KR101192205B1 - A Test Block Apparatus For Solenoid Valve Operating Main Steam Isolation Valve And A Method Using Of It - Google Patents

A Test Block Apparatus For Solenoid Valve Operating Main Steam Isolation Valve And A Method Using Of It Download PDF

Info

Publication number
KR101192205B1
KR101192205B1 KR1020110009952A KR20110009952A KR101192205B1 KR 101192205 B1 KR101192205 B1 KR 101192205B1 KR 1020110009952 A KR1020110009952 A KR 1020110009952A KR 20110009952 A KR20110009952 A KR 20110009952A KR 101192205 B1 KR101192205 B1 KR 101192205B1
Authority
KR
South Korea
Prior art keywords
solenoid valve
main steam
valve
pressure
port
Prior art date
Application number
KR1020110009952A
Other languages
Korean (ko)
Other versions
KR20120088949A (en
Inventor
이승훈
Original Assignee
주식회사 에네스지
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 에네스지 filed Critical 주식회사 에네스지
Priority to KR1020110009952A priority Critical patent/KR101192205B1/en
Publication of KR20120088949A publication Critical patent/KR20120088949A/en
Application granted granted Critical
Publication of KR101192205B1 publication Critical patent/KR101192205B1/en

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C17/00Monitoring; Testing ; Maintaining
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K37/00Special means in or on valves or other cut-off apparatus for indicating or recording operation thereof, or for enabling an alarm to be given
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Abstract

본 발명에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치 및 방법은, 주증기차단밸브 동작용 솔레노이드밸브(Solenoid Valve)의 누설유량 및 유압을 측정하기 위한 것으로서, 유압공급장치(HPU)로부터 유압을 공급받아 주증기차단밸브 동작용 솔레노이드밸브의 압력포트(Pressure Port)를 연결하는 압력포트연결관로, 상기 주증기차단밸브 동작용 솔레노이드밸브의 압력포트를 통해 유입된 유압을 공급포트를 통하여 탱크로 공급하는 공급포트연결관로, 상기 주증기차단밸브 동작용 솔레노이드밸브의 압력포트에서 유입된 유압을 리턴포트(Return Port)를 통하여 다른 솔레노이드밸브에 배유시키기 위한 리턴포트연결관로와; 상기 다른 솔레노이드밸브로 드레인(배유)되는 유압을 우회시켜 유량계로 실시간 유량을 측정한 후 탱크로 배유시키기 위한 유량계연결관로, 상기 다른 솔레노이드밸브로 드레인(배유)되는 유압을 다른 솔레노이드밸브의 공급포트를 통하여 배유시키는 배유포트연결관로를 포함하여 이루어지는 것을 특징으로 한다.
본 발명에 의하면, 주증기차단밸브 동작용 솔레노이드밸브의 동작 신뢰성을 파악하기 위해 유량 및 누설유량을 측정하여 주증기차단밸브 동작용 솔레노이드밸브의 성능저하를 미연에 감지함으로써, 발전정지를 예방할 수 있다.
The test block device and method of the solenoid valve for operating the main steam shutoff valve of a nuclear power plant according to the present invention are for measuring the leakage flow rate and the hydraulic pressure of the solenoid valve for operating the main steam shutoff valve. ) Is a pressure port connecting pipe connecting the pressure port of the solenoid valve for main steam shutoff valve operation and receiving the hydraulic pressure from the main steam shutoff valve, and supplying the hydraulic pressure introduced through the pressure port of the solenoid valve for main steam shutoff valve operation. A supply port connecting pipe for supplying the tank to the tank via a return port connecting pipe for distributing the hydraulic pressure introduced from the pressure port of the main steam shutoff valve operation solenoid valve to another solenoid valve through a return port; By passing the hydraulic pressure drained (drainage) to the other solenoid valve and measuring the real-time flow rate by the flow meter and the flow meter connecting pipe for draining to the tank, the hydraulic pressure drained (drained) to the other solenoid valve supply port of the other solenoid valve Characterized in that it comprises an exhaust port connecting pipe for doubling through.
According to the present invention, it is possible to prevent the power generation stop by detecting the deterioration of the performance of the main steam shutoff valve operation solenoid valve by measuring the flow rate and the leakage flow rate in order to grasp the operation reliability of the main steam shutoff valve operation solenoid valve. .

Description

원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치 및 방법{A Test Block Apparatus For Solenoid Valve Operating Main Steam Isolation Valve And A Method Using Of It}Test Block Apparatus For Solenoid Valve Operating Main Steam Isolation Valve And A Method Using Of It}

본 발명에 의한 원자력발전소 주증기차단밸브(MSIV : Main Steam Isolation Valve) 동작용 솔레노이드밸브의 테스트 블록장치 및 방법은, 원자력발전소 주증기차단밸브에 장착되는 솔레노이드밸브의 성능을 운전 상태와 동일한 상태에서 검증하기 위해 적용되는 것으로서, 상기 주증기차단밸브 동작용 솔레노이드밸브(Solenoid Valve)의 유량을 측정하고 동작상태 검증하기 위한 테스트 블록(Test Block)장치 및 그를 이용하는 방법에 관한 것이다.The test block device and method of a solenoid valve for operating a nuclear power plant main steam isolation valve (MSIV) according to the present invention, the performance of the solenoid valve mounted on the nuclear power plant main steam isolation valve in the same state as the operation state Applied for verification, the present invention relates to a test block device for measuring the flow rate of the main steam shutoff valve operation solenoid valve and a method of using the same.

원자력발전소 주증기차단밸브(MSIV : Main Steam Isolation Valve)는 원자로 정지시 주증기관을 차단하여 원자로의 안정 정지를 도와주는 부분으로, 주증기차단밸브(MSIV) 동작용 솔레노이드밸브는 도 1에 도시한 바와 같이, 원자력발전소 주증기차단밸브의 하단부에 장착되어 사용되는데, 케이지(cage), 스풀(Spool), 시트(seat), 아머쳐(armature) 등을 포함하여 이루어지며, 구체적으로 상기 원자력발전소 주증기차단밸브에 장착되어, 정상적인 동작중에는 압력포트(P)에서 공급포트(A)로 유압이 공급(비상정지 유압계통)되며, 비상정지시 압력포트(P)가 격리되고 공급포트(A)는 리턴포트(T)로 배유되어 비상정지 계통 유압 해제를 실시함으로써 원자력발전소 주증기차단밸브를 비상정지시키기 위한 것이다. The main steam isolation valve (MSIV) of the nuclear power plant is a part that helps to stabilize the reactor by shutting off the main steam engine when the reactor stops. The solenoid valve for operating the main steam isolation valve (MSIV) is shown in FIG. As such, it is mounted and used at the lower end of the nuclear power plant main steam shutoff valve, including a cage, a spool, a seat, an armature, and the like, specifically, the nuclear power plant main Equipped with steam shut-off valve, during normal operation, hydraulic pressure is supplied from the pressure port (P) to the supply port (A) (emergency stop hydraulic system) .In case of emergency stop, the pressure port (P) is isolated and the supply port (A) This is to emergency stop the main steam shut-off valve of the nuclear power plant by draining to the return port (T) and performing emergency stop system hydraulic release.

상기 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브에는 에드워드 솔레노이드밸브(Edward Solenoid Valve), 케인 솔레노이드밸브(Kane Solenoid Valve) 등이 사용되는데, 참고로, 도 2는 원자력발전소 주증기차단밸브 동작용 에드워드 솔레노이드밸브의 주요부구성도이고, 도 3은 원자력발전소 주증기차단밸브 동작용 케인 솔레노이드밸브의 주요부구성도이다.
Edward Solenoid Valve, Kane Solenoid Valve, etc. are used as the solenoid valve for operating the main steam shut-off valve of the nuclear power plant. For reference, FIG. 3 is an essential part configuration diagram of a valve, and FIG. 3 is an essential part configuration diagram of a kane solenoid valve for operating a main steam cutoff valve of a nuclear power plant.

한편, 상기 주증기차단밸브 동작용 솔레노이드밸브가 고장 내지 불량일 때, 비상정지 계통에 유입되는 압력이 상실되어 원자력발전소 주증기차단밸브에 비정상적인 동작이 유발되므로, 상기 주증기차단밸브의 급속정지 또는 기동정지와 같은 문제가 발생하며, 운전중 고장 내지 불량으로 인하여 원자력발전소 주증기차단밸브 계통에 심각한 문제가 발생하나, 이에 대한 테스트장비가 미비한 상태이다.On the other hand, when the solenoid valve for operation of the main steam shutoff valve is faulty or defective, the pressure flowing into the emergency stop system is lost, causing abnormal operation of the main steam shutoff valve of the nuclear power plant. Problems such as starting stop occurs, and serious problems occur in the nuclear power plant main steam shut-off valve system due to failure or failure during operation, but the test equipment is insufficient.

따라서 본 발명은 상기와 같은 종래 원자력발전소 주증기차단밸브의 문제점을 해결코자 발명된 것으로서, 원자력발전소 주증기차단밸브에 장착되는 솔레노이드밸브(Solenoid Valve)에 적용되어, 유량을 측정하고 원자력발전소 주증기차단밸브의 성능 및 동작상태 검증하기 위한 테스트 블록(Test Block)장치 및 그를 이용하는 방법을 제공하는 것을 그 목적으로 한다.Therefore, the present invention was invented to solve the problems of the conventional main steam shut-off valve as described above, and is applied to a solenoid valve mounted on the main steam shut-off valve of a nuclear power plant to measure the flow rate and the main steam of the nuclear power plant. It is an object of the present invention to provide a test block device for verifying the performance and operation state of a shutoff valve and a method of using the same.

상기와 같은 목적을 달성하기 위하여, 본 발명에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치는, 주증기차단밸브 동작용 솔레노이드밸브(Solenoid Valve)의 누설유량 및 유압을 측정하기 위한 것으로서, In order to achieve the above object, the test block device of the solenoid valve for operation of the main steam shutoff valve operation of the nuclear power plant according to the present invention, for measuring the leakage flow rate and oil pressure of the solenoid valve (Solenoid Valve) for operation of the main steam shutoff valve As,

유압공급장치(HPU)로부터 유압을 공급받아 주증기차단밸브 동작용 솔레노이드밸브의 압력포트(Pressure Port)를 연결하는 압력포트연결관로, 상기 주증기차단밸브 동작용 솔레노이드밸브의 압력포트를 통해 유입된 유압을 공급포트를 통하여 탱크로 공급하는 공급포트연결관로, 상기 주증기차단밸브 동작용 솔레노이드밸브의 압력포트에서 유입된 유압을 리턴포트(Return Port)를 통하여 다른 솔레노이드밸브에 배유시키기 위한 리턴포트연결관로와; 상기 다른 솔레노이드밸브로 드레인(배유)되는 유압을 우회시켜 유량계로 실시간 유량을 측정한 후 탱크로 배유시키기 위한 유량계연결관로, 상기 다른 솔레노이드밸브로 드레인(배유)되는 유압을 다른 솔레노이드밸브의 공급포트를 통하여 배유시키는 배유포트연결관로를 포함하여 이루어지는 것을 특징으로 한다.Pressure port connecting pipe connecting the pressure port of the solenoid valve for main steam shut-off valve operation by receiving hydraulic pressure from the hydraulic supply device (HPU), which is introduced through the pressure port of the solenoid valve for main steam shut-off valve operation Supply port connecting pipe for supplying the hydraulic pressure to the tank through the supply port, the return port connection for distributing the hydraulic pressure flowed from the pressure port of the solenoid valve for operation of the main steam shutoff valve to the other solenoid valve through the return port Pipelines; By passing the hydraulic pressure drained (drainage) to the other solenoid valve and measuring the real-time flow rate by the flow meter and the flow meter connecting pipe for draining to the tank, the hydraulic pressure drained (drained) to the other solenoid valve supply port of the other solenoid valve Characterized in that it comprises an exhaust port connecting pipe for doubling through.

한편, 주증기차단밸브 동작용 솔레노이드밸브의 테스트 방법은 상기 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치를 이용하는 방법으로서, 상기 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록에 주증기차단밸브 동작용 솔레노이드밸브, 다른 솔레노이드밸브와 유량계 및 압력계, 압력센서, 니들밸브(Needle valve)를 장착하며, 배관 및 센서케이블들을 연결하는 단계; 상기 주증기차단밸브 동작용 솔레노이드밸브와 다른 솔레노이드밸브에 전원을 연결하는 단계; 상기 연결된 배관으로 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록에 유압을 공급하는 단계; 상기 주증기차단밸브 동작용 솔레노이드밸브에 전원을 공급하여 여자시키는 단계; 상기 장착된 유량계로 유량을 통과시키며 내부 누설을 측정하는 단계;를 포함하여 이루어진다.
Meanwhile, the test method of the solenoid valve for operating the main steam shutoff valve is a method using a test block device of the solenoid valve for operating the main steam shutoff valve for the nuclear power plant, and the main steam cutoff to the test block of the solenoid valve for operating the main steam shutoff valve Mounting a solenoid valve for valve operation, another solenoid valve and a flow meter and a pressure gauge, a pressure sensor, a needle valve, and connecting pipes and sensor cables; Connecting power to the solenoid valve for operating the main steam shutoff valve and another solenoid valve; Supplying hydraulic pressure to a test block of a solenoid valve for operating a main steam shutoff valve through the connected pipe; Energizing and supplying power to the solenoid valve for operation of the main steam shutoff valve; And passing the flow rate through the mounted flow meter and measuring the internal leakage.

본 발명에 의한 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치 및 방법은, 상기 주증기차단밸브 동작용 솔레노이드밸브의 동작 신뢰성을 파악하기 위해 유량 및 누설유량을 측정하여 주증기차단밸브 동작용 솔레노이드밸브의 성능저하를 미연에 감지함으로써, 발전정지를 예방할 수 있는 것이다.
The test block device and method of the solenoid valve for main steam shutoff valve operation according to the present invention, the solenoid for main steam shutoff valve operation by measuring the flow rate and the leakage flow in order to determine the operation reliability of the solenoid valve for main steam shutoff valve operation By detecting the performance degradation of the valve in advance, it is possible to prevent the power generation stop.

상기한 바와 같은 구성 및 작용은 하나의 실시예로서 본 발명의 청구범위를 제한하는 것은 아니며, 본 발명의 기술적 사상을 변경하지 아니하는 범위 내에서 다양한 변경과 수정이 가능함은 본 발명이 속하는 분야에 종사하는 자에게는 자명한 것이다.The configuration and operation as described above are not limited to the claims of the present invention as an embodiment, and various changes and modifications are possible within the scope of not changing the technical spirit of the present invention. It is obvious to those who are engaged.

본 발명에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치 및 방법은 주증기차단밸브 동작용 솔레노이드밸브의 실시간 유량 및 압력을 측정하여 성능 및 동작상태 검증함으로써, 주증기차단밸브 동작용 솔레노이드밸브의 건전성을 진단할 수 있도록 한다.The test block device and method of the solenoid valve for operation of the main steam shutoff valve of a nuclear power plant according to the present invention measure the real-time flow rate and pressure of the solenoid valve for operating the main steam shutoff valve, The solenoid valve's health can be diagnosed.

도 1은 원자력발전소 주증기차단밸브 참고도
도 2는 원자력발전소 주증기차단밸브 동작용 에드워드 솔레노이드밸브(Edward Solenoid Valve)의 주요부구성도
도 3은 원자력발전소 주증기차단밸브 동작용 케인 솔레노이드밸브(Kane Solenoid Valve)의 주요부구성도
도 4는 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브에의 테스트 블록 사용상태도
도 5는 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록 평면투시 참고도
도 6은 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록 정면투시 참고도
도 7은 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록 좌측면투시 참고도
도 8은 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록 좌측면투시 참고도
도 9는 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트방법 순서도
1 is a reference diagram of the main steam cutoff valve of the nuclear power plant
2 is a principal part configuration diagram of an Edward Solenoid Valve for operating a main steam shutoff valve of a nuclear power plant
3 is a main configuration diagram of a Kane Solenoid Valve for operating a main steam shutoff valve of a nuclear power plant;
4 is a state diagram used in the test block for the solenoid valve for operating the main steam shutoff valve of the nuclear power plant according to an embodiment of the present invention.
5 is a plan view of a test block of a solenoid valve for operating a main steam shutoff valve of a nuclear power plant according to an embodiment of the present invention.
6 is a front perspective view of a test block of a solenoid valve for operating a main steam shutoff valve of a nuclear power plant according to an embodiment of the present invention;
7 is a left side perspective view of a test block of a solenoid valve for operating a main steam shutoff valve of a nuclear power plant according to an embodiment of the present invention;
8 is a left side perspective view of a test block of a solenoid valve for operating a main steam shutoff valve of a nuclear power plant according to an embodiment of the present invention;
9 is a flowchart illustrating a test method of a solenoid valve for operating a main steam shutoff valve of a nuclear power plant according to an embodiment of the present invention.

이하, 첨부된 도면을 참조하여 본 발명에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브(Solenoid Valve)의 테스트 블록장치 및 방법의 바람직한 실시예를 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail a preferred embodiment of the test block device and method of the solenoid valve (Solenoid Valve) for operating the main steam shutoff valve of the nuclear power plant according to the present invention.

도 4는 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브에의 테스트 블록 사용상태도이다. 본 발명에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록(300)은 주증기차단밸브 동작용 솔레노이드밸브(Solenoid Valve)(100)의 누설유량을 측정하기 위한 것으로, 도 4에 도시한 바와 같이, 전체적으로 상기 주증기차단밸브 동작용 솔레노이드밸브(100) 뿐 아니라, 다른 솔레노이드밸브(200)와 유량계(FM) 및 압력계(PM), 압력센서(PS), 니들밸브(Needle valve)(NV) 등이 장착되어 사용되어 진다.
4 is a state diagram of a test block used in a solenoid valve for operating a main steam shutoff valve of a nuclear power plant according to an embodiment of the present invention. The test block 300 of the solenoid valve for operating the main steam shutoff valve of a nuclear power plant according to the present invention is for measuring the leakage flow rate of the solenoid valve 100 for operating the main steam shutoff valve. As described above, the solenoid valve 100 for operating the main steam shutoff valve 100 as well as the other solenoid valve 200, the flow meter FM, the pressure gauge PM, the pressure sensor PS, the needle valve NV ) Etc. are used.

도 5는 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록 평면투시 참고도이고, 도 6은 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록 정면투시 참고도이고, 도 7과 도 8은 각각 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록 좌측면투시 참고도, 우측면투시 참고도이다. 도 5 내지 도 8에 도시한 바와 같이, 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록(300)은, 5 is a plan view of a test block of a nuclear power plant main steam cutoff valve operation solenoid valve according to an embodiment of the present invention, Figure 6 is a nuclear power plant main steam cutoff valve operation solenoid according to an embodiment of the present invention 7 is a front view reference diagram of a test block of a valve, and FIGS. 7 and 8 are left side perspective views and right side perspective views of a test block of a solenoid valve for operating a main steam shutoff valve of a nuclear power plant according to an embodiment of the present invention, respectively. 5 to 8, the test block 300 of the solenoid valve for operating the main steam shutoff valve of a nuclear power plant according to an embodiment of the present invention,

유압공급장치(HPU)로부터 유압을 공급받아 주증기차단밸브 동작용 솔레노이드밸브(100)의 압력포트(Pressure Port)(P)를 연결하는 압력포트연결관로(P'), 상기 주증기차단밸브 동작용 솔레노이드밸브(100)의 압력포트(P)를 통해 유입된 유압을 공급포트(A)를 통하여 탱크로 공급하는 공급포트연결관로(A'), 상기 주증기차단밸브 동작용 솔레노이드밸브(100)의 압력포트(P)에서 유입된 유압을 리턴포트(Return Port)(T)를 통하여 다른 솔레노이드밸브(200)에 배유시키기 위한 리턴포트연결관로(T')와;Pressure port connecting pipe (P ') for connecting the pressure port (P) of the solenoid valve 100 for the main steam shutoff valve operation by receiving the hydraulic pressure from the hydraulic supply device (HPU), the main steam shutoff valve Supply port connecting pipe (A ') for supplying the hydraulic pressure introduced through the pressure port (P) of the operation solenoid valve 100 to the tank through the supply port (A), the solenoid valve 100 for operating the main steam shutoff valve A return port connecting pipe line T 'for discharging the hydraulic pressure introduced from the pressure port P of the pump to another solenoid valve 200 through a return port T;

상기 다른 솔레노이드밸브(200)로 드레인(배유)되는 유압을 우회시켜 유량계(FM)로 실시간 유량을 측정한 후 탱크로 배유시키기 위한 유량계연결관로(SF'), 상기 다른 솔레노이드밸브(200)로 드레인(배유)되는 유압을 다른 솔레노이드밸브의 공급포트(A)를 통하여 배유시키는 배유포트연결관로(SA')를 포함하여 이루어지는 것을 특징으로 한다.Bypassing the hydraulic pressure drained (drainage) to the other solenoid valve 200 to measure the flow rate in real time by the flow meter (FM) and then flow to the tank (SF '), drain to the other solenoid valve 200 It characterized in that it comprises a drainage port connecting pipe passage (SA ') for draining the hydraulic pressure (drainage) through the supply port (A) of the other solenoid valve.

따라서, 상기 테스트 블록(300)의 리턴포트연결관로(T')에 다른 솔레노이드밸브(200)가 장착되며, 상기 테스트 블록(300)의 유량계연결관로(SF')에 유량계(FM)가 장착되어 진다. Therefore, another solenoid valve 200 is mounted on the return port connection pipe line T 'of the test block 300, and a flow meter FM is mounted on the flow meter connection pipe path SF' of the test block 300. Lose.

한편, 상기 테스트 블록(300)의 압력포트연결관로(P')에 압력계 또는 압력센서(PS)가 장착되는 것이 바람직하고, 상기 테스트 블록(300)의 리턴포트연결관로(T')에도 압력계 또는 압력센서(PS)가 장착되는 것이 바람직하다.On the other hand, it is preferable that the pressure gauge or the pressure sensor PS is mounted on the pressure port connecting pipe line P 'of the test block 300, and the pressure gauge or the return port connecting pipe line T' of the test block 300 is also provided. Preferably, the pressure sensor PS is mounted.

또한, 상기 테스트 블록(300)에서 압력포트연결관로(P')의 입구와 공급포트연결관로(A')의 출구에는 각각 니들밸브(NV)를 장착하여 유압을 단속할 수 있도록 하는 것이 바람직하다. In addition, it is preferable to install a needle valve NV at the inlet of the pressure port connecting pipe line P 'and the outlet of the supply port connecting pipe line A' in the test block 300 to control the hydraulic pressure. .

기타, 상기 테스트 블록(300)에 유량계(FM) 및 압력계(PM), 압력센서(PS), 니들밸브(Needle valve)(NV) 등의 기구를 장착하는데 있어서의 기술적 사항들은 당업자에게 있어 자명한 사항이므로 이에 대한 구체적인 설명은 생략토록 한다.
In addition, the technical matters for mounting the apparatus such as the flow meter (FM), the pressure gauge (PM), the pressure sensor (PS), the needle valve (NV) in the test block 300 is obvious to those skilled in the art. As it is a matter, detailed description thereof will be omitted.

도 9는 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트방법 순서도이다. 도 9에 도시한 바와같이, 본 발명의 일실시예에 의한 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트방법은, 본 발명에 의한 상기 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치를 이용한 주증기차단밸브 동작용 솔레노이드밸브의 테스트 방법에 있어서,9 is a flowchart illustrating a test method of a solenoid valve for operating a main steam shutoff valve of a nuclear power plant according to an embodiment of the present invention. As shown in FIG. 9, the test method for a solenoid valve for operating a main steam shutoff valve for a nuclear power plant according to an embodiment of the present invention includes a test block device for a solenoid valve for operating a main steam shutoff valve for nuclear power plant according to the present invention. In the main steam shutoff valve operation solenoid valve test method using

상기 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록에 주증기차단밸브 동작용 솔레노이드밸브(100), 다른 솔레노이드밸브(200)와 유량계(FM) 및 압력계(PM), 압력센서(PS), 니들밸브(Needle valve)(NV)를 장착하며, 배관 및 센서케이블들을 연결하는 단계(S100); 상기 장착한 주증기차단밸브 동작용 솔레노이드밸브(100)와 다른 솔레노이드밸브(200)에 전원을 연결하는 단계(S200); 상기 연결된 배관으로 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록(300)에 유압을 공급하는 단계(S300); 상기 주증기차단밸브 동작용 솔레노이드밸브(100)에 전원을 공급하여 여자시키는 단계(S400); 상기 장착된 유량계(FM)로 유량을 통과시키며 내부 누설을 측정하는 단계(S500);를 포함하여 이루어진다.
The main steam shut-off valve operation solenoid valve in the test block of the main steam shut-off valve operation solenoid valve 100, another solenoid valve 200 and flow meter (FM) and pressure gauge (PM), pressure sensor (PS), needle valve Mounting a needle valve (NV), and connecting the pipe and the sensor cable (S100); Connecting power to the mounted main steam shutoff valve operation solenoid valve 100 and another solenoid valve 200 (S200); Supplying hydraulic pressure to the test block (300) of the solenoid valve for main steam shutoff valve operation through the connected pipe (S300); Supplying power to the main steam shutoff valve operation solenoid valve (100) to excite (S400); And passing the flow rate through the mounted flow meter (FM) and measuring internal leakage (S500).

즉, 본 발명의 일실시예에 의한 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치의 테스트 방법은, 상기 주증기차단밸브 동작용 솔레노이드밸브의 동작 신뢰성을 파악하기 위해 압력포트(P)에서 공급포트(A)로 유압이 공급되는 상태에서 리턴포트(T)로 배유되는 유량을 측정하여 누설유량이 증가할 경우 주증기차단밸브 동작용 솔레노이드밸브의 성능저하를 미연에 감지함으로써, 발전정지를 예방할 수 있는 것이다.
That is, the test method of the test block device of the solenoid valve for operating the main steam shutoff valve according to an embodiment of the present invention, is supplied from the pressure port (P) to determine the operation reliability of the solenoid valve for operating the main steam shutoff valve By measuring the flow rate drained to the return port (T) while the hydraulic pressure is supplied to the port (A), if the leakage flow rate increases, by detecting the performance degradation of the solenoid valve for operation of the main steam shutoff valve, it is possible to prevent the power generation stop. It can be.

상기한 바와 같은 구성 및 작용은 하나의 실시예로서 본 발명의 청구범위를 제한하는 것은 아니며, 본 발명의 기술적 사상을 변경하지 아니하는 범위 내에서 다양한 변경과 수정이 가능함은 본 발명이 속하는 분야에 종사하는 자에게는 자명한 것이다.
The configuration and operation as described above are not limited to the claims of the present invention as an embodiment, and various changes and modifications are possible within the scope of not changing the technical spirit of the present invention. It is obvious to those who are engaged.

100 : 주증기차단밸브 동작용 솔레노이드밸브
200 : 다른 솔레노이드밸브 300 : 테스트 블록
P' : 압력포트연결관로 A' : 공급포트연결관로
T' : 리턴포트연결관로 SF' : 유량계연결관로
SA' : 배유포트연결관로 FM : 유량계
PS : 압력센서 NV : 니들밸브
PM : 압력계
100: solenoid valve for main steam shutoff valve
200: other solenoid valve 300: test block
P ': Pressure port connector A': Supply port connector
T ': Return port connector SF': Flow meter connector
SA ': Oil drainage port FM: Flow meter
PS: Pressure Sensor NV: Needle Valve
PM: pressure gauge

Claims (5)

원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치에 있어서,
유압공급장치(HPU)로부터 유압을 공급받아 주증기차단밸브 동작용 솔레노이드밸브의 압력포트(Pressure Port)(P)를 연결하는 압력포트연결관로(P'),
상기 주증기차단밸브 동작용 솔레노이드밸브의 압력포트(P)를 통해 유입된 유압을 공급포트(A)를 통하여 탱크로 공급하는 공급포트연결관로(A'),
다른 솔레노이드밸브가 장착되며, 상기 주증기차단밸브 동작용 솔레노이드밸브의 압력포트(P)에서 유입된 유압을 리턴포트(Return Port)(T)를 통하여 다른 솔레노이드밸브로 배유(드레인)시키기 위한 리턴포트연결관로(T')와;
유량계(FM)가 장착되며, 상기 다른 솔레노이드밸브로 배유되는 유압을 우회시켜 유량계(FM)로 실시간 유량을 측정한 후 탱크로 배유시키기 위한 유량계연결관로(SF'),
상기 다른 솔레노이드밸브로 드레인(배유)되는 유압을 다른 솔레노이드밸브의 공급포트(A)를 통하여 배유시키는 배유포트연결관로(SA')를 포함하여 이루어지는 것을 특징으로 하는 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치
In the test block device of the solenoid valve for operating the main steam shut-off valve of the nuclear power plant,
Pressure port connecting pipe (P ') for connecting the pressure port (P) of the solenoid valve for main steam shutoff valve operation by receiving hydraulic pressure from the hydraulic supply unit (HPU),
Supply port connecting pipe (A ') for supplying the hydraulic pressure introduced through the pressure port (P) of the solenoid valve for operation of the main steam shutoff valve to the tank through the supply port (A),
Another solenoid valve is mounted, and a return port for draining (draining) the hydraulic pressure introduced from the pressure port P of the solenoid valve for operation of the main steam shutoff valve to another solenoid valve through a return port T. A connecting pipe T ';
Flow meter (FM) is installed, bypass the hydraulic pressure drained to the other solenoid valve to measure the flow rate in real time with the flow meter (FM) flow meter connecting pipe (SF '), for draining to the tank,
A solenoid for operating the main steam shutoff valve of a nuclear power plant, characterized in that it comprises a drainage port connecting pipe (SA ') for draining the hydraulic pressure (drained) to the other solenoid valve through the supply port (A) of the other solenoid valve. Test block device of valve
삭제delete 제 1항에 있어서,
상기 압력포트연결관로(P')에 압력계 또는 압력센서가 장착되고, 상기 리턴포트연결관로(T')에도 압력계 또는 압력센서가 장착되는 것을 특징으로 하는 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치
The method of claim 1,
A pressure gauge or a pressure sensor is mounted on the pressure port connecting pipe (P '), and a pressure gauge or a pressure sensor is mounted on the return port connecting pipe (T'). Test Block Device
제 1항에 있어서,
상기 압력포트연결관로(P')의 입구와 공급포트연결관로(A')의 출구에는 각각 니들밸브(NV)를 장착하는 것을 특징으로 하는 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치
The method of claim 1,
A test block device for a solenoid valve for operating a main steam shutoff valve of a nuclear power plant, characterized in that a needle valve (NV) is mounted at an inlet of the pressure port connecting pipe line (P ') and an outlet of a supply port connecting pipe line (A'), respectively.
유압공급장치(HPU)로부터 유압을 공급받아 주증기차단밸브 동작용 솔레노이드밸브의 압력포트(Pressure Port)(P)를 연결하는 압력포트연결관로(P'), 상기 주증기차단밸브 동작용 솔레노이드밸브의 압력포트(P)를 통해 유입된 유압을 공급포트(A)를 통하여 탱크로 공급하는 공급포트연결관로(A'), 다른 솔레노이드밸브가 장착되며, 상기 주증기차단밸브 동작용 솔레노이드밸브의 압력포트(P)에서 유입된 유압을 리턴포트(Return Port)(T)를 통하여 다른 솔레노이드밸브로 배유(드레인)시키기 위한 리턴포트연결관로(T')와; 유량계(FM)가 장착되며, 상기 다른 솔레노이드밸브로 배유되는 유압을 우회시켜 유량계(FM)로 실시간 유량을 측정한 후 탱크로 배유시키기 위한 유량계연결관로(SF'), 상기 다른 솔레노이드밸브로 드레인(배유)되는 유압을 다른 솔레노이드밸브의 공급포트(A)를 통하여 배유시키는 배유포트연결관로(SA')를 포함하는 원자력발전소 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록장치를 이용한 주증기차단밸브 동작용 솔레노이드밸브의 테스트 방법에 있어서,
상기 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록에 주증기차단밸브 동작용 솔레노이드밸브(100) 및 다른 솔레노이드밸브(200), 유량계(FM), 압력계(PM), 압력센서(PS), 니들밸브(Needle valve)(NV)를 장착하며, 배관 및 센서케이블들을 연결하는 단계(S100);
상기 장착한 주증기차단밸브 동작용 솔레노이드밸브(100)와 다른 솔레노이드밸브(200)에 전원을 연결하는 단계(S200);
상기 연결된 배관으로 주증기차단밸브 동작용 솔레노이드밸브의 테스트 블록(300)에 유압을 공급하는 단계(S300);
상기 주증기차단밸브 동작용 솔레노이드밸브(100)에 전원을 공급하여 여자시키는 단계(S400);
상기 장착된 유량계(FM)로 유량을 통과시키며 내부 누설을 측정하는 단계(S500);를 포함하여 이루어지는 것을 특징으로 하는 주증기차단밸브 동작용 솔레노이드밸브의 테스트 방법
Pressure port connecting pipe (P ') connecting the pressure port (P) of the solenoid valve for main steam shutoff valve operation by receiving hydraulic pressure from the hydraulic supply device (HPU), the solenoid valve for operating the main steam shutoff valve The supply port connecting pipe (A ') for supplying the hydraulic pressure introduced through the pressure port (P) of the tank to the tank through the supply port (A), the other solenoid valve is mounted, the pressure of the solenoid valve for operating the main steam shutoff valve A return port connecting pipe line T 'for draining (draining) the hydraulic pressure introduced from the port P to another solenoid valve through a return port T; Flow meter (FM) is installed, the flow meter connecting pipe (SF ') for circulating the oil pressure drained by the other solenoid valve to measure the real-time flow rate by the flow meter (FM), and drained to the tank, drain to the other solenoid valve ( Main steam shutoff valve using the test block device of the solenoid valve for operation of the nuclear power plant main steam shutoff valve including an oil drain port connecting line (SA ') for draining hydraulic oil through the supply port (A) of another solenoid valve. In the test method of the solenoid valve,
The main steam shut-off valve operation solenoid valve in the test block of the main steam shut-off valve operation solenoid valve 100 and the other solenoid valve 200, flow meter (FM), pressure gauge (PM), pressure sensor (PS), needle valve Mounting a needle valve (NV), and connecting the pipe and the sensor cable (S100);
Connecting power to the mounted main steam shutoff valve operation solenoid valve 100 and another solenoid valve 200 (S200);
Supplying hydraulic pressure to the test block (300) of the solenoid valve for main steam shutoff valve operation through the connected pipe (S300);
Supplying power to the main steam shutoff valve operation solenoid valve (100) to excite (S400);
Passing the flow rate to the mounted flow meter (FM) and measuring the internal leakage (S500); Test method of the solenoid valve for main steam shutoff valve operation comprising a
KR1020110009952A 2011-02-01 2011-02-01 A Test Block Apparatus For Solenoid Valve Operating Main Steam Isolation Valve And A Method Using Of It KR101192205B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110009952A KR101192205B1 (en) 2011-02-01 2011-02-01 A Test Block Apparatus For Solenoid Valve Operating Main Steam Isolation Valve And A Method Using Of It

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110009952A KR101192205B1 (en) 2011-02-01 2011-02-01 A Test Block Apparatus For Solenoid Valve Operating Main Steam Isolation Valve And A Method Using Of It

Publications (2)

Publication Number Publication Date
KR20120088949A KR20120088949A (en) 2012-08-09
KR101192205B1 true KR101192205B1 (en) 2012-10-17

Family

ID=46873942

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110009952A KR101192205B1 (en) 2011-02-01 2011-02-01 A Test Block Apparatus For Solenoid Valve Operating Main Steam Isolation Valve And A Method Using Of It

Country Status (1)

Country Link
KR (1) KR101192205B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103616169A (en) * 2013-10-25 2014-03-05 苏州恩意精密机械有限公司 An inflating and force-measuring device of a coffee pot steam switch detection machine

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101495033B1 (en) * 2013-05-03 2015-02-25 주식회사 에네스지 A Test Block Apparatus For Solenoid Valve And A Test Method Using Of It
KR101467744B1 (en) * 2013-08-26 2014-12-03 주식회사 에네스지 A Test Block Apparatus For Valve And A Test Method Using Of It
KR101418370B1 (en) * 2013-08-26 2014-07-11 주식회사 에네스지 A Test Block Apparatus For Solenoid Valve And A Test Method Using Of It
KR101467743B1 (en) * 2013-10-25 2014-12-03 주식회사 에네스지 A Test Block Apparatus For Disc-Dump Valve And A Test Method Using Of It
KR101539030B1 (en) * 2014-11-13 2015-07-24 주식회사 에네스지 Test apparatus of air ventilation valve used in hydraulic actuator for a power plant

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100866350B1 (en) * 2008-04-14 2008-10-31 주식회사 에네스코 F solenoid valve diagnostic test block and method of hydraulic actuator

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100866350B1 (en) * 2008-04-14 2008-10-31 주식회사 에네스코 F solenoid valve diagnostic test block and method of hydraulic actuator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103616169A (en) * 2013-10-25 2014-03-05 苏州恩意精密机械有限公司 An inflating and force-measuring device of a coffee pot steam switch detection machine

Also Published As

Publication number Publication date
KR20120088949A (en) 2012-08-09

Similar Documents

Publication Publication Date Title
KR101192205B1 (en) A Test Block Apparatus For Solenoid Valve Operating Main Steam Isolation Valve And A Method Using Of It
KR101273776B1 (en) A compound flow measuring apparatus
KR101314585B1 (en) Test eqipment of fuel ejection valve for ship diesel engine
RU2561110C2 (en) Control device for section of powered support in production face of mine
KR101467744B1 (en) A Test Block Apparatus For Valve And A Test Method Using Of It
KR101284359B1 (en) Butterfly Valve Life Test Equipment
KR101495033B1 (en) A Test Block Apparatus For Solenoid Valve And A Test Method Using Of It
KR20130047001A (en) Leakage testing apparatus for double check valve and its testing method
CN103493033A (en) Wellhead hips with automatic testing and self-diagnostics
CN102797726A (en) Contaminant sensitivity testing equipment for hydraulic pump
CN103851339B (en) The system and method for detection pipe leakage
KR101418370B1 (en) A Test Block Apparatus For Solenoid Valve And A Test Method Using Of It
CN103506352A (en) Construction method for oil flushing for installation of hydraulic pipeline of rolling mill
RU2478860C2 (en) Method to diagnose tightness of stop pipeline valves gate and device for its realisation
JP2010210448A (en) Operation inspection system and operation inspection method of excessive flow rate blocking valve
KR101707894B1 (en) Apparatus for opening and closing a movable weir
KR100932469B1 (en) Stagnant water circulation system at the end of water supply system
JP2006226947A (en) Operation inspection system of excessive flow rate blocking valve and operation inspecting method, and draining device used for the same
KR101107931B1 (en) Sensing line back filling device and method
JP2008241497A (en) Power-steering oil circulation system for cold test bench
KR101467743B1 (en) A Test Block Apparatus For Disc-Dump Valve And A Test Method Using Of It
KR20180066016A (en) Gas Leakage Sensing System of 3-Way
CN204342480U (en) Prevent the protected location that resin is revealed
KR20170123550A (en) Gas Leakage Sensing System of 3-Way Valve
KR102520395B1 (en) Measuring device for liquid flow

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20151012

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20161212

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170928

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20181011

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20191210

Year of fee payment: 8