KR101261442B1 - Jig for plating of pipe and crain control methode using same - Google Patents

Jig for plating of pipe and crain control methode using same Download PDF

Info

Publication number
KR101261442B1
KR101261442B1 KR1020100125721A KR20100125721A KR101261442B1 KR 101261442 B1 KR101261442 B1 KR 101261442B1 KR 1020100125721 A KR1020100125721 A KR 1020100125721A KR 20100125721 A KR20100125721 A KR 20100125721A KR 101261442 B1 KR101261442 B1 KR 101261442B1
Authority
KR
South Korea
Prior art keywords
frame body
pipe
chain
jig
plating
Prior art date
Application number
KR1020100125721A
Other languages
Korean (ko)
Other versions
KR20120064466A (en
Inventor
이웅세
Original Assignee
주식회사 티앤디코리아
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 티앤디코리아 filed Critical 주식회사 티앤디코리아
Priority to KR1020100125721A priority Critical patent/KR101261442B1/en
Publication of KR20120064466A publication Critical patent/KR20120064466A/en
Application granted granted Critical
Publication of KR101261442B1 publication Critical patent/KR101261442B1/en

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25DPROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
    • C25D17/00Constructional parts, or assemblies thereof, of cells for electrolytic coating
    • C25D17/06Suspending or supporting devices for articles to be coated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G49/00Conveying systems characterised by their application for specified purposes not otherwise provided for
    • B65G49/02Conveying systems characterised by their application for specified purposes not otherwise provided for for conveying workpieces through baths of liquid
    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25DPROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
    • C25D21/00Processes for servicing or operating cells for electrolytic coating
    • C25D21/10Agitating of electrolytes; Moving of racks
    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25DPROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
    • C25D7/00Electroplating characterised by the article coated
    • C25D7/04Tubes; Rings; Hollow bodies

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Coating With Molten Metal (AREA)

Abstract

본 발명은 도금대상물인 강관 파이프를 도금시마다 파이프의 길이 규격이 다른 경우에도 같은 지그 구조물을 이용하여 호환적으로 사용할 수 있게 하며, 상기 파이프를 안정하게 고정하여 승,하강 및 이동될 수 있게 한 파이프 도금용 지그 및 이를 이용하는 크레인 승하강 조정방법으로서,
강관이 끼워지는 수평지지봉을 갖으며 서로 마주하는 양측 두 개의 프레임 몸체 중, 제1 프레임 몸체에 체인을 고정하고, 제2 프레임 몸체에 상기 체인이 슬라이딩되면서 상기 제2 프레임을 고정할 수 있게 한 구조의 파이프 도금용 지그를 제공한다.
또한, 상기 제2 프레임 몸체를 일정 높이 상부로 견인 승강시킨 후, 제1 및 제2 프레임 몸체를 동시에 승강시켜 이동하고 하강시키는 순서의 방법으로 파이프를 안정하게 지지시키는 파이프 도금용 지그를 이용하는 크레인 조정방법을 제공한다.
The present invention makes it possible to use the same jig structure even when the length of the pipe is different for each time the plating of the steel pipe pipe to be plated, and the pipe to stably fix the pipe to move up, down and move Plating jig and crane lifting and lowering adjustment method using the same,
A structure in which a chain is fixed to a first frame body, and the chain is slid to a second frame body among the two frame bodies having horizontal support rods to which steel pipes are fitted and facing each other. To provide a jig for pipe plating.
In addition, after the second frame body is pulled up and down to a predetermined height, crane adjustment using a pipe plating jig for stably supporting the pipe in the order of moving up and down by simultaneously lifting and moving the first and second frame bodies. Provide a method.

Description

파이프 도금용 지그 및 이를 이용하는 크레인 승하강 제어방법{JIG FOR PLATING OF PIPE AND CRAIN CONTROL METHODE USING SAME}Jig for pipe plating and crane lifting control method using the same {JIG FOR PLATING OF PIPE AND CRAIN CONTROL METHODE USING SAME}

본 발명은 파이프 도금용 지그 및 이를 이용하는 크레인 승하강 제어방법에 관한 것으로서, 특히 도금대상물인 중공이 있는 강관 파이프를 지그 측에 고정하여 용융아연 도금시에 파이프의 길이 규격이 다른 경우에도 모두 호환적으로 사용할 수 있도록 새로운 방식으로 개선한 파이프 도금용 지그 및 이를 이용하는 크레인 승하강 제어방법에 관한 것이다.
The present invention relates to a pipe plating jig and a crane lifting control method using the same, in particular, even if the length specification of the pipe during hot-dip galvanizing by fixing the steel pipe pipe with a hollow object to the jig side, all compatible The present invention relates to a pipe plating jig improved in a new way so that it can be used as a crane, and a crane lift control method using the same.

일반적으로 용융아연 도금은 철금속의 내식성 등을 향상시키고 외관을 좋게 하는 등의 목적으로 널리 행해지는 도금방법으로서, 용용아연도금 방법은 약 450℃ 이상의 용용아연도금액이 담겨있는 도금조에 파이프나 채널같은 도금대상물을 지그를 이용해 지지 고정시킨 채로 도금조 내에 침지시켰다가 끌어올려 상온에서 자연 건조시키거나 열풍건조시키는 방법으로 행한다.In general, hot dip galvanizing is a plating method widely used to improve corrosion resistance and improve the appearance of ferrous metal. The hot dip galvanizing method is a pipe or channel in a plating bath containing a molten zinc plating solution of about 450 ° C. or more. The same plating object is immersed in the plating bath while being supported and fixed by using a jig, pulled up, and dried at room temperature or dried by hot air.

이와 같이 도금시에는 지그를 사용하여 도금이 행해지는데, 지그에 도금대상물을 고정시키고 도금후에 해체하는 작업의 번거로움이 있기에 이의 작업성을 좋게 하기 위해 본 특허출원의 발명자의 발명에 의해 지그의 구조를 실용신안 등록 제 358477호와 디자인등록 제30-377839호로서 이미 개시한 바 있다.
In this way, the plating is performed by using a jig during plating, and the structure of the jig according to the invention of the inventor of the present patent application in order to improve its workability because there is the trouble of fixing the plating object to the jig and dismantling after plating. Has already been disclosed as Utility Model Registration No. 358477 and Design Registration No. 30-377839.

