KR101215595B1 - Management system for planed outage and method thereof - Google Patents

Management system for planed outage and method thereof Download PDF

Info

Publication number
KR101215595B1
KR101215595B1 KR1020110063165A KR20110063165A KR101215595B1 KR 101215595 B1 KR101215595 B1 KR 101215595B1 KR 1020110063165 A KR1020110063165 A KR 1020110063165A KR 20110063165 A KR20110063165 A KR 20110063165A KR 101215595 B1 KR101215595 B1 KR 101215595B1
Authority
KR
South Korea
Prior art keywords
work
section
load
line
distribution
Prior art date
Application number
KR1020110063165A
Other languages
Korean (ko)
Inventor
신정훈
신창훈
하복남
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR1020110063165A priority Critical patent/KR101215595B1/en
Application granted granted Critical
Publication of KR101215595B1 publication Critical patent/KR101215595B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/007Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • H02J3/0073Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources for providing alternative feeding paths between load and source when the main path fails, e.g. transformers, busbars
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • H02J3/144Demand-response operation of the power transmission or distribution network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Human Computer Interaction (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PURPOSE: A distribution line dead-line work management and a method thereof are provided to secure the safety of a worker by supporting an operation to prevent a human error in a manual operation. CONSTITUTION: A dead-line work reviewing and managing server(100) writes a work order by obtaining various information from a distribution automation system(200). The distribution automation system includes a transformation operating server(210), a distribution automation server(230), a transformation operating information DB(220), and a distribution system connection information DB(240). The distribution automation sever monitors a power flow and a current state of a distribution network by collecting power information through a distribution automation communication network(300). A distribution automation terminal device(450) and a distribution line switch(440) are installed in a distribution line(400). A user terminal(500) provides interface for monitoring and controlling a system to a user. [Reference numerals] (100) Dead-line work reviewing and managing server; (210) Transformation operating server; (220) Transformation operating information DB; (230) Distribution automation server; (240) Distribution system connection information DB; (250) Section load DB; (300) Distribution automation communication network; (410) Substation breaker; (420) Substation terminal device; (430) Distribution line breaker; (440) Distribution line switch; (450) Distribution automation terminal device; (500) User terminal

Description

배전선로 휴전작업 관리시스템 및 방법{Management System for Planed Outage and Method thereof}Management System and Planned Outage and Method of Distribution Line

본 발명은 단선도 기반 배전선로 휴전작업 관리시스템 및 방법에 관한 것이다.
The present invention relates to a system and method for managing interruption work based on a disconnection diagram.

배전계통은 전력설비의 신?증설, 노후설비 교체 및 이설 등의 작업이 상시 발생하게 된다. 따라서, 고객에의 전력공급에 차질이 없도록 하기 위해 가능한 무정전 작업을 수행하는 것이 바람직하다. 하지만, 부득이하게 휴전작업이 요구되는 경우도 발생하게 된다. 이러한 휴전작업에는 자동화 기기뿐만 아니라 수동기기를 활용한 휴전구간의 분리와 건전구간의 부하 절체와 관련된 스위치 조작이 필요하게 된다.The distribution system always takes place such as new and expanded power facilities, replacement of old equipment, and relocation. Therefore, it is desirable to perform the uninterruptible work as much as possible in order to prevent disruption of power supply to the customer. However, there is an inevitable occurrence of truce work. This cease-fire operation requires the switch operation related to the separation of the armistice section using manual equipment as well as the automatic equipment and the load switching of the healthy section.

계획 휴전 또는 긴급 휴전 여부에 관계없이, 배전계통 휴전작업을 실시하기 위해서는 사전에 배전공사감독 및 배전계통 담당자와 함께 논의 및 검토할 필요가 있다. 이를 통해, 휴전 구간 이외의 건전 구간에 대한 부하절체와 휴전 구간의 격리를 위한 스위치 조작 절차를 검토하여야 하며, 이때, 연계선로 및 연계 변전소의 부하 현황, 조작 스위치 및 차단기의 특성, 재폐로 방지 설정, 선로간 및 변전소간 연계점 투입에 따른 전력조류 검토 등 다양한 관점에서의 검토 작업이 선행되어야 한다.Regardless of whether there is a planned ceasefire or an emergency ceasefire, it is necessary to discuss and review with the distribution supervision and distribution system staff in advance to carry out the distribution system cease-fire work. Through this, the switch operation procedure for load transfer and isolation of armistice sections for non-armistice sections should be reviewed.In this case, the load status of link lines and associated substations, characteristics of operation switches and breakers, and prevention of reclosing In addition, the review work from various points of view, such as the review of electric currents in connection with the connection point between lines and substations, should be preceded.

휴전작업의 사전 검토시에, 배전공사감독은 배전자동화 시스템에서 작업선로는 물론 건전 구간 부하절체 가능선로의 변전소의 인출 및 자동화 개폐기 부하전류를 활용하여 휴전구간을 격리하고 건전 구간을 절체하는 최적의 부하절체 방안을 검토한다. 또한, 배전공사감독은 도출된 상기 부하절체 방안을 이용하여 작업지시서를 작성하고, 작업시행일 전에 미리 "배전센터 기기조작 관리시스템"에 입력하여 배전센터에 통보한다. 이후, 배전센터의 배전계통 담당자는 입력된 작업지시서의 적합성 여부를 검토한다.During the preliminary review of the cease-fire operation, the distribution inspection supervision utilizes not only work lines but also substations of the load-transferable substations in the automatic distribution system and the use of automatic switchgear load current to isolate the armistice section and transfer the whole section. Review the load transfer plan. In addition, the power distribution construction supervisor prepares a work instruction by using the derived load transfer method, and inputs it to the "distribution center equipment operation management system" before the work execution date to notify the power distribution center. After that, the distribution system manager of the distribution center examines the suitability of the entered work orders.

한편, 배전선로 휴전작업의 사전검토는 자동화 및 수동개폐기 구간부하, 계통 연결정보 및 변전소 운전정보 등 작업예정시점의 계통정보를 예측하여 이루어진다. 특히, 구간부하의 경우 계절별, 시간대별로 큰 차이가 발생하므로, 잘못된 작업예정시점을 선택하게 되면 부하절체 방안에 문제가 발생할 수 있다.Meanwhile, the preliminary review of the distribution line cease-fire work is performed by predicting the system information at the scheduled time of operation, such as the automatic load and the automatic switch section load, the system connection information and the substation operation information. In particular, in the case of the section load, a large difference occurs according to seasons and time zones, and selecting an incorrect work schedule point may cause a problem in the load switching method.

또한, 수동개폐기 단위로 부하절체 방안이 도출되어야 하는 휴전작업에 있어서 수동개폐기 구간부하 산정방법이 대략적으로 이루어지고 있는 부분도 조작 신뢰도를 저해할 수 있는 요소로 작용한다.In addition, the part where the manual switchgear section load estimation method is made roughly in the cease-fire work in which the load switching method should be derived in the manual switchgear unit also acts as a factor that may impair the operation reliability.

상기와 같이, 종래의 휴전작업 사전검토는 배전공사감독 및 배전개통 담당자가 일일이 수작업으로 처리하게 되므로, 부주의 또는 실수에 의해 불필요한 정전의 발생 또는 작업자의 안전에 치명적인 사고를 유발할 가능성이 높고, 동일한 검토 기준에 따라 사전검토가 이루어지지 않기 때문에 업무의 효율이 저하된다.As described above, the prior review of the cease-fire work is manually handled by the distribution supervision and distribution distribution personnel, so it is highly likely to cause unnecessary power outages or accidents that are fatal to the safety of workers due to carelessness or mistakes. Work efficiency is reduced because prior review is not performed according to the standard.

따라서, 휴전구간 지정에 따른 최적화된 부하절체 방법을 결정하고 사전에 이를 시뮬레이션을 할 수 있는 시스템이 절실히 요구되고 있다.
Therefore, there is an urgent need for a system capable of determining an optimized load transfer method according to the designation of an armistice section and simulating it in advance.

본 발명은 부하절체 기준, 계통구성 제약 조건, 절체 우선순위 등을 만족하는 작업구간의 격리와 건전구간의 부하절체를 포함하는 최적화된 일련의 조작 솔루션을 결정하고, 상기 조작 솔루션을 이용하여 사전에 시뮬레이션할 수 있는 배전선로 휴전작업 관리시스템 및 방법을 제공한다.The present invention determines an optimized series of operating solutions including isolation of working sections that meet load transfer criteria, system configuration constraints, transfer priorities, and transfer of loads in the health zone, and in advance using the operating solutions. Provides a simulation system of power distribution line operation and control system.

