KR101120071B1 - Climbing jack system in lifting of heavy weight equipment - Google Patents

Climbing jack system in lifting of heavy weight equipment Download PDF

Info

Publication number
KR101120071B1
KR101120071B1 KR1020090119164A KR20090119164A KR101120071B1 KR 101120071 B1 KR101120071 B1 KR 101120071B1 KR 1020090119164 A KR1020090119164 A KR 1020090119164A KR 20090119164 A KR20090119164 A KR 20090119164A KR 101120071 B1 KR101120071 B1 KR 101120071B1
Authority
KR
South Korea
Prior art keywords
jack
lifting
heavy
coupled
cylinder
Prior art date
Application number
KR1020090119164A
Other languages
Korean (ko)
Other versions
KR20110062442A (en
Inventor
심상호
Original Assignee
세방 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 세방 주식회사 filed Critical 세방 주식회사
Priority to KR1020090119164A priority Critical patent/KR101120071B1/en
Publication of KR20110062442A publication Critical patent/KR20110062442A/en
Application granted granted Critical
Publication of KR101120071B1 publication Critical patent/KR101120071B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/46Combinations of several jacks with means for interrelating lifting or lowering movements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/10Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks
    • B66F7/16Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by one or more hydraulic or pneumatic jacks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F17/00Safety devices, e.g. for limiting or indicating lifting force

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

본 발명은 초중량물 인양용 크라이밍 잭 장치에 관한 것으로, 상기의 초중량물을 받쳐놓은 상태에서 서서히 들어올림에 따라 상기 초중량물을 보다 안전하게 설치할 뿐만 아니라 안전사고를 방지하도록 한 것이다. The present invention relates to a lifting jack lifting device for super-heavy weight lifting, and to prevent the safety accident as well as to install the super-heavy weight more safely by gradually lifting in the state holding the super-heavy weight.

이를 위해, 본 발명은 부두항이나 건설현장, 조선소, 화학설비공장 등에서 무게가 많이 나가는 무거운 초중량화물, 대형 골리앗크레인, 화공 PLANT 및 기타 공장 설치자재 등과 같은 초중량물을 들어올리도록 하는 크라이밍 잭 장치가 설치되되, 상기의 크라이밍 잭 장치는, 지면에 하부가 접촉되어 상기 크라이밍 잭 장치의 각 구성을 지지하도록 하는 마스트와, 상기 마스트의 일측면에 결합되는 세로방향으로 길게 형성되는 적어도 하나 이상의 스케어 바와, 상기 스케어 바에는 상기 스케어 바를 따라 상하방향으로 왕복이동가능하게 결합되어 상기의 초중량물을 들어올렸다 내렸다 하도록 하는 크라이밍 잭부와, 상기 크라이밍 잭부의 상부에 설치되어 상기 크라이밍 잭부에 의해 상하방향으로 왕복이동하도록 상기 초중량물을 지지하는 리프팅 빔으로 구성된 것이다. To this end, the present invention is a climbing jack device to lift the super-heavy cargo, such as heavy super-heavy cargo, large goliath crane, chemical plant and other plant installation materials such as heavy weight in the dock port, construction site, shipyard, chemical equipment factory, etc. Is provided, wherein the climbing jack device, the bottom is in contact with the ground to support each of the components of the climbing jack device, and at least one longitudinally long coupled to one side of the mast Scare bar and the scare bar is coupled to the reciprocating movement in the vertical direction along the scare bar, the climbing jack portion for lifting and lowering the super-heavy weight, and installed on top of the climbing jack portion by the climbing jack portion Lifting beam for supporting the super-heavy weight to reciprocate in the vertical direction It is configured.

초중량물, 크라이밍 잭 장치, 마스트, 스케어 바, 크라이밍 잭부 Super Heavy, Climbing Jack Device, Mast, Scare Bar, Climbing Jack

Description

초중량물 인양용 크라이밍 잭 장치{CLIMBING JACK SYSTEM IN LIFTING OF HEAVY WEIGHT EQUIPMENT}Climbing jack device for super heavy lifting {CLIMBING JACK SYSTEM IN LIFTING OF HEAVY WEIGHT EQUIPMENT}

본 발명은 부두항이나 건설현장, 조선소, 화학설비공장 등에서 무게가 많이 나가는 무거운 초중량화물, 대형 골리앗크레인, 화공 PLANT 및 기타 공장 설치자재 등과 같은 초중량물을 들어올리도록 하는 크라이밍 잭(climbing jack) 장치에 관한 것으로서, 좀 더 구체적으로는 크라이밍 잭 장치를 이용하여 초중량물을 받쳐놓은 상태에서 서서히 들어올림에 따라 상기 초중량물을 보다 안전하게 설치할 뿐만 아니라 상기 초중량물 인양과정에서 발생할 수 있는 안전사고를 미연에 방지하도록 한 초중량물 인양용 크라이밍 잭 장치에 관한 것이다. The present invention is a climbing jack (climbing jack) to lift a super heavy cargo, such as heavy super heavy cargo, large Goliath crane, chemical plant and other plant installation materials such as heavy weight in dock port or construction site, shipyard, chemical equipment factory As the device relates to the device, more specifically, the safe lifting of the super heavy material by slowly lifting the super heavy material using the climbing jack device, as well as the safety accidents that may occur during the super heavy lifting process It relates to a super heavy lifting lifting jack device to prevent in advance.

일반적으로 겐트리 크레인(Gantry Crane, 일명 골리앗 크레인)과 같은 장비를 세워 설치하거나 또는, 무게가 많이 나가는 초중량물을 들어올리기 위하여 타워 크레인 및 호이스트 등과 같은 장치를 이용한다. In general, a device such as a gantry crane (Gantry Crane, also known as a Goliath crane) is installed upright, or a device such as a tower crane and a hoist is used to lift a heavy weight.

그러나, 이러한 종래의 타워크레인 및 호이스트 등의 장치는 무게가 많이 나가는 겐트리 크레인을 세워 설치하거나 초중량물을 들어올릴 때 일정한 무게 이상 들어올 수 없으므로 상기 겐트리 크레인을 세워 설치할 수 없음은 물론 들어올 수 있는 하중을 벗어난 무게 즉, 초중량물을 들어올릴 수 없는 문제점이 있었다. However, such a conventional tower crane and a hoist device, such as the installation of a heavy gantry crane, or can not enter more than a certain weight when lifting the super-heavy weight can not install the gantry crane can be installed, of course There was a problem that the weight off the load, that is, can not lift the super heavy.

또한, 상기 타워 크레인이나 호이스트를 이용하여 초중량물을 들어올릴 때 와이어 및 고리를 이용하여 상기의 와이어 및 고리를 초중량물에 걸어 고정한 상태에서 들어올리는 인양작업함에 따라 상기 인양과정에서 초중량물이 흔들리는 현상이 발생되므로 인하여 상기 초중량물을 안전하게 인양 및 설치하지 못하는 문제가 발생될 뿐만 아니라 상기 와이어 및 고리에서 초중량물을 걸어놓은 부분이 상기 초중량물의 흔들림으로 인하여 해제될 경우 상기 초중량물이 낙하되어 큰 안전사고의 위험이 따르는 문제점도 있었다. In addition, when lifting the super heavy object by using the tower crane or hoist lifting the super heavy object in the lifting process by lifting the wire and the hook in the fixed state by fixing the wire and the hook using the super heavy object phenomenon This causes not only the problem of failing to safely lift and install the super-heavy goods, but also the super-heavy weight falls when the super heavy material hangs from the wire and the ring is released due to the shaking of the super-heavy weight. There was also a problem with the risk of an accident.

그리고, 실외에서 상기 초중량물을 들어올리는 작업을 할 때 상기 작업장 주변에서 발생하는 바람 즉, 강풍이 불 때에 들어올려지는 초중량물이 흔들릴 뿐만 아니라 상기 지상으로부터 일정높이 이상 올라가게 되면 바람의 영향이 더 커짐에 따라 상기 초중량물의 흔들림이 더 심해지게 되므로 상기 초중량물이 인양하는 과정에서 낙하하는 사고가 발생됨은 물론 상기 초중량물의 낙하사고에 따라 물건의 파손 및 인명 사고의 위험도 발생하는 문제점도 있었다. In addition, when the work of lifting the super-heavy weights outdoors, the wind generated around the work site, that is, the super-heavy weights lifted when the strong winds are not only shaken, but also rises above a certain height from the ground, the effect of the wind is more. As the size of the super-heavy weight is increased, the shaking of the super-heavy weight is more severe. As a result, the accident of falling in the process of lifting the super-heavy weight, as well as the risk of damage to a product and a casualty accident, occurs according to the falling accident of the super-heavy weight.

한편, 무게가 많이 나가는 초중량물을 들어올릴 때 사용되는 타워크레인 및 호이스트를 크게 제작함은 물론 상기 초중량물을 걸어 고정하는 와이어 및 고리의강도 역시 높이도록 굵고 강하게 제작하여야 하는 등 상기 초중량물을 들어올리는 장비 제작에 따른 비용이 많이 듦은 물론 장비 제작을 쉽지 않은 문제점도 있었다. On the other hand, the tower crane and hoist used to lift a heavy weight heavy weight, as well as to produce a large and strong so as to increase the strength of the wire and the hook to fasten the super-heavy weight and also to lift There was a problem that the production of equipment is not easy to raise the cost of raising the equipment.

본 발명은 상기한 바와 같은 종래 기술에서의 문제점을 해결하기 위하여 제안된 것으로서, 마스트와 스케어 바 및 크라이밍 잭부와 리프팅 빔이 구비된 크라이밍 잭 장치를 구성하도록 하여 상기 크라이밍 잭 장치의 마스트를 따라 크라이밍 잭부가 서서히 상하로 왕복이동하면서 리프팅 빔을 이동시킴에 따라 상기 리프팅 빔에 얹혀진 초중량물을 서서히 들어올리면서 이동시키므로 상기 초중량물을 보다 안전하게 들어올림은 물론 설치할 뿐만 아니라 단일 무게가 최대 약 8,000 TON 까지 초중량물이라도 충분히 들어올 수 있도록 하는데 그 목적이 있다. The present invention has been proposed in order to solve the problems in the prior art as described above, to make the mast of the crying jack device by configuring the mast, the scare bar and the crying jack device provided with the climbing jack portion and the lifting beam. Accordingly, as the climbing jack moves the lifting beam by reciprocating up and down gradually, the super heavy weight mounted on the lifting beam is gradually lifted and moved, thus not only lifting and installing the super heavy weight more safely but also a single weight up to about 8,000 Its purpose is to make it possible to get enough super heavy materials up to TON.

또한, 본 발명은 크라이밍 잭 장치의 리프팅 빔에 초중량물이 얹혀져 고정된 상태에서 들어 올려짐에 따라 상기 들어 올려지는 과정에서 상기 초중량물이 움직이지 않은 물론 바람에도 영향이 받지 않음에 따라 상기 초중량물의 낙하를 방지하면서도 초중량물이 안전하게 들어올려 설치함은 물론 상기 초중량물에 의한 안전사고를 미연에 방지하도록 하는데 그 목적이 있다. In addition, according to the present invention, the super-heavy weight is placed on the lifting beam of the climbing jack device as the super-heavy weight is lifted in a fixed state, so that the super-heavy weight does not move as well as the wind is not affected by the lifting process. While preventing the fall of the super-heavy weight is safely installed, as well as the purpose of preventing the accident by the super-weight in advance.

상기한 바와 같은 목적을 달성하기 위한 본 발명은, 부두항이나 건설현장, 조선소, 화학설비공장 등에서 무게가 많이 나가는 무거운 초중량화물, 대형 골리앗크레인, 화공 PLANT 및 기타 공장 설치자재 등과 같은 초중량물을 들어올리도록 하는 크라이밍 잭 장치가 설치되되, 상기의 크라이밍 잭 장치는, 지면에 하부가 접촉되어 상기 크라이밍 잭 장치의 각 구성을 지지하도록 하는 마스트와, 상기 마스트 의 일측면에 결합되는 세로방향으로 길게 형성되는 적어도 하나 이상의 스케어 바와, 상기 스케어 바에는 상기 스케어 바를 따라 상하방향으로 왕복이동가능하게 결합되어 상기의 초중량물을 들어올렸다 내렸다 하도록 하는 크라이밍 잭부와, 상기 크라이밍 잭부의 상부에 설치되어 상기 크라이밍 잭부에 의해 상하방향으로 왕복이동하도록 상기 초중량물을 지지하는 리프팅 빔으로 구성됨을 특징으로 하는 초중량물 인양용 크라이밍 잭 장치가 제공된다. The present invention for achieving the above object, the super-heavy goods such as heavy heavy cargo, large goliath crane, chemical plant and other plant installation materials such as heavy weight in the dock port, construction site, shipyard, chemical equipment factory, etc. A climbing jack device is provided for lifting, wherein the climbing jack device includes: a mast for lowering the ground contacting the ground to support each configuration of the climbing jack device; and a longitudinal direction coupled to one side of the mast. At least one scare bar which is formed to be long and is provided with a climbing jack portion which is coupled to the scare bar so as to reciprocate upward and downward along the scare bar to lift and lower the super-heavy weight; The reciprocating movement by the crying jack part in a vertical direction There is provided a heavy lifting lifting jack device, characterized in that it consists of a lifting beam supporting a mass.

또한 본 발명은, 크라이밍 잭 장치의 마스트는, 상기 마스트의 하부에 설치되어 지면과 접촉됨은 물론 상기의 마스트를 지지하는 지지부; 상기 지지부의 상부에는 사각형태로 각 모서리에 위치됨과 함께 세로방향으로 세워지도록 결합되는 복수개의 세로프레임과, 상기 각 세로프레임 사이에 위치 및 상기 각 세로프레임에 각각 결합되어 상기 각 세로프레임을 서로 연결하도록 하는 복수개의 가로프레임과, 상기 각 가로프레임 사이 및 상기 각 세로프레임 사이에 위치하여 상기 각 세로프레임에 각각 결합되어 상기 각 세로프레임을 서로 연결하도록 일정각도로 경사진 복수개의 경사프레임으로 이루어진 고정부;로 구성됨을 특징으로 하는 초중량물 인양용 크라이밍 잭 장치가 제공된다. In addition, the present invention, the mast of the climbing jack device, is installed in the lower portion of the mast in contact with the ground as well as the support for supporting the mast; A plurality of vertical frames are coupled to each other in a square shape and erected in a vertical direction at the top of the support, and are coupled to each of the vertical frames and the vertical frames connected to each vertical frame, respectively. A plurality of horizontal frames and a plurality of slanted frames inclined at a predetermined angle so as to be coupled to each of the vertical frames and to be connected to each of the vertical frames, respectively, located between the horizontal frames and between the respective vertical frames. The government provides a super heavy lifting lifting jack device, characterized in that consisting of.

또한 본 발명은, 마스트의 지지부 상면에는 고정부를 일정범위 내에서 이동가능하도록 상기 지지부의 상면을 따라 슬라이딩되면서 왕복이동하는 슬라이딩빔이 설치됨을 특징으로 하는 초중량물 인양용 크라이밍 잭 장치가 제공된다. In another aspect, the present invention, there is provided a lifting device for lifting a heavy weight lifting jack device, characterized in that the sliding beam for reciprocating while sliding along the upper surface of the support portion is installed on the upper surface of the support portion of the mast to be movable within a certain range. .

또한 본 발명은, 크라이밍 잭 장치의 하부에는 상기 크라이밍 잭 장치를 이동시키도록 하는 이동장치가 구비됨을 특징으로 하는 초중량물 인양용 크라이밍 잭 장치가 제공된다. In another aspect, the present invention is provided with a lifting device for lifting a heavy weight lifting jack, characterized in that the lower portion of the climbing jack device is provided with a moving device for moving the climbing jack device.

또한 본 발명은, 크라이밍 잭 장치의 크라이밍 잭부는, 각 스케어 바에 슬라이딩가능하게 결합되어 상기 각 스케어 바를 따라 상하방향으로 왕복이동하도록 상기 각 스케어 바가 내삽되는 결합홈부를 갖는 상, 하부 블록; 상기 상, 하부 블록의 각 결합홈부 내에는 일정범위 내에서 이동가능하게 각각 결합되어 상기 상, 하부 블록의 왕복이동에 따라 상기 각 스케어 바의 외면에 밀착된 상태로 결합 및 분리되도록 상기 상, 하부 블록의 내면과 일정간격 이격되는 웨지; 상기 상, 하부 블록 사이에 왕복이동가능하게 설치되어 압축과 팽창이 반복적으로 이루어지면서 상기 상, 하부 블록을 상하방향으로 왕복이동시키도록 실린더 본체와, 상기 실린더 본체 내에 설치되어 왕복이동하는 피스톤과, 상기 피스톤과 하부 블록을 연결 결합하는 피스톤로드를 갖는 잭 실린더; 상기 상, 하부 블록 사이인 상기 잭 실린더의 일측에 설치되어 상기 상, 하브 불록을 서로 연결함과 함께 상기 잭 실린더와 더불어 상기 상, 하부 블록을 당겼다 밀었다하면서 상, 하부 블록을 왕복이동시키도록 상기 상부 블록에 결합되는 상부로드와, 상기 하부 블록에 결합되어 상부로드 내로 삽탈되는 하부로드와, 상기 상부로드 내로 하부로드가 삽탈되도록 스위칭하는 스위칭부를 갖는 스위치 실린더; 상기 상부 블록의 상부에 왕복이동가능하게 설치되어 압축과 팽창이 반복적으로 이루어지면서 상기 상부 블록이 평행한 상태로 왕복이동되도록 실린더본체와, 상기 실린더본체 내에서 왕복이동하는 피스톤과, 상기 피스톤과 상부 블록 및 잭 실린더를 서로 연결 결합하는 피스톤로드를 갖는 이컬라이저 실린더; 상기 이컬라이저 실린더의 상부에 결합되어 상부면에 리프팅 빔이 얹혀져 지지함은 물론 상기의 리프팅 빔을 왕복이동시키도록 상기 이컬라이저 실린더에 의해 왕복이동하는 플레이트로 구성됨을 특징으로 하는 초중량물 인양용 크라이밍 잭 장치가 제공된다. In another aspect, the present invention, the climbing jack portion of the climbing jack device, the upper and lower blocks having a coupling groove portion is inserted into each of the scare bar is slidably coupled to each of the scare bar reciprocating in the vertical direction along the respective scare bar; The coupling grooves of the upper and lower blocks are coupled to each other so as to be movable within a predetermined range, and the upper and lower portions are coupled to and separated from each other by being in close contact with the outer surface of the respective scare bars according to the reciprocating movement of the upper and lower blocks. Wedges spaced apart from the inner surface of the block; A cylinder body installed to reciprocate between the upper and lower blocks to repeatedly reciprocate the upper and lower blocks while repeatedly compressing and expanding, and a piston installed in the cylinder body to reciprocate; A jack cylinder having a piston rod connecting and coupling the piston and the lower block; It is installed on one side of the jack cylinder between the upper and lower blocks to reciprocate the upper and lower blocks while connecting the upper and lower blocks together and pulling and pushing the upper and lower blocks together with the jack cylinder. A switch cylinder having an upper rod coupled to the upper block, a lower rod coupled to the lower block and inserted into and inserted into the upper rod, and a switching unit for switching the lower rod into and inserted into the upper rod; A cylinder body and a piston reciprocating in the cylinder body so that the upper block is reciprocated in a parallel state while repeatedly installed in the upper portion of the upper block so that compression and expansion are repeated. An equalizer cylinder having a piston rod connecting and coupling the block and the jack cylinder to each other; Ultra-heavy weight lifting cryo comprising a plate coupled to the upper portion of the equalizer cylinder, the lifting beam is mounted on the upper surface and supported, as well as a plate reciprocating by the equalizer cylinder to reciprocate the lifting beam. A mining jack device is provided.

또한 본 발명은, 웨지는 이등변 삼각형상으로 형성되되, 상기 웨지의 일면은 상, 하부 블록의 내면과 일정간격으로 이격된 상태로 결합됨과 함께 상, 하부 블록이 슬라이딩되도록 일정각도로 경사지게 형성되고, 상기 웨지의 타면은 상, 하부 블록에 의해 스케어 바의 외면과 밀착된 상태로 결합 및 분리되도록 스케어 바의 외면과 평행하게 형성되며, 상기 웨지의 타면에는 스케어 바에서 미끄러짐을 방지하도록 복수개의 톱니가 형성됨을 특징으로 초중량물 인양용 크라이밍 잭 장치가 제공된다. In addition, the present invention, the wedge is formed in an isosceles triangular shape, one side of the wedge is formed to be inclined at a predetermined angle so as to slide the upper and lower blocks while being coupled to the inner surface of the upper, lower blocks at regular intervals, The other side of the wedge is formed in parallel with the outer surface of the spur bar to be coupled and separated in close contact with the outer surface of the spur bar by the upper and lower blocks, the plurality of teeth on the other side of the wedge to prevent slipping in the spur bar It is characterized in that it is provided with a climbing jack device for ultra-heavy lifting.

