed, and screwed into a coupling bolt portion (not shown) on the outer circumference of the target body 10, and a screw hole 21a is formed at the opposite end of the target body 10.

상기 외체관(21)의 나사공(21a)에는 지지관체(22)가 나사결합되는데, 상기 지지관체(22)는 상기 타겟몸체(10)로 향하는 내측단에는 나사부(도시하지 않음)가 형성되어, 상기 외체관(21)의 나사공(21a)에 나사결합한 후 상기 나사공(21a)의 나사산으로 따라 회전되어 그 길이가 신축된다.The support tube body 22 is screwed to the screw hole 21a of the outer tube tube 21, and the support tube body 22 is formed with a screw portion (not shown) at an inner end facing the target body 10. After screwing into the screw hole 21a of the outer tube 21, the length of the screw hole 21a is rotated along the thread of the screw hole 21a.

그리고 상기 타겟몸체(10)의 바깥으로 향하는 상기 지지관체(22)의 외측단에는 고정블럭(23)이 결합되는데, 상기 고정블럭(23)은 상기 스턴튜브(T)의 내주단에 걸쳐지도록 걸림턱(23a)이 형성되어 있다.In addition, a fixed block 23 is coupled to an outer end of the support tube 22 toward the outside of the target body 10, and the fixed block 23 is caught to cover the inner circumferential end of the stern tube T. The jaw 23a is formed.

또한 상기 고정블럭(23)은 자성체로 구성될 수도 있다.In addition, the fixed block 23 may be made of a magnetic material.

상기한 지지고정대(20)들은 도 3에 도시한 바와 같이 상기 타겟몸체(10)를 기준으로 상기 타겟몸체(10)의 좌,우측에 각각 한 쌍으로 배치되어 결합되는데, 상기 타겟몸체(10)의 좌,우측에 각각 배치되는 한 쌍의 지지고정대(20)들은 서로 간의 사이 내각이 35°~45°이루고, 상기 지지고정대(20)들의 상,하측 사이 내각은 135°~145˚를 이루어 상기 타겟몸체(10)에 방사상으로 결합된다.As shown in FIG. 3, the support fixtures 20 are arranged in pairs on the left and right sides of the target body 10 based on the target body 10, respectively, and are coupled to the target body 10. The pair of support fixtures 20 disposed on the left and right sides of each of the inner angle between each other 35 ° ~ 45 °, the upper and lower angles of the support brackets 20 made of 135 ° ~ 145 ° It is coupled radially to the target body (10).

본 발명의 구성에 따른 스턴튜브 센터 타겟를 스턴튜브(T)의 개구공에 설치하는 과정을 도 3을 참조하여 살펴보면 다음과 같다.The process of installing the stern tube center target according to the configuration of the present invention in the opening hole of the stern tube T will be described with reference to FIG. 3.

먼저 임의로 상기 타겟몸체(10)를 스턴튜브(T)의 중심에 위치한 후 상기 지지고정대(20)들의 상기 지지관체(22)들을 회전시켜, 상기 지지관체(22)들의 길이를 스턴튜브(T)의 개구공 내주연에 맞닿을 있도록 조작한다.First, the target body 10 is arbitrarily positioned at the center of the stern tube T, and then the support tubes 22 of the support fixing rods 20 are rotated to lengthen the length of the support tubes 22 to the stern tube T. Operate so as to abut against the inner circumference of the opening.

상기 지지고정대(20)의 상기 지지관체(22)가 회전함에 따라 상기 지지관체(22)가 상기 외체관(21)의 나사공(21a)에 형성된 나사산을 타고, 그 길이가 신장되고, 상기 지지고정대(20)의 고정블럭(23)에 형성된 걸림턱(23a)이 상기 스턴튜브(T)의 내주단에 맞닿아 걸쳐지게 되어 상기 타겟몸체(10)가 스턴튜브(T)의 중심에 위치하여 고정되므로 설치가 완료된다.As the support tube 22 of the support fixture 20 rotates, the support tube 22 rides on a thread formed in the screw hole 21a of the outer tube 21, and the length thereof is extended, and the support The locking jaw 23a formed on the fixing block 23 of the fixing stand 20 is brought into contact with the inner circumferential end of the stern tube T so that the target body 10 is located at the center of the stern tube T. The installation is completed because it is fixed.