상기 실용신안 등록 제 358477호와 상기 디자인등록 제30-377839호의 기술을 살펴보면, 도 1 및 도 2에 도시된 바와같이, 중앙에 축공(710)을 갖는 파이프 등과 같은 도금대상물(700)을 용융아연 도금하는 데 사용되는 용융아연 도금용 지지대에 관한 것으로서, 상부에 진동발생장치(500)와 연결된 연결구(400)에 연결하기 위한 고정고리(110)가 구비되어 있으며, 그 하부로 적어도 한 개 이상의 횡프레임(200)이 구비되어 있고, 상기 횡프레임(200)의 측방으로 상기 축공(710)에 끼워 상기 도금대상물(700)을 측방에서 지지할 수 있도록 하는 수평지지봉(220)이 소정길이 돌출되어 다수개가 형성되어 있고, 상기 횡프레임(200)은 양단부에 핀공(212)을 갖는 복수개의 고정브라켓(210)이 일체로 결합되어 있으며, 상기 고정브라켓(210) 사이에 탈착이 가능하도록 하는 고정핀(230)이 삽입될 수 있는 핀홈(310)을 양단부에 갖는 이탈방지고정바(300)가 구비된다. 따라서, 상기 이탈방지고정바(300)를 구비함으로써, 서로 마주보게 배치된 지지대(100,100') 사이의 간격을 유지할 수 있을 뿐더러, 중앙에 축공(710)을 갖는 도금대상물(700)이 수평지지봉(220)에서 이탈하여 낙하하는 등의 안전사고를 미연에 방지할 수 있게 된다.Looking at the technology of the Utility Model Registration No. 358477 and the Design Registration No. 30-377839, as shown in Figures 1 and 2, the coating object 700, such as a pipe having a shaft hole 710 in the center, such as molten zinc The present invention relates to a support for hot-dip galvanizing used for plating, and has a fixing ring (110) for connecting to a connector (400) connected to a vibration generating device (500) at an upper portion thereof, and at least one or more transverse sides thereof. Frame 200 is provided, the horizontal support rod 220 is inserted into the shaft hole 710 to the side of the horizontal frame 200 to support the plating object 700 from the side a plurality of protruding a predetermined length Dog is formed, the horizontal frame 200 is a plurality of fixing brackets 210 having a pin hole 212 is integrally coupled to both ends, the fixing pins to be detachable between the fixing bracket (210) ( 230) The imported pin groove departure prevention fixing bars 300 having a (310) at both ends which may be provided. Therefore, by providing the separation prevention fixing bar 300, not only can maintain the interval between the support (100, 100 ') disposed to face each other, the plating object 700 having a shaft hole 710 in the center is a horizontal support rod ( Safety accidents, such as falling off from 220 and falling, can be prevented in advance.

그러나, 상술한 종래의 지그는 핀홈(210)을 갖는 이탈방지고정바(300)가 도금대상물인 파이프(700)의 길이에 따라 이탈방지고정바(300)를 개개로 보유하여야 하는 단점이 있었다. 즉, 이탈방지고정바(300)의 핀홈(310)에 의해 양측 마주보는 지지대(100,100')의 간격이 한정되어지고 이에 따라 수평지지봉(220,220')에 끼워지는 파이프(700)의 길이도 한정되어지게 되며, 이로인해 지지대(100,100')를 양측에서 고정하는 두 파이프(700)의 길이에 따라 이탈방지고장바(300)를 다르게 갖추어야 하는 단점이 있다.However, the above-described conventional jig has a disadvantage in that the anti-separation fixing bar 300 having the pin groove 210 has to separately hold the anti-separation fixing bar 300 according to the length of the pipe 700 which is the plating object. That is, the distance between the support members 100 and 100 'facing each other by the pin groove 310 of the anti-separation fixing bar 300 is limited, and thus the length of the pipe 700 fitted to the horizontal support rods 220 and 220' is also limited. There is a disadvantage in that the separation prevention failure bar 300 must be provided differently according to the length of the two pipes 700 for fixing the support (100, 100 ') on both sides.

또한, 종래의 지그는 상기 횡프레임(200)의 양단부에 삼각형 형상으로 연이어지면서 상부에 연결체인(120)과 체결·고정되는 체인고정구(132)가 일체로 형성된 수직바(130)의 측단부에 연결되어 일체로 형성되는 제1보조바(140a) 및 제2보조바(140b)와, 복수개의 횡프레임(200) 사이에 직교되게 다수개의 제3보조바(140c)가 일체로 형성됨으로써 지지대(100)의 강성을 높히게 되어 있다. 그러나, 상술한 수직바(130)가 상부의 연결체인(120)과 연결되는 구조로 되어 있어 보조바(140a,140b)에 보강된 수직바(130) 자체의 강성만으로는 지지대(100,100') 양측이 기울어지게 될 경우 지그 및 지그에 지탱된 도금대상물 전체의 무게를 감당하기 어려운 문제점이 있다. 즉, 도금대상물(700)을 도금조에 침지시키거나 꺼낼 때 양측 지지대(100,100')의 어느 한쪽을 먼저 침지시키거나 꺼내도록 도금대상물이 기울어지지 않도록 양측 지지대(100,100')를 내리거나 끌어올리는 연결구(400) 및 진동발생장치(500) 상부의 양측 크레인(호이스트 크레인, 이하 크레인이라 약칭함)의 운전을 수평하게 제어해 주어야 하는 운전상의 어려움이 있었다.
In addition, the conventional jig is connected to both ends of the horizontal frame 200 in a triangular shape at the side end of the vertical bar 130 is formed integrally with the chain fastener 132 is fastened and fixed to the connecting chain 120 at the top. The first auxiliary bar 140a and the second auxiliary bar 140b connected to each other and integrally formed with a plurality of third auxiliary bars 140c are orthogonally formed between the plurality of horizontal frames 200 to support each other. It is supposed to increase the rigidity of 100). However, since the above-described vertical bar 130 has a structure connected to the upper connection chain 120, both sides of the support 100, 100 'are supported only by the rigidity of the vertical bar 130 itself, which is reinforced on the auxiliary bars 140a and 140b. If it is inclined, there is a problem in that it is difficult to bear the weight of the jig and the entire plating object supported on the jig. That is, when the plating object 700 is immersed in or taken out of the plating tank, the connector for lowering or pulling up both supporters 100 and 100 'so that the plating object is not inclined so as to immerse or remove one of the two supporters 100 and 100' first ( 400) and the operation of the two sides (hoist crane, abbreviated crane) for the operation of the upper side of the vibration generating device 500 has to control the operation horizontally.

상술한 종래의 문제점을 해결하기 위해 안출된 본 발명은 도금대상물인 중공(종래기술에서 축공이라 표현되어 있음)이 있는 강관 파이프를 도금시마다 파이프의 길이가 다른 경우에도 같은 지그 구조물을 이용하여 호환적으로 사용할 수 있게 하는 파이프 도금용 지그를 제공하는데 목적을 두고 있다.The present invention devised to solve the above-mentioned problems is compatible with the same jig structure even when the length of the pipe is different every time the steel pipe is coated with a hollow object (expressed as a shaft hole in the prior art) which is a plating object. It is an object of the present invention to provide a jig for plating a pipe that can be used as a tool.

아울러, 상기 파이프가 상기 목적의 파이프 도금용 지그에 안정하게 고정되어 승,하강 및 이동될 수 있도록 상기 파이프 도금용 지그를 이용하는 크레인 승하강 제어방법을 제공하는데 또다른 목적을 두고 있다.
In addition, another object of the present invention is to provide a crane lift control method using the pipe plating jig so that the pipe can be stably fixed to the pipe plating jig of the purpose to move up, down, and move.

상술한 목적을 달성하기 위한 본 발명은,The present invention for achieving the above object,

길이방향 중공을 갖는 강관 파이프(P)를 도금조에 침지하여 도금하는데 사용되는 파이프 도금용 지그에 있어서,In the jig for pipe plating used to plate a steel pipe (P) having a longitudinal hollow in the plating bath,

상기 파이프(P)의 중공에 끼워 상기 파이프(P)들을 지지하기 위한 다수의 수평지지봉(15)을 갖는 두 개 이상의 가로방향 프레임(14)(24)이 세로방향 프레임(16)(26)과 용접된 제1 프레임 몸체(10) 및 제2 프레임 몸체(20)가 서로 마주보게 구비되어지되, 상기 제1 프레임 몸체(10)는 양측 측단부 상,하부에 체인을 고정하기 위한 2개의 고정고리(12a,12b)(12a',12b')가 각각 마련됨과 아울러 상기 가로방향 프레임(14) 상부 양측에 크레인(44)으로 연결하기 위한 연결체인(36)과 결합된 연결고리(18a,18b)가 마련되고, 상기 제 2프레임 몸체(20)에는 양 측단부에 체인(32)이 슬라이딩가능하게 관통되는 관통지지고리(22)(22')가 각각 마련되고,Two or more horizontal frames 14 and 24 having a plurality of horizontal support rods 15 for supporting the pipes P are inserted into the hollows of the pipes P and the longitudinal frames 16 and 26. The welded first frame body 10 and the second frame body 20 are provided to face each other, the first frame body 10 has two fixing rings for fixing the chain on the upper and lower sides of both sides (12a, 12b) (12a ', 12b') is provided, respectively, and the connecting ring (18a, 18b) coupled with the connecting chain 36 for connecting the crane 44 on both sides of the upper side of the horizontal frame (14) The second frame body 20 is provided with penetrating support rings 22, 22 'through which the chain 32 is slidably penetrated at both side ends thereof, respectively.

상기 체인(32)의 양단이 상기 양측 관통지지고리(22)(22')를 통해 상기 양측 고정고리(12a,12b)(12a',12b')에 상하 분할하여 두 개의 체인(32a,32b)으로 각각 결합고정시키는 체인부(30)가 상기 제1 및 제2 프레임 몸체(10,20) 양측으로 구비되어, 상기 제1 프레임 몸체(10)와 제2 프레임 몸체(20)가 상기 체인부(30)에 연결된 채로 서로 간격이 좁혀지거나 이격될 수 있도록 구성된 것을 특징으로 하는 파이프 도금용 지그를 제공한다. 상술한 구성에서, 상기 체인부(30)는 상기 두 개의 체인(32a,32b)으로 상하 분할되는 시작지점의 체인이 하나 이상의 파이프 봉체(33)에 의해 합쳐져 고정된 구조인 것을 특징으로 하는 파이프 도금용 지그를 제공한다.
Both ends of the chain 32 are vertically divided into both fixing rings 12a, 12b (12a ', 12b') through the two through holes 22 and 22 ', and thus, two chains 32a and 32b. Chain parts 30 are respectively provided at both sides of the first and second frame bodies 10 and 20, and the first frame body 10 and the second frame body 20 are connected to the chain part 30. 30) provides a jig for plating the pipe, characterized in that configured to be spaced apart or spaced apart from each other. In the above-described configuration, the chain portion 30 is a pipe plating, characterized in that the chain of the starting point divided up and down into the two chains (32a, 32b) is joined and fixed by one or more pipe rods (33) Provide the jig for

또한, 본 발명은. 파이프(P)의 중공에 끼워 상기 파이프(P)들을 지지하기 위한 다수의 수평지지봉(15)이 구비된 두 개 이상의 가로방향 프레임(14)(24)이 세로방향 프레임(16)(26)과 용접된 제1 프레임 몸체(10) 및 제2 프레임 몸체(20)가 서로 마주보게 구비되어지되, In addition, the present invention. Two or more horizontal frames 14 and 24 having a plurality of horizontal supporting rods 15 for supporting the pipes P are inserted into the hollows of the pipes P and the longitudinal frames 16 and 26. The welded first frame body 10 and the second frame body 20 are provided to face each other,

상기 제1 프레임 몸체(10)는 양측 측단부 상,하부에 체인을 고정하기 위한 2개의 고정고리(12a,12b)(12a',12b')가 각각 마련됨과 아울러 상기 가로방향 프레임(14) 상부 양측에 제1 크레인(44)으로 연결하기 위한 연결체인(36)과 결합된 연결고리(18a,18b)가 마련되고, 상기 제 2프레임 몸체(20)에는 양 측단부에 체인(32)이 슬라이딩가능하게 관통되는 관통지지고리(22)(22')가 각각 마련되어 상기 관통지지고리(22)(22')를 통해 체인(32)이 제2 크레인(44')으로 연결될 수 있게 하나의 선상으로 연결되어지고, The first frame body 10 is provided with two fixing rings 12a, 12b (12a ', 12b') for fixing the chains on both side end portions, and on the lower side of the horizontal frame 14, respectively. Connection rings 18a and 18b coupled to the connection chain 36 for connecting the first crane 44 to both sides are provided, and the chain 32 slides on both side ends of the second frame body 20. Through-through rings 22 and 22 ', which are possibly penetrated, are respectively provided so that the chain 32 can be connected to the second crane 44' through the penetrating rings 22 and 22 '. Connected,

상기 체인(32)의 양단이 상기 양측 관통지지고리(22)(22')를 통해 상기 양측 고정고리(12a,12b)(12a',12b')에 상하 분할하여 두 개의 체인(32a,32b)으로 각각 결합고정시키는 체인부(30)가 상기 제1 및 제2 프레임 몸체(10,20) 양측으로 구비되는 파이프 도금용 지그를 이용하는 크레인 승하강 제어방법에 있어서, Both ends of the chain 32 are vertically divided into both fixing rings 12a, 12b (12a ', 12b') through the two through holes 22 and 22 ', and thus, two chains 32a and 32b. In the crane elevating control method using a pipe plating jig provided with the chain portion 30 is fixed to each of the first and second frame body (10, 20) on both sides,

상기 제2 크레인(44')에 의해 상기 제2 프레임 몸체(20)를 일정 높이만큼 먼저 상승시키는 단계, 상기 제1 및 제2 크레인(44,44')에 의해 상기 제1 프레임 몸체(10)와 제2 프레임 몸체(20)를 동시에 상승 및 하강시키는 단계에 의하여 제1 프레임 몸체(10)와 제2 프레임 몸체(20)의 간격이 좁혀지게 하여 파이프(P)를 안정하게 고정지지하게 하는 것을 특징으로 하는 파이프 도금용 지그를 이용하는 크레인 승하강 제어방법을 제공한다.
First raising the second frame body 20 by the second crane 44 'by a predetermined height; first frame body 10 by the first and second cranes 44,44' And the second frame body 20 by simultaneously raising and lowering the gap between the first frame body 10 and the second frame body 20 to narrow the pipe (P) to stably support It provides a crane lifting control method using a pipe plating jig characterized in that.

이와같이 구성된 본 발명에 따르면, 도금대상물인 강관 파이프를 도금시마다 파이프의 길이가 다른 경우에도 동일한 지그 구조물을 이용하여 호환적으로 사용할 수 있게 됨으로써 종전에 비해 길이가 다른 파이프를 지그에 고정시킬 때의 작업시간을 줄일 수 있는 등 작업성을 크게 향상시킬 수 있고 이에 따라 같은 시간 대비 도금 생산성을 향상되는 효과가 있으며. 또한 종전과 같이 지그 구조물의 일부 구조물을 파이프 규격마다 매번 따로 준비하여야 하는 번거로움과 비용도 크게 줄일 수 있게 된다.According to the present invention configured as described above, even when the length of the pipe to be plated, the pipe is different, even when the length of the pipe can be used interchangeably using the same jig structure to work when fixing the pipe with a different length than the conventional jig It can greatly improve workability, such as reducing the time, thereby improving the plating productivity over the same time. In addition, as in the past, some structures of the jig structure can be greatly reduced in the trouble and cost of having to prepare each time for each pipe size.

아울러, 파이프를 도금용 지그에 안정하게 고정 지지시켜 승,하강 및 이동시킬 수 있어 파이프가 이탈되어 발생할 수 있는 안전사고나 도금작업 공정이 중단되는 일이 없어지게 되는 효과가 있다.
In addition, the pipe is stably fixed to the plating jig to support the lifting, lowering and moving, there is an effect that the safety accident or plating work process that may occur due to the separation of the pipe is not interrupted.

도 1은 종래 도금에 이용되는 도금용 지그의 구성을 나타낸 분해 사시도.
도 2는 종래의 도금용 지그를 나타낸 사시도.
도 3은 본 발명의 지그에 파이프를 고정하기 이전상태를 보인 사시도.
도 4는 본 발명의 지그에 파이프를 고정시킨 상태를 보인 사시도.
도 5는 본 발명의 지그에 파이프를 고정하기 위해 준비하는 상태를 설명하기 위한 측면도.
도 6은 본 발명의 지그에 파이프를 고정시키는 과정부터 파이프가 빠지지 않도록 지그를 상승시킨 후 하강시키는 과정의 순서를 설명하기 위해 보인 측면도.
도 7은 본 발명의 지그에 의해 파이프를 도금한 이후에 도금조로부터 지그를 상승시키는 상태를 보인 측면도.
1 is an exploded perspective view showing the configuration of a plating jig used for conventional plating.
Figure 2 is a perspective view showing a conventional plating jig.
Figure 3 is a perspective view showing a state before fixing the pipe to the jig of the present invention.
Figure 4 is a perspective view showing a state in which the pipe is fixed to the jig of the present invention.
Figure 5 is a side view for explaining a state prepared for fixing the pipe to the jig of the present invention.
Figure 6 is a side view shown to explain the sequence of the process of raising and lowering the jig so that the pipe does not fall from the process of fixing the pipe to the jig of the present invention.
7 is a side view showing a state in which the jig is raised from the plating bath after the pipe is plated by the jig of the present invention.

이하, 본 발명의 바람직한 실시예를 도면을 참조하여 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings.

도금할 파이프를 지그에 고정하기 이전 상태와, 도금할 파이프를 고정하여 지지시킨 후의 상태를 각각 보인 도 3과 도 4를 참조하면, 본 발명의 파이프 도금용 지그는 길이방향의 중공을 갖는 강관 파이프(P)를 용융아연 도금하는 데 사용하는데 적합하다.3 and 4 showing the state before fixing the pipe to be plated to the jig and the state after fixing and supporting the pipe to be plated, respectively, the pipe plating jig of the present invention is a steel pipe having a longitudinal hollow. Suitable for use in hot dip galvanizing (P).

본 발명에 의한 지그의 구성을 살펴보면, 상기 파이프(P)의 중공에 끼워 상기 파이프(P)들을 지지하기 위한 간격을 두어 다수의 수평지지봉(15)을 갖는 두 개 이상의 가로방향 프레임(14)이 세로방향 프레임(16)과 용접된 제1 및 제2 프레임 몸체(10,20)가 서로 마주보게 구비되어진다. Looking at the configuration of the jig according to the present invention, two or more horizontal frame 14 having a plurality of horizontal support rods 15 at intervals for supporting the pipes (P) sandwiched in the hollow of the pipe (P) is The longitudinal frame 16 and the welded first and second frame bodies 10, 20 are provided facing each other.

상기 제1 프레임 몸체(10)는 양측 측단부 상,하부에 체인을 고정하기 위한 2개의 고정고리(12a,12b)(12a',12b')가 각각 마련됨과 아울러 상기 가로방향 프레임(14) 상부 양측에 제1 크레인(44)으로 연결하기 위한 연결체인(36)과 결합된 연결고리(18a,18b)가 마련되고, 상기 제 2프레임 몸체(20)에는 양 측단부에 체인(32)이 미끄러짐에 의해 슬라이딩 가능하게 관통되는 충분한 구경의 관통지지고리(22)(22')가 각각 마련된다. 상기 연결체인(36)의 상부에는 양단부에 착탈가능한 고리(41,42)를 갖는 견인체인(40)이 갖추어진다. 상기 제 2프레임몸체(20)의 관통지지고리(22,22')를 통해 빠져나온 체인(32)은 제2 크레인(44') 방향으로 한 개의 선상으로 돌출하고 견인체인(40')의 고리(41')에 연결되어짐으로써 중간 매개인 고리들(42'43')을 통해 크레인(44')에 연결된다. The first frame body 10 is provided with two fixing rings 12a, 12b (12a ', 12b') for fixing the chains on both side end portions, and on the lower side of the horizontal frame 14, respectively. Connection rings 18a and 18b coupled to the connection chain 36 for connecting the first crane 44 to both sides are provided, and the chain 32 slides on both side ends of the second frame body 20. The through-rings 22 and 22 'of sufficient diameter penetrating slidably are provided respectively. The upper portion of the connecting chain 36 is provided with a traction chain 40 having a detachable ring (41, 42) at both ends. The chain 32 exited through the penetrating support rings 22 and 22 'of the second frame body 20 protrudes in a line in the direction of the second crane 44' and the ring of the towing chain 40 '. By connecting to 41 ', it is connected to the crane 44' via intermediate mediation rings 42'43 '.

또, 상기 체인(32)의 양단이 상기 양측 관통지지고리(22)(22')를 통해 상기 양측 고정고리(12a,12b)(12a',12b')에 상하 분할하여 두 개의 체인(32a,32b)으로 각각 고정시키는 체인부(30)가 프레임 몸체(10,20) 양측으로 각각 구비되며, 이와 같이 연결 구성되는 체인부(30)와 두 프레임 몸체(10,20)의 결합구조에 의해, 상기 제1 프레임 몸체(10)와 제2 프레임 몸체(20)가 상기 체인부(30)에 연결된 채로 서로 간격이 좁혀지거나 이격되게 작용할 수 있도록 구성된다.In addition, both ends of the chain 32 are vertically divided into both fixing rings 12a, 12b, 12a ', and 12b' through the two through holes 22 and 22 ', so that the two chains 32a, 32b) are respectively provided with chain portions 30 fixed to both sides of the frame bodies 10 and 20, and by the coupling structure of the chain portion 30 and the two frame bodies 10 and 20 connected in this way, The first frame body 10 and the second frame body 20 are configured to act to be narrowed or spaced apart from each other while being connected to the chain portion 30.

바람직하게는, 상기 체인부(30)는 상기 두 개의 체인(32a,32b)으로 상하 분할되는 시작지점의 체인이 하나 이상의 파이프 봉체(33)에 의해 합쳐져 고정된 구조로 된다. 상기 파이프 봉체(33)는 체인(32a,32b)를 합쳐 고정하는 역할과 아울러 체인(32) 전체가 아래쪽으로 늘어지게 되어 엉키게 되는 것을 방지하는 역할을 하며, 도3 및 도 4에 도시된 바와 같이 두 개 또는 그 이상의 개수로 구비될 수도 있다. Preferably, the chain portion 30 has a structure in which the chain of the starting point divided into two chains 32a and 32b is joined together by one or more pipe rods 33 to be fixed. The pipe rod 33 serves to fix the chains 32a and 32b together and to prevent the chain 32 from being entangled downward and tangled, as shown in FIGS. 3 and 4. It may be provided with two or more numbers together.

상기 제2 프레임 몸체측에 보이는 체인(32)은 한 가닥이 아닌 파이프 봉체(33)는 체인(32)을 끼워서 고정할 수도 있다. 다르게는 분할된 체인(32a,32b)을 파이프 봉체(33)의 일측과 용접하고 파이프 봉체(33)의 타측에 한 가닥의 체인(32)을 용접하는 방법도 가능하다. The chain 32 visible on the second frame body side may be fixed by inserting the chain 32 into the pipe rod 33 that is not one strand. Alternatively, the divided chains 32a and 32b may be welded to one side of the pipe rod 33 and one strand of chain 32 to the other side of the pipe rod 33.

상기 고정고리(12a,12b)와 상기 체인(32a,32b)를 결합하는 것은 착탈방식을 갖는 고정결합 방식일 수도 있고 착탈방식이 아닌 단순 고정결합을 할 수도 있다.
Combining the fixing ring (12a, 12b) and the chain (32a, 32b) may be a fixed coupling method having a removable method or may be a simple fixed coupling not a removable method.

이와 같이 구성된 본 발명의 지그에 파이프를 고정시킨 후 도금조에 투입하여 도금한 후 도금조로부터 지그를 꺼내는 단계를 순서적으로 설명하면 다음과 같다.After fixing the pipe to the jig of the present invention configured as described above, the step of taking out the jig from the plating bath after putting it in the plating bath and plating is as follows.

도 5에 도시된 바와같이, 제1 프레임 몸체(10)와 제2 프레임몸체(20)를 수평지지봉(15,25)이 서로 대향하도록 하게 마주하여 내려놓고, 파이프(P)를 끼워넣을 준비를 하되, 이때 파이프(P) 길이보다 두 프레임 몸체(10,20) 간의 간격을 띠운다.As shown in FIG. 5, the first frame body 10 and the second frame body 20 face down so that the horizontal support rods 15 and 25 face each other, and the pipe P is ready for insertion. However, the pipe (P) at this time than the gap between the two frame body (10, 20).

이어서, 도 6의 a 단계 도면에 도시된 바와같이 일측 프레임 몸체(10)의 수평지지봉(15)에 파이프(P)의 일측을 삽입하고 이어서 도 6의 두 번째 그림 b 단계 도면과 같이 타측 프레임 몸체(20)의 수평지지봉(25)에 파이프(P)의 타측이 삽입되게 하여 다수의 파이프(P)를 고정 지지하게 한다. 물론 이때 제2 프레임 몸체(20)에 먼저 파이프(P)를 삽입하고 제1 프레임 몸체(10)에 파이프(P)를 삽입하여 고정 지지 시키는 순서도 무방할 것이다.Subsequently, one side of the pipe P is inserted into the horizontal support rod 15 of the one side frame body 10 as shown in step a of FIG. 6 and then the other side frame body as shown in the second step b of FIG. 6. The other side of the pipe (P) is inserted into the horizontal support rod (25) of the (20) to fix the plurality of pipes (P). Of course, at this time, the order in which the pipe P is first inserted into the second frame body 20 and the pipe P is inserted into the first frame body 10 is fixedly supported.

이와 같이 파이프(P)가 지그 구조물에 지지된 상태에서 도 3 및 도 4 에 기재된 양측 두 크레인(44.44')을 이용하여 제1 프레임과 제2 프레임을 끌어올려 상승시킨다. 이때, 파이프(P)가 빠지지 않게 하기 위해 도 6의 세 번째 그림 c 단계와 같이 제2 크레인(44')에 의해 제2 프레임 몸체(20)를 먼저 상승시켜 파이프(P)가 비스듬히 사선방향으로 누워진 상태로 되게 한 다음에 그 누워진 상태를 유지한 상태에서 제1 프레임 몸체(10)와 제2 프레임 몸체(20)을 동시에 양측 두 크레인(44,44')에 의해 상향으로 동시 견인하여 지그 및 파이프 전체를 상승시킨다. 이렇게 제2 프레임 몸체(20)를 먼저 상승시키는 과정에서 상기 체인부(30)의 체인(32)은 관통공(22,22')을 통해 슬라이딩되어 제2 크레인(44')이 있는 윗쪽 방향으로 당겨지게 되므로 제1 프레임 몸체(10)와 제2 프레임 몸체(20)가 서로 무게의 편중 작용에 의해 최대한 간격이 좁혀지게 되어 파이프(P)가 수평지지봉(15,25)으로부터 이탈되지 않도록 파이프(P)를 안정되게 상부로 견인할 수 있게 되는 것이다. 이러한 프레임 몸체(10,20) 간의 간격이 무게 편중에 의해 자연적으로 좁혀지게 되는 작용으로 인해 파이프(P)의 길이에 무관하게 본 지그를 호환적으로 사용할 수 있게 되는 것이다. 이는 관통지지공(22,22')에 양측 체인부(30)의 체인(32)이 슬라이딩 관통되므로 가능한 것이다.In this way, while the pipe P is supported by the jig structure, the first frame and the second frame are pulled up and raised using the two cranes 44.44 'shown in FIGS. 3 and 4. At this time, in order to prevent the pipe P from falling out, as shown in the third step c of FIG. 6, the second frame body 20 is first lifted by the second crane 44 'so that the pipe P is obliquely diagonally. After being laid down, the first frame body 10 and the second frame body 20 are simultaneously simultaneously pulled upward by both cranes 44 and 44 'while being in the laid state. Raise the jig and the whole pipe. In the process of raising the second frame body 20 first, the chain 32 of the chain part 30 is slid through the through-holes 22 and 22 'so that the second crane 44' is upward. Since the first frame body 10 and the second frame body 20 are pulled apart as much as possible by the biasing action of the weight, the pipe P is not separated from the horizontal support rods 15 and 25. P) can be towed to the top stably. The gap between the frame bodies 10 and 20 is naturally narrowed by the weight bias, so that the jig can be used interchangeably regardless of the length of the pipe P. This is possible because the chain 32 of the both side chain portion 30 slides through the through holes 22 and 22 '.

이와 같이 상부 견인된 지그를 양측 두 크레인(44,44')의 동시 이동에 의해 도 7에 도시된 용융아연액이 담겨진 도금조로 이동하여 하강시킬 때에도 상술한 파이프(P)가 비스듬히 사선상태를 유지하게 한 상태에서 침지시킨 후 도금을 행하고, 도금이 완료되면 건조하기 위해 이동할 때에도 상술한 파이프(P)가 비스듬히 사선상태를 유지하게 한 상태로 하여 이동시키고 건조가 완료되면 원하는 곳에 도 6의 b 단계 상태와 같이 지그를 내려놓고 양측 두 프레임 몸체(10,20) 간격을 벌려 파이프(P)를 빼내면 된다. The pipe P described above is obliquely maintained even when the upper towed jig moves to the plating bath containing the molten zinc liquid shown in FIG. 7 by simultaneous movement of both cranes 44 and 44 '. After the immersion in the state to perform the plating, and when the plating is complete, even when moving to dry the above-mentioned pipe (P) to be in an oblique state to maintain the oblique state and when the drying is complete step b of Figure 6 where desired As shown in the state, the jig is put down and the two frame bodies 10 and 20 are spaced apart to remove the pipe P.

상술한 제1 프레임 몸체 및 제2 프레임 몸체의 승하강 높이 제어 및 승하강 순서 제어는 크레인의 작동을 제어하는 PLC 프로그램의 제어에 의해 달성될 수 있다.
The elevation height control and the elevation order control of the first frame body and the second frame body described above may be achieved by control of a PLC program that controls the operation of the crane.

한편, 상술한 본 발명의 구성은 다량의 파이프(P)를 동시 도금할 때 사용되는 것이나, 소량의 파이프(P)를 도금할 때의 경우에 사용할 수 있는 파이프 도금용 지그의 예로서, 상기 제1 프레임 몸체(10) 및 제2 프레임 몸체(20)의 구성을, 간격을 두어 다수의 수평지지봉(15)(25)을 갖는 각각의 가로방향 프레임(12)(24)을 일열 한 개만 갖게 하고, 상기 한 개의 가로방향 프레임 양측에 상기의 고정고리(12a,12b)(12a',12b')를 두 개로 하지 않고 한 개만 마련하여 상술한 바와같이 분할되지 않은 하나의 체인으로 연결하고, 다른 구성요소들은 그대로 적용하는 구조를 채택할 수 있으며, 이에 대하여 특허청구범위의 청구항 3으로서 기재하였다. 이와같이 본 발명은 제1 프레임(10)과 제 2 프레임(20) 간의 간격이 좁혀졌다 벌어졌다 할 수 있게 하는 크레인 조정의 제어 순서를 이용하는 구조 및 방법을 갖는 기술사상에서 당업자가 생각할 수 있는 유사한 다양한 창작이 가능할 것이며, 이는 본 발명의 기술적 사상의 범주 내에 포함된다 할 것이다.
On the other hand, the above-described configuration of the present invention is an example of a pipe plating jig that can be used when simultaneously plating a large amount of pipes P, or can be used when plating a small amount of pipes P. The configuration of the first frame body 10 and the second frame body 20 is spaced apart so that there is only one row of each horizontal frame 12, 24 having a plurality of horizontal support rods 15, 25. In this case, only one of the fixing rings 12a, 12b (12a ', 12b') is provided on both sides of the one horizontal frame, and is connected to one undivided chain as described above. The elements can adopt a structure that applies as is, which is described as claim 3 in the claims. As such, the present invention provides a variety of similar inventions conceivable to one of ordinary skill in the art having a structure and method of utilizing a control sequence of crane adjustment to allow the gap between the first frame 10 and the second frame 20 to be narrowed and widened. It will be possible, which will be included within the scope of the technical spirit of the present invention.

P-파이프 10-제1 프레임 몸체
12a,12b,12a',12b'- 고정고리 14,24-가로방향 프레임
15-수평지지봉 16,26-세로방향 프레임
18a,18b-연결고리 20-제2 프레임 몸체
22,22'-관통지지고리 26 - 세로방향 프레임
30-체인부 32-체인
33-파이프 봉체
36-연결체인 44.44'-크레인
P-Pipe 10-First Frame Body
12a, 12b, 12a ', 12b'- Fixed ring 14,24-Horizontal frame
15-Horizontal Support Rods 16,26-Vertical Frame
18a, 18b linkage 20-second frame body
22,22'-through ring 26-vertical frame
30-chain section 32-chain
33-pipe seal
36-connected 44.44'-crane

Claims (4)

강관 파이프(P)를 도금조에 침지하여 도금하는데 사용되는 파이프 도금용 지그에 있어서,
상기 파이프(P)의 중공에 끼워 상기 파이프(P)들을 지지하기 위한 다수의 수평지지봉(15)을 갖는 두 개 이상의 가로방향 프레임(14)(24)이 세로방향 프레임(16)(26)과 용접된 제1 프레임 몸체(10) 및 제2 프레임 몸체(20)가 서로 마주보게 구비되어지되,
상기 제1 프레임 몸체(10)는 양측 측단부 상,하부에 체인을 고정하기 위한 2개의 고정고리(12a,12b)(12a',12b')가 각각 마련됨과 아울러 상기 가로방향 프레임(14) 상부 양측에 제1 크레인(44)으로 연결하기 위한 연결체인(36)과 결합된 연결고리(18a,18b)가 마련되고,
상기 제 2프레임 몸체(20)에는 양 측단부에 체인(32)이 슬라이딩 가능하게 관통되는 관통지지고리(22)(22')가 각각 마련되어 상기 관통지지고리(22)(22')를 통해 상기 체인(32)이 제2 크레인(44')으로 연결될 수 있게 하나의 선상으로 연결되는 구조이고,
상기 체인(32)의 양단이 상기 양측 관통지지고리(22)(22')를 통해 상기 양측 고정고리(12a,12b)(12a',12b')에 상하 분할하여 두 개의 체인(32a,32b)으로 각각 결합고정시키는 체인부(30)가 상기 제1 프레임 몸체(10) 및 제2 프레임 몸체(10) 양측으로 마련되는 구조로 이루어져,
상기 제1 프레임 몸체(10)와 제2 프레임 몸체(20)가 상기 체인부(30)에 연결된 채로 서로 간격이 좁혀지거나 이격될 수 있도록 한 것을 특징으로 하는 파이프 도금용 지그.
In the jig for pipe plating used for immersing the steel pipe pipe (P) in the plating bath,
Two or more horizontal frames 14 and 24 having a plurality of horizontal support rods 15 for supporting the pipes P are inserted into the hollows of the pipes P and the longitudinal frames 16 and 26. The welded first frame body 10 and the second frame body 20 are provided to face each other,
The first frame body 10 is provided with two fixing rings 12a, 12b (12a ', 12b') for fixing the chains on both side end portions, and on the lower side of the horizontal frame 14, respectively. Connection rings 18a and 18b coupled to the connection chain 36 for connecting the first crane 44 to both sides are provided,
The second frame body 20 is provided with through rings 22 and 22 ', respectively, through which the chain 32 is slidably penetrated at both side ends thereof, through the penetrating rings 22 and 22'. The chain 32 is a structure that is connected in one line to be connected to the second crane 44 ',
Both ends of the chain 32 are vertically divided into both fixing rings 12a, 12b (12a ', 12b') through the two through holes 22 and 22 ', and thus, two chains 32a and 32b. The chain portion 30 to be coupled to each other to be made of a structure provided on both sides of the first frame body 10 and the second frame body 10,
Jig for plating the pipe, characterized in that the first frame body (10) and the second frame body (20) is to be spaced apart or spaced apart from each other while being connected to the chain portion (30).
제 1 항에 있어서 상기 체인부(30)는 상기 두 개의 체인(32a,32b)으로 상하 분할되는 시작지점의 체인이 하나 이상의 파이프 봉체(33)에 의해 합쳐져 고정된 구조인 것을 특징으로 하는 파이프 도금용 지그.
The pipe part of claim 1, wherein the chain part 30 has a structure in which a chain of a starting point divided up and down into the two chains 32a and 32b is joined and fixed by one or more pipe rods 33. Dragon jig.
강관 파이프를 용융아연 도금하는 데 사용되는 파이프 도금용 지그에 있어서,
상기 강관 파이프의 중공에 끼워 파이프들을 지지하기 위한 다수의 수평지지봉이 구비된 한 개의 가로방향 프레임으로 된 제1 프레임 몸체 및 제2 프레임 몸체가 서로 마주보게 구비되어지되,
상기 제1 프레임 몸체의 가로방향 프레임의 양측 단부에 체인을 고정하기 위한 한 개의 고정고리가 각각 마련됨과 아울러 상기 수평 프레임 상부 양측에 크레인과 연결체인으로 연결하기 위한 연결고리가 마련되고, 상기 제 2프레임 몸체에는 양 측단부에 상기 크레인방향으로 체인이 슬립가능하게 관통하여 관통지지고리가 각각 마련되고,
상기 체인 한 개가 상기 양측 관통지지고리를 통해 상기 양측 고정고리에 결합고정되는 체인부가 상기 제1 및 제2 프레임 몸체 양측으로 구비되어, 상기 제1 프레임 몸체와 제2 프레임 몸체가 상기 체인부에 연결된 채로 서로 간격이 좁혀지거나 이격될 수 있도록 구성된 것을 특징으로 하는 파이프 도금용 지그.
In the pipe plating jig used to hot-dip galvanized steel pipe,
The first frame body and the second frame body of a horizontal frame having a plurality of horizontal support rods for supporting the pipes to be inserted into the hollow of the steel pipe pipe is provided facing each other,
One fixing ring for fixing the chain is provided at both ends of the horizontal frame of the first frame body, and a connecting ring for connecting the crane and the connecting chain is provided on both sides of the horizontal frame, and the second The frame body is provided with a through ring by slipping the chain in both side ends in the direction of the crane,
One chain is provided on both sides of the first frame and the second frame body, the chain part being coupled to and fixed to the both side fixing rings through the two side penetrating rings, and the first frame body and the second frame body are connected to the chain part. Jig for plating the pipe, characterized in that configured to be spaced apart or spaced apart from each other.
파이프(P)의 중공에 끼워 상기 파이프(P)들을 지지하기 위한 다수의 수평지지봉(15)을 갖는 두 개 이상의 가로방향 프레임(14)(24)이 세로방향 프레임(16)(26)과 용접된 제1 프레임 몸체(10) 및 제2 프레임 몸체(20)가 서로 마주보게 구비되어지되,
상기 제1 프레임 몸체(10)는 양측 측단부 상,하부에 체인을 고정하기 위한 2개의 고정고리(12a,12b)(12a',12b')가 각각 마련됨과 아울러 상기 가로방향 프레임(14) 상부 양측에 제1 크레인(44)으로 연결하기 위한 연결체인(36)과 결합된 연결고리(18a,18b)가 마련되고, 상기 제 2프레임 몸체(20)에는 양 측단부에 체인(32)이 슬라이딩가능하게 관통되는 관통지지고리(22)(22')가 각각 마련되어 상기 관통지지고리(22)(22')를 통해 체인(32)이 제2 크레인(44')으로 연결될 수 있게 하나의 선상으로 연결되는 구조이고,
상기 체인(32)의 양단이 상기 양측 관통지지고리(22)(22')를 통해 상기 양측 고정고리(12a,12b)(12a',12b')에 상하 분할하여 두 개의 체인(32a,32b)으로 각각 결합고정시키는 체인부(30)가 상기 제1 및 제2 프레임 몸체(10,20) 양측으로 마련된 구조를 갖는 된 파이프 도금용 지그를 이용하는 크레인 승하강 제어방법에 있어서,
상기 제2 크레인(44')에 의해 상기 제2 프레임 몸체(20)를 일정 높이만큼 먼저 상승시키는 단계, 상기 제1 및 제2 크레인(44,44')에 의해 상기 제1 프레임 몸체(10)와 제2 프레임 몸체(20)를 동시에 상승 및 하강시키는 단계에 의하여 제1 프레임 몸체(10)와 제2 프레임 몸체(20)의 간격이 좁혀지게 하여 파이프(P)를 안정하게 고정지지하게 하는 것을 특징으로 하는 파이프 도금용 지그를 이용하는 크레인 승하강 제어방법.
Two or more transverse frames 14, 24 having a plurality of horizontal support rods 15 for supporting the pipes P sandwiched in the hollow of the pipe P are welded with the longitudinal frames 16, 26. The first frame body 10 and the second frame body 20 are provided to face each other,
The first frame body 10 is provided with two fixing rings 12a, 12b (12a ', 12b') for fixing the chains on both side end portions, and on the lower side of the horizontal frame 14, respectively. Connection rings 18a and 18b coupled to the connection chain 36 for connecting the first crane 44 to both sides are provided, and the chain 32 slides on both side ends of the second frame body 20. Through-through rings 22 and 22 ', which are possibly penetrated, are respectively provided so that the chain 32 can be connected to the second crane 44' through the penetrating rings 22 and 22 '. Connected structure,
Both ends of the chain 32 are vertically divided into both fixing rings 12a, 12b (12a ', 12b') through the two through holes 22 and 22 ', and thus, two chains 32a and 32b. In the crane lifting control method using a jig for plating the pipe having a structure provided on both sides of the first and second frame body (10, 20) is coupled to each fixed by
First raising the second frame body 20 by the second crane 44 'by a predetermined height; first frame body 10 by the first and second cranes 44,44' And the second frame body 20 by simultaneously raising and lowering the gap between the first frame body 10 and the second frame body 20 to narrow the pipe (P) to stably support Crane lifting control method using a pipe plating jig characterized in that.
KR1020100125721A 2010-12-09 2010-12-09 Jig for plating of pipe and crain control methode using same KR101261442B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100125721A KR101261442B1 (en) 2010-12-09 2010-12-09 Jig for plating of pipe and crain control methode using same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100125721A KR101261442B1 (en) 2010-12-09 2010-12-09 Jig for plating of pipe and crain control methode using same

Publications (2)

Publication Number Publication Date
KR20120064466A KR20120064466A (en) 2012-06-19
KR101261442B1 true KR101261442B1 (en) 2013-05-10

Family

ID=46684571

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100125721A KR101261442B1 (en) 2010-12-09 2010-12-09 Jig for plating of pipe and crain control methode using same

Country Status (1)

Country Link
KR (1) KR101261442B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101704615B1 (en) 2016-04-19 2017-02-08 (주)아이케이텍 Plating Equipment
CN108441931A (en) * 2018-05-03 2018-08-24 于法周 A kind of clamping device for pipe fitting plating processing
KR20190123633A (en) 2018-04-24 2019-11-01 와이제이산업(주) Hanger for hot dip galvanizing of circular pipe

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106435699A (en) * 2016-11-09 2017-02-22 重庆长安工业(集团)有限责任公司 Small-diameter thin-wall opening ring part zinc plating rack

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200358477Y1 (en) * 2004-05-19 2004-08-07 지 테크 주식회사 Supporter for Hot-dip Galvanization Coating

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200358477Y1 (en) * 2004-05-19 2004-08-07 지 테크 주식회사 Supporter for Hot-dip Galvanization Coating

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101704615B1 (en) 2016-04-19 2017-02-08 (주)아이케이텍 Plating Equipment
KR20190123633A (en) 2018-04-24 2019-11-01 와이제이산업(주) Hanger for hot dip galvanizing of circular pipe
CN108441931A (en) * 2018-05-03 2018-08-24 于法周 A kind of clamping device for pipe fitting plating processing

Also Published As

Publication number Publication date
KR20120064466A (en) 2012-06-19

Similar Documents

Publication Publication Date Title
CN201381166Y (en) Hanging-point adjustable transverse hanging beam
KR101261442B1 (en) Jig for plating of pipe and crain control methode using same
CN200999456Y (en) Safety self-locking electric up-down scaffold
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN204958134U (en) Prefabricated floor plate special hoisting bar
CN105645248B (en) A kind of steel reinforcement cage lifting device and method
CN101324146A (en) Construction method for hanging wide span arcuated open-web beam
CN204713400U (en) A kind of boat scaffold
CN107416685B (en) Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN105863276A (en) Manual lifting device used for hoisting factory building roof rod member, and manufacturing method
CN206396306U (en) A kind of steel pipe enters auto tube feeding frame mechanism before baking oven
CN103395689A (en) Horizontal hoisting clamp for wallboard
CN201634333U (en) Super-altitude gantry crane
CN104944276A (en) Lightweight wall plate start shipment lifting frame
CN106012861B (en) The construction method of the mounting and positioning device of Wavelike steel webplate and the Wavelike steel webplate
CN201574573U (en) Adherent anti-falling lifting scaffold
CN112193984B (en) Steel reinforcement cage lifting and fixing device and steel reinforcement cage lifting method
CN205045696U (en) Iron tower lower margin cable suspension device for hot -galvanize
CN104085832A (en) Flexible component lifting device and lifting method thereof
CN204198306U (en) A kind of device for purlin lifting in building operation
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
CN205892511U (en) Sclausura zinc -plating panel is hung and is used frock
CN201865360U (en) Polyurethane laminboard installation device
CN205741935U (en) The mounting and positioning device of Wavelike steel webplate
CN215402554U (en) Angle steel galvanizing lifting appliance for angle steel tower of national power grid

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160428

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170502

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20200304

Year of fee payment: 8