KR101147439B1 - Manufacturing equipment and method mould union pin for concrete - Google Patents

Manufacturing equipment and method mould union pin for concrete Download PDF

Info

Publication number
KR101147439B1
KR101147439B1 KR1020120022290A KR20120022290A KR101147439B1 KR 101147439 B1 KR101147439 B1 KR 101147439B1 KR 1020120022290 A KR1020120022290 A KR 1020120022290A KR 20120022290 A KR20120022290 A KR 20120022290A KR 101147439 B1 KR101147439 B1 KR 101147439B1
Authority
KR
South Korea
Prior art keywords
cylinder
hose
concrete formwork
fastening
fastening pin
Prior art date
Application number
KR1020120022290A
Other languages
Korean (ko)
Inventor
장순기
장세기
Original Assignee
장세기
장순기
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 장세기, 장순기 filed Critical 장세기
Priority to KR1020120022290A priority Critical patent/KR101147439B1/en
Application granted granted Critical
Publication of KR101147439B1 publication Critical patent/KR101147439B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D28/00Shaping by press-cutting; Perforating
    • B21D28/02Punching blanks or articles with or without obtaining scrap; Notching
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/02Advancing work in relation to the stroke of the die or tool
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/76Making machine elements elements not mentioned in one of the preceding groups
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/04Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

PURPOSE: An apparatus and a method for manufacturing joint pins for a concrete mold are provided to implement quick punching by automatically transferring and pressing joint pins stored in a hopper. CONSTITUTION: An apparatus for manufacturing joint pins for a concrete mold comprises a lead hose(1), a hydraulic piston pump(2), first to third insertion hoses(21,22,23), first to four cylinders(11,12,13), a press groove(34), and a press rod(32). The lead hose leads joint pins in a row one by one through a hopper. The first insertion hose has a blocking plate(5) that blocks the entry of the lead hose so that a joint pin is inserted into the first insertion hose by the down motion of the hydraulic piston pump. The first cylinder pushes the joint pin inserted in the first insertion hose to move the joint pin. The joint pin moved by the first cylinder is inserted into the second insertion hose. The second cylinder moves a joint plate(7) attached to the second insertion hose. The third cylinder pushes the joint pin, which is horizontally moved by the second cylinder. The joint pin moved by the third cylinder is inserted into the third insertion hose. The press rod is vertically inserted into the press groove to bore a wedge pin insertion hole in the joint pin. The fourth cylinder pushes the completed joint pin out.

Description

콘크리트 거푸집용 체결핀 제조 장치 및 그 방법{MANUFACTURING EQUIPMENT AND METHOD MOULD UNION PIN FOR CONCRETE}Device for manufacturing fastening pin for concrete formwork and its method {MANUFACTURING EQUIPMENT AND METHOD MOULD UNION PIN FOR CONCRETE}

콘크리트 거푸집용 체결핀 제조 장치 및 그 방법에 대한 것으로서, 보다 상세하게는 콘크리트 거푸집용 체결핀을 자동으로 이동시키고 프레스할 수 있는 콘크리트 거푸집용 체결핀 제조 장치 및 그 방법에 관한 것이다.The present invention relates to a fastening pin manufacturing apparatus for concrete formwork and a method thereof, and more particularly, to a fastening pin manufacturing apparatus for concrete formwork and a method for automatically moving and pressing the fastening pin for concrete formwork.

종래의 콘형 거푸집용 체결핀은 철재봉을 다단계로 단조하여 콘형상으로 제조하고 웨지핀 삽입구멍을 천공하는 단계를 통해 제조되는 것으로 완성된 체결핀의 중량이 73~75g이므로 중량이 많고 가격이 고가로 되는 불편이 있었다.Conventional fastening pins for cone formwork are manufactured through the step of forging a steel rod into a cone shape and drilling the wedge pin insertion hole. The weight of the finished fastening pin is 73-75g, which is high in weight and high in price. There was inconvenience to become.

이에 대한 해결책으로 한국등록특허 제0893604호는 콘크리트 거푸집을 서로 연결할 때 사용하는 체결핀 제조방법에 관한 것으로 보다 구체적인 것은 단면이 원형으로 되고 일정길이를 가지는 철사봉을 절단하여 1차성형부에 형성된 성형홈에 삽입하고 펀치와 해더를 작동시켜 펀치가 삽입되는 곳에 구멍을 형성하는 중심 구멍형성단계와 중심에 구멍이 형성된 소재를 내부가 콘형상으로 축소된 성형홈)으로 되고 입구에 콘형상으로 축소된 성형홈 입구 보다 확장되는 해드성형홈이 형성된 몸체성형홈을 가지고 입구 외측과 내측에서 가격되는 해딩 성형기를 작동시켜 구멍이 형성된 소재의 내측이 콘형상으로 축소되어 축소부를 이루고 구멍반대측에 있는 외측머리부분이 확장되는 1차성형단계를 통해 내부가 허공으로 된 기초 성형물을 얻는 기초성형단계와, 내부가 허공으로 된 기초 성형물의 외측머리부분과 내측 축소부 끝에서 해드성형기를 더 가격하여 외측머리 중심에 요입홈을 형성하면서 체결핀 형상을 완성하는 2차성형단계를 통해 체결핀 몸체를 완성하는 몸체 성형단계와, 성형된 체결핀 몸체를 체결핀 몸체와 같은 형상으로 된 펀칭홀딩부(301)가 형성되어 입구에 스프링(303)에 탄발되는 고정자(302)가 장치되고 체결핀 몸체에 형성될 웨지핀삽입공과 같은 모양의 천공펀치(304)가 체결핀 몸체와 직각방향으로 배치되어 체결핀 몸체 중간에 웨지핀삽입공을 천공하는 펀칭성형기(300)에 체결핀 몸체를 끼워 넣고 천공펀치(304)를 작동시켜 체결핀 몸체 중간에 웨지핀삽입공(2)을 천공하는 웨지핀삽입공 천공단계와 웨지핀삽입공이 천공된 체결핀을 펀칭홀딩부에서 에어실린더 밀대(305)로 밀어내어 이송덕트(307)에 낙하시키고 이송덕트에 낙하된 체결핀을 이송덕트 입구에 장치된 송풍기(306)로 불어내어 이송덕트(307)에서 수집통으로 투입시키는 단계로 제조되는 콘크리트 거푸집용 체결핀 제조방법이다.As a solution to this, Korean Patent No. 0893604 relates to a manufacturing method for fastening pins used when connecting concrete formwork to each other. More specifically, a molding groove formed in a primary molding part by cutting a wire rod having a circular cross section and having a certain length is formed. The center hole forming step of forming a hole where the punch is inserted by inserting it into the hole, and forming a hole where the punch is inserted, and forming a material in which the hole is formed in the center of the material. The head molding groove which has a head forming groove which extends more than the groove inlet is operated. Basic molding to obtain basic molding with hollow inside through expanded primary molding step Fastening pin body through the secondary molding step to complete the shape of the fastening pin while forming a recessed groove in the center of the outer head by further hitting the head molding machine at the outer head portion and the inner reduction end of the base molding having the hollow inside. Body forming step of completing the, and the forming of the fastening holding the pinned body in the same shape as the fastening pin body is formed with a stator 302 is installed in the inlet stator 302 and the fastening pin body The punching punch 304 having the same shape as the wedge pin insertion hole to be formed is disposed in a direction perpendicular to the fastening pin body to insert the fastening pin body into the punching molding machine 300 for drilling the wedge pin insertion hole in the middle of the fastening pin body. Wedge pin insertion hole drilling step for drilling the wedge pin insertion hole (2) in the middle of the fastening pin body by operating the punch 304 and push the fastening pin punched by the wedge pin insertion hole from the punching holding part to the air cylinder pusher 305 Take out Method for manufacturing fastening pins for concrete formwork, which is manufactured by dropping the fastening pin dropped on the transfer duct 307 and dropped into the collecting duct by blowing the fastening pin dropped on the transfer duct to the blower 306 installed at the inlet of the transfer duct. to be.

그러나 여전히 수동으로 스프링(303)에 탄발되는 고정자(302)를 이동시켜 체결핀을 삽입하는 것은 작업 공수를 증가시키고, 작업자의 부주의에 의한 불량발생율의 증가와 산업재해의 위험을 안고 있었다.However, manually inserting the fastening pins by moving the stator 302 that is elastically applied to the spring 303 increases the labor of the worker, and increases the incidence of defects caused by carelessness of the worker and risks of industrial accidents.

상술한 문제점을 해결하기 위하여 본 발명은 콘크리트 거푸집용 체결핀을 자동으로 이동시키고 프레스하여 체결핀을 정교한 규격 제품으로 만들 수 있는 콘크리트 거푸집용 체결핀 제조 장치 및 그 방법을 제공하는 데 목적이 있다.In order to solve the above problems, an object of the present invention is to provide an apparatus and method for manufacturing a fastening pin for concrete formwork which can automatically move and press the fastening pin for concrete formwork to form a precise standard product.

본 발명은 호퍼를 통하여 콘크리트 거푸집용 체결핀이 일렬로 하나씩 진입하도록 하는 진입호스와, 상기 진입호스의 진입로를 막고 있다가 일정 신호에 의하여 상하이동아암(arm)이 상승한 후 하강하도록 하는 유압피스톤펌프와, 상기 진입로를 막는 차단판이 일측면에 부착되고, 상기 유압피스톤펌프에 따른 하강 운동에 의하여 상기 콘크리트 거푸집용 체결핀이 삽입되는 제1삽입호스와, 상기 제1삽입호스에 삽입된 상기 콘크리트 거푸집용 체결핀을 밀어 이동시키는 제1실린더와, 상기 제1실린더가 이동시킨 상기 콘크리트 거푸집용 체결핀을 삽입받는 제2삽입호스와, 상기 제2삽입호스에 부착된 체결판을 이동시키는 제2실린더와, 상기 체결판에 부착되며, 상기 제2실린더에 의하여 상기 콘크리트 거푸집용 체결핀이 수평 이동된 후 밀어 이동시키는 제3실린더와, 상기 제3실린더가 이동시킨 상기 콘크리트 거푸집용 체결핀을 삽입받는 제3삽입호스와, 상기 제3삽입호스 중간부를 관통하여 형성된 프레스홈과, 상기 프레스홈에 직각 삽입되어 상기 콘크리트 거푸집용 체결핀에 웨지핀 삽입공을 천공하는 프레스봉과, 상기 프레스봉의 천공 후 상기 콘크리트 거푸집용 체결핀을 밀어내는 제4실린더로 구성된다.The present invention is a hydraulic piston pump for stopping the entry path of the concrete formwork fastening pins one by one through the hopper, and the entrance hose of the entry hose to the Shanghai Dong-arm (arm) ascending and descending by a certain signal And a first insertion hose to which the access plate blocking the access road is attached to one side, and the fastening pin for the concrete formwork is inserted by the lowering motion according to the hydraulic piston pump, and the concrete formwork inserted into the first insertion hose. A first cylinder for pushing the fastening pin for movement, a second insertion hose for receiving the concrete formwork fastening pin moved by the first cylinder, and a second cylinder for moving the fastening plate attached to the second insertion hose. And, it is attached to the fastening plate, the fastening pin for the concrete formwork by the second cylinder is moved horizontally and then pushed to move A third insertion hose, a third insertion hose for receiving the concrete formwork fastening pin moved by the third cylinder, a press groove formed through an intermediate portion of the third insertion hose, and a right angle inserted into the press groove to insert the concrete formwork. It consists of a press rod for punching the wedge pin insertion hole in the fastening pin for fastening, and a fourth cylinder for pushing the fastening pin for the concrete formwork after the punching of the press rod.