그리고 상기 타겟몸체(10)의 외주연에 결합된 조절볼트(13)들을 조작하면, 상기 조절볼트(13)들과 연결된 상기 가이드(12)들에 의해 중심에 타겟홀(14a)이 형성된 타겟프레임(14)이 상,하,좌,우로 이동되어, 상기 스턴튜브(T)의 센터를 미세하게 계측할 수도 있다.And when operating the control bolts 13 coupled to the outer periphery of the target body 10, the target frame 14a is formed in the target hole 14a in the center by the guides 12 connected to the control bolts 13 14 may be moved up, down, left, and right, and the center of the stern tube T may be finely measured.

본 발명은 도면에 도시된 실시 예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 다른 실시 예가 가능하다는 점을 이해할 것이다. 따라서 본 발명의 진정한 기술적 보호 범위는 첨부된 특허청구범위의 기술적 사상에 의하여 정해져야 할 것이다.
While the present invention has been described with reference to exemplary embodiments, it is to be understood that the invention is not limited to the disclosed exemplary embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims. Accordingly, the true scope of the present invention should be determined by the technical idea of the appended claims.

T: 스턴튜브 10: 타겟몸체 11: 바디프레임
12: 가이드 13: 조절볼트 14: 타겟프레임
14a: 센터홀 20: 지지고정대 21: 외관체
21a: 나사공 22: 지지관체 23: 고정블럭
23a: 걸림턱
T: Stern Tube 10: Target Body 11: Body Frame
12: Guide 13: Adjustment bolt 14: Target frame
14a: center hole 20: support fixture 21: exterior body
21a: screw hole 22: support tube 23: fixed block
23a: jamming jaw

Claims (4)

스턴튜브의 개구공에 설치되어 중심에 형성된 센터홀로 스턴튜브의 중심점이 확인되는 타겟몸체 및 상기 스턴튜브 내주면에 지지되어 상기 스턴튜브 중심에 상기 타겟몸체가 위치되게 상기 타겟몸체의 외주면에 방사상으로 결합되는 4개의 지지고정대가 포함되는 스턴튜브 센터 타겟에 있어서,
상기 타겟몸체는
중심부가 원형으로 천공된 고리형의 바디프레임;
상기 바디프레임의 내주연을 따라 상,하,좌,우측면에 각각 결합되는 복수의 가이드;
상기 바디프레임의 상,하,좌,우측 외주연에서 내주연으로 향하게 각각 체결되고, 볼트단이 상기 가이드를 관통하는 복수의 조절볼트;
상기 바디프레임의 천공 중심에 위치되고, 중심에는 타겟홀이 형성되며, 상기 조절볼트들을 조작함에 따라 상기 가이드들을 따라 상,하,좌,우로 이동되는 정사각형의 타겟프레임;이 포함되는 스턴튜브 센터 타겟.
A center hole formed in the center of the stern tube is formed in the center of the target body and the center point of the stern tube and the support is supported on the inner circumferential surface of the stern tube radially coupled to the outer peripheral surface of the target body so that the target body is located in the center of the stern tube In the stern tube center target that includes four support fixtures,
The target body
An annular body frame in which the center is punched in a circle;
A plurality of guides respectively coupled to upper, lower, left, and right sides along an inner circumference of the body frame;
A plurality of adjusting bolts fastened from the outer circumferential edges of the body frame toward the inner circumferential edge of the body frame and having bolt ends penetrating the guides;
Stern tube center target is located in the center of the perforation of the body frame, the target hole is formed in the center, the square target frame to move up, down, left, right along the guides as the control bolt is manipulated .
제1항에 있어서,
상기 지지고정대들은
상기 타겟몸체에 방사상으로 결합될 시 상기 타겟몸체를 기준으로 상기 타겟몸체의 좌,우측에 위치하는 상기 지지고정대들의 사이 내각은 35°~45°이루고, 상기 타겟몸체의 상,하측에 위치하는 상기 지지고정대들의 사이 내각은 135°~145˚를 이루도록 결합되는 스턴튜브 센터 타겟.
The method of claim 1,
The support fixtures
When the radially coupled to the target body, the inner angle between the support fixing rods located on the left and right of the target body relative to the target body is 35 ° ~ 45 °, the upper and lower positions of the target body Stern tube center target is coupled between the support bracket to form a 135 ° ~ 145 °.
제1항에 있어서,
상기 지지고정대는
상기 타겟몸체에 일단이 나사결합되고, 타단에는 나사공이 형성되는 외관체;
상기 외관체의 나사공에 내측단이 나사결합되어 나사산으로 따라 회전되어 길이가 신축되는 지지관체;
상기 지지관체의 외측단에 결합되고, 상기 스턴튜브의 내주단에 걸쳐지도록 걸림턱이 형성된 고정블럭;이 포함되는 스턴튜브 센터 타겟.
The method of claim 1,
The support fixture is
An external body having one end screwed to the target body and a screw hole formed at the other end thereof;
A support tube having an inner end screwed into the screw hole of the outer body to be rotated along a thread to stretch its length;
And a fixed block coupled to an outer end of the support tube and having a locking jaw formed to cover the inner circumferential end of the stern tube.
삭제delete
KR1020120059248A 2012-06-01 2012-06-01 Stern tube center target KR101356273B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120059248A KR101356273B1 (en) 2012-06-01 2012-06-01 Stern tube center target

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120059248A KR101356273B1 (en) 2012-06-01 2012-06-01 Stern tube center target

Publications (2)

Publication Number Publication Date
KR20130135565A KR20130135565A (en) 2013-12-11
KR101356273B1 true KR101356273B1 (en) 2014-02-05

Family

ID=49982774

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120059248A KR101356273B1 (en) 2012-06-01 2012-06-01 Stern tube center target

Country Status (1)

Country Link
KR (1) KR101356273B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101915225B1 (en) 2017-09-15 2018-11-05 삼성중공업 주식회사 Jig for setting of ship block

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010112720A (en) * 2000-06-12 2001-12-21 김형벽ㅂ Draught measuring devices
KR20020072881A (en) * 2001-03-13 2002-09-19 대우조선해양 주식회사 Axis align method using total station
KR200411896Y1 (en) * 2005-12-21 2006-03-21 현대중공업 주식회사 Jig for checking stern tube position
KR200415437Y1 (en) 2006-02-13 2006-05-03 대우조선해양 주식회사 Marking and measuring structure for datum line of block

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010112720A (en) * 2000-06-12 2001-12-21 김형벽ㅂ Draught measuring devices
KR20020072881A (en) * 2001-03-13 2002-09-19 대우조선해양 주식회사 Axis align method using total station
KR200411896Y1 (en) * 2005-12-21 2006-03-21 현대중공업 주식회사 Jig for checking stern tube position
KR200415437Y1 (en) 2006-02-13 2006-05-03 대우조선해양 주식회사 Marking and measuring structure for datum line of block

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101915225B1 (en) 2017-09-15 2018-11-05 삼성중공업 주식회사 Jig for setting of ship block

Also Published As

Publication number Publication date
KR20130135565A (en) 2013-12-11

Similar Documents

Publication Publication Date Title
CN202010720U (en) Automatic centring point punching jig
KR200411896Y1 (en) Jig for checking stern tube position
CN203092469U (en) Puller
US9279338B2 (en) Method for balancing a propulsive system having non-hull contra-rotating propellers
CN106041176A (en) Clamp for flange plate drilling
CN105500235B (en) A kind of oblique impact apparatus of thin-wall pipe varied angle
KR101356273B1 (en) Stern tube center target
CN104511863A (en) Spring fixture
CN104057286B (en) A kind of erecting device of motor rotor upper bearing (metal)
KR20140118302A (en) Jig for circular welding test piece
CN102564262A (en) Double-reference automobile girder inspection device
CN206405726U (en) The combined type fixture of bead part
CN104807582B (en) A kind of torsion detection tooling
CN105081721B (en) Positioning tool for core penetrating pipe
CN108069333A (en) Aero-engine spray pipe lifting device
KR20130011518A (en) Jig for mounting shaft
CN209036026U (en) A kind of internal stay tool
CN204457451U (en) Bracing or strutting arrangement, mast assembly and rotary drilling rig
KR200476503Y1 (en) Centering target jig of stern tube
CN204248318U (en) Anchor studs fixator
CN209986462U (en) Vertical device for welding steel pipe stand column and flange of cantilever crane
KR20140000808U (en) Center target
KR20150000901U (en) Manual welding apparatus for ship
KR200476504Y1 (en) Centering target jig of rudder horn
CN203701554U (en) Flexible worktable for round diameter-adjustable silo structure lining construction

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170120

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180122

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190121

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20200121

Year of fee payment: 7