또한 본 발명은, 잭 실린더와 이컬라이저 실린더는 스케어 바의 양측에 위치되도록 한 쌍으로 구비됨을 특징으로 하는 초중량물 인양용 크라이밍 잭 장치가 제공된다. In another aspect, the present invention, the jack cylinder and the equalizer cylinder is provided with a pair of ultra-large lifting lifting jack device, characterized in that provided in a pair to be located on both sides of the scare bar.

또한 본 발명은, 플레이트와 리프팅 빔 사이에는 상기 플레이트의 상부에 리프팅 빔이 얹혀진 상태로 결합됨과 함께 마스트의 지지부에 슬라이딩가능하게 결합되는 슬라이드부가 추가로 설치됨을 특징으로 하는 초중량물 인양용 크라이밍 잭 장치가 제공된다. In another aspect, the present invention, between the plate and the lifting beam coupled to the lifting beam is placed on the upper portion of the plate, and the slide portion is coupled to the sliding support that is slidably coupled to the support of the mast additionally characterized in that the lifting jack An apparatus is provided.

상기에서 설명한 바와 같이 이루어진 본 발명에 따르면, 마스트와, 스케어 바 및, 상하부 블록과 웨지와 잭 실린더와 스위치 실린더와 이컬라이저 실린더와 플레이트로 이루어진 크라이밍 잭부 그리고, 리프팅 빔이 구비된 복수개의 크라이밍 잭 장치를 설치함으로써, 상기 크라이밍 잭 장치의 리프팅 빔에 겐트리 크레인의 상판을 얹거나 또는, LINK, WIRE 등으로 달아서 무게가 많이 나가는 무거운 초중량물을 고정한 상태에서 상기 크라이밍 잭 장치의 크라이밍 잭부가 서서히 상하방향으로 왕복이동함에 따라 상기 리프팅 빔도 상하방향으로 왕복이동하면서 상기 겐트리 크레인을 세워 설치하거나 또는 초중량물을 서서히 들어올림에 따라 상기 겐트리 크레인의 설치 및 상기 초중량물을 보다 안전하게 들어올리도록 하는 효과가 있다. According to the present invention made as described above, the climbing jack portion consisting of the mast, the scare bar, the upper and lower blocks, the wedge, the jack cylinder, the switch cylinder, the equalizer cylinder and the plate, and a plurality of climbing beams By installing the jack device, the top of the gantry crane is mounted on the lifting beam of the climbing jack device, or the climbing of the crying jack device is carried out while fixing heavy super-heavy goods that are heavily attached by LINK, WIRE, etc. As the jack portion reciprocates gradually in the vertical direction, the lifting beam is also reciprocated in the vertical direction while the gantry crane is installed upright, or the super heavy weight is gradually lifted to install the gantry crane and the super heavy weight more safely. It has the effect of lifting up.

또한, 상기 크라이밍 잭 장치의 리프팅 빔에 얹혀져 고정된 상태에서 상기 크라이밍 잭부에 의해 상하방향으로 서서히 왕복이동함에 따라 상기 겐트리 크레인이 보다 안전하게 세워 설치하거나 또는, 상기 초중량물이 크라이밍 잭 장치에서 고정된 상태에서 서서히 들어올려짐에 따라 바람에 의한 영향을 받지 않는 등 상기 초중량물의 흔들림을 방지할 뿐만 아니라 상기 초중량물의 흔들림 방지로 인하여 상기 초중량물을 보다 안전하게 들어올릴 수 있으므로 상기 들어올리는 과정에서 발생할 수 있는 안전사고 즉, 겐트리 크레인이 쓰러지거나 상기 초중량물이 낙하는 현상이 방지되는 등 안전사고의 위험을 미연에 방지하도록 하는 효과도 있다. In addition, the gantry crane is installed more securely as the reciprocating reciprocally moves upward and downward by the climbing jack part while being mounted on the lifting beam of the climbing jack device and fixed, or the super heavy material is the climbing jack device. The lifting process is not only prevented from shaking due to wind as it is slowly lifted in a fixed state in the fixed state, and the lifting of the super heavy material can be more safely lifted due to the shaking of the super heavy weight. There is also an effect to prevent the risk of a safety accident, such as a safety accident that may occur in the fall, such as the gantry crane falls or the fall of the ultra-heavy weight is prevented.

이하 본 발명에 따른 초중량물 인양용 크라이밍 잭 장치의 일 실시예는 첨부된 도 1 내지 도 10을 참조하여 보다 구체적으로 설명하면 다음과 같다. Hereinafter, an embodiment of an ultra heavy lifting lifting jack device according to the present invention will be described in more detail with reference to FIGS. 1 to 10.

도 1은 본 발명 겐트리 크레인을 세워 설치하는 크라이밍 잭 장치가 설치된 상태를 나타낸 사시도이고, 도 2는 본 발명 초중량물 인양용 크라이밍 잭 장치의 구조를 나타낸 사시도이고, 도 3은 본 발명 초중량물 인양용 크라이밍 잭 장치를 정면에서 나타낸 정면도이고, 도 4는 본 발명 초중량물 인양용 크라이밍 잭 장치를 평면에서 나타낸 평면도이고, 도 5는 본 발명 크라이밍 잭 장치의 크라이밍 잭부를 나타낸 사시도이고, 도 6은 본 발명 크라이밍 잭 장치의 크라이밍 잭부를 정면에서 나타낸 정면도이고, 도 7은 본 발명 크라이밍 잭 장치의 크라이밍 잭부를 측면에서 나타낸 측면도이고, 도 8은 본 발명 크라이밍 잭 장치의 크라이밍 잭부를 평면에서 나타낸 평면도이고, 도 9a 내지 도 9g는 본 발명 크라이밍 잭부의 작동상태를 순차적으로 나타낸 작동상태도이고, 도 10은 본 발명 크라이밍 잭부의 웨지 형상을 나타낸 사시도이다.1 is a perspective view showing a state in which a climbing jack device for installing the gantry crane upright of the present invention is installed, Figure 2 is a perspective view showing the structure of the climbing jack device for lifting the super-heavy weight of the present invention, Figure 3 is the beginning of the present invention 4 is a front view showing a lifting jack device for lifting heavy goods from the front, and FIG. 4 is a plan view showing the super heavy lifting lifting jack device of the present invention in a plan view, and FIG. 5 is a perspective view showing a climbing jack unit of the climbing jack device of the present invention. 6 is a front view showing the crying jack portion of the present invention jack jack, from the front, and FIG. 7 is a side view showing the crying jack portion of the present invention jack jack from the side, and FIG. 8 is the present invention jack 9 is a plan view showing the climbing jack portion of the apparatus in a plan view, and FIGS. Attitude and, Figure 10 is a perspective view of the present invention, Cry Ming jack wedge-shaped portion.

본 발명은 부두항이나 건설현장, 조선소, 화학설비공장 등에서 무게가 많이 나가는 무거운 초중량화물, 대형 골리앗크레인(일명 켄트리 크레인)(1), 화공 PLANT 및 기타 공장 설치자재 등과 같은 초중량물을 들어올리도록 설치하거나 또는, 무게가 많이 나가는 무거운 초중량물을 얹혀져 고정된 상태에서 서서히 들어올리도록 하는 크라이밍 잭 장치(climbing jack apparatus)(100)가 구비되어 있다. The present invention is to carry super-heavy cargo such as heavy super-heavy cargo, large goliath crane (aka kentry crane) (1), chemical plant and other plant installation materials such as heavy weight in the dock or construction site, shipyard, chemical equipment factory, etc. Climbing jack apparatus (climbing jack apparatus) 100 is installed to lift slowly in a fixed state, or mounted on a heavy, heavy weight that is heavily loaded.

즉, 상기의 크라이밍 잭 장치(100)는 겐트리 크레인(1)을 세워 설치하거나 또는, 무거운 초중량물을 들어올릴 때도 사용하도록 하는 것이다. That is, the above-mentioned climbing jack device 100 is to be used when the gantry crane 1 is installed upright or when lifting a heavy super heavy object.

여기서는, 일 예로 상기 크라이밍 잭 장치(100)를 이용하여 상기 겐트리 크레인(1)을 서서히 세워 설치하는 것에 대해서만 설명하겠다. Here, only an example of slowly installing the gantry crane 1 using the climbing jack device 100 will be described.

도 1에서와 같이, 상기 겐트리 크레인(1)의 양측에는 상기 겐트리 크레인(1) 을 세우도록 하는 레그(11)가 각각 설치되어 있고, 상기 각 레그(11)에는 상기 각 레그(11)를 접히거나 펴지도록 하는 적어도 하나 이상의 접철부(11a)가 형성되어 있으며, 상기 각 레그(11)의 상단에는 컨테이너 박스나 건설 자재 등을 옮기기 위한 호이스트가 설치된 상판(12)이 결합되어 있다. As shown in FIG. 1, legs 11 for erecting the gantry crane 1 are provided at both sides of the gantry crane 1, and each leg 11 is provided at each leg 11. At least one folding portion (11a) is formed to be folded or unfolded, the upper end of each leg 11 is coupled to the top plate 12 is provided with a hoist for moving a container box or construction materials.

상기 크라이밍 잭 장치(100)에는 도 1과 도 2에서와 같이 상기 겐트리 크레인(1)의 상판(12)이 얹혀진 상태로 지지하도록 하는 리프팅 빔(140)이 결합되어 있다. The lifting jack 140 is coupled to the climbing jack device 100 to support the top plate 12 of the gantry crane 1 as shown in FIGS. 1 and 2.

상기의 크라이밍 잭 장치(100)는 도 2 내지 도 5에서 도시한 바와 같이, 상기 겐트리 크레인(1)의 상판(12) 양측에는 지면에 하부가 접촉되어 상기 크라이밍 잭 장치(100)의 각 구성을 지지하도록 하는 마스트(110)가 설치되어 있고, 상기의 마스트(110)는 상판(12)의 양측에 각각 한 쌍으로 구비되어 있다. As shown in FIGS. 2 to 5, the crying jack device 100 has a lower portion in contact with the ground on both sides of the upper plate 12 of the gantry crane 1 of the crying jack device 100. The mast 110 which supports each structure is provided, and said mast 110 is provided in pair in the both sides of the upper board 12, respectively.