상기 차단판은 상기 제1삽입호스에 부착되어, 상기 유압피스톤 펌프의 하강 운동에 의해 상기 진입호스의 진입로를 차단하고, 상승 운동에 의하여 상기 진입호스의 진입로를 오픈한다.The blocking plate is attached to the first insertion hose to block the entry path of the entry hose by the downward movement of the hydraulic piston pump, and open the entry path of the entry hose by the upward movement.

상기 유압피스톤 펌프의 하강 운동 후 제1실린더, 제2실린더, 제3실린더, 제4실린더가 차례대로 상기 콘크리트 거푸집용 체결핀을 밀어 이동시키며, 상기 제3실린더가 상기 콘크리트 거푸집용 체결핀을 이동시킨 후 프레스봉이 작동하도록 제어하는 제어부가 더 포함되어 구성된다.After the downward movement of the hydraulic piston pump, the first cylinder, the second cylinder, the third cylinder, and the fourth cylinder sequentially push the fastening pins for the concrete formwork, and the third cylinder moves the fastening pins for the concrete formwork. After the control is further configured to control the press rod to operate.

본 발명은 진입호스에 의해 콘크리트 거푸집용 체결핀이 일렬로 하나씩 진입하는 단계와, 상기 진입호스의 진입로를 막고 있다가 일정 신호에 의하여 상하이동아암(arm)이 상승한 후 하강하는 단계와, 상기 진입로를 막는 차단판이 일측면에 부착되고, 상기 유압피스톤펌프에 따른 하강 운동에 의하여 상기 콘크리트 거푸집용 체결핀이 제1삽입호스에 삽입되는 단계와, 상기 제1삽입호스에 삽입된 상기 콘크리트 거푸집용 체결핀을 제1실린더가 밀어 이동시키는 단계와, 상기 제1실린더가 이동시킨 상기 콘크리트 거푸집용 체결핀이 제2삽입호스에 삽입되는 단계와, 제2실린더가 상기 제2삽입호스에 부착된 체결판을 이동시키는 단계와, 제3실린더가 상기 제2실린더에 의하여 상기 콘크리트 거푸집용 체결핀이 수평 이동된 후 밀어 이동시키는 단계와, 상기 제3실린더가 이동시킨 상기 콘크리트 거푸집용 체결핀을 제3삽입호스에 삽입하는 단계와, 상기 제3삽입호스 중간부를 관통하여 형성된 프레스홈에 프레스봉이 직각 삽입되어 상기 콘크리트 거푸집용 체결핀에 웨지핀 삽입공을 천공하는 단계와, 상기 프레스봉의 천공 후 제4실린더가 상기 콘크리트 거푸집용 체결핀을 밀어내는 단계로 이루어진다.The present invention comprises the steps of entering the concrete formwork fastening pins one by one by the entry hose, the step of blocking the entry of the entry hose and descending after the Shanghai East Arm (arm) by a certain signal, and the access road Blocking plate is attached to one side, and the fastening pin for the concrete formwork is inserted into the first insertion hose by the lowering motion according to the hydraulic piston pump, and the concrete formwork fastening inserted into the first insertion hose A step of pushing the pin by the first cylinder, inserting the fastening pin for concrete formwork moved by the first cylinder into a second insertion hose, and a fastening plate having the second cylinder attached to the second insertion hose. And moving the fastening pins after the fastening pins for the concrete formwork are horizontally moved by the second cylinder by the second cylinder; Inserting the concrete formwork fastening pin moved by the third cylinder into the third insertion hose, and a press rod is inserted at right angles into the press groove formed through the middle portion of the third insertion hose, thereby inserting a wedge pin to the fastening pin for the concrete formwork. Perforating the insertion hole, and the fourth cylinder after the punching of the press rod consists of the step of pushing the fastening pin for the concrete formwork.

본 발명에 따르면 호퍼에 미리 저장된 콘크리트 거푸집용 체결핀을 자동으로 이동시키고 프레스하여 천공작업이 사람의 손이 필요 없이 용이하고 신속하게 이루어진다.According to the present invention, by automatically moving and pressing the concrete formwork fastening pins pre-stored in the hopper, the drilling operation is easily and quickly made without the need of a human hand.

또한 본 발명에 따르면 자동화 공정에 의해 콘크리트 거푸집용 체결핀을 정교한 규격 제품으로 만들 수 있다.In addition, according to the present invention it is possible to make a fastening pin for concrete formwork into an elaborate standard product by an automated process.

도1은 종래 발명에 따른 수동 콘크리트 거푸집용 체결핀 제조장치.
도2는 본 발명의 일실시예에 따른 콘크리트 거푸집용 체결핀 제조 장치의 전체적인 구성을 보여주고, 아암이 하강한 상태를 보여주는 도면.
도3은 본 발명에 따라 아암이 상승하여 체결핀이 삽입되는 모습을 보여주는 도면.
도4는 본 발명에 따라 상승 운동에 의하여 진입호스의 진입로를 오픈하는 것을 보여주는 절단면도.
도5는 본 발명에 따라 진입로가 오픈된 후 이동된 체결핀을 유압피스톤펌프에 의해 하강 이동시키는 것을 보여주는 절단면도.
도6(a)(b)는 제1실린더가 제1삽입호스에 삽입된 콘크리트 거푸집용 체결핀을 밀어 이동시키는 것을 보여주는 도면.
도7은 제2실린더가 제2삽입호스에 부착된 체결판을 이동시키는 것을 보여주는 도면.
도8(a)(b)는 제3실린더가 체결판에 부착되어, 제2실린더에 의하여 콘크리트 거푸집용 체결핀을 수평 이동시킨 후 밀어 이동시키는 것을 보여주는 도면.
도9와 도10과 도11은 프레스봉으로 프레스홈에 웨지핀 삽입공을 천공하는 것을 순서대로 보여주는 도면.
도12는 제4실린더가 프레스봉의 천공 후 콘크리트 거푸집용 체결핀을 밀어내는 것을 보여주는 도면.
도13은 본 발명에 따른 콘크리트 거푸집용 체결핀을 보여주는 사시도.
1 is a fastening pin manufacturing apparatus for manual concrete formwork according to the conventional invention.
Figure 2 shows the overall configuration of the fastening pin manufacturing apparatus for concrete formwork according to an embodiment of the present invention, a view showing a state in which the arm is lowered.
Figure 3 is a view showing a state in which the arm is raised fastening pin is inserted according to the present invention.
Figure 4 is a cross-sectional view showing the opening of the entry path of the entry hose by the upward movement in accordance with the present invention.
Figure 5 is a cross-sectional view showing the downward movement of the fastening pin moved by the hydraulic piston pump after the access road is opened in accordance with the present invention.
Figure 6 (a) (b) is a view showing that the first cylinder pushes the fastening pin for concrete formwork inserted into the first insertion hose.
7 shows the second cylinder moving the fastening plate attached to the second insertion hose.
Figure 8 (a) (b) is a view showing that the third cylinder is attached to the fastening plate, by the second cylinder to move the fastening pin for concrete formwork horizontally and then push.
9 and 10 and 11 is a view showing in order to drill the wedge pin insertion hole in the press groove with a press rod.
Figure 12 shows that the fourth cylinder pushes the fastening pin for the concrete formwork after the punching of the press rod.
Figure 13 is a perspective view showing a fastening pin for concrete formwork according to the present invention.

이하 본 발명의 실시를 위한 구체적인 내용을 도면을 참고하여 자세히 설명한다.Hereinafter, with reference to the drawings will be described in detail for the practice of the present invention.

본 발명에 따른 콘크리트 거푸집용 체결핀 제조 장치는 진입호스(1)와, 유압피스톤펌프(2)와, 제1삽입호스(21)와, 제1실린더(11)와, 제2삽입호스(22)와, 제2실린더(12)와, 제3실린더(13)와, 제3삽입호스(23)와, 프레스홈(34)과, 프레스봉(32)과, 제4실린더(14)로 크게 구성된다.Fastening pin manufacturing apparatus for concrete formwork according to the present invention is the entry hose (1), the hydraulic piston pump (2), the first insertion hose 21, the first cylinder (11), the second insertion hose (22) ), A second cylinder 12, a third cylinder 13, a third insertion hose 23, a press groove 34, a press rod 32, and a fourth cylinder 14 It is composed.

도2와 도3과 도4에서 보는 바와 같이 진입호스(1)는 호퍼(미도시)를 통하여 콘크리트 거푸집용 체결핀(100)이 진입되는 호스로서, 내부가 상기 콘크리트 거푸집용 체결핀(100)이 일렬로 하나씩 진입할 수 있는 지름을 가지고 있다.2, 3 and 4, the entry hose 1 is a hose into which the concrete formwork fastening pin 100 enters through a hopper (not shown), and the inside of the concrete formwork fastening pin 100 is provided. It has a diameter that can enter one by one in this line.

유압피스톤펌프(2)는 상기 진입호스(1)의 진입로를 막고 있다가 일정 신호에 의하여 상하이동아암(arm)이 상승한 후 하강하도록 하는 펌프로서, 상하 이동 운동을 반복하여 실시할 수 있는 다양한 펌프로 대체 가능하다.Hydraulic piston pump (2) is a pump to block the entrance of the entry hose (1), but the Shanghai East Arm (arm) ascends and descends by a certain signal, various pumps that can be repeatedly performed up and down movement It can be replaced with

또한 상기 유압피스톤펌프(2)는 걸림대(4)를 통해 지랫대 원리로 피스톤(3)의 움직임을 더 용이하게 할 수도 있다.In addition, the hydraulic piston pump (2) may make the movement of the piston (3) more easily on the basis of the belt through the hanging bar (4).

제1삽입호스(21)는 상기 진입로를 막는 차단판(5)이 일측면에 부착되고, 상기 유압피스톤펌프에 따른 하강 운동에 의하여 상기 콘크리트 거푸집용 체결핀(100)이 삽입되는 호스로서, 상기 차단판(5)은 상기 제1삽입호스(21)에 부착되어, 상기 유압피스톤 펌프(2)의 하강 운동에 의해 상기 진입호스(1)의 진입로를 차단하고, 도4에서 보는 바와 같이 상승 운동에 의하여 상기 진입호스(1)의 진입로를 오픈하는 것이 바람직하다.The first insertion hose 21 is a hose to which the blocking plate 5 which blocks the access road is attached to one side, and the fastening pin 100 for the concrete formwork is inserted by the lowering motion according to the hydraulic piston pump. The blocking plate 5 is attached to the first insertion hose 21 to block the entry path of the entry hose 1 by the downward movement of the hydraulic piston pump 2, and as shown in FIG. 4, the upward movement. It is preferable to open the access path of the entry hose (1) by.

또한 도5에서 보는 바와 같이 진입로가 오픈된 후 이동된 체결핀(100)을 유압피스톤펌프에 의해 하강 이동시킨다.In addition, as shown in FIG. 5, the fastening pin 100 moved after the access road is opened is moved downward by the hydraulic piston pump.

도6(a)(b)에서 보는 바와 같이 제1실린더(11)는 상기 제1삽입호스(21)에 삽입된 상기 콘크리트 거푸집용 체결핀(100)을 밀어 이동시키는 장치로서, 상기 콘크리트 거푸집용 체결핀(100)이 제2삽입호스(22)로 삽입되도록 한다.As shown in Figure 6 (a) (b), the first cylinder 11 is a device for pushing the fastening pin 100 for the concrete formwork inserted into the first insertion hose 21, the concrete formwork The fastening pin 100 is inserted into the second insertion hose 22.

즉 제2삽입호스(22)는 상기 제1실린더(11)가 이동시킨 상기 콘크리트 거푸집용 체결핀(100)을 삽입받는다.That is, the second insertion hose 22 receives the fastening pin 100 for the concrete formwork moved by the first cylinder 11.

계속하여 도7에서 보는 바와 같이 제2실린더(12)는 상기 제2삽입호스(22)에 부착된 체결판(7)을 이동시키는 데, 상기 체결판(7)에는 제3실린더(13)와 상기 제2삽입호스(22)가 체결되는 것이 바람직하다.Subsequently, as shown in FIG. 7, the second cylinder 12 moves the fastening plate 7 attached to the second insertion hose 22, and the fastening plate 7 has a third cylinder 13. It is preferable that the second insertion hose 22 is fastened.

이를 위해 상기 제3실린더(13)는 체결뭉치(8)에 의해 상기 체결판(7)에 부착된다.To this end, the third cylinder 13 is attached to the fastening plate 7 by a fastening bundle 8.

도8(a)(b)에서 보는 바와 같이 제3실린더(13)는 상기 체결판(7)에 부착되며, 상기 제2실린더(12)에 의하여 상기 콘크리트 거푸집용 체결핀(100)이 수평 이동된 후 밀어 이동시키는 장치이다.As shown in FIG. 8 (a) (b), the third cylinder 13 is attached to the fastening plate 7, and the fastening pin 100 for concrete formwork is moved horizontally by the second cylinder 12. It is a device that moves after being pushed.

제3삽입호스(23)는 상기 제3실린더(13)가 이동시킨 상기 콘크리트 거푸집용 체결핀(100)을 삽입받는 호스로서, 프레스홈이 형성된 프레스판(9)을 관통하여 형성된다.The third insertion hose 23 is a hose receiving the fastening pin 100 for the concrete formwork moved by the third cylinder 13, and is formed through the press plate 9 in which the press groove is formed.

도9와 도10과 도11에서 보는 바와 같이 프레스홈(34)은 상기 제3삽입호스(23) 중간부를 관통하여 형성된 홈으로서, 상기 제3삽입호스(23)를 관통하고, 상기 프레스홈을 프레스한 프레스봉(32)은 상기 프레스홈(34)에 직각 삽입되어 상기 콘크리트 거푸집용 체결핀(100)에 웨지핀 삽입공을 천공한다.9, 10, and 11, the press groove 34 is a groove formed through an intermediate portion of the third insertion hose 23, passes through the third insertion hose 23, and opens the press groove. The pressed press rod 32 is inserted into the press groove 34 at a right angle to drill the wedge pin insertion hole in the fastening pin 100 for the concrete formwork.

도12에서 보는 바와 같이 제4실린더(14)는 상기 프레스봉(32)의 천공 후 상기 콘크리트 거푸집용 체결핀(100)을 밀어낸다.As shown in FIG. 12, the fourth cylinder 14 pushes the fastening pin 100 for the concrete formwork after drilling the press rod 32.

다시말해 본 발명은 상기 유압피스톤 펌프(2)의 하강 운동 후 제1실린더(11), 제2실린더(12), 제3실린더(13), 제4실린더(14)가 차례대로 상기 콘크리트 거푸집용 체결핀(100)을 밀어 이동시키며, 상기 일련의 일정한 명령이 미리 저장된 제어부에 의해 연속 작용이 가능하다.In other words, the present invention is the first cylinder 11, the second cylinder 12, the third cylinder 13, the fourth cylinder 14 in order for the concrete formwork after the downward movement of the hydraulic piston pump (2) The fastening pin 100 is moved, and the series of predetermined commands can be continuously operated by the pre-stored control unit.

또한 여기에서 본 발명에 따른 상기 제3실린더(13)가 상기 콘크리트 거푸집용 체결핀(100)을 이동시킨 후 프레스봉이 작동하도록 제어하는 것이 바람직하다.
In addition, it is preferable that the third cylinder 13 according to the present invention controls the press rod to operate after moving the fastening pin 100 for the concrete formwork.

이하 본 발명에 따른 콘크리트 거푸집용 체결핀 제조 방법의 실시를 위한 구체적인 내용을 도면을 참고하여 자세히 설명한다.Hereinafter will be described in detail with reference to the drawings for carrying out the method of manufacturing a fastening pin for concrete formwork according to the present invention.

먼저 진입호스에 의해 콘크리트 거푸집용 체결핀이 일렬로 하나씩 진입시킨다. 이 경우 상측부로 곡면을 두거나 진동에 의해 상기 체결핀이 용이하게 진입할 수 있도록 한다.First, fastening pins for concrete formwork enter one by one by the entry hose. In this case, the fastening pin can be easily entered by placing a curved surface toward the upper side or by vibration.

그리고 상기 진입호스의 진입로를 막고 있다가 일정 신호에 의하여 상하이동아암(arm)이 상승한 후 하강한다.Then, the entrance hose of the entry hose is blocked and the Shanghai East Arm (arm) ascends and descends by a certain signal.

또한 상기 진입로를 막는 차단판이 일측면에 부착되고, 상기 유압피스톤펌프에 따른 하강 운동에 의하여 상기 콘크리트 거푸집용 체결핀이 제1삽입호스에 삽입된다.In addition, a blocking plate blocking the access road is attached to one side, the fastening pin for the concrete formwork is inserted into the first insertion hose by the lowering motion according to the hydraulic piston pump.

계속하여 상기 제1삽입호스에 삽입된 상기 콘크리트 거푸집용 체결핀을 제1실린더가 밀어 이동시킨다.Subsequently, the first cylinder pushes the fastening pin for concrete formwork inserted into the first insertion hose.

그리고 상기 제1실린더가 이동시킨 상기 콘크리트 거푸집용 체결핀이 제2삽입호스에 삽입된다.And the fastening pin for concrete formwork moved by the first cylinder is inserted into the second insertion hose.

또한 제2실린더가 상기 제2삽입호스에 부착된 체결판을 이동시킨다.Also, a second cylinder moves the fastening plate attached to the second insertion hose.

계속하여 제3실린더가 상기 제2실린더에 의하여 상기 콘크리트 거푸집용 체결핀이 수평 이동된 후 밀어 이동시킨다.Subsequently, the third cylinder is pushed and moved after the fastening pin for the concrete formwork is horizontally moved by the second cylinder.

그리고 상기 제3실린더가 이동시킨 상기 콘크리트 거푸집용 체결핀을 제3삽입호스에 삽입한다.Then, the fastening pin for concrete formwork moved by the third cylinder is inserted into a third insertion hose.

계속하여 상기 제3삽입호스 중간부를 관통하여 형성된 프레스홈에 프레스봉이 직각 삽입되어 상기 콘크리트 거푸집용 체결핀에 웨지핀 삽입공을 천공한다.Subsequently, a press rod is inserted at right angles into the press groove formed through the intermediate portion of the third insertion hose to drill a wedge pin insertion hole in the fastening pin for concrete formwork.

그리고 상기 프레스봉의 천공 후 제4실린더가 상기 콘크리트 거푸집용 체결핀을 밀어낸다.
After the punching of the press rod, the fourth cylinder pushes the fastening pin for the concrete formwork.

1 : 진입호스 2 : 유압피스톤펌프
3 : 피스톤 4 : 걸림대
5 : 차단판 6 : 제1삽입호스 연결부
7 : 체결판 8 : 체결뭉치
9 : 프레스판 11 : 제1실린더
12 : 제2실린더 13 : 제3실린더
14 : 제4실린더 21 : 제1삽입호스
22 : 제2삽입호스 23 : 제3삽입호스
32 : 프레스봉 34 : 프레스홈
100 : 콘크리트 거푸집용 체결핀
1: Entry hose 2: Hydraulic piston pump
3: piston 4: hanger
5: blocking plate 6: first insertion hose connecting portion
7: fastening plate 8: fastening bundle
9: press plate 11: first cylinder
12: 2nd cylinder 13: 3rd cylinder
14: 4th cylinder 21: 1st insertion hose
22: second insertion hose 23: third insertion hose
32: press rod 34: press groove
100: fastening pin for concrete formwork

Claims (4)

호퍼를 통하여 콘크리트 거푸집용 체결핀이 일렬로 하나씩 진입하도록 하는 진입호스와;
상기 진입호스의 진입로를 막고 있다가 일정 신호에 의하여 상하이동아암(arm)이 상승한 후 하강하도록 하는 유압피스톤펌프와;
상기 진입로를 막는 차단판이 일측면에 부착되고, 상기 유압피스톤펌프에 따른 하강 운동에 의하여 상기 콘크리트 거푸집용 체결핀이 삽입되는 제1삽입호스와;
상기 제1삽입호스에 삽입된 상기 콘크리트 거푸집용 체결핀을 밀어 이동시키는 제1실린더와;
상기 제1실린더가 이동시킨 상기 콘크리트 거푸집용 체결핀을 삽입받는 제2삽입호스와;
상기 제2삽입호스에 부착된 체결판을 이동시키는 제2실린더와;
상기 체결판에 부착되며, 상기 제2실린더에 의하여 상기 콘크리트 거푸집용 체결핀이 수평 이동된 후 밀어 이동시키는 제3실린더와;
상기 제3실린더가 이동시킨 상기 콘크리트 거푸집용 체결핀을 삽입받는 제3삽입호스와;
상기 제3삽입호스 중간부를 관통하여 형성된 프레스홈과;
상기 프레스홈에 직각 삽입되어 상기 콘크리트 거푸집용 체결핀에 웨지핀 삽입공을 천공하는 프레스봉과;
상기 프레스봉의 천공 후 상기 콘크리트 거푸집용 체결핀을 밀어내는 제4실린더;로 구성되는 것을 특징으로 하는 콘크리트 거푸집용 체결핀 제조 장치.
An entry hose through which a fastening pin for concrete formwork enters one by one through a hopper;
A hydraulic piston pump which blocks the entry path of the entry hose and causes the Shanghai East Arm to rise and descend according to a predetermined signal;
A first insertion hose to which the blocking plate which blocks the access road is attached to one side, and the fastening pin for the concrete formwork is inserted by the lowering motion according to the hydraulic piston pump;
A first cylinder for pushing the fastening pin for concrete formwork inserted into the first insertion hose;
A second insertion hose receiving the fastening pin for concrete formwork moved by the first cylinder;
A second cylinder for moving the fastening plate attached to the second insertion hose;
A third cylinder attached to the fastening plate and configured to move the fastening pin for concrete formwork horizontally by the second cylinder and then to move the fastening pin;
A third insertion hose receiving the fastening pin for concrete formwork moved by the third cylinder;
A press groove formed through the intermediate portion of the third insertion hose;
A press rod inserted into the press groove at a right angle to drill a wedge pin insertion hole in the fastening pin for concrete formwork;
Fourth cylinder for pushing the fastening pin for concrete formwork after drilling of the press rod; Concrete formwork fastening pin manufacturing apparatus, characterized in that consisting of.
제1항에 있어서,
상기 차단판은,
상기 제1삽입호스에 부착되어, 상기 유압피스톤 펌프의 하강 운동에 의해 상기 진입호스의 진입로를 차단하고, 상승 운동에 의하여 상기 진입호스의 진입로를 오픈하는 것을 특징으로 하는 콘크리트 거푸집용 체결핀 제조 장치.
The method of claim 1,
The blocking plate,
Attached to the first insertion hose, the fastening pin manufacturing apparatus for concrete formwork, characterized in that to block the entry path of the entry hose by the downward movement of the hydraulic piston pump, and to open the entry path of the entry hose by the upward movement. .
제1항에 있어서,
상기 유압피스톤 펌프의 하강 운동 후 제1실린더, 제2실린더, 제3실린더, 제4실린더가 차례대로 상기 콘크리트 거푸집용 체결핀을 밀어 이동시키며, 상기 제3실린더가 상기 콘크리트 거푸집용 체결핀을 이동시킨 후 프레스봉이 작동하도록 제어하는 제어부가 더 포함되어 구성되는 것을 특징으로 하는 콘크리트 거푸집용 체결핀 제조 장치.
The method of claim 1,
After the downward movement of the hydraulic piston pump, the first cylinder, the second cylinder, the third cylinder, and the fourth cylinder sequentially push the fastening pins for the concrete formwork, and the third cylinder moves the fastening pins for the concrete formwork. Fastening pin manufacturing apparatus for concrete formwork, characterized in that further comprising a control unit for controlling the press rod to operate after.
진입호스에 의해 콘크리트 거푸집용 체결핀이 일렬로 하나씩 진입하는 단계와;
상기 진입호스의 진입로를 막고 있다가 일정 신호에 의하여 상하이동아암(arm)이 상승한 후 하강하는 단계와;
상기 진입로를 막는 차단판이 일측면에 부착되고, 유압피스톤펌프에 따른 하강 운동에 의하여 상기 콘크리트 거푸집용 체결핀이 제1삽입호스에 삽입되는 단계와;
상기 제1삽입호스에 삽입된 상기 콘크리트 거푸집용 체결핀을 제1실린더가 밀어 이동시키는 단계와;
상기 제1실린더가 이동시킨 상기 콘크리트 거푸집용 체결핀이 제2삽입호스에 삽입되는 단계와;
제2실린더가 상기 제2삽입호스에 부착된 체결판을 이동시키는 단계와;
제3실린더가 상기 제2실린더에 의하여 상기 콘크리트 거푸집용 체결핀이 수평 이동된 후 밀어 이동시키는 단계와;
상기 제3실린더가 이동시킨 상기 콘크리트 거푸집용 체결핀을 제3삽입호스에 삽입하는 단계와;
상기 제3삽입호스 중간부를 관통하여 형성된 프레스홈에 프레스봉이 직각 삽입되어 상기 콘크리트 거푸집용 체결핀에 웨지핀 삽입공을 천공하는 단계와;
상기 프레스봉의 천공 후 제4실린더가 상기 콘크리트 거푸집용 체결핀을 밀어내는 단계;로 이루어지는 것을 특징으로 하는 콘크리트 거푸집용 체결핀 제조 방법.
A step of entering the concrete formwork fastening pins one by one by an entry hose;
Blocking the entry route of the entry hose and then descending after the Shanghai East Arm is raised by a certain signal;
A blocking plate blocking the access road is attached to one side, and the fastening pin for the concrete formwork is inserted into the first insertion hose by the lowering motion according to the hydraulic piston pump;
A first cylinder pushing and moving the fastening pin for concrete formwork inserted into the first insertion hose;
Inserting the concrete formwork fastening pin moved by the first cylinder into a second insertion hose;
Moving a fastening plate attached to the second insertion hose by a second cylinder;
A third cylinder pushing the concrete form fastening pin by the second cylinder to move the horizontally and then pushing it;
Inserting the concrete formwork fastening pin moved by the third cylinder into a third insertion hose;
Inserting a press rod at a right angle into a press groove formed through the middle portion of the third insertion hose to drill a wedge pin insertion hole in the fastening pin for concrete formwork;
4. The method of manufacturing the fastening pins for concrete formwork, characterized in that the fourth cylinder pushes the fastening pins for concrete formwork after drilling of the press rod.
KR1020120022290A 2012-03-05 2012-03-05 Manufacturing equipment and method mould union pin for concrete KR101147439B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120022290A KR101147439B1 (en) 2012-03-05 2012-03-05 Manufacturing equipment and method mould union pin for concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120022290A KR101147439B1 (en) 2012-03-05 2012-03-05 Manufacturing equipment and method mould union pin for concrete

Publications (1)

Publication Number Publication Date
KR101147439B1 true KR101147439B1 (en) 2012-05-21

Family

ID=46272325

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120022290A KR101147439B1 (en) 2012-03-05 2012-03-05 Manufacturing equipment and method mould union pin for concrete

Country Status (1)

Country Link
KR (1) KR101147439B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002153940A (en) 2000-11-22 2002-05-28 Somic Ishikawa Inc Jointing device and method for producing its housing
KR100893604B1 (en) 2008-06-17 2009-04-20 미래테크(주) Manufacturing method mould union pin for concrete

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002153940A (en) 2000-11-22 2002-05-28 Somic Ishikawa Inc Jointing device and method for producing its housing
KR100893604B1 (en) 2008-06-17 2009-04-20 미래테크(주) Manufacturing method mould union pin for concrete

Similar Documents

Publication Publication Date Title
CN109109003B (en) Firmly snatch manipulator
KR20110093065A (en) Apparatus for automatically forming pin-hole of aluminum form
CN103522568A (en) Pneumatic pressure machine
CN105057535A (en) Forging and stamping mold and forging and stamping system provided with same
CN102366918B (en) Automatic production line for concrete tubular pile
KR101147439B1 (en) Manufacturing equipment and method mould union pin for concrete
CN212042225U (en) Punching mechanism convenient for cleaning waste
CN207981998U (en) A kind of hole punched device for greenhouse aluminium section bar
CN105665535A (en) Motor stamping piece die
KR101346108B1 (en) Gripper dvice for wire transfer
CN204770423U (en) Forge and press mould and have forging and pressing system of this forging and pressing mould
CN205798088U (en) A kind of stamping machine automatic blanking device
CN110508633B (en) Automatic die penetrating equipment and die penetrating method applying same
CN104438826B (en) The progressive die walks to expect Anti-dislocation method
KR101758790B1 (en) Apparatus for Punching the Joint Flange for Concrete Pile Mold
CN106077233A (en) A kind of full-automatic multi-direction perforating press
CN207267008U (en) A kind of stamping equipment doffer
CN107009638B (en) Hot riveting machine
JP2002301513A (en) Draw bench
CN104827268A (en) Automatic assembling machine for riveting shells and rivet stems
WO2010016036A1 (en) Template for centering rollers at the foot of an ingot mold
CN105618663B (en) Rivet rejects instrument and its method
CN104226803B (en) One bends tube system and circle mold mechanism thereof
CN210023435U (en) Punching die
JPH0494828A (en) Method and device for feeding front end of material to progressive die

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee