- Publication number
- KR101226948B1 KR101226948B1 KR1020120023500A KR20120023500A KR101226948B1 KR 101226948 B1 KR101226948 B1 KR 101226948B1 KR 1020120023500 A KR1020120023500 A KR 1020120023500A KR 20120023500 A KR20120023500 A KR 20120023500A KR 101226948 B1 KR101226948 B1 KR 101226948B1
- Authority
- KR
- South Korea
- Prior art keywords
- support
- concrete pile
- concrete
- blocking plate
- support body
- Prior art date
Links
- 230000000903 blocking effect Effects 0.000 title claims abstract description 42
- 239000011178 precast concrete Substances 0.000 title 1
- 239000004567 concrete Substances 0.000 claims abstract description 104
- 230000002787 reinforcement Effects 0.000 claims abstract description 22
- 230000003014 reinforcing effect Effects 0.000 claims description 52
- 238000000034 method Methods 0.000 claims description 19
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 238000005452 bending Methods 0.000 claims description 2
- 229910000831 Steel Inorganic materials 0.000 abstract description 24
- 239000010959 steel Substances 0.000 abstract description 24
- 238000009434 installation Methods 0.000 abstract description 11
- 239000000463 material Substances 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 12
- 239000012528 membrane Substances 0.000 description 9
- 238000010586 diagram Methods 0.000 description 7
- 125000006850 spacer group Chemical group 0.000 description 6
- 238000005520 cutting process Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 238000009736 wetting Methods 0.000 description 2
- 241001290198 Dicliptera Species 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000002542 deteriorative effect Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009408 flooring Methods 0.000 description 1
- 238000007373 indentation Methods 0.000 description 1
- 238000001746 injection moulding Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
- 238000009966 trimming Methods 0.000 description 1
- 230000003313 weakening effect Effects 0.000 description 1
- 239000013585 weight reducing agent Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/10—Follow-blocks of pile-drivers or like devices
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/223—Details of top sections of foundation piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/226—Protecting piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/60—Piles with protecting cases
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
- E02D2300/0034—Steel; Iron in wire form
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
본 발명은 항두막이 장치에 적용되는 항두 지지대에 관한 것으로, 특히 파일의 항두내부에 삽입되는 연결철근을 보다 간편하고 확실하게 고정하여 견고하게 지지할 수 있으며, 전체적인 기초바닥타설 과정을 단축할 수 있도록 한 항두 지지대에 관한 것이다.
The present invention relates to a head support for which the head membrane is applied to the device, and in particular, it is possible to more easily and reliably fix the connecting reinforcing bars inserted into the head of the pile, so as to shorten the overall foundation flooring process. It's about a harborhead support.
일반적으로 지상에 건축구조물을 건설하는 경우 터파기를 한 다음, 연약지반에서는 콘크리트 말뚝을 타입 설치하여 지상구조물의 하중이 콘크리트 말뚝을 통하여 지지층에 전달되도록 하고 있다.In general, in the case of building construction structures on the ground and then excavated, in the soft ground to install a concrete pile type so that the load of the ground structure is transferred to the support layer through the concrete pile.
일반적으로 콘크리트 말뚝은 중공부를 가지는 원통형 단면으로 형성되는 콘크리트 주벽부와, 이 콘크리트 주벽부에 매설된 강선으로 구성된다.Generally, a concrete pile consists of a concrete main wall part formed in the cylindrical cross section which has a hollow part, and the steel wire embedded in this concrete main wall part.
이러한 콘크리트 말뚝을 타입 설치한 후에는 콘크리트 말뚝용 상단부 일정 부위(대략 30cm)의 콘크리트 주벽부를 제거하여 콘크리트 주벽부에 매설된 강선이 30cm정도 노출되도록 하고, 노출된 강선에 항두막이를 결속한 후 콘크리트 말뚝용 중공부 상단부위(약 15cm)에 콘크리트(C급 콘크리트)를 채워 콘크리트 말뚝 상단을 막은 다음 기초철근을 배근하여 기초바닥 콘크리트를 타설하고 있다.After installing the concrete pile type, the concrete main wall part of the upper part of the concrete pile (approximately 30 cm) is removed to expose the steel wire embedded in the concrete main wall to about 30 cm, and after binding the membrane to the exposed steel wire Concrete (C-class concrete) is filled in the upper part of the hollow part for piles (about 15 cm) to block the top of the concrete pile, and then the foundation reinforcement is poured to lay the foundation concrete.
종래 콘크리트 말뚝의 콘크리트 주벽부에 매설된 강선의 상단 일부를 노출시키기 위하여 콘크리트 주벽부를 제거하는 과정은 콘크리트 말뚝의 상단부에 복수개의 구멍을 뚫는 단계, 구멍의 상부를 절단해내는 단계, 콘크리트 주벽부의 주위를 커팅하는 단계, 커팅된 부위의 윗부분을 파쇄기로 절취하여 강선이 노출되도록 하는 단계 및 날망치로 정다듬하는 단계를 거쳐 이루어진다.The process of removing the concrete circumferential wall portion in order to expose the upper portion of the steel wire embedded in the concrete circumferential wall portion of the conventional concrete pile, drilling a plurality of holes in the upper end of the concrete pile, cutting the upper portion of the hole, around the concrete circumferential wall portion Cutting the cutting, cutting the upper portion of the cut portion with a crusher to expose the steel wire is made through the step of trimming with a hammer.
또한 콘크리트 말뚝의 중공부 상단 부위에 콘크리트를 채우는 과정에서는 막이캡의 받침판을 콘크리트 말뚝의 중공부 상단에서 일정한 깊이로 삽입하고 받침판을 복수개의 고정철선으로 상기 강선에 결속하여 지지하는 단계와, 터파기 된 바닥면에 버림 콘크리트를 타설함과 동시에 받침판의 상부의 중공부에 막음 콘크리트를 채우는 단계를 거쳐 이루어진다.In addition, in the process of filling the concrete in the upper portion of the hollow part of the concrete pile, inserting the support plate of the membrane cap to a certain depth at the upper end of the hollow part of the concrete pile and supporting the support plate by binding to the steel wire with a plurality of fixed wires; It is made through the step of filling the concrete to block the hollow portion of the upper portion of the base plate at the same time pouring the discarded concrete on the floor.
이후, 기초바닥 철근을 배근한 다음, 기초바닥 콘크리트를 타설한다.Thereafter, the foundation floor reinforcement is reinforced and the foundation floor concrete is poured.
이때 콘크리트 말뚝의 상단 중공부가 막음 콘크리트에 의해 막혀 있으므로 기초바닥 콘크리트를 타설하는 과정에서 생콘크리트가 중공부로 흘러들어가서 그 부위에서 함몰부가 생기는 것을 방지하게 된다.At this time, since the upper hollow part of the concrete pile is blocked by the blocking concrete, the raw concrete flows into the hollow part in the process of pouring the foundation floor concrete, thereby preventing the indentation from occurring at the site.
그러나 이러한 종래 기술에서는 강선이 노출되도록 하는 작업을 수행함에 있어서 강선과 콘크리트 말뚝 상단이 손상되지 않도록 주의를 기울여야 할 뿐만 아니라 여러 장비와 공구를 사용하여 여러 단계로 작업이 이루어지게 되기 때문에 그 작업이 매우 번거롭고, 그 작업과정에서 충격에 의하여 콘크리트 말뚝의 상단이 손상되고 수직균열이 발생하여 콘크리트 말뚝의 지지력이 저하되는 등 내구성 유지에 치명적인 문제점이 있다.However, in this prior art, in the work to expose the steel wire, care must be taken not to damage the top of the steel wire and the concrete pile, and the work is performed in various stages using various equipment and tools. It is cumbersome, and there is a fatal problem in maintaining durability, such as damage to the top of the concrete pile due to the impact during the work process and vertical cracking occurs to lower the bearing capacity of the concrete pile.
또한, 강선이 손상되었을 경우 콘크리트 말뚝과 기초바닥 콘크리트가 일체로 작용하지 않아 수평하중에 의한 내진에 심각한 문제를 드러내게 된다.In addition, when the steel wire is damaged, the concrete piles and the foundation floor concrete do not work together, which causes a serious problem in the seismic resistance due to the horizontal load.
또한, 막이캡을 설치함에 있어서도 고정철선의 하단을 받침판의 가장자리에 결속하고 그 상단에 고리를 만들어 강선에 걸어서 지지하는 것이기 때문에 그 설치 작업이 번거롭고 받침판이 정확한 위치에 설치되지 않아 중공부 내면과 받침판의 외주부 사이 틈새로 막음 콘크리트가 흘러 내려가게 되어 콘크리트 채움 작업에 어려움이 있고, 콘크리트가 낭비되는 문제점이 있다.In addition, when installing the cap, the bottom of the fixed wire is bound to the edge of the support plate, and a loop is formed on the upper end to support it by hanging on the steel wire. Therefore, the installation work is cumbersome and the support plate is not installed at the correct position. Blocked by the gap between the outer peripheral portion of the concrete flows down there is a difficulty in filling the concrete, there is a problem that the concrete is wasted.
한편, 상술한 종래 문제점 중 막이캡과 관련된 문제점을 해결하기 위하여 등록실용신안 20-0186133호와 같은 콘크리트 말뚝용 중공부 막이캡이 안출되어 있다.On the other hand, in order to solve the problems associated with the membrane cap of the above-mentioned conventional problems, hollow portion membrane cap for concrete piles, such as the Utility Model Registration No. 20-0186133 has been devised.
그러나 등록실용신안의 막이캡을 사용하더라도 강선을 노출시키는 작업과 관련한 문제점은 해결할 수 없다.However, even using the cap of the registration utility model does not solve the problems associated with exposing the steel wire.
또한 상기의 문제점을 해결하기 위하여 파일의 강선을 포함하여 콘크리트 말뚝의 두부를 절단하고 콘크리트 말뚝의 강선을 대신하여 철근을 삽입하는 시공방식의 채택으로 종래에는 등록실용신안 20-0400702호와 같이 콘크리트 말뚝의 중공부를 가로막는 캡과, 이 캡에서 일정 거리 이격되어 콘크리트 말뚝의 상단에 얹혀지는 제1지지판과, 캡과 제1지지판 사이에 위치하는 제2지지판 및, 캡과 제1, 제2지지판에 지지되는 철근으로 구성된 기초공사용 파일의 캡 조립체가 안출되어 있다.In addition, in order to solve the above problems, by adopting a construction method that cuts the head of the concrete pile including the steel wire of the pile and inserts the reinforcing bars in place of the steel wire of the concrete pile, the conventional concrete pile, such as registered utility model 20-0400702 A cap that blocks the hollow portion of the first support plate, which is spaced a certain distance from the cap, and which is placed on the top of the concrete pile, a second support plate positioned between the cap and the first support plate, and supported by the cap and the first and second support plates. Cap assembly of the foundation engineering pile consisting of the reinforcing bar is drawn.
그러나 통상적으로 콘크리트 말뚝은 형틀에 강선망을 거치하여 콘크리트를 주입하고 형틀을 회전하여 원심력에 의해 콘크리트의 충전이 이루어져 일정한 살두께의 주벽부와 중공부를 가지도록 성형하는 과정에서 발생하는 레이턴스가 콘크리트 말뚝 내부에 침전, 응고되어 있어 원형을 유지하지 못하게 되므로 실질적으로 캡과 제2지지판을 콘크리트 말뚝의 중공부에 삽입하는 작업이 여의치 않게 되는 문제점이 있다.However, in general, concrete piles are loaded with a wire mesh on the mold to inject concrete, and the mold is rotated to fill the concrete by centrifugal force. There is a problem that it is practical to insert the cap and the second support plate in the hollow of the concrete pile because it is settled inside, solidified so as not to maintain the circular shape.
또한 캡은 강판을 사용하여 가장자리를 찢어서 변형되도록 한 것이므로 콘크리트 페이스트가 누출되며, 레이턴스가 침전, 응고된 중공부 형상에 따라 자유로이 변형되지 않아 찌그러짐이 발생하고 이에 따라 페이스트의 누출이 더욱 심화되는 문제점이 있다.In addition, since the cap is to be deformed by tearing the edge by using a steel sheet, the concrete paste leaks, and the latencies are not freely deformed according to the shape of the hollow part where the latencies are settled and solidified. have.
또한 강판으로 된 캡과 제1 및 제2지지판에 철근을 용접하여 결합하는 것이므로 용접열에 의해 철근의 강도가 급격히 증가되면서 연성이 저하되는 재질의 변화를 초래할 뿐만 아니라 철근이 녹으면서 철근단면에 손상이 발생하는 문제점이 있다.In addition, since the reinforcing bar is welded to the steel plate cap and the first and second support plates, the strength of the reinforcing bar is rapidly increased due to the welding heat, resulting in a change in the material in which the ductility is degraded. There is a problem that occurs.
또한 제1지지판은 콘크리트 말뚝의 상단면에 단순히 얹혀지는 것이므로 콘크리트 말뚝 상단면과 제1지지판 사이에 공극이 발생하며, 이 공극 내에 콘크리트의 완벽한 충전이 되지 않아 상부 구조물의 하중에 의한 처짐이 발생하게 되는 문제점이 있다.In addition, since the first support plate is simply mounted on the upper surface of the concrete pile, voids are generated between the upper surface of the concrete pile and the first support plate, and the sag caused by the load of the upper structure is not generated because the concrete is not completely filled in the voids. There is a problem.
그 외에도 강판을 사용하기 때문에 가공이 번거로워 작업능률이 저하될 뿐만 아니라 제조비용이 증가되는 문제점이 있다.In addition, since the steel plate is used, the processing is cumbersome and the work efficiency is reduced, as well as the manufacturing cost is increased.
한편, 상술한 제반 문제점을 해결하기 위하여 특허출원 10-2005-0110608호의 항두막음 장치가 개발되어 출원한 바 있다.On the other hand, in order to solve the above-mentioned problems, the anti-cementing device of patent application 10-2005-0110608 has been developed and filed.
위 출원발명의 항두막음 장치는 받침판이 연결철근을 통해 연결철근 지지수단을 구성하는 지지대에 지지되는 것이기 때문에 연결철근과 막음 콘크리트의 하중이 온전히 받침판에 가해지게 되고, 이에 따라 받침판이 콘크리트 말뚝의 중공부의 정위치로 유지되지 못하고 밑으로 내려가게 되는 경우 막음 콘크리트의 타설과 연결철근의 설치가 정확하게 이루어지지 않게 되는 문제점이 있었다.In the above-described anti-ceiling device of the present invention, since the supporting plate is supported by the support constituting the connecting reinforcing means through the connecting reinforcing bar, the load of the connecting reinforcing rod and the blocking concrete is completely applied to the supporting plate, and thus the supporting plate is hollowed out of the concrete pile. If it is not kept in the negative position to go down, there was a problem that the installation of the blocking concrete and the installation of the connecting reinforcement was not made correctly.
또한 연결철근의 지지상태가 불안정한 상태로 되기 때문에 이를 견고하게 하기 위해서는 별도의 막음 콘크리트 타설공정이 필요하게 된다. 이러한 막음 콘크리트 타설은 작업자가 각 콘크리트 말뚝의 중공부마다 일일이 수작업으로 채워 넣어야 하기 때문에 그 작업이 매우 번거롭고 별도의 공기가 소요되는 문제점이 있었다.In addition, since the support state of the connecting reinforcing bar is to be unstable state, in order to solidify it is necessary to separate concrete placing process. This prevented concrete pouring has a problem that the work is very cumbersome and requires separate air because the worker has to manually fill each hollow part of each concrete pile.
또한 연결철근을 받침판과 지지대에 지지하는 과정에서 별도의 쐐기를 박아 넣어야 하므로 항두막음 장치의 조립이 번거롭게 되며, 작업능률이 저하되고 부적정 시공으로 이어지는 문제점이 있었다.In addition, in the process of supporting the connecting bar to the support plate and the support, it is necessary to put a separate wedge, so the assembly of the anti-blocking device becomes cumbersome, there is a problem that the work efficiency is lowered and leads to improper construction.
또한 받침판과 지지대 및 쐐기 등의 사출성형하여야 하므로 제조비용이 증가하게 되는 문제점이 있다.In addition, there is a problem that the manufacturing cost is increased because the injection plate and the support and the wedge should be injection molded.
또한 상술한 제반 문제점을 해결하기 위하여 선출원으로서 특허출원 10-2005-130383호의 항두막음 장치가 출원된 바 있다.In addition, in order to solve the above-mentioned problems, the anti-ceiling device of Patent Application No. 10-2005-130383 has been filed as a prior application.
위 출원발명의 항두막음 장치는 콘크리트 말뚝의 상단에 걸쳐지는 막음판 지지선재에 연결철근을 지지하는 스페이서를 단순히 걸쳐놓는 구조로 되어 있기 때문에 조립과정에서 스페이서가 임의로 움직이면서 스페이서에 지지된 연결철근의 위치가 정확한 위치로 유지되지 못하고 막음판 지지선재가 흩어져 있어 콘크리트 말뚝 내부에 대한 설치 작업이 까다로워 시공불량을 초래하고 시공품질이 저하되는 문제점이 있으며, 또한 막음판 지지선재의 하단에 막음판을 결합하는 과정에서 손이 미끄러져서 작업이 지연되는 문제점이 있다.Since the anti-ceiling device of the present invention has a structure in which a spacer supporting the connecting rebar is simply laid over the blocking plate supporting wire which is spread over the top of the concrete pile, the position of the connecting rebar supported by the spacer as the spacer moves randomly during the assembly process. Is not maintained in the correct position, and the blocking plate support wires are scattered, so that the installation work on the inside of the concrete pile is difficult, causing poor construction and deteriorating construction quality. Also, the blocking plate is coupled to the bottom of the blocking plate support wire. There is a problem that the work is delayed due to slipping of the hand in the process.
이에 따라 선 출원된 특허등록 제0795437호와 같이, 콘크리트 말뚝의 중공부에 삽입되는 막음판과; 상기 막음판의 가장자리에 연결되는 복수개의 지지선재와; 콘크리트 말뚝의 중공부 상단에 삽입되는 스페이서와; 상기 막음판과 스페이서에 연결 삽입되는 복수개의 연결철근을 갖는 항두막이 장치를 안출함에 따라, 콘크리트 말뚝의 강선을 노출시키지 않고 별도의 연결철근을 콘크리트 말뚝의 중공부에 설치함에 있어서 조립 및 설치가 신속하고 간편하게 이루어지게 되면서도 연결철근의 설치가 정확하게 이루어지므로 시공 품질이 향상되는 것이고, 콘크리트 말뚝의 중공부에 대한 내부 막음 콘크리트의 타설공정을 생략할 수 있으며, 막음판에 대한 지지선재의 결합방향이 항상 정확하게 유지되어 막음판 지지선재의 상단에 구비된 걸침고리의 교정작업이 필요 없게 되어 시공이 신속하고 간편하게 이루어질 수 있도록 한 것이다.Accordingly, as in the previously registered patent registration No. 0795437, the blocking plate is inserted into the hollow portion of the concrete pile; A plurality of support wires connected to edges of the blocking plate; A spacer inserted into the top of the hollow part of the concrete pile; As the anti-membrane having a plurality of connecting bars inserted into the blocking plate and the spacer is placed in the device, assembly and installation are quick in installing a separate connecting bar in the hollow of the concrete pile without exposing the steel wire of the concrete pile. The construction quality is improved because the installation of the connecting rebar is made precisely and easily, and it can omit the process of placing concrete inside the hollow part of the concrete pile, and the bonding direction of the supporting wire to the blocking plate is always It is precisely maintained so that the construction work can be done quickly and simply because there is no need to correct the hooks provided on the top of the blocking plate support wire.
그러나, 상기와 같은 항두막이 장치에 사용되는 항두 지지대(스페이서)는 항두 지지대 및 연결철근과 막음판의 결합체를 콘크리트 말뚝의 선단에 걸어 지지시키기 위한 별도의 지지선재를 반드시 구비하여야 하므로 상기 지지선재의 제작비에 대한 부담은 물론 설치 및 시공상의 번거로움이 뒤따르는 문제점을 갖고 있는 것이다.However, the above-mentioned head support (spacer) used in the above-described anti-membrane device must be provided with a separate support wire for supporting the combination of the head support and the connecting bar and the blocking plate on the tip of the concrete pile. The burden on manufacturing costs as well as the hassle of installation and construction has a problem.
또한, 상기와 같은 구조로 된 항두막이 장치는 막음판과 연결철근의 조립, 막음판과 지지선재의 조립, 연결철근과 항두 지지대의 조립, 지지선재와 항두 지지대의 조립과 같이 다단계의 조립과정을 거쳐야 하므로 작업이 매우 번거롭고 작업시간이 연장되는 불이익을 초래하게 된다.In addition, the anti-braking device having the above structure has a multi-step assembling process such as assembling the blocking plate and the connecting rebar, assembling the blocking plate and the supporting wire, assembling the connecting bar and the harbor head support, and assembling the supporting wire and the head support. Since the work must be done, the work is very cumbersome and the working time is prolonged.
특히, 콘크리트 말뚝의 상부에 기초바닥 콘크리트를 타설하게 되면 상기의 콘크리트 말뚝 선단을 통해 막음판까지 충입되는 콘크리트 유입물의 하중이 상기 막음판에 그대로 전달되므로 막음판과 지지선재 간의 결합력이 약화 및 상실될 수 있어 이와 같은 경우에는 막음판이 지지선재로부터 분리되면서 과다한 량의 콘크리트가 막음판을 지나쳐 콘크리트 말뚝의 내부 깊숙한 곳까지 유입되어 지지선재의 단면을 크게 하여야 하는 폐단이 발생하게 되는 것이다.
In particular, when the base-floor concrete is poured on the top of the concrete pile, the load of the concrete inflow that is charged to the blocking plate through the concrete pile tip is transferred to the blocking plate as it is, thus weakening and losing the binding force between the blocking plate and the supporting wire. In this case, as the blocking plate is separated from the supporting wire, an excessive amount of concrete passes through the blocking plate and flows deep into the interior of the concrete pile, causing a closed end to increase the cross section of the supporting wire.
본 발명은 전기한 바와 같은 문제점을 개선한 것으로서, 평면상 다각형으로 된 돌출연결부를 갖는 지지본체에 연결철근이 삽입 고정되는 철근고정부와 상기 철근고정부로부터 연장 돌출되는 버팀부를 방사상으로 형성하되, 상기 돌출연결부는 지지본체 및 철근고정부에 비하여 얇은 단면을 갖고 있어 휨이 가능하도록 하여 연결철근이 상광하협 형태로 고정되게 하고, 상기 철근고정부는 내부에 젖힘날개와 간섭돌기가 형성되어 있어 연결철근이 되빠짐 없이 견고하게 고정되도록 하며, 상기의 버팀부는 콘크리트 말뚝의 선단에 쐐기형태로 끼워지도록 하여 파일내부에 충전된 콘크리트 및 연결철근의 하중이 상광하협 형태로 경사지게 배치된 연결철근에 의해 수직방향과 수평방향으로 분산되도록 구성함으로써,The present invention is to solve the problems as described above, the reinforcing rod is fixed to the reinforcing rod is inserted into the support body having a projection connecting portion of the planar polygon and the support portion extending from the reinforcing fixing portion radially, The protruding connecting portion has a thin cross section compared to the supporting body and the reinforcing fixing part so that the bending is possible so that the connecting reinforcing bar is fixed in the form of a light beam and the reinforcing fixing part has a wetting wing and an interference protrusion formed therein. It is firmly fixed without falling, and the support portion is inserted into the tip of the concrete pile in a wedge shape so that the load of the concrete and the connecting reinforcement charged inside the pile is inclined in the form of a light beam. By dispersing in the horizontal direction and
기존에 사용되던 지지선재가 없어도 연결철근 및 막음판에 대한 안정적인 설치가 이루어질 수 있는 것이고, 항두막이 장치에 대한 조립 및 설치가 간단하도록 하면서도 항두 지지대와 연결철근 간의 결합력을 향상시킬 수 있는 것이고, 하중의 분산으로 부재의 단면을 효율적으로 줄일 수 있어 더욱 경제적이고 신속한 기초바닥 시공이 이루어질 수 있도록 한 특징을 갖는 개선된 구조의 항두 지지대를 제공함에 본 발명의 목적이 있는 것이다.
It is possible to achieve stable installation of connecting bars and blocking plates without the existing support wire, and to make the assembly and installation of the headboard device simple, while improving the bonding force between the head support and connecting bars, It is an object of the present invention to provide an improved piercing support having a feature that the cross section of the member can be efficiently reduced by the dispersion of the structure so that more economical and rapid foundation floor construction can be achieved.
상기한 바와 같은 목적을 달성하기 위한 본 발명은, 내측에 중공부가 형성된 지지본체를 구비하고, 상기 지지본체의 외측부에 외향 확장의 돌출연결부를 형성하며, 상기 돌출연결부의 끝단부에는 수직의 끼움공을 갖는 복수 개의 철근고정부를 방사상으로 형성하고, 연결철근을 경사지게 배치하여 하중을 분산하며, 상기 철근고정부의 외측면에는 저면에 상향의 경사면을 갖는 버팀부를 돌출하여,The present invention for achieving the object as described above, has a support body with a hollow portion formed on the inside, and forms a protruding connection portion of the outward extension on the outer portion of the support body, the vertical fitting hole at the end of the protruding connection portion Forming a plurality of reinforcing bars having a radial, distributing the load by arranging the connecting rebar inclined, protruding the brace having an upward inclined surface on the bottom surface on the outer surface of the reinforcing bars,
상기 철근고정부에 의해서는 콘크리트 말뚝 내측의 막음판과 결합되는 연결철근이 삽입 고정되게 하고, 상기 버팀부에 의해서는 막음판 및 연결철근이 결합된 지지본체가 콘크리트 말뚝의 선단 내측에 쐐기 형태로 끼워 지지되면서 고정되도록 구성하여 이루어진 것이다.
The reinforcing bars are inserted and fixed to the connecting reinforcing bar coupled with the blocking plate inside the concrete pile, and the support body is coupled to the blocking plate and the connecting bar in the wedge shape inside the tip of the concrete pile It is configured to be fixed while being fitted.
본 발명은, 종래의 지지선재가 없더라도 막음판과 연결철근 및 항두 지지대에 의한 항두막이 장치를 쐐기형태로 지지 설치하여 콘크리트 말뚝의 선단에 안정적이고 견고하게 설치할 수 있어 항두막이 장치의 조립이 매우 간편한 것이고, 운반이나 설치 후에도 막음판과 연결철근 및 항두 지지대 간의 결합력이 상실되지 아니하므로 취급이 매우 용이한 것이며, 항두 지지대에 방사상으로 돌출 형성된 버팀부에 의해 항두 지지대 및 막음판에 작용하는 콘크리트 및 연결철근의 하중을 수직방향과 수평방향으로 분산시켜 주어 작은 단면으로 하중을 지탱할 수 있는 것이며, 연결철근과 철근고정구 간의 결합력을 상승시키는 효과가 있는 것이다.
According to the present invention, even if there is no conventional support wire, the membrane block, the connecting rebar and the anchor head support device by the wedge support can be supported and installed in the wedge shape so that it can be installed stably and firmly on the tip of the concrete pile. It is easy to handle because the coupling force between the blocking plate and the connecting rebar and the harbor support is not lost even after transportation or installation.The concrete and the connection acting on the harbor support and the closure plate by the braces radially protruding from the harbor support By distributing the load of the rebar in the vertical direction and the horizontal direction, it is possible to support the load in a small cross section, and to increase the coupling force between the connecting bar and the reinforcing bar.
도 1은 본 발명에 따른 항두 지지대의 전체 사시도
도 2는 본 발명에 따른 항두 지지대의 저면 사시도
도 3은 본 발명에 따른 항두 지지대의 측면 전체도
도 4는 본 발명에 따른 항두 지지대의 전체 단면도
도 5는 본 발명에 따른 항두 지지대의 요부 확대 단면도
도 6은 본 발명에 따른 항두 지지대를 이용한 시공과정도로서, 항두 지지대에 연결철근을 결합한 상태도
도 7은 본 발명에 따른 항두 지지대를 이용한 시공과정도로서, 도 6의 연결철근에 막음판을 결합한 상태도
도 8은 본 발명에 따른 항두 지지대를 이용한 시공과정도로서, 도 7에 의한 항두막이 장치를 콘크리트 말뚝 선단에 설치한 상태도
도 9는 본 발명에 따른 항두 지지대를 이용한 시공과정도로서, 도 8의 상태에서 기초바닥 콘크리트를 타설한 상태도1 is an overall perspective view of the head support according to the invention
Figure 2 is a bottom perspective view of the head support according to the invention
Figure 3 is an overall side view of the head support according to the invention
Figure 4 is an overall cross-sectional view of the head support in accordance with the present invention
Figure 5 is an enlarged cross-sectional view of the main portion of the head support in accordance with the present invention
Figure 6 is a construction process diagram using the wharf support according to the present invention, a state diagram coupled to the reinforcing bar support bar
7 is a construction process diagram using the head support according to the present invention, a state diagram coupled to the blocking plate of the connecting rod of FIG.
8 is a construction process diagram using the head support according to the present invention, the state in which the anchoring device according to Figure 7 installed on the concrete pile tip
Figure 9 is a construction process diagram using the dock head support according to the present invention, a state diagram in which the foundation concrete in the state of Figure 8
본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms and words used in the present specification and claims should not be construed as limited to ordinary or dictionary meanings and the inventor may properly define the concept of the term to describe its invention in the best possible way And should be construed in accordance with the principles and meanings and concepts consistent with the technical idea of the present invention.
이하 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 1은 본 발명에 따른 항두 지지대의 전체 사시도이고, 도 2는 본 발명에 따른 항두 지지대의 저면 사시도이며, 도 3은 본 발명에 따른 항두 지지대의 측면 전체도, 도 4는 본 발명에 따른 항두 지지대의 전체 단면도, 도 5는 본 발명에 따른 항두 지지대의 요부 확대 단면도이다.1 is an overall perspective view of the anti-head support according to the present invention, FIG. 2 is a bottom perspective view of the anti-head support according to the present invention, FIG. 3 is an overall side view of the anti-head support according to the present invention, and FIG. 5 is an enlarged cross-sectional view of the main portion of the head support according to the present invention.
도시와 같이 본 발명에 따른 항두 지지대는 내측에 원형의 중공부(11)가 형성되어 있는 다각형상의 지지본체(10)로 이루어져 있는 것으로서, 합성수지를 사출 성형하여 정형화하면서도 경량화를 실현하고 재생 수지를 사용할 수도 있어 매우 경제적인 것이다.As shown in the figure, the head support according to the present invention is composed of a
이와 같은 지지본체(10)는 외측으로 돌출연결부(12)가 형성되어 있는데 상기의 돌출연결부(12)는 지지본체(10)로부터 외측을 향하여 점차 단면이 축소되도록 구성하여 상기 돌출연결부(12)에 대한 휨이 자연스럽게 이루어질 수 있도록 제작하여야 할 것이다.The
또한, 상기와 같은 돌출연결부(12)는 지지본체(10)와 같이 평면상 다각형상을 갖도록 구성하되, 지지본체(10)는 12각형으로 제작하여 지지 강성을 향상시키고, 돌출연결부(12)는 6각형의 형태로 제작하여 각 모서리에 철근고정부(20)(20')를 일체로 성형함에 따라 6개소의 철근고정부(20)(20')를 통해 6개의 연결철근을 결합 고정시킬 수 있도록 한 것이다.In addition, the projecting
이때, 상기의 철근고정부(20)(20')는 별도의 연결철근이 결합 고정되는 개체이므로 수직방향으로의 끼움공(21)을 갖는 파이프 형태를 갖추고 있는 것이고, 상기 끼움공(21)의 내측 선단에는 상향 경사진 젖힘날개(22)(22')가 방사상으로 끼움공(21) 보다 길게 돌출 형성되어 있으며, 상기 젖힘날개(22)(22')의 하측으로는 끼움공(21)의 내면으로부터 돌출 형성된 간섭돌기(23)(23')가 역시 방사상으로 수직 형성되어 있는 것이다.At this time, the reinforcing
여기서, 상기의 젖힘날개(22)(22')는 외측 끝단의 두께가 끼움공(21) 내면의 끝단 두께보다 두껍게 제작함에 따라 끼움공(21)으로 삽입되는 연결철근(이형철근)의 측면을 강하게 가압하게 될 것이고, 상기의 젖힘날개(22)(22')에 의해 끼움공(21) 내측면에 작용하는 복원력으로 인해 상기의 연결철근에 대한 되빠짐이 방지될 수 있도록 하는 것이다.Here, the wetting wings (22) and (22 ') is the thickness of the outer end is made thicker than the end thickness of the inner surface of the
또한, 상기의 간섭돌기(23)(23')는 상기 철근고정부(20)(20')의 하측으로부터 삽입되는 연결철근의 외면과 간섭되도록 하여 상기의 연결철근이 철근고정부(20)(20')의 끼움공(21)으로 억지끼움 형태로 삽입될 수 있도록 함에 따라 철근고정부(20)(20')와 연결철근 간의 견고한 고정력을 지속적으로 유지할 수 있도록 하는 것이다.In addition, the
이와 같은 각각의 철근고정부(20)(20')는 외측으로 일체의 버팀부(30)가 돌출 형성되어 있는 것으로서, 상기 버팀부(30)의 저면에는 상향의 경사면(31)이 형성되어 있는 것이고, 상기의 경사면(31)은 콘크리트 말뚝의 선단에 항두 지지대가 얹혀져 지지되는 착좌부에 해당되는 것이다.Each of these reinforcing fixing parts (20, 20 ') is formed as a protruding
이에 따라 상기와 같은 구조로 된 항두 지지대를 포함한 항두막이 장치의 조립 및 시공과정을 설명하면 다음과 같다.Accordingly, the process of assembling and constructing the apparatus of the head membrane including the head support having the structure as described above is as follows.
먼저, 도 6의 도시와 같이 상기 지지본체(10)에 형성된 철근고정부(20)(20')에 연결철근(120)(120')을 삽입 고정하되, 상기 연결철근(120)(120')을 철근고정부(20)(20')의 하측으로부터 억지로 상향 삽입하여 균일한 높이를 갖도록 고정시킨다.First, as shown in FIG. 6, the connecting reinforcing
이어, 도 7의 도시와 같이 상기 연결철근(120)(120')의 하단에 별도로 구비되는 막음판(110)을 조립하되, 연결철근(120)(120')의 하단부가 막음판(110)의 조립공(111)(111')에 끼워져 상기의 연결철근(120)(120')이 수직 방사상으로 배치될 수 있도록 하는 것이다.Subsequently, as shown in FIG. 7, the assembly of the blocking
이때, 상기 철근고정부(20)(20')의 원형 배치 간격은 상기 막음판(100)에 형성되는 조립공(111)(111')의 원형 배치 간격보다 넓게 형성함에 따라 상기의 철근고정부(20)(20')이 삽입된 연결철근(120)(120')의 하단을 막음판(100)의 조립공(111)(111')에 조립하게 되면 상기의 연결철근(120)(120')은 상향 확장된 상광하협의 형태를 갖게 되는 것이다.At this time, the circular arrangement interval of the reinforcing fixing
또한, 상기와 같이 연결철근(120)(120')이 경사지게 조립됨에 따라 상기 지지본체(10)의 돌출연결부(11)가 하향 절곡되면서 지지본체(10)의 철근고정부(20)(20')가 함께 경사지게 되는 것이고, 철근고정부(20)(20')가 경사짐에 따라 일체의 버팀부(30) 역시 하향 경사진 상태가 이루어지게 되는 것이다.In addition, as the connecting reinforcing
이와 같이 상기 지지본체(10)와 막음판(110) 및 연결철근(120)(120')이 서로 조립이 이루어지면, 이들을 도 8의 도시와 같이 지중 근입 상태인 콘크리트 말뚝(100)의 선단 내측으로 삽입하게 되는 것인데, 상기의 막음판(110)은 종래와 마찬가지로 외측단의 절개 및 절곡부에 의해 콘크리트 말뚝(100)의 내측으로 긴밀하게 밀착 삽입되는 것이고, 상기의 지지본체(10)는 콘크리트 말뚝(100)의 내경보다 넓은 간격을 갖고 있는 버팀부(30)에 의해 콘크리트 말뚝(100)의 선단에 걸쳐진 상태를 유지하게 되는 것이다.As such, when the
여기서, 상기의 버팀부(30)는 저면의 경사면(31)에 의해 콘크리트 말뚝(100)의 선단 내측으로 쐐기와 같은 형태로 삽입 및 안치되는 것으로서, 방사상으로 분할 형성된 각각의 버팀부(30)에 의해 상기 지지본체(10) 전체는 콘크리트 말뚝(100)의 선단으로부터 안정적인 안치 및 고정 상태가 이루어지게 되는 것이다.Here, the
이와 같은 상태에서 콘크리트 말뚝(100)의 선단으로 노출되어 있는 연결철근(120)(120')에 기초바닥 철근(150)을 배근하고 기 타설된 버림 콘크리트층(130)에 기초바닥 콘크리트층(140)을 시공하면 타설되는 콘크리트는 지지본체(10)의 중공부(11)를 통해 막음판(110)의 상부까지 콘크리트 말뚝(100)의 항두 내에 채워지면서 기초바닥 콘크리트층(140)과의 연결 상태로 기초 바닥이 완성될 수 있는 것이다.In this state, the
따라서, 상기와 같은 구조로 된 본 발명의 항두 지지대는 조립이 용이하면서도 연결철근(120)(120')이 확장 경사형태로 배치되어 있어 기존의 수직형 연결철근에 비하여 기초 콘크리트에 대한 철근의 정착 효과가 증대될 수 있는 것이다.Therefore, the harbor head support of the present invention having the structure as described above is easy to assemble, but the connecting reinforcement (120, 120 ') is arranged in an extended inclined form, the reinforcement of the reinforcement for the foundation concrete compared to the conventional vertical connecting reinforcement The effect can be increased.
또한, 콘크리트의 타설 과정에서 작용하는 압력이나 막음판 및 연결철근에 의한 하중이 지지본체(10)의 버팀부(30)에 형성된 경사면(31)을 통해 콘크리트 말뚝(100)의 선단으로부터 하향 경사지도록 전달되면서 지지되므로 지지본체(10)와 연결철근(120)(120') 간의 고정력이 약화되는 것을 방지할 수 있는 것이다.In addition, the pressure applied during the concrete pouring process, or the load due to the blocking plate and the connecting rebar is inclined downward from the tip of the
이상과 같은 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 이들을 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.
It is to be understood that both the foregoing general description and the following detailed description of the present invention are exemplary and explanatory and are intended to provide further explanation of the present invention as defined by the appended claims. Examples should be understood.
10 : 지지본체 11 : 중공부
12 : 돌출연결부
20,20' : 철근고정부 21 : 끼움공
22,22' : 젖힘날개 23,23' : 간섭돌기
30 : 버팀부 31 : 경사면
100 : 콘크리트 말뚝
110 : 막음판 111,111' : 조립공
120,120' : 연결철근
130 : 버림 콘크리트층
140 : 기초바닥 콘크리트층
150 : 기초바닥 철근10
12: projecting connection
20,20 ': Reinforcing high government 21: Chigong
22,22 ': Flipping
30: bracing portion 31: inclined surface
100: concrete pile
110: blocking plate 111,111 ': assembly worker
120,120 ': connecting rebar
130: discarded concrete layer
140: foundation floor concrete layer
150: foundation floor rebar
Claims (6)
상기 철근고정부(20)(20')의 외측면에는 저면에 상향의 경사면(31)을 갖는 버팀부(30)를 돌출 형성하여 버팀부(30)에 의해서는 막음판(110) 및 연결철근(120)(120')이 결합된 지지본체(10)가 콘크리트 말뚝(100)의 선단 내측에 쐐기 형태로 끼워 고정되도록 구성함을 특징으로 하는 개선된 구조의 항두 지지대.
A support body 10 having a hollow part 11 formed therein is provided, and a protruding connection part 12 of outward extension is formed on an outer side of the support body 10, and perpendicular to an end of the protruding connection part 12. A plurality of reinforcing fixing parts 20, 20 'having a fitting hole 21 of the radially formed, by the reinforcing fixing parts 20, 20' by the inner blocking plate of the concrete pile 100 ( In the head support of the improved structure that allows the connecting reinforcing rods 120, 120 'coupled to the 110 is inserted and fixed,
On the outer surface of the reinforcing fixing parts 20, 20 'protruding to form a brace portion 30 having an upward inclined surface 31 on the bottom surface by the brace portion 30, the blocking plate 110 and the connecting reinforcement (120) (120 ') is a combined support body (10) is a wedge support of the improved structure, characterized in that configured to be fixed in the wedge shape inside the tip of the concrete pile (100).
상기 철근고정부(20)(20')의 끼움공(21) 내측 선단에 상향 경사진 젖힘날개(22)(22')를 방사상으로 돌출 형성하되, 젖힘날개가 끼움공(21) 보다 길게 돌출되고, 외측 끝단은 내측 끝단보다 두껍게 형성함을 특징으로 하는 개선된 구조의 항두 지지대.
The method of claim 1,
The radially protruding tilting wings 22 and 22 'are radially projected on the inner end of the fitting hole 21 of the reinforcing fixing parts 20 and 20', but protruding longer than the fitting holes 21. And the outer end is formed thicker than the inner end.
지지본체(10)에 방사상으로 배치되는 철근고정부(20)(20') 간의 원형 배치 간격은 콘크리트 말뚝(100)의 내부에 위치하는 막음판(110)에 형성되는 조립공(111)(111')의 원형 배치 간격보다 넓게 형성하여 지지본체(10) 및 막음판(110)에 결합되는 연결철근(120)(120')이 상광하협 형태로 고정되게 하되,
상기 연결철근(120)(120')의 경사각에 의한 돌출연결부(11)의 하향 절곡으로 인해 버팀부(30)(30')의 경사면(31)이 콘크리트 말뚝(100)의 선단 내측에 쐐기 형태로 끼워져 안치되도록 구성함을 특징으로 하는 개선된 구조의 항두 지지대.
The method of claim 1,
Circular arrangement intervals between the reinforcing bars 20 and 20 'disposed radially on the support body 10 are assembly holes 111 and 111' formed in the blocking plate 110 located inside the concrete pile 100. It is formed to be wider than the circular arrangement interval of the coupling to be connected to the support body 10 and the blocking plate 110, 120 (120 ') is fixed in the form of light beams,
Due to the downward bending of the protruding connecting portion 11 due to the inclination angle of the connecting reinforcing rods 120 and 120 ', the inclined surfaces 31 of the brace portions 30 and 30' are wedge-shaped inside the tip of the concrete pile 100. An improved head support, characterized in that it is configured to fit into the seat.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120023500A KR101226948B1 (en) | 2012-03-07 | 2012-03-07 | Device for blocking hollow of precast concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120023500A KR101226948B1 (en) | 2012-03-07 | 2012-03-07 | Device for blocking hollow of precast concrete pile |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101226948B1 true KR101226948B1 (en) | 2013-01-28 |
Family
ID=47842698
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120023500A KR101226948B1 (en) | 2012-03-07 | 2012-03-07 | Device for blocking hollow of precast concrete pile |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101226948B1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101902449B1 (en) * | 2016-09-05 | 2018-09-28 | 김완철 | Means for solidarity reinforcement bar of head part in steel pipe pile |
KR101934038B1 (en) * | 2018-07-18 | 2019-04-05 | 임병균 | Pile and baseplate connection apparatus |
KR20190049151A (en) * | 2017-11-01 | 2019-05-09 | 주식회사 클라썸테크 | The apparatus to disperse the load inflicted in reinforcement ULBON of prestressed concrete structure and increase bearing capacity |
KR20200141714A (en) * | 2019-06-11 | 2020-12-21 | 대한민국(육군참모총장) | Ground Turning Table |
CN114482017A (en) * | 2022-01-04 | 2022-05-13 | 中铁时代建筑设计院有限公司 | Hole sealing device for pile core of precast concrete pipe pile |
US20220154418A1 (en) * | 2019-03-21 | 2022-05-19 | Wobben Properties Gmbh | Foundation for a tower structure, tower for a wind power installation, and wind power installation, and also method for establishing a foundation for a tower structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100685442B1 (en) * | 2005-11-30 | 2007-02-26 | 병 균 임 | Device for blocking hollow of precast concrete pile |
KR100795437B1 (en) * | 2006-05-02 | 2008-01-17 | 병 균 임 | Device for Blocking Hollow of Precast Concrete Pile |
KR100922645B1 (en) * | 2007-08-27 | 2009-10-19 | 박진화 | An assembling unit having cap in pile |
KR101050600B1 (en) * | 2009-04-20 | 2011-07-19 | 양근영 | Concrete Mortar Support Cap Structure |
-
2012
- 2012-03-07 KR KR1020120023500A patent/KR101226948B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100685442B1 (en) * | 2005-11-30 | 2007-02-26 | 병 균 임 | Device for blocking hollow of precast concrete pile |
KR100795437B1 (en) * | 2006-05-02 | 2008-01-17 | 병 균 임 | Device for Blocking Hollow of Precast Concrete Pile |
KR100922645B1 (en) * | 2007-08-27 | 2009-10-19 | 박진화 | An assembling unit having cap in pile |
KR101050600B1 (en) * | 2009-04-20 | 2011-07-19 | 양근영 | Concrete Mortar Support Cap Structure |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101902449B1 (en) * | 2016-09-05 | 2018-09-28 | 김완철 | Means for solidarity reinforcement bar of head part in steel pipe pile |
KR20190049151A (en) * | 2017-11-01 | 2019-05-09 | 주식회사 클라썸테크 | The apparatus to disperse the load inflicted in reinforcement ULBON of prestressed concrete structure and increase bearing capacity |
KR102152387B1 (en) * | 2017-11-01 | 2020-09-04 | 주식회사 클라썸테크 | The apparatus to disperse the load inflicted in reinforcement ULBON of prestressed concrete structure and increase bearing capacity |
KR101934038B1 (en) * | 2018-07-18 | 2019-04-05 | 임병균 | Pile and baseplate connection apparatus |
US20220154418A1 (en) * | 2019-03-21 | 2022-05-19 | Wobben Properties Gmbh | Foundation for a tower structure, tower for a wind power installation, and wind power installation, and also method for establishing a foundation for a tower structure |
KR20200141714A (en) * | 2019-06-11 | 2020-12-21 | 대한민국(육군참모총장) | Ground Turning Table |
KR102269830B1 (en) | 2019-06-11 | 2021-06-28 | 대한민국 | Ground Turning Table |
CN114482017A (en) * | 2022-01-04 | 2022-05-13 | 中铁时代建筑设计院有限公司 | Hole sealing device for pile core of precast concrete pipe pile |
CN114482017B (en) * | 2022-01-04 | 2024-04-19 | 中铁时代建筑设计院有限公司 | Precast concrete tubular pile stake core hole sealing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101226948B1 (en) | Device for blocking hollow of precast concrete pile | |
KR100866419B1 (en) | Iron Rod Cap Assembly for reinforcing concrete pile | |
KR100795437B1 (en) | Device for Blocking Hollow of Precast Concrete Pile | |
CN110512748B (en) | Wall-beam-plate connecting structure of prefabricated building and construction method | |
JP4433066B2 (en) | Wall structure with permanent anchor construction, wall construction method with permanent anchor construction, | |
JP2008231799A (en) | Base isolation structure | |
JP6650257B2 (en) | Mountain retaining structure and construction method thereof | |
KR100685442B1 (en) | Device for blocking hollow of precast concrete pile | |
JP6543077B2 (en) | Construction method of structure | |
KR20160130113A (en) | Device for Blocking Hollow of Precast Concrete Pile | |
CN211873064U (en) | Prefabricated multi-pile foundation | |
JP2015183366A (en) | Structure and construction method for banking structure | |
KR100583880B1 (en) | Method for constructing foundation work using concrete pile | |
CN210857527U (en) | Wall-beam connecting structure for prefabricated building | |
KR101616846B1 (en) | Precast concrete pile with sheath and the construction method therewith | |
JP6774781B2 (en) | How to build a composite foundation structure | |
JP4129523B2 (en) | Exterior wall formwork method of concrete underground structure and concrete underground structure | |
KR101021466B1 (en) | Pile cap | |
JP5324515B2 (en) | Offshore construction method | |
KR101534058B1 (en) | Soil retaining wall for load support and constructing method thereof | |
JP4385127B2 (en) | Slope protection retaining wall construction method and retaining wall building unit | |
KR101298399B1 (en) | Support for a upper reinforcing bar of footings | |
JPH08105066A (en) | Footing slab anchoring method of phc pile and earth retaining tool for anchoring part | |
KR102624203B1 (en) | Reinforcement structure for PHC piles | |
KR101157091B1 (en) | An assembly of vertical reinforcement bar for foundation work and that of using method for constructing foundation work |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20151030 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20161109 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20171110 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20191121 Year of fee payment: 8 |