KR101106865B1 - System and method for managing a contractor - Google Patents
System and method for managing a contractor Download PDFInfo
- Publication number
- KR101106865B1 KR101106865B1 KR1020070131060A KR20070131060A KR101106865B1 KR 101106865 B1 KR101106865 B1 KR 101106865B1 KR 1020070131060 A KR1020070131060 A KR 1020070131060A KR 20070131060 A KR20070131060 A KR 20070131060A KR 101106865 B1 KR101106865 B1 KR 101106865B1
- Authority
- KR
- South Korea
- Prior art keywords
- information
- subcontractor
- block
- client
- company
- Prior art date
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Primary Health Care (AREA)
- Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
Abstract
The present invention can not only check the contract information with the subcontractor and the change information of the subcontractor in real time when managing two or more subcontractors, and the ship construction company and each subcontractor can share the contract information and the change information. To a subcontractor management system and method,
The quaternary company management system according to the present invention controls the DB block that stores the subcontractor information and the subcontract information and the process of viewing or updating specific information stored in the DB block in response to a request for viewing or updating a client's information. Under the control of the subcontractor management server and the subcontractor management server, a DB that selectively stores information introduced from the client in a required area of the DB block or selectively outputs various information from the DB block. It consists of a management module, the DB block is a contract information DB that stores the contract information for the four orders signed by the shipbuilding company and the first subcontractor for each subcontractor, and the general Primary subcontractor information DB that stores information And it is configured to operate information DB, which serves to store a set of operational information to operate the Web page, such as business information DB and Web page graphics, information, web pages, setting information.
Quaternary ship
Description
The present invention relates to a subcontractor management system and method, and more specifically, in the case of managing two or more subcontractors, the contract information with the subcontractor and the change information of the subcontractor can be confirmed in real time, as well as the ship building company and each. A subcontractor management system and method by which subcontractors can share their contract information and change information.
Looking at the general ship construction flow, first, the initial design is made according to the type, size, etc. of the ordered ships and establish a schedule of production according to the schedule. Subsequently, a detailed design, a purchase schedule of the material is established, and a middle schedule production plan is established to be linked with the corresponding purchase schedule. As a final step, the production design and production schedule of small schedules are established by department and by sector, and when the goods are received, actual production proceeds.
In such a ship construction flow, shipbuilding companies may directly purchase and procure materials required for shipbuilding. However, as the types of materials required for shipbuilding are wide, there are many cases of procurement of materials in quadruple form. .
The company manages subcontractors to procure the material through the subsidiaries, sometimes managing two or more subcontractors as necessary. For example, if the raw material is supplied to the primary subcontractor, and the raw material is first processed, the secondary subcontractor finally assembles to complete the required material.
In this way, when procuring materials through two or more levels of subcontractors, when the contract with the primary subcontractor is made, information about the secondary subcontractor is specified in the contract document to manage the first and second subcontractors at once. On the other hand, when the secondary subcontractor is changed due to the change of the external environment, the information on the secondary subcontractor is changed to the primary subcontractor through wire or a predetermined document.
As described above, when the secondary subcontractor is changed, the primary subcontractor is notified through a wired or predetermined document, and thus there is a problem of lack of accuracy of information transmission and confusion.
The present invention has been made in order to solve the above problems, not only can confirm the contract information with the subcontractor and the change information of the subcontractor in real time management of two or more subcontractors, in addition to the ship construction company and each subclass Its purpose is to provide a subcontractor management system and method by which an entity can share its contract information and change information.
In accordance with an embodiment of the present invention, there is provided a sub-company management system according to the present invention. The DB block stores sub-company information and sub-contract information, and specific information stored in the DB block in response to a request for viewing or updating a client's information. Under the control of the subcontractor management server and the subcontractor management server, the information flowed from the client is selectively stored in the required area of the DB block or various information is selected from the DB block. And a DB management module for outputting the data, and the DB block includes a contract information DB for storing contract information on a four-tier contract signed by a ship construction company and a first-tier subcontractor; The primary supplier information database, which stores all the information for the primary subcontractor, and the secondary subcontractor. It is characterized by consisting of a second-tier subcontractor information DB that stores all the information and an operation information DB that stores a series of operation information for operating web pages such as web page graphic information and web page setting information. .
In addition, the quaternary company management method according to the present invention comprises the steps of storing the contract information, primary and secondary quasi-supplier information in the contract information DB, the primary sub-supplier information DB, secondary secondary company information DB of the DB block and When the access event occurs from the client, the subcontractor management server generates a main page for guiding the reading or modifying of the contract information, the first subcontractor information and the second subcontractor information, and delivers the main page to the client and on the main page. When the reading or modifying event of any one of the contract information, the first subcontractor information, the second subcontractor information occurs, the subcontractor management server generates a reading page or an update page of the information and sends it to the client. Characterized in that made.
When the subcontractor management server transmits an update page of the corresponding information to the client in response to a modification event on the main page, the modification is performed on the update page of the corresponding information by the client, and the modified information is displayed on the subcontractor. And selectively updating and storing the required area of the DB block under the control of the management server.
Quaternary company management system and method according to the present invention has the following effects.
By managing subcontractor information and contract information with subcontractors under one system, and sharing the changed subcontractor information and contract information with subcontractors and shipbuilding companies, it is possible to ensure the accuracy of logistics movements, Information transfer becomes possible. This facilitates the management of the material supplied.
Hereinafter, with reference to the drawings will be described in detail the subcontractor management system and method according to an embodiment of the present invention. 1 is a block diagram of a subcontractor management system according to an embodiment of the present invention, Figure 2 is a flow chart for explaining a subcontractor management method according to an embodiment of the present invention.
First, a description will be given of the subcontractor management system according to an embodiment of the present invention. As shown in FIG. 1, the subcontractor management system according to an exemplary embodiment of the present invention is largely composed of a combination of a
In detail, the
On the other hand, the contract information DB (111) stores the contract information for the four orders signed by the ship building company and the primary subcontractor for each subclass company. The contract information between the ship building company and the primary subcontractor includes information on the secondary subcontractor as well as general information on the material such as the type and quantity of raw materials. Here, if there are three or more levels of subcontractors, the third subcontractor information and the fourth subcontractor information may be further included.
The first subcontractor information DB 112 stores all the information on the primary subcontractor, for example, the amount of the subsequent processing amount, the subcontract history, the sales amount, the general information of the company, and the like. Like the first
The operation information DB 114 stores a series of operation information for operating a web page such as web page graphic information, web page setting information, and the like.
On the other hand, the
Lastly, the
In the state having the above configuration, the
In the above, the configuration of the subcontractor management system according to an embodiment of the present invention has been described. Hereinafter, a description will be given of the subcontractor management method according to an embodiment of the present invention using the subcontractor management system.
First, as shown in FIG. 2, predetermined information is pre-stored in each of the
Access from the
As shown in FIG. 3, the main page displayed on the
Specifically, when the confirmation item of the contract information is clicked, the corresponding event is transmitted to the
On the other hand, in the case of modifying the contract information, the contract information modification item on the main page is clicked. Like the contract information checking process, predetermined event information is transmitted to the
As described above, the process of viewing and updating the contract information has been described. The process of viewing and updating the first and second subcontractor information is also performed in the same process as the process of viewing and updating the contract information.
For reference, the reading and updating of the contract information, the first and second subcontractor information, it is preferable to set only to the user authorized to access in order to maintain the accuracy and confidentiality of the information, for example, the ship It is preferable to set the update to be possible only through the
1 is a block diagram of a subcontractor management system according to an embodiment of the present invention.
Figure 2 is a flow chart for explaining a quasi-company management method according to an embodiment of the present invention.
3 is a reference diagram showing a main page generated by the subcontractor management server.