또한, 기존의 수작업 방식 대신 시스템화된 운전 지원을 통해 인적 오류를 최소화하고 불필요한 정전을 예방하며 작업자의 안전을 확보할 수 있는 배전선로 휴전작업 검토?관리시스템 및 방법을 제공한다.
In addition, it provides a system and method for reviewing and managing cease-fire operations on distribution lines that can minimize human error, prevent unnecessary power outages, and ensure worker safety through systemized operation support instead of the existing manual methods.

상기한 본 발명의 목적을 달성하기 위한 본 발명의 제 1측면에 따른 배전선로 휴전작업 검토관리 방법은, 계절별, 요일별, 주야간별, 기상상황별 및 시간별 과거부하 통계자료 중 하나 이상에 기초하여 작업예정일시의 구간부하를 예측하는 단계, 상기 작업예정일시의 구간부하를 이용하여 수동개폐기의 구간부하를 계산하는 단계, 상기 수동개폐기의 구간부하를 기초로 휴전작업구간을 설정하는 단계, 상기 휴전작업구간의 백업선로를 설정하는 단계, 상기 휴전작업구간에 대한 작업절차를 결정하는 단계, 상기 결정된 작업절차를 이용하여 시뮬레이션을 수행하는 단계 및 상기 시뮬레이션 결과를 반영하여 작업지시서를 생성하는 단계를 포함한다.Distribution line interruption work review management method according to the first aspect of the present invention for achieving the object of the present invention, the work based on one or more of the seasonal, weekday, day and night, weather conditions and hourly past load statistical data Estimating the section load of the scheduled date and time, calculating the section load of the manual switchgear using the section load of the scheduled date and time, setting an armistice work section based on the section load of the manual switchgear, the armistice work Setting a backup line of a section, determining a work procedure for the armistice work section, performing a simulation by using the determined work procedure, and generating a work order reflecting the simulation result; .

여기서, 상기 작업예정일시의 구간부하를 예측하는 단계는, 상기 하나 이상의 과거부하 통계자료에 대하여 할증률을 적용하는 단계를 더 포함할 수 있다.Here, the step of predicting the interval load of the scheduled work schedule may further include applying a premium rate to the one or more past load statistics.

여기서, 상기 수동개폐기 구간부하를 계산하는 단계는 상기 작업예정일시의 구간부하, 구간 긍장 및 구간 변압기 용량 정보를 이용하여 상기 수동개폐기 구간부하를 계산하는 단계일 수 있다.Here, the step of calculating the manual switchgear section load may be a step of calculating the manual switchgear section load by using the section load, section positive and section transformer capacity information of the scheduled working time.

여기서, 상기 휴전작업구간을 설정하는 단계는 상기 배전선로에서 상기 수동개폐기가 포함된 최소 구간으로 상기 휴전작업구간을 설정하는 단계일 수 있다.The step of setting the armistice work section may be a step of setting the armistice work section to a minimum section including the manual switchgear in the distribution line.

여기서, 상기 백업선로를 설정하는 단계는 내부루프, 연계선로 및 건전부하를 절체한 연계선로 중 하나 이상을 이용하여 상기 백업선로를 탐색하여 선택하는 단계일 수 있다.Here, the setting of the backup line may be a step of searching for and selecting the backup line using at least one of an internal loop, a connection line, and a connection line in which sound load is transferred.

여기서, 상기 작업절차를 결정하는 단계는 조작횟수의 최소화, 부하평준화 및 건전부하절체 최소화 중 어느 하나에 가중치를 더하여 작업절차를 결정하는 단계일 수 있다.The determining of the work procedure may include determining a work procedure by adding a weight to any one of minimizing the number of manipulations, load leveling, and minimizing sound load switching.

여기서, 상기 작업절차를 결정하는 단계는 상기 결정된 작업절차의 수행 실패시에 조작을 수동으로 변경하는 단계를 더 포함할 수 있다.The determining of the work procedure may further include manually changing an operation when the determined work procedure fails to be performed.

여기서, 상기 시뮬레이션을 수행하는 단계는 상기 휴전작업구간에 대해 상기 결정된 작업 절차에 따라 휴전작업을 시뮬레이션하는 단계일 수 있다.
Here, the performing of the simulation may be a step of simulating the ceasefire work according to the determined work procedure for the ceasefire work zone.

또한, 본 발명의 제 2 측면에 따른 배전선로 휴전작업 검토관리를 수행하는 휴전작업 검토관리서버는, 통계자료에 기초하여 작업예정일시의 구간부하를 예측하여 수동개폐기의 구간부하를 연산하는 구간부하 연산부, 상기 수동개폐기의 구간부하를 기초로 휴전작업구간을 설정하는 휴전작업구간 설정부, 상기 휴전작업구간에 대한 백업선로를 결정하는 백업선로 설정부, 상기 휴전작업구간에 대한 작업절차를 결정하는 작업절차 설정부, 상기 결정된 작업절차에 따라 시뮬레이션을 수행하는 시뮬레이션 수행부 및 상기 시뮬레이션 결과를 반영하여 작업지시서를 생성하는 작업지시서 생성부를 포함할 수 있다.In addition, the armistice work review management server for performing the distribution line cease-fire review management according to the second aspect of the present invention, the section load for calculating the section load of the manual switchgear by predicting the section load of the scheduled work based on the statistical data An operation unit, an armistice work section setting unit for setting an armistice work section based on the section load of the manual switchgear, a backup line setting unit for determining a backup line for the armistice work section, and a work procedure for the armistice work section It may include a work procedure setting unit, a simulation execution unit for performing a simulation according to the determined work procedure, and a work order generation unit for generating a work order by reflecting the simulation results.

여기서, 상기 구간부하 연산부는 계절별, 요일별, 주야간별, 기상상황별 및 시간별 과거부하 통계자료 중 하나 이상에 기초하여 작업예정일시의 구간부하를 예측할 수 있다.Here, the section load calculation unit may predict the section load at the scheduled working time based on at least one of seasonal, day of the week, day and night, weather conditions, and hourly past load statistical data.

여기서, 상기 구간부하 연산부는 상기 하나 이상의 과거부하 통계자료에 대하여 할증률을 적용하여 작업예정일시의 구간부하를 예측할 수 있다.Here, the section load calculation unit may predict the section load at the scheduled working time by applying a premium to the at least one past load statistical data.

여기서, 상기 구간부하 연산부는 상기 작업예정일시의 구간부하, 구간 긍장 및 구간 변압기 용량 정보를 이용하여 상기 수동개폐기 구간부하를 계산할 수 있다.Here, the section load calculator may calculate the section load of the manual switchgear by using section load, section affirmation, and section transformer capacity information of the scheduled work date and time.

여기서, 상기 휴전작업구간 설정부는 상기 배전선로에서 상기 수동개폐기가 포함된 최소 구간으로 상기 휴전작업구간을 설정할 수 있다.Here, the cease-fire work section setting unit may set the cease-fire work section to the minimum section including the manual switch in the distribution line.

여기서, 상기 백업선로 설정부는 내부르프, 연계선로 및 건전부하를 절체한 연계선로 중 하나 이상을 이용하여 상기 백업선로를 설정할 수 있다.Here, the backup line setting unit may set the backup line by using at least one of an internal ruff, a link line, and a link line in which sound load is transferred.

여기서, 상기 작업절차 설정부는 조작횟수의 최소화, 부하평준화 및 건전부하절체 최소화 중 어느 하나에 가중치를 더하여 작업절차를 결정할 수 있다.
Here, the work procedure setting unit may determine the work procedure by adding a weight to any one of minimizing the number of manipulations, load leveling, and minimizing healthy load switching.

본 발명의 실시예의 의하면, 단선도 기반 배전선로의 휴전작업에서 부하절체 기준, 계통구성 제약 조건, 절체 우선순위 등을 만족하는 작업구간의 격리와 건전구간의 부하절체를 포함하는 최적화된 일련의 조작 솔루션을 결정하고, 상기 조작 솔루션을 이용하여 사전에 시뮬레이션 할 수 있다.According to an embodiment of the present invention, an optimized series of operations including isolation of work zones and load transfer of healthy zones that satisfy load transfer criteria, system configuration constraints, transfer priorities, etc. The solution can be determined and simulated in advance using the manipulation solution.

또한, 본 발명의 실시예에 의하면, 시스템적 운전지원을 통해 종래의 수작업 방식에서 발생할 수 있는 인적 오류를 방지함으로써 불필요한 정전을 예방하고 작업 안전을 확보하며, 일원화된 검토기준을 확립하여 배전휴전계획의 업무 효율성을 향상시키고 업무 소요 시간을 단축시킬 수 있다.
In addition, according to an embodiment of the present invention, through the system operation support to prevent human errors that can occur in the conventional manual method to prevent unnecessary power outages, to ensure the safety of work, to establish a unified review criteria for power distribution interruption plan Improve your work efficiency and reduce your turnaround time.

도 1은 일반적인 배전망의 개요도이다.
도 2는 본 발명의 일 실시예에 따른 단선도 기반의 배전선로 휴전작업 검토시스템의 구조도이다.
도 3은 본 발명의 일 실시예에 따른 휴전작업 검토관리서버의 세부 구성도이다.
도 4는 본 발명의 일 실시예에 따른 배전선로 휴전작업 검토관리방법의 흐름도이다.
도 5는 본 발명의 일 실시예에 따른 작업예정일시의 구간부하를 예측하는 흐름도이다.
도 6은 본 발명의 일 실시예에 따른 수동개폐기 구간부하 산정 방법을 설명하기 위한 도면이다.
도 7은 본 발명의 일 실시예에 따른 단선도에서 배전선로 휴전작업구간을 설정하기 위한 실시도이다.
도 8은 본 발명의 일 실시예에 따른 단선도에서 휴전작업구간 백업선로 의 선택 방법을 설명하기 위한 실시도이다.
도 9는 본 발명의 일 실시예에 따른 휴전작업구간에 대한 작업절차를 계산하는 흐름도이다.
도 10은 본 발명의 일 실시예에 따른 휴전작업구간에 대한 작업절차를 수행하는 흐름도이다.
도 11은 본 발명의 일 실시예에 따른 휴전작업구간에 대한 작업절차를 수행하는 실시도이다.
도 12는 본 발명의 일 실시예에 따른 휴전작업구간에 대한 작업절차의 수행 결과를 나타내는 실시도이다.
1 is a schematic diagram of a general distribution network.
2 is a structural diagram of a system for reviewing a truce work of a distribution line based on a disconnection diagram according to an embodiment of the present invention.
Figure 3 is a detailed configuration of the truce work review management server according to an embodiment of the present invention.
4 is a flowchart of a distribution line cease-fire review management method according to an embodiment of the present invention.
5 is a flow chart for predicting the interval load of the scheduled work schedule according to an embodiment of the present invention.
6 is a view for explaining a method for calculating the manual load switch interval load according to an embodiment of the present invention.
7 is an exemplary view for setting a distribution line cease-fire operation section in a disconnected diagram according to an embodiment of the present invention.
8 is a diagram illustrating a method of selecting a backup line of a truce work zone in a disconnected diagram according to an embodiment of the present invention.
9 is a flowchart illustrating a work procedure for an armistice work zone according to an embodiment of the present invention.
10 is a flowchart for performing a work procedure for a ceasefire work zone according to an embodiment of the present invention.
11 is a view for performing a work procedure for the armistice work section according to an embodiment of the present invention.
12 is an exemplary view showing a result of performing a work procedure for an armistice work section according to an embodiment of the present invention.

본 발명은 다양한 변경을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 이를 상세한 설명을 통해 상세히 설명하고자 한다. 그러나, 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.The present invention may be variously modified and have various embodiments, and specific embodiments will be illustrated in the drawings and described in detail with reference to the accompanying drawings. It should be understood, however, that the invention is not intended to be limited to the particular embodiments, but includes all modifications, equivalents, and alternatives falling within the spirit and scope of the invention.

본 발명을 설명함에 있어서, 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명을 생략한다. 또한, 본 명세서의 설명 과정에서 이용되는 숫자(예를 들어, 제1, 제2 등)는 하나의 구성요소를 다른 구성요소와 구분하기 위한 식별기호에 불과하다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention will be described in detail with reference to the accompanying drawings. In addition, numerals (e.g., first, second, etc.) used in the description of the present invention are merely an identifier for distinguishing one component from another.

또한, 본 명세서에서, 일 구성요소가 다른 구성요소와 "연결된다" 거나 "접속된다" 등으로 언급된 때에는, 상기 일 구성요소가 상기 다른 구성요소와 직접 연결되거나 또는 직접 접속될 수도 있지만, 특별히 반대되는 기재가 존재하지 않는 이상, 중간에 또 다른 구성요소를 매개하여 연결되거나 또는 접속될 수도 있다고 이해되어야 할 것이다.
Also, in this specification, when an element is referred to as being "connected" or "connected" with another element, the element may be directly connected or directly connected to the other element, It should be understood that, unless an opposite description is present, it may be connected or connected via another element in the middle.

이하, 첨부된 도면들을 참조하여 본 발명을 상세히 설명하기로 한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 일반적인 배전망의 개요도이다. 배전망(400)은 변전소의 변전소 차단기(410)와 연결되며 배전선로용 차단기(430), 배전선로용 개폐기(440) 및 배전선로용 단말장치(450)를 포함할 수 있다. 한편, 변전소에는 변전소 단말장치(420)를 포함할 수 있다. 각각의 장치들은 자동 또는 수동으로 조작될 수 있으며, 선로 중에 분기되어 각기 다른 연계선로로 연결될 수 있다.
1 is a schematic diagram of a general distribution network. The distribution network 400 is connected to the substation breaker 410 of the substation and may include a circuit breaker 430 for a distribution line, a switch 440 for a distribution line, and a terminal device 450 for a distribution line. Meanwhile, the substation may include a substation terminal device 420. Each device can be operated automatically or manually and can be branched off the track and connected to different link lines.

도 2는 본 발명의 일 실시예에 따른 단선도 기반의 배전선로 휴전작업 검토시스템의 구조도이다.2 is a structural diagram of a system for reviewing a truce work of a distribution line based on a disconnection diagram according to an embodiment of the present invention.

도 2에 도시된 바와 같이, 배전선로 휴전작업 검토시스템은 휴전작업 검토관리서버(100), 외부의 배전자동화 시스템(200), 배전자동화 통신망(300) 및 배전선로(400)를 포함한다. 또한, 휴전작업 검토관리서버(100)에 연결되어 사용자에게 시스템 감시 및 제어를 위한 인터페이스를 제공하는 각종 사용자 단말(500)을 포함할 수 있다.As shown in FIG. 2, the distribution line cease-fire work review system includes an armistice work review management server 100, an external distribution automation system 200, a distribution automation communication network 300, and a distribution line 400. In addition, it may include a variety of user terminal 500 is connected to the ceasefire task review management server 100 to provide a user interface for system monitoring and control.

휴전작업 검토관리서버(100)는 배전자동화 시스템(200)으로부터 필요한 각종 정보를 취득하여 휴전작업 절체 작업을 미리 시뮬레이션하고 그 결과를 반영하여 작업지시서를 작성한다. 구체적으로, 휴전작업 검토관리서버(100)는 배전계통 시스템 정보, 변전계통 시스템 정보, 변압기 용량정보 등을 이용하여 작업예정일의 부하 예측, 수동개폐기 구간부하 및 변전소간 연계시 루프조류 등을 계산할 수 있다. 이하, 휴전작업 검토관리서버(100)의 세부 구성에 대해서는 도 3에서 상세히 설명하기로 한다.The ceasefire work review management server 100 obtains various necessary information from the distribution automation system 200, simulates the ceasefire work transfer work in advance, and creates a work instruction by reflecting the result. Specifically, the ceasefire work review management server 100 may calculate the load current of the scheduled work schedule, the manual switchgear section load, and the loop algae when the substation is linked using the distribution system information, substation system information, transformer capacity information, and the like. have. Hereinafter, a detailed configuration of the truce work review management server 100 will be described in detail with reference to FIG. 3.

배전자동화 시스템(200)은 변전소 및 이와 연결되는 배전망을 보호, 감시 및 제어하고 데이터를 저장, 관리하는 각종 서버 및 데이터베이스를 포함한다. 구체적으로, 배전자동화 시스템(200)은 배전망의 보호, 감시 및 제어를 목적으로 배전선로(400)의 적정위치에 설치된 변전소 차단기(410), 배전선로용 차단기(430), 배전선로용 개폐기(440), 변전소 단말장치(420) 및 배전자동화 단말장치(450) 등의 정보를 수집한다. 이를 위해, 배전자동화 시스템(200)은 배전 자동화 통신망(300)을 이용하여 배전선로(400) 상의 각각의 장치와 연결되어 정보를 송수신할 수 있다.The distribution automation system 200 includes various servers and databases for protecting, monitoring and controlling substations and distribution networks connected thereto and storing and managing data. Specifically, the distribution automation system 200 is a substation breaker 410, a distribution line breaker 430, a distribution line switch (installed at an appropriate position of the distribution line 400 for the purpose of protection, monitoring and control of the distribution network) 440, the substation terminal device 420, and the distribution automation terminal device 450 are collected. To this end, the distribution automation system 200 may be connected to each device on the distribution line 400 using the distribution automation communication network 300 to transmit and receive information.

또한, 배전자동화 시스템(200)은 변전 운영 서버(210), 배전 자동화 서버(230) 및 이와 연동되는 변전 운영정보 DB(220), 배전계통 연결정보 DB(240) 및 구간부하 DB(250) 등을 포함할 수 있다.In addition, the distribution automation system 200 includes a substation operation server 210, a distribution automation server 230, and a substation operation information DB 220 interlocked with this, a distribution system connection information DB 240, and a section load DB 250. It may include.

변전 운영 서버(210)에는 변전설비의 운전을 수행하는 변전자동화 시스템(SCADA) 및 계통정보 및 부하정보를 저장하는 변전소 운전결과 관리시스템(SOMAS) 등을 포함할 수 있으며, 이를 통해 변전계통의 보호, 감시 및 제어를 수행한다.Substation operation server 210 may include a substation automation system (SCADA) for performing the operation of the substation facility and a substation operation result management system (SOMAS) for storing the system information and load information, through which the protection of the substation system Perform monitoring and control.

배전자동화 서버(230)은 각 기기의 개폐 상태와 전압, 전류 등의 전력 정보를 배전 자동화 통신망(300)을 통해 수집하여 배전망의 현재 상태와 전력 흐름을 감시할 수 있다.The distribution automation server 230 may collect power information such as an open / closed state and voltage and current of each device through the distribution automation communication network 300 to monitor the current state and power flow of the distribution network.

또한, 배전자동화 서버(230)는 운영자의 제어명령을 배전자동화 통신망(300)을 경유하여 배전선로(400) 상에 설치된 배전자동화 단말장치(450) 및 배전선로용 개폐기(440)에 전달하여 배전선로용 개폐기(440)를 투입 또는 개방함으로써 작업 과부하 및 고장에 따른 선로의 변경 및 부하절체 운전을 수행할 수 있다.In addition, the distribution automation server 230 transmits an operator's control command to the distribution automation terminal device 450 and the distribution line switch 440 installed on the distribution line 400 via the distribution automation communication network 300. By inserting or opening the furnace switch 440, a line change and load transfer operation according to work overload and failure can be performed.

배전자동화 서버(230)는 배전설비의 운전을 수행하는 배전자동화 메인 서버 및 배전계통정보 및 이력 정보 등을 저장하는 배전자동화 이력 서버 등을 포함할 수 있다.The distribution automation server 230 may include a distribution automation main server that performs operation of a distribution facility, and a distribution automation history server that stores distribution system information and history information.

변전 운영정보 DB(220)는 변전소 인출 부하정보, 변전소 계통정보 및 변전소 차단기 운전정보 등을 저장, 관리할 수 있다.The substation operation information DB 220 may store and manage substation drawing load information, substation system information, and substation breaker operation information.

배전계통 연결정보 DB(240)는 배전계통 연결정보, 선종정보, 금장정보 및 구간 변압기용량정보 등을 저장, 관리할 수 있다.The distribution system connection information DB 240 may store and manage distribution system connection information, ship type information, gold length information, and section transformer capacity information.

구간부하 DB(250)는 자동화개폐기 부하전류 정보, 시간별 부하전류 정보, 최대부하정보, 최소부하정보 및 평균부하정보 등을 저장, 관리할 수 있다.The section load DB 250 may store and manage the automatic switchgear load current information, hourly load current information, maximum load information, minimum load information, average load information, and the like.

사용자 단말(500)은 휴전작업에 관련되는 다양한 사용자들에게 필요한 조작 관리 인터페이스를 제공한다. 이러한 사용자 단말(500)은 시공 부서, 검토 부서, 설비관리 부서 및 기타 사용자 들에게 제공될 수 있다.
The user terminal 500 provides an operation management interface required for various users involved in the ceasefire work. The user terminal 500 may be provided to the construction department, review department, facility management department and other users.

다음으로, 휴전작업 검토관리서버(100)의 세부 구성에 대해 설명하기로 한다.Next, a detailed configuration of the truce review operation management server 100 will be described.

도 3은 본 발명의 일 실시예에 따른 휴전작업 검토관리서버의 세부 구성도이다. 도 3에 도시된 바와 같이, 휴전작업 검토관리서버(100)는 구간부하 연산부(110), 휴전작업구간 설정부(120), 백업선로 설정부(130), 작업절차 설정부(140), 시뮬레이션 수행부(150) 및 작업지시서 생성부(160)를 포함한다.Figure 3 is a detailed configuration of the truce work review management server according to an embodiment of the present invention. As shown in FIG. 3, the ceasefire work review management server 100 includes a section load calculator 110, an armistice work section setting unit 120, a backup line setting unit 130, a work procedure setting unit 140, and a simulation. The execution unit 150 and the work order generation unit 160 are included.

구간부하 연산부(110)는 작업예정일시의 구간부하를 예측하고, 이를 이용하여 수공개폐기의 구간부하를 계산한다. 구체적으로, 구간부하 연산부(110)는 통계자료에 기초하여 작업예정일시의 구간부하를 예측한다. 이러한 통계자료에는 계절별 과거부하, 요일별 과거부하, 주야간별 과거부하, 기상상황별 과거부하 및 시간별 과거부하 통계자료 등일 수 있다. 이 경우, 구간부하 연산부(110)는 상기 하나 이상의 과거부하 통계자료에 대하여 할증률을 적용하여 작업예정일시의 구간부하를 예측할 수 있다. 작업예정일시의 구간부하 예측 방법에 대해서는 도 5를 이용하여 상세히 후술하기로 한다.The section load calculation unit 110 predicts the section load at the scheduled working time, and calculates the section load of the manual switchgear using the section load calculation. Specifically, the section load calculator 110 predicts the section load at the scheduled working time based on the statistical data. Such statistical data may include seasonal past loads, past daily loads, past daily loads during the day and night, past loads by weather conditions, and historical past loads over time. In this case, the section load calculator 110 may predict the section load at the scheduled working time by applying a premium rate to the one or more past load statistics. The interval load prediction method at the scheduled working time will be described later in detail with reference to FIG. 5.

구간부하 연산부(110)는 상기 작업예정일시의 구간부하와 배전자동화 시스템(200)의 선로 긍장 및 시신배전정보시스템(NDIS)의 구간 고압고객 계약전력을 포함한 변압기 용량의 합을 활용하여 수동개폐기 구간부하를 통계적으로 계산할 수 있다. 구간부하 계산 방법에 대해서는 도 6을 이용하여 상세히 후술하기로 한다.The section load calculation unit 110 utilizes the sum of the section load at the scheduled working time and the line capacity of the distribution automation system 200 and the transformer capacity including the section high voltage customer contract power of the body distribution information system (NDIS). The load can be calculated statistically. The section load calculation method will be described later in detail with reference to FIG. 6.

휴전작업구간 설정부(120)는 배전선로에서 수동개폐기가 포함된 최소 구간으로 휴전작업구간을 설정한다.The armistice work section setting unit 120 sets the armistice work section to a minimum section including a manual switch in the distribution line.

구체적으로, 휴전작업구간 설정부(120)는 단선도에서 배전선로 휴전작업구간을 설정한다. 도 7에 도시된 바와 같이, 휴전작업구간 설정은 수동개폐기가 포함된 최소 구간으로 지정될 수 있으며, 휴전 구간으로 지정할 선로의 특정 구간이 지정되면, 탐색된 선로에 관한 정보가 단선도 화면 상에 표시될 수 있다(S700). 이 때, 화면에 표시되는 선로 정보에는 휴전구간의 ID, 선로명, 휴전구간의 전원측 개폐기 및 부하측 개폐기 등이 포함될 수 있다.Specifically, the cease-fire zone work section setting unit 120 sets the distribution line cease-fire work zone in the disconnected diagram. As shown in FIG. 7, the setting of the armistice work section may be designated as a minimum section including a manual switchgear, and when a specific section of a track to be designated as a truce section is specified, information about the found track is displayed on the single-line diagram screen. It may be displayed (S700). In this case, the line information displayed on the screen may include an ID of the truce, a line name, a power switch and a load switch of the truce.

백업선로 설정부(130)는 상기 설정된 휴전작업구간에 대한 백업선로를 결정한다.The backup line setting unit 130 determines the backup line for the set cease-fire work period.

구체적으로, 백업선로 설정부(130)는 내부 루프, 연계선로 및 건전부하를 절체한 연계선로 중 하나 이상을 이용하여 백업선로를 설정한다. 백업선로 설정부(130)는 휴전작업구간에 관한 정보를 이용하여 휴전 구간의 발생에 따른 건전부하의 절체를 위한 백업선로를 탐색한다.In detail, the backup line setting unit 130 sets the backup line using at least one of an inner loop, a link line, and a link line in which sound loads are transferred. The backup line setting unit 130 searches for the backup line for switching of the healthy load according to the occurrence of the ceasefire section by using the information about the ceasefire work section.

도 8에 도시된 바와 같이, 백업선로 탐색 시에, 우선순위에 따라 하나 이상의 백업선로를 결정할 수 있다. 또한, 상기 결정된 하나 이상의 백업선로 중에서 하나의 백업선로가 자동으로 선택될 수도 있고, 운영자에 의해 선택될 수도 있다(S800). 예를 들어, 백업선로 설정부(130)는 작업구간 선로 내 루프인 내부 루프를 이용하여 백업선로를 탐색할 수 있고, 하나 이상의 연계선로를 이용하여 백업선로를 탐색할 수도 있다. 또한, 건전부하를 절체한 하나 이상의 연계선로를 이용하여 백업선로를 탐색할 수도 있다.As illustrated in FIG. 8, when searching for a backup line, one or more backup lines may be determined according to a priority. In addition, one backup line may be automatically selected among the determined one or more backup lines, or may be selected by an operator (S800). For example, the backup line setting unit 130 may search the backup line using an inner loop, which is a loop in the work section line, or may search the backup line using one or more link lines. In addition, the backup line may be searched by using one or more link lines that transfer the healthy load.

작업절차 설정부(140)는 상기 결정된 휴전작업구간에 대한 작업절차(이하, "조작절차"라고도 함)를 결정한다. 휴전작업에 따른 작업절차는 고장에 따른 건전구간의 부하절체에 관한 조작절차와 개념적, 설계적으로 동일한 알고리즘을 사용하여 계산할 수 있으나, 수동개폐기를 포함한 범위로의 확장과, 해당구간의 분리보다 건전구간의 절체를 먼저 수행한다는 점에서 차이가 있다.The work procedure setting unit 140 determines a work procedure (hereinafter, also referred to as an “operation procedure”) for the determined armistice work section. The operation procedure according to the cease-fire operation can be calculated using the same algorithm conceptually and designally as the operation procedure regarding the load transfer of the power section due to the failure, but it is sounder than the expansion to the range including the manual switchgear and separation of the section. The difference is that the transfer of intervals is performed first.

작업절차 계산 방식은 선로조작의 효율성을 고려해 1~3 순위의 절체 방안을 적용하여 작업절차를 결정할 수 있다. 구체적으로, 작업절차 설정부(140)는 조작횟수의 최소화, 부하 평준화 또는 건전부하 절체의 최소화의 관점에서 각각 최선의 작업 절차를 결정할 수 있다. 또한, 상기 세 가지의 기준 별로 각기 다른 가중치를 설정하여 작업절차를 설정하는 것도 가능하다. 이 경우, 도출된 작업 절차대로 진행 중에 기기 조작이 실패한 경우에 수동으로 전환하는 기능을 추가로 포함시킬 수 있다. 또한, 작업 완료 후 역순으로 이루어지는 환원조작절차를 더 포함할 수도 있다. 구체적인 작업절차의 계산 및 수행 방법에 대해서는 도 9 및 도 10에서 상세히 설명하기로 한다.In the work procedure calculation method, the work procedure can be determined by applying the transfer method of 1 ~ 3 rank considering the efficiency of track operation. In detail, the work procedure setting unit 140 may determine the best work procedure in terms of minimizing the number of manipulations, load leveling, or minimizing healthy load switching. In addition, it is also possible to set the work procedure by setting different weights for each of the three criteria. In this case, it is possible to additionally include a function for manually switching in case the operation of the device fails while the derived work procedure is in progress. In addition, it may further include a reduction operation procedure is performed in the reverse order after the operation is completed. A method of calculating and performing a specific work procedure will be described in detail with reference to FIGS. 9 and 10.

시뮬레이션 수행부(150)는 상기 결정된 작업절차에 따라 시뮬레이션을 수행한다. 시뮬레이션 수행부(150)는 상기 실행 결과의 성공, 실패여부를 화면에 표시할 수 있으며, 상기 작업절차의 각각의 단계별로 구분하여 실행할 수도 있다.The simulation performing unit 150 performs the simulation according to the determined work procedure. The simulation execution unit 150 may display success or failure of the execution result on the screen, and may divide and execute each step of the work procedure.

작업지시서 생성부(160)는 상기 결정된 작업절차에 상기 시뮬레이션 결과를 반영하여 작업지시서를 생성한다. 또한, 작업지시서 생성부(160)는 운영자가 생성된 작업지시서의 작업의 세부적인 사항들을 추가 편집할 수 있는 기능을 제공할 수 있다.
The work order generation unit 160 generates a work order by reflecting the simulation result in the determined work procedure. In addition, the work order generation unit 160 may provide a function for the operator to further edit details of the work of the generated work order.

다음으로, 본 발명의 바람직한 일 실시예에 따른 배전선로 휴전작업 검토관리방법을 설명하기로 한다.Next, a distribution line cease-fire review work management method according to an embodiment of the present invention will be described.

도 4는 본 발명의 일 실시예에 따른 배전선로 휴전작업 검토관리방법의 흐름도이다. 도 4에 도시된 바와 같이, 배전선로 휴전작업 검토관리 방법은, 계절별, 요일별, 주야간별, 기상상황별 및 시간별 과거부하 통계자료 중 하나 이상에 기초하여 작업예정일시의 구간부하를 예측하는 단계, 상기 작업예정일시의 구간부하를 이용하여 수동개폐기의 구간부하를 계산하는 단계, 상기 수동개폐기의 구간부하를 기초로 휴전작업구간을 설정하는 단계, 상기 휴전작업구간의 백업선로를 설정하는 단계, 상기 휴전작업구간에 대한 작업절차를 결정하는 단계, 상기 결정된 작업절차를 이용하여 시뮬레이션을 수행하는 단계 및 상기 시뮬레이션 결과를 반영하여 작업지시서를 생성하는 단계를 포함할 수 있다.4 is a flowchart of a distribution line cease-fire review management method according to an embodiment of the present invention. As shown in Figure 4, the distribution line cease-fire work review management method, the step of predicting the interval load of the scheduled work schedule based on one or more of the seasonal, day of the week, day and night, weather conditions and hourly past load statistical data, Calculating a section load of the manual switchgear using the section load of the scheduled work schedule, setting a truce work section based on the section load of the manual switchgear, setting a backup line of the truce work section, and The method may include determining a work procedure for an armistice work section, performing a simulation using the determined work procedure, and generating a work instruction based on the simulation result.

우선, 구간부하 연산부(110)는 작업예정일시의 구간부하를 예측한다(S400). 미래 시점의 부하를 정확히 예측하는 것은 불가능하지만, 계절별, 주/야간별, 평일/주말별, 기타 여건 등의 부하변동 변수를 고려하여 가장 근사한 과거부하 통계의 최대 전류로 작업예정일시의 부하를 예측할 수 있다. 이때, 각각의 변수에 대해 각각 할증률을 적용하여 기상 상황, 공휴일 등의 부하변동 여건을 추가적으로 반영할 수 있다.First, the section load calculation unit 110 predicts the section load at the scheduled working time (S400). Although it is impossible to accurately predict future loads, it is not possible to predict the load at the scheduled working time with the maximum current of the closest past load statistics, taking into account the load fluctuation variables such as season, week / night, weekday / weekend, and other conditions. Can be. In this case, a premium rate may be applied to each variable to further reflect load variation conditions such as weather conditions and holidays.

작업예정일시의 구간부하의 예측 방법에 대해서 좀 더 상세히 설명하면, 도 5에서, 우선, 작업예정일시를 입력한다(S500), 이후, 기초 통계자료로 이용될 과거부하의 통계범위를 지정한다(S510). 이후, 부하 할증률의 적용 여부를 검토하여(S520), 할증률을 적용하고자 하는 경우에는, 원하는 부하변동 변수에 대해 부하 할증률을 입력하여 통계정보에 적용할 수 있다(S530). 만일, 할증률을 적용하지 않는 경우에는 부하 할증률의 입력 없이 통계기간 중 최대부하를 선정한다(S540). 이후, 선정된 구간부하통계를 이용하여 작업예정일시의 부하 예측값을 결정한다(S550).A more detailed description of the method of predicting the interval load of the scheduled work date, in Fig. 5, first, input the scheduled work date (S500), and then, specify the statistical range of the past load to be used as basic statistical data ( S510). Subsequently, by examining whether or not the load premium rate is applied (S520), if the premium rate is to be applied, the load premium rate may be input to a desired load variation variable and applied to statistical information (S530). If the premium rate is not applied, the maximum load during the statistical period is selected without input of the load premium rate (S540). Thereafter, the load prediction value at the scheduled work schedule is determined using the selected section load statistics (S550).

다시 도 4로 되돌아가서, 구간부하 연산부(110)는 예측한 작업예정일시의 구간부하를 이용하여 수동개폐기의 구간부하를 계산한다(S410). 수동개폐기의 구간부하의 계산방법은 아래와 같다.4, the section load calculation unit 110 calculates the section load of the manual switchgear using the estimated section load at the scheduled work schedule (S410). The calculation method of section load of manual switchgear is as follows.

Figure 112011049433368-pat00001
Figure 112011049433368-pat00001

여기서, Msec는 수동개폐기 구간부하이고, Vn은 배전선로 공칭전압(nominal voltage), ISsec는 자동화기기 구간 부하전류, LSsec는 자동화기기 구간 긍장, LMsec는 수동기기 구간 긍장, PSsec는 자동화기기 구간 변압기 용량이고, PMsec는 수동기기 구간 변압기 용량이다. 한편, 상기의 구간부하 계산방법을 단선도에 간략히 표현한 도면이 도 6에 도시되어 있다.Where M sec is the manual switch section load, V n is the nominal voltage of the distribution line, I Ssec is the load current of the automation equipment section, L Ssec is the automation equipment section, L Msec is the manual equipment section, and P Ssec Is the automation equipment section transformer capacity and P Msec is the manual equipment section transformer capacity. On the other hand, FIG. 6 is a diagram schematically illustrating the above section load calculation method in a single line diagram.

이후, 휴전작업구간 설정부(120)는 수동개폐기가 포함된 배전선로 휴전작업구간을 설정한다(S420). 휴전작업 구간설정은 수동개폐기가 포함된 최소구간으로 지정한다.Thereafter, the cease-fire work section setting unit 120 sets a cease-fire work section for a distribution line including a manual switch (S420). The setting of armistice work intervals shall be specified as the minimum intervals with manual switchgear.

이후, 백업선로 설정부(130)는 상기 설정된 휴전작업구간에 대한 백업선로를 설정한다(S430). 이때, 백업선로의 설정은 내부루프, 연계선로 및 건전부하를 절체한 연계선로 중 하나 이상을 이용하여 설정할 수 있다.Thereafter, the backup line setting unit 130 sets a backup line for the set truce work period (S430). In this case, the backup line may be set using at least one of an internal loop, a link line, and a link line in which sound loads are transferred.

이후, 작업절차 설정부(140)는 상기 휴전작업구간에 대한 작업절차를 결정한다. 또한, 작업절차 설정부(140)는 상기 작업절차에 대응되는 환원 절차도 결정할 수 있다(S450).Thereafter, the work procedure setting unit 140 determines a work procedure for the armistice work section. In addition, the work procedure setting unit 140 may determine a reduction procedure corresponding to the work procedure (S450).

구체적으로 설명하면, 도 9에 도시된 바와 같이, 휴전작업구간에 대한 작업절차의 계산은, 우선, 절체구간의 부하를 계산한다(S900). 이후, 절체구간이 포함되는 휴전작업구간에 대한 백업선로의 존재 여부를 판단하여(S910), 백업선로가 존재하는 경우에는 과부하 또는 전압강하가 있는지 여부를 판단한다(S920). 만일, 백업선로가 존재하지 않거나, 과부하 또는 전압강하가 있는 경우에는 절체 불가로 판단하여(S950) 작업을 종료시킬 수 있다. 만일, 백업선로가 존재하고 또한 과부하 또는 전압강하가 없는 경우에는 복구절차를 계산하고(S930), 우선순위별 작업절차를 표시한다(S940).Specifically, as shown in FIG. 9, the calculation of the work procedure for the armistice work section first calculates the load of the transfer section (S900). Thereafter, it is determined whether there is a backup line for the truce work section including the transfer section (S910), and if there is a backup line, it is determined whether there is an overload or a voltage drop (S920). If the backup line does not exist or there is an overload or voltage drop, it is determined that the transfer is impossible (S950) and the operation can be terminated. If there is a backup line and there is no overload or voltage drop, the recovery procedure is calculated (S930), and the work procedure for each priority is displayed (S940).

한편, 도 10에는 본 발명의 일 실시예에 따른 상기 작업절차의 수행 과정이 일례로서 도시되어 있다. On the other hand, Figure 10 is shown as an example of the process of performing the work procedure according to an embodiment of the present invention.

우선, 휴전작업구간에서, 백업선로 연계 개폐기를 투입한다(S1000). 이 때, 차단기가 트립된 경우에는(S1010), 작업을 수동으로 전환한다(S1060). 차단기가 트립되지 않은 경우에는 휴전구간 부하측 개폐기를 개방한다(S1020). 휴전구간 부하측 개폐기의 개방이 정상적으로 종료되면(S1030), 휴전구간 전원측 개폐기를 개방하고(S1040), 정상 종료되지 않으면 작업을 수동으로 전환한다(S1060). 휴전구간 전원측 개폐기의 개방이 정상적으로 종료된 경우에는(S1050), 작업을 종료하고 정상 종료되지 않은 경우에는 작업을 수동으로 전환한다(S1060).First, in the armistice work section, the backup line connection switch is inserted (S1000). At this time, if the breaker is tripped (S1010), the work is manually switched (S1060). If the breaker is not tripped, the load side switchgear in the armistice section is opened (S1020). When the opening of the armistice section load side switchgear is normally terminated (S1030), the power supply section switchgear of the ceasefire section is opened (S1040), and if not normally terminated, the operation is manually switched (S1060). When the opening of the power supply section of the cease-fire zone is normally terminated (S1050), when the work is terminated and the work is not normally terminated, the work is manually switched (S1060).

이후, 도 4에서, 시뮬레이션 수행부(150)는 상기 결정된 작업절차를 이용하여 시뮬레이션을 수행한다(S450). 시뮬레이션 결과를 반영하여 상기 작업절차를 수정할 수 있다.Then, in FIG. 4, the simulation performing unit 150 performs the simulation using the determined work procedure (S450). The work procedure can be modified to reflect the simulation result.

이후, 작업지시서 생성부(160)는 상기 작업절차 및 시뮬레이션 결과를 반영하여 작업지시서를 작성할 수 있다. 생성된 작업지시서는 엔지니어 또는 운영자에 의해 수동 또는 배전자동화 서버(230) 상에서 자동으로 수행될 수 있다. 상기 수행 결과는 수집되어 사용자 단말(500)을 통해 운영자에게 표시될 수 있다. 도 11은 상기 작업지시서에 따른 배전선로 휴전작업의 작업 결과를 단계별로 표시한 실시도면이다. 도 11에 도시된 바와 같이, 각각의 장치별 원상태 및 조작 후상태가 표시될 수 있다. 또한, 도 12에 도시된 바와 같이, 단계별 조작 상태 및 조작 결과를 각각 표시하는 것도 가능하다.
Thereafter, the work order generation unit 160 may create a work order by reflecting the work procedure and the simulation result. The generated work orders may be automatically performed on the manual or distribution automation server 230 by an engineer or an operator. The performance result may be collected and displayed to the operator through the user terminal 500. 11 is an exemplary view showing step by step results of a distribution line cease-fire operation according to the work order. As shown in FIG. 11, the original state and the post-operation state for each device may be displayed. In addition, as shown in Fig. 12, it is also possible to display the step-by-step operation status and operation results, respectively.

상술한 구성에 의하면, 배전선로 휴전 작업에 대하여 변전소용 차단기, 배전선로용 차단기 및 배전선로용 개폐기로부터 자동화 통신망을 경유하여 배전자동화 서버 및 변전운영 서버로 전송되어 저장된 구간부하와 수동개폐기 구간의 예측부하를 통해 작업예정시점의 부하를 예측하고 휴전작업구간의 절체, 작업구간 격리 등의 일련의 과정을 시스템상에서 검토할 수 있어서, 종래의 수동검토방식보다 신속하고 정확하며 일원화된 검토 및 작업시행이 가능하여 휴전 작업의 효율성이 크게 개선되는 효과가 있다.According to the above-described configuration, prediction of the section load and manual switch section stored and transmitted to the distribution automation server and the substation operation server from the substation breaker, the distribution line breaker and the distribution line switchgear for the distribution line cease-fire operation via the automation communication network. Through the load, it is possible to predict the load at the scheduled working time and review the series of processes such as transfer of armistice work section and isolation of work section on the system, so that faster and more accurate and unified review and work execution can be performed than conventional manual review method. As a result, the efficiency of ceasefire operations is greatly improved.

본 발명의 일 실시예는 컴퓨터에 의해 실행되는 프로그램 모듈과 같은 컴퓨터에 의해 실행 가능한 명령어를 포함하는 기록 매체의 형태로도 구현될 수 있다.One embodiment of the present invention may also be embodied in the form of a recording medium including instructions executable by a computer, such as program modules, being executed by a computer.

컴퓨터 판독 가능 매체는 컴퓨터에 의해 액세스될 수 있는 임의의 가용 매체일 수 있고, 휘발성 및 비 휘발성 매체, 분리형 및 비 분리형 매체를 모두 포함한다.Computer readable media can be any available media that can be accessed by a computer and includes both volatile and nonvolatile media, removable and non-removable media.

또한, 컴퓨터 판독가능 매체는 컴퓨터 저장 매체 및 통신 매체를 모두 포함할 수 있다. 컴퓨터 저장 매체는 컴퓨터 판독가능 명령어, 데이터 구조, 프로그램 모듈 또는 기타 데이터와 같은 정보의 저장을 위한 임의의 방법 또는 기술로 구현된 휘발성 및 비휘발성, 분리형 및 비 분리형 매체를 모두 포함한다. In addition, the computer-readable medium may include both computer storage media and communication media. Computer storage media includes both volatile and nonvolatile, removable and non-removable media implemented in any method or technology for storage of information such as computer readable instructions, data structures, program modules or other data.

통신 매체는 전형적으로 컴퓨터 판독가능 명령어, 데이터 구조, 프로그램 모듈, 또는 반송파와 같은 변조된 데이터 신호의 기타 데이터, 또는 기타 전송 메커니즘을 포함하며, 임의의 정보 전달 매체를 포함한다. Communication media typically includes any information delivery media, including computer readable instructions, data structures, program modules, or other data in a modulated data signal such as a carrier wave, or other transport mechanism.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형 가능하다는 것을 이해할 수 있을 것이다.The foregoing description of the present invention is intended for illustration, and it will be understood by those skilled in the art that the present invention may be easily modified in other specific forms without changing the technical spirit or essential features of the present invention. .

그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.It is therefore to be understood that the above-described embodiments are illustrative in all aspects and not restrictive. For example, each component described as a single entity may be distributed and implemented, and components described as being distributed may also be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is shown by the following claims rather than the above description, and all changes or modifications derived from the meaning and scope of the claims and their equivalents should be construed as being included in the scope of the present invention. do.

Claims (15)

삭제delete 배전선로 휴전작업 검토관리 방법에 있어서,
계절별, 요일별, 주야간별, 기상상황별 및 시간별 과거부하 통계자료 중 하나 이상에 기초하여 작업예정일시의 구간부하를 예측하는 단계,
상기 작업예정일시의 구간부하를 이용하여 수동개폐기의 구간부하를 계산하는 단계,
상기 수동개폐기의 구간부하를 기초로 휴전작업구간을 설정하는 단계,
상기 휴전작업구간의 백업선로를 설정하는 단계,
상기 휴전작업구간에 대한 작업절차를 결정하는 단계,
상기 결정된 작업절차를 이용하여 시뮬레이션을 수행하는 단계 및
상기 시뮬레이션 결과를 반영하여 작업지시서를 생성하는 단계를 포함하며,
상기 작업예정일시의 구간부하를 예측하는 단계는, 상기 하나 이상의 과거부하 통계자료에 대하여 할증률을 적용하는 단계를 더 포함하는, 배전선로 휴전작업 검토관리 방법.
In the distribution line truce work review management method,
Estimating the interval load at the scheduled working time based on one or more of seasonal, day of the week, day and night, weather conditions, and hourly past load statistics;
Calculating the section load of the manual switchgear using the section load of the scheduled work schedule;
Setting an armistice work section based on the section load of the manual switch;
Setting a backup line of the armistice work section;
Determining a work procedure for the armistice work section,
Performing a simulation using the determined working procedure; and
Generating a work order by reflecting the simulation result;
The step of predicting the interval load of the scheduled work period further comprises the step of applying a premium rate to the one or more past load statistics, distribution line ceasefire work review management method.
제 2 항에 있어서,
상기 수동개폐기 구간부하를 계산하는 단계는,
상기 작업예정일시의 구간부하, 선로 긍장 및 구간 변압기 용량 정보를 이용하여 상기 수동개폐기 구간부하를 계산하는 단계인, 배전선로 휴전작업 검토관리 방법.
The method of claim 2,
The step of calculating the manual switch section load,
And calculating the manual switchgear section load by using section load, line affirmation, and section transformer capacity information of the scheduled work date and time.
제 2 항에 있어서,
상기 휴전작업구간을 설정하는 단계는,
상기 배전선로에서 상기 수동개폐기가 포함된 최소 구간으로 상기 휴전작업구간을 설정하는 단계인, 배전선로 휴전작업 검토관리 방법.
The method of claim 2,
The step of setting the armistice work section,
And setting the cease-fire work section to the minimum section including the manual switch in the distribution line.
제 2 항에 있어서,
상기 백업선로를 설정하는 단계는,
내부루프, 연계선로 및 건전부하를 절체한 연계선로 중 하나 이상을 이용하여 상기 백업선로를 탐색하여 선택하는 단계인, 배전선로 휴전작업 검토관리 방법.
The method of claim 2,
Setting the backup line,
And searching and selecting the backup line by using at least one of an internal loop, a connecting line, and a connecting line having transferred a healthy load.
제 2 항에 있어서,
상기 작업절차를 결정하는 단계는,
조작횟수의 최소화, 부하평준화 및 건전부하절체 최소화 중 어느 하나에 가중치를 더하여 작업절차를 결정하는 단계인, 배전선로 휴전작업 검토관리 방법.
The method of claim 2,
Determining the work procedure,
A method for reviewing distribution line truce work, which is a step of determining a work procedure by adding a weight to any one of minimizing the number of operations, load leveling, and minimizing healthy load switching.
제 6 항에 있어서,
상기 작업절차를 결정하는 단계는,
상기 결정된 작업절차의 수행 실패시에 조작을 수동으로 변경하는 단계를 더 포함하는, 배전선로 휴전작업 검토관리 방법.
The method according to claim 6,
Determining the work procedure,
And manually changing an operation when the determined work procedure fails to perform.
제 2 항에 있어서,
상기 시뮬레이션을 수행하는 단계는,
상기 휴전작업구간에 대해 상기 결정된 작업 절차에 따라 휴전작업을 시뮬레이션하는 단계인, 배전선로 휴전작업 검토관리 방법.
The method of claim 2,
Wherein performing the simulation comprises:
And simulating a ceasefire work according to the determined work procedure for the ceasefire work section, a distribution line ceasefire work review management method.
삭제delete 배전선로 휴전작업 검토관리를 수행하는 휴전작업 검토관리서버에 있어서,
통계자료에 기초하여 작업예정일시의 구간부하를 예측하여 수동개폐기의 구간부하를 연산하는 구간부하 연산부,
상기 수동개폐기의 구간부하를 기초로 휴전작업구간을 설정하는 휴전작업구간 설정부,
상기 휴전작업구간에 대한 백업선로를 결정하는 백업선로 설정부,
상기 휴전작업구간에 대한 작업절차를 결정하는 작업절차 설정부,
상기 결정된 작업절차에 따라 시뮬레이션을 수행하는 시뮬레이션 수행부 및
상기 시뮬레이션 결과를 반영하여 작업지시서를 생성하는 작업지시서 생성부를 포함하며,
상기 구간부하 연산부는,
계절별, 요일별, 주야간별, 기상상황별 및 시간별 과거부하 통계자료 중 하나 이상에 기초하여 작업예정일시의 구간부하를 예측하는, 휴전작업 검토관리서버.
In the truce operation review management server that performs the distribution line cease-fire review management,
Section load calculation section for calculating section load of manual switchgear by predicting section load at work due date based on statistical data,
Armistice work section setting unit for setting the armistice work section based on the section load of the manual switchgear,
A backup line setting unit for determining a backup line for the armistice work section,
A work procedure setting unit for determining a work procedure for the armistice work section,
A simulation performing unit for performing a simulation according to the determined working procedure;
It includes a work order generation unit for generating a work order by reflecting the simulation result,
The section load calculator,
An armistice work review management server that predicts a section load at a scheduled date of work based on one or more of seasonal, day of the week, day and night, weather conditions, and hourly past load statistics.
제 10 항에 있어서,
상기 구간부하 연산부는,
상기 하나 이상의 과거부하 통계자료에 대하여 할증률을 적용하여 작업예정일시의 구간부하를 예측하는, 휴전작업 검토관리서버.
11. The method of claim 10,
The section load calculator,
A truce work review management server for predicting a section load at the scheduled working time by applying a premium rate to the at least one past load statistical data.
제 10 항에 있어서,
상기 구간부하 연산부는,
상기 작업예정일시의 구간부하, 선로 긍장 및 구간 변압기 용량 정보를 이용하여 상기 수동개폐기 구간부하를 계산하는 것을 더 포함하는 휴전작업 검토관리서버.
11. The method of claim 10,
The section load calculator,
The armistice work review management server further comprising calculating the manual switchgear section load by using the section load, line affirmation and section transformer capacity information of the scheduled work date and time.
제 10 항에 있어서,
상기 휴전작업구간 설정부는,
상기 배전선로에서 상기 수동개폐기가 포함된 최소 구간으로 상기 휴전작업구간을 설정하는, 휴전작업 검토관리서버.
11. The method of claim 10,
The ceasefire work section setting unit,
Setting an armistice work section to the minimum section including the manual switch in the distribution line, ceasefire work review management server.
제 10 항에 있어서,
상기 백업선로 설정부는,
내부 루프, 연계선로 및 건전부하를 절체한 연계선로 중 하나 이상을 이용하여 상기 백업선로를 설정하는, 휴전작업 검토관리서버.
11. The method of claim 10,
The backup line setting unit,
An armistice operation review management server for setting the backup line by using at least one of an inner loop, an interconnection line, and an interconnection line that transfers a healthy load.
제 10 항에 있어서,
상기 작업절차 설정부는,
조작횟수의 최소화, 부하평준화 및 건전부하절체 최소화 중 어느 하나에 가중치를 더하여 작업절차를 결정하는, 휴전작업 검토관리서버.
11. The method of claim 10,
The work procedure setting unit,
An armistice work review management server that determines a work procedure by adding a weight to any one of minimizing the number of operations, load leveling, and minimizing healthy load switching.
KR1020110063165A 2011-06-28 2011-06-28 Management system for planed outage and method thereof KR101215595B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110063165A KR101215595B1 (en) 2011-06-28 2011-06-28 Management system for planed outage and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110063165A KR101215595B1 (en) 2011-06-28 2011-06-28 Management system for planed outage and method thereof

Publications (1)

Publication Number Publication Date
KR101215595B1 true KR101215595B1 (en) 2012-12-26

Family

ID=47908282

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110063165A KR101215595B1 (en) 2011-06-28 2011-06-28 Management system for planed outage and method thereof

Country Status (1)

Country Link
KR (1) KR101215595B1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103618297A (en) * 2013-07-17 2014-03-05 国家电网公司 High-efficiency and high-reliability fault processing method aiming at complex power distribution network
KR101542609B1 (en) * 2013-09-26 2015-08-07 한국전력공사 Power fault restoration apparatus and method for operating the same
KR101589708B1 (en) 2015-07-21 2016-01-28 (주)대일티이씨 Management method for planned power outage of power distribution line
KR101643313B1 (en) * 2016-01-04 2016-07-28 (주)우진이엔지 Management method for outage working of power distribution line
CN109754333A (en) * 2018-12-21 2019-05-14 国网江苏省电力有限公司苏州供电分公司 A kind of regional thunder and lightning sensitive load method for digging of multizone polymerization
KR20210046165A (en) * 2019-10-18 2021-04-28 한국전력공사 LOAD TRANSFER SYSTEM and METHOD for POWER TRANSMISSION and POWER SUPPLY
CN113078730A (en) * 2021-03-31 2021-07-06 王文林 Method for regularly switching working states of power grid equipment
CN113449266A (en) * 2021-07-22 2021-09-28 南方电网海南数字电网研究院有限公司 Closed loop switching power supply statistical method based on hand-in-hand line
CN113872329A (en) * 2021-09-29 2021-12-31 湖北工业大学 Intelligent power distribution system and method
CN114069610A (en) * 2021-10-21 2022-02-18 国网山东省电力公司潍坊市寒亭区供电公司 Power system scheduling control management method and system
KR20220074513A (en) * 2020-11-27 2022-06-03 한국전력공사 Distribution line simplification information providing system and simplification method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004096959A (en) * 2002-09-03 2004-03-25 Mitsubishi Electric Corp Accident restoration support system for power grid
JP2008160981A (en) * 2006-12-25 2008-07-10 Hokkaido Electric Power Co Inc:The Simulation method for accident restoration operation in power system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004096959A (en) * 2002-09-03 2004-03-25 Mitsubishi Electric Corp Accident restoration support system for power grid
JP2008160981A (en) * 2006-12-25 2008-07-10 Hokkaido Electric Power Co Inc:The Simulation method for accident restoration operation in power system

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103618297A (en) * 2013-07-17 2014-03-05 国家电网公司 High-efficiency and high-reliability fault processing method aiming at complex power distribution network
KR101542609B1 (en) * 2013-09-26 2015-08-07 한국전력공사 Power fault restoration apparatus and method for operating the same
KR101589708B1 (en) 2015-07-21 2016-01-28 (주)대일티이씨 Management method for planned power outage of power distribution line
KR101643313B1 (en) * 2016-01-04 2016-07-28 (주)우진이엔지 Management method for outage working of power distribution line
CN109754333A (en) * 2018-12-21 2019-05-14 国网江苏省电力有限公司苏州供电分公司 A kind of regional thunder and lightning sensitive load method for digging of multizone polymerization
CN109754333B (en) * 2018-12-21 2021-06-08 国网江苏省电力有限公司苏州供电分公司 Regional lightning sensitive load excavation method with multi-region aggregation
KR20210046165A (en) * 2019-10-18 2021-04-28 한국전력공사 LOAD TRANSFER SYSTEM and METHOD for POWER TRANSMISSION and POWER SUPPLY
KR102271244B1 (en) 2019-10-18 2021-06-30 한국전력공사 LOAD TRANSFER SYSTEM and METHOD for POWER TRANSMISSION and POWER SUPPLY
KR20220074513A (en) * 2020-11-27 2022-06-03 한국전력공사 Distribution line simplification information providing system and simplification method
KR102577665B1 (en) * 2020-11-27 2023-09-13 한국전력공사 Distribution line simplification information providing system and simplification method
CN113078730A (en) * 2021-03-31 2021-07-06 王文林 Method for regularly switching working states of power grid equipment
CN113078730B (en) * 2021-03-31 2024-01-30 王文林 Periodic switching method for working state of power grid equipment
CN113449266A (en) * 2021-07-22 2021-09-28 南方电网海南数字电网研究院有限公司 Closed loop switching power supply statistical method based on hand-in-hand line
CN113449266B (en) * 2021-07-22 2024-04-09 南方电网海南数字电网研究院有限公司 Closed loop power supply statistical method based on hand-in-hand line
CN113872329A (en) * 2021-09-29 2021-12-31 湖北工业大学 Intelligent power distribution system and method
CN114069610A (en) * 2021-10-21 2022-02-18 国网山东省电力公司潍坊市寒亭区供电公司 Power system scheduling control management method and system
CN114069610B (en) * 2021-10-21 2023-09-22 国网山东省电力公司潍坊市寒亭区供电公司 Power system dispatching control management method and system

Similar Documents

Publication Publication Date Title
KR101215595B1 (en) Management system for planed outage and method thereof
Hamidieh et al. Microgrids and resilience: A review
KR101643313B1 (en) Management method for outage working of power distribution line
US20140156031A1 (en) Adaptive Stochastic Controller for Dynamic Treatment of Cyber-Physical Systems
US8650060B2 (en) Plan execution control apparatus, plan execution control method, and plan execution control program
KR101278309B1 (en) Outage schedule management apparatus and method in ems
CN101958536A (en) Distribution network failure isolation and quick power service restoration decision support system
CN113328437B (en) Intelligent power distribution network CPS topology construction method and fault recovery method
Cao et al. Coordinating self-healing control of bulk power transmission system based on a hierarchical top-down strategy
CN105144542A (en) Use of a demand response to enable improved power supply restoration planning
JP2017034750A (en) Monitoring control system
JP2004088978A (en) Device and program for deciding power quality of power distribution system
Goto et al. Integrated management and remote monitoring system for telecommunications power plants with fully DC-powered center equipment
KR101589708B1 (en) Management method for planned power outage of power distribution line
CN113872329A (en) Intelligent power distribution system and method
US20210334910A1 (en) Systematic Outage Planning and Coordination in a Distribution Grid
JP5036776B2 (en) Blackout plan evaluation system and blackout plan evaluation program
Kováč et al. Autonomous power restoration of medium voltage distribution network
JP2003174724A (en) Power system monitor/control apparatus and program for making the apparatus operate
JP6604073B2 (en) Supervisory control system
Miu et al. Service restoration for unbalanced radial distribution systems with varying loads: solution algorithm
CN108649572A (en) Network prepared auto restart control system and method based on power network dispatching system EMS
Arif Distribution system outage management after extreme weather events
Nielsen Improving outage restoration efforts using rule-based prediction and advanced analysis
Eves et al. A Utility's Response to Major Storm Events

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20181130

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20191128

Year of fee payment: 8