즉, 상기 겐트리 크레인(1)의 양측에 각각 구비되는 마스트(110)는 후술할 리프팅 빔(140)의 양측이 각각 얹혀진 상태에서 상기 리프팅 빔(140)을 도면상 상하방향으로 왕복이동할 수 있도록 한 쌍으로 이루어져 있다. That is, the masts 110 respectively provided on both sides of the gantry crane 1 may reciprocate the lifting beams 140 in the up and down directions in the state in which both sides of the lifting beams 140, which will be described later, are placed on each side. It consists of a pair.

상기 마스트(110)는 도 2와 도 4에서 도시한 바와 같이, 상기 마스트(110)의 하부에는 지면과 접촉됨은 물론 상기의 마스트(110)를 지지하는 지지부(111)가 설치되어 있고, 상기 지지부(111)의 상부에는 크라이밍 잭 장치(100)를 도면상 상하방향으로 왕복이동할 때 상기 크라이밍 잭 장치(100)의 이동을 안내함은 물론 상기 크라이밍 잭 장치(100)를 지지 고정하도록 하는 고정부(112)가 설치되어 있다. As shown in FIGS. 2 and 4, the mast 110 is provided with a support 111 that contacts the ground as well as supports the mast 110 at the lower portion of the mast 110. The upper portion of the 111 to guide the movement of the crying jack device 100 as well as to support and secure the crying jack device 100 when reciprocating the climbing jack device 100 in the vertical direction on the drawing The fixing part 112 is provided.

상기의 고정부(112)는 상기 지지부(111)의 상부에 사각형태로 각 모서리에 위치되도록 세로방향으로 세워지는 복수개의 세로프레임(112a)이 설치되어 있고, 상기 각 세로프레임(112a) 사이에는 상기 각 세로프레임(112a)을 서로 연결 결합함과 함께 상기 사각형태의 각 모서리에 위치하는 각 세로프레임(112a)이 벌어지는 것을 방지 및 원래의 형태를 유지하게 고정하도록 하는 복수개의 가로프레임(112b)가 설치되어 있으며, 상기 각 세로프레임(112a) 사이 및 각 가로프레임(112b) 사이에 위치하여 상기 각 가로프레임(112b)과 더불어 상기 각 세로프레임(112a)을 서로 연결 결합함과 함께 상기 각 세로프레임(112a)이 벌어지는 것을 방지하도록 일정각도로 경사진 복수개의 경사프레임(112c)이 설치되어 있다. The fixing part 112 is provided with a plurality of vertical frames (112a) standing in the vertical direction to be positioned at each corner in a rectangular shape on the upper portion of the support 111, between each of the vertical frames (112a) A plurality of horizontal frames 112b for connecting and connecting the respective vertical frames 112a to each other and preventing each vertical frame 112a positioned at each corner of the rectangular shape from spreading and maintaining the original shape. Are installed between each of the vertical frame (112a) and between each of the horizontal frame (112b) and each of the horizontal frame (112b) and each of the vertical frame (112a) and coupled to each other and coupled to each other A plurality of inclined frames 112c are inclined at a predetermined angle to prevent the frame 112a from spreading.

즉, 상기 각 세로프레임(112a)과 상기 각 가로프레임(112b)은 서로 직교되도록 결합되어 있으며, 상기 각 세로프레임(112a) 사이에 상기 각 세로프레임(112a)의 결합력을 높이기 위해 상기 각 경사프레임(112c)은 일정한 각도로 경사지게 결합되어 있다. That is, the vertical frames 112a and the horizontal frames 112b are coupled to be orthogonal to each other, and the respective inclined frames to increase the coupling force of the vertical frames 112a between the vertical frames 112a. 112c is inclined at an angle.

한편, 상기 겐트리 크레인(1)을 보다 안전하게 세워서 설치하기 위하여 상기 마스트(110)의 지지부(111) 상면에는 상기 고정부(112)를 일정범위 내에서 이동가능하도록 상기 지지부(111)의 상면을 따라 슬라이딩되면서 왕복이동하는 슬라이딩빔(113)을 더 구비 설치할 수 있다. On the other hand, in order to install the gantry crane 1 more securely installed on the upper surface of the support portion 111 of the mast 110, the upper surface of the support portion 111 so as to be movable within a certain range. It may be further provided with a sliding beam 113 for reciprocating while sliding along.

상기 각 마스트(110)의 일측면에는 후술할 크라이밍 잭 장치(100)의 크라이밍 잭부(120)가 마스트(110)를 따라 상하방향으로 왕복이동하도록 상기 크라이밍 잭부(120)의 왕복 이송로를 형성하도록 세로방향으로 길게 형성되는 적어도 하나 이상의 스케어 바(130)가 설치되어 있다. One side of each mast 110 is a reciprocating transfer path of the climbing jack portion 120 so that the climbing jack portion 120 of the climbing jack device 100 to be described later reciprocates along the mast 110 in the vertical direction. At least one or more scare bars 130 are formed to extend in the longitudinal direction to form a.

상기의 스케어 바(130)는 하나 또는 도면상에서와 같이 3개 및 그 이상 설치할 수 있는데, 이는 상기 겐트리 크레인(1)의 크기 및 규모 또는, 상기 크라이밍 잭 장치(100)의 사용목적이나 효과 등을 고려하여 선택적으로 설치하기 위함이다. Scare bar 130 may be installed in one or three or more as shown in the drawings, which is the size and scale of the gantry crane (1), or the purpose or effect of the use of the climbing jack device 100 In order to selectively install in consideration of such.

한편, 상기 각 스케어 바(130)에는 상기 각 스케어 바(130)를 따라 상하방향으로 왕복이동하면서 상기 겐트리 크레인(1)을 세워 설치하기 위하여 상기 겐트리 크레인(1)의 상판(12)과 접촉된 상태에서 상기의 상판(12)을 들어올렸다가 내렸다 하도록 하는 크라이밍 잭부(120)가 왕복이동가능하게 결합되어 있다. On the other hand, each of the top plate 12 of the gantry crane (1) to install the gantry crane (1) up and down while reciprocating in the vertical direction along each of the scare bar (130) The climbing jack part 120 which raises and lowers the upper plate 12 in the contacted state is reciprocally coupled.

상기 크라이밍 잭부(120)의 상부에는 상기 겐트리 크레인(1)의 상판(12)이 얹혀져 고정 결합됨은 물론 상기 크라이밍 잭부(120)에 의해 각 스케어 바(130)을 따라 상하방향으로 왕복이동하면서 상기 겐트리 크레인(1)을 세우도록 하는 리프팅 빔(140)이 설치되어 있다. The top plate 12 of the gantry crane 1 is fixedly coupled to the upper portion of the climbing jack part 120, and reciprocates upward and downward along the respective scare bars 130 by the climbing jack part 120. While the lifting beam 140 to stand the gantry crane (1) is installed.

상기의 크라이밍 잭부(120)는 도 6 내지 도 10에서 도시한 바와 같이, 상기 각 스케어 바(130)에는 상기 각 스케어 바(130)를 따라 상하방향으로 왕복이동하는 상, 하부 블록(121,122)이 슬라이딩가능하게 각각 결합되어 있고, 상기 상, 하부 블록(121,122)에는 상기 상, 하부 블록(121,122)과 스케어 바(130)이 흔들림없이 견고하게 결합되도록 상기 각 스케어 바(130)가 내삽 즉, 내부에 삽입되는 결합홈부(121a,122a)가 각각 형성되어 있다. As shown in FIGS. 6 to 10, the crying jack part 120 includes upper and lower blocks 121 and 122 that reciprocate upward and downward along the respective scare bars 130. The slidably coupled to each of the upper and lower blocks 121 and 122, the upper and lower blocks 121 and 122 and the Scare Bar 130 is interpolated so that the firmly coupled without shaking, that is, Coupling grooves 121a and 122a inserted therein are formed, respectively.

상기 상, 하부 블록(121,122)의 각 결합홈부(121a,122a) 내에는 상기 상, 하부 블록(121,122)의 왕복이동에 따라 상기 각 스케어 바(130)의 외면에 밀착된 상태로 결합되거나 또는, 상기 각 스케어 바(130)의 외면과 떨어져 분리되도록 상기 상, 하부 블록(121,122)의 내면과 일정간격 이격되는 웨지(123)가 일정범위 내에서 이동가능하게 각각 결합되어 있다. In the coupling grooves 121a and 122a of the upper and lower blocks 121 and 122, the upper and lower blocks 121 and 122a are coupled in close contact with the outer surfaces of the respective scare bars 130 according to the reciprocating movement of the upper and lower blocks 121 and 122; The wedges 123 spaced apart from the inner surfaces of the upper and lower blocks 121 and 122 by a predetermined distance so as to be separated from the outer surface of the respective scare bars 130 are movably coupled within a predetermined range.

상기의 웨지(123)는 도 10에서와 같이 이등변 삼각형상으로 형성되어 있으며, 상기 웨지(123)의 일면(123a) 즉, 상기 상, 하부 블록(121,122)의 내면과 일정간격 이격된 상태에서 상, 하부 블록(121,122)의 내면과 결합되는 웨지(123)의 일면(123a)은 상, 하부 블록(121,122)이 슬라이딩되면서 상기 웨지(123)을 잡아 고정하거나 해제하도록 일정각도로 경사지게 형성되어 있고, 상기 웨지(123)의 타면(123b) 즉, 스케어 바(130) 측인 웨지(123)의 타면(123b)은 상기 상, 하부 블록(121,122)에 의해 상기 웨지(123)가 스케어 바(130)의 외면에 밀착된 상태로 결합되거나 분리되도록 상기 스케어 바(130)의 외면과 평행한 형태로 형성되어 있다. The wedge 123 is formed in an isosceles triangle shape as shown in Figure 10, the upper surface 123a of the wedge 123, that is, the image in a state spaced apart from the inner surface of the upper, lower blocks (121, 122) The one surface 123a of the wedge 123 coupled to the inner surfaces of the lower blocks 121 and 122 is formed to be inclined at a predetermined angle to hold and fix the wedge 123 while the upper and lower blocks 121 and 122 slide. The other surface 123b of the wedge 123, that is, the other surface 123b of the wedge 123 on the side of the spur bar 130, is formed by the upper and lower blocks 121 and 122 of the wedge 123 of the spur bar 130. It is formed in a form parallel to the outer surface of the scare bar 130 to be coupled or separated in a state in close contact with the outer surface.

상기 웨지(123)의 타면(123b)에는 상기 스케어 바(130)의 외면에 웨지(123)가 밀착된 상태로 결합됨은 물론 상기 스케어 바(130)의 외면에 결합 고정된 웨지(123)가 미끄러지는 것을 방지하도록 복수개의 톱니(123c)가 형성되어 있다. The wedge 123 is coupled to the other surface 123b of the wedge 123 in a state in which the wedge 123 is in close contact with the outer surface of the spur bar 130, and the wedge 123 fixed to the outer surface of the spur bar 130 slips. A plurality of teeth 123c are formed so as to prevent that.

상기 상, 하부 블록(121,122) 사이에는 압축과 팽창이 반복적으로 이루어짐에 따라 상기의 상, 하부 블록(121,122)을 도면상 상하방향으로 왕복이동시키도록 하는 잭 실린더(124)가 왕복이동가능하게 설치되어 있고, 상기의 잭 실린더(124)는 각 스케어 바(130)의 양측에 각각 위치되도록 한 쌍으로 구비되어 있다. As the compression and expansion are repeatedly performed between the upper and lower blocks 121 and 122, a jack cylinder 124 for reciprocating the upper and lower blocks 121 and 122 in a vertical direction in the drawing is installed to be reciprocally movable. The jack cylinder 124 is provided in pairs so as to be located at both sides of each of the scare bars 130, respectively.

상기의 잭 실린더(124)는 실린더 본체(124a)가 설치되어 있고, 상기 실린더 본체(124a) 내에는 압축과 팽창에 의해 상기 실린더 본체(124a) 내에서 왕복이동하는 피스톤(124b)이 설치되어 있으며, 상기 피스톤(124b)에는 상기 피스톤(124b)과 하부 블록(122)을 서로 연결 결합함과 함께 상기 피스톤(124b)의 왕복이동에 따라 왕복이동하면서 하부 블록(122)을 상승 및 하강시키도록 하는 피스톤로드(124c)가 설치되어 있다. The jack cylinder 124 is provided with a cylinder body 124a, and a piston 124b for reciprocating in the cylinder body 124a by compression and expansion is provided in the cylinder body 124a. In addition, the piston 124b connects and couples the piston 124b and the lower block 122 to each other, and raises and lowers the lower block 122 while reciprocating according to the reciprocating movement of the piston 124b. The piston rod 124c is provided.

상기 상, 하부 블록(121,122) 사이인 상기 각 잭 실린더(124)의 일측에는 상기 상, 하부 블록(121,122)을 서로 연결하도록 상, 하부 블록(121,122)에 결합됨은 물론 상기 잭 실린더(124)의 피스톤(124b) 왕복이동에 따라 길이가 늘어나거 줄어들면서 상기 잭 실린더(124)와 더불어 상, 하부 블록(121,122)을 당겼다 밀었다하면서 왕복 이동시키도록 하는 스위치 실린더(125)가 설치되어 있다. One side of each jack cylinder 124 between the upper and lower blocks 121 and 122 is coupled to the upper and lower blocks 121 and 122 to connect the upper and lower blocks 121 and 122 to each other, as well as the jack cylinder 124 of the jack cylinder 124. As the piston 124b reciprocates, its length increases and decreases, and the switch cylinder 125 is installed to reciprocate while pulling and pushing the upper and lower blocks 121 and 122 together with the jack cylinder 124.

상기의 스위치 실린더(125)는 상기 상부 블록(121)의 하부에 상부로드(125a)가 결합 설치되어 있고, 상기 하부 블록(122)의 상부에는 상기 상부로드(125a) 내로 삽입 및 탈거되면서 상기 스위치 실린더(125)의 길이를 조정하는 하부로드(125b)가 결합 설치되어 있고, 상기 상부로드(125a)에는 상기 상부로드(125a) 내로 하부로드(125b)가 삽탈되도록 스위칭하는 스위칭부(125c)가 회동가능하게 결합되어 있다. The switch cylinder 125 has an upper rod 125a coupled to the lower portion of the upper block 121, and the switch is inserted into and removed from the upper rod 125a on the upper portion of the lower block 122. The lower rod 125b for adjusting the length of the cylinder 125 is coupled and installed, and the upper rod 125a has a switching unit 125c for switching the lower rod 125b to be inserted into the upper rod 125a. It is rotatably coupled.

즉, 상기 스위치 실린더(125)는 회동되는 스위칭부(125c)의 조작에 따라 상기 상부로드(125a) 내로 하부로드(125b)가 삽입 및 탈거될 뿐만 아니라 상기 하부로드(125b)가 상부로드(125a) 내로 삽입 및 탈거되지 않는다. That is, the switch cylinder 125 is inserted and removed from the lower rod 125b into the upper rod 125a according to the operation of the switching unit 125c that is rotated, and the lower rod 125b is not the upper rod 125a. Are not inserted into or removed from).

상기 상부 블록(121)의 상부에는 압축과 팽창이 반복적으로 이루어짐에 따라 상기의 상부 블록(121)이 유동됨없이 스케어 바(130)을 따라 평행한 상태로 왕복이동시키도록 하는 이컬라이저 실린더(126)가 왕복이동가능하게 설치되어 있ㄱ고, 상 기 이컬라이저 실린더(126)는 각 스케어 바(130)의 양측에 각각 위치되도록 한 쌍으로 구비되어 있다. As the upper block 121 is repeatedly compressed and expanded on the upper block 121, the upper block 121 reciprocates in parallel with the scare bar 130 without flowing, thereby allowing the reciprocator to move. ) Is installed so as to reciprocate, and the equalizer cylinder 126 is provided in pairs so as to be located on both sides of each scare bar 130, respectively.

상기의 이컬라이저 실린더(126)는 실린더본체(126a)가 설치되어 있고, 상기 실린더본체(126a) 내에는 압축과 팽창에 의해 상기 실린더본체(126a) 내에서 왕복이동하는 피스톤(126b)이 설치되어 있으며, 상기 피스톤(126b)에는 상기 피스톤(126b)과 상부블록(121) 및 잭 실린더(124)를 서로 연결 결합함과 함께 상기 피스톤(126b)의 왕복이동에 따라 왕복이동하면서 상기 잭 실린더(124)와 더불어 상부블록(121)하는 상승 및 하강시키도록 하는 피스톤로드(126c)가 설치되어 있다. The equalizer cylinder 126 is provided with a cylinder body 126a, and the cylinder body 126a is provided with a piston 126b reciprocating in the cylinder body 126a by compression and expansion. The piston 126b has the piston 126b, the upper block 121, and the jack cylinder 124 connected to each other, and the jack cylinder 124 while reciprocating according to the reciprocating movement of the piston 126b. In addition, a piston rod 126c is installed to raise and lower the upper block 121.

상기 이컬라이저 실린더(126)의 상부에는 상기 리프팅 빔(140)이 얹혀져 지지 고정됨은 물론 상기 리프팅 빔(140)을 왕복이동시키도록 상기 이컬라이저 실린더(126) 및 잭 실린더(124), 스위치 실린더(125)에 의해 왕복이동하는 플레이트(127)가 결합되어 있다. The escalator cylinder 126, the jack cylinder 124, and the switch cylinder (not shown) are fixed to the lifting beam 140 by being mounted on the upper portion of the equalizer cylinder 126 to reciprocate the lifting beam 140. The plate 127 reciprocating by 125 is coupled.

상기 플레이트(127)와 리프팅(140) 빔 사이에는 상기 리프팅 빔(140)이 얹혀져 고정된 상태로 상기 플레이트(127)의 상부에 결합됨과 함께 상기 마스트(110)의 지지부(111)에 슬라이딩가능하게 결합되어 상기의 리프팅 빔(140)을 왕복이동시키는 슬라이드부(128)를 추가로 설치할 수 있는데, 상기 슬라이드부(128)는 크라이밍 잭 장치(100)에서 사용목적이나 용도 및 효과 등에 따라 설치하거나 설치하지 않을 수 있다. The lifting beam 140 is mounted and fixed between the plate 127 and the lifting 140 beam and is slidably coupled to the support 111 of the mast 110 while being coupled to an upper portion of the plate 127. The slide unit 128 may be additionally installed to reciprocate the lifting beam 140. The slide unit 128 may be installed according to the purpose of use, use, effects, etc. in the climbing jack device 100. You may not install it.

상기 크라이밍 잭 장치(100)의 하부에는 겐트리 크레인(1)을 세워 설치할 때 상기 겐트리 크레인(1)의 상판(12)과 상기 크라이밍 잭 장치(100)가 정확한 위치에 놓이도록 상기 크라이밍 잭 장치(100)를 이동시키도록 하는 이동장치(129)가 구비되어 있으며, 상기의 이동장치(129)는 바퀴 또는, 운송차량 등 크라이밍 잭 장치(100)를 이동시킬 수 있는 것이라면 어떠한 이동장치를 사용하여도 무방하다. When the gantry crane 1 is erected and installed in the lower part of the climbing jack device 100, the cryo jack 12 and the crying jack device 100 are placed in the correct position. A moving device 129 for moving the mining jack device 100 is provided, and the moving device 129 is any movement if it can move the climbing jack device 100 such as a wheel or a transport vehicle. You can also use the device.

이와 같이 구성된 본 발명의 작용에 대해 설명하면 다음과 같다. Referring to the operation of the present invention configured as described above are as follows.

먼저, 겐트리 크레인(1)을 세워 설치하거나 또는, 무게가 많이 나가는 무거운 초중량물을 들어올리도록 하는 크라이밍 잭 장치(100)에서 상기 크라이밍 잭 장치(100)는 겐트리 크레인(1)을 세워 설치하는 과정에 대해서만 설명하기로 한다. First, the climbing jack device 100 stands up the gantry crane (1) in the climbing jack device 100 to install the gantry crane (1) upright, or to lift heavy super-heavy goods Only the installation process will be described.

상기 크라이밍 잭 장치(100)를 상기 겐트리크레인(1)의 양측에 설치된 각 레그(11)의 양측부에 위치하도록 설치하는데, 즉 상기 크라이밍 잭 장치(100)의 마스트(110)를 설치함과 함께 상기 마스트(110)의 일측면에 스케어 바(130)를 복수개 설치한다. The crying jack device 100 is installed to be located at both sides of each leg 11 installed at both sides of the gantry crane 1, that is, the mast 110 of the crying jack device 100 is installed. In addition, a plurality of scare bars 130 are installed on one side of the mast 110.

그리고, 상기 각 스케어 바(130)에 크라이밍 잭부(120)를 각각 결합함과 함께 상기 각 스케어 바(130)에 결합된 크라이밍 잭부(120)의 상부에 겐트리 크레인(1)의 상판이 얹혀진 상태로 결합되어 지지되는 리프팅 빔(140)을 결합한다. In addition, the top plate of the gantry crane 1 is coupled to the upper portion of the climbing jack portion 120 coupled to the respective climbing jack portion 120 to each of the scare bar 130, respectively. Combine the lifting beam 140 is coupled and supported in a mounted state.

상기와 같이 상기 마스트(110)와, 스케어 바(130) 및, 크라이밍 잭부(120) 그리고, 리프팅 빔(140)의 설치가 완료되면 상기 크라이밍 잭부(120)는 작동되면서 겐트리 크레인(1)을 세워 설치하게 된다. As described above, when the installation of the mast 110, the scare bar 130, the climbing jack 120, and the lifting beam 140 is completed, the climbing jack 120 is operated while the gantry crane 1 ) Will be installed upright.

상기 크라이밍 잭부(120)는 도 9a에서와 같이, 상기 크라이밍 잭부(120)의 스위치 실린더(125)는 축소된 상태 즉, 잭 실린더(124)의 상승에 의해 스위치 실린더(125)의 상부로드(125a) 내에서 하부로드(125b)가 탈거되어 길이가 긴 상태이며, 상기 크라이밍 잭부(120)의 하부블록(122) 내에 결합된 하부측 웨지(123)는 스케어 바(130)에 물린 상태가 해제된 상태이다. As shown in FIG. 9A, the climbing jack part 120 is in a state in which the switching cylinder 125 of the climbing jack part 120 is in a reduced state, that is, the upper rod of the switch cylinder 125 is raised by the jack cylinder 124. The lower rod 125b is removed and long in the 125a state, and the lower side wedge 123 coupled in the lower block 122 of the crying jack 120 is bitten by the scare bar 130. Is off.

다시 말해, 상기 잭 실린더(124)에서 피스톤(124b)가 다 올라가더라도 상기 스케어 바(130)의 외면에는 하부측 웨지(123)가 일정 폭만큼 여유가 있다. In other words, even when the piston 124b is raised from the jack cylinder 124, the lower side wedge 123 has a predetermined width on the outer surface of the scare bar 130.

이 때, 도 9b에서와 같이 상기 스위치 실린더(125)의 스위칭부(125c)를 스위칭하게 되면 상기 잭 실린더(124)가 팽창 즉, 잭 실린더(124)의 피스톤(124b)이 하방으로 이동함에 따라 상기 하부블록(122)의 하부측 웨지(123)는 스케어 바(130)에 물린 상태로 결합 고정됨과 함께 상기 상부블록(121)의 상부측 웨지(123)는 스케어 바(130)와 물린 상태가 해제된다. In this case, as shown in FIG. 9B, when the switching unit 125c of the switch cylinder 125 is switched, the jack cylinder 124 expands, that is, the piston 124b of the jack cylinder 124 moves downward. The lower side wedge 123 of the lower block 122 is fixedly coupled to the state of the bite bar 130, while the upper side wedge 123 of the upper block 121 is bite and the state of the bite bar 130 Is released.

이와 같이, 상기 하부블록(122)가 상승할 준비된 상태에서 다음 인양작업 준비를 위해 도 9c에서와 같이 상기 잭 실린더(124)를 축소 즉, 잭 실린더(124)의 피스톤(124b)이 실린더 본체(124a) 내에서 상승하는 압축이 이루어지면 하부블록(122)이 상승하여야 하나, 상기 상부블록(121)의 상부측 웨지(123)가 스케어 바(130)에 물려 있지 않고 해제된 상태임에 따라 상기 상부측 웨지(123)가 스케어 바(130)에 물릴 때까지 상기 잭 실린더(124)는 약간 하강하게 된다. As such, the jack cylinder 124 is reduced as shown in FIG. 9C to prepare for the next lifting operation in the state in which the lower block 122 is ready to be raised, that is, the piston 124b of the jack cylinder 124 is the cylinder body ( The lower block 122 should be raised when the compression is performed in the upper portion 124a, but the upper wedge 123 of the upper block 121 is not bited by the care bar 130 and is released. The jack cylinder 124 is lowered slightly until the upper side wedge 123 is bitten by the scare bar 130.

상기 상부측 웨지(123)이 스케어 바(130)에 물린 상태로 결합 고정된 상태에서 잭 실린더(124)가 작동되면 도 9d에서와 같이, 상기 잭 실린더(124)의 피스톤(124b)는 실린더 본체(124a) 내로 상승함과 함께 상기 스위치 실린더(125)의 상부로드(125a) 내로 하부로드(125b)가 삽입된다. When the jack cylinder 124 is operated in a state where the upper side wedge 123 is coupled to and fixed by the scare bar 130, as shown in FIG. 9D, the piston 124b of the jack cylinder 124 is a cylinder body. The lower rod 125b is inserted into the upper rod 125a of the switch cylinder 125 while rising into the 124a.

이 때, 상기 하부블록(122)의 하부측 웨지(123)은 스케어 바(130)에서 해제 된 상태임에 따라 상기 잭 실린더(124)의 피스톤(124b)이 상승함에 따라 상기 잭 실린더(124)의 하부에 설치된 하부블록(122)도 상승하면서 상기 잭 실린더(124)의 스크로크만큼 이동하게 된다. At this time, as the lower side wedge 123 of the lower block 122 is released from the scare bar 130, the jack cylinder 124 as the piston 124b of the jack cylinder 124 is raised. The lower block 122 installed at the lower portion of the jack is also moved up by the stroke of the jack cylinder 124.

상기 하부블록(122)의 상승이 완료되면, 도 9e에서와 같이 상기 스위치 실린더(125)의 스위칭부(125c)를 스위칭하게 되면 상기 스위치 실린더(125)는 일정거리만큼 더 수축 즉, 스위치 실린더(125)의 상부로드(125a) 내로 하부로드(125b)가 더 삽입될 뿐만 아니라 상기 하부블록(122)의 하부측 웨지(123)도 스케어 바(130)을 따라 일정 거리만큼 이동하도록 상승됨에 따라 상기 하부측 웨지(123)은 스케어 바(130)의 외면에 물리지 않고 해제된 상태가 된다. When the rising of the lower block 122 is completed, as shown in FIG. 9E, when the switching unit 125c of the switch cylinder 125 is switched, the switch cylinder 125 further contracts by a predetermined distance, that is, the switch cylinder ( As the lower rod 125b is further inserted into the upper rod 125a of the 125, the lower side wedge 123 of the lower block 122 is also lifted to move along the scar bar 130 by a predetermined distance. The lower side wedge 123 is released without being bitten by the outer surface of the scare bar 130.

이 상태에서, 상기 상부블록(121)을 상승시키기 위해 도 9f에서와 같이 상기 잭 실린더(124)를 상승 즉, 잭 실린더(124)가 팽창되어 피스톤(124b)이 하방으로 일정길이만큼 약간 이동하게 되면 상기 하방으로 이동하는 피스톤(124b)에 의해 하부블록(122)도 하방으로 약간 이동하면서 하부측 웨지(123)가 하방측으로 밀게 된다. In this state, the jack cylinder 124 is raised to lift the upper block 121, that is, the jack cylinder 124 is expanded so that the piston 124b moves slightly by a predetermined length downward. When the lower block 122 is also slightly moved downward by the piston 124b moving downward, the lower side wedge 123 is pushed downward.

그러면, 상기 하부블록(122)의 내면과 일정간격 이격되게 위치하는 하부측 웨지(123)의 일면(123a)과 하부블록(122)의 내면이 접촉됨은 물론 상기 하부블록(122)에 의해 웨지(123)가 밀리게 되고, 그에 따라 상기 하부측 웨지(123)의 톱니(123c)가 형성된 타면(123b)이 스케어 바(130)의 외면에 밀착되므로 인해 상기 하부측 웨지(123)는 스케어 바(130)에 물린상태로 결합 고정된다. Then, one surface 123a of the lower side wedge 123 positioned to be spaced apart from the inner surface of the lower block 122 and the inner surface of the lower block 122 are contacted with the wedge by the lower block 122 as well. The lower side wedge 123 is pushed because the other surface 123b having the teeth 123c of the lower side wedge 123 comes into close contact with the outer surface of the scare bar 130. 130 is fixed in the state of bite.

그리고, 상기 하부측 웨지(123)가 스케어 바(130)에 물린 상태로 결합 고정 됨과 함께 상기 상부측 웨지(123)는 스케어 바(130)에 물린 상태가 해제된 상태가 되므로 인해 상기 계속해서 팽창하는 잭 실린더(124)는 스케어 바(130)를 따라 도 9g에서와 같이 상승하게 된다. In addition, the lower side wedge 123 is coupled and fixed in a state of being bitten by the scare bar 130 and the upper side wedge 123 is continuously inflated because the bite of the scare bar 130 is released. Jack cylinder 124 is raised along the scare bar 130 as shown in Figure 9g.

이 때, 상기 스위치 실린더(125)의 하부로드(125b)는 상부로드(125a)로부터 탈거되어 길이가 길어지면서 상기 잭 실린더(124)와 함께 상부블록(121)을 상승시켜 상부측으로 이동시키게 된다. At this time, the lower rod (125b) of the switch cylinder 125 is removed from the upper rod (125a) and the length is increased to move the upper block 121 together with the jack cylinder 124 to the upper side.

상기 상부블록(121)의 이동이 완료되면 상기 상부블록(121)의 하중에 의해 상기 상부블록(121)의 내면은 상부측 웨지(123)의 일면(123a)을 따라 슬라이딩되면서 상기 상부측 웨지(123)를 스케어 바(130)로 밀게 됨에 따라 상기 상부측 웨지(123)의 톱니(123c)가 형성된 타면(123b)은 스케어 바(130) 외면에 밀착된 상태로 결합 고정된다. When the movement of the upper block 121 is completed, the inner surface of the upper block 121 is slid along one surface 123a of the upper side wedge 123 by the load of the upper block 121 and the upper side wedge ( As the 123 is pushed to the spur bar 130, the other surface 123b having the teeth 123c of the upper wedge 123 is coupled and fixed in close contact with the outer surface of the spur bar 130.

그리고, 상기 하부블록(122)은 잭 실린더(124)에 의해 일정거리만큼 이동됨에 따라 상기 하부블록(122)의 내면과 하부측 웨지(123)의 일면(123a)은 일정 길이만큼 이격됨에 따라 상기 하부측 웨지(123)는 스케어 바(130)의 외면으로부터 해제된다. As the lower block 122 is moved by the jack cylinder 124 by a predetermined distance, the inner surface of the lower block 122 and the one surface 123a of the lower side wedge 123 are spaced apart by a predetermined length. The lower side wedge 123 is released from the outer surface of the scare bar 130.

이와 같이, 상기 도 9a 내지 도 9g의 작동이 순차적으로 연속적으로 행해지면서 상부블록(121)과 하부블록(122)이 잭 실린더(124)의 스트로크만큼 계속해서 상승하게 된다. As described above, the operations of FIGS. 9A to 9G are sequentially performed, and the upper block 121 and the lower block 122 continue to rise as much as the stroke of the jack cylinder 124.

한편, 상기 크라이밍 잭부(120)의 상부블록(121) 상부에 설치된 이컬라이저 실린더(126)는 잭 실린더(124)에 의해 상승하는 상부블록(121)에 의해 압축과 팽창 이 번갈아가면서 상승 즉, 상기 잭 실린더(124)와 상부블록(121)이 상승하게 되면 상기 이컬라이저 실린더(126)의 피스톤(126b)는 실린더본체(126a) 내에서 상승하게 된다. On the other hand, the equalizer cylinder 126 installed on the upper block 121 of the crying jack 120, the compression and expansion alternately rises, that is, by the upper block 121 that is raised by the jack cylinder 124, When the jack cylinder 124 and the upper block 121 is raised, the piston 126b of the equalizer cylinder 126 is raised in the cylinder body 126a.

상기 이컬라이저 실린더(126)의 피스톤(126b)이 상승된 상태에서 상기 이컬라이저 실린더(126)가 팽창하게 되면 상기 상부블록(121)이 스케어 바(130)에 결합 고정되어 있음에 따라 상기 피스톤(126b)과 피스톤로드(126c)에 의해 상기 이컬라이저 실린더(126)은 스케어 바(130)을 따라 상승하게 된다. When the equalizer cylinder 126 is expanded while the piston 126b of the equalizer cylinder 126 is raised, the upper block 121 is fixed to the scare bar 130 and thus the piston ( The equalizer cylinder 126 is raised along the scare bar 130 by 126b and the piston rod 126c.

이와 함께, 상기 이컬라이저 실린더(126)의 상부에 결합된 플레이트(127)도 상승하게 되고, 상기 플레이트(127)의 상부에 결합된 리프팅 빔(140) 또한 상승하게 된다. In addition, the plate 127 coupled to the upper portion of the equalizer cylinder 126 also rises, and the lifting beam 140 coupled to the upper portion of the plate 127 also rises.

상기 상승하는 리프팅 빔(140)의 상부에 얹혀진 상태로 결합된 겐트리 크레인(1)의 상판(12)도 상승하게 된다. The top plate 12 of the gantry crane 1 coupled in a state where it is mounted on the rising lifting beam 140 is also raised.

상기와 같이, 계속해서 크라이밍 잭부(120)의 상승작업에 의하여 상기 리프팅 빔(140)이 상승됨과 동시에 겐트리 크레인(1)의 상판(12)도 상승됨에 따라 상기 겐트리 크레인(1)의 양측에 설치되어 있던 각 레그(11)는 펴지게 된다. As described above, as the lifting beam 140 is raised by the lifting operation of the climbing jack part 120 and the top plate 12 of the gantry crane 1 is also raised, the gantry crane 1 is Each leg 11 provided in both sides is unfolded.

상기 겐트리 크레인(1)이 다 세워지면 상기 각 레그(11)는 펴진 상태가 되며, 이 때 상기 각 레그(11)의 접철부(11a)를 볼트 등의 결합수단으로 고정 결합하여 상기 각 레그(11)가 접히는 것을 방지하는 상태로 상기 겐트리 크레인(1)을 세워 설치한다. When the gantry crane 1 stands up, each leg 11 is in an unfolded state. At this time, the leg 11a of each leg 11 is fixedly coupled to each other by a coupling means such as a bolt. The gantry crane 1 is erected and installed in a state of preventing the (11) from being folded.

상기와 같이, 상기 크라이밍 잭 장치(100)는 겐트리 크레인(1)을 서서히 세 워 설치할 수 있을 뿐만 아니라 상기 크라이밍 잭 장치(100)의 리프팅 빔(140)에 초중량물을 얹혀 고정한 상태에서 크라이밍 잭부(120)의 상하방향으로 서서히 왕복이동함에 따라 상기의 초중량물을 서서히 들어올릴 수 있으며, 또한 상기 리프팅 빔(140)에 고리를 결합하여 상기 고리에 초중량물을 걸어 고정한 상태에서 크라이밍 잭부(120)를 상하방향으로 서서히 왕복이동시켜 상기 리트팅 빔(140)을 왕복이동시키면서 초중량물을 서서히 들어올리게 되는데, 이는 상기 크라이밍 잭 장치(100)의 사용목적이나 효과 등에 따라 다양하게 사용하도록 하기 위함이다. As described above, the climbing jack device 100 may not only slowly install the gantry crane 1 and install the super heavy material on the lifting beam 140 of the climbing jack device 100 in a fixed state. As the reciprocating movement gradually in the vertical direction of the climbing jack portion 120, the super-heavy weight can be slowly lifted, and in addition, by attaching the loop to the lifting beam 140, the super-heavy weight is hung on the hook, and the crying is fixed. By gradually reciprocating the jack portion 120 in the vertical direction to gradually lift the super-heavy weight while reciprocating the lifting beam 140, which is used in various ways depending on the purpose or effect of the crying jack device 100 To do that.

이와 같이, 본 발명에 따른 상기의 초중량물 인양용 크라이밍 잭 장치는 예시된 도면을 참조하여 설명하였으나, 본 명세서에 기재된 실시예와 도면에 의해 본 발명은 한정되지 않으며 그 발명의 기술범위 내에서 당업자에 의해 다양한 변형이 이루어질 수 있으므로 본 발명의 기술적 사상이나 전망으로부터 개별적으로 이해되어져서는 안되는 것이다. As described above, the ultra-heavy weight lifting jacking device according to the present invention has been described with reference to the illustrated drawings, but the present invention is not limited by the embodiments and drawings described herein and is within the technical scope of the present invention. Various modifications may be made by those skilled in the art and thus should not be individually understood from the technical spirit or the prospect of the present invention.

도 1은 본 발명 겐트리 크레인을 세워 설치하는 크라이밍 잭 장치가 설치된 상태를 나타낸 사시도. 1 is a perspective view showing a state in which a climbing jack device for installing the present invention gantry crane is installed.

도 2는 본 발명 초중량물 인양용 크라이밍 잭 장치의 구조를 나타낸 사시도. Figure 2 is a perspective view showing the structure of the present invention heavy lifting lifting jack device.

도 3은 본 발명 초중량물 인양용 크라이밍 잭 장치를 정면에서 나타낸 정면도. Figure 3 is a front view of the present invention super heavy lifting lifting jack device.

도 4는 본 발명 초중량물 인양용 크라이밍 잭 장치를 평면에서 나타낸 평면도. Figure 4 is a plan view of the present invention super heavy lifting lifting jack device in plan view.

도 5는 본 발명 크라이밍 잭 장치의 크라이밍 잭부를 나타낸 사시도. Figure 5 is a perspective view showing a climbing jack portion of the present invention jack jack.

도 6은 본 발명 크라이밍 잭 장치의 크라이밍 잭부를 정면에서 나타낸 정면도. Fig. 6 is a front view showing the climbing jack portion from the front of the present invention jack jack.

도 7은 본 발명 크라이밍 잭 장치의 크라이밍 잭부를 측면에서 나타낸 측면도. Figure 7 is a side view showing a climbing jack portion from the side of the present invention jack jack.

도 8은 본 발명 크라이밍 잭 장치의 크라이밍 잭부를 평면에서 나타낸 평면도. 8 is a plan view showing a climbing jack portion of the present invention jack jack in plan view.

도 9a 내지 도 9g는 본 발명 크라이밍 잭부의 작동상태를 순차적으로 나타낸 작동상태도. Figures 9a to 9g is an operating state diagram showing sequentially the operating state of the present invention jack jack portion.

도 10은 본 발명 크라이밍 잭부의 웨지 형상을 나타낸 사시도. 10 is a perspective view showing the wedge shape of the present invention jack jack portion.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1: 겐트리 크레인 11: 레그1: gantry crane 11: leg

12: 상판 100: 크라이밍 잭 장치12: top plate 100: climbing jack device

110: 마스트 120: 크라이밍 잭부110: mast 120: climbing jackbu

121: 상부블록 122: 하부블록121: upper block 122: lower block

123: 웨지 124: 잭 실린더123: wedge 124: jack cylinder

125: 스위치 실린더 126: 이컬라이저 실린더125: switch cylinder 126: equalizer cylinder

127: 플레이트 130: 스케어 바127: Plate 130: Scare Bar

140: 리프팅 빔140: lifting beam

Claims (8)

부두항이나 건설현장, 조선소, 화학설비공장 등에서 무게가 많이 나가는 무거운 초중량화물, 대형 골리앗크레인, 화공 PLANT 및 기타 공장 설치자재 등과 같은 초중량물을 들어올리기 위하여, 지면에 하부가 접촉되어 크라이밍 잭 장치의 각 구성을 지지하도록 하는 마스트와, 상기 마스트의 일측면에 결합되는 세로방향으로 길게 형성되는 적어도 하나 이상의 스케어 바와, 상기 스케어 바를 따라 상하방향으로 왕복이동가능하도록 상기 스케어 바에 결합되어 상기의 초중량물을 들어올렸다 내렸다 하도록 하는 크라이밍 잭부와, 상기 크라이밍 잭부의 상부에 설치되어 상기 크라이밍 잭부에 의해 상하방향으로 왕복이동하도록 상기 초중량물을 지지하는 리프팅 빔이 구비된 초중량물 인양용 크라이밍 잭 장치에 있어서, Crimping jacks are contacted with the lower part of the ground to lift super heavy cargoes such as heavy cargoes, large goliath cranes, chemical plant and other plant installation materials, etc., which are heavily weighted at dock ports, construction sites, shipyards, chemical facilities, etc. A mast for supporting each component of the apparatus, at least one or more longitudinally formed scare bars coupled to one side of the mast, and coupled to the scare bars to reciprocate vertically along the scare bars; A lifting device for lifting a heavy object, comprising a climbing jack portion for lifting and lowering a heavy object, and a lifting beam installed on an upper portion of the climbing jack portion for supporting the super heavy material so as to reciprocate upward and downward by the climbing jack portion. In the jack device, 상기 크라이밍 잭 장치의 크라이밍 잭부는, The climbing jack portion of the climbing jack device is 상기 각 스케어 바에 슬라이딩가능하게 결합되어 상기 각 스케어 바를 따라 상하방향으로 왕복이동하도록 상기 각 스케어 바가 내삽되는 결합홈부를 갖는 상, 하부 블록; Upper and lower blocks slidably coupled to the respective scare bars and having coupling grooves into which the respective scare bars are interpolated so as to reciprocate upward and downward along the respective scare bars; 상기 상, 하부 블록의 각 결합홈부 내에는 일정범위 내에서 이동가능하게 각각 결합되어 상기 상, 하부 블록의 왕복이동에 따라 상기 각 스케어 바의 외면에 밀착된 상태로 결합 및 분리되도록 상기 상, 하부 블록의 내면과 일정간격 이격되는 웨지; The coupling grooves of the upper and lower blocks are coupled to each other so as to be movable within a predetermined range, and the upper and lower portions are coupled to and separated from each other by being in close contact with the outer surface of the respective scare bars according to the reciprocating movement of the upper and lower blocks. Wedges spaced apart from the inner surface of the block; 상기 상, 하부 블록 사이에 왕복이동가능하게 설치되어 압축과 팽창이 반복적으로 이루어지면서 상기 상, 하부 블록을 상하방향으로 왕복이동시키도록 실린더 본체와, 상기 실린더 본체 내에 설치되어 왕복이동하는 피스톤과, 상기 피스톤과 하부 블록을 연결 결합하는 피스톤로드를 갖는 잭 실린더; A cylinder body installed to reciprocate between the upper and lower blocks to repeatedly reciprocate the upper and lower blocks while repeatedly compressing and expanding, and a piston installed in the cylinder body to reciprocate; A jack cylinder having a piston rod connecting and coupling the piston and the lower block; 상기 상, 하부 블록 사이인 상기 잭 실린더의 일측에 설치되어 상기 상, 하브 불록을 서로 연결함과 함께 상기 잭 실린더와 더불어 상기 상, 하부 블록을 당겼다 밀었다하면서 상, 하부 블록을 왕복이동시키도록 상기 상부 블록에 결합되는 상부로드와, 상기 하부 블록에 결합되어 상부로드 내로 삽탈되는 하부로드와, 상기 상부로드 내로 하부로드가 삽탈되도록 스위칭하는 스위칭부를 갖는 스위치 실린더; It is installed on one side of the jack cylinder between the upper and lower blocks to reciprocate the upper and lower blocks while connecting the upper and lower blocks together and pulling and pushing the upper and lower blocks together with the jack cylinder. A switch cylinder having an upper rod coupled to the upper block, a lower rod coupled to the lower block and inserted into and inserted into the upper rod, and a switching unit for switching the lower rod into and inserted into the upper rod; 상기 상부 블록의 상부에 왕복이동가능하게 설치되어 압축과 팽창이 반복적으로 이루어지면서 상기 상부 블록이 평행한 상태로 왕복이동되도록 실린더본체와, 상기 실린더본체 내에서 왕복이동하는 피스톤과, 상기 피스톤과 상부 블록 및 잭 실린더를 서로 연결 결합하는 피스톤로드를 갖는 이컬라이저 실린더; A cylinder body and a piston reciprocating in the cylinder body so that the upper block is reciprocated in a parallel state while repeatedly installed in the upper portion of the upper block so that compression and expansion are repeated. An equalizer cylinder having a piston rod connecting and coupling the block and the jack cylinder to each other; 상기 이컬라이저 실린더의 상부에 결합되어 상부면에 리프팅 빔이 얹혀져 지지함은 물론 상기의 리프팅 빔을 왕복이동시키도록 상기 이컬라이저 실린더에 의해 왕복이동하는 플레이트로 구성됨을 특징으로 하는 초중량물 인양용 크라이밍 잭 장치. Ultra-heavy weight lifting cryo comprising a plate coupled to the upper portion of the equalizer cylinder, the lifting beam is mounted on the upper surface and supported, as well as a plate reciprocating by the equalizer cylinder to reciprocate the lifting beam. Dimmable jack device. 삭제delete 삭제delete 삭제delete 삭제delete 제 1 항에 있어서, The method of claim 1, 웨지는 이등변 삼각형상으로 형성되되, 상기 웨지의 일면은 상, 하부 블록의 내면과 일정간격으로 이격된 상태로 결합됨과 함께 상, 하부 블록이 슬라이딩되도록 일정각도로 경사지게 형성되고, 상기 웨지의 타면은 상, 하부 블록에 의해 스케어 바의 외면과 밀착된 상태로 결합 및 분리되도록 스케어 바의 외면과 평행하게 형성되며, 상기 웨지의 타면에는 스케어 바에서 미끄러짐을 방지하도록 복수개의 톱니가 형성됨을 특징으로 초중량물 인양용 크라이밍 잭 장치. The wedge is formed in an isosceles triangle shape, one surface of the wedge is coupled in a state spaced apart from the inner surface of the upper, lower blocks at a predetermined interval and is formed to be inclined at a predetermined angle so that the upper and lower blocks slide, the other surface of the wedge Upper and lower blocks are formed in parallel with the outer surface of the Scare Bar to be coupled and separated in close contact with the outer surface of the Scare Bar, the other surface of the wedge is characterized in that a plurality of teeth formed to prevent slipping in the Scare Bar Climbing jack device for heavy lifting. 제 1 항에 있어서, The method of claim 1, 잭 실린더와 이컬라이저 실린더는 스케어 바의 양측에 위치되도록 한 쌍으로 구비됨을 특징으로 하는 초중량물 인양용 크라이밍 잭 장치. Jack jack and the equalizer cylinder is provided in a pair so as to be located on both sides of the Scare Bar. 제 1 항에 있어서, The method of claim 1, 플레이트와 리프팅 빔 사이에는 상기 플레이트의 상부에 리프팅 빔이 얹혀진 상태로 결합됨과 함께 마스트의 지지부에 슬라이딩가능하게 결합되는 슬라이드부가 추가로 설치됨을 특징으로 하는 초중량물 인양용 크라이밍 잭 장치. The lifting jack is coupled between the plate and the lifting beam in a state in which the lifting beam is mounted on the top of the plate, and the lifting device for the heavy lifting lifting jack device, characterized in that the sliding portion is additionally installed.
KR1020090119164A 2009-12-03 2009-12-03 Climbing jack system in lifting of heavy weight equipment KR101120071B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090119164A KR101120071B1 (en) 2009-12-03 2009-12-03 Climbing jack system in lifting of heavy weight equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090119164A KR101120071B1 (en) 2009-12-03 2009-12-03 Climbing jack system in lifting of heavy weight equipment

Publications (2)

Publication Number Publication Date
KR20110062442A KR20110062442A (en) 2011-06-10
KR101120071B1 true KR101120071B1 (en) 2012-03-22

Family

ID=44396623

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090119164A KR101120071B1 (en) 2009-12-03 2009-12-03 Climbing jack system in lifting of heavy weight equipment

Country Status (1)

Country Link
KR (1) KR101120071B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104514231A (en) * 2013-09-29 2015-04-15 武汉倡文科技咨询有限公司 Jack-embedded type static testing girder

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104085823B (en) * 2014-06-28 2016-02-24 中铁一局集团有限公司 Subway is laid a railway track gantry crane dismounting and transport rotary lifter
KR101696744B1 (en) * 2015-03-18 2017-01-16 박병룡 Extension Method of Crane Leg
CN107758509B (en) * 2016-08-19 2019-05-31 中石化重型起重运输工程有限责任公司 Integral hoisting device for rapid and method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6180786U (en) * 1984-10-31 1986-05-29
JPS642994A (en) 1987-06-25 1989-01-06 Takenaka Komuten Co Ltd Tower crane for executing rc built superhigh rised building

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6180786U (en) * 1984-10-31 1986-05-29
JPS642994A (en) 1987-06-25 1989-01-06 Takenaka Komuten Co Ltd Tower crane for executing rc built superhigh rised building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104514231A (en) * 2013-09-29 2015-04-15 武汉倡文科技咨询有限公司 Jack-embedded type static testing girder
CN104514231B (en) * 2013-09-29 2017-09-22 武汉倡文科技咨询有限公司 The embedded static test girder of jack

Also Published As

Publication number Publication date
KR20110062442A (en) 2011-06-10

Similar Documents

Publication Publication Date Title
EP2969884B1 (en) Self erecting jacking tower
EP1317593B1 (en) Improved self-raising platform assembly
KR101120071B1 (en) Climbing jack system in lifting of heavy weight equipment
EP2969887B1 (en) Scissors lift assembly for jacking tower
KR20070116222A (en) Clamp for a construction apparatus
CN103434974A (en) Multifunctional lift
KR20120042115A (en) Tower crane
CN110185188A (en) Large-span reticulated shell installation method
CN105417397B (en) A kind of Mobile hoisting hoisting transportation device and method
CN205802916U (en) A kind of intelligence automatic-lifting overhauling platform for transmission equipment
CN217676492U (en) Transfer cart
CN212712330U (en) Cross crossbeam removes portal
JP2016142097A (en) Portable hoist unit and horizontal member dismantling method
CN210480800U (en) Hydraulic lifting device
KR102683589B1 (en) Indoor lifting apparatus and indoor beam construction method using the same
KR101696744B1 (en) Extension Method of Crane Leg
CN216512542U (en) Steel case roof beam lifting device of high security
JP2000191270A (en) Elevating mechanism and construction machine
JP7320801B1 (en) Erection device for heavy objects and its method
CN213950311U (en) Aviation of protection personal safety hangs and uses material frame
CN203486840U (en) Multifunctional lifting machine
CN221002205U (en) Communication tower hydraulic pressure station self-supporting construction equipment
CN220317144U (en) Stable protection device of crane and crane
CN213867371U (en) A top pushes away handle device for lifting by crane case roof beam
CN217518227U (en) Supporting elevation adjusting device and supporting device

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150223

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160217

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170217

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180213

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190201

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20200217

Year of fee payment: 9