KR101103991B1 - Confirmation Device for whether the Fuel Assembly and Reactor Upper Guide Structure were simultaneously drawn or not - Google Patents

Confirmation Device for whether the Fuel Assembly and Reactor Upper Guide Structure were simultaneously drawn or not Download PDF

Info

Publication number
KR101103991B1
KR101103991B1 KR1020090074080A KR20090074080A KR101103991B1 KR 101103991 B1 KR101103991 B1 KR 101103991B1 KR 1020090074080 A KR1020090074080 A KR 1020090074080A KR 20090074080 A KR20090074080 A KR 20090074080A KR 101103991 B1 KR101103991 B1 KR 101103991B1
Authority
KR
South Korea
Prior art keywords
joint
lifting
check lever
handle support
guide structure
Prior art date
Application number
KR1020090074080A
Other languages
Korean (ko)
Other versions
KR20110016540A (en
Inventor
최삼조
백원종
윤영정
류대원
박훈
이조용
Original Assignee
한전케이피에스 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한전케이피에스 주식회사 filed Critical 한전케이피에스 주식회사
Priority to KR1020090074080A priority Critical patent/KR101103991B1/en
Publication of KR20110016540A publication Critical patent/KR20110016540A/en
Application granted granted Critical
Publication of KR101103991B1 publication Critical patent/KR101103991B1/en

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/02Details of handling arrangements
    • G21C19/10Lifting devices or pulling devices adapted for co-operation with fuel elements or with control elements
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/19Reactor parts specifically adapted to facilitate handling, e.g. to facilitate charging or discharging of fuel elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

본 발명은 최소의 인양높이에서 원전연료의 동시인양 여부를 사전에 확인하고 조치하기 위한 원자로 상부 안내 구조물의 인양시 연료집합체의 동시 인양 확인 장치에 관한 것이다.The present invention relates to a device for confirming simultaneous lifting of a fuel assembly when lifting a reactor upper guide structure for confirming and preemptively checking whether nuclear fuel is simultaneously lifted at a minimum lifting height.

본 발명에 의하면, 스토퍼를 갖춘 탑조인트가 하부에 설치되는 러그, 상기 러그의 탑조인트 중앙에 길게 연결 설치되고 내부엔 내측조인트가 움직일 수 있게 설치되며 하부엔 하부조인트와 확인레버가 연결 결합 설치되는 외측조인트, 상기 외측조인트의 내측에서 움직일 수 있게 연결 설치되고 상부엔 핸들서포트가 결합 설치되고 하부엔 하부조인트와 함께 푸시가이드가 연결 설치되는 내측조인트, 그리고 상기 핸들서포트의 높낮이 위치를 조절하여 상기 확인레버를 펼치거나 접을 수 있도록 하는 홀드핀을 포함하여 이루어진다. According to the present invention, a top joint with a stopper is installed at the bottom of the lug, a long connection is installed at the center of the top joint of the lug, and the inner joint is installed to move inside, and the lower joint and the check lever are installed at the lower part. The outer joint, the inner joint is installed so as to be movable inside the outer joint and the handle support is coupled to the upper installation and the lower joint is connected to the push guide and the lower joint is installed, and the height of the handle support to adjust the position It includes a holding pin to extend or fold the lever.

인양높이, 원전연료, 인양, 사전확인, 원자로, 상부안내구조물, 연료집합체 Lifting Height, Nuclear Fuel, Lifting, Confirmation, Reactor, Upper Guide Structure, Fuel Assembly

Description

원자로 상부안내구조물의 인양시 연료집합체의 동시 인양 확인장치{Confirmation Device for whether the Fuel Assembly and Reactor Upper Guide Structure were simultaneously drawn or not}Confirmation Device for whether the Fuel Assembly and Reactor Upper Guide Structure were simultaneously drawn or not}

본 발명은 최소의 인양높이에서 원전연료의 동시인양 여부를 사전에 확인하고 조치하기 위한 원자로 상부 안내 구조물의 인양시 연료집합체의 동시 인양 확인 장치에 관한 것이다.The present invention relates to a device for confirming simultaneous lifting of a fuel assembly when lifting a reactor upper guide structure for confirming and preemptively checking whether nuclear fuel is simultaneously lifted at a minimum lifting height.

일반적으로 원자력 발전소의 계획 예방 정비시에 원자로의 분해공정에서 원자로의 구성요소인 베셀(Vessel), 헤드(Head), 상부안내구조물(Upper Guide Structure), CSB(Core Support Barrel), LSS(Lower Support Structure) 중 상부안내구조물(Upper Guide Structure)를 인양하여 저장대에 안착한 다음에 원전연료를 재장전하게 된다.In general, during the planned preventive maintenance of a nuclear power plant, the components of the reactor, such as the vessel, the head, the upper guide structure, the core support barrel, and the lower support, are components of the reactor. In the structure, the upper guide structure is lifted, settled in the storage rack, and the nuclear fuel is reloaded.

