KR101253411B1 - Mounting method for derrick of drillship - Google Patents

Mounting method for derrick of drillship Download PDF

Info

Publication number
KR101253411B1
KR101253411B1 KR1020110029194A KR20110029194A KR101253411B1 KR 101253411 B1 KR101253411 B1 KR 101253411B1 KR 1020110029194 A KR1020110029194 A KR 1020110029194A KR 20110029194 A KR20110029194 A KR 20110029194A KR 101253411 B1 KR101253411 B1 KR 101253411B1
Authority
KR
South Korea
Prior art keywords
derrick
drillship
mounting
lifting
mounting method
Prior art date
Application number
KR1020110029194A
Other languages
Korean (ko)
Other versions
KR20120110977A (en
Inventor
윤호원
Original Assignee
현대중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대중공업 주식회사 filed Critical 현대중공업 주식회사
Priority to KR1020110029194A priority Critical patent/KR101253411B1/en
Publication of KR20120110977A publication Critical patent/KR20120110977A/en
Application granted granted Critical
Publication of KR101253411B1 publication Critical patent/KR101253411B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/20Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/04Arrangement of ship-based loading or unloading equipment for cargo or passengers of derricks, i.e. employing ships' masts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/10Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes
    • B63B27/12Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes of gantry type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/30Moving or transporting modules or hull blocks to assembly sites, e.g. by rolling, lifting or floating
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • E04H12/10Truss-like structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/14Hull parts
    • B63B2003/147Moon-pools, e.g. for offshore drilling vessels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B17/00Vessels parts, details, or accessories, not otherwise provided for
    • B63B2017/0054Rests or supports for movable ship-borne equipment
    • B63B2017/0063Boom rests, i.e. props for main sail booms, derricks, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Civil Engineering (AREA)
  • Transportation (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Jib Cranes (AREA)

Abstract

본 발명은 드릴쉽의 대형 데릭 탑재 공법에 관한 것으로, 그 목적은 기존 크레인의 용량(Capacity)을 능가한 작업이 가능토록 하여 데릭을 분해하지 않고 그대로 탑재할 수 있도록 한 드릴쉽의 대형 데릭 탑재 공법을 제공함에 있다. 이를 위한 본 발명의 드릴쉽의 대형 데릭 탑재 공법은 별도 제작된 데릭을 드릴쉽에 탑재함에 있어서, 인양장비를 이용하여 데릭을 인양하되, 데릭의 높이가 크레인 보다 낮아지도록 데릭을 소정 각도 기울여서 인양하는 인양단계(S110); 상기 S110 단계를 통해 인양된 데릭을 드릴쉽에 마련된 문풀 부근으로 이동시키는 이동단계(S120); 상기 S120 단계를 통해 문풀 부근으로 이동된 데릭의 일측 하단부를 문풀 주변의 데크 상에 거치시키는 거치단계(S130); 상기 S130 단계 후, 문풀 주변에 준비된 다수 개의 윈치로부터 연장되는 와이어를 데릭에 결속하여 데릭과 다수 개의 윈치를 연결하고, 인양장비와 윈치를 이용하여 데릭을 수직하게 세운 뒤, 데릭을 선체에 고정시키는 탑재단계(S140)로 구성된다.The present invention relates to a large-sized derrick mounting method of a drillship, and its purpose is to enable a large-sized derrick mounting method of a drillship so that the work can be carried out without disassembling the derrick to enable the operation beyond the capacity of the existing crane. In providing. In the large-size derrick mounting method of the drillship of the present invention for this purpose, in order to mount a separately manufactured derrick on the drillship, the derrick is lifted using the lifting equipment, and the derrick is lifted by tilting the derrick at a predetermined angle so that the height of the derrick is lower than the crane. Lifting step (S110); A moving step of moving the derrick lifted through the step S110 to the vicinity of the door pool provided in the drillship (S120); Mounting step (S130) for mounting the lower end of one side of the derrick moved to the vicinity of the moon pool on the deck around the moon pool through the step S120; After the step S130, the wires extending from the plurality of winches prepared around the door pool to the derrick to connect the derrick and the plurality of winches, by using the lifting equipment and the winch to set the derrick vertically, fixing the derrick to the hull It consists of a mounting step (S140).

Description

드릴쉽의 대형 데릭 탑재 공법{Mounting method for derrick of drillship}Mounting method for derrick of drillship

본 발명은 드릴쉽 건조 시 대형 데릭을 드릴쉽에 탑재하는 공법에 관한 것으로, 특히 대형 데릭의 운반 및 탑재를 위한 크레인의 높이가 데릭 수직높이 보다 낮아서 현재의 공법으로는 탑재 불가능하여 데릭을 기울여 드릴쉽에 운반 및 탑재하는 공법에 관한 것이다.The present invention relates to a method for mounting a large derrick to the drillship when the drillship is dry, in particular, the height of the crane for transporting and mounting the large derrick is lower than the vertical height of the derrick tilting the derrick because it is impossible to mount with the current method It is related with the construction method to carry and mount easily.

일반적으로 드릴쉽이라 함은 해저 자원의 탐사나 채굴을 위하여 해저면에 시추공을 형성하는 선박으로써, 선체에 마련된 문풀(moon pool)의 주위에는 시추장비를 지지하기 위한 데릭(Derrick)이 설치되어 있다.In general, a drillship is a vessel that forms a borehole on the seabed for exploration or mining of seabed resources, and a derrick is installed around a moon pool provided in the hull to support drilling equipment. .

상기 데릭은 드릴 파이프와 같은 시추장비를 승강시키기 위하여 100m가 넘는 높이를 갖는 대형 구조물로써, 선박건조작업의 효율을 높이기 위하여 별도의 장소에서 제작되며, 별도 제작된 데릭을 드릴쉽에 운반 및 탑재하여 고정시키게 된다.The derrick is a large structure having a height of more than 100 m to elevate drilling equipment such as a drill pipe, and is manufactured in a separate place to increase the efficiency of the ship construction work, and carries and mounts a separately manufactured derrick on a drillship It is fixed.

그러나 상기 데릭은 앞서 설명된 바와 같이, 100m가 넘는 높이를 갖는 대형 구조물로써, 도크(Dock)에 마련된 기존 크레인을 이용하여 드릴쉽에 탑재가 불가능 함에 따라 데릭의 상단부를 분해하여 데릭의 높이를 낮춘 뒤, 크레인을 이용하여 데릭을 드릴쉽에 탑재하고, 데릭의 탑재가 완료되면 상단부를 다시 데릭에 조립하는 방식으로 데릭의 탑재 작업을 진행하고 있다.However, the derrick is a large structure having a height of more than 100m, as described above, by lowering the height of the derrick by disassembling the upper part of the derrick as it is impossible to mount on the drillship using the existing crane provided in the dock (Dock) Afterwards, the derrick is mounted on the drillship using a crane, and when the mounting of the derrick is completed, the upper part is assembled to the derrick by mounting the derrick.

이처럼 종래에는 데릭의 높이로 인하여 데릭을 그대로 탑재하지 못하고 상단부의 분해와 재조립이 요구되므로, 데릭의 탑재에 많은 시간과 인력이 소요되는 문제점을 갖고 있다.As such, in the related art, since the height of the derrick does not mount the derrick as it is, the disassembly and reassembly of the upper part is required.

본 발명은 상기와 같은 문제점을 고려하여 이루어진 것으로, 본 발명의 목적은 별도 제작된 데릭을 분해하지 않고 그대로 탑재할 수 있도록 한 드릴쉽의 대형 데릭 탑재 공법을 제공함에 있다.The present invention has been made in consideration of the above problems, and an object of the present invention is to provide a large-size derrick mounting method of the drillship to be mounted as it is without disassembling the separately produced derrick.

본 발명의 다른 목적은 데릭의 탑재를 위해 소요되는 시간과 인력을 감소시킬 수 있는 드릴쉽의 대형 데릭 탑재 공법을 제공함에 있다.Another object of the present invention is to provide a large-size derrick mounting method of the drillship that can reduce the time and manpower required for mounting the derrick.

상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명의 드릴쉽의 대형 데락 탑재 공법은 인양장비를 이용하여 데릭을 인양하되, 데릭을 크레인 높이 아래만큼의 소정 각도 기울여서 인양하는 인양단계(S110); 상기 S110 단계를 통해 인양된 데릭을 드릴쉽에 마련된 문풀 부근으로 이동시키는 이동단계(S120); 상기 S120 단계를 통해 문풀 부근으로 이동된 데릭의 일측 하단부를 문풀 주변의 데크 상에 거치시키는 거치단계(S130); 상기 S130 단계 후, 문풀 주변에 준비된 다수 개의 윈치로부터 연장되는 와이어를 데릭에 결속하여 데릭과 다수 개의 윈치를 연결하고, 인양장비와 윈치를 이용하여 데릭을 수직하게 세운 뒤, 데릭을 선체에 고정시키는 탑재단계(S140)로 이루어진 것을 특징으로 한다.The large deck mounting method of the drillship of the present invention to achieve the object as described above and to perform the problem to eliminate the conventional defects by lifting the derrick using the lifting equipment, by tilting the derrick by a predetermined angle below the crane height Lifting step (S110); A moving step of moving the derrick lifted through the step S110 to the vicinity of the door pool provided in the drillship (S120); Mounting step (S130) for mounting the lower end of one side of the derrick moved to the vicinity of the moon pool on the deck around the moon pool through the step S120; After the step S130, the wires extending from the plurality of winches prepared around the door pool to the derrick to connect the derrick and the plurality of winches, by using the lifting equipment and the winch to set the derrick vertically, fixing the derrick to the hull Characterized in that the mounting step (S140).

상기와 같은 특징을 갖는 본 발명에 의하면, 기존 크레인의 용량(Capacity)을 능가한 작업이 가능하며, 이에 따라 데릭을 분해하지 않고 그대로 드릴쉽에 탑재할 수 있게 되어 드릴쉽의 탑재에 소요되는 시간과 인력을 감소시킬 수 있는 효과를 가지고 있다.According to the present invention having the above characteristics, it is possible to work beyond the capacity (capacity) of the existing crane, and thus can be mounted on the drill ship without disassembling the derrick, so that the time required for mounting the drill ship and It has the effect of reducing manpower.

도 1은 본 발명의 일 실시예에 따른 데릭 탑재 공법의 공정도,
도 2는 본 발명의 또 다른 실시예에 따른 데릭 탑재 공법의 공정도.
1 is a process diagram of the derrick mounting method according to an embodiment of the present invention,
Figure 2 is a process diagram of the derrick mounting method according to another embodiment of the present invention.

이하, 본 발명의 바람직한 실시예를 첨부된 도면과 연계하여 상세히 설명하면 다음과 같다. 본 발명의 실시예를 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명은 생략한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description of the embodiments of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

도 1은 본 발명의 일 실시예에 따른 데릭 탑재 공법의 공정도를, 도 2는 본 발명의 또 다른 실시예에 따른 데릭 탑재 공법의 공정도를 도시하고 있다.1 is a process diagram of the derrick mounting method according to an embodiment of the present invention, Figure 2 is a process diagram of a derrick mounting method according to another embodiment of the present invention.

본 발명은 별도의 선행공정을 통해 제작된 데릭을 크레인의 높이에 맞추어 분해하지 않고 그대로 드릴쉽에 탑재할 수 있도록 한 드릴쉽의 대형 데릭 탑재 공법에 관한 것으로, 본 발명에 따른 드릴쉽의 대형 데릭 탑재 공법은 인양장비(21)를 이용하여 상기 데릭(10)을 기울인 채로 인양하여 드릴쉽의 문풀(moon pool,40) 부근으로 이동한 뒤, 기울어진 데릭(10)을 수직하게 세워 선체와 데릭(10)을 고정시키는 것으로 구성된다.The present invention relates to a large sized derrick mounting method of a drillship in which a derrick manufactured through a separate preceding process can be mounted on a drillship without disassembling according to the height of a crane, and a large derrick of a drillship according to the present invention. Mounting method is using the lifting equipment 21 to lift the derrick 10 while inclined to move near the moon pool (moon pool, 40) of the drillship, and then tilted the derrick (10) vertically to the hull and derrick It consists of fixing 10.

한편 본 발명에 따른 드릴쉽의 탑재공정을 보다 구체적으로 구분하면, 인양장비(21)를 이용하여 데릭(10)을 인양하되, 데릭(10)을 소정 각도 기울인 채로 인양하는 인양단계(S110)와, 상기 S110 단계를 통해 인양된 데릭(10)을 드릴쉽에 마련된 문풀(40) 부근으로 이동시키는 이동단계(S120)와, 상기 S120 단계를 통해 문풀 부근으로 이동된 데릭(10)의 일측 하단부를 데릭(10)이 문풀 주변의 데크 상에 거치시키는 거치단계(S130)와, 상기 S130 단계 후 데릭(10)을 수직하게 세워 선체에 고정하는 탑재단계(S140)로 구분될 수 있다.On the other hand, the drillship mounting process according to the present invention in more detail, the lifting step (S110) and to lift the derrick 10 by using the lifting equipment 21, while lifting the derrick 10 at a predetermined angle. The movement step (S120) for moving the derrick 10 lifted through the step S110 to the vicinity of the door pool 40 provided in the drillship, and the lower end of one side of the derrick 10 moved to the vicinity of the door pool through the step S120 The derrick 10 may be divided into a mounting step (S130) for mounting on the deck around the door pool, and the mounting step (S140) for fixing the derrick 10 to the hull vertically after the step S130.

상기 인양단계(S110)는 별도 제작된 데릭(10)을 드릴쉽에 탑재하기 위하여 공중으로 인양하는 단계로써, 데릭(10)을 기울여 데릭(10)의 높이가 인양장비(21)의 높이 보다 낮아지도록 한 상태에서 인양하게 된다. 이와 같이 데릭(10)을 기울이는 작업은 인양장비(21) 또는 인양장비(21)와 보조장비를 함께 이용하여 진행될 수 있다.The lifting step (S110) is a step of lifting to the air to mount the separately produced derrick 10 in the drillship, the height of the derrick 10 by tilting the derrick 10 is lower than the height of the lifting equipment 21 It is lifted in the condition that it is built. As described above, the tilting of the derrick 10 may be performed by using the lifting equipment 21 or the lifting equipment 21 together with the auxiliary equipment.

한편 상기 인양장비(21)로는 드릴쉽의 건조가 이루어지는 도크 주변에 구비된 겐트리 크레인(gantry crane)이나 해상 크레인 등이 사용될 수 있고, 상기 보조장비(22)는 또 다른 크레인이나 윈치가 사용될 수 있다. 참고로 도 1에는 바지(Barge)에 의해 운반된 데릭을 한 대의 크레인을 이용하여 운반 및 탑재하는 상태가 도시되어 있고, 도 2에는 바지(Barge)에 의해 운반된 데릭을 두 대의 크레인을 이용하여 운반 및 탑재하는 상태가 도시되어 있다.Meanwhile, the lifting equipment 21 may be a gantry crane or a marine crane provided around the dock where the drillship is dried, and the auxiliary equipment 22 may use another crane or winch. have. For reference, FIG. 1 illustrates a state in which a derrick carried by a barge is carried and mounted by using a single crane, and FIG. 2 illustrates a derrick carried by a barge by using two cranes. The state of carrying and mounting is shown.

상기와 같이 데릭(10)을 기울인 채로 인양하게 됨으로써, 데릭(10)의 높이에 상관없이 기존 크레인을 이용하여 데릭(10)의 인양 및 이동이 가능하게 된다.As the derrick 10 is lifted while tilting as described above, the derrick 10 can be lifted and moved using an existing crane regardless of the height of the derrick 10.

상기 이동단계(S120)는 인양장비(21)에 의해 인양된 데릭(10)을 드릴쉽에 형성된 문풀(40) 부근으로 이동시키는 단계이다. 이러한 이동단계는 데릭(10)을 인양하고 있는 인양장비(21)의 이동에 의해 이루어지게 된다. 물론 도 2와 같이 보조장비(22)로써 또 다른 크레인이 사용된 경우, 두 크레인의 이동에 의해 데릭의 이동이 이루어지게 된다.The moving step S120 is a step of moving the derrick 10 lifted by the lifting equipment 21 to the vicinity of the door pool 40 formed in the drillship. This movement step is made by the movement of the lifting equipment 21 is lifting the derrick 10. Of course, when another crane is used as the auxiliary equipment 22 as shown in Figure 2, the movement of the derrick is made by the movement of the two cranes.

상기 거치단계(S130)는 문풀 부근으로 이동된 데릭(10)을 수직으로 세우기에 앞서 데릭(10)의 일측 하변을 데릭(10)이 문풀 주변의 데릭 상에 놓아 데릭(10)의 회전 지지점을 마련하는 것이다. 이때 데릭(10)을 데크 상에 완전히 놓을 경우, 데릭(10)의 무게로 인해 데크 또는 데릭의 손상이 발생될 수 있으므로, 데릭(10)의 무게의 대부분을 인양장비(21)가 지지할 수 있도록 하는 것이 바람직하다.The mounting step (S130) is to place the lower side of the derrick 10 on the derrick around the door pool prior to setting up the derrick 10 moved to the vicinity of the door pool vertically to support the rotation of the derrick 10 To prepare. At this time, if the derrick 10 is completely placed on the deck, the weight of the derrick 10 may cause damage to the deck or derrick, the lifting equipment 21 can support most of the weight of the derrick 10. It is desirable to.

한편 데릭(10)의 일측 하변이 데크 상에 놓여지게 되면, 문풀 주변에 준비된 다수 개의 윈치(31,32)로부터 연장되는 와이어를 데릭(10)에 결속하여 데릭과 다수 개의 윈치를 연결하게 된다. 이때 다수 개의 윈치(31,32) 중 일부 윈치(31)는 데릭(10)의 전방에서 데릭(10)과 연결되어 데릭(10)을 잡아당겨 데릭(10)을 세우는 작업을 보조하게 되고, 나머지 윈치(32)는 데릭(10)의 후방에서 데릭(10)과 연결되어 데릭(10)의 급작스런 회전을 방지하도록 데릭(10)을 지지하게 된다.Meanwhile, when one side of the lower side of the derrick 10 is placed on the deck, the wires extending from the plurality of winches 31 and 32 prepared around the door pool are bound to the derrick 10 to connect the derrick and the plurality of winches. At this time, some of the winch (31, 32) of the winch 31 is connected to the derrick 10 in front of the derrick 10 to pull the derrick 10 to assist in the construction of the derrick (10), the rest The winch 32 is connected to the derrick 10 at the rear of the derrick 10 to support the derrick 10 to prevent sudden rotation of the derrick 10.

상기 탑재단계(S140)는 데크 상에 기울어진 채로 놓여진 데릭(10)을 수직하게 세운 후 데크에 고정시키는 단계이다. 이러한 작업은 데릭(10)을 인양하고 있는 인양장비(21) 또는 인양장비(21)와 보조장비(22)를 함께 이동시키면서 데릭(10)의 전방에 위치한 윈치(31)를 이용하여 데릭(10)을 잡아당김으로써 이루어지게 되며, 이때 데릭(10)의 후방에 연결된 윈치(32)는 데릭(10)과 연결된 와이어가 적절한 장력을 유지토록 하여 데릭(10)이 서서히 세워질 수 있도록 보조하게 된다.
The mounting step S140 is a step of vertically setting the derrick 10 placed inclined on the deck and then fixing it to the deck. This operation is carried out by using the winch 31 located in front of the derrick 10 while moving the lifting equipment 21 or the lifting equipment 21 and the auxiliary equipment 22 that are lifting the derrick 10, and the derrick 10 ), And the winch 32 connected to the rear of the derrick 10 assists the derrick 10 to stand up slowly so that the wire connected to the derrick 10 maintains the proper tension.

상기와 같은 공정을 통해 데릭(10)을 드릴쉽에 탑재하는 본 발명은 조선소 내에 마련된 기존 인양장비(21)를 활용하면서 데릭(10)의 분해없이 그대로 탑재가 가능하므로, 작업시간을 단축하고 인력의 소모를 줄일 수 있는 효과를 기대할 수 있게 된다.
The present invention for mounting the derrick 10 in the drillship through the above process can be mounted as it is without disassembly of the derrick 10 while utilizing the existing lifting equipment 21 provided in the shipyard, reducing the work time and manpower The effect of reducing the consumption of can be expected.

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined in the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.

<도면의 주요 부분에 대한 부호의 설명>
(10) : 데릭
(21) : 인양장비
(22) : 보조장비
(31),(32) : 윈치
(40) : 문풀
Description of the Related Art
(10): Derrick
(21): lifting equipment
(22): auxiliary equipment
31, 32: winch
40: Moonpool

Claims (3)

별도 제작된 데릭을 드릴쉽에 탑재함에 있어서,
인양장비를 이용하여 데릭을 인양하되, 데릭을 소정 각도 기울인 채로 인양하는 인양단계(S110);
상기 S110 단계를 통해 인양된 데릭을 드릴쉽에 마련된 문풀 부근으로 이동시키는 이동단계(S120);
상기 S120 단계를 통해 문풀 부근으로 이동된 데릭의 일측 하단부를 문풀 주변의 데크 상에 거치시키는 거치단계(S130);
상기 S130 단계 후, 문풀 주변에 준비된 다수 개의 윈치로부터 연장되는 와이어를 데릭에 결속하여 데릭과 다수 개의 윈치를 연결하고, 인양장비와 윈치를 이용하여 데릭을 수직하게 세운 뒤, 데릭을 선체에 고정시키는 탑재단계(S140)로 구성된 것을 특징으로 하는 드릴쉽의 대형 데릭 탑재 공법.
In mounting a separately manufactured derrick on the drillship,
Lifting the derrick using the lifting equipment, the lifting step of lifting the derrick at a predetermined angle (S110);
A moving step of moving the derrick lifted through the step S110 to the vicinity of the door pool provided in the drillship (S120);
Mounting step (S130) for mounting the lower end of one side of the derrick moved to the vicinity of the moon pool on the deck around the moon pool through the step S120;
After the step S130, the wires extending from the plurality of winches prepared around the door pool to the derrick to connect the derrick and the plurality of winches, by using the lifting equipment and the winch to set the derrick vertically, fixing the derrick to the hull Large-size derrick mounting method of the drillship, characterized in that the mounting step (S140).
제 1 항에 있어서,
상기 인양장비는 크레인으로써, 두 대의 겐트리 크레인을 이용하여 상기 데릭을 기울인 채로 인양하는 것을 특징으로 하는 드릴쉽의 대형 데릭 탑재 공법.
The method of claim 1,
The lifting equipment is a crane, a large derrick mounting method of the drill ship, characterized in that the lifting using the two gantry cranes while tilting the derrick.
삭제delete
KR1020110029194A 2011-03-31 2011-03-31 Mounting method for derrick of drillship KR101253411B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110029194A KR101253411B1 (en) 2011-03-31 2011-03-31 Mounting method for derrick of drillship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110029194A KR101253411B1 (en) 2011-03-31 2011-03-31 Mounting method for derrick of drillship

Publications (2)

Publication Number Publication Date
KR20120110977A KR20120110977A (en) 2012-10-10
KR101253411B1 true KR101253411B1 (en) 2013-04-11

Family

ID=47281731

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110029194A KR101253411B1 (en) 2011-03-31 2011-03-31 Mounting method for derrick of drillship

Country Status (1)

Country Link
KR (1) KR101253411B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160143350A (en) 2015-06-05 2016-12-14 삼성중공업 주식회사 Transport ship

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0829748B2 (en) * 1990-02-08 1996-03-27 株式会社鈴木造船工業 Barge
JPH09104390A (en) * 1995-10-12 1997-04-22 Mitsubishi Heavy Ind Ltd Erecting/falling type shears device for sand pile driving ship
KR20100004897A (en) * 2009-09-11 2010-01-13 대우조선해양 주식회사 Foldable derrick structure for a ship
KR20120019175A (en) * 2010-08-25 2012-03-06 대우조선해양 주식회사 Method for installing flare tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0829748B2 (en) * 1990-02-08 1996-03-27 株式会社鈴木造船工業 Barge
JPH09104390A (en) * 1995-10-12 1997-04-22 Mitsubishi Heavy Ind Ltd Erecting/falling type shears device for sand pile driving ship
KR20100004897A (en) * 2009-09-11 2010-01-13 대우조선해양 주식회사 Foldable derrick structure for a ship
KR20120019175A (en) * 2010-08-25 2012-03-06 대우조선해양 주식회사 Method for installing flare tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160143350A (en) 2015-06-05 2016-12-14 삼성중공업 주식회사 Transport ship

Also Published As

Publication number Publication date
KR20120110977A (en) 2012-10-10

Similar Documents

Publication Publication Date Title
EP1969274B1 (en) Offshore system
CN102852147B (en) Method for righting jacket by using single cantilever gin pole and double hooks
CN110984994B (en) Laying and recovering system and method of fully flexible pipe ocean mining system
JP2020514205A5 (en)
US20150217838A1 (en) Method for lowering and hoisting of a load to or from an ocean floor
WO2003074353A1 (en) A method for underwater transportation and installation or removal of objects at sea
JP6313613B2 (en) Crane equipment and work boat
KR101253411B1 (en) Mounting method for derrick of drillship
GB2567218A (en) A semi submersible vessel
CN105829203A (en) Saddle and hook system
AU2015237363B2 (en) Method for lowering a subsea structure having a substantially flat support base into the water through the splash zone
US10240407B2 (en) Method and system for wireline intervention in a subsea well from a floating vessel
KR20090101990A (en) Method for mounting thruster in semi-submergible rig
KR101751833B1 (en) Drillship
KR20160005887A (en) Floating crane rigging system
KR101566522B1 (en) Method for loading large block of ship
KR20140028863A (en) Drum shaft lifting method for maintenance of draw work
US20180223493A1 (en) Crane barge conversion to a jack-up unit
KR102055400B1 (en) Method for mounting thruster of ship in dock
KR101665478B1 (en) Drilling system and method
KR20130001807A (en) Loading method for derrick of drill ship
KR102684488B1 (en) Riser handling system of drillship
CN107060674B (en) Production tree transfers the production tree leading arm of guided tooling
KR20160106813A (en) Cursor Guide Structure Including Semi-submergible RIG
KR20170030200A (en) Offshore structure installation vessel

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee