KR101091407B1 - Standard bom structure auto generation method - Google Patents

Standard bom structure auto generation method Download PDF

Info

Publication number
KR101091407B1
KR101091407B1 KR1020100006097A KR20100006097A KR101091407B1 KR 101091407 B1 KR101091407 B1 KR 101091407B1 KR 1020100006097 A KR1020100006097 A KR 1020100006097A KR 20100006097 A KR20100006097 A KR 20100006097A KR 101091407 B1 KR101091407 B1 KR 101091407B1
Authority
KR
South Korea
Prior art keywords
bom
item
master
pending
design
Prior art date
Application number
KR1020100006097A
Other languages
Korean (ko)
Other versions
KR20110086387A (en
Inventor
전승행
정민석
윤동철
이지현
Original Assignee
에스티엑스조선해양 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 에스티엑스조선해양 주식회사 filed Critical 에스티엑스조선해양 주식회사
Priority to KR1020100006097A priority Critical patent/KR101091407B1/en
Publication of KR20110086387A publication Critical patent/KR20110086387A/en
Application granted granted Critical
Publication of KR101091407B1 publication Critical patent/KR101091407B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/15Vehicle, aircraft or watercraft design
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mathematical Optimization (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Computational Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Automation & Control Theory (AREA)
  • Pure & Applied Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

본 발명은, 조선소에서 유사선, 동형선 또는 신조선 설계업무를 진행함에 있어서 MASTER BOM을 활용하여 설계 계획용 PRELIMINARY BOM을 정보처리장치 상에서 조기에 구성할 수 있도록 구현하는 방법으로서, 각 부분별 대상 참조 호선을 지정하는 ‘MASTER BOM 지정’ 단계; ERP에 존재하는 DATA로 특정 MODEL을 기준으로 영구 추가로 구조화된 MASTER BOM에서 현재 생성하고자 하는 PROJECT BOM과 유사한 구조를 갖는 DATA를 추출하는 ‘MASTER BOM 추출’ 단계; 추출한 DATA를 기준으로 선체 BOM에 의장품 BOM을 추가 구성하는 ‘의장품 표준구조 생성’ 단계; 추출한 DATA를 참조로 구성된 의장품 BOM 하부에 속성값이 포함된 PENDING ITEM을 생성하는 ‘PENDING ITEM 생성’ 단계 및; 상기 ‘MASTER BOM 지정’ 단계부터 ‘PENDING ITEM 생성’ 단계까지의 과정을 통해 생성된 PROJECT BOM을 일괄 채번하여, PLM에 반영하고 TPI에 관련 정보를 전송하는 ‘BOM 일괄 채번’ 단계;를 포함하는 표준 BOM 구조 자동 생성 방법을 제시한다.The present invention, as a way to implement a design plan PRELIMINARY BOM early on the information processing device by using a master BOM in the design of similar ships, copper wire boats or new ships in shipyards, see the target of each part 'MASTER BOM Assignment' step of designating line; 'MASTER BOM extraction' step of extracting DATA having a structure similar to the current project BOM to be created from the MASTER BOM that is permanently additionally structured based on the specific MODEL as the data existing in the ERP; ‘Generating a design standard structure’ for additionally constructing a design BOM in the hull BOM based on the extracted DATA; ‘PENDING ITEM generation’ step of generating a PENDING ITEM including attribute values in the design BOM below the extracted DATA; Standard 'BOM batch number' step to batch process the PROJECT BOM created through the 'MASTER BOM designation' step to 'PENDING ITEM generation' step, reflect to the PLM and transmit the relevant information to the TPI; It shows how to automatically create BOM structure.

Description

표준 BOM 구조 자동 생성 방법{STANDARD BOM STRUCTURE AUTO GENERATION METHOD}Automatic generation of standard GORM structure {STANDARD BOM STRUCTURE AUTO GENERATION METHOD}

본 발명은 조선소에서 유사선, 동형선 또는 신조선 설계업무를 진행함에 있어서 MASTER BOM을 활용하여 설계 계획용 PRELIMINARY BOM을 정보처리장치 상에서 조기에 구성할 수 있도록 구현하는 방법에 관한 것이다.The present invention relates to a method for implementing a design plan PRELIMINARY BOM early on the information processing device by using the MASTER BOM in the design of similar ships, copper wire boats or new ships in shipyards.

종래 조선소에서는 유사선, 동형선 또는 신조선 등의 설계를 위하여 다음의 가 내지 마 단계에 따른 MANUAL 업무를 수행하였다(도 1 참조).In the prior shipyard, the MANUAL work was performed according to the following steps (a) to design similar ships, copper ships or new ships (see FIG. 1).

가. BLOCK DIVISION 기준으로 PROJECT/OPTION/PE/BLOCK TREE 구조 MANUAL 작성 : 호선을 건조하기 앞서 생산공법에서 선박을 만들기 위해 배를 BLOCK 단위로 생산 가능한 형태로 나눠놓은 BLOCK DIVISION이 설계부서에 배포되면, 그 해당 호선의 BLOCK DIVISION을 보고 어떠한 BLOCK들이 합쳐져서 PE가 되고, PE가 합쳐져서 OPTION이 되는지 상위구조를 만들게 된다.end. PROJECT / OPTION / PE / BLOCK TREE structure MANUAL by BLOCK DIVISION Standard: Before the ship is built, BLOCK DIVISION is distributed to the design department, which divides the ship into blocks that can be produced in units of blocks to make the ship in the production process. By looking at the BLOCK DIVISION of the line, the block structure is combined to become PE, and the PE is combined to make an OPTION structure.

나. OPTION 활용 유무 검토 : 현재 구성하게 될 OPTION이 기존 OPTION과 동일하여 활용할 수 있을지 없을지를 검토한다. 이때 활용 가능하다면 기존 의장품들도 그대로 활용하게 된다.I. Review the use of OPTION: Review whether the OPTION to be configured is the same as the existing OPTION. In this case, existing equipments will be used as they are.

다. 생산 ACTIVITY/ROUTING 기준 ITEM 검토 : ACTIVITY와 ROUTING에 대상 ITEM을 설계부서에서 검토하여 해당되는 구조에 들어가야 하는지 생성할 필요가 없는지 검토한다. 이때, ITEM을 생성할 필요가 없다는 것은 해당 구조에 작업이 없다는 의미이다.All. ITEM Review of Production ACTIVITY / ROUTING Criteria: The target ITEM for ACTIVITY and ROUTING is reviewed by the design department to see whether it is necessary to create or not enter the appropriate structure. In this case, it is not necessary to create an ITEM means that there is no work in the structure.

라. TEMPLATE(EXCEL) 확정 후 TPI를 통해 상위 구조 구성 : 설계부서에서 의장품 생성 유무에 대해 체크한 TEMPLATE(EXCEL)을 토대로 TPI에서 EXCEL 파일을 LOADING하여 ITEM들을 생성하게 되고 PLM으로 전송하게 되면 ITEM CODE가 신규 채번되고, BOM 구조가 자동으로 생성된다.la. After the TEMPLATE (EXCEL) is confirmed, the upper structure is composed through TPI: Based on the TEMPLATE (EXCEL) checked in the design department for design creation, the ITEM is created by loading the EXCEL file from the TPI and sending it to PLM. It is serialized and the BOM structure is automatically generated.

마. 상위 구조 확정 후 PRELIMINARY BOM 구성(PENDING & STANDARD ITEM)
hemp. PRELIMINARY BOM CONFIGURATION (PENDING & STANDARD ITEM)

그런데, 이러한 MANUAL 작업 방식에는 다음과 같은 많은 문제점이 있다.However, there are many problems with the manual work method as follows.

첫째, MANUAL 업무가 과다하게 발생한다. BLOCK DIVISION을 참조로 상위 TREE 구조를 생성하기 위해서는 MANUAL로 ITEM을 생성하여 BOM을 연계하는 과정이 필요하며, PRELIMIANRY BOM 구성 시 PENDING ITEM & STANDARD ITEM 연계를 MANUAL로 구성하고 연계하여야 한다.First, there is excessive manual work. In order to create the upper tree structure with reference to the block division, it is necessary to create an ITEM with MANUAL and associate BOM with each other.When forming PRELIMIANRY BOM, the PENDING ITEM & STANDARD ITEM connection must be configured with MANUAL.

둘째, ITEM & BOM 구조에 오류가 발생할 수 있다. 부서 간 중복 구조가 생성되고, MANUAL 작업에 따른 ITEM & BOM 구조 누락 현상이 발생할 수 있다. 또한 생산 ACTIVITY/ROUTING 연계 대상 ITEM 누락에 따른 후행 부서 업무 혼선이 발생할 가능성이 높아진다.Second, errors can occur in the ITEM & BOM structure. Duplicate structures can be created between departments and missing ITEM & BOM structures due to manual work can occur. In addition, there is a high possibility of confusion in post-department departments due to missing ITEM for production ACTIVITY / ROUTING connection.

셋째, 기술변경 과다 발생에 따른 조달/물류/생산/경영/원가 부문 업무 혼선이 발생할 수 있다. ITEM 변경 및 BOM 구조 오류에 따른 PR/PO, 생산 계획, 원가 및 회계 부문 오류가 발생할 수 있다.Third, there may be confusion in procurement, logistics, production, management, and cost sectors due to excessive technological change. PR / PO, production planning, cost and accounting errors can occur due to ITEM changes and BOM structure errors.

넷째, 표준 구조의 정립이 어렵다. 부서별 MANUAL 관리에 따른 표준 구조 정립이 어렵고, MASTER DATA 증가에 따라 시스템의 효율성이 떨어지는 문제가 발생할 수 있다. PROJECT BOM의 실적이 누적되면 MODEL별(같은 선종, 유사 사양을 가진 선박의 그룹)로 BOM 정보가 계속 쌓이게 된다. 이때 이러한 BOM 정보들을 통칭하여 MASTER BOM이라고 한다. 향후 PROJECT BOM을 생성할 시 MASTER BOM에서 유사 구조가 있다면 해당 구조를 사용되게 된다. 그런데, MASTER 호선의 DATA가 선박을 건조하면 할수록 늘어나게 되어 표준 구조정립이 어렵게 되고, 많은 MASTER로부터 OPTION을 활용하는데 어려움이 따르게 된다. 따라서 표준 구조를 정립함으로써 MASTER 호선의 DATA를 보다 쉽게 활용할 수 있도록 하는 방법을 모색할 필요가 있는 것이다.Fourth, it is difficult to establish a standard structure. It is difficult to establish a standard structure according to departmental MANUAL management and the efficiency of the system may decrease with increasing MASTER DATA. If the performance of PROJECT BOM is accumulated, BOM information will continue to accumulate by MODEL (group of ships with the same ship type and similar specifications). At this time, such BOM information is collectively called MASTER BOM. When creating PROJECT BOM in the future, if there is similar structure in MASTER BOM, the structure is used. By the way, as the data of the MASTER ship is built, the more the ship is built, the more difficult it is to establish a standard structure, and it is difficult to utilize the OPTION from many MASTERs. Therefore, it is necessary to find a way to make it easier to utilize the data of the MASTER line by establishing a standard structure.

본 발명은 상기와 같은 문제점을 해결하기 위해 제안된 것으로, 조선소에서 유사선, 동형선 또는 신조선 설계업무를 진행함에 있어서 MASTER BOM을 활용하여 설계 계획용 PRELIMINARY BOM을 정보처리장치 상에서 조기에 구성할 수 있도록 구현하는 방법을 제공하는 것을 목적으로 한다.The present invention has been proposed to solve the above problems, it is possible to construct a design plan PRELIMINARY BOM early on the information processing device by using the MASTER BOM in the design of similar ships, copper wires or new ships in shipyards The goal is to provide a way to implement it.

본 발명의 기타 목적 및 장점들은 하기에 설명될 것이며, 이는 본 발명의 청구범위에 기재된 사항 및 그 실시예의 개시 내용뿐만 아니라, 이들로부터 용이하게 추고할 수 있는 범위 내의 수단 및 조합에 의해 보다 넓은 범위로 포섭될 것임을 첨언한다.Other objects and advantages of the present invention will be described below, which are not limited to the matters set forth in the claims and the disclosure of the embodiments thereof, but also to the broader ranges by means and combinations within the range readily recited therefrom. Add that it will be included.

상기한 목적을 달성하기 위하여 본 발명은,
조선소에서 유사선, 동형선 또는 신조선 설계업무를 진행함에 있어서 MASTER BOM을 활용하여 설계 계획용 PRELIMINARY BOM을 정보처리장치 상에서 조기에 구성할 수 있도록 구현하는 방법으로서,
각 부분별 대상 참조 호선을 지정하는 ‘MASTER BOM 지정’ 단계;
ERP에 존재하는 DATA로 특정 MODEL을 기준으로 영구 추가로 구조화된 MASTER BOM에서 현재 생성하고자 하는 PROJECT BOM과 유사한 구조를 갖는 DATA를 추출하는 ‘MASTER BOM 추출’ 단계;
추출한 DATA를 기준으로 선체 BOM에 의장품 BOM을 추가 구성하는 ‘의장품 표준구조 생성’ 단계;
추출한 DATA를 참조로 구성된 의장품 BOM 하부에 속성값이 포함된 PENDING ITEM을 생성하는 ‘PENDING ITEM 생성’ 단계 및;
상기 ‘MASTER BOM 지정’ 단계부터 ‘PENDING ITEM 생성’ 단계까지의 과정을 통해 생성된 PROJECT BOM을 일괄 채번하여, PLM에 반영하고 TPI에 관련 정보를 전송하는 ‘BOM 일괄 채번’ 단계;
를 포함하는 표준 BOM 구조 자동 생성 방법을 제시한다.
The present invention to achieve the above object,
As a way to implement the design plan PRELIMINARY BOM early on the information processing device by using MASTER BOM in designing similar ships, moving ships or new ships at shipyards,
'MASTER BOM designation' step of designating target reference line for each part;
A 'MASTER BOM extraction' step of extracting DATA having a structure similar to the PROJECT BOM to be currently generated from the MASTER BOM that is permanently additionally structured based on a specific MODEL as the DATA existing in the ERP;
'Generating a design standard structure' to add a design BOM to the hull BOM based on the extracted DATA;
A 'PENDING ITEM generation' step of generating a PENDING ITEM including attribute values at the bottom of the design bill of materials consisting of the extracted DATA;
A 'BOM batch numbering' step of collectively numbering the PROJECT BOM generated through the process of 'MASTER BOM designation' step to 'PENDING ITEM generation' step, reflecting to PLM and transmitting related information to TPI;
It proposes a standard BOM structure automatic generation method including a.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

본 발명은 BLOCK DIVISION 자동 연계 기능, STANDARD BOM STRUCTURE DB 구축 기능, MASTER DATA 자동 연계 및 LOADING 기능, PENDING ITEM 자동 생성 기능, STANDARD ITEM 자동 연계 기능 등 다양한 기능을 가지며, 이에 따라 부서간 중첩 업무 방지, MANUAL 작업 지양을 통한 업무 효율화, BOM 정합성 향상을 통한 기술변경 최소화, ACTIVITY/ROUTING 연계한 상위 구조 표준화 정립 등 다양하고 유용한 효과를 창출한다.The present invention has various functions such as BLOCK DIVISION automatic linkage function, STANDARD BOM STRUCTURE DB construction function, MASTER DATA automatic linkage and LOADING function, PENDING ITEM automatic generation function, STANDARD ITEM automatic linkage function, etc. It creates various useful effects, such as work efficiency through job avoidance, minimization of technological change through improvement of BOM consistency, and standardization of upper structure standardization in connection with ACTIVITY / ROUTING.

본 발명의 다른 효과는, 이상에서 설명한 실시예 및 본 발명의 청구범위에 기재된 사항뿐만 아니라, 이들로부터 용이하게 추고할 수 있는 범위 내에서 발생할 수 있는 효과 및 산업 발전에 기여하는 잠정적 장점의 가능성들에 의해 보다 넓은 범위로 포섭될 것임을 첨언한다.Other effects of the present invention, as well as those described in the above-described embodiments and claims of the present invention, as well as potential effects that may occur within the range that can be easily estimated therefrom and potential advantages that contribute to industrial development It will be added that it will be covered by a wider scope.

도 1은 종래 조선소의 MANUAL 업무 수행 과정.
도 2는 본 발명에 따른 표준 BOM 구조 자동 생성 방법의 순서도.
도 3은 본 발명에 따른 ‘MASTER BOM 지정’ 단계의 순서도.
도 4는 본 발명에 따른 ‘MASTER BOM 추출’ 단계의 순서도.
도 5는 본 발명에 따른 ‘의장품 표준구조 생성’ 단계의 순서도.
1 is a process of performing a manual work of a conventional shipyard.
2 is a flowchart of a method for automatically generating a standard BOM structure according to the present invention.
Figure 3 is a flow chart of the 'MASTER BOM designation' step in accordance with the present invention.
4 is a flow chart of the 'MASTER BOM extraction' step in accordance with the present invention.
Figure 5 is a flow chart of the 'creation of the standard structure of the article' according to the present invention.

이하, 본 발명의 바람직한 실시예를 첨부된 도면들을 참조하여 상세히 설명한다. 본 발명을 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략한다. 또한, 이하에서 본 발명의 바람직한 실시예를 설명할 것이나, 본 발명의 기술적 사상은 이에 한정하거나 제한되지 않고 당업자에 의해 변형되어 다양하게 실시될 수 있음은 물론이다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. In describing the present invention, when it is determined that the detailed description of the related well-known configuration or function may obscure the gist of the present invention, the detailed description thereof will be omitted. In addition, the following will describe a preferred embodiment of the present invention, but the technical idea of the present invention is not limited thereto and may be variously modified and modified by those skilled in the art.

먼저, 본 발명을 설명함에 있어서 필요한 용어를 먼저 정의하고자 한다.First, terms necessary for describing the present invention will be defined first.

* OPTION : 제품을 구성하는데 있어서 필요한 기능을 목적 및 용도에 따라 분류하는 단위이다. BLOCK들이 합쳐져서 PE가 되고 PE가 합쳐져서 OPTION이 구성되어진다. 그리고 OPTION이 모여서 PROJECT(선박)을 만들게 된다. 주로 DOCK장에서 골리앗크레인으로 탑재되는 대형 BLOCK이 이에 해당된다.* OPTION: It is a unit that classifies the functions necessary for constructing the product according to purpose and use. The blocks are combined to become PE and the PE is combined to form an OPTION. And the OPTION will come together to make a PROJECT. This is mainly the case of large blocks mounted as goliath cranes at the DOCK site.

* ACTIVITY : 책임단위 별 업무의 완성을 위하여 수행하는 일 혹은 일의 묶음을 말한다. 실적집계 및 공정 관리의 단위로 사용된다.* ACTIVITY: The work or group of work performed for the completion of work by each responsibility unit. It is used as a unit of performance aggregation and process control.

* ROUTING : 생산을 위한 공정 기준 정보로서 공정의 구성에 필요한 작업부서, 공정의 유효일, 자재출고방식, 자원 명, 원가부과방식, 자원사용원단위, 스케줄링 방법, 기타 BOM에 정의되지 않는 생산관련 정보를 정의해 둔 것으로 BOM과 더불어 작업지시 및 자재 수급 계획 수립을 위한 기초 정보로 활용된다.* ROUTING: Process standard information for production, which includes work department, process effective date, material release method, resource name, cost charging method, resource usage unit, scheduling method, and other production related information not defined in BOM. In addition to the BOM, it is used as the basic information for work order and material supply and demand planning.

* TEMPLATE(EXCEL) : 호선에 대한 BOM을 구성하기 전, 각각의 OPTION/PE/BLOCK에 대한 의장품들을 도표로 구성해 놓은 EXCEL 파일로서, 설계 작업자 들이 해당 구조에 필요한 의장품들을 체크하면 그 구조대로 BOM 상위구조를 만들게 된다.* TEMPLATE (EXCEL): EXCEL file that shows the design items for each OPTION / PE / BLOCK in the table before constructing the BOM for the ship. When the design workers check the necessary design items for the structure, the BOM is in accordance with the structure. You will create a superstructure.

* PENDING ITEM : SPEC/MAKER/설계 등이 미확정되어 PROJECT BOM 상에 최종 정보를 달지 못하고 PENDING 이라는 대표 ITEM을 임시로 달아놓은 것을 말한다. 기존 호선에서 가장 유사한 ITEM을 참조 ITEM 및 PENDING ITEM 속성값으로 활용한다.* PENDING ITEM: SPEC / MAKER / Design, etc. is not confirmed, so the final information on PROJECT BOM is not attached and the representative ITEM named PENDING is temporarily attached. The most similar ITEM on the existing line is used as reference ITEM and PENDING ITEM attribute values.

* STANDARD ITEM : 선박의 선종/건조기지 별 표준화 된 BOM 구조의 ITEM을 말한다.* STANDARD ITEM: ITEM of standardized BOM structure by ship type / building base.

* TPI : ‘TRIBON PLM INTERFACE’의 약자로서, 설계에서 트라이본(CAD 프로그램)을 통해 모델링(설계 정보의 형상화)된 아이템을 PLM 상에 업로드 하기 위해 일괄 채번 및 일괄 전송 작업을 할 수 있게 만든 모듈이다.* TPI: Abbreviation for 'TRIBON PLM INTERFACE', a module that enables batch sequencing and batch transfer operations for uploading items modeled (design information design) through PB (CAD program) in PLM to be.

* STANDARD STRUCTURE : 한 호선을 구성하는 품목들의 관계는 피라미드 구조로써 도식화 할 수 있다. 그 구조를 구성하기 위해서는 피라미드의 꼭지점(호선)을 중심으로 구성을 해야 하는데, STANDARD STRUCTURE란 이 피라미드 구조의 상윗단에 해당되는 구조이다. 일반적으로 호선에서 단위 블록구조까지를 상위구조로써 구성한다.STANDARD STRUCTURE The relationship between the items that make up a line can be plotted as a pyramid. In order to construct the structure, the structure should be centered on the vertex of the pyramid. The STANDARD STRUCTURE is a structure corresponding to the upper end of the pyramid structure. In general, the structure from the line to the unit block structure is configured as a superstructure.

* PLM : ‘PRODUCT LIFECYCLE MANAGEMENT(제품 수명 주기 관리)’의 줄임말로서, 연구개발을 중심으로 제품의 수명 주기 상에서 발생되는 ENGINEERING DATABASE를 관리하는 시스템이다. 제품의 기획에서 설계/제조/인증 및 마케팅 등 제품 개발에 관련되는 모든 데이터를 상호 연관 관계를 설정하여 관리하며, 여기에는 관련되는 프로젝트 데이터, 기록 및 문서는 물론, BOM, 계획서, 모델, CAD 도면, 이미지 등을 포함한, 각 개발 단계별로 필요한 모든 데이터가 포함된다.* PLM stands for 'PRODUCT LIFECYCLE MANAGEMENT'. It is a system that manages ENGINEERING DATABASE that occurs in the life cycle of products with a focus on R & D. Correlate and manage all data related to product development, from product planning to design / manufacturing / certification and marketing, including BOM, plan, model, CAD drawings as well as project data, records and documents. All the necessary data for each stage of development, including images, images and more are included.

* ERP : ‘ENTERPRISE RESOURCE PLANNING(전사적 자원 계획)’의 줄임말로서, 기업 전반의 업무 프로세스를 통합 관리하여 정보를 실시간으로 공유함으로써 신속하고 투명한 업무처리를 돕는 전사적 통합 시스템을 말한다.* ERP: Short for “ENTERPRISE RESOURCE PLANNING”, it refers to an enterprise-wide integrated system that enables rapid and transparent business processing by sharing information in real time through integrated management of overall business processes.

* BOM : ‘BILL OF MATERIAL'을 의미하는 바, 구체적으로는 선박(제품)이 어떠한 부품(ITEM)들로 구성되는지에 대한 구조화된 정보를 담고 있으며, 부품(ITEM)들 간의 모자관계(RELATIONSHIP)를 정의한 데이터를 의미한다. 이때, 부품(ITEM)은 원재료, 반제품, 완제품 등 선박건조에 들어가는 자재들을 통칭하는 개념이다.* BOM: means 'BILL OF MATERIAL'. Specifically, it contains structured information about which parts (ITEM) a ship (product) consists of, and the relationship between the parts (ITEM). Means data defined. At this time, the part (ITEM) is a concept that collectively refers to the materials that go into the shipbuilding, such as raw materials, semi-finished products, finished products.

* PROJECT BOM : 특정 호선에 해당하는 BOM으로서, 특성별 그룹 항목 및 값을 선택하여 특정 호선의 제품을 생산하는 데 소용되는 자재 내역들의 구조화된 구성체계를 의미한다.* PROJECT BOM: A BOM corresponding to a specific line, which means a structured structure of material details used to produce products for a specific line by selecting group items and values by characteristics.

* PRELIMINARY BOM : 도면확정 전 설계/생산/경영 계획용 BOM으로서, PROJECT BOM의 초기단계이다. PROJECT BOM 구성을 위한 초안이며, 일정 계획 및 예상물량 산출 목적으로 활용된다.* PRELIMINARY BOM: BOM for design / production / management plan prior to drawing confirmation. It is the initial stage of PROJECT BOM. It is a draft for PROJECT BOM composition and is used for scheduling and estimating quantity.

* MASTER BOM : PLM/ERