KR101104856B1 - Construction method of land reclamation - Google Patents

Construction method of land reclamation Download PDF

Info

Publication number
KR101104856B1
KR101104856B1 KR1020090023550A KR20090023550A KR101104856B1 KR 101104856 B1 KR101104856 B1 KR 101104856B1 KR 1020090023550 A KR1020090023550 A KR 1020090023550A KR 20090023550 A KR20090023550 A KR 20090023550A KR 101104856 B1 KR101104856 B1 KR 101104856B1
Authority
KR
South Korea
Prior art keywords
coast
reclaimed
river
land
construction method
Prior art date
Application number
KR1020090023550A
Other languages
Korean (ko)
Other versions
KR20100104865A (en
Inventor
전영진
Original Assignee
전영진
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 전영진 filed Critical 전영진
Priority to KR1020090023550A priority Critical patent/KR101104856B1/en
Publication of KR20100104865A publication Critical patent/KR20100104865A/en
Application granted granted Critical
Publication of KR101104856B1 publication Critical patent/KR101104856B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/18Reclamation of land from water or marshes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Revetment (AREA)

Abstract

본 발명은 친환경적인 간척지 시공방법에 관한 것으로, 간척하고자 하는 지역의 강 연안 및 해안을 따라 방조제를 축조하되, 상기 강 연안이나 해안과 만나는 간척하고자 하는 지역의 지수 부위에 배출수로가 설치되도록 하여 간척하고자 하는 지역의 강과 바다가 연결된 채로 보존되어 해수와 담수의 원활한 유통이 이루어지고, 이에 따라 연어, 은어, 대구 등과 같은 회귀성 어류가 바다와 강을 자유롭게 이동가능하여 생태계가 보존될 수 있는 친환경적인 간척지 시공방법이다.The present invention relates to an environmentally friendly reclaimed land construction method, while constructing a repellent along the river coast and coast of the region to be reclaimed, reclaimed by installing the discharge channel in the index portion of the region to be reclaimed to meet the river coast or coast It is preserved while the river and the sea of the region to be connected are connected to facilitate the smooth distribution of seawater and fresh water.As a result, eco-friendly reclaimed land where regressive fish such as salmon, sweetfish, and cod can move freely through the sea and river to preserve the ecosystem It is a construction method.

배출수로, 방조제, 블록, 간척 Drains, embankments, blocks, reclamation

Description

친환경적인 간척지 시공방법{Construction method of land reclamation}Construction method of land reclamation

본 발명은 친환경적인 간척지 시공방법에 관한 것으로, 보다 상세하게는 바다와 강이나 하천과 같은 지수의 유통이 원활하게 이루어질 수 있도록 방조제를 축조하여 생태계의 파괴를 최소화할 수 있는 친환경적인 간척지 시공방법에 관한 것이다.The present invention relates to an environmentally friendly reclaimed land construction method, and more particularly to an environmentally friendly reclaimed land construction method that can minimize the destruction of the ecosystem by building a seawall so that the distribution of the index such as the sea and rivers or rivers can be made smoothly It is about.

간척사업이란 호수나 바닷가에 방조제를 축조하고, 그 안에 있는 물을 빼내 육지화하여 농토나 기타 산업부지로 만드는 것을 말한다. 상기 간척사업은 주로 바닷물이 드나드는 갯벌이 주 대상이 된다.Reclamation is the construction of a dike on a lake or a beach, the extraction of water from the land, and the formation of land into agricultural land or other industrial sites. The reclamation project is mainly focused on tidal flats where seawater flows in and out.

이러한 간척사업은 간척하고자 하는 지역에 사석을 쌓아 제방을 형성하고, 강과 바다가 만나는 지점에 강물이 증가하였을 때 배수 가능하도록 하는 수문을 설치함으로써 방조제가 축조됨으로써 이루어진다.This reclamation project is accomplished by building a dike in the area to be reclaimed to form an embankment, and by installing a water gate to allow drainage when the river water increases at the point where the river and the sea meet.

이와 같이 방조제가 축조된 간척지역은 방조제에 의해 간척지역 내부로의 해수유입을 막고 그 내부에서 흐르는 강물만이 수문의 개방에 의해 바다로 배출되도록 하여 간척하고자 하는 지역의 염분이 점점 제거되도록 함으로써 농업용지나 산업, 공업용지 등으로 이용될 수 있는 것이다.As such, the reclaimed area in which the dike is built is prevented from inflow of seawater into the reclaimed area by the dike, and only the river water flowing therein is discharged to the sea by the opening of the hydrology so that the salinity of the area to be reclaimed is gradually removed. It can be used as industrial or industrial land.

또한, 상기 방조제에 의해 강물이 바다로 원활하게 흘러나가는 것을 막음에 따라 강을 중심으로 하여 인공호가 형성되는데, 이러한 인공호의 물은 간조시에 수문을 열어 강물이 바다로 배수되도록 하고 만조시에는 수문을 닫아 해수유입을 막는 작업이나 빗물의 지속적인 유입 등이 반복적으로 이루어짐으로써 시간이 지나면인공호의 물이 담수화될 수 있으며, 이와 같이 담수화된 물은 간척하고자 하는 지역의 공업용수나 농업용수 등으로 사용하게 된다.In addition, the artificial water is formed around the river by preventing the river from flowing smoothly into the sea by the scavenger, and the water of the artificial lake opens the sluice at low tide to allow the river to drain into the sea and at high tide It is possible to dewater the artificial lake over time as the operation to prevent the inflow of seawater or the continuous inflow of rainwater by closing it, and the desalted water is used as industrial water or agricultural water in the area to be reclaimed. .

그러나 상기와 같이 형성된 간척지는 방조제에 의해 해수와 담수의 유통을 막아버리기 때문에 연어나, 장어, 대구, 은어 등과 같은 회귀성 어류의 산란을 위한 이동과 영양물질의 이동을 단절하여 연안 어족자원의 고갈을 유도하는 등 생태계를 파괴하게 된다.However, the reclaimed land formed as described above prevents the distribution of seawater and fresh water by the sea scavenger, so that the migration of nutrients and the migration of nutrients such as salmon, eel, cod, sweetfish, etc. are cut off. To destroy the ecosystem.

또한, 하천수와 같은 지수 등에 쓸려오는 모래의 갯벌 유입을 차단하여 갯벌 생태계 또한 해치게 되는 문제점이 있다.In addition, there is a problem that the tidal-flat ecosystem is also harmed by blocking the inflow of sand tidal swept to the index, such as river water.

본 발명은 상기와 같은 문제점을 해결하기 위한 것으로,The present invention is to solve the above problems,

간척하고자 하는 지역의 생태계의 파괴를 방지할 수 있는 친환경적인 간척지 시공방법을 제공하는 것을 목적으로 한다.The purpose of this project is to provide environmentally friendly reclaimed land construction methods that can prevent the destruction of the ecosystem of the area to be reclaimed.

본 발명의 다른 목적은 간척하고자 하는 지역의 갯벌이 보존될 수 있는 친환경적인 간척지 시공방법을 제공하는데 있다.Another object of the present invention to provide an environmentally friendly reclaimed land construction method that can be preserved tidal flats of the area to be reclaimed.

본 발명의 또 다른 목적은 보다 넓은 면적의 땅이 이용 가능하도록 하는 친환경적인 간척지 시공방법을 제공하는데 있다.Still another object of the present invention is to provide an environmentally friendly reclaimed land construction method that allows a larger area of land to be used.

상기와 같은 목적을 달성하기 위하여 본 발명은,According to an aspect of the present invention,

간척하고자 하는 지역의 강 연안 및 해안을 따라 방조제를 축조하되, 상기 강 연안이나 해안과 만나는 간척하고자 하는 지역의 지수 부위에 배출수로가 설치된 것을 특징으로 하는 친환경적인 간척지 시공방법을 제공한다.Provides an environmentally friendly reclaimed land construction method characterized in that the construction of the embankment along the river coast and coast of the area to be reclaimed, the discharge channel is installed in the index portion of the area to be reclaimed to meet the river coast or coast.

또한, 본 발명은 상기 강 연안이나 해안과 만나는 상기 지수 부위에 배출수로를 설치하는 배출수로 시공단계와;In addition, the present invention comprises a discharge waterway construction step of installing a discharge waterway in the index portion that meets the river coast or the coast;

상기 배출수로를 제외한 나머지 강 연안 및 해안을 따라 한 쌍의 블록을 나란하게 설치하는 블록시공단계와;A block construction step of installing a pair of blocks side by side along the remaining river coast and coast except for the discharge channel;

상기 한 쌍의 블록 사이에 형성된 수용공간부에 사석을 채워 방조제를 축조하는 단계;를 포함하는 것을 특징으로 한다.And filling the sandstones in the accommodation spaces formed between the pair of blocks to build a scavenger.

또한, 본 발명은 상기 지수의 흐름을 따라 그 양측에 둑을 형성하는 둑시공단계를 더 포함하는 것을 특징으로 한다.In addition, the present invention is characterized in that it further comprises a weir construction step of forming a weir on both sides of the flow along the index.

또한, 본 발명의 상기 지수의 흐름이 굴곡되어 있는 경우 상기 지수의 굴곡이 시작되는 점과 굴곡이 끝나는 점을 연결하는 둑을 설치하는 것을 특징으로 한다.In addition, when the flow of the exponent of the present invention is curved, it characterized in that the installation of a weir connecting the point where the start of the bend and the end of the bend.

상술한 바와 같이 본 발명에 따른 친환경적인 간척지 시공방법은 간척하고자 하는 지역의 강과 바다가 연결된 채로 보존되어 해수와 담수의 원활한 유통이 이루어지고, 이에 따라 연어, 은어, 대구 등과 같은 회귀성 어류가 바다와 강을 자유롭게 이동가능하여 생태계가 보존되므로 친환경적이고, 간척하고자 하는 지역 내의 지수가 배출수로와 연결되어 바다로 배출이 용이하게 이루어질 수 있다는 효과를 갖는다.As described above, the eco-friendly reclaimed land construction method according to the present invention is preserved while the river and the sea of the region to be reclaimed are connected to facilitate the smooth distribution of seawater and fresh water, so that regressive fish such as salmon, sweetfish, cod, etc. Since the ecosystem is preserved by freely moving rivers, it is eco-friendly, and the index in the area to be reclaimed is connected to the drainage channel so that it can be easily discharged to the sea.

또한, 지수 주변에 둑이 설치되어 수문의 개방에 의해 해수가 지수로 유입되더라도 주변 땅으로 염분이 흡수되는 것을 방지할 수 있고, 해수 유입으로 지수 주변에 갯벌이 형성되어 갯벌에 사는 해양생물의 서식이 가능하게 되며, 갯벌에 있는 미생물이 오염물질을 분해하여주어 자연정화가 이루어질 수 있다는 효과를 갖는다.In addition, dams are installed around the exponent to prevent the absorption of salinity into the surrounding land even though seawater is introduced into the exponent by the opening of the floodgate. This becomes possible, and the microorganisms in the tidal flats can decompose contaminants and have a natural purification effect.

또한, 굴곡되어 있는 지수의 흐름이 직선화되면서 굴곡되어 있던 지수부분의 땅이 농지나 공업용지 등으로 이용 가능하게 되고, 지수로 인해 분할되는 땅의 수가 감소될 수 있으며, 지수와 지수 사이에 이용 가능한 땅의 면적이 넓어지게 되어 보다 효율적인 땅을 이용이 가능하다는 효과를 갖는다. In addition, as the flow of the curved index is straightened, the curved part of the index can be used as farmland or industrial land, and the number of lands divided by the index can be reduced. The land area becomes wider, which has the effect of enabling more efficient land use.

이하에서는 본 발명에 대하여 첨부된 도면에 도시된 실시예에 따라 구체적으로 설명하기는 하나, 본 발명이 도면에 도시된 실시예만으로 한정되는 것은 아니다. Hereinafter, the present invention will be described in detail with reference to the embodiments shown in the accompanying drawings, but the present invention is not limited to the embodiments shown in the drawings.

도 1은 본 발명의 일실시예에 따른 친환경적인 간척지 시공방법에 의해 시공된 간척지를 개략적으로 나타낸 도면이고, 도 2는 도 1의 A 부분을 확대하여 나타낸 요부사시도이며, 도 3은 도 도 2의 배출수로를 확대하여 나타낸 사시도이다.1 is a view schematically showing a reclaimed land constructed by an environmentally friendly reclaimed land construction method according to an embodiment of the present invention, FIG. 2 is an enlarged main part perspective view of part A of FIG. 1, and FIG. 3 is FIG. 2. A perspective view showing an enlarged drainage path of the.

이에 도시된 바와 같이 본 발명에 따른 친환경적인 간척지의 시공방법은 간척하고자 하는 지역의 강 연안 및 해안을 따라 방조제(10)를 축조하되, 상기 강 연안이나 해안과 만나는 간척하고자 하는 지역의 지수(a) 부위에는 배출수로(20)가 설치된 것이다.As shown therein, the construction method of eco-friendly reclaimed land according to the present invention, while constructing the repellent (10) along the river coast and coast of the area to be reclaimed, the index of the area to be reclaimed to meet the river coast or coast (a ) Part of the discharge passage 20 is installed.

이는 간척하고자 하는 지역의 강을 제외한 부분에만 방조제(10)가 축조되어 강물과 바닷물의 유통이 원활하게 이루어지도록 함으로써 회귀성 어류의 서식이 원활하게 이루어질 수 있도록 하고, 지수(a)가 배출수로(20)를 통해 바다(b)나 강(c)으로 지수(a)가 배출되도록 하는 등 최대한 간척하고자 하는 지역의 자연적인 물의 흐름이 보존될 수 있도록 함으로써 생태계의 파괴를 방지하고자 하는 것이다. This means that the repellent (10) is built only in the part except the river in the area to be reclaimed, so that the river and sea water can be smoothly flowed, so that the regressive fish can be formed smoothly, and the index (a) is the discharge channel (20). This is to prevent the destruction of the ecosystem by ensuring that the natural water flow in the region to be reclaimed as much as possible, such as discharge of the index (a) to the sea (b) or river (c) through the).

이와 같은 방조제(10)와 배출수로(20)의 시공에 대해 단계별로 나누어 보다 구체적으로 살펴보면, 첫 번째 단계는 간척하고자 하는 지역의 강(c) 연안이나 해안과 만나는 상기 간척하고자 하는 지역의 지수(a) 부위에 배출수로(15)를 설치하 는 배출수로 시공단계이다.Looking in more detail by dividing the construction of the seawall (10) and the discharge channel (20) step by step, the first step is the index of the area to be reclaimed to meet the river (c) coast or coast of the area to be reclaimed ( a) The construction of the drainage water drainage channel 15 is installed in the site.

이러한 배출수로(20)의 설치는 덤프트럭 등을 이용하여 설치하고자 하는 지역으로 운반시킨 뒤 해저면으로 낙하시킴으로써 설치 가능한 것으로, 상기 배출수로(20)는 도 3에 도시된 바와 같이 전면과 후면이 개방된 관형으로 형성되되, 그 내측에는 개폐가 가능한 수문(21)이 구비된 것이다. 여기서 상기 배출수로(20)를 관형으로 형성하는 것은 방조제(10)의 축조가 완료된 후 배출수로(20)의 상부와 방조제(20)의 상부가 연결되어 콘크리트 등을 도포하는 것만으로 도로로 사용가능하도록 하기 위한 것이다.The installation of the discharge channel 20 can be installed by transporting it to an area to be installed using a dump truck and then dropping to the sea floor. The discharge channel 20 has front and rear surfaces as shown in FIG. 3. It is formed in an open tubular shape, the inside thereof is provided with a water gate 21 that can be opened and closed. Here, the discharge channel 20 is formed in a tubular shape so that the upper part of the discharge channel 20 and the upper part of the modifier 20 are connected to the upper part of the discharge channel 20 after the construction of the faucet 10 is completed so that the discharge channel 20 can be used as a road. It is to.

이러한 배출수로(20)의 일측에는 수문(21)이 개폐되도록 하는 개폐수단이 구비되는데, 이때 상기 개폐수단으로는 수문(20)의 일측에 원판을 회전시켜 수문(21)을 열고 닫는 통상의 버터플라이 밸브(22) 등을 이용하여 버터플라이 밸브(22)의 회전에 따라 수문(21)이 기울어지면서 개방되어 물이 유통될 수 있는 공간이 확보되도록 하고, 수문(21)을 폐쇄하고자 하는 경우에는 버터플라이 밸브(22)를 역회전시켜 폐쇄되도록 할 수 있다. 이밖에도 상기 수문(21)의 개폐수단으로는 모터와 같은 동력원과 상기 동력원의 동력을 전달하기 위한 스프라켓과 체인 등과 같은 동력전달원을 이용하여 모터가 회전되면 그 회전력을 동력전달원으로 전달하여 이와 연결된 수문(21)을 개방되도록 하는 등 상기 수문(21)의 개폐수단은 상기 구성에 한정되지 않고, 공지된 다양한 수단에 의해 이루어질 수 있다.One side of the discharge passage 20 is provided with opening and closing means for opening and closing the water gate 21, wherein the opening and closing means is a conventional butter to open and close the water gate 21 by rotating the disc on one side of the water gate (20) When the water gate 21 is inclined to open as the butterfly valve 22 is rotated by using the fly valve 22 or the like, to secure a space in which water can be distributed, and to close the water gate 21. The butterfly valve 22 can be reversed to close. In addition, as the opening and closing means of the water gate 21, when the motor is rotated by using a power source such as a motor and a power transmission source such as a sprocket and a chain for transmitting the power of the power source, the rotational force is transmitted to the power transmission source and connected thereto. Opening and closing means of the water gate 21, such as to open the water gate 21 is not limited to the above configuration, it may be made by a variety of known means.

두 번째 단계는 상기 배출수로(20)를 제외한 상기 강 연안 및 해안을 따라 한 쌍의 블록(11,11')을 나란하게 설치하는 블록시공단계이다.The second step is a block construction step of installing a pair of blocks (11, 11 ') side by side along the river coast and coast except for the discharge passage (20).

상기 블록(11,11')은 본 출원인 출원한 바 있는 출원번호 제10-1007-100050호의 기재된 방조제 축조용 기초블록이 사용되는 것으로, 상기 블록(11,11')는 상부가 좁고 하부가 넓게 형성되고, 상기 블록(11,11')의 중간에는 운반시 부력을 인가할 수 있도록 선단에서 후단으로 관통되게 형성되는 중공부(112)와; 상기 블록(11,11')의 선단면과 후단면에는 상호 연결 고정할 수 있도록 형성되는 연결고정부(113);가 형성된 것을 특징으로 하는 블록(11,11')으로 그 길이가 약 50~80m이고 높이가 4~9m 정도이다.The block (11, 11 ') is used as the base block for the fabrication of the embankment construction described in the application No. 10-1007-100050 filed by the present applicant, the block (11, 11') is narrow in the upper part and wide in the lower part A hollow portion 112 formed in the middle of the blocks 11 and 11 'so as to penetrate from the front end to the rear end so that buoyancy can be applied during transportation; Blocks 11 and 11 'are formed on the front and rear end surfaces of the blocks 11 and 11', and the fixing parts 113 are formed to be connected to each other. It is 80m high and 4 ~ 9m high.

이러한 블록(11,11')은 상기 중공부(112)에 공기를 주입하여 부력을 갖도록 한 다음, 수표면에 상기 블록(11,11')을 띄워 예인선 등을 통해 설치하고자 하는 위치로 이동시킨 뒤, 중공부(112)의 공기를 배기시켜 부력을 제거하여 블록(11,11')의 자중에 의해 수중으로 가라앉게 하여 설치하는 것으로, 이때 예인선의 크레인 등을 이용하여 정확한 위치에 안착되도록 함으로써 설치가 완료된다. The blocks 11 and 11 'have a buoyancy force by injecting air into the hollow part 112, and then float the blocks 11 and 11' on the water surface to move to a position to be installed through a tugboat. Afterwards, the air of the hollow part 112 is exhausted to remove buoyancy so as to sink into the water by the weight of the blocks 11 and 11 ', whereby it is settled in the correct position by using a crane of a tugboat. The installation is complete.

아울러 상기와 같이 두 개의 블록(11,11')은 한 쌍을 이루도록 서로 평행을 이루며 나란하게 설치하되, 서로 마주하는 블록(11,11')의 하부가 맞닿도록 설치하거나 일정간격 이격되도록 설치할 수 있으며, 블록(11,11')의 선단면과 후단면에 형성된 연결고정부(113)를 연결하여 다수의 블록(11,11')이 길이방향으로 연결되도록 한다.In addition, as described above, the two blocks 11 and 11 'may be installed in parallel to each other to form a pair, and may be installed side by side, but may be installed so that the lower portions of the blocks 11 and 11' facing each other are in contact with each other or spaced apart from each other at regular intervals. In addition, the plurality of blocks 11 and 11 'are connected in the longitudinal direction by connecting the connection fixing parts 113 formed at the front and rear ends of the blocks 11 and 11'.

마지막 단계는 상기 한 쌍의 블록(11,11') 사이에 형성된 수용공간부에 사석(114)을 채워 방조제(10)를 축조하는 단계이다. The last step is to build the scavenger 10 by filling the sandstone 114 in the receiving space formed between the pair of blocks 11 and 11 '.