<Explanation of symbols for the main parts of the drawings>
101: sub-company management server 102: DB management module
103: interface module 104: client
110: DB block 111: Contract Information DB
112: primary subcontractor information DB 113: secondary subcontractor information DB
114: Operational Information DB
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070131060A KR101106865B1 (en) | 2007-12-14 | 2007-12-14 | System and method for managing a contractor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070131060A KR101106865B1 (en) | 2007-12-14 | 2007-12-14 | System and method for managing a contractor |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090063621A KR20090063621A (en) | 2009-06-18 |
KR101106865B1 true KR101106865B1 (en) | 2012-01-19 |
Family
ID=40992549
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070131060A KR101106865B1 (en) | 2007-12-14 | 2007-12-14 | System and method for managing a contractor |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101106865B1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020021839A (en) * | 2000-09-18 | 2002-03-23 | 구자홍 | Parts stock information sharing system using a network and operating method thereof |
KR20030006432A (en) * | 2001-07-12 | 2003-01-23 | 최영휘 | Enterprise Resource Planning Method and System for performing original cost control using quality control and productivity control |
KR20040108260A (en) * | 2003-06-17 | 2004-12-23 | 주식회사 포스코 | Automatic ordering and manufacturing system and method thereof |
-
2007
- 2007-12-14 KR KR1020070131060A patent/KR101106865B1/en not_active IP Right Cessation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020021839A (en) * | 2000-09-18 | 2002-03-23 | 구자홍 | Parts stock information sharing system using a network and operating method thereof |
KR20030006432A (en) * | 2001-07-12 | 2003-01-23 | 최영휘 | Enterprise Resource Planning Method and System for performing original cost control using quality control and productivity control |
KR20040108260A (en) * | 2003-06-17 | 2004-12-23 | 주식회사 포스코 | Automatic ordering and manufacturing system and method thereof |
Also Published As
Publication number | Publication date |
---|---|
KR20090063621A (en) | 2009-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kassem et al. | BIM in facilities management applications: a case study of a large university complex | |
Lin et al. | Developing mobile BIM/2D barcode-based automated facility management system | |
Kannan et al. | An analysis of the general benefits of a centralised VMI system based on the EOQ model | |
KR20230069258A (en) | Blockchain enabled collaborative transaction information processing for a supply chain | |
US20130082101A1 (en) | System and method for field management using barcodes and optical scanners | |
KR101872933B1 (en) | Production management system | |
Campuzano-Bolarín et al. | A rolling horizon simulation approach for managing demand with lead time variability | |
CN102859540A (en) | Plant deliverable management system | |
KR101472324B1 (en) | Automatic System and method for Generating Structural Drawings | |
KR101106865B1 (en) | System and method for managing a contractor | |
Hamasaki et al. | Robust linear programming application for the production planning problem | |
JP2009251935A (en) | Building management information-sharing system | |
KR100868478B1 (en) | System and Method for on-line design cooperation | |
KR101072739B1 (en) | System and method for managing materials requirement | |
Benedict | Supply chain management (SCM): The extent of its application and features in the successful delivery of construction projects | |
KR20220080885A (en) | BIM-based remote collaboration construction management simulation server using mixed reality | |
Sarkar et al. | Cloud based Project Management Information System (PMIS) for construction projects | |
KR102266121B1 (en) | Bom management system of electronic drawing and managing method thereof | |
KR101103928B1 (en) | System and method for analysis a load of subcontract company | |
KR102500541B1 (en) | Management server for members of union for proceeding reconstruction project and operation method of the same | |
Thorpe et al. | Facilitating the link between point-of-production workers and corporate ICT systems in construction | |
Reimers et al. | Supply chain resource planning systems: A scenario of future enterprise systems | |
US20200258483A1 (en) | Systems and methods for dynamic monitor management | |
Shorney‐Darby | How Do Design‐Bid‐Build and Design‐Build Differ? | |
KR20230073043A (en) | System and method for investment employment platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration | ||
GRNT | Written decision to grant | ||
LAPS | Lapse due to unpaid annual fee |