그러나 이러한 상부안내구조물의 취급 중 주변구조물과 간섭에 의하여 상부안내구조물 구성품의 변형문제, 원전연료의 정렬불량문제, 이물질에 의한 고착문제 등의 사유에 의하여 안내 튜브와 원전연료의 고착현상이 발생하고 이에 따라 원전연료가 동시에 인양되게 되는 문제가 발생하고 있으며, 결국 공정지연이 발생하고 발전소의 경제적 손실을 끼치게 되며 설비의 안전을 위협하게 되는 심대한 문제를 발생시키기도 한다.However, when the upper guide structure is handled, the guide tube and the nuclear fuel may be stuck due to the deformation of the upper guide structure, the misalignment of the nuclear fuel, and the seizure due to foreign substances. Accordingly, there is a problem that nuclear fuel is lifted at the same time, resulting in process delays, economic loss of the power plant, and profound problems that threaten the safety of the facility.

그리하여 이러한 종래의 문제를 사전에 해소하기 위한 차원에서 상부안내구조물의 최하단부가 베셀 플랜지(Vessel Flange) 상부로 인양되었을때 수중카메라를 활용하여 원전연료의 동시인양 여부를 확인하고 있다.Therefore, in order to solve such a problem in advance, when the lower end of the upper guide structure is lifted to the upper portion of the vessel flange (Vessel Flange), it is used to check whether the nuclear fuel is simultaneously lifted by using an underwater camera.

그러나, 이와 같이 수중카메라에 의하여 확인한 결과 원전연료의 동시인양이 확인되었을 경우 노심에 정상적으로 장전되어 있는 원전연료의 상부에서 완전하게 인출된 상태를 유지하게 되므로 노심 내의 원전연료 및 원자로 구성품 등이 손상위험에 크게 노출되게 되는 문제가 발생하게 된다. However, as a result of confirming with the underwater camera, if the simultaneous salvage of nuclear fuel is confirmed, it remains completely drawn out from the upper part of nuclear fuel normally loaded in the core, so the nuclear fuel and reactor components in the core are damaged. There is a problem that is greatly exposed to.

본 발명은 이와 같은 종래의 문제점을 해소하기 위하여 연구 개발이 이루어진 것으로, 다음과 같은 목적을 갖는다.The present invention has been made in order to solve such a conventional problem, has the following object.

본 발명의 목적은 상부안내구조물를 최소한의 높이로 인양하고 원전연료의 동시인양여부를 확인할 수 있도록 하여 작업공정의 안전성 확보와 발생될 수 있는 원전연료와 원자로 구성품의 손상예방 및 작업자의 방사선 피폭 최소화 등으로 경제적인 손실을 예방하고 원전 운영의 경제성과 안전성을 제고시키고자 함에 있다.The object of the present invention is to lift the upper guide structure to the minimum height and to confirm the simultaneous lifting of the nuclear fuel to ensure the safety of the work process and to prevent damage to the nuclear fuel and reactor components that can be generated, and to minimize the radiation exposure of the operator, etc. The aim is to prevent economic losses and to improve the economics and safety of nuclear power plant operations.

본 발명은 위와 같은 목적을 달성하기 위하여, 스토퍼를 갖춘 탑조인트가 하부에 설치되는 러그, 상기 러그의 탑조인트 중앙에 길게 연결 설치되고 내부엔 내측조인트가 움직일 수 있게 설치되며 하부엔 하부조인트와 확인레버가 연결 결합 설치되는 외측조인트, 상기 외측조인트의 내측에서 움직일 수 있게 연결 설치되고 상부엔 핸들서포트가 결합 설치되고 하부엔 하부조인트와 함께 푸시가이드가 연결 설치되는 내측조인트, 그리고 상기 핸들서포트의 높낮이 위치를 조절하여 상기 확인레버를 펼치거나 접을 수 있도록 하는 홀드핀을 포함하여 이루어지는 원자로 상부 안내 구조물의 인양시 연료집합체의 동시 인양 확인 장치를 제공한다. The present invention, in order to achieve the above object, the top joint with a stopper is installed in the bottom lug, the long connection is installed in the center of the top joint of the lug and the inner joint is installed inside the lower joint and the bottom joint and check An outer joint with a lever coupled and installed, an inner joint connected to be movable so as to be movable inside the outer joint, an upper joint with a handle support installed at an upper part, and a push guide connected with a lower joint at a lower part, and a height of the handle support. It provides a device for confirming the simultaneous lifting of the fuel assembly when lifting the reactor upper guide structure comprising a holding pin to adjust the position to open or fold the check lever.

본 발명에 의하면, 상부안내구조물을 최소한의 높이로 인양하고 원전연료의 동시인양여부를 확인할 수 있도록 하여 작업공정의 안전성 확보와 함께 발생될 수 있는 원전연료와 원자로 구성품의 손상예방 및 작업자의 방사선 피폭 최소화 등으로 인한 경제적인 손실을 예방할 수 있고 원전 운영의 경제성과 안전성을 제고시킬 수 있다.According to the present invention, the upper guide structure can be lifted to a minimum height and the simultaneous lifting of nuclear fuel can be confirmed to prevent the damage of nuclear fuel and reactor components that can occur with securing the safety of the work process and the radiation exposure of workers. Economic losses due to minimization can be prevented and the economics and safety of nuclear power plant operations can be improved.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 예를 중심으로 보다 상세하게 살펴보기로 한다.Hereinafter, with reference to the accompanying drawings will be described in more detail with reference to the preferred example of the present invention.

첨부한 도면에 나타낸 바와 같이, 본 발명인 확인장치(100)의 바람직한 예에 의하면 스토퍼(10)를 갖춘 탑조인트(20)가 하부에 설치되는 러그(1), 상기 러그(1)의 탑조인트(20) 중앙에 길게 연결 설치되고 내부엔 내측조인트(5)가 움직일 수 있게 설치되며 하부엔 하부조인트(30)와 확인레버(40)가 연결 결합 설치되는 외측조인트(3), 상기 외측조인트(3)의 내측에서 움직일 수 있게 연결 설치되고 상부엔 핸들서포트(50)가 결합 설치되고 하부엔 하부조인트(62)와 함께 푸시가이드(60)가 연결 설치되는 내측조인트(5), 그리고 상기 핸들서포트(50)의 높낮이 위치를 조절하여 상기 확인레버(40)를 펼치거나 접을 수 있도록 하는 홀드핀(7)을 포함하여 이루어지게 된다.As shown in the accompanying drawings, according to a preferred example of the identification device 100 of the present invention, the top joint 20 having the stopper 10 is provided with a lug 1 and a top joint of the lug 1 20) is installed in the center long and the inner joint (5) is installed to move inside the outer joint (3), the outer joint (3), the lower joint (30) and the check lever 40 is installed and connected to the lower portion Inner joint (5), which is installed to be movable in the inner side and the handle support 50 is coupled to the upper part and the push guide 60 is connected to the lower joint (62), and the handle support ( It is made to include a holding pin (7) to adjust the height of 50) to expand or fold the check lever (40).

이때, 러그(1)의 스토퍼(10)는 전체적으로 돌출 절곡 형성되고 중앙엔 내측조인트(5)의 핸들서포트(50)가 통과할 수 있도록 개공(12)이 형성되어 탑조인트(20) 상부에 고정 설치되며, 상기 탑조인트(20)는 러그(1)의 하부에 고정 설치되고 중앙에 외측조인트(3)의 상부가 개방된 상태로 결합 설치되어 이루어진다.In this case, the stopper 10 of the lug 1 is formed to protrude and bend overall, and the opening 12 is formed to allow the handle support 50 of the inner joint 5 to pass through the center, thereby fixing the top joint 20. Is installed, the top joint 20 is fixedly installed in the lower portion of the lug (1) and the coupling is made in the state that the upper portion of the outer joint (3) is opened in the center.

다음, 상기 외측조인트(3)는 내부가 비어 있는 형태로서 상기 러그(1)의 탑조인트(20) 중앙에 길게 연결 설치되고 내부엔 내측조인트(5)가 움직일 수 있게 설치되며 하부엔 하부조인트(30)와 확인레버(40)가 연결 결합 설치되는데, 여러 개의 외측조인트유니트(3a)와 내측이 비어 있는 외측조인트연결구(3b)를 서로 나사식으로 결합하여 구성되고, 상기 하부조인트(30)는 일측이 개방되고 끝단엔 확인레버(40)가 힌지 고정 설치되며 상기 확인레버(40)의 일측과 상기 푸시가이드(60)의 일측 사이에 링크(42)를 힌지 결합하여 이루어지며 상기 내측조인트(5)와 연결 설치되는 상기 푸시가이드(60)의 변위에 의하여 확인레버(40)를 펼쳐 세우거나 아니면 접을 수 있게 구성된다.Next, the outer joint (3) is a hollow form inside the top joint 20 of the lug (1) is installed long connected, the inner joint (5) is installed inside the lower joint (lower joint) 30) and the check lever 40 is installed and coupled, the outer joint unit (3a) and the inner side of the outer joint connector (3b) is configured by screwing together with each other, the lower joint (30) One side is opened and the check lever 40 is hinged fixedly installed at the end and is made by hinged link 42 between one side of the check lever 40 and one side of the push guide 60 and the inner joint (5) By the displacement of the push guide 60 is installed and connected to) is configured to expand or fold the check lever (40).

다음, 내측조인트(5)는 상기 외측조인트(3)의 내측에서 움직일 수 있게 연결 설치되고 상부엔 핸들서포트(50)가 결합 설치되고 하부엔 하부조인트(62)와 함께 푸시가이드(60)가 연결 설치되고 여러 개의 내측조인트유니트(5a)와 내측조인트연결구(5b)를 나사식으로 서로 결합하여 구성되는데, 상기 핸들서포트(50)는 상부에 가로대(52)가 결합 설치되고 전술한 확인레버(40), 링크(42) 및 푸시가이드(60)의 작동 중 확인레버(40)를 펼치거나 접는 작동이 이루어지도록 상,하 이동 변위가 발생하게 되는 푸시가이드(60)의 이동거리를 감안하여 설정한 상,하부 통공(54,56)을 각각 형성하여 그 위치에 따라 선택적으로 후술되는 홀드핀(7)을 끼워 결합할 수 있게 구성되며, 상기 하부조인트(62)와 함께 연결 설치되는 푸시가이드(60)는 일측이 개방되어 전술한 확인레버(40)를 수용하면서 상기 링크(42)의 일측이 힌지 설치되어 상기 외측조인트(3)의 내부에서 상기 내측조인트(5)가 승,하강함에 따라 확인레버(40)를 펼치거나 접을 수 있게 구성된다.Next, the inner joint (5) is installed so as to be movable inside the outer joint (3), the handle support (50) is installed in the upper coupled and the lower guide (62) together with the push guide (60) is connected It is installed and configured by coupling a plurality of inner joint unit (5a) and the inner joint connector (5b) with each other, the handle support (50) is installed on the crossbar 52 is coupled to the upper check lever (40) ) In consideration of the movement distance of the push guide 60 in which the up and down movement displacement is generated so that the check lever 40 is expanded or folded during the operation of the link 42 and the push guide 60. The upper and lower through-holes 54 and 56 are respectively formed to be coupled to hold pins 7 to be selectively described according to their positions, and the push guides 60 are connected to and installed with the lower joint 62. ) Is one side is opened to confirm the above-mentioned check lever 40 The one side of the link 42 is installed is configured to be hinged inside the joint (5) expand the check lever 40 as W, fall or collapse at the inside of the outer joint (3), while for the.

그리고 상기 홀드핀(7)은 상기 핸들서포트(50)의 높낮이 위치를 조절하여 상기 확인레버(40)를 펼치거나 접을 수 있도록 위치를 고정하게 되는데, 선단엔 상기 핸들서포트(50)의 상,하부 통공(54,56)에 선택적으로 끼워 결합하게 되는 통공결합부(70)가 마련되고 후부엔 와이어(72)에 의하여 탑조인트(20)의 일측에 서로 결합 설치하여 분실을 막을 수 있도록 구성한다.And the holding pin (7) is fixed to the position to expand or fold the check lever 40 by adjusting the height of the handle support 50, the top and bottom of the handle support (50) The through coupling portion 70 is selectively provided in the through holes 54 and 56 to be coupled to the through holes 54 and 56, and is connected to the one side of the top joint 20 by the wire 72 to prevent the loss.

미설명 부호로서, 8은 상부안내구조물, 9는 장치를 거치하기 위한 홀더, 80은 상부안내구조물(8)의 슈라우드 튜브(Shroud Tube), 82는 안내튜브를 각각 나타낸다.As reference numeral 8 denotes the upper guide structure, 9 is a holder for mounting the device, 80 is a shroud tube of the upper guide structure (8), 82 is a guide tube, respectively.

위와 같이 이루어지는 본 발명인 확인장치(100)는 사용시에 예를 들면, 도 1 내지 도 12에 도시한 바와 같이, 원자력발전소의 계획예방정비시에 원자로의 분해공정에서 상부안내구조물(8)을 인양함에 있어서 최소의 인양높이에서 원전연료의 동시 인양 여부를 사전에 확인하기 위하여 제어봉이 삽입되지 않은 여분의 공간에 본 발명인 확인장치(100)를 삽입하되, 이때 본 발명인 확인장치(100)는 상부안내구조물(8)의 슈라우드 튜브(80)와 안내튜브(82)를 통하여 삽입한 상태에서 핸들서포트(50)를 들어올리게 되면 내측조인트유니트(5a), 내측조인트연결구(5b), 하부조인트(62) 및 푸시가이드(60)가 함께 동시에 움직이면서 링크(42)는 확인레버(40)를 들어올려 펼쳐 세우게 되고, 이 상태에서 홀드핀(7)의 통공결합부(70)를 핸들서포트(50)의 하부통공(56)에 끼워 결합하여 푸시가이드(60)가 하강하지 않고 제자리에 있도록 하여 확인레버(40)를 들어올린 펼친상태를 유지하도록 한 상태에서 러그(1)를 잡고 제자리에서 회전시키게 되면 확인레버(40)와 서로 부딪치지 아니하는 경우엔 주변에 원전연료가 동시 인양되지 않음을 확인할 수 있게 된다.
또한, 하부통공(56)으로부터 홀드핀(7)을 빼고 핸들서포트(50)를 포함한 내측조인트(5)를 하강시키게 되면 확인레버(40)는 원위치하면서 링크(42) 역시 하강하고 확인레버(40) 역시 접혀지게 되어 푸시가이드(60) 내측으로 결합되면 상부안내구조물(8)의 슈라우드 튜브(80)와 안내튜브(82)로부터 빼서 분리하였다가 다시 확인을 위하여 인접한 다른 비어있는 슈라우드 튜브(80)와 안내튜브(82)에 다시 결합하고 위와 같은 과정을 반복하여 원전연료의 동시 인양 여부를 확인하면 된다.
The present invention confirming device 100 is configured to lift the upper guide structure 8 in the decomposition process of the reactor during the planned preventive maintenance of the nuclear power plant, for example, as shown in Figure 1 to 12 when in use. In order to confirm in advance the simultaneous lifting of nuclear fuel at the minimum lifting height, the present invention is inserted into the confirmation device 100 in the extra space that the control rod is not inserted, the inventors confirmation device 100 is the upper guide structure When the handle support 50 is lifted while being inserted through the shroud tube 80 and the guide tube 82 of (8), the inner joint unit 5a, the inner joint connector 5b, the lower joint 62 and As the push guide 60 simultaneously moves together, the link 42 lifts and raises the check lever 40. In this state, the through hole coupling portion 70 of the hold pin 7 is lowered through the handle support 50. Fitted with (56) When the push guide (60) is in place without lowering and holding the check lever (40) in a raised state to keep it in an expanded state by holding the lug (1) and rotating it in place, it does not collide with the check lever (40). In this case, it can be confirmed that nuclear fuel is not simultaneously lifted around.
In addition, when the holding pin 7 is removed from the lower hole 56 and the inner joint 5 including the handle support 50 is lowered, the check lever 40 returns to its original position while the link 42 is also lowered. ) Is also folded to the inner side of the push guide (60) is removed from the shroud tube 80 and the guide tube 82 of the upper guide structure (8) to separate and then check again another adjacent empty shroud tube (80) And again coupled to the guide tube 82 and by repeating the above process to check whether or not the simultaneous salvage of nuclear fuel.

물론, 이와 같은 확인과정에서 실제로 원전연료의 동시 인양이 확인되는 경우엔 그 상태에서 바로 조기에 대처할 수 있어 원전연료 및 설비의 손상을 미연에 방지할 수 있게 된다.Of course, if the simultaneous salvage of the nuclear fuel is confirmed in this confirmation process, it is possible to cope immediately in such a state, it is possible to prevent damage to the nuclear fuel and equipment in advance.

도 1은 본 발명인 확인장치의 바람직한 일례를 보여주는 일부 절결 분리 외관도,1 is a partial cutaway appearance of the present invention showing a preferred example of the identification device,

도 2는 도 1의 러그와 핸들서포트를 중심으로 나타낸 확대 좌측면도,FIG. 2 is an enlarged left side view of the lug and the handle support of FIG. 1; FIG.

도 3은 도 1의 스토퍼를 중심으로 분리하여 나타낸 우측면도,3 is a right side view of the stopper of FIG. 1 separated from the center;

도 4는 도 1의 스토퍼를 중심으로 분리하여 나타낸 종단면도,Figure 4 is a longitudinal cross-sectional view showing the center of the stopper of Figure 1;

도 5는 도 1의 외측조인트를 중심으로 나타낸 일부절결 요부 확대도,5 is an enlarged view of a partially cutout portion centered on an outer joint of FIG. 1;

도 6은 외측조인트의 끝부분에 결합 설치되는 하부조인트를 중심으로 나타낸 일부 절결 확대도,6 is a partially cut-away enlarged view centering on a lower joint installed at an end of an outer joint;

도 7은 도 1의 내측조인트 상부에 결합설치되는 핸들서포트의 일부 절결 확대도,FIG. 7 is an enlarged cutaway view of a part of a handle support coupled to an upper inner joint of FIG. 1;

도 8은 도 1의 내측조인트를 중심으로 나타낸 일부절결 요부 확대도,FIG. 8 is an enlarged view of a partially cutout main part of the inner joint of FIG. 1;

도 9는 내측조인트의 끝부분에 결합 설치되는 하부조인트를 중심으로 나타낸 일부 절결 확대도,9 is a partially cut-away view showing a center of a lower joint coupled to an end of an inner joint,

도 10은 하부조인트와 결합 설치되는 푸시가이드의 일부 생략 확대도,10 is a partially omitted enlarged view of the push guide coupled to the lower joint,

도 11은 본 발명의 하부 구조를 확대하여 나타낸 작동 상태도,11 is an operating state diagram showing an enlarged lower structure of the present invention,

도 12는 본 발명의 사용상태 예시도.12 is an exemplary view of a use state of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1: 러그, 3: 외측조인트,1: lug, 3: outer joint,

3a: 외측조인트유니트, 3b: 외측조인트연결구,3a: outer joint unit, 3b: outer joint connector,

5: 내측조인트, 5a: 내측조인트유니트,5: inner joint, 5a: inner joint unit,

5b: 내측조인트연결구, 7: 홀드핀,5b: Inner joint connector, 7: Hold pin,

8: 상부안내구조물, 9: 홀더,8: upper guide structure, 9: holder,

10: 스토퍼, 12: 개공,10: stopper, 12: opening,

20: 탑조인트, 30, 62: 하부조인트,20: top joint, 30, 62: bottom joint,

40: 확인레버, 42: 링크,40: check lever, 42: link,

50: 핸들서포트, 52: 가로대,50: handle support, 52: crossbar,

54:상부통공, 56: 하부통공,54: upper through hole, 56: lower through hole,

60: 푸시가이드, 70: 통공결합부,60: push guide, 70: through joint,

72: 와이어, 80: 슈라우드튜브,72: wire, 80: shroud tube,

82: 안내튜브, 100: 확인장치82: guide tube, 100: check device

Claims (5)

스토퍼(10)를 갖춘 탑조인트(20)가 하부에 설치되는 러그(1),Lug (1) having a top joint (20) having a stopper (10) is installed at the bottom, 상기 러그(1)의 탑조인트(20) 중앙에 길게 연결 설치되고 내부엔 내측조인트(5)가 움직일 수 있게 설치되며 하부엔 하부조인트(30)와 확인레버(40)가 연결 결합 설치되는 외측조인트(3),The outer joint in which the long joint is installed in the center of the top joint 20 of the lug 1 and the inner joint 5 is movable inside, and the lower joint 30 and the check lever 40 are connected and installed in the lower part. (3), 상기 외측조인트(3)의 내측에서 움직일 수 있게 연결 설치되고 상부엔 핸들서포트(50)가 결합 설치되고 하부엔 하부조인트(62)와 함께 푸시가이드(60)가 연결 설치되는 내측조인트(5), 그리고The inner joint (5), which is installed to be movable in the outer joint (3) and the handle support (50) is coupled to the upper installation and the lower side of the lower joint (62) and the push guide (60) is connected and installed, And 상기 핸들서포트(50)의 높낮이 위치를 조절하여 상기 확인레버(40)를 펼치거나 접을 수 있도록 하는 홀드핀(7)을 포함하여 이루어지는 것을 특징으로 하는 원자로 상부안내구조물의 인양시 연료집합체의 동시 인양 확인장치.Simultaneous lifting of the fuel assembly when lifting the reactor upper guide structure, characterized in that it comprises a holding pin (7) to adjust the height of the handle support (50) to expand or fold the check lever (40). Confirmation device. 제1항에 있어서,The method of claim 1, 상기 러그(1)의 스토퍼(10)는 전체적으로 돌출 절곡 형성되고 중앙엔 내측조인트(5)의 핸들서포트(50)가 통과할 수 있도록 개공(12)이 형성되어 탑조인트(20) 상부에 고정 설치되며,The stopper 10 of the lug 1 is formed to protrude and bend as a whole, and the opening 12 is formed to allow the handle support 50 of the inner joint 5 to pass through the center and is fixedly installed on the top joint 20. , 상기 탑조인트(20)는 러그(1)의 하부에 고정 설치되고 중앙에 외측조인트(3)의 상부가 개방된 상태로 결합 설치되어 이루어지는 것을 특징으로 하는 원자로 상부안내구조물의 인양시 연료집합체의 동시 인양 확인장치.The top joint 20 is fixed to the lower portion of the lug 1 and at the same time the upper part of the outer joint (3) is coupled to the installation state of the fuel assembly at the time of lifting the upper guide structure, characterized in that the coupling is installed. Lifting confirmation device. 제1항에 있어서,The method of claim 1, 상기 외측조인트(3)는 내부가 비어 있는 형태로서 상기 러그(1)의 탑조인트(20) 중앙에 길게 연결 설치되고 내부엔 내측조인트(5)가 움직일 수 있게 설치되며 하부엔 하부조인트(30)와 확인레버(40)가 연결 결합 설치하여 이루어지되, 여러 개의 외측조인트유니트(3a)와 내측이 비어 있는 외측조인트연결구(3b)를 나사식으로 서로 결합하여 구성되고,The outer joint (3) is a hollow form inside the top joint 20 of the lug (1) is installed to be connected long and the inner joint (5) is installed inside the lower joint (30) And the check lever 40 is made by connecting coupling installation, consisting of a plurality of outer joint unit (3a) and the outer joint connector (3b) of the inner hollow is screwed together, 상기 하부조인트(30)는 일측이 개방되고 끝단엔 확인레버(40)가 힌지 고정 설치되며 상기 확인레버(40)의 일측과 상기 푸시가이드(60)의 일측 사이에 링크(42)를 힌지 결합하여 이루어져 상기 푸시가이드(60)의 변위에 의하여 상기 확인레버(40)를 펼쳐 세우거나 아니면 접을 수 있게 구성되는 것을 특징으로 하는 원자로 상부안내구조물의 인양시 연료집합체의 동시 인양 확인장치.The lower joint 30 is open at one side and the check lever 40 is hinged and installed at the end, and hinged link 42 between one side of the check lever 40 and one side of the push guide 60. Concurrent lifting confirmation device of the fuel assembly during the lifting of the upper guide structure of the reactor, characterized in that configured to extend or fold the check lever 40 by the displacement of the push guide (60). 제1항에 있어서,The method of claim 1, 상기 내측조인트(5)는 상기 외측조인트(3)의 내측에서 움직일 수 있게 연결 설치되고 상부엔 핸들서포트(50)가 결합 설치되고 하부엔 하부조인트(62)와 함께 푸시가이드(60)가 연결 설치되고 여러개의 내측조인트유니트(5a)와 내측조인트연결구(5b)를 나사식으로 서로 결합하여 구성이 이루어지되,The inner joint (5) is installed so as to be movable inside the outer joint (3), the handle support (50) is installed in the upper coupled and the lower guide (62) together with the push guide (60) is installed in connection And a plurality of inner joint unit (5a) and the inner joint connector (5b) by screwing together to form a configuration, 상기 핸들서포트(50)는 상부에 가로대(52)가 결합 설치되고 상기 확인레버(40), 링크(42) 및 푸시가이드(60)의 작동 중 확인레버(40)를 펼치거나 접는 작동이 이루어지도록 상,하 이동 변위가 발생하게 되는 푸시가이드(60)의 이동거리를 감안하여 설정한 상,하부통공(54,56)을 각각 형성하여 그 위치에 따라 선택적으로 홀드핀(7)을 끼워 결합할 수 있게 구성되며,The handle support 50 is provided with a crosspiece 52 is coupled to the upper portion and to open or fold the check lever 40 during the operation of the check lever 40, the link 42 and the push guide (60). The upper and lower through-holes 54 and 56 are set in consideration of the moving distance of the push guide 60 in which the up and down movement displacement occurs, and the holding pins 7 can be selectively fitted according to their positions. Is configured to 상기 하부조인트(62)와 함께 연결 설치되는 푸시가이드(60)는 일측이 개방되어 상기 확인레버(40)를 수용하면서 상기 링크(42)의 일측이 힌지 설치되어 상기 외측조인트(3)의 내부에서 상기 내측조인트(5)가 승, 하강함에 따라 확인레버(40)를 펼치거나 접을 수 있게 구성되는 것을 특징으로 하는 원자로 상부안내구조물의 인양시 연료집합체의 동시 인양 확인장치.The push guide 60 connected to the lower joint 62 is installed at one side thereof to receive the check lever 40, and one side of the link 42 is hinged so that the push joint 60 is installed at the inside of the outer joint 3. Simultaneous lifting confirmation device of the fuel assembly when lifting the upper guide structure of the reactor, characterized in that the inner joint (5) is configured to expand or collapse the check lever (40) as the rise and fall. 제1항에 있어서,The method of claim 1, 상기 홀드핀(7)은 상기 핸들서포트(50)의 높낮이 위치를 조절하여 상기 확인레버(40)를 펼치거나 접을 수 있도록 위치를 고정하게 이루어지되, 선단엔 상기 핸들서포트(50)의 상,하부통공(54,56)에 선택적으로 끼워 결합하게 되는 통공결합부(70)가 마련되고,The holding pin 7 is fixed to a position to expand or fold the check lever 40 by adjusting the height of the handle support 50, the top and bottom of the handle support 50 The through coupling portion 70 is selectively provided to be coupled to the through holes (54, 56), 후부엔 와이어(72)에 의하여 탑조인트(20)의 일측에 서로 결합 설치하여 이루어지는 것을 특징으로 하는 원자로 상부안내구조물의 인양시 연료집합체의 동시 인양 확인장치.A device for confirming simultaneous lifting of a fuel assembly at the time of lifting the upper guide structure of the reactor, characterized in that the rear part is connected to each other on one side of the top joint 20 by a wire 72.
KR1020090074080A 2009-08-12 2009-08-12 Confirmation Device for whether the Fuel Assembly and Reactor Upper Guide Structure were simultaneously drawn or not KR101103991B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090074080A KR101103991B1 (en) 2009-08-12 2009-08-12 Confirmation Device for whether the Fuel Assembly and Reactor Upper Guide Structure were simultaneously drawn or not

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090074080A KR101103991B1 (en) 2009-08-12 2009-08-12 Confirmation Device for whether the Fuel Assembly and Reactor Upper Guide Structure were simultaneously drawn or not

Publications (2)

Publication Number Publication Date
KR20110016540A KR20110016540A (en) 2011-02-18
KR101103991B1 true KR101103991B1 (en) 2012-01-06

Family

ID=43774856

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090074080A KR101103991B1 (en) 2009-08-12 2009-08-12 Confirmation Device for whether the Fuel Assembly and Reactor Upper Guide Structure were simultaneously drawn or not

Country Status (1)

Country Link
KR (1) KR101103991B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111477371A (en) * 2020-04-14 2020-07-31 福建福清核电有限公司 Pressure vessel top cover and in-pile component guiding device and hoisting method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19990024697A (en) * 1997-09-05 1999-04-06 이원 Utility poles for reactor core work
KR20000018967A (en) * 1998-09-07 2000-04-06 김형국 Tool for removing missing bar-end stopper of a control rod in a light water reactor
KR20100005148A (en) * 2007-04-27 2010-01-13 오스람 게젤샤프트 미트 베쉬랭크터 하프퉁 Dielectric barrier discharge lamp configured as a double tube

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19990024697A (en) * 1997-09-05 1999-04-06 이원 Utility poles for reactor core work
KR20000018967A (en) * 1998-09-07 2000-04-06 김형국 Tool for removing missing bar-end stopper of a control rod in a light water reactor
KR20100005148A (en) * 2007-04-27 2010-01-13 오스람 게젤샤프트 미트 베쉬랭크터 하프퉁 Dielectric barrier discharge lamp configured as a double tube

Also Published As

Publication number Publication date
KR20110016540A (en) 2011-02-18

Similar Documents

Publication Publication Date Title
JP5398254B2 (en) Control rod / fuel support bracket handling equipment
US4279699A (en) Combined gripper for a nuclear reactor
US20140198890A1 (en) Apparatus and method for removing the upper internals from a nuclear reactor pressurized vessel
KR101103991B1 (en) Confirmation Device for whether the Fuel Assembly and Reactor Upper Guide Structure were simultaneously drawn or not
KR101067065B1 (en) Removal device for reactor coolant system cold leg side of thermal sleeve
US20020157327A1 (en) Method of handling a structure and equipment of handling the same
EP2948958B1 (en) Nuclear fuel assembly handling apparatus
KR20110067254A (en) Removal method for reactor coolant system cold leg side of thermal sleeve
WO2024027092A1 (en) Integrated reactor, and charging and refueling system and method
US20060034413A1 (en) Method and device for loading a fuel assembly into the core of a nuclear reactor
EP0187651A1 (en) Fixture for inserting locking tubes in reconstitutable nuclear fuel assemblies
US5118465A (en) Device for the fitting of a blocking sleeve of a guide tube in a removable connector of a fuel assembly of a nuclear reactor
DE102011003462B3 (en) Device for pulling fuel element from core of pressurized water nuclear reactor provided in position below fuel element-exchanging machine in power plant, has gripping tool vertically adjustably mounted at lower beam at distance from axis
KR101227019B1 (en) Control rod drive shaft handling apparatus
JP4965070B2 (en) Tools and methods for fuel assembly nozzle replacement
EP3970165B1 (en) Boiling water reactor blade guide and exchange tool
KR20080089857A (en) Refueling machine grapple
JPS62113094A (en) Method and device for repairing damage of guide thimble
DE102011004821B3 (en) Method for stabilizing blocked fuel assembly when loading/unloading core of nuclear reactor, involves compensating difference between buoyancy and gravitational forces acting on fuel assembly and moving object by buoyancy element
JPH038716B2 (en)
EP2184742B1 (en) Tie plate and corresponding fuel assembly
US8009790B2 (en) Debris Trap
KR101497337B1 (en) Apparatus for elevating thruster
US5139732A (en) Process and a device for extracting a heating rod having deformations from a pressurizer casing of a pressurized-water nuclear reactor
CN112513413A (en) Sliding subsea electronic module infrastructure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141217

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20151216

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170103

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20171226

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20181219

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20191223

Year of fee payment: 9