KR101219079B1 - System and method on labor cost treatment - Google Patents
System and method on labor cost treatment Download PDFInfo
- Publication number
- KR101219079B1 KR101219079B1 KR1020120072215A KR20120072215A KR101219079B1 KR 101219079 B1 KR101219079 B1 KR 101219079B1 KR 1020120072215 A KR1020120072215 A KR 1020120072215A KR 20120072215 A KR20120072215 A KR 20120072215A KR 101219079 B1 KR101219079 B1 KR 101219079B1
- Authority
- KR
- South Korea
- Prior art keywords
- payment
- information
- subcontractor
- client
- instruction
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063112—Skill-based matching of a person or a group to a task
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
- G06Q20/08—Payment architectures
- G06Q20/10—Payment architectures specially adapted for electronic funds transfer [EFT] systems; specially adapted for home banking systems
- G06Q20/102—Bill distribution or payments
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
- G06Q20/08—Payment architectures
- G06Q20/10—Payment architectures specially adapted for electronic funds transfer [EFT] systems; specially adapted for home banking systems
- G06Q20/108—Remote banking, e.g. home banking
Landscapes
- Business, Economics & Management (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Entrepreneurship & Innovation (AREA)
- Game Theory and Decision Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
Abstract
Description
본 발명은 노무비 지급을 보증하는 실시간 노무비 지급 시스템 및 그 시스템의 정보 처리 방법에 관한 것으로서, 더욱 더 상세하게는 노무비 지급이 보장/보증되는 실시간 노무비 지급 시스템 및 그 시스템의 정보 처리 방법에 관한 것이다.
The present invention relates to a real-time labor cost payment system that guarantees labor costs payment and information processing method of the system, and more particularly to a real-time labor cost payment system that guarantees / guaranteed labor costs payment and information processing method of the system.
대한민국에서 공공건설 공사 발주 금액은 연간 약 38조원(2010년 기준) 정도이며, 이 중 노무비로 지급되는 금액은 약 8조에 이른다. 2010년에는 체불 노무자가 33,372명에 달하고, 체불 임금은 1,464억원에 달할 정도로 이러한 노무비와 관련하여 건설 산업의 불연속성, 도급 방식 등의 특수성으로 인하여 임금 체불, 지불 지연 등 노무비 관련 문제가 많이 발생하고 있는 것이 현실이다. In Korea, the amount of orders for public construction projects is about 38 trillion won per year (as of 2010), and about 8 trillion won is paid as labor costs. In 2010, there were 33,372 non-performing laborers, and the postponed wages amounted to 146.6 billion won. Due to the discontinuity of the construction industry and the peculiarity of the contracting method, many labor-related problems such as delayed payment of wages, It is a reality.
이러한 노무비 관련 문제를 해결하기 위하여 2012년 1월 1일부터 노무비 분리 관리 및 기급 확인제가 시행되고 있다. 이러한 규정 및 현행 건설업계의 관행에 따르면, 하도급 업체가 전월 지급 내역서, 당월 청구 내역서, 은행 이체 확인증 및 노무비 전용 통장 입출금 기장 내역을 준비하여 원청 업체에 노무비를 청구하고, 원청 업체는 전월 지급 내역서, 당월 청구 내역서, 은행 이체 확인증, 노무비 전용 통장 입출금 기장 내역 및 하도급 서류(하도급 업체 내역을 포함)를 취합하여 발주처에 노무비를 청구한다. 이에, 발주처는 전월 지급 내역을 확인하고, 청구 노무비를 원도급 업체에 지불하고, 원도급 업체는 자사 소속 또는 자사 관리 노무자에게 노임을 지급하고, 하도급 업체에 청구 노무비를 지급하며, 하도급 업체는 자사 소속 또는 자사 관리 노무자에게 노무비를 지급한다. 이때, 원도급 업체는 하도급 업체 소속 또는 하도급 업체 관리 노무자에게 노무비 지급 사실을 문자 등으로 통보한다.In order to solve these labor-related problems, the separation of labor costs and the system for checking the supply of labor have been implemented from January 1, According to these regulations and the current construction industry practice, the subcontractor prepares the payment schedule of the previous month, the bill statement of the month, the bank transfer confirmation certificate, and the account information of the bank account book, We collect labor bill for the current month, confirmation of bank transfer, certificate of deposit and withdrawal, and subcontracting documents (including details of subcontractors). In this case, the client confirms the payment details of the previous month, pays the requested labor cost to the supplier, the contractor pays the worker to his / her own company or management employee, and submits the worker's claim to the subcontractor. We pay labor costs to our management workers. At this time, the contractor notifies the management of the subcontractor or the subcontractor by letter.
상기와 같은 규정이 있고, 이러한 규정 하에서의 노무비 지급 방식이 있더라도 발주자가 노무비를 원청 업체에게 지급한 이후, 공사와 관련된 노무자들에게 노무비 지급이 보장/보증되지는 않는 문제가 있다. 이에, 노무자들에게 노무비 지급이 보장/보증될 수 있도록 지원할 수 있는 정보 시스템의 개발이 절실히 요구되어 왔다.
There is a problem in that labor costs are not guaranteed / guaranteed to the laborers related to the construction after the contractor has paid the labor cost to the raw material supplier even though there is the above regulation and the labor payment method under this regulation. Therefore, it has been urgently required to develop an information system capable of assuring that labor costs are guaranteed / guaranteed to laborers.
본 발명이 해결하고자 하는 첫번째 기술적 과제는 노무비 지급이 보장되거나 보증되는 실시간 노무비 지급 시스템의 정보 처리 방법을 제시하는 것이다.A first technical problem to be solved by the present invention is to provide an information processing method of a real-time labor payment system in which labor payment is guaranteed or guaranteed.
본 발명이 해결하고자 하는 두번째 기술적 과제는 노무비 지급이 보장되거나 보증되는 실시간 노무비 지급 시스템을 제시하는 것이다.
A second technical problem to be solved by the present invention is to provide a real-time labor payment system in which labor payment is guaranteed or guaranteed.
본 발명이 이루고자 하는 기술적 과제를 달성하기 위하여, 실시간 노무비 지급 시스템의 정보 처리 방법에 있어서, 상기 실시간 노무비 지급 시스템이 (A) 적어도 하나 이상의 원청 업체별로 상기 원청 업체로부터 적어도 하나 이상의 하청 업체에 지급될 하청 지급 항목별 공사비 정보를 입수 받는 단계; (B) 상기 원청 업체별로 상기 원청 업체의 상위 업체로부터 상기 원청 업체에 지급될 원청 지급 항목별 공사비 정보를 입수 받는 단계; (C) 상기 원청 지급 항목별 공사비 정보 및 상기 하청 지급 항목별 공사비 정보 중 어느 하나 이상에 포함된 적어도 하나 이상의 노무비에 대한 노무비 지급 청구를 포함하는 공사비 지급 청구에 대한 청구 승인 정보를 입수하는 단계; (D) 노무비를 포함하는 상기 공사비 지급 청구에 대한 적어도 1회 이상의 지급 승인 정보를 생성하는 단계; 및 (E) 적어도 하나 이상의 금융 서비스 시스템으로 적어도 1회 이상의 지급 지시 명령 정보를 입수하고, 상기 지급 지시 명령 정보에 기초하여 적어도 1회 이상의 지급 지시 정보를 전송하는 단계;를 실시하는 것인 것이며, 상기 원청 지급 항목별 공사비 정보, 상기 하청 지급 항목별 공사비 정보, 상기 지급 지시 명령 정보 또는 상기 지급 지시 정보에는 적어도 1인 이상의 원청 업체 관련 노무자의 계좌 정보 또는 적어도 1인 이상의 하청 업체 관련 노무자의 계좌 정보 및 노무비 정보 중 어느 하나 이상이 포함되어 있는 것인 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법을 제시한다.In order to accomplish the object of the present invention, there is provided an information processing method of a real-time labor payment system, wherein the real-time labor payment system comprises: (A) at least one contractor Obtaining construction cost information for each subcontracted payment item; (B) receiving the construction cost information for each of the raw material suppliers by the raw material supply item to be supplied to the raw material supplier from the upstream supplier of the raw material supplier; (C) obtaining billing approval information for a construction cost payment request including a labor cost payment request for at least one labor cost included in at least one of the construction cost information for each originally provided payment item and the construction cost information for each subcontracted payment item; (D) generating at least one payment approval information for the construction fee payment request including labor costs; And (E) obtaining at least one or more payment instruction order information to at least one financial service system and transmitting at least one or more payment instruction information based on the payment instruction instruction information. The cost information by the subsidiary payment item, the cost information by subcontract payment item, the payment instruction order information or the payment instruction information includes account information of at least one contractor-related laborer or account information of at least one contractor-related laborer. And it presents an information processing method of the real-time labor costs payment system, characterized in that any one or more of the labor costs information is included.
(F) 상기 (D) 단계의 실시 전 또는 상기 (D) 단계의 실시 후 중 어느 하나 이상에서 상기 노무비 정보의 처리 대상이 되는 노무자 계좌에 대한 지급 계좌 조회 처리를 수행하는 단계;를 더 포함하는 것이 바람직하다. (F) performing payment account inquiry processing on the labor-management account to be the object of the labor-management information processing before the execution of the step (D) or after the execution of the step (D) .
상기 (B) 단계는 원청 업체 시스템 또는 원청 업체 관리자 단말로부터 입수되는 것인 것인 것이며, 상기 상기 (C) 단계는 발주자 시스템 또는 발주자 단말기로부터 입수되는 것인 것이 바람직하다. The step (B) is to be obtained from the original office company system or the original office company administrator terminal, the step (C) is preferably obtained from the client system or the client terminal.
상기 (A) 단계는 원청 업체 시스템 또는 원청 업체 관리자 단말로부터 입수되는 것인 것이거나, 하청 업체 시스템 또는 하청 업체 관리자 단말로부터 입수된 이후에, 상기 원청 업체 시스템 또는 상기 원청 업체 관리자 단말로부터 가공되거나, 변경되거나, 승인되어 입수되는 것인 것이 바람직하다. The step (A) may be performed by a system of a raw material supplier or a manager terminal of a raw material supplier, after being obtained from a contractor system or a sub contractor manager terminal, Modified, or approved.
상기 (C) 단계는 발주자측 관리자 단말기로부터 입수되는 것인 것이며, 상기 승인의 대상은 원청 지급 항목별 공사비 정보 및 상기 하청 지급 항목별 공사비 정보인 것이 바람직하다. Preferably, the step (C) is obtained from the client terminal of the client side, and the approval object is the construction cost information for each originally provided payment item and the construction cost information for each subcontracted payment item.
상기 지급 승인 정보는 발주자-원청 업체간 지급 승인 정보, 원청 업체-하청 업체간 지급 승인 정보, 원청 업체-노무자간 지급 승인 정보 및 하청 업체-노무자간 지급 승인 정보 중 어느 하나 이상을 포함하는 것인 것이 바람직하다. The payment approval information includes at least one of authorization information between the client and the client, information on approval of payment between the client and the subcontractor, approval information between the client and the laborer, and approval information between the contractor and the laborer .
상기 지급 지시 정보는 발주자-원청 업체간 지급 지시 정보, 원청 업체-하청 업체간 지급 지시 정보, 원청 업체-노무자간 지급 지시 정보 및 하청 업체-노무자간 지급 지시 정보 중 어느 하나 이상을 포함하는 것인 것이 바람직하다. The payment instruction information includes at least one of the payment instruction information between the client and the client, the payment instruction information between the source company and the subcontractor, the payment instruction information between the source company and the laborer, and the payment instruction information between the subcontractor and the laborer .
발주자-원청 업체간 지급 승인 정보, 원청 업체-하청 업체간 지급 승인 정보, 원청 업체-노무자간 지급 승인 정보 및 하청 업체-노무자간 지급 승인 정보는 발주자측 관리자 단말로부터 입수되는 것인 것이 바람직하다. It is desirable that the information on the approval of the payment between the client and the client company, the information on the payment of the payment between the client company and the subcontractor, the information on the payment between the client and the client, and the payment information of the contractor and the laborer are obtained from the client terminal.
상기 발주자-원청 업체간 지급 승인 정보는 발주자측 관리자 단말기로부터 입수되는 것이며, 상기 원청 업체-하청 업체간 지급 승인 정보 및 상기 원청 업체-노무자간 지급 승인 정보는 상기 원청 업체 관리자 단말기로부터 입수되는 것이며, 상기 하청 업체-노무자간 지급 승인 정보는 상기 하청 업체 관리자 단말기로부터 입수되는 것인 것이 바람직하다. The payment approval information between the client and the client company is obtained from the client terminal of the client, the payment approval information between the client company and the subcontractor and the payment approval information between the client company and the laborer are obtained from the manager terminal of the client company, The payment information of the subcontractor-laborer is preferably obtained from the subcontractor manager terminal.
상기 발주자-원청 업체간 지급 지시 명령 정보, 상기 원청 업체-하청 업체간 지급 지시 명령 정보, 상기 원청 업체-노무자간 지급 지시 명령 정보 및 상기 하청 업체-노무자간 지급 지시 명령 정보는 발주자측 관리자 단말로부터 입수되는 것인 것이 바람직하다. The information on the dispensing instruction command between the client and the client company, the payment instruction instruction information between the source company and the subcontractor, the payment instruction instruction information between the source company and the laborer, and the payment instruction instruction information between the subcontractor and the laborer are transmitted from the client terminal It is preferable that it is obtained.
상기 발주자-원청 업체간 지급 지시 명령 정보는 발주자측 관리자 단말기로부터 입수되는 것이며, 상기 원청 업체-하청 업체간 지급 지시 명령 정보 및 상기 원청 업체-노무자간 지급 지시 명령 정보는 상기 원청 업체 관리자 단말기로부터 입수되는 것이며, 상기 하청 업체-노무자간 지급 지시 명령 정보는 상기 원청 업체 관리자 단말기 또는 상기 하청 업체 관리자 단말기로부터 입수되는 것인 것이 바람직하다. The payment instruction instruction information between the client and the client company is obtained from the client terminal of the client, and the payment instruction instruction information between the client company and the subcontractor and the payment instruction instruction information between the client company and the laborer are obtained from the manager terminal And the payment instruction instruction information between the subcontractor and the laborer is obtained from the source agent manager terminal or the subcontractor manager terminal.
상기 발주자-원청 업체간 지급 승인 정보에는 상기 원청 업체-하청 업체간 지급 승인 정보, 상기 원청 업체-노무자간 지급 승인 정보 및 상기 하청 업체-노무자간 지급 승인 정보 중 어느 하나 이상이 포함되어 있는 것인 것이며, 상기 원청 업체-하청 업체간 지급 승인 정보에는 상기 하청 업체-노무자간 지급 승인 정보가 포함되어 있는 것인 것이 바람직하다. The payment approval information between the client and the client company includes at least one of the payment approval information between the source company and the subcontractor, the payment information between the source company and the laborer, and the payment approval information between the subcontractor and the laborer And the payment approval information between the raw material supplier and the subcontractor preferably includes the approval information for payment between the subcontractor and the laborer.
(G) (G1) 상기 원청 업체-하청 업체간 지급 승인 정보 및 상기 원청 업체-노무자간 지급 승인 정보 중 어느 하나 이상이 상기 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인하는 단계; 및 (G2) 상기 하청 업체-노무자간 지급 승인 정보가 상기 원청 업체-하청 업체간 지급 승인 정보에 포함되어 있는 지를 확인하는 단계; 중 어느 하나 이상의 지급 승인 정보간 교차 검증을 실행하는 단계;를 더 포함하는 것이 바람직하다. (G) (G1) a step of confirming whether or not at least one of the payment approval information between the source company and the subcontractor and the payment information between the source company and the laborer is included in the payment approval information between the client and the client ; And (G2) confirming whether the payment information of the subcontractor-laborer is included in the payment approval information between the source company and the subcontractor. And performing the cross validation between any one or more of the payment approval information.
원청 업체-하청 업체간 지급 지시 명령 정보 및 원청 업체-노무자간 지급 지시 명령 정보는 상기 (G1) 단계의 실시 후에 처리되는 것인 것이며, 상기 (G1) 단계에서 확인이 실패하는 경우, 상기 원청 업체-하청 업체간 지급 지시 명령 정보 및 원청 업체-노무자간 지급 지시 명령 정보가 처리되지 않는 것인 것이며, 하청 업체-노무자간 지급 지시 명령 정보는 상기 (G2) 단계의 실시 후에 처리되는 것인 것이며, 상기 (G2) 단계에서 확인이 실패하는 경우, 상기 하청 업체-노무자간 지급 지시 명령 정보가 처리되지 않는 것인 것이 바람직하다. The payment instruction instruction information between the source company and the subcontractor and the payment instruction instruction information between the source company and the laborer are processed after the execution of the step (G1). If the confirmation fails at the step (G1) - the payment instruction instruction information between the subcontractors and the payment source instruction information between the source company and the laborer are not processed and the payment instruction instruction information between the subcontractor and the laborer is processed after the execution of the step (G2) If the confirmation fails in the step (G2), it is preferable that the payment instruction instruction information between the subcontractor and the laborer is not processed.
(H) (H1) 발주자-원청 업체간 지급 지시 정보가 상기 발주자-원청 업체간 지급 승인 정보에 포함되어 있는지를 확인하는 단계; (H2) 원청 업체-하청 업체간 지급 지시 정보가 상기 원청 업체-하청 업체간 지급 승인 정보에 포함되어 있는지를 확인하는 단계; (H3) 원청 업체-노무자간 지급 지시 정보가 상기 원청 업체-노무자간 지급 승인 정보에 포함되어 있는지를 확인하는 단계;및 (H4) 하청 업체-노무자간 지급 지시 정보가 상기 하청 업체-노무자간 지급 지시 정보에 포함되어 있는지를 확인하는 단계; 중 어느 하나 이상의 지급 지시 정보-지급 승인 정보간 교차 검증을 실행하는 단계;를 더 포함하는 것이 바람직하다. (H) (H1) checking whether the payment instruction information between the client and the client is included in the payment approval information between the client and the client; (H2) confirming whether the payment instruction information between the source company and the subcontractor is included in the payment approval information between the source company and the subcontractor; (H3) confirming whether the payment instruction information between the source company and the laborer is included in the approval information between the source company and the laborer; and (H4) the payment information between the subcontractor and the laborer is paid between the subcontractor and the laborer Confirming whether it is included in the instruction information; And performing the cross validation between the payment instruction information and the payment approval information.
발주자-원청 업체간 지급 지시 명령 정보는 상기 (H1) 단계의 실시 후에 처리되는 것인 것이며, 상기 (H1) 단계에서 확인이 실패하는 경우, 상기 발주자-원청 업체간 지급 지시 명령 정보는 처리되지 않는 것인 것이며, 원청 업체-하청 업체간 지급 지시 정보는 상기 (H2) 단계의 실시 후에 처리되는 것인 것이며, 상기 (H2) 단계에서 확인이 실패하는 경우, 상기 원청 업체-하청 업체간 지급 지시 정보는 처리되지 않는 것인 것이며, 원청 업체-노무자간 지급 지시 명령 정보는 상기 (H3) 단계의 실시 후에 처리되는 것인 것이며, 상기 (H3) 단계에서 확인이 실패하는 경우, 상기 원청 업체-노무자간 지급 지시 명령 정보는 처리되지 않는 것인 것이며, 하청 업체-노무자간 지급 지시 명령 정보는 상기 (H4) 단계의 실시 후에 처리되는 것인 것이며, 상기 (H4) 단계에서 확인이 실패하는 경우, 상기 하청 업체-노무자간 지급 지시 명령 정보는 처리되지 않는 것인 것이 바람직하다. The payment instruction command information between the client and the client company is processed after the execution of the step (H1), and if the confirmation fails in the step (H1), the payment instruction command information between the client and the client is not processed And the payment instruction information between the source company and the subcontractor is processed after the execution of the step (H2). If the confirmation fails in the step (H2), the payment instruction information between the source company and the subcontractor (H3), and if the check fails in the step (H3), it is determined that there is a difference between the source company and the laborer The payment instruction command information is not processed, and the subcontractor-labor intercompany payment instruction command information is processed after the execution of the step (H4), and in the step (H4) If that fails, the Contractor - laborer between payment instruction command information, preferably will not be processed.
상기 원청 업체-하청 업체간 지급 지시 명령 정보 또는 상기 원청 업체-노무자간 지급 지시 명령 정보가 상기 원청 업체 관리자 단말기로부터 입수되어 상기 원청 업체-하청 업체간 지급 지시 정보 또는 상기 원청 업체-노무자간 지급 지시 정보가 상기 금융 서비스 시스템으로 전송된 경우, 상기 원청 업체-하청 업체간 지급 지시 명령 정보의 처리, 상기 원청 업체-노무자간 지급 지시 명령 정보의 처리, 상기 원청 업체-하청 업체간 지급 지시 정보의 처리 또는 상기 원청 업체-노무자간 지급 지시 정보의 처리는 상기 발주자측 관리자에게 리포팅 되는 것인 것이며, 상기 하청 업체-노무자간 지급 지시 명령 정보가 상기 하청 업체 관리자 단말기로부터 입수되어, 상기 하청 업체-노무자간 지급 지시 정보가 상기 금융 서비스 시스템으로 전송된 경우, 상기 하청 업체-노무자간 지급 지시 명령 정보의 처리 또는 상기 하청 업체-노무자간 지급 지시 정보의 처리는 상기 발주자측 관리자 또는 상기 원청 업체 관리자에게 리포팅 되는 것인 것이 바람직하다. The payment instruction instruction information between the source company and the subcontractor or the information about the payment order instruction between the source company and the laborer is obtained from the source company manager terminal and the payment instruction information between the source company and the subcontractor or the payment instruction between the source company and the laborer Processing information of the payment instruction command information between the source company and the subcontractor when the information is transmitted to the financial service system, processing of the payment information instruction command information between the source company and the laborer, processing of the payment instruction information between the source company and the subcontractor Or between the contractor and the laborer is reported to the manager of the contractor side, and the information of the contractor-labor intercompany payment instruction command is obtained from the contractor manager terminal, and the contractor- When the payment instruction information is transmitted to the financial service system, The processing of the subcontractor-intergovernmental dispatch instruction command information or the processing of the subcontractor-intergovernment dispatch instruction information is preferably reported to the client side manager or the client company manager.
(I) 상기 지급 지시 정보의 전송 또는 상기 지급 지시 명령 정보의 생성에 대응되어 지급 증빙 정보를 생성하는 단계;를 더 포함하는 것이 바람직하다. (I) generating proof of payment information corresponding to the transmission of the payment instruction information or the generation of the payment instruction instruction information.
상기 지급 지시 명령 정보는 상기 지급 승인 정보의 생성에 따라 추가적인 입력 없이 생성되는 것인 것이 바람직하다. And the payment instruction command information is generated without additional input according to generation of the payment approval information.
상기 원청 업체와 발주자 사이에서는 적어도 하나 이상의 상위 원청 업체가 존재하는 것인 것이 바람직하다. It is preferable that there is at least one higher quality raw material supplier between the raw material supplier and the client.
상기 실시간 노무비 지급 시스템은 발주자측에서 운영되는 것인 것이 바람직하다. The real-time labor payment system is preferably operated by the client.
상기 원청 지급 항목별 공사비 정보 및 상기 하청 지급 항목별 공사비 정보에는 기 설정된 지급 단위별을 기준으로 금회 지급 청구 명세 정보 및 전회 지급 내역 증빙 정보 중 어느 하나 이상이 포함되어 있는 것이 바람직하다. It is preferable that the construction cost information for each of the originally supplied payment items and the construction cost information for the subcontracted payment items include at least one of the current payment request specification information and the previous payment history information based on the predetermined payment unit.
상기 (B) 단계와 상기 (A) 단계는 원청 업체 관리자 단말기 또는 상기 원청 업체 시스템으로부터 입수되는 것인 것이거나, 상기 (B) 단계는 원청 업체 관리자 단말기 또는 원청 업체 시스템으로부터 입수되고, 상기 (A) 단계는 하청 업체 관리자 단말기 또는 하청 업체 시스템으로부터 입수되는 것인 것이 바람직하다. Wherein the step (B) and the step (A) are obtained from the client manager terminal or the client company system, (B) is obtained from the client manager terminal or the client company system, ) Step is preferably obtained from a subcontractor manager terminal or a subcontractor system.
상기 (B) 단계와 상기 (A) 단계는 적어도 하나 이상의 원청 업체 또는 적어도 하나 이상의 하청 업체에 대하여, (B) 단계 이후에 (A) 단계가 실시되거나, (A) 단계 이후에 (B) 단계가 실시되거나, (B) 단계와 (A) 단계가 독립되어 실시되는 것인 것이 바람직하다. Wherein the step (B) and the step (A) are carried out after at least one raw material supplier or at least one or more subcontractors performs step (A) after step (B) Or step (B) and step (A) are carried out independently of each other.
상기 지급 지시 명령 정보 또는 상기 지급 지시 정보에는 노무자별로 상기 노무자의 계좌 정보 및 상기 노무비 정보가 포함되어 있으며, 상기 노무자의 계좌 정보 및 상기 노무비 정보는 상기 (D) 단계의 승인의 대상 내역에 포함되는 것인 것이며, 선택적으로 상기 노무자의 계좌 정보는 상기 (B) 단계 또는 상기 (A) 단계에서 입수된 것인 것이며, 선택적으로 상기 (C) 단계의 경과 후에는 추가되거나 변경될 수 없는 것인 것이 바람직하다. Wherein the payment instruction command information or the payment instruction information includes the account information of the laborer and the labor cost information for each laborer and the account information of the laborer and the labor cost information are included in the approval target of the step (D) , And optionally the account information of the laborer is obtained in the step (B) or (A), and optionally can not be added or changed after the elapse of the step (C) desirable.
상기 지급 지시 명령 정보는 예약될 수 있는 것인 것이며, 상기 예약을 위한 예약 정보는 상기 발주자-원청 업체간 지급 지시 명령 정보, 상기 원청 업체-하청 업체간 지급 지시 명령 정보, 상기 원청 업체-노무자간 지급 지시 명령 정보 및 상기 하청 업체-노무자간 지급 지시 명령 정보가 상기 발주자측 관리자 단말로부터 입수될 수 있는 것일 경우에는 상기 발주자측 관리자 단말기로부터 입수되는 것인 것이며, 상기 발주자-원청 업체간 지급 지시 명령 정보가 상기 발주자측 관리자 단말기로부터 입수되는 것일 경우, 상기 발주자측 관리자 단말기로부터 입수되는 것인 것이며, 상기 원청 업체-하청 업체간 지급 지시 명령 정보 및 상기 원청 업체-노무자간 지급 지시 명령 정보가 상기 원청 업체 관리자 단말기로부터 입수되는 것일 경우, 상기 원청 업체 관리자 단말기로부터 입수되는 것인 것이며, 상기 하청 업체-노무자간 지급 지시 명령 정보가 상기 원청 업체 관리자 단말기로부터 입수되는 것일 경우, 상기 원청 업체 관리자 단말기로부터 입수되는 것인 것이 바람직하다.The payment instruction command information may be reserved, and the reservation information for the reservation may include payment instruction command information between the client and the client company, payment instruction instruction information between the client company and the subcontractor, Payment instruction command information and payment information between the subcontractor and the laborer can be obtained from the client terminal on the client side, the information is obtained from the client terminal on the client side, Information of the payment instruction command between the source company and the subcontractor and the payment instruction information of the source company and the laborer are received from the client side terminal when the information is obtained from the client terminal of the client side, If it is obtained from a business manager terminal, Would would be available from the administrator terminal, the contractor-case be a laborer between payment instruction command information received from the administrator terminal prime areas, it is preferred that it is obtained from the prime areas administrator terminal.
상기 하청 업체-노무자간 지급 지시 명령 정보가 상기 하청 업체 관리자 단말기로부터 입수되는 것일 경우, 상기 하청 업체 관리자 단말기로부터 입수되는 것인 것이 바람직하다.And when the subcontractor-labor intervening payment instruction information is obtained from the subcontractor manager terminal, it is preferable that the information is obtained from the subcontractor manager terminal.
(J) 발주자측 관리자 단말기로부터 지급 지시 명령의 입수 후 기 설정된 기간 동안 원청 업체 관리자 단말기 또는 상기 하청 업체 관리자 단말기로부터의 지급 지시 명령이 없는 경우, 상기 발자자측 관리자의 가상 공간에 기 설정된 알림 정보를 전송하는 단계;를 더 포함하는 것이 바람직하다.(J) If there is no payment instruction from the original company manager terminal or the subcontractor manager terminal for a preset period of time after obtaining the payment instruction from the client terminal manager terminal, the notification information preset in the virtual space of the client side manager; It is preferable to further include; transmitting a.
상기 실시간 노무비 지급 시스템의 정보 처리는 발주 공사 단위로 처리되는 것인 것이 바람직하다. And the information processing of the real-time labor payment system is processed in units of order construction.
본 발명이 이루고자 하는 기술적 과제를 달성하기 위하여, 상기의 어느 한 항의 방법을 실시하는 것을 특징으로 하는 실시간 노무비 지급 시스템을 제시한다.
In order to accomplish the object of the present invention, there is provided a real-time labor payment system characterized by carrying out the method of any one of the above-described methods.
본 발명을 실시하면 다음과 같은 효과가 있다.The present invention has the following effects.
첫째, 노무자들에게 노무비의 지급이 보장/보증된다. 발주자->원청->하청->노무자의 이체 과정에서 발생할 수도 있는 노무비 지불 연체/미지급 또는 오용이나 유용이 차단되는 장점이 있다. 그리고, 예약 이체 등의 경우에는 담당자의 출장 혹은 외근 시에도 예약 이체를 통하여 지정한 날짜에 노무비 지급이 보장된다. 이를 통해 노무자의 안정적인 생활 기반이 마련될 수 있으며, 임금 체불에 대한 걱정이 해소 될 수 있으며, 직무 만족도가 제고될 수 있다.First, the payment of labor costs is guaranteed / guaranteed to laborers. There is an advantage that the overdue / nonpayment, misuse or misuse of labor payment that may arise in the process of transfer of the client -> original government -> subcontracting -> laborer is blocked. Also, in case of reservation transfer, the payment of labor costs is guaranteed on the designated date through the reservation transfer even when the person in charge is traveling or traveling. This can provide a stable basis for the laborer's life, reduce worries about delayed wages, and improve job satisfaction.
둘째, 원청 업체의 노무비 지급, 하청 업체의 노무비 지급 내역이 모니터링 될 수 있어, 노무비 지급이 투명하게 관리될 수 있다. 그리고, 지급 기한 내에 노무비의 이체가 발생하지 않으면 상위 업체에게 알람되어, 노무비의 지급이 확실하게 관리될 수 있다.Second, the labor costs of labor contractors and the details of labor costs of subcontractors can be monitored, and the payment of labor costs can be managed transparently. If the transfer of labor costs does not occur within the payment period, the higher-level company is notified and the payment of the labor costs can be reliably managed.
셋째, 다양한 통계 정보가 생성될 수 있다.Third, various statistical information can be generated.
넷째, 본 발명의 시스템을 도입하는 발주자는 관리 감독 기능이 강화되고, 임금 체불에 따른 민원이 감소되며, 사회적 약자에 대한 생존권을 보장해 줄 수 있게 된다.Fourth, the client introducing the system of the present invention can strengthen the management supervision function, reduce civil complaints due to the delayed payment of wages, and guarantee the right to live for the socially weak.
다섯째, 원청 업체와 하청 업체는 행정 업무 부담이 완화되며, 자사 소속 또는 자사 관리 노무자의 임금을 보호해 줄 수 있게 된다.
Fifth, the contractor and the subcontractor can relieve the burden of administrative work and protect the wages of their affiliates or their management officials.
도 1은 본 발명의 실시간 노무비 지급 시스템의 일 실시예적 구성에 관한 도면이다.
도 2는 본 발명의 실시간 노무비 지급 시스템의 일 실시예적 정보 처리 방법에 관한 도면이다.
도 3은 원청 업체-하청 업체간 지급 승인 정보가 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인되는 경우, 원청 업체-노무자간 지급 지시 명령 정보 처리하는 본 발명의 실시간 노무비 지급 시스템의 일 실시예적 정보 처리 방법에 관한 도면이다.
도 4는 원청 업체-노무자간 지급 승인 정보가 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인하는 경우, 원청 업체-노무자간 지급 지시 명령 정보 처리하는 본 발명의 실시간 노무비 지급 시스템의 일 실시예적 정보 처리 방법에 관한 도면이다.
도 5는 하청 업체-노무자간 지급 승인 정보가 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인하는 경우, 하청 업체-노무자간 지급 지시 명령 정보 처리하는 본 발명의 실시간 노무비 지급 시스템의 일 실시예적 정보 처리 방법에 관한 도면이다.
도 6은 원청 업체-하청 업체간 지급 지시 정보가 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인하는 경우, 원청 업체-하청 업체간 지급 지시 명령 정보 처리하는 본 발명의 실시간 노무비 지급 시스템의 일 실시예적 정보 처리 방법에 관한 도면이다.
도 7은 원청 업체-노무자간 지급 지시 정보가 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인하는 경우, 원청 업체-노무자간 지급 지시 명령 정보 처리하는 본 발명의 실시간 노무비 지급 시스템의 일 실시예적 정보 처리 방법에 관한 도면이다.
도 8은 하청 업체-노무자간 지급 지시 정보가 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인하는 경우, 하청 업체-노무자간 지급 지시 명령 정보 처리하는 본 발명의 실시간 노무비 지급 시스템의 일 실시예적 정보 처리 방법에 관한 도면이다.
도 9는 지급 증빙 보고서와 관련된 정보를 처리하는 본 발명의 실시간 노무비 지급 시스템의 일 실시예적 정보 처리 방법에 관한 도면이다.
도 10은 발주자측 지급 지시 정보 송신이 있는 경우, 설정 시간 내에 원청 업체측의 노무자에 대한 노무비 지급 지시 정보 송신/하청 업체로의 공사비 지급 지시 정보 송신이 있는가를 살펴, 그렇지 않을 경우 발주자측에 미지급 알림 정보 전송하는 본 발명의 실시간 노무비 지급 시스템의 일 실시예적 정보 처리 방법에 관한 도면이다.
도 11은 원청 업체측 지급 지시 정보 송신이 있는 경우, 설정 시간 내에 하청 업체측의 노무자에 대한 노무비 지급 지시 정보 송신이 있는가를 살펴, 그렇지 않을 경우 발주자측 또는 원청 업체측에 노무비 미지급 알림 정보 전송하는 본 발명의 실시간 노무비 지급 시스템의 일 실시예적 정보 처리 방법에 관한 도면이다.
도 12는 청구서 등록과 관련된 본 발명의 실시간 노무비 지급 시스템의 일 실시예적 정보 처리 방법에 관한 도면이다.BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a diagram showing an embodiment of a real-time labor payment system according to the present invention; FIG.
FIG. 2 is a diagram of an embodiment of the information processing method of the real-time labor payment system of the present invention.
FIG. 3 is a flowchart showing the real-time labor payment system of the present invention for processing payment information of a source company and a laborer when it is confirmed that the payment approval information between the source company and the subcontractor is included in the payment approval information between the client and the source company Fig. 2 is a diagram of an exemplary information processing method.
FIG. 4 is a flowchart showing the process of real-time payment processing system of the present invention for processing information on dispensing instruction information between a raw material supplier and a laborer when confirming whether the payment information between the raw material supplier and the laborer is included in the payment approval information between the purchaser and the raw material supplier 1 is a diagram of an exemplary information processing method.
FIG. 5 is a flowchart showing the process of processing the payment information of the subcontractor and the laborer in the real-time labor payment system of the present invention for processing information of the subcontractor- 1 is a diagram of an exemplary information processing method.
FIG. 6 shows the real-time labor costs of the present invention for processing payment instruction information between a source company and a subcontractor when confirming whether the payment instruction information between the source company and the subcontractor is included in the payment approval information between the client and the source company Fig. 1 is a diagram of a method for processing information according to an embodiment of the present invention;
FIG. 7 is a flowchart showing the process of real-time payment processing system according to the present invention for processing information on dispatch instruction information between a source company and a laborer when confirming whether payment information between the source company and the laborer is included in the payment approval information between the client and the source company 1 is a diagram of an exemplary information processing method.
FIG. 8 is a flowchart showing the process of processing the payment instruction information of the subcontractor-labor between the subcontractor and the laborer when confirming whether the payment instruction information between the subcontractor and the laborer is included in the payment approval information between the client and the client. 1 is a diagram of an exemplary information processing method.
9 is a diagram of an exemplary information processing method of the real-time labor payment system of the present invention for processing information related to a proof of payment report.
FIG. 10 is a view showing whether there is the sending of labor cost payment instruction information to the laborer of the raw material supplier side or the transmission of the construction cost payment instruction information to the subcontracting company in the set time, if there is the transmission of the payment instruction information of the client side, A real-time labor payment system according to the present invention for transferring information.
FIG. 11 is a view for explaining whether there is a transmission of labor payment instruction information to the laborer of the subcontracting company within the set time in the case of sending the payment instruction information from the raw material supplier, FIG. 1 is a diagram of an exemplary information processing method of a real-time labor payment system of the invention.
12 is a diagram of an exemplary method of processing information of a real-time labor payment system of the present invention related to bill registration.
이하, 도면을 참조하면서 더욱 더 상세하게 설명한다.Hereinafter, the present invention will be described in more detail with reference to the drawings.
도 1은 본 발명의 실시간 노무비 지급 시스템(1000)의 일 실시예적 구성에 관한 도면이다.FIG. 1 is a diagram illustrating an exemplary configuration of a real-time
본 발명의 실시간 노무비 지급 시스템(1000)은 유무선 네트워크(5000)를 통하여, 적어도 하나 이상의 금융 서비스 시스템(3000), 적어도 하나 이상의 발주자측 관리자 단말기(2100), 적어도 하나 이상의 원청 업체 관리자 단말기(2200), 및 적어도 하나 이상의 하청 업체 관리자 단말기(2300)와 정보를 주고 받는다. 상기 실시간 노무비 지급 시스템(1000)은 기초 정보를 등록 받는 기초 정보 등록 모듈(1100), 공사비 또는 노무비 청구에 관한 정보의 입수, 승인, 계좌 정합성 조회 등을 수행하는 청구 관리 모듈(1200), 노무비 지급 관리를 수행하는 노무비 지급 관리 모듈(1300), 상기 실시간 노무비 지급 시스템(1000)의 사용 주체를 관리하는 사용자 관리 모듈(1400), 및 각종 입수 받은 정보 및 생성한 정보를 저장하는 DB부(1500), 상기 금융 서비스 시스템(3000)이나 상기 발주자측 관리자 단말기(2100), 원청 업체 관리자 단말기(2200), 및 하청 업체 관리자 단말기(2300)와 정보를 주고 받는 정보 교환 인터페이스를 포함하는 인터페이싱 모듈(1600), 토계 정보를 생성하거나, 기 설정된 적어도 하나 이상의 포맷으로 된 보고서를 생성하는 통계/보고서관리모듈(1700)을 포함하고 있다.The real-time
상기 실시간 노무비 지급 시스템(1000)의 업체 정보 등록 모듈(1110)은 원청 업체나 하청 업체 등과 같은 업체에 관한 정보를 입수 받아 등록 받으며, 노무자 정보 등록 모듈(1120)은, 원청 업체 소속 노무자나 하청 업체 소속 노무자의 성명 등과 같은 노무자의 정보를 등록 받고, 특히 상기 노무자 정보 등록 모듈(1120)의 노무자 계좌 등록 모듈(1121)은 노무자에게 지급될 노무비를 수신하는 노무자의 계좌 정보(금융 기관 명, 계좌 번호, 예금주 명 등)를 등록 받는다. 상기 업체 정보 등록 모듈(1110)은 공사에 관한 각종 기초 정보를 입수 받음은 물론일 것이다. 공사현장정보등록 모듈(1130)은 공사가 진행되고 있는 현장에 관한 각종 정보를 등록받으며, 기준직종정보등록 모듈(1140)은 노무자의 기준 직종에 관한 정보를 등록받으며, 공종관리정보등록 모듈(1150)은 공종에 관한 적어도 하나 이상의 공종에 대한 적어도 하나 이사상의 관리 정보를 등록 받으며, 기준노무비정보등록 모듈(1160)은 기준이 되는 노무비 정보를 등록받는다. 등록받은 각 정보는 본 발명의 DB부(1500)에 저장된다.The business
상기 청구 관리 모듈(1200)은 공사비 지급 항목별 공사비 정보를 입수 받는 지급 항목별 공사비 정보 입수 모듈(1210), 원청 업체 또는 하청 업체의 공사비 청구 승인을 처리하는 청구 승인 처리 모듈(1220), 및 계좌 정합성 조회 모듈(1230)을 포함하고 있다. 상기 계좌 정합성 조회 모듈(1230)은 상기 노무자 계좌 등록 모듈(1121)을 통하여 등록된 계좌를 금융 서비스 시스템(3000)에 조회하여, 정합성을 체크하는 정보 처리를 수행한다.The
상기 노무비 지급 관리 모듈(1300)은 기 설정된 교차 검증을 수행하는 교차 검증 모듈(1310), 노무비를 포함하는 공사비 지급의 승인을 처리하는 지급 승인 처리 모듈(1320), 인출계좌, 송금계좌 및 송금액 등과 같은 공사비의 지급을 위한 명령 정보를 생성하는 지급 지시 명령 처리 모듈(1330), 생성된 지급 명령 정보를 금융 서비스 시스템(3000)에 전송하는 지급 지시 처리 모듈(1340)을 포함하고 있다. 한편, 상기 노무비 지급 관리 모듈(1300)은 공사비의 지급 여부를 감시하는 지급 감시 모듈(1350), 공사비의 지급 시 보고서를 생성하는 보고서 생성 모듈(1360)을 포함하고 있으며, 노무자에게 노무비의 지급을 SMS 등으로 알려 주는 노무비 지급 알림 모듈(1370)을 포함하고 있을 수 있다.The labor
상기 사용자 관리 모듈(1400)에는 발주자의 정보를 관리하는 발주자 정보 관리 모듈(1410), 원청 업체의 정보를 관리하는 원청 업체 정보 관리 모듈(1420), 하청 업체의 정보를 관리하는 하청 업체 정보 관리 모듈(1430) 을 포함하고 있다. 한편, 상기 사용자 관리 모듈(1400)에는 발주자의 계좌 정보를 관리하는 발주자 계좌 관리 모듈(1440), 원청 업체의 계좌 정보를 관리하는 원청 업체 계좌 관리 모듈(1450), 하청 업체의 계좌 정보를 관리하는 하청 업체 계좌 관리 모듈(1460) 을 더 포함하고 있을 수 있다. 상기 원청 업체 계좌 관리 모듈(1450)과 상기 하청 업체 계좌 관리 모듈(1460) 에는 원청 업체와 하청 업체에 소속된 노무자의 계좌 정보가 관리될 수 있다.The
상기 DB부(1500)에는 발주자와 관련된 입력 및 생성 정보가 저장되는 발주자 데이터부(1510), 원청 업체와 관련된 입력 및 생성 정보가 저장되는 원청 업체 데이터부(1520), 및 하청 업체와 관련된 입력 및 생성 정보가 저장되는 하청 업체 데이터부(1530) 및 노무자와 관련된 정보가 저장되는 노무자 데이터부(1540)가 포함되어 있을 수 있다.The
상기 통계/보고서관리모듈(1700)은 통계 처리 및 보고서 생성을 수행한다. 상기 통계/보고서관리모듈(1700)은 공사별 지급현황 데이터(1710), 기관별 지급현황 데이터(1720), 직종별 지급현황 데이터(1730), 기간(월/년)별 지급현황 데이터(1740)에 대한 통계 처리 및 보고서의 생성을 수행한다. 상기 통계/보고서관리모듈(1700)이 생성하는 보고서가 생성하는 통계 처리 결과 또는 보고서는 각각 공사별 지급현황 데이터(1710), 기관별 지급현황 데이터(1720), 직종별 지급현황 데이터(1730), 기간(월/년)별 지급현황 데이터(1740)에 저장되고 관리될 수 있다. 한편, 상기 공사별 지급현황 데이터(1710), 기관별 지급현황 데이터(1720), 직종별 지급현황 데이터(1730), 기간(월/년)별 지급현황 데이터(1740)는 본 발명의 DB부(1500) 하에 저장되고 관리될 수도 있음은 물론이다 할 것이다.The statistical /
상기 금융 서비스 시스템(3000)에는 상기 실시간 노무비 지급 시스템(1000)과 정보 교환을 지원하는 통신 모듈(3100) 및 금융 계좌를 관리하는 금융 계좌 관리 모듈(3200), 송금 정보를 처리하는 송금 처리 모듈(3300) 등을 포함하고 있을 수 있다. 본 발명의 실시와 관련하여 상기 금융 계좌 관리 모듈(3200)에는 적어도 하나 이상의 발주자 금융 계좌 , 적어도 하나 이상의 원청 업체 금융 계좌 , 적어도 하나 이상의 하청 업체 금융 계좌 및 적어도 하나 이상의 노무자 금융 계좌가 있을 것이다.The
상기 실시간 노무비 지급 시스템(1000)에 접속하는 발주자측 관리자 단말기(2100)가 있을 수 있으며, 상기 발주자측 관리자 단말기(2100)는 통신 가능한 개인용 컴퓨터, 스마트 폰 등과 같은 통신 가능한 휴대용 컴퓨터일 수도 있다. 한편, 상기 발주자측 관리자 단말기(2100)의 특별한 형태로 기 설정된 기능을 수행하는 시스템일 수도 있으며, 이 경우, 상기 시스템에는 발주자측 관리자가 통신 가능한 개인용 컴퓨터, 스마트 폰 등과 같은 통신 가능한 휴대용 컴퓨터로 접속할 수 있다. 단말의 의미는 실시간 노무비 지급 시스템(1000)의 입장에서는 상기 발주자측 관리자 단말기(2100)가 컴퓨터이든 시스템이든 터미널(terminal)이기 때문이다. 본 문단의 설명은 상기 실시간 노무비 지급 시스템(1000)에 접속하는 상기 원청 업체 관리자 단말기(2200)와 상기 하청 업체 관리자 단말기(2300)도 마찬가지로 적용된다.There may be an
도 2는 본 발명의 실시간 노무비 지급 시스템(1000)의 일 실시예적 정보 처리 방법에 관한 도면이다.FIG. 2 is a diagram illustrating an exemplary information processing method of the real-time
본 발명의 실시간 노무비 지급 시스템(1000)의 지급 항목별 공사비 정보 입수 모듈(1210)은 (A) 적어도 하나 이상의 원청 업체별로 상기 원청 업체로부터 적어도 하나 이상의 하청 업체에 지급될 하청 지급 항목별 공사비 정보를 입수 받고, (B) 상기 원청 업체별로 상기 원청 업체의 상위 업체로부터 상기 원청 업체에 지급될 원청 지급 항목별 공사비 정보를 입수 받는다(S12). 상기 하청 업체에 지급될 하청 지급 항목별 공사비 정보에는 하청 업체 소속 또는 하청 업체가 관리하는 적어도 하나 이상의 노무자별 노무비 정보와 노무비가 송금되는 노무자 금융 계좌 정보가 포함되어 있을 수 있다. 그리고, 상기 원청 업체에 지급될 원청 지급 항목별 공사비 정보에는 원청 업체 소속 또는 원청 업체가 관리하는 적어도 하나 이상의 노무자별 노무비 정보와 노무비가 송금되는 노무자 금융 계좌 정보가 포함되어 있을 수 있다. 상기 입수 받은 원청 업체에 관한 정보는 원청 업체 정보 관리 모듈(1420)이 관리하고, 원청 업체 데이터부(1520)에 저장된다. 한편, 상기 입수 받은 하청 업체에 관한 정보는 하청 업체 정보 관리 모듈(1430)이 관리하고, 하청 업체 데이터부(1530)에 저장된다.The construction cost
이어, 상기 실시간 노무비 지급 시스템(1000)의 청구 승인 처리 모듈(1220)은 (C) 상기 원청 지급 항목별 공사비 정보 및 상기 하청 지급 항목별 공사비 정보 중 어느 하나 이상에 포함된 적어도 하나 이상의 노무비에 대한 노무비 지급 청구를 포함하는 공사비 지급 청구에 대한 청구 승인 정보를 입수 받는다(S13). 이어, 지급 승인 처리 모듈(1320)은 (D) 노무비를 포함하는 상기 공사비 지급 청구에 대한 적어도 1회 이상의 지급 승인 정보를 생성한다(S14). 이어, 상기 실시간 노무비 지급 시스템(1000)의 지급 지시 명령 처리 모듈(1330)은 (E) 적어도 하나 이상의 금융 서비스 시스템(3000)으로 적어도 1회 이상의 지급 지시 명령 정보를 입수하고, 상기 실시간 노무비 지급 시스템(1000)의 지급 지시 처리 모듈(1340)은 상기 지급 지시 명령 정보에 기초하여 적어도 1회 이상의 지급 지시 정보를 전송한다. 이때, 상기 원청 지급 항목별 공사비 정보, 상기 하청 지급 항목별 공사비 정보, 상기 지급 지시 명령 정보 또는 상기 지급 지시 정보에는 적어도 1인 이상의 원청 업체 관련 노무자의 계좌 정보 또는 적어도 1인 이상의 하청 업체 관련 노무자의 계좌 정보 및 노무비 정보 중 어느 하나 이상이 더 포함되어 있다.Then, the billing
이때, 상기 실시간 노무비 지급 시스템(1000)의 계좌 정합성 조회 모듈(1230)은 상기 인터페이싱 모듈(1600)을 경유하여 (F) 상기 (D) 단계의 실시 전 또는 상기 (D) 단계의 실시 후 중 어느 하나 이상에서 상기 노무비 정보의 처리 대상이 되는 노무자 계좌에 대한 지급 계좌 조회 처리를 수행한다. 상기 금융 서비스 시스템(3000)의 펌뱅킹(firm banking) 모듈은 상기와 같은 계좌 정합성 조회 모듈(1230)의 정보 처리를 돕는다. 상기 계좌 정합성 조회 모듈(1230)은 상기 등록된 적어도 하나 이상의 원청 업체의 계좌, 적어도 하나 이상의 하청 업체의 계좌 및 적어도 하나 이상의 노무자 계좌를 상기 계좌가 운영되는 은행(금융 서비스 시스템(3000))에 조회하여 계좌의 유효성/정합성을 확인 체크한다. 정합성이 확인되지 않는 계좌에는 공사비의 지급 지시 명령이 불허되며, 그 계좌를 등록한 자(원청 업체, 하청 업체의 관리자)에게 정합성 확인 실패의 사실을 전송하거나 기타의 방식으로 통보한다.At this time, the account
상기 (A) 단계와 상기 (B) 단계는 공사비와 관련된 청구성의 등록이며, 이에 대한 일 실시예적 도면은 도 12에 있다. 상기 (A) 단계는 하청 업체에 지급될 공사비에 대한 청구서 등록에 관한 것으로 이러한 청구서의 등록은 하청 업체가 직접 등록할 수도 있으며, 원청 업체에 의해 취합되어 원청 업체에 의해 등록될 수도 있다. 도 12는 후자를 예시하고 있다. 즉, 상기 (A) 단계의 청구 정보는 원청 업체 시스템 또는 원청 업체 관리자 단말로부터 입수되는 것인 것이거나, 하청 업체 시스템 또는 하청 업체 관리자 단말로부터 입수된 이후에, 상기 원청 업체 시스템 또는 상기 원청 업체 관리자 단말로부터 가공되거나, 변경되거나, 승인되어 입수되는 것일 수 있다. 즉, 입수되는 정보의 제공자와 관련하여서는 상기 (B) 단계와 상기 (A) 단계는 원청 업체 관리자 단말기(2200) 또는 상기 원청 업체 시스템으로부터 입수되는 것인 것이거나, 상기 (B) 단계는 원청 업체 관리자 단말기(2200) 또는 원청 업체 시스템으로부터 입수되고, 상기 (A) 단계는 하청 업체 관리자 단말기(2300) 또는 하청 업체 시스템으로부터 입수될 수 있다. 한편, 입수되는 정보의 시간 상의 순서와 관련하여서는 상기 (B) 단계와 상기 (A) 단계는 적어도 하나 이상의 원청 업체 또는 적어도 하나 이상의 하청 업체에 대하여, (B) 단계 이후에 (A) 단계가 실시되거나, (A) 단계 이후에 (B) 단계가 실시되거나, (B) 단계와 (A) 단계가 독립되어 실시될 수도 있다. 도 12를 예로 들어 설명하면 다음고 같다. 하청 업체의 관리자는 상기 실시간 노무비 지급 시스템(1000)에 원청업체에 청구할 청구서 등록(S121)하고, 원청업체에 청구서 승인 요청(S122)을 할 수 있다. 이때, 원청 업체 관리자는 상기 실시간 노무비 지급 시스템(1000)에 발주처에 청구할 자사 관련된 청구서 등록(S123)하고, 하청 업체 청구서 검토/승인/결재/취합(S124)한 다음, 발주처에 취합 청구서 승인 요청(S125)한다. 발주처 관리자는 상기 실시간 노무비 지급 시스템(1000)을 통하여, 청구서 검토/승인(S126)한 다음, 노무자 노무비 계좌 정합성 확인(S127)하고, 지급 승인 정보 생성(S128)한다.The steps (A) and (B) are registration of the billing related to the construction cost, and an exemplary embodiment thereof is shown in FIG. The above step (A) relates to the billing registration for the construction cost to be paid to the subcontractor. The subcontractor may register the bill or may be collected by the contractor and registered by the contractor. Fig. 12 illustrates the latter. That is, the billing information in the step (A) may be obtained from the raw material supplier system or the management agent terminal of the raw material supplier, or may be obtained from the subcontractor system or the subcontractor manager terminal, It may be processed, changed, or approved and obtained from the terminal. That is, with respect to the provider of the information to be obtained, the step (B) and the step (A) are obtained from the
이때, 상기 원청 지급 항목별 공사비 정보 및 상기 하청 지급 항목별 공사비 정보에는 기 설정된 지급 단위별를 기준으로 금회 지급 청구 명세 정보 및 전회 지급 내역 증빙 정보 중 어느 하나 이상이 포함되어 있는 것이 바람직하다.At this time, it is preferable that at least one of the current billing specification information and the previous payment history information is included in the construction cost information for each of the above-mentioned original payment items and the cost information for each subcontract payment item, based on the predetermined payment unit.
상기 (B) 단계는 원청 업체에 지급될 공사비에 대한 청구서 정보의 등록과 관련된 상기 실시간 노무비 지급 시스템(1000)의 정보 처리에 관한 것이다. 상기 (B) 단계는 원청 업체 시스템 또는 원청 업체 관리자 단말로부터 입수되는 것인 것인 것이며, 상기 상기 (C) 단계는 발주자 시스템 또는 발주자 단말기로부터 입수되는 것일 수 있다.The step (B) relates to the information processing of the real-time
상기 (C) 단계는 발주자측 관리자 단말기(2100)로부터 입수되는 것인 것이며, 상기 승인의 대상은 원청 지급 항목별 공사비 정보 및 상기 하청 지급 항목별 공사비 정보인 것이 바람직하다.It is preferable that the step (C) is obtained from the
이어, 상기 실시간 노무비 지급 시스템(1000)의 지급 승인 정보 처리 방법 및 지급 지시 정보 처리 방법에 대해서 도 3 내지 도 5를 참조하면서 더욱 더 상세하게 설명한다.Next, a payment approval information processing method and a payment instruction information processing method of the real-
상기 지급 승인 정보는 발주자-원청 업체간 지급 승인 정보, 원청 업체-하청 업체간 지급 승인 정보, 원청 업체-노무자간 지급 승인 정보 및 하청 업체-노무자간 지급 승인 정보가 있을 수 있다. 상기 지급 승인 정보에는 출금 계좌, 입금 계좌, 송금 금액을 포함하고 있다. 이때, 원청 업체가 다수인 경우, 발주자의 출금 계좌로부터 다수의 원청 업체별 입금 계좌가 대응될 수 있으며, 하청 업체가 다수인 경우, 원청 업체의 출금 계좌로부터 다수의 하청 업체별 입금 계좌가 대응될 수 있으며, 원청 업체에 소속된 노무자가 다수인 경우, 원청 업체의 출금 계좌로부터 다수의 노무자별 입금 계좌가 대응될 수 있으며, 하청 업체에 소속된 노무자가 다수인 경우, 하청 업체의 출금 계좌로부터 다수의 노무자별 입금 계좌가 대응될 수 있다. The above payment approval information may include payment approval information between the client and the client, information on approval of payment between the client and the subcontractor, information on approval of payment between the client and the laborer, and approval information between the subcontractor and the laborer. The payment approval information includes a withdrawal account, a deposit account, and a remittance amount. In this case, when there are a plurality of raw material suppliers, a plurality of accounts can be corresponded from the withdrawal account of the client, and when there are a plurality of subcontractors, a plurality of accounts of the subcontractor can be corresponded from the withdrawal account of the source company In case that there are a lot of laborers belonging to the raw material supplier, a large number of labor accounts can be corresponded from the withdrawal account of the raw material supplier. If there are a lot of laborers belonging to the subcontracting company, A separate deposit account can be corresponded.
상기 각 지급 승인 정보에는 승인의 주체가 다를 수 있다. 발주자-원청 업체간 지급 승인, 원청 업체-하청 업체간 지급 승인, 원청 업체-노무자간 지급 승인 및 하청 업체-노무자간 지급 승인을 모두 발주자 처리하는 제1 승인 방법이 있을 수 있다. 이때는 상기 실시간 노무비 지급 시스템(1000)의 약관이나 법규 등에 의해서 공사비나 노무비의 지급과 관련된 상기 원청 업체의 원청 업체 금융 계좌 , 상기 하청 업체의 하청 업체 금융 계좌에 대한 관리 권한(송금 지시 권한)이 상기 실시간 노무비 지급 시스템(1000)의 관리자 또는 발주자측 관리자가 보유하고 있거나, 적어도 적법 절차에 의하여 위임되어 있어야 한다.The subject of approval may be different for each payment approval information. There may be a first approval method for the client to approve the payment between the client and the client, to approve the payment between the client and the subcontractor, to approve the payment between the client and the laborer, and to the subcontractor and the laborer. At this time, according to the terms and regulations of the real-time
한편, 발주자-원청 업체간 지급 승인은 발주자측 관리자가 가지고, 원청 업체-하청 업체간 지급 승인 권한은 원청 업체 관리자가 가지고, 원청 업체-노무자간 지급 승인 권한은 원청 업체 관리자가 가지고, 하청 업체-노무자간 지급 승인 권한은 하청 업체 관리자가 가지고, 각자가 각각의 지급 승인을 수행하는 처리하는 제2 승인 방법이 있을 수 있다.On the other hand, the approval of the payment between the client and the client is carried out by the client side manager, the client company manager has the authority to approve the payment between the client company and the subcontractor, There may be a second approval method in which the subcontractor manager has authority to approve payment between labor and management, each of which carries out approval of each payment.
이때, 승인을 위한 승인 정보는 승인 권한이 있는 주체의 단말기로부터 입수된다. 상기 제1 승인 방법이 실시되는 경우, 발주자-원청 업체간 지급 승인 정보, 원청 업체-하청 업체간 지급 승인 정보, 원청 업체-노무자간 지급 승인 정보 및 하청 업체-노무자간 지급 승인 정보는 발주자측 관리자 단말로부터 입수된다. 상기 제2 승인 방법이 실시되는 경우에는 상기 발주자-원청 업체간 지급 승인 정보는 발주자측 관리자 단말기(2100)로부터 입수되는 것이며, 상기 원청 업체-하청 업체간 지급 승인 정보 및 상기 원청 업체-노무자간 지급 승인 정보는 상기 원청 업체 관리자 단말기(2200)로부터 입수되는 것이며, 상기 하청 업체-노무자간 지급 승인 정보는 상기 하청 업체 관리자 단말기(2300)로부터 입수될 수 있다.At this time, the approval information for approval is obtained from the terminal of the subject having the approval authority. When the first approval method is implemented, information on approval of payment between the client and the client, information on approval of payment between the client and the subcontractor, information on approval of payment between the client and the laborer, And is obtained from the terminal. In the case where the second approval method is implemented, payment approval information between the client and the client company is obtained from the
이때, 하위 단계의 승인 주체가 승인할 수 있는 승인 범위는 상위 단계에서 승인된 승인 범위를 벗어날 수 없다. 즉, 하청 업체의 관리자가 노무비의 지급을 위해 승인할 수 있는 승인의 한계는 원청 업체가 하청 업체에 제공하는 승인의 한계를 넘을 수 없다. 예를 들면, 원청 업체가 하청 업체 소속의 홍길동에게 금월 노무비로 300만원을 지급하고, 김철수에게 금월 노무비로 350만원을 지급하는 것을 승인하는 경우, 하청 업체는 홍길동이나 김철수를 누락하거나, 아닌 다른 자에게 금액을 지급할 수 없으며, 금액도 다르게 지급할 수도 없으며, 등록된 계좌가 아닌 계좌로의 송금 승인도 불허되는 것이 바람직할 것이다. 하청 업체 관리자의 승인 범위가 원청 업체가 지정한 범위를 넘을 수 없고, 원청 업체 관리자의 승인 범위가 발주자가 지정한 범위를 넘을 수 없다. 발주자가 관리하는 정보에는 원청 업체에 소속된 노무자별로의 지급 금액과 지급 계좌가 포함되어 있으며, 바람직하게는 하청 업체에 소속된 노무자별 지급 금액과 지급 계좌 정보가 포함되어 있을 수 있다. 상기 발주자-원청 업체간 지급 승인 정보에는 상기 원청 업체-하청 업체간 지급 승인 정보, 상기 원청 업체-노무자간 지급 승인 정보 및 상기 하청 업체-노무자간 지급 승인 정보 중 어느 하나 이상이 포함되어 있게 괸다. 그리고, 상기 원청 업체-하청 업체간 지급 승인 정보에는 상기 하청 업체-노무자간 지급 승인 정보가 포함되어 있게 된다.At this time, the approval range that can be approved by the lower level approval body can not exceed the approval range approved by the higher level. In other words, the limit of the approval that the subcontractor's manager can approve for the payment of labor costs can not exceed the limit of approval provided by the subcontractor to the subcontractor. For example, if the contractor authorizes Mr. Hong Kil-dong, a subcontractor, to pay 3 million won for the month of labor and 3.5 million won for the month of labor, he may omit Hong Kil Dong or Kim Chul Su, It is preferable that the money can not be given to the account, the amount can not be paid differently, and the transfer to the account other than the registered account is not permitted. The scope of the approval of the subcontractor manager can not exceed the scope specified by the contractor and the scope of the approval of the contractor manager can not exceed the range specified by the client. The information managed by the client includes the payment amount and the payment account for each laborer belonging to the client company, and preferably the payment amount for each laborer belonging to the subcontractor and the payment account information may be included. The payment approval information between the client and the client company includes at least one of the payment approval information between the source company and the subcontractor, the payment information between the source company and the laborer, and the payment approval information between the subcontractor and the laborer. The payment approval information between the raw material supplier and the subcontractor includes the payment approval information between the subcontractor and the laborer.
따라서, 지급 승인 정보의 처리 전에 이러한 포함 관계에 대한 교차 검증이 선택적으로 있는 것이 정확한 정보 처리를 위해 바람직할 것이다. 이를 위해 상기 실시간 노무비 지급 시스템(1000)의 교차 검증 모듈(1310)은 (G) (G1) 상기 원청 업체-하청 업체간 지급 승인 정보 및 상기 원청 업체-노무자간 지급 승인 정보 중 어느 하나 이상이 상기 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인하는 단계; 및 (G2) 상기 하청 업체-노무자간 지급 승인 정보가 상기 원청 업체-하청 업체간 지급 승인 정보에 포함되어 있는 지를 확인하는 단계; 중 어느 하나 이상의 지급 승인 정보간 교차 검증을 실행하는 단계;를 실시한다.Thus, it would be desirable for the correct information processing to optionally have cross validation of this inclusion relationship before processing of the payment approval information. To this end, the
도 3 내지 도 5를 참조하면서 상기 교차 검증 모듈(1310)의 정보 처리 방법을 더욱 더 상세하게 설명한다. The information processing method of the
도 3에서 알 수 있듯이, 상기 실시간 노무비 지급 시스템(1000)은 원청 업체-하청 업체간 지급 승인 정보가 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인(S21)하고, 확인 되는 경우 원청 업체-노무자간 지급 지시 명령 정보 처리하고(S22) 그렇지 않은 경우에는 원청 업체-하청 업체간 지급 지시 명령 정보 처리 않는(S23) 방식으로 정보 처리 한다.As shown in FIG. 3, the real-time
도 4에서 알 수 있듯이, 상기 실시간 노무비 지급 시스템(1000)은 원청 업체-노무자간 지급 승인 정보가 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인(S31)하고, 확인되는 경우 원청 업체-노무자간 지급 지시 명령 정보 처리하고(S32), 확인 되지 않는 경우, 원청 업체-노무자간 지급 지시 명령 정보 처리 않는(S33) 방식으로 정보 처리한다.As shown in FIG. 4, the real-time
도 5에서 알 수 있듯이, 상기 실시간 노무비 지급 시스템(1000)은 하청 업체-노무자간 지급 승인 정보가 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인(S41)하고, 확인 되는 경우 하청 업체-노무자간 지급 지시 명령 정보 처리하고(S42), 그렇지 않은 경우 하청 업체-노무자간 지급 지시 명령 정보 처리 않는(S43) 방식으로 정보 처리한다.As shown in FIG. 5, the real-time
원청 업체-하청 업체간 지급 지시 명령 정보 및 원청 업체-노무자간 지급 지시 명령 정보는 상기 (G1) 단계의 실시 후에 처리되는 것인 것이며, 상기 (G1) 단계에서 확인이 실패하는 경우, 상기 원청 업체-하청 업체간 지급 지시 명령 정보 및 원청 업체-노무자간 지급 지시 명령 정보가 처리되지 않는다. 그리고, 하청 업체-노무자간 지급 지시 명령 정보는 상기 (G2) 단계의 실시 후에 처리되는 것인 것이며, 상기 (G2) 단계에서 확인이 실패하는 경우, 상기 하청 업체-노무자간 지급 지시 명령 정보가 처리되지 않는다.The payment instruction instruction information between the source company and the subcontractor and the payment instruction instruction information between the source company and the laborer are processed after the execution of the step (G1). If the confirmation fails at the step (G1) - Information on payment instruction instruction between subcontractors and information on payment instruction instruction between the source company and the laborer is not processed. The payment instruction instruction information between the subcontractor and the laborer is processed after the execution of the step (G2). If the check fails in the step (G2), the payment instruction instruction information between the subcontractor and the laborer is processed It does not.
상기 제1 지급 승인 방법 또는 상기 제2 지급 승인 방법을 통하여, 지급 승인이 처리 되면, 실제 공사비 또는 노무비의 지급을 위한 절차가 개시된다. 노무비의 실제 지급은 2단계를 통해서 이루어 질 수 있다. 첫번째 단계는 지급 명령 권한을 가진 자에 의해 지급 지시 명령 정보의 생성과 노무자의 계좌로의 실질적 송금 처리를 위하여, 금융 서비스 시스템(3000)에 계좌 이체를 위한 지급 지시 정보의 전송이 그것이다. 물론, 상기 실시간 노무비 지급 시스템(1000)의 정보 처리 방법에서 상기 지급 지시 승인이 지급 지시 명령과 일치되거나, 자동적으로 연계되어 처리될 수 있음은 물론일 것이다. 즉, 상기 지급 지시 명령 정보는 상기 지급 승인 정보의 생성에 따라 추가적인 입력 없이 생성될 수 있을 것이다.
When payment approval is processed through the first payment approval method or the second payment approval method, a procedure for actual payment of the construction cost or the labor cost is started. The actual payment of labor costs can be made in two steps. The first step is the transfer of the payment instruction information for account transfer to the
상기 지급 지시 정보에는 발주자-원청 업체간 지급 지시 정보, 원청 업체-하청 업체간 지급 지시 정보, 원청 업체-노무자간 지급 지시 정보 및 하청 업체-노무자간 지급 지시 정보가 있을 수 있다.The payment instruction information may include payment instruction information between the client and the client, payment instruction information between the client company and the subcontractor, payment instruction information between the client company and the laborer, and payment instruction information between the contractor and the laborer.
지급 지시 명령을 내릴 수 있는 권한이 발주자측 관리자에게 있거나, 권한이 위임된 경우, 상기 발주자-원청 업체간 지급 지시 명령 정보, 상기 원청 업체-하청 업체간 지급 지시 명령 정보, 상기 원청 업체-노무자간 지급 지시 명령 정보 및 상기 하청 업체-노무자간 지급 지시 명령 정보는 발주자측 관리자 단말로부터 입수된다. 한편, 지급 지시 명령을 내릴 수 있는 권한이 분산되어 있는 경우에는 상기 발주자-원청 업체간 지급 지시 명령 정보는 발주자측 관리자 단말기(2100)로부터 입수되는 것이며, 상기 원청 업체-하청 업체간 지급 지시 명령 정보 및 상기 원청 업체-노무자간 지급 지시 명령 정보는 상기 원청 업체 관리자 단말기(2200)로부터 입수되는 것이며, 상기 하청 업체-노무자간 지급 지시 명령 정보는 상기 원청 업체 관리자 단말기(2200) 또는 상기 하청 업체 관리자 단말기(2300)로부터 입수될 수 있다.If the owner of the client has authority to issue a payment instruction command, or if the authority is delegated, information on the payment instruction command between the client and the client, information on the payment instruction between the client and the subcontractor, Payment instruction command information and payment information of the subcontractor-interlocutor payment instruction are obtained from the client terminal of the client side. Meanwhile, if the right to issue the payment instruction command is distributed, the payment instruction command information between the client and the client company is obtained from the
한편, 하위 단계의 지급 지시 명령의 범위는 상위 단계에서의 지급 지시 명령의 범위를 벗어날 수 없다. 즉, 하청 업체의 관리자가 노무비의 지급을 위해 지급 지시 명령을 할 수 있는 한계는 원청 업체가 하청 업체에 제공하는 지급 지시 명령의 한계를 넘을 수 없게 된다. 이때, 상기 교차 검증 모듈(1310)은 상기 지급 지시 정보와 지급 승인 정보 간에서 양자의 일치 또는 포함 관계 여부에 대하여 교차 검증을 수행한다.On the other hand, the range of the payment instruction instruction at the lower level can not be out of the range of the payment instruction instruction at the upper level. In other words, the limit that a subcontractor's manager can issue a payment order for the payment of labor costs can not exceed the limit of the payment order command provided by the contractor to the subcontractor. At this time, the
상기 교차 검증 모듈(1310)의 정보 처리 방법을 도 6 내지 도 8을 참조하면서 설명한다.An information processing method of the
도 6에서 알 수 있듯이 상기 실시간 노무비 지급 시스템(1000)은 원청 업체-하청 업체간 지급 지시 정보가 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인(S51)하고, 확인 되는 경우 원청 업체-하청 업체간 지급 지시 명령 정보 처리하고(S52) 그렇지 않는 경우에는 원청 업체-하청 업체간 지급 지시 명령 정보 처리 않는다(S53).As shown in FIG. 6, the real-time
도 7에서 알 수 있듯이, 상기 실시간 노무비 지급 시스템(1000)은 원청 업체-노무자간 지급 지시 정보가 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인(S61)하고, 확인 되는 경우 원청 업체-노무자간 지급 지시 명령 정보 처리(S62)하고, 그렇지 않은 경우에는 원청 업체-노무자간 지급 지시 명령 정보 처리 않는다(S63).As shown in FIG. 7, the real-time
도 8에서 알 수 있듯이, 상기 실시간 노무비 지급 시스템(1000)은 하청 업체-노무자간 지급 지시 정보가 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인(S71)하고, 확인 되는 경우 하청 업체-노무자간 지급 지시 명령 정보 처리(S72)하고, 그렇지 않은 경우 하청 업체-노무자간 지급 지시 명령 정보 처리 않는다(S73).As shown in FIG. 8, the real-time
상기 교차 검증 모듈(1310)은 (H) (H1) 발주자-원청 업체간 지급 지시 정보가 상기 발주자-원청 업체간 지급 승인 정보에 포함되어 있는지를 확인하는 단계; (H2) 원청 업체-하청 업체간 지급 지시 정보가 상기 원청 업체-하청 업체간 지급 승인 정보에 포함되어 있는지를 확인하는 단계; (H3) 원청 업체-노무자간 지급 지시 정보가 상기 원청 업체-노무자간 지급 승인 정보에 포함되어 있는지를 확인하는 단계;및 (H4) 하청 업체-노무자간 지급 지시 정보가 상기 하청 업체-노무자간 지급 지시 정보에 포함되어 있는지를 확인하는 단계; 중 어느 하나 이상의 지급 지시 정보-지급 승인 정보간 교차 검증을 실행한다.The
상기 실시간 노무비 지급 시스템(1000)의 정보 처리에 있어서, 발주자-원청 업체간 지급 지시 명령 정보는 상기 (H1) 단계의 실시 후에 처리되는 것인 것이며, 상기 (H1) 단계에서 확인이 실패하는 경우, 상기 발주자-원청 업체간 지급 지시 명령 정보는 처리되지 않는다. 원청 업체-하청 업체간 지급 지시 정보는 상기 (H2) 단계의 실시 후에 처리되는 것인 것이며, 상기 (H2) 단계에서 확인이 실패하는 경우, 상기 원청 업체-하청 업체간 지급 지시 정보는 처리되지 않는다. 원청 업체-노무자간 지급 지시 명령 정보는 상기 (H3) 단계의 실시 후에 처리되는 것인 것이며, 상기 (H3) 단계에서 확인이 실패하는 경우, 상기 원청 업체-노무자간 지급 지시 명령 정보는 처리되지 않는다. 하청 업체-노무자간 지급 지시 명령 정보는 상기 (H4) 단계의 실시 후에 처리되는 것인 것이며, 상기 (H4) 단계에서 확인이 실패하는 경우, 상기 하청 업체-노무자간 지급 지시 명령 정보는 처리되지 않는다.In the information processing of the real-time labor payment system (1000), payment instruction command information between the client and the client company is processed after the execution of the step (H1), and when the confirmation fails at the step (H1) The payment instruction command information between the client and the client is not processed. The payment instruction information between the source company and the subcontractor is processed after the execution of the step (H2), and if the verification fails in the step (H2), the payment instruction information between the source company and the subcontractor is not processed . If the verification fails in the step (H3), the dispense instruction information between the source company and the laborer is not processed. . The payment instruction instruction information between the subcontractor and the laborer is processed after the execution of the step (H4), and if the verification fails in the step (H4), the payment instruction instruction information between the subcontractor and the laborer is not processed .
이어, 본 발명의 보고서 생성 모듈(1360)의 정보 처리 방법에 대해서 설명한다. 상기 보고서 생성 모듈(1360)은 지급 지시 명령이 있거나, 지급 지시 정보의 전송이 있는 경우, 지급 지시 명령의 내용 또는 지급 지시 정보의 내용을 요약/정리하여 기 설정된 리포트를 생성하고, 지정된 관리자의 가상 계정 또는 지정된 관리자에게 리포팅을 수행한다. 즉, 상기 보고서 생성 모듈(1360)은 상기 원청 업체-하청 업체간 지급 지시 명령 정보 또는 상기 원청 업체-노무자간 지급 지시 명령 정보가 상기 원청 업체 관리자 단말기(2200)로부터 입수되어 상기 원청 업체-하청 업체간 지급 지시 정보 또는 상기 원청 업체-노무자간 지급 지시 정보가 상기 금융 서비스 시스템(3000)으로 전송된 경우, 상기 원청 업체-하청 업체간 지급 지시 명령 정보의 처리, 상기 원청 업체-노무자간 지급 지시 명령 정보의 처리, 상기 원청 업체-하청 업체간 지급 지시 정보의 처리 또는 상기 원청 업체-노무자간 지급 지시 정보의 처리는 상기 발주자측 관리자에게 리포팅한다. 그리고, 상기 보고서 생성 모듈(1360)은 상기 하청 업체-노무자간 지급 지시 명령 정보가 상기 하청 업체 관리자 단말기(2300)로부터 입수되어, 상기 하청 업체-노무자간 지급 지시 정보가 상기 금융 서비스 시스템(3000)으로 전송된 경우, 상기 하청 업체-노무자간 지급 지시 명령 정보의 처리 또는 상기 하청 업체-노무자간 지급 지시 정보의 처리는 상기 발주자측 관리자 또는 상기 원청 업체 관리자에게 리포팅 한다. (I) 상기 지급 지시 정보의 전송 또는 상기 지급 지시 명령 정보의 생성에 대응되어 지급 증빙 정보를 생성하는 단계;를 더 포함하는 것이 바람직하다. Next, an information processing method of the
도 9는 지급 증빙 보고서와 관련된 정보를 처리하는 본 발명의 실시간 노무비 지급 시스템(1000)의 일 실시예적 정보 처리 방법을 예시하고 있다. 상기 실시간 노무비 지급 시스템(1000)은 지급 지시 정보를 송신(S81)하고, 지급 증빙 보고서를 생성(S82)한 다음, 지급 증빙 보고서를 전송(S83)한다.FIG. 9 illustrates an exemplary method of processing information of a real-
노무자에게 노무비의 지급을 확실하게 보장/보증될 수 있도록 하기 위하여, 상기 지급 지시 명령 정보 또는 상기 지급 지시 정보에는 노무자별로 상기 노무자의 계좌 정보 및 상기 노무비 정보가 포함되어 있으며, 상기 노무자의 계좌 정보 및 상기 노무비 정보는 상기 (D) 단계의 승인의 대상 내역에 포함되어 있으며, 상기 노무자의 계좌 정보는 상기 (B) 단계 또는 상기 (A) 단계에서 입수된 것인 것이며, 상기 (C) 단계의 경과 후에는 추가되거나 변경될 수 없는 것인 것이 바람직하다.The payment instruction command information or the payment instruction information includes the account information of the laborer and the labor cost information for each laborer in order to securely guarantee / guarantee the payment of the labor costs to the laborer, Wherein the labor information is included in an object of approval in the step (D), the account information of the laborer is obtained in the step (B) or the step (A), and the elapsed time of the step It is preferable that it can not be added or changed afterwards.
한편, 발주자측 관리자, 원청 업체의 관리자, 하청 업체의 관리자가 휴가나 출장 또는 부재 중이거나, 상기 (D) 단계 및/또는 상기 (E) 단계를 잊어버리고 있거나, 나태할 수도 있으며, 이 경우 노무자는 노무비를 적시에 지급 받지 못할 위험에 처리하게 된다. 이를 위하여 노무자에게 노무비가 즉시에 지급되는 것을 위하여 상기 지급 지시 명령 정보는 예약될 수 있도록 처리되는 것이 바람직할 것이다. On the other hand, if the manager of the client side, the manager of the client company, and the manager of the subcontractor are on vacation, out of business or absent, forgetting the step (D) and / or the step (E) Will deal with the risk of not receiving timely payment of labor costs. For this purpose, it is desirable that the payment instruction command information is processed so that the labor management information can be reserved for the labor cost to be paid immediately.
상기 예약을 위한 예약 정보는 상기 발주자-원청 업체간 지급 지시 명령 정보, 상기 원청 업체-하청 업체간 지급 지시 명령 정보, 상기 원청 업체-노무자간 지급 지시 명령 정보 및 상기 하청 업체-노무자간 지급 지시 명령 정보가 상기 발주자측 관리자 단말로부터 입수될 수 있는 것일 경우에는 상기 발주자측 관리자 단말기(2100)로부터 입수되는 것인 것이며, 상기 발주자-원청 업체간 지급 지시 명령 정보가 상기 발주자측 관리자 단말기(2100)로부터 입수되는 것일 경우, 상기 발주자측 관리자 단말기(2100)로부터 입수되는 것인 것이며, 상기 원청 업체-하청 업체간 지급 지시 명령 정보 및 상기 원청 업체-노무자간 지급 지시 명령 정보가 상기 원청 업체 관리자 단말기(2200)로부터 입수되는 것일 경우, 상기 원청 업체 관리자 단말기(2200)로부터 입수되는 것인 것이며, 상기 하청 업체-노무자간 지급 지시 명령 정보가 상기 원청 업체 관리자 단말기(2200)로부터 입수되는 것일 경우, 상기 원청 업체 관리자 단말기(2200)로부터 입수되는 것인 것이 좋다. 한편, 상기 하청 업체-노무자간 지급 지시 명령 정보가 상기 하청 업체 관리자 단말기(2300)로부터 입수되는 것일 경우, 상기 하청 업체 관리자 단말기(2300)로부터 입수되는 것인 것이 바람직하다.The reservation information for the reservation includes information on payment instruction instruction between the client and the client company, payment instruction instruction information between the source company and the subcontractor, payment instruction instruction information between the source company and the laborer, Information from the
이어, 도 10 내지 도 11을 참조하면서, 노무자에게 노무비의 지급을 확실하게 보장/보증될 수 있도록 하기 위한 상기 실시간 노무비 지급 시스템(1000)의 지급 감시 모듈(1350)의 정보 처리 방법에 대해서 설명한다.Next, with reference to FIGS. 10 to 11, an information processing method of the
도 10에서 예시되어 있듯이, 상기 지급 감시 모듈(1350)은 발주자측 지급 지시 정보 송신(S91)이 있는 경우, 설정 시간 내에 원청 업체측의 노무자에 대한 노무비 지급 지시 정보 송신/하청 업체로의 공사비 지급 지시 정보 송신이 있는가를 확인(S92)하고, 확인 되는 경우 지급 증빙 보고서 발주자측에 송신(S93)하고, 그렇지 않을 경우 발주자측에 미지급 알림 정보 전송(S94)한다. 한편, 도 11에서 예시되어 있듯이, 상기 지급 감시 모듈(1350)은 원청 업체측 지급 지시 정보 송신(S101)이 있는 경우, 설정 시간 내에 하청 업체측의 노무자에 대한 노무비 지급 지시 정보 송신이 있는가를 확인(S102)하고, 확인되는 경우 지급 증빙 보고서 발주자측에 송신(S103)하고, 그렇지 않을 경우 발주자측 또는 원청 업체측에 노무비 미지급 알림 정보 전송(S104)한다.As illustrated in FIG. 10, the
상위 단계(발주자, 원청 업체)에서 공사비나 노무비의 지급이 있더라도, 하위 단계(원청 업체, 하청 업체)에서의 공사비나 노무비의 실질적인 지급 처리가 지연될 수 있으며, 이 경우, 노무자는 노무비를 적시에 지급 받지 못할 위험에 처리하게 된다. 이를 위하여 상기 지급 감시 모듈(1350)은 (J) 발주자측 관리자 단말기(2100)로부터 지급 지시 명령의 입수 후 기 설정된 기간 동안 원청 업체 관리자 단말기(2200) 또는 상기 하청 업체 관리자 단말기(2300)로부터의 지급 지시 명령이 없는 경우, 상기 발자주측 관리자의 가상 공간에 기 설정된 알림 정보를 전송하는 정보 처리를 수행한다. 그리고, 상기 지급 감시 모듈(1350)은 원청 업체측 관리자 단말기로부터 지급 지시 명령의 입수 후 기 설정된 기간 동안 하청 업체 관리자 단말기(2300)로부터의 지급 지시 명령이 없는 경우, 상기 발자주측 관리자 또는 상기 원청 업체의 관리자의 가상 공간에 기 설정된 알림 정보를 전송하는 정보 처리를 수행한다. Even in the case of higher costs (contractor or contractor), the actual payment of labor costs or labor costs at the lower level (contractor, subcontractor) may be delayed. In this case, The risk of not getting paid is handled. To this end, the payment monitoring module 1350 (J) the payment from the subsidiary
상기에서는 발주자-원청 업체-하청 업체와 같은 3개의 주체를 기준으로 본 발명 사상을 설명하였다. 하지만, 실제 공사 현장에서는 복수 개의 원청 업체와 원천 업체 밑에는 n(n은 자연수) 단계의 하청 업체가 있는 경우가 대부분이다. 이와 같이, 하나의 공사에 원청 업체 밑에 1차 하청, 2차 하청, 3차 하청과 같이 다단계 하청 구조가 있을 경우에도 본 발명 사상이 적용됨은 물론일 것이다. 즉, 본 발명의 설명에서 상기 원청 업체와 발주자 사이에서는 적어도 하나 이상의 상위 원청 업체가 존재할 수 있을 것이다. 상기 상위 원청 업체의 관점에서는 상기 원청 업체는 자신의 하청 업체가 되게 될 것이다.In the above, the present invention has been described based on three subjects such as the client, the client, and the subcontractor. However, in actual construction sites, there are many subcontractors and subcontractors with n (n is a natural number) subcontractor. In this way, the present invention will be applied to a case where there is a multi-stage subcontracting structure such as a primary subcontracting, a secondary subcontracting, and a tertiary subcontracting under one contractor. That is, in the description of the present invention, there may be at least one higher quality raw material supplier between the raw material supplier and the purchaser. From the viewpoint of the above-mentioned raw material suppliers, the raw material suppliers will become their own subcontractors.
상기 실시간 노무비 지급 시스템(1000)은 발주자측에서 운영되는 것인 것일 수 있으며, 대형 건설사와 같은 원청 업체가 운영할 수도 있을 것이다. 한편, 상기 발주자 측에서 1개 이상의 공사를 발주한 경우라면, 상기 실시간 노무비 지급 시스템(1000)의 정보 처리는 발주 공사 단위로 처리되는 것이 공사비의 관리 측면에서 좋을 것이다.
The real-time
본 발명은 건설 산업에서 광범위하게 활용될 수 있을 것이다.
The present invention may be widely used in the construction industry.
1000 : 실시간 노무비 지급 시스템
1100 : 기초 정보 등록 모듈
1110 : 업체 정보 등록 모듈
1120 : 노무자 정보 등록 모듈
1121 : 노무자 계좌 등록 모듈
1130 : 공사현장정보등록 모듈
1140 : 기준직종정보등록 모듈
1150 : 공종관리정보등록 모듈
1160 : 기준노무비정보등록 모듈
1200 : 청구 관리 모듈
1210 : 지급 항목별 공사비 정보 입수 모듈
1220 : 청구 승인 처리 모듈
1230 : 계좌 정합성 조회 모듈
1300 : 노무비 지급 관리 모듈
1310 : 교차 검증 모듈
1320 : 지급 승인 처리 모듈
1330 : 지급 지시 명령 처리 모듈
1340 : 지급 지시 처리 모듈
1350 : 지급 감시 모듈
1360 : 보고서 생성 모듈
1370 : 노무비 지급 알림 모듈
1400 : 사용자 관리 모듈
1410 : 발주자 정보 관리 모듈
1420 : 원청 업체 정보 관리 모듈
1430 : 하청 업체 정보 관리 모듈
1440 : 발주자 계좌 관리 모듈
1450 : 원청 업체 계좌 관리 모듈
1460 : 하청 업체 계좌 관리 모듈
1500 : DB부
1510 : 발주자 데이터부
1520 : 원청 업체 데이터부
1530 : 하청 업체 데이터부
1540 : 노무자 데이터부
1600 : 인터페이싱 모듈
1700 : 통계/보고서관리모듈
1710 : 공사별 지급현황 데이터
1720 : 기관별 지급현황 데이터
1730 : 직종별 지급현황 데이터
1740 : 기간별 지급현황 데이터
2100 : 발주자측 관리자 단말기
2200 : 원청 업체 관리자 단말기
2300 : 하청 업체 관리자 단말기
3000 : 금융 서비스 시스템
3100 : 통신 모듈
3200 : 금융 계좌 관리 모듈
3300 : 송금 처리 모듈
5000 : 유무선 네트워크1000: real-time labor payment system
1100: basic information registration module
1110: Business Listing Registration Module
1120: Labor Information Registration Module
1121: Laborer account registration module
1130: Construction site information registration module
1140: Standard job type information registration module
1150: Work type management information registration module
1160: Standard labor information registration module
1200: Billing management module
1210: Cost information acquisition module for each payment item
1220: Billing approval processing module
1230: Account Integrity Lookup Module
1300: Labor payment management module
1310: Cross validation module
1320: Payment Approval Processing Module
1330: Payment instruction command processing module
1340: Payment instruction processing module
1350: Payment monitoring module
1360: Report generation module
1370: Labor Dispatch Notification Module
1400: User management module
1410: Client information management module
1420: Supplier information management module
1430: Contractor information management module
1440: Client Account Management Module
1450: Account management module
1460: Contractor Account Management Module
1500: DB section
1510:
1520: Supplier data section
1530: Subcontractor data section
1540:
1600: Interfacing module
1700: Statistics / Report Management Module
1710: Payment status data by construction
1720: Payment data by institution
1730: Payment Status Data by Occupation
1740: Payment Status Data by Period
2100: Client terminal of the client side
2200: Manager of the original company
2300: Subcontractor manager terminal
3000: Financial Services System
3100: Communication module
3200: financial account management module
3300: Money Transfer Processing Module
5000: wired and wireless network
Claims (15)
(A) 적어도 하나 이상의 원청 업체별로 상기 원청 업체로부터 적어도 하나 이상의 하청 업체에 지급될 하청 지급 항목별 공사비 정보를 입수 받는 단계;
(B) 상기 원청 업체별로 상기 원청 업체의 상위 업체로부터 상기 원청 업체에 지급될 원청 지급 항목별 공사비 정보를 입수 받는 단계;
(C) 상기 원청 지급 항목별 공사비 정보 및 상기 하청 지급 항목별 공사비 정보 중 어느 하나 이상에 포함된 적어도 하나 이상의 노무비에 대한 노무비 지급 청구를 포함하는 공사비 지급 청구에 대한 청구 승인 정보를 입수하는 단계;
(D) 노무비를 포함하는 상기 공사비 지급 청구에 대한 적어도 1회 이상의 지급 승인 정보를 생성하는 단계;
(E) 적어도 하나 이상의 금융 서비스 시스템으로 적어도 1회 이상의 지급 지시 명령 정보를 입수하고, 상기 지급 지시 명령 정보에 기초하여 적어도 1회 이상의 지급 지시 정보를 전송하는 단계; 및
(F) 상기 (D) 단계의 실시 전 또는 상기 (D) 단계의 실시 후 중 어느 하나 이상에서 상기 노무비 정보의 처리 대상이 되는 노무자 계좌에 대한 지급 계좌 조회 처리를 수행하는 단계;를 실시하는 것인 것이며,
상기 원청 지급 항목별 공사비 정보, 상기 하청 지급 항목별 공사비 정보, 상기 지급 지시 명령 정보 또는 상기 지급 지시 정보에는 적어도 1인 이상의 원청 업체 관련 노무자의 계좌 정보 또는 적어도 1인 이상의 하청 업체 관련 노무자의 계좌 정보 및 노무비 정보 중 어느 하나 이상이 포함되어 있는 것인 것이며,
상기 지급 승인 정보는
발주자-원청 업체간 지급 승인 정보,
원청 업체-하청 업체간 지급 승인 정보,
원청 업체-노무자간 지급 승인 정보 및
하청 업체-노무자간 지급 승인 정보 중 어느 하나 이상을 포함하는 것인 것이며,
상기 발주자-원청 업체간 지급 승인 정보에는 상기 원청 업체-하청 업체간 지급 승인 정보, 상기 원청 업체-노무자간 지급 승인 정보 및 상기 하청 업체-노무자간 지급 승인 정보 중 어느 하나 이상이 포함되어 있는 것인 것이며,
상기 원청 업체-하청 업체간 지급 승인 정보에는 상기 하청 업체-노무자간 지급 승인 정보가 포함되어 있는 것인 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.In the information processing method of the real-time labor cost payment system to guarantee the labor cost payment, the real-time labor cost payment system is
(A) receiving construction cost information for each subcontracting company to be paid to at least one or more subcontractors from at least one source company;
(B) receiving the construction cost information for each of the raw material suppliers by the raw material supply item to be supplied to the raw material supplier from the upstream supplier of the raw material supplier;
(C) obtaining billing approval information for a construction cost payment request including a labor cost payment request for at least one labor cost included in at least one of the construction cost information for each originally provided payment item and the construction cost information for each subcontracted payment item;
(D) generating at least one payment approval information for the construction fee payment request including labor costs;
(E) obtaining at least one or more payment instruction order information to at least one financial service system, and transmitting at least one or more payment instruction information based on the payment instruction instruction information; And
(F) performing the payment account inquiry processing for the laborer's account which is the object of processing the labor cost information before any of the step (D) or after the step (D); Is
The cost information by the subsidiary payment item, the cost information by subcontract payment item, the payment instruction order information or the payment instruction information includes account information of at least one contractor-related laborer or account information of at least one contractor-related laborer. And one or more of the labor costs information is included,
The payment approval information
Client - Payment approval information between the client companies,
Information on approval of payment between the contractor and the contractor,
Contractor-to-laborer payment approval information and
Includes any one or more of the subcontractor-approval payment authorization information,
The payment approval information between the client and the client company includes at least one of the payment approval information between the source company and the subcontractor, the payment information between the source company and the laborer, and the payment approval information between the subcontractor and the laborer Lt; / RTI &
Information processing method of the real-time labor costs payment system, characterized in that the payment approval information between the subcontractor-subcontractor includes payment approval information between the subcontractor-laborers.
상기 지급 지시 정보는
발주자-원청 업체간 지급 지시 정보,
원청 업체-하청 업체간 지급 지시 정보,
원청 업체-노무자간 지급 지시 정보 및
하청 업체-노무자간 지급 지시 정보 중 어느 하나 이상을 포함하는 것인 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.The method of claim 1,
The payment instruction information
Client - Payment instruction information between the client companies,
Information on payment instructions between the contractor and the subcontractor,
Information on payment instructions between the contractor and the laborer
Information processing method of the real-time labor costs payment system, characterized in that it comprises any one or more of the payment instruction information between the subcontractor-laborers.
발주자-원청 업체간 지급 승인 정보, 원청 업체-하청 업체간 지급 승인 정보, 원청 업체-노무자간 지급 승인 정보 및 하청 업체-노무자간 지급 승인 정보는 발주자측 관리자 단말로부터 입수되는 것인 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.The method of claim 1,
Payment approval information between the client-owner company, payment approval information between the subcontractor-subcontractor, payment approval information between the subcontractor-worker and subcontractor-approval payment information from the subcontractor-laborer Information processing method of real time labor payment system.
상기 발주자-원청 업체간 지급 승인 정보는 발주자측 관리자 단말기로부터 입수되는 것이며,
상기 원청 업체-하청 업체간 지급 승인 정보 및 상기 원청 업체-노무자간 지급 승인 정보는 상기 원청 업체 관리자 단말기로부터 입수되는 것이며,
상기 하청 업체-노무자간 지급 승인 정보는 상기 하청 업체 관리자 단말기로부터 입수되는 것인 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.The method of claim 1,
The payment approval information between the client and the client is obtained from the client terminal of the client,
The payment approval information between the source company and the subcontractor and the payment information between the source company and the laborer are obtained from the manager terminal of the source company,
The subcontractor-worker payment approval information is obtained from the subcontractor manager terminal information processing method of the real-time labor costs payment system, characterized in that.
(G) (G1) 상기 원청 업체-하청 업체간 지급 승인 정보 및 상기 원청 업체-노무자간 지급 승인 정보 중 어느 하나 이상이 상기 발주자-원청 업체간 지급 승인 정보에 포함되어 있는 것인 지를 확인하는 단계; 및
(G2) 상기 하청 업체-노무자간 지급 승인 정보가 상기 원청 업체-하청 업체간 지급 승인 정보에 포함되어 있는 지를 확인하는 단계; 중 어느 하나 이상의 지급 승인 정보간 교차 검증을 실행하는 단계;를 더 포함하는 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.The method of claim 1,
(G) (G1) a step of confirming whether or not at least one of the payment approval information between the source company and the subcontractor and the payment information between the source company and the laborer is included in the payment approval information between the client and the client ; And
(G2) confirming whether the approval information of the subcontractor-laborer is included in the payment approval information between the source company and the subcontractor; And performing cross-validation between any one or more payment approval information of the real-time labor costs payment system.
원청 업체-하청 업체간 지급 지시 명령 정보 및 원청 업체-노무자간 지급 지시 명령 정보는 상기 (G1) 단계의 실시 후에 처리되는 것인 것이며, 상기 (G1) 단계에서 확인이 실패하는 경우, 상기 원청 업체-하청 업체간 지급 지시 명령 정보 및 원청 업체-노무자간 지급 지시 명령 정보가 처리되지 않는 것인 것이며,
하청 업체-노무자간 지급 지시 명령 정보는 상기 (G2) 단계의 실시 후에 처리되는 것인 것이며, 상기 (G2) 단계에서 확인이 실패하는 경우, 상기 하청 업체-노무자간 지급 지시 명령 정보가 처리되지 않는 것인 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.6. The method of claim 5,
The payment instruction instruction information between the source company and the subcontractor and the payment instruction instruction information between the source company and the laborer are processed after the execution of the step (G1). If the confirmation fails at the step (G1) - Information on payment instruction instruction between subcontractors and information on payment instruction instruction between laborer and laborer is not processed.
Subcontractor-worker payment instruction order information is to be processed after the execution of the step (G2), if the verification fails in the step (G2), the subcontractor-laborer payment instruction order information is not processed Information processing method of the real-time labor costs payment system, characterized in that.
(H) (H1) 발주자-원청 업체간 지급 지시 정보가 상기 발주자-원청 업체간 지급 승인 정보에 포함되어 있는지를 확인하는 단계;
(H2) 원청 업체-하청 업체간 지급 지시 정보가 상기 원청 업체-하청 업체간 지급 승인 정보에 포함되어 있는지를 확인하는 단계;
(H3) 원청 업체-노무자간 지급 지시 정보가 상기 원청 업체-노무자간 지급 승인 정보에 포함되어 있는지를 확인하는 단계;및
(H4) 하청 업체-노무자간 지급 지시 정보가 상기 하청 업체-노무자간 지급 지시 정보에 포함되어 있는지를 확인하는 단계; 중 어느 하나 이상의 지급 지시 정보-지급 승인 정보간 교차 검증을 실행하는 단계;를 더 포함하는 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.6. The method of claim 5,
(H) (H1) checking whether the payment instruction information between the client and the client is included in the payment approval information between the client and the client;
(H2) confirming whether the payment instruction information between the source company and the subcontractor is included in the payment approval information between the source company and the subcontractor;
(H3) confirming whether the payment information between the source company and the laborer is included in the payment approval information between the source company and the laborer; and
(H4) confirming whether the subcontractor-interoffice payout instruction information is included in the subcontractor-interoffice payout instruction information; And performing cross-validation between any one or more of the payment instruction information-payment approval information.
발주자-원청 업체간 지급 지시 명령 정보는 상기 (H1) 단계의 실시 후에 처리되는 것인 것이며, 상기 (H1) 단계에서 확인이 실패하는 경우, 상기 발주자-원청 업체간 지급 지시 명령 정보는 처리되지 않는 것인 것이며,
원청 업체-하청 업체간 지급 지시 정보는 상기 (H2) 단계의 실시 후에 처리되는 것인 것이며, 상기 (H2) 단계에서 확인이 실패하는 경우, 상기 원청 업체-하청 업체간 지급 지시 정보는 처리되지 않는 것인 것이며,
원청 업체-노무자간 지급 지시 명령 정보는 상기 (H3) 단계의 실시 후에 처리되는 것인 것이며, 상기 (H3) 단계에서 확인이 실패하는 경우, 상기 원청 업체-노무자간 지급 지시 명령 정보는 처리되지 않는 것인 것이며,
하청 업체-노무자간 지급 지시 명령 정보는 상기 (H4) 단계의 실시 후에 처리되는 것인 것이며, 상기 (H4) 단계에서 확인이 실패하는 경우, 상기 하청 업체-노무자간 지급 지시 명령 정보는 처리되지 않는 것인 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.8. The method of claim 7,
The payment instruction command information between the client and the client company is processed after the execution of the step (H1), and if the confirmation fails in the step (H1), the payment instruction command information between the client and the client is not processed ≪ / RTI >
The payment instruction information between the source company and the subcontractor is processed after the execution of the step (H2), and if the confirmation fails in the step (H2), the payment instruction information between the source company and the subcontractor is not processed ≪ / RTI >
If the verification fails in the step (H3), the dispensing instruction command information between the source company and the laborer is processed after the execution of the step (H3) ≪ / RTI >
Subcontractor-worker payment instruction order information is to be processed after the execution of the step (H4), if the verification fails in the step (H4), the subcontractor-laborer payment instruction order information is not processed Information processing method of the real-time labor costs payment system, characterized in that.
(I) 상기 지급 지시 정보의 전송 또는 상기 지급 지시 명령 정보의 생성에 대응되어 지급 증빙 정보를 생성하는 단계;를 더 포함하는 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.The method of claim 1,
(I) generating proof of payment information corresponding to the transmission of the payment instruction information or the generation of the payment instruction command information; information processing method of the real-time labor costs payment system further comprising.
상기 원청 업체와 발주자 사이에서는 적어도 하나 이상의 상위 원청 업체가 존재하는 것인 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.The method of claim 1,
Information processing method of the real-time labor costs payment system, characterized in that at least one or more top primary companies exist between the original agency and the client.
상기 실시간 노무비 지급 시스템은 발주자측에서 운영되는 것인 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.The method of claim 1,
The real-time labor cost payment system is an information processing method of a real-time labor cost payment system, characterized in that operated on the client side.
상기 원청 지급 항목별 공사비 정보 및 상기 하청 지급 항목별 공사비 정보에는 기 설정된 지급 단위별를 기준으로 금회 지급 청구 명세 정보 및 전회 지급 내역 증빙 정보 중 어느 하나 이상이 포함되어 있는 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.The method of claim 1,
The real-time labor cost payment system, characterized in that the construction cost information by the subsidiary payment item and the construction cost information by the subcontracting payment item includes any one or more of the current payment claim specification information and the previous payment history evidence information based on the predetermined payment unit How information is processed.
(J) 발주자측 관리자 단말기로부터 지급 지시 명령의 입수 후 기 설정된 기간 동안 원청 업체 관리자 단말기 또는 상기 하청 업체 관리자 단말기로부터의 지급 지시 명령이 없는 경우, 발주자측 관리자의 가상 공간에 기 설정된 알림 정보를 전송하는 단계;를 더 포함하는 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.The method according to claim 1,
(J) If there is no payment instruction from the original administration company administrator terminal or the subcontractor administrator terminal for a preset period of time after obtaining the payment instruction order from the client side manager terminal, the preset notification information is transmitted to the virtual space of the client side manager. The information processing method of the real-time labor costs payment system characterized in that it further comprises.
상기 실시간 노무비 지급 시스템의 정보 처리는 발주 공사 단위로 처리되는 것인 것을 특징으로 하는 실시간 노무비 지급 시스템의 정보 처리 방법.The method of claim 1,
Information processing method of the real-time labor costs payment system characterized in that the processing of the ordered construction unit.
적어도 하나 이상의 원청 업체별로 상기 원청 업체로부터 적어도 하나 이상의 하청 업체에 지급될 하청 지급 항목별 공사비 정보를 입수 받고, 상기 원청 업체별로 상기 원청 업체의 상위 업체로부터 상기 원청 업체에 지급될 원청 지급 항목별 공사비 정보를 입수 받으며, 상기 원청 지급 항목별 공사비 정보 및 상기 하청 지급 항목별 공사비 정보 중 어느 하나 이상에 포함된 적어도 하나 이상의 노무비에 대한 노무비 지급 청구를 포함하는 공사비 지급 청구에 대한 청구 승인 정보를 입수하는 청구 관리 모듈; 및
노무비를 포함하는 상기 공사비 지급 청구에 대한 적어도 1회 이상의 지급 승인 정보를 생성하고, 적어도 하나 이상의 금융 서비스 시스템으로 적어도 1회 이상의 지급 지시 명령 정보를 입수하고, 상기 지급 지시 명령 정보에 기초하여 적어도 1회 이상의 지급 지시 정보를 전송하는 노무비 지급 관리 모듈;을 포함하며,
상기 실시간 노무비 지급 시스템은 상기 노무비 정보의 처리 대상이 되는 노무자 계좌에 대한 지급 계좌 조회 처리를 수행하는 것인 것이며,
상기 원청 지급 항목별 공사비 정보, 상기 하청 지급 항목별 공사비 정보, 상기 지급 지시 명령 정보 또는 상기 지급 지시 정보에는 적어도 1인 이상의 원청 업체 관련 노무자의 계좌 정보 또는 적어도 1인 이상의 하청 업체 관련 노무자의 계좌 정보 및 노무비 정보 중 어느 하나 이상이 포함되어 있는 것인 것이며,
상기 지급 승인 정보는
발주자-원청 업체간 지급 승인 정보,
원청 업체-하청 업체간 지급 승인 정보,
원청 업체-노무자간 지급 승인 정보 및
하청 업체-노무자간 지급 승인 정보 중 어느 하나 이상을 포함하는 것인 것이며,
상기 발주자-원청 업체간 지급 승인 정보에는 상기 원청 업체-하청 업체간 지급 승인 정보, 상기 원청 업체-노무자간 지급 승인 정보 및 상기 하청 업체-노무자간 지급 승인 정보 중 어느 하나 이상이 포함되어 있는 것인 것이며,
상기 원청 업체-하청 업체간 지급 승인 정보에는 상기 하청 업체-노무자간 지급 승인 정보가 포함되어 있는 것인 것을 특징으로 하는 실시간 노무비 지급 시스템.
In the real-time labor cost payment system to guarantee the payment of labor costs, the real-time labor costs payment system is
Receive construction cost information by subcontractor payment item to be paid to at least one subcontractor from at least one subcontractor by at least one subcontractor; Obtain information and obtain billing approval information for a construction cost payment claim including labor cost payment claim for at least one labor cost included in any one or more of the construction cost information by subsidiary payment item and the construction cost information by subcontract payment item. A billing management module; And
Generate at least one or more payment approval information for the construction cost payment request including labor cost, obtain at least one or more payment instruction order information from at least one financial service system, and based on the payment instruction order information, at least one Labor management payment management module for transmitting payment instruction information more than times;
The real-time labor cost payment system is to perform a payment account inquiry processing for the laborer account that is the processing target of the labor cost information,
The cost information by the subsidiary payment item, the cost information by subcontract payment item, the payment instruction order information or the payment instruction information includes account information of at least one contractor-related laborer or account information of at least one contractor-related laborer. And one or more of the labor costs information is included,
The payment approval information
Client - Payment approval information between the client companies,
Information on approval of payment between the contractor and the contractor,
Contractor-to-laborer payment approval information and
Includes any one or more of the subcontractor-approval payment authorization information,
The payment approval information between the client and the client company includes at least one of the payment approval information between the source company and the subcontractor, the payment information between the source company and the laborer, and the payment approval information between the subcontractor and the laborer Lt; / RTI &
Real-time labor costs payment system, characterized in that the subcontractor-subcontractor payment approval information includes the subcontractor-worker payment approval information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120072215A KR101219079B1 (en) | 2012-07-03 | 2012-07-03 | System and method on labor cost treatment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120072215A KR101219079B1 (en) | 2012-07-03 | 2012-07-03 | System and method on labor cost treatment |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101219079B1 true KR101219079B1 (en) | 2013-01-17 |
Family
ID=47841274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120072215A KR101219079B1 (en) | 2012-07-03 | 2012-07-03 | System and method on labor cost treatment |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101219079B1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101520167B1 (en) * | 2013-04-25 | 2015-05-13 | 주식회사 우리은행 | Subcontract management system and performing mehtod thereof |
CN104850940A (en) * | 2015-04-29 | 2015-08-19 | 国网辽宁省电力有限公司鞍山供电公司 | Completion settlement making method and completion settlement making system based on project whole-process management |
KR102197294B1 (en) * | 2020-05-08 | 2020-12-31 | 강도혁 | Real-time construction payment integrated management system for simplify construction regulations |
CN112348487A (en) * | 2020-11-30 | 2021-02-09 | 深圳淘力网络科技有限公司 | Intelligent outsourcing system based on block chain and using method thereof |
KR20230099712A (en) | 2021-12-27 | 2023-07-05 | 주식회사 한국결제통신 | Method on Labor Cost Treatment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005141712A (en) | 2003-11-10 | 2005-06-02 | Techno Net:Kk | Method of construction cost payment agency business for letting cost payment agency keep construction cost of contract construction from business owner and for letting cost payment agency pay kept construction cost to construction-related company in place of main contractor |
JP2009146330A (en) | 2007-12-18 | 2009-07-02 | Ace Home Co Ltd | Escrow system for building construction cost |
KR101039233B1 (en) | 2011-03-16 | 2011-06-07 | 엠씨지컨설팅(주) | Management system for confirmed in transaction payment and commitment, business dealing of business-to-business |
KR101134106B1 (en) | 2010-07-21 | 2012-04-20 | 이기상 | Value Engineering System and Method on the Same |
-
2012
- 2012-07-03 KR KR1020120072215A patent/KR101219079B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005141712A (en) | 2003-11-10 | 2005-06-02 | Techno Net:Kk | Method of construction cost payment agency business for letting cost payment agency keep construction cost of contract construction from business owner and for letting cost payment agency pay kept construction cost to construction-related company in place of main contractor |
JP2009146330A (en) | 2007-12-18 | 2009-07-02 | Ace Home Co Ltd | Escrow system for building construction cost |
KR101134106B1 (en) | 2010-07-21 | 2012-04-20 | 이기상 | Value Engineering System and Method on the Same |
KR101039233B1 (en) | 2011-03-16 | 2011-06-07 | 엠씨지컨설팅(주) | Management system for confirmed in transaction payment and commitment, business dealing of business-to-business |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101520167B1 (en) * | 2013-04-25 | 2015-05-13 | 주식회사 우리은행 | Subcontract management system and performing mehtod thereof |
CN104850940A (en) * | 2015-04-29 | 2015-08-19 | 国网辽宁省电力有限公司鞍山供电公司 | Completion settlement making method and completion settlement making system based on project whole-process management |
CN104850940B (en) * | 2015-04-29 | 2018-08-31 | 国网辽宁省电力有限公司鞍山供电公司 | Budget needed for the completion of projects preparation method and system based on engineering Whole Course Management |
KR102197294B1 (en) * | 2020-05-08 | 2020-12-31 | 강도혁 | Real-time construction payment integrated management system for simplify construction regulations |
CN112348487A (en) * | 2020-11-30 | 2021-02-09 | 深圳淘力网络科技有限公司 | Intelligent outsourcing system based on block chain and using method thereof |
KR20230099712A (en) | 2021-12-27 | 2023-07-05 | 주식회사 한국결제통신 | Method on Labor Cost Treatment |
KR102680446B1 (en) | 2021-12-27 | 2024-07-03 | 주식회사 한국결제통신 | Method on Labor Cost Treatment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6007303B2 (en) | Management apparatus and management method | |
CN101711396A (en) | Construction payment management system and method with document exchange features | |
KR101219079B1 (en) | System and method on labor cost treatment | |
KR101405356B1 (en) | System and Method on Labor Cost Treatment | |
KR20210090146A (en) | Direct payment monitoring system and method without withdrawl limit account | |
KR101421341B1 (en) | Account transfer system for real-time cash management | |
KR20150111684A (en) | System and Method for payment monitoring service of labor cost using location information | |
KR101984620B1 (en) | Electronic Payment System | |
KR20150111685A (en) | System and Method for payment monitoring and evaluating service | |
KR20220086140A (en) | Heavy Equipment Lease Management System | |
KR101039233B1 (en) | Management system for confirmed in transaction payment and commitment, business dealing of business-to-business | |
JP6792274B1 (en) | Waste disposal settlement information management system | |
KR101493349B1 (en) | Customs and logistics fund management system | |
KR101520167B1 (en) | Subcontract management system and performing mehtod thereof | |
KR20150060375A (en) | Method and server for managing automatic payment | |
KR102342083B1 (en) | method for mediating payment for freelancer's service pay | |
KR102232545B1 (en) | Method and system of advanced payment of construction cost | |
KR100769736B1 (en) | The integrated management method which uses the management unit of research and development equipment | |
KR20050000643A (en) | Electronic bulletin and settlement service system | |
KR101779921B1 (en) | Method, company server and sns server for providing payment service using sns | |
JP6224195B1 (en) | Payment means switching system, method, and program | |
JP2008123286A (en) | Settlement process system and method | |
KR20010000428A (en) | Apparatus and method for billing and payment using internet | |
KR20230013440A (en) | Payment method and system for perfoming the same | |
KR101482603B1 (en) | System and method for financial services |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20151103 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20161213 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20181031 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20191031 Year of fee payment: 8 |