KR101340749B1 - Transparent kinetic protection dam for preserve waterfront rock painting and method of construction thereof - Google Patents

Transparent kinetic protection dam for preserve waterfront rock painting and method of construction thereof Download PDF

Info

Publication number
KR101340749B1
KR101340749B1 KR1020130079782A KR20130079782A KR101340749B1 KR 101340749 B1 KR101340749 B1 KR 101340749B1 KR 1020130079782 A KR1020130079782 A KR 1020130079782A KR 20130079782 A KR20130079782 A KR 20130079782A KR 101340749 B1 KR101340749 B1 KR 101340749B1
Authority
KR
South Korea
Prior art keywords
protective film
petroglyphs
waterfront
transparent
rock
Prior art date
Application number
KR1020130079782A
Other languages
Korean (ko)
Inventor
함인선
Original Assignee
주식회사 선진엔지니어링 종합건축사 사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 선진엔지니어링 종합건축사 사무소 filed Critical 주식회사 선진엔지니어링 종합건축사 사무소
Priority to KR1020130079782A priority Critical patent/KR101340749B1/en
Application granted granted Critical
Publication of KR101340749B1 publication Critical patent/KR101340749B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/129Polyhedrons, tetrapods or similar bodies, whether or not threaded on strings

Abstract

A folding-type transparent protective cover for preserving waterfront rock paintings according to the present invention comprises the following parts: a protective cover base; a protective cover frame installed on top of the base; a transparent membrane; a buttress installed between rocks; a flagstone-supporting wing; a slate flagstone; and a hard-urethane waterproofing filler plate (33). The folding-type transparent protective cover for preserving waterfront rock paintings and an installation method thereof according to the present invention enable the height of the folding-type transparent protective cover to be changed based on the water level of a waterfront, wherein the water level is changed in accordance with precipitation changes throughout the year. The front of the protective cover is formed by using a transparent membrane, so that uniform sunshine conditions can be provided throughout the year, and therefore moss can be effectively prevented from growing on a rock face and on rock paintings. A normal protective cover has a structure which endures water pressure by being formed in a cantilever shape, but the folding-type transparent protective cover of the present invention has a structure which endures water pressure by being formed in an arch shape, and therefore is more robust. Structures forming the folding-type transparent protective cover are produced at the outside and then only assembled together at a construction site which is crowded and at which construction is difficult, and disassembly can be performed in the reverse order of the assembly, therefore the structures can be reused.

Description

수변 암각화 보존을 위한 접이식 투명 보호막 및 그 설치 공법{TRANSPARENT KINETIC PROTECTION DAM FOR PRESERVE WATERFRONT ROCK PAINTING AND METHOD OF CONSTRUCTION THEREOF}TRANSPARENT KINETIC PROTECTION DAM FOR PRESERVE WATERFRONT ROCK PAINTING AND METHOD OF CONSTRUCTION THEREOF}

본 발명은 수변 암각화 보존을 위한 접이식 투명 보호막 및 그 설치 공법에 관한 것으로, 구체적으로는 암각화 주변 수위가 변동되는 것에 따라 접이식으로 높이 조절이 가능하고 투명 보호막으로 빛 투과가 가능하며 아치형 구조로 견고함과 아울러 외부 제작 후 현장에서 조립 구성이 가능한 수변 암각화 보존을 위한 접이식 투명 보호막 및 그 설치 공법에 관한 것이다.The present invention relates to a foldable transparent protective film for the conservation of waterside petroglyphs and a method for installing the same. Specifically, the height can be adjusted by folding as the water level around the petroglyph is changed, and the light can be transmitted through the transparent protective film. In addition, the present invention relates to a foldable transparent protective film and its installation method for preserving waterside petroglyphs that can be assembled in the field after external manufacture.

자연 문화 유산은 보호되고 보존되어야 한다. 암벽에 형성되어 있는 암각화의 경우에도 보호 보존되어야 하는데 특히 수변에 위치한 경우에는 침수에 의해서 그 형태가 손실되는 문제가 종종 발생된다. 예를 들어, 울산 대곡리 반구대 암각화의 경우 가로 약 가로 약 8m, 세로 약 2m, 높이는 3.7m의 암벽에 고래,개,늑대,호랑이,사슴,멧돼지,곰,토끼,여우,거북,물고기,사람 등의 형상과 고래잡이 모습, 배와 어부의 모습, 사냥하는 광경 등을 표현되어 있어서 국보 제285호로 지정되어 있다. 뿐만 아니아 2010년에는 유네스코 세계문화유산 잠정목록에 등재되었다. 그러나 반구대 암각화의 경우에는 강변에 위치하고 있어서 암각화 주변의 수변의 수위에 민감하게 영향을 받게 된다.Natural heritage must be protected and preserved. In the case of petroglyphs formed on the rock wall, it should be preserved and preserved. In particular, when located on the waterfront, the problem of loss of shape due to inundation often occurs. For example, in Ulsan Daegokri hemisphere petroglyphs, whales, dogs, wolves, tigers, deer, wild boars, bears, rabbits, foxes, turtles, fish, people, etc., are about 8m wide, 2m tall, and 3.7m high. It is designated as National Treasure No. 285 due to its shape, whale hunt, boat and fisherman, and hunting scenes. In addition, in 2010, it was listed on the UNESCO Provisional List. However, in the case of hemisphere petroglyphs, they are located along the river and are sensitive to the water level around the petroglyphs.

반구대 암각화의 경우에는 여러 가지 문제점이 존재하는데 암각화가 위치한 주변 강수원이 생활 용수와 공업 용수로 사용되기 위하여 담수용 댐이 건설되어 있다. 담수용 댐의 경우 목적에 의해 일정 수위를 유지할 필요가 있는데 이 경우 반구대 암각화가 침수되어 손상될 수 있다. 또한 연간 강수량의 변화에 따라 반구대 암각화 주변의 수위가 변동될 수 있어서 우기에 침수될 수 있는 문제점이 존재한다.In the case of hemisphere petroglyphs, there are various problems. Freshwater dams are constructed so that the nearby rivers where the petroglyphs are located are used as living water and industrial water. In case of freshwater dam, it is necessary to maintain a certain level according to the purpose, in which case hemisphere petroglyphs may be flooded and damaged. In addition, there is a problem that the water level around the hemisphere petroglyphs can be changed according to the change of annual rainfall, so that it may be flooded during the rainy season.

이와 같이, 수변에 위치하는 암각화는 수변 환경에 따라서 손상될 수 있어서 이를 적극적으로 보호할 필요가 있다. 특히, 담수용 댐이 건설된 경우에는 공업 및 생활용 수자원 활용 측면과 충돌되지 않으면서도 자연 문화 유산을 효과적으로 보존할 수 있는 수변 암각화 보존을 위한 접이식 투명 보호막이 요구되고 있다.As such, petroglyphs located in the waterside may be damaged according to the waterside environment, and it is necessary to actively protect it. In particular, when freshwater dams are constructed, there is a demand for a foldable transparent protective film for preserving waterside petroglyphs that can effectively preserve natural cultural heritage without colliding with industrial and living water resource utilization aspects.

본 발명의 목적은 대체 상수원 확보 혹은 우회 수로 개설 등과 같이 근본적인 암각화 보호 방안이 구현되기 이전에도 물로부터 보존될 수 있으며, 생태댐 건설 등 기존 자연경관 및 지형 변경을 유발하지 않으면서도 암각화를 보존할 수 있도록 높이 조절이 가능하며, 생태댐 건설시 우려되는 우물 효과나 일초 차단 등의 우려가 없는 투명한 구조를 갖는, 그리고 건설 및 해체 과정에서 주변 지형과 암각화에 영향을 최소화 할 수 있는 접이식 투명 보호막 및 그 설치 공법을 제공하는데 있다.The object of the present invention can be preserved from water even before the fundamental petroglyphic protection measures, such as securing alternative water resources or opening a bypass channel, can be preserved, and the petroglyphs can be preserved without causing changes in the existing natural landscape and topography such as the construction of an ecological dam. Foldable transparent protective film that has a transparent structure that can be height-adjustable, and does not have a concern about the well effect or a second barrier that is concerned when constructing an ecological dam, and can minimize the impact on the surrounding topography and petroglyphs during construction and dismantling. To provide an installation method.

상기한 기술적 과제를 달성하기 위한 본 발명의 일면은 수변 암각화 보존을 위한 접이식 투명 보호막에 관한 것이다. 본 발명의 수변 암각화 보존을 위한 접이식 투명 보호막은: 암각화가 형성된 암벽의 전방 수변 지반에 조립 설치되며 자갈 및 모래가 충진된 보호막 기초; 상기 보호막 기초 위에 설치되며 수변 수위에 따라 높이가 조절 가능한 계단형 조립 구조의 보호막 골조; 상기 보호막 골조의 전방으로 설치되며 빛 투과가 가능한 투명 아크릴로 구성되는 투명 멤브레인; 상기 보호막 기초의 양단에서 상기 보호막 골조를 지지하도록 수직으로 설치되어 횡력을 지지하는 버트레스; 상기 버트레스의 후방으로 설치되는 판석 지지용 윙; 및 상기 판석 지지용 윙과 상기 암벽 사이에 설치되는 경질 우레탄 표면 방수 채움판을 포함한다.One aspect of the present invention for achieving the above technical problem relates to a foldable transparent protective film for preservation of waterside petroglyphs. The folding transparent protective film for preservation of the petroleum petroglyphs of the present invention includes: a foundation installed on the front waterfront of the rock wall where the petroglyphs are formed and filled with gravel and sand; A protective frame skeleton installed on the protective film base and having a stepped assembly structure whose height is adjustable according to the water level; A transparent membrane formed of transparent acrylic which is installed in front of the protective membrane frame and is capable of transmitting light; Buttresses installed vertically to support the protective film frame at both ends of the protective film base to support the lateral force; Flagstone support wing installed to the rear of the buttress; And a hard urethane surface waterproof filler plate installed between the flag support wing and the rock wall.

일 실싱예에 있어서, 상기 보호막 기초와 상기 보호막 골조 및 투명 멤브레인은 전체적으로 수평의 아치형 구조를 갖는다.In one embodiment, the protective film base, the protective film frame and the transparent membrane have an overall horizontal arcuate structure.

일 실싱예에 있어서, 상기 보호막 기초는 수변 전방 하부의 암반층에 무진동 드릴로 천공하여 설치되는 차수벽(consolidation grouting)과 스틸 파일(steel pile) 기초로 지지하는 구조를 갖는다.In one embodiment, the protective film base has a structure supported by a steel pile foundation and a consolidation grouting drilled by a vibration-free drill in the rock layer below the water front.

일 실시예에 있어서, 상기 보호막 기초는 수변 전방 하부의 암반층에 그라우팅 공법으로 충진하여 설치되는 마찰력을 상기 보호막 기초의 자중과 용수처리로 저항하고 지내력을 암반에 전달하는 구조를 갖는다.In one embodiment, the protective film base has a structure that resists the frictional force installed by filling the rock layer below the water front by grouting method by the self weight and water treatment of the protective film base and transmits the bearing force to the rock.

본 발명의 다른 일면은 수변 암각화 보존을 위한 접이식 투명 보호막의 설치 공법에 관한 것이다. 본 발명의 수변 암각화 보존을 위한 접이식 투명 보호막의 설치 공법은: 암각화가 형성된 암벽의 전방 수변으로 보호막 기초를 하역 및 이동하는 단계; 상기 보호막 기초를 상기 암각화가 형성된 암벽의 전방 수변에 아치형으로 조립 설치하는 단계; 상기 보호막 기초의 양단에서 상기 보호막 골조를 지지하도록 수직으로 설치되어 횡력을 지지하는 버트레스를 설치하는 단계; 상기 암각화가 형성된 암벽의 전방 수변에 아치형으로 조립 설치된 상기 보호막 기초에 자갈과 모래를 충진하는 단계; 상기 자갈과 모래가 충진된 상기 보호막 기초의 상부에 수변 수위에 따라 높이가 조절 가능한 계단형 조립 구조와 아치형 구조의 보호막 골조를 설치하는 단계; 상기 보호막 기초 위에 설치된 상기 보호막 골조의 전방으로 빛 투과가 가능한 투명 아크릴로 구성되는 투명 멤브레인을 설치하는 단계; 상기 버트레스의 후방으로 판석 지지용 윙을 설치하는 단계; 및 상기 판석 지지용 윙과 상기 암벽 사이에 경질 우레탄 표면 방수채움판을 설치하는 단계를 포함한다.Another aspect of the present invention relates to a installation method of a foldable transparent protective film for preservation of waterside petroglyphs. The installation method of the foldable transparent protective film for preserving the petroleum petroglyphs of the present invention includes: unloading and moving the protective film base to the front waterfront of the rock wall where the petroglyphs are formed; Assembling and installing the protective film base in an arcuate shape on the front waterfront of the rock wall where the petroglyphs are formed; Installing a buttress vertically installed at both ends of the protective film base to support the protective film frame to support the transverse force; Filling gravel and sand in the foundation of the protective film that is arch-assembled in the front waterfront of the rock wall where the petroglyphs are formed; Installing a stepped assembly structure and an arch-type protective film frame whose height can be adjusted according to the water level in the upper part of the protective film base filled with the gravel and sand; Installing a transparent membrane made of transparent acrylic capable of transmitting light to the front of the protective film frame provided on the protective film base; Installing a flag support wing to the rear of the buttress; And installing a hard urethane surface waterproof filler plate between the flagstone support wing and the rock wall.

본 발명의 수변 암각화 보존을 위한 접이식 투명 보호막 및 그 설치 공법에 의하면, 연중 강수량의 변화에 따라 달라지는 수변의 수위에 따라서 접이식 투명 보호막의 높이를 가변 할 수 있다. 투명 멤브레인을 이용하여 보호막의 전방을 구성하기 때문에 연중 균일한 일조 조건을 제공할 수 있어서 암벽과 암각화에 이끼가 발생되는 것을 효과적으로 방지할 수 있다. 일반 보호막(땜)은 캔틸레버 형태로 구성되어 수압을 견디는 구조이나 본 발명의 접이식 투명 보호막은 아치구조로서 수압을 견디는 구조임으로 견고성이 더 좋다. 접이식 투명 보호막을 구성하는 구조물은 외부에서 제작한 후, 복잡하고 공사하기가 곤란한 현장에서는 조립만 하면 되며 해체시에도 조립의 역순으로 하면 재이용이 가능하다.According to the foldable transparent protective film and the installation method for the waterfront petroglyphic preservation of the present invention, it is possible to vary the height of the foldable transparent protective film according to the water level of the water changes according to the change of precipitation throughout the year. Since the transparent membrane is used to form the front of the protective film, it is possible to provide uniform sunshine conditions throughout the year, thereby effectively preventing moss from occurring in rock walls and petroglyphs. The general protective film (solder) is formed in a cantilever shape to withstand hydraulic pressure, but the foldable transparent protective film of the present invention has an arch structure to withstand hydraulic pressure, so that it is more robust. The structure constituting the foldable transparent protective film is manufactured externally, and then only assembled at the site that is complicated and difficult to construct, and can be reused when the assembly is in reverse order.

도 1은 본 발명의 바람직한 실시예에 따른 수변 암각화 보존을 위한 접이식 투명 보호막의 구성 및 그 설치 구조를 보여주는 도면이다.
도 2는 접이식 투명 보호막의 보호막 기초와 암벽과의 접합 부분의 구조를 보여주는 도면이다.
도 3은 도 1의 보호막 기초 부분을 확대하여 보여주는 도면이다.
도 4는 보호막 기초의 평면도이다.
도 5는 보호막 기초 위에 보호막 골조가 설치된 구조를 보여주는 평면도이다.
도 6은 수변 암각화 보존을 위한 접이식 투명 보호막의 설치 공법을 단계별로 예시한 도면이다.
도 7은 수위 변화에 따라 높이를 가변한 경우를 예시적으로 보여주는 도면이다.
1 is a view showing the configuration and installation structure of a foldable transparent protective film for preserving the waterfront petroglyph according to a preferred embodiment of the present invention.
2 is a view showing the structure of the bonding portion between the protective film base and the rock wall of the foldable transparent protective film.
FIG. 3 is an enlarged view of the protective film foundation of FIG. 1.
4 is a plan view of the protective film base.
5 is a plan view showing a structure in which a protective film frame is installed on the protective film base.
FIG. 6 is a diagram illustrating step-by-step installation method of a foldable transparent protective film for preservation of waterside petroglyphs.
7 is a diagram illustrating a case where the height is changed according to the change in the water level.

본 발명을 충분히 이해하기 위해서 본 발명의 바람직한 실시예를 첨부 도면을 참조하여 설명한다. 본 발명의 실시예는 여러 가지 형태로 변형될 수 있으며, 본 발명의 범위가 아래에서 상세히 설명하는 실시예로 한정되는 것으로 해석되어서는 안 된다. 본 실시예는 당업계에서 평균적인 지식을 가진 자에게 본 발명을 보다 완전하게 설명하기 위해서 제공 되어지는 것이다. 따라서 도면에서의 요소의 형상 등은 보다 명확한 설명을 강조하기 위해서 과장되어 표현될 수 있다. 각 도면에서 동일한 구성은 동일한 참조부호로 도시한 경우가 있음을 유의하여야 한다. 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 공지 기능 및 구성에 대한 상세한 기술은 생략된다.For a better understanding of the present invention, a preferred embodiment of the present invention will be described with reference to the accompanying drawings. The embodiments of the present invention may be modified into various forms, and the scope of the present invention should not be construed as being limited to the embodiments described in detail below. The present embodiments are provided to enable those skilled in the art to more fully understand the present invention. Therefore, the shapes and the like of the elements in the drawings can be exaggeratedly expressed to emphasize a clearer description. It should be noted that the same components are denoted by the same reference numerals in the drawings. Detailed descriptions of well-known functions and constructions which may be unnecessarily obscured by the gist of the present invention are omitted.

도 1은 본 발명의 바람직한 실시예에 따른 수변 암각화 보존을 위한 접이식 투명 보호막의 구성 및 그 설치 구조를 보여주는 도면이고, 도 2는 접이식 투명 보호막의 보호막 기초와 암벽과의 접합 부분의 구조를 보여주는 도면이다.1 is a view showing the configuration and installation structure of a foldable transparent protective film for preserving the water petroleum petroglyph according to a preferred embodiment of the present invention, Figure 2 is a view showing the structure of the bonding portion of the protective film base and the rock wall of the foldable transparent protective film to be.

도 1 및 도 2를 참조하여, 본 발명의 바람직한 실시예에 따른 수변 암각화 보존을 위한 접이식 투명 보호막(30)은 보호막 기초(36)와 그 위에 설치되는 보호막 골조(32)와 투명 멤브레인(31) 그리고 암벽 사이에 설치되는 버트레스(35), 판석 지지용 윙(34), 슬레이트 판석(37), 및 경질 우레탄 표면 방수 채움판(33)으로 구성된다.Referring to FIGS. 1 and 2, the foldable transparent protective film 30 for preserving waterside petroglyphs according to a preferred embodiment of the present invention includes a protective film base 32 and a protective film frame 32 and a transparent membrane 31 installed thereon. And it is composed of a buttress 35, a flag support wing 34, a slate flagstone 37, and a hard urethane surface waterproof filling plate 33 installed between the rock wall.

보호막 기초(36)는 암각화(10)가 형성된 암벽(20)의 전방 수변 지반에 조립 설치되며 자갈 및 모래가 충진 된다. 보호막 골조(32)는 보호막 기초(36) 위에 설치되며 수변 수위에 따라 높이가 조절 가능한 계단형 조립 구조를 갖는다. 투명 멤브레인(31)은 보호막 골조(32)의 전방으로 설치되며 빛 투과가 가능한 투명 아크릴로 구성된다. 버트레스(35)는 보호막 기초의 양단에서 상기 보호막 골조를 지지하도록 수직으로 설치되어 횡력을 지지한다. 판석 지지용 윙(34)는 버트레스(35)의 후방으로 설치되며, 판석 지지용 윙(34)와 암벽(20) 사이에 경질 우레탄 표면 방수 채움판(33)이 설치된다.The protective film base 36 is assembled and installed on the front waterfront of the rock wall 20 on which the petroglyphs 10 are formed, and is filled with gravel and sand. The protective film frame 32 is installed on the protective film base 36 and has a stepped assembly structure whose height is adjustable according to the water level. The transparent membrane 31 is installed in front of the protective film frame 32 and is made of transparent acrylic capable of transmitting light. Buttress 35 is installed vertically to support the protective frame frame at both ends of the protective film base to support the lateral force. The flagstone support wing 34 is installed at the rear of the buttress 35, and a hard urethane surface waterproof filler plate 33 is installed between the flagstone support wing 34 and the rock wall 20.

도 3은 도 1의 보호막 기초 부분을 확대하여 보여주는 도면이고 도 4는 보호막 기초의 평면도이다. 그리고 도 5는 보호막 기초 위에 보호막 골조가 설치된 구조를 보여주는 평면도이다. FIG. 3 is an enlarged view of the protective film base of FIG. 1 and FIG. 4 is a plan view of the protective film base. 5 is a plan view showing a structure in which a protective film frame is installed on the protective film base.

도 3 내지 도 5를 참조하여, 보호막 기초(36)는 수압에 의해 구조물이 강하류쪽으로 밀릴 수 있음으로 무진동 코아 드릴로 구멍을 파고 철로된 보드파일(50)을 박고 무수축 몰탈을 충진하여 고정함으로서 구조물이 움직이지 않도록 한다. 또한 보호막 기초(36)는 단계적으로 계단식으로 단차지게 구성하여 보호막 기초(36)의 자중과 지내역을 암반에 전달하는 구조를 갖는다. 여기에 보호막 기초(36)는 수변 전방 하부의 암반층에 무진동 드릴로 천공하여 설치되는 차수벽(consolidation grouting)(40)과 철로된 스틸 파일(steel pile)(50)을 박고 무수축 몰탈을 충진하여 고정한다. 또한 보호막 기초(36)는 수변 전방 하부의 암반층에 그라우팅(42)으로 충진하여 설치함으로 마찰력을 보호막 기초(36)의 자중과 용수처리로 저항하고 지내력을 암반에 전달하는 구조를 갖는다.With reference to Figures 3 to 5, the protective film base 36 can be pushed toward the downstream by the hydraulic pressure, the hole is drilled with a vibration-free core drill, the board pile 50 made of iron and filled with non-shrink mortar To prevent the structure from moving. In addition, the protective film base 36 is configured to be stepped step by step to have a structure for transmitting the weight and local area of the protective film base 36 to the rock. The protective film base 36 is fixed by filling a steel pile 50 and a consolidation grouting 40 and a steel pile 50 installed by drilling a rock-free drill in the rock layer below the water front. do. In addition, the protective film base 36 is installed by filling the rock layer below the water front with grouting 42 to resist friction by self-weight and water treatment of the protective film base 36 and to transmit the bearing force to the rock.

그리고 10m 깊이의 수압의 대략 10톤의 힘을 받음으로 5m씩 물을 채워 중간 수압을 형성하는 중간층(56)을 구성하는 것이 바람직하다. 즉, 바깥 부분과 안쪽 부분을 구획하는 중간층(56)을 구성한다. 보호막 기초(36)의 하부가 퇴적암으로 구성되는 경우 침출수가 유입될 수 있기 때문에 수압을 5톤씩 나눠지도록 함으로서 침출수 유입을 억제할 수 있다. 이러한 구조를 갖는 보호막 기초(36) 위에는 다수개의 공압 실린더(54)에 의해서 접이식으로 동작되는 계단형 조립 구조의 보호막 골조(32)가 설치된다.And it is preferable to configure the intermediate layer 56 to fill the water by 5m by receiving a force of approximately 10 tons of water pressure of 10m depth to form an intermediate water pressure. That is, the intermediate layer 56 which divides the outer part and the inner part is constituted. When the lower portion of the protective film foundation 36 is composed of sedimentary rocks, the leachate can be introduced by dividing the water pressure by 5 tons because leachate can be introduced therein. On the protective film base 36 having such a structure, a protective film frame 32 having a stepped assembly structure which is foldable by a plurality of pneumatic cylinders 54 is provided.

도 6은 수변 암각화 보존을 위한 접이식 투명 보호막의 설치 공법을 단계별로 예시한 도면이다.FIG. 6 is a diagram illustrating step-by-step installation method of a foldable transparent protective film for preservation of waterside petroglyphs.

도 6을 참조하여, 상술한 바와 같은 구조를 갖는 접이식 투명 보호막(30)의 설치 공법은 다음과 같은 수순으로 진행된다. 먼저 단계 10에서 암각화(10)가 형성된 암벽(20)의 전방 수변으로 보호막 기초(36)를 하역 및 이동한다. 보호막 기초(36)는 건설 및 해체시 주변 지형과 암각화에 영향을 최소화 하는 조립 공법을 사용한다. 그럼으로 보호막 기초(36) 건설 현장에서 제작하는 것이 아니고 별도로 미리 제작하여 단순히 현장으로 이동하여 조립하게 된다.Referring to Figure 6, the installation method of the foldable transparent protective film 30 having the structure as described above proceeds in the following procedure. First, in step 10, the protective film foundation 36 is unloaded and moved to the front waterfront of the rock wall 20 on which the petroglyphs 10 are formed. The shield foundation 36 uses an assembly method that minimizes the impact on the surrounding topography and petroglyphs during construction and dismantling. Therefore, the protective film foundation 36 is not manufactured at the construction site, but is manufactured separately in advance and simply moved to the site to be assembled.

단계 S20에서는 암벽(20)의 전방으로 이동이 완료된 보호막 기초(36)는 암각화(10)가 형성된 암벽(20)의 전방 수변에 아치형으로 조립 설치한다. 보호막 기초(36)는 수변 전방 하부의 암반층에 무진동 드릴로 천공하여 설치되는 차수벽(consolidation grouting)(40)과 철로된 스틸 파일(steel pile)(50)을 박고 무수축 몰탈을 충진하여 고정한다. 또한 보호막 기초(36)는 수변 전방 하부의 암반층에 그라우팅(42)으로 충진하여 설치함으로 마찰력을 보호막 기초(36)의 자중과 용수처리로 저항하고 지내력을 암반에 전달하는 구조를 갖는다. 그리고 보호막 기초(36)는 단계적으로 계단식으로 단차지게 구성하여 보호막 기초(36)의 자중과 지내역을 암반에 전달하는 구조를 갖는다.In step S20, the protective film base 36, which is completed to move forward of the rock wall 20, is assembled in an arcuate manner in the front waterfront of the rock wall 20 in which the petroglyphs 10 are formed. The protective film foundation 36 embeds a consolidation grouting 40 and a steel pile 50, which are installed by drilling a rock-free drill in the rock layer below the water front, and fill and fix the non-shrink mortar. In addition, the protective film base 36 is installed by filling the rock layer below the water front with grouting 42 to resist friction by self-weight and water treatment of the protective film base 36 and to transmit the bearing force to the rock. In addition, the protective film foundation 36 is configured to be stepped in a stepwise manner to have a structure for transmitting the weight and local area of the protective film foundation 36 to the rock.

여기서 보호막 기초(36)는 10m 깊이의 수압의 대략 10톤의 힘을 받음으로 5m씩 물을 채워 중간 수압을 형성하는 중간층(56)을 구성하는 것이 바람직하다. 즉, 바깥 부분과 안쪽 부분을 구획하는 중간층(56)을 구성한다. 보호막 기초(36)의 하부가 퇴적암으로 구성되는 경우 침출수가 유입될 수 있기 때문에 수압을 5톤씩 나눠지도록 함으로서 침출수 유입을 억제할 수 있다. 그리고 단계 S30에서는 암각화(10)가 형성된 암벽(20)의 전방 수변에 아치형으로 조립 설치된 보호막 기초(36)에 자갈과 모래를 충진한다.In this case, the protective film base 36 is preferably configured to form an intermediate layer 56 which is filled with water by 5 m to receive intermediate pressure of 10 tons of water pressure of 10 m depth. That is, the intermediate layer 56 which divides the outer part and the inner part is constituted. When the lower portion of the protective film foundation 36 is composed of sedimentary rocks, the leachate can be introduced by dividing the water pressure by 5 tons because leachate can be introduced therein. In step S30, gravel and sand are filled in the protective film foundation 36 installed in an arcuate manner in the front waterfront of the rock wall 20 on which the petroglyphs 10 are formed.

이어 단계 S40에서는 자갈과 모래가 충진된 보호막 기초(36)의 상부에 수변 수위에 따라 높이가 조절 가능한 계단형 조립 구조와 아치형 구조를 갖는 보호막 골조(32)를 설치한다. 보호막 기초(36) 위에 보호막 골조(32)를 완성한 후에 단계 S50에서는 보호막 기초(36) 위에 설치된 보호막 골조(32)의 전방으로 빛 투과가 가능한 투명 아크릴로 구성되는 투명 멤브레인(31)을 설치한다.Subsequently, in step S40, a protective film frame 32 having a stepped assembly structure and an arcuate structure whose height is adjustable according to the water level is installed on the top of the protective film foundation 36 filled with gravel and sand. After completing the protective film frame 32 on the protective film base 36, in step S50, a transparent membrane 31 made of transparent acrylic capable of transmitting light to the front of the protective film frame 32 provided on the protective film base 36 is provided.

그리고 단계 S60에서는 보호막 기초(36)의 양단에서 보호막 골조(32)를 지지하도록 수직으로 설치되어 횡력을 지지하는 버트레스(35)와 버트레스(35)의 후방으로 판석 지지용 윙(34)을 각각 설치하고, 판석 지지용 윙(34)과 암벽(20) 사이에 경질 우레탄 표면 방수 채움판(33)을 각각 설치한다.And in step S60 is installed vertically to support the protective film frame 32 at both ends of the protective film base 36 to install the plate support for supporting flap (35) and the wing 34 to the rear of the buttress (35), respectively. Then, a hard urethane surface waterproof filler plate 33 is provided between the flag support wing 34 and the rock wall 20, respectively.

도 7은 수위 변화에 따라 높이를 가변한 경우를 예시적으로 보여주는 도면이다.7 is a diagram illustrating a case where the height is changed according to the change in the water level.

도 7을 참조하여, 이상과 같은 조립 공법에 의해서 완성된 접이식 투명 보호막(30)은 강수량이 적은 1월 내지 4월에 수변의 수위가 낮은 경우(a)에는 계단형 구조를 갖는 보호막 골조(32)를 단계적으로 낮게 조정하여 암각화(10) 주변에 직접적으로 빛이 조사될 수 있도록 한다. 강수량이 많은 8월 내지 9월에 수변의 수위가 높아지는 경우에는 그에 적합하게 보호막 골조(32)를 높게 조정하여 암각화(10)가 담수된 물에 직접 접촉되지 않도록 함과 아울러 보호막 골조(32)의 전방에 설치된 투명 멤브레인(31)을 통하여 빛이 투과되거나 혹은 상단 개구된 부분을 통하여 직접적으로 빛이 조사될 수 있도록 한다. 이와 같이, 접이식 투명 보호막(30)에 의해 수변 암각화(10)는 연중 안정되게 일조 확보가 가능하게 된다.Referring to FIG. 7, when the water level of the waterside is low in January to April with less precipitation (a), the folding transparent protective film 30 completed by the assembly method as described above has a protective film frame 32 having a stepped structure. ) To be lowered step by step so that light can be directly irradiated around the petroglyphs 10. When the water level of the water surface is increased in August to September when the rainfall is high, the protective film frame 32 is adjusted to be suitable so that the petroglyphs 10 do not come into direct contact with fresh water, and the protective film frame 32 The light is transmitted through the transparent membrane 31 installed at the front or the light can be directly irradiated through the upper opening. As described above, the waterfront petroglyphs 10 can be stably ensured during the year by the foldable transparent protective film 30.

이상에서 설명된 본 발명의 수변 암각화 보존을 위한 접이식 투명 보호막 및 그 설치 공법의 실시예는 예시적인 것에 불과하며, 본 발명이 속한 기술분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 잘 알 수 있을 것이다. 그럼으로 본 발명은 상기의 상세한 설명에서 언급되는 형태로만 한정되는 것은 아님을 잘 이해할 수 있을 것이다. 따라서 본 발명의 진정한 기술적 보호 범위는 첨부된 특허청구범위의 기술적 사상에 의해 정해져야 할 것이다. 또한, 본 발명은 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 그 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.Embodiments of the foldable transparent protective film and its installation method for preserving the waterside petroglyphs of the present invention described above are merely illustrative, and those skilled in the art to which the present invention pertains various modifications and equivalents therefrom It will be appreciated that other embodiments are possible. Accordingly, it is to be understood that the present invention is not limited to the above-described embodiments. Accordingly, the true scope of the present invention should be determined by the technical idea of the appended claims. It is also to be understood that the invention includes all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.

10: 암각화 20: 암벽
30: 보호막 31: 투명 멤브레인
32: 보호막 골조 33: 경질 우레탄 표면 방수 채움판
34: 판석 지지용 윙 35: 버트레스
36: 보호막 기초 40: 차수벽
42: 그라우팅 50: 스틸 파일
52: 계단식 단차 54: 공압 실린더
56: 중간층
10: petroglyphs 20: rock walls
30: protective film 31: transparent membrane
32: protection frame frame 33: hard urethane surface waterproof filler plate
34: Flagstone support wing 35: Buttress
36: Shield Foundation 40: Order Wall
42: grouting 50: steel file
52: stepped step 54: pneumatic cylinder
56: middle layer

Claims (5)

암각화가 형성된 암벽의 전방 수변 지반에 조립 설치되며 자갈 및 모래가 충진된 보호막 기초;
상기 보호막 기초 위에 설치되며 수변 수위에 따라 높이가 조절 가능한 계단형 조립 구조의 보호막 골조;
상기 보호막 골조의 전방으로 설치되며 빛 투과가 가능한 투명 아크릴로 구성되는 투명 멤브레인;
상기 보호막 기초의 양단에서 상기 보호막 골조를 지지하도록 수직으로 설치되어 횡력을 지지하는 버트레스;
상기 버트레스의 후방으로 설치되는 판석 지지용 윙; 및
상기 판석 지지용 윙과 상기 암벽 사이에 설치되는 경질 우레탄 표면 방수 채움판을 포함하는 것을 특징으로 하는 수변 암각화 보존을 위한 접이식 투명 보호막.
A foundation installed on the front waterfront of the rock wall where the petroglyphs are formed and filled with gravel and sand;
A protective frame skeleton installed on the protective film base and having a stepped assembly structure whose height is adjustable according to the water level;
A transparent membrane formed of transparent acrylic which is installed in front of the protective membrane frame and is capable of transmitting light;
Buttresses installed vertically to support the protective film frame at both ends of the protective film base to support the lateral force;
Flagstone support wing installed to the rear of the buttress; And
Foldable transparent protective film for preservation of waterside petroglyphs comprising a hard urethane surface waterproof filling plate installed between the flag support wing and the rock wall.
제1항에 있어서,
상기 보호막 기초와 상기 보호막 골조 및 투명 멤브레인은 전체적으로 수평의 아치형 구조를 갖는 것을 특징으로 하는 수변 암각화 보존을 위한 접이식 투명 보호막.
The method of claim 1,
The protective film base, and the protective film frame and the transparent membrane is a foldable transparent protective film for preservation of the waterside petroglyph, characterized in that it has an overall horizontal arched structure.
제1항에 있어서,
상기 보호막 기초는 수변 전방 하부의 암반층에 무진동 드릴로 천공하여 설치되는 차수벽(consolidation grouting)과 스틸 파일(steel pile) 기초로 지지하는 구조를 갖는 것을 특징으로 하는 수변 암각화 보존을 위한 접이식 투명 보호막.
The method of claim 1,
The protective film base is foldable transparent protective film for preservation of waterside petroglyphs, characterized in that it has a structure supported by a steel pile (consolidation grouting) and a steel pile (puncture) installed in the rock layer in the lower front of the waterfront with a vibration-free drill.
제1항에 있어서
상기 보호막 기초는 수변 전방 하부의 암반층에 그라우팅 공법으로 충진하여 설치되는 마찰력을 상기 보호막 기초의 자중과 용수처리로 저항하고 지내력을 암반에 전달하는 구조를 갖는 것을 특징으로 하는 수변 암각화 보존을 위한 접이식 투명 보호막.
The method of claim 1, wherein
The protective film base is foldable and transparent for preserving waterside petroglyphs, characterized in that it has a structure that resists the frictional force installed by the grouting method in the rock layer below the water front by the self-weight and water treatment of the protective film base and transmits the bearing force to the rock. Shield.
암각화가 형성된 암벽의 전방 수변으로 보호막 기초를 하역 및 이동하는 단계;
상기 보호막 기초를 상기 암각화가 형성된 암벽의 전방 수변에 아치형으로 조립 설치하는 단계;
상기 보호막 기초의 양단에서 상기 보호막 골조를 지지하도록 수직으로 설치되어 횡력을 지지하는 버트레스를 설치하는 단계;
상기 암각화가 형성된 암벽의 전방 수변에 아치형으로 조립 설치된 상기 보호막 기초에 자갈과 모래를 충진하는 단계;
상기 자갈과 모래가 충진된 상기 보호막 기초의 상부에 수변 수위에 따라 높이가 조절 가능한 계단형 조립 구조와 아치형 구조의 보호막 골조를 설치하는 단계;
상기 보호막 기초 위에 설치된 상기 보호막 골조의 전방으로 빛 투과가 가능한 투명 아크릴로 구성되는 투명 멤브레인을 설치하는 단계;
상기 버트레스의 후방으로 판석 지지용 윙을 설치하는 단계; 및
상기 판석 지지용 윙과 상기 암벽 사이에 경질 우레탄 표면 방수채움판을 설치하는 단계를 포함하는 것을 특징으로 하는 수변 암각화 보존을 위한 접이식 투명 보호막 설치 공법.
Unloading and moving the protective film base to the front waterfront of the rock wall where the petroglyphs are formed;
Assembling and installing the protective film base in an arcuate shape on the front waterfront of the rock wall where the petroglyphs are formed;
Installing a buttress vertically installed at both ends of the protective film base to support the protective film frame to support the transverse force;
Filling gravel and sand in the foundation of the protective film that is arch-assembled in the front waterfront of the rock wall where the petroglyphs are formed;
Installing a stepped assembly structure and an arch-type protective film frame whose height can be adjusted according to the water level in the upper part of the protective film base filled with the gravel and sand;
Installing a transparent membrane made of transparent acrylic capable of transmitting light to the front of the protective film frame provided on the protective film base;
Installing a flag support wing to the rear of the buttress; And
A folding transparent protective film installation method for preserving waterside petroglyphs, comprising the step of installing a hard urethane surface waterproof fill plate between the flag support wing and the rock wall.
KR1020130079782A 2013-07-08 2013-07-08 Transparent kinetic protection dam for preserve waterfront rock painting and method of construction thereof KR101340749B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130079782A KR101340749B1 (en) 2013-07-08 2013-07-08 Transparent kinetic protection dam for preserve waterfront rock painting and method of construction thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130079782A KR101340749B1 (en) 2013-07-08 2013-07-08 Transparent kinetic protection dam for preserve waterfront rock painting and method of construction thereof

Publications (1)

Publication Number Publication Date
KR101340749B1 true KR101340749B1 (en) 2013-12-12

Family

ID=49988135

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130079782A KR101340749B1 (en) 2013-07-08 2013-07-08 Transparent kinetic protection dam for preserve waterfront rock painting and method of construction thereof

Country Status (1)

Country Link
KR (1) KR101340749B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120652A (en) * 2016-08-31 2016-11-16 郭舒洋 A kind of method utilizing lichen and Stalactitum to reinforce river levee
CN107012856A (en) * 2017-05-14 2017-08-04 郭舒洋 A kind of method of utilization liver moss stalactite mixing consolidation by grouting sand

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04189909A (en) * 1990-11-26 1992-07-08 Toda Constr Co Ltd Underwater observation device
KR20060029944A (en) * 2004-10-04 2006-04-07 신성산건 주식회사 Structure for flood damage prevention and it's construction method
KR20120009248A (en) * 2010-07-23 2012-02-01 (주)대우건설 Permeability rock stagnant water grouting method for bulk injection type
KR101117924B1 (en) 2011-08-04 2012-02-22 박기경 Composite type steel temporary construction and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04189909A (en) * 1990-11-26 1992-07-08 Toda Constr Co Ltd Underwater observation device
KR20060029944A (en) * 2004-10-04 2006-04-07 신성산건 주식회사 Structure for flood damage prevention and it's construction method
KR20120009248A (en) * 2010-07-23 2012-02-01 (주)대우건설 Permeability rock stagnant water grouting method for bulk injection type
KR101117924B1 (en) 2011-08-04 2012-02-22 박기경 Composite type steel temporary construction and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120652A (en) * 2016-08-31 2016-11-16 郭舒洋 A kind of method utilizing lichen and Stalactitum to reinforce river levee
CN107012856A (en) * 2017-05-14 2017-08-04 郭舒洋 A kind of method of utilization liver moss stalactite mixing consolidation by grouting sand

Similar Documents

Publication Publication Date Title
Winterwerp et al. Managing erosion of mangrove-mud coasts with permeable dams–lessons learned
CN105040595B (en) Main Pier of Bridges cushion cap foundation pit supporting construction on riverbed, gentle slope basement rock and construction method thereof
PH12014000057A1 (en) Submarine construction for tsunami and flooding protection, for tidal and energy storage, and for fish farming
EP1880058B1 (en) Flood barrier
Nordstrom Coastal dunes with resistant cores
KR101340749B1 (en) Transparent kinetic protection dam for preserve waterfront rock painting and method of construction thereof
Herle et al. Geotechnical problems of cultural heritage due to floods
RU2643383C2 (en) Method for fixing slope with geocell geosynthetic material
CN204959768U (en) A underground structure for airport
CN109577277B (en) Wall-mounted drainage anchor rod retaining wall structure and construction method thereof
CN204849777U (en) Tilting board double row pile supporting construction that bears down on one
Hardaway Jr et al. Design and performance of headland bays in Chesapeake Bay, USA
KR200437790Y1 (en) Vegetation revetment block
Morang et al. Performance of submerged prefabricated structures to improve sand retention at beach nourishment projects
Pirazzoli et al. The projected" MOSE" barriers against flooding in Venice (Italy) and the expected global sea-level rise
CN208328984U (en) Ecological gridiron barricade
CN204023496U (en) A kind of novel ecological channel revetment
Liao et al. A tale of twin cut slopes in Taiwan
CN207944426U (en) A kind of protection slope
CN207131405U (en) Deep cheuch cut-and-cover tunnel structure
CN203022005U (en) Protective structure of tidal flat reclamation district deep foundation pit retaining and protecting structure
Hardaway Jr et al. Living shoreline sea level resiliency: Performance and adaptive management of existing breakwater sites, year 2 summary report
Sissakian et al. Geological and Geotechnical Study of Badush Dam, Iraq
RU121270U1 (en) SUPPORT WEIR (OPTIONS) AND FLEXIBLE CONCRETE MAT FOR ITS CREATION
das Neves et al. Beach and dune reinforcement with geotextile encapsulated-sand systems. The Portuguese experience

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20161205

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20171205

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20181203

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20191202

Year of fee payment: 7