상기 사석(114)은 큰 모래와 돌로 이루어진 것으로, 덤프트럭 등으로 운반하 여 해저면으로 낙하하여 상기 수용공간부에 적재시킴으로써 방조제(10)가 세워지는 것이며, 상기 방조제(10)는 전술한 블록(11,11')으로 기초지반을 구축한 후 그 블록(11,11')의 사이에 형성된 수용공간부로 최소한의 사석(114)을 채움으로써 형성이 가능하기 때문에 간편하고 효율적으로 구축이 가능하다. The sandstone 114 is made of large sand and stone, and transported by a dump truck, etc., dropped to the bottom of the sea and loaded on the receiving space, so that the seawater 10 is erected, and the seawater 10 is the block described above. It is possible to construct simply and efficiently because the base ground is constructed with (11, 11 ') and then formed by filling the minimum sandstone 114 with the receiving space formed between the blocks 11, 11'. .

상기와 같은 본 발명에 따른 친환경적인 간척지 시공방법은 간척하고자 하는 지역의 강과 바다가 연결된 채로 보존되어 해수와 담수의 원활한 유통이 이루어지므로 연어, 은어, 대구 등과 같은 회귀성 어류가 바다와 강을 자유롭게 이동 가능하도록 해주고, 이에 따라 회귀성 어류와 같은 연안어족의 생태계가 보존될 수 있어 친환경적이며, 간척하고자 하는 지역 내의 지수가 배출수로와 연결되어 바다로 배출이 용이하게 이루어질 수 있다.Eco-friendly reclaimed land construction method according to the present invention as described above is preserved while connected to the river and the sea in the area to be reclaimed, so that the smooth distribution of seawater and fresh water, regressive fish such as salmon, sweetfish, cod, etc. freely move the sea and river In this way, the ecosystem of coastal fish such as regressive fish can be preserved, which is environmentally friendly, and the indexes within the area to be reclaimed can be easily connected to the drainage channel.

도 4는 본 발명의 다른 실시예에 따른 친환경적인 간척지 시공방법에 의해 시공된 간척지를 개략적으로 나타낸 도면이다.Figure 4 is a schematic view showing the reclaimed land constructed by environmentally friendly reclaimed land construction method according to another embodiment of the present invention.

이에 도시된 바와 같이 본 발명에 따른 친환경적인 간척지 시공방법은 상기 지수(a)의 흐름을 따라 그 양측에 둑(30)을 형성하는 둑시공단계를 더 포함하는 것이 바람직하다.As shown here, the environmentally friendly reclaimed land construction method according to the present invention preferably further includes a weir construction step of forming a weir 30 on both sides along the flow of the index (a).

상기 둑(30)은 개울, 하천 등과 같은 지수(a)의 범람을 막기 위하여 구비되는 것으로, 이는 호수나 개울 등의 주변에 흙이나 콘크리트 따위를 소정높이로 쌓아 만드는 통상적인 둑(30) 설치방법을 통해 형성된다. The dam 30 is provided to prevent the flooding of the index (a) such as a stream, rivers, etc., which is a conventional dam (30) installation method for stacking soil or concrete at a predetermined height around the lake or stream Is formed through.

이러한 둑(30)은 빗물 등으로 인하여 지수(a)가 증가하는 경우 범람으로 인 한 주변의 농지나 공업용지 등의 피해를 방지할 수 있음은 물론, 둑(30)으로 농지나 공업용지 등으로 이용 가능한 땅과 지수를 나눠주어 배출수로(20)의 개폐를 조작하여 해수가 지수로 유입되더라도 염분이 흡수되는 것을 방지할 수 있다.When the index (a) is increased due to rainwater, the dam 30 can prevent damage to surrounding farmland or industrial land due to flooding, as well as farmland or industrial land as a bank 30. By dividing the available land and the index, the opening and closing of the discharge channel 20 can be operated to prevent the salt from being absorbed even if the seawater is introduced into the index.

또한, 이와 같이 지수(a)로 해수의 유입이 이루어짐에 따라 지수 주변에 갯벌이 형성될 수 있어 갯벌에 사는 갯지렁이류, 게와 같은 갑각류, 고둥, 조개 등의 해양생물의 서식이 가능하게 되며, 갯벌에 있는 미생물이 오염물질을 분해하여주어 자연정화가 이루어질 수 있다.In addition, as the inflow of seawater into the exponent (a) can form a tidal flat around the exponent, which makes it possible to inhabit marine life such as shellworms, crustaceans such as crabs, shellfish, shellfish, etc. Microorganisms in the tidal-flat can decompose contaminants, resulting in natural purification.

한편, 간척하고자 하는 지역의 지수(a)의 흐름이 굴곡이 심하면 지수로 인하여 이용 가능한 땅이 나뉘기 때문에 사용가능한 면적이 감소하게 되고, 지수(a)로 인하여 분할되는 땅이 많아지기 때문에 효율적인 이용이 어렵다. On the other hand, if the flow of the exponent (a) in the region to be reclaimed is severe, the usable area is diminished because the available land is divided by the exponent. This is difficult.

따라서 본 발명에 따른 친환경적인 간척지 시공방법은 상기 지수(a)의 흐름이 굴곡되어 있는 경우 상기 지수(a)의 굴곡이 시작되는 점(d)과 굴곡이 끝나는 점(e)을 연결하는 둑(30)을 설치하는 것이 바람직하다.Therefore, the eco-friendly reclaimed land construction method according to the present invention, when the flow of the exponent (a) is bend connecting the point (d) at which the start of the index (a) and the end of the bend (e) ( It is preferable to install 30).

이는 지수(a)의 굴곡이 시작되는 점(d)과 굴곡이 끝나는 점(e)을 연결하여 굴곡되어 있는 지수(a)의 흐름이 직선에 가깝게 흐르도록 유도하는 새로운 물길이 형성되도록 둑(30)이 형성되도록 하는 것으로, 도 4에 도시된 바와 같이 굴곡되어 있던 지수(a)의 흐름이 직선화되면서 굴곡되어 있던 지수(a)부분의 땅이 농지나 공업용지 등으로 이용 가능하게 되고, 지수(a)로 인해 분할되는 땅의 수가 감소될 수 있으며, 지수(a)와 지수(a) 사이에 이용가능한 땅의 면적이 넓어지게 되어 보다 효 율적인 땅의 이용이 가능하다. This is connected to the point (d) at which the bend of the exponent (a) starts and the end (e) at the end of the bend (30) so that a new water path is formed to induce a flow of the curved exponent (a) to be close to a straight line. ) Is formed, the land of the index (a) that is curved as the flow of the curved index (a) is straightened as shown in FIG. a) can reduce the number of lands to be divided and increase the area of land available between exponents (a) and (a), thus enabling more efficient use of land.

도 1은 본 발명에 따른 친환경적인 간척지 시공방법에 의해 시공된 간척지를 개략적으로 나타낸 도면.1 is a view schematically showing the reclaimed land constructed by environmentally friendly reclaimed land construction method according to the present invention.

도 2는 도 1의 A 부분을 확대하여 나타낸 요부사시도.2 is an enlarged main part perspective view of the portion A of FIG. 1;

도 3은 도 도 2의 배출수로를 확대하여 나타낸 사시도.3 is an enlarged perspective view of the drainage channel of FIG. 2;

<도면의 주요부호에 대한 상세한 설명><Detailed description of the major symbols in the drawings>

a: 지수 b:바다 c: 강a: exponent b: sea c: river

d: 굴곡이 시작되는 점 e: 굴곡이 끝나는 점d: starting point of bending e: ending point of bending

10: 방조제10: repellent

11, 11': 블록 112: 중공부11, 11 ': block 112: hollow part

113: 연결고정부 114: 사석113: Consolidated Government 114: Sasok

20: 배출수로20: outlet

21: 수문 22: 버터플라이밸브21: sluice 22: butterfly valve

30: 둑30: weir

Claims (4)

삭제delete 삭제delete 삭제delete 간척하고자 하는 지역의 강 연안 및 해안을 따라 방조제(10)를 축조하되, 상기 강 연안이나 해안과 만나는 간척하고자 하는 지역의 지수(a) 부위에 배출수로(20)가 설치되는 친환경적인 간척지 시공방법에 있어서,Eco-friendly reclaimed land construction method of constructing the dike (10) along the river coast and coast of the area to be reclaimed, the discharge channel 20 is installed in the index (a) of the area to be reclaimed to meet the river coast or coast To 상기 강 연안이나 해안과 만나는 상기 지수(a) 부위에 배출수로(20)를 설치하는 배출수로 시공단계와;A drainage channel construction step of installing a drainage channel 20 at the index (a) portion that meets the river coast or the coast; 상기 배출수로(20)를 제외한 나머지 강 연안 및 해안을 따라 한 쌍의 블록(11,11')을 나란하게 설치하는 블록시공단계와;Block construction step of installing a pair of blocks (11, 11 ') side by side along the remaining river coast and coast except for the discharge passage (20); 상기 한 쌍의 블록(11,11') 사이에 형성된 수용공간부에 사석(114)을 채워 방조제(10)를 축조하는 단계;Constructing a seawall (10) by filling a sandstone (114) in an accommodation space formed between the pair of blocks (11, 11 '); 상기 지수(a)의 흐름을 따라 그 양측에 둑(30)을 형성하는 둑시공단계를 포함하며,Weak construction step of forming a weir (30) on both sides along the flow of the index (a), 상기 지수(a)의 흐름이 굴곡되어 있는 경우 상기 지수(a)의 굴곡이 시작되는 점(d)과 굴곡이 끝나는 점(e)을 연결하는 둑(30)을 설치하는 것을 특징으로 하는 친환경적인 간척지 시공방법.When the flow of the exponent (a) is bent, the weir (30) connecting the point (d) at which the bend of the exponent (a) starts and the point at which the bend (e) is installed Reclaimed land construction method.
KR1020090023550A 2009-03-19 2009-03-19 Construction method of land reclamation KR101104856B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090023550A KR101104856B1 (en) 2009-03-19 2009-03-19 Construction method of land reclamation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090023550A KR101104856B1 (en) 2009-03-19 2009-03-19 Construction method of land reclamation

Publications (2)

Publication Number Publication Date
KR20100104865A KR20100104865A (en) 2010-09-29
KR101104856B1 true KR101104856B1 (en) 2012-01-16

Family

ID=43009069

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090023550A KR101104856B1 (en) 2009-03-19 2009-03-19 Construction method of land reclamation

Country Status (1)

Country Link
KR (1) KR101104856B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2571742B2 (en) * 1992-09-24 1997-01-16 實 八木 Construction method of underwater concrete using concrete block
KR20010045969A (en) * 1999-11-09 2001-06-05 양원회 A method for constructing a breakwater using a buoyancy tank
KR20050006781A (en) * 2003-07-10 2005-01-17 주식회사 선프라텍 A flood gate for agricultural water control
KR20070059509A (en) * 2005-12-06 2007-06-12 김현태 Method for composing river with little tidewater for ecologically recovering a freshwater lake by a seawall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2571742B2 (en) * 1992-09-24 1997-01-16 實 八木 Construction method of underwater concrete using concrete block
KR20010045969A (en) * 1999-11-09 2001-06-05 양원회 A method for constructing a breakwater using a buoyancy tank
KR20050006781A (en) * 2003-07-10 2005-01-17 주식회사 선프라텍 A flood gate for agricultural water control
KR20070059509A (en) * 2005-12-06 2007-06-12 김현태 Method for composing river with little tidewater for ecologically recovering a freshwater lake by a seawall

Also Published As

Publication number Publication date
KR20100104865A (en) 2010-09-29

Similar Documents

Publication Publication Date Title
Katopodis et al. Nature-like and conventional fishways: Alternative concepts?
US4645377A (en) Method of causing sedimentation of sedimentary solid material transported in a body of water, such as a lake, a sea, or an ocean
CN109836018B (en) Natural recovery method for severely polluted river channel
CN102733351B (en) Method for treating river entrance
CN105970875B (en) Promote the method for the solid sand of silt at seabeach using natural energy
Xue Coastal erosion and management of Majuro atoll, Marshall Islands
RU2665072C1 (en) Method of reservoir water area localization of pollutants entering reservoir from tributaries and drains
WO2021140559A1 (en) Method for preventing repeated (tsunami, storm surge, and river) disasters by forces of nature
JP4194460B2 (en) Aquatic vegetation in waters affected by tidal saltwater
KR101104856B1 (en) Construction method of land reclamation
KR101095374B1 (en) The method of constructing for a ecological restoration in river
KR100807404B1 (en) Method to generate power continuously and to purify folluted water by means of constructing reservoir water space having big capacity higher than bank of river
CN215562338U (en) Multi-stage storage-regulation hydrophilic ecological bank protection structure based on existing vertical retaining wall
JPH10176316A (en) River structure
JP4183601B2 (en) Flood control dam composed of stalagmite fishway and stone dam
EP1034334B1 (en) A method for coastal protection and a pressure equalization module for use in this connection
KR100510884B1 (en) Construction method of rivers using natural stone
KR200337316Y1 (en) block
KR20020079707A (en) The facility of river in the civil center and method restoration of it
KR101010204B1 (en) Drainage pipe of bank using river
KR101917988B1 (en) Environment-friendly harbors to prevent sedimentation
Wang et al. Flood defense and water/sediment management—With particular reference to the Yellow River
JP2001017957A (en) Purification system of exterior water basin utilizing hollow of water basin
KR200370052Y1 (en) Struture for preventing break rivers
Rickard et al. River Weirs–Good Practice Guide Guide-Section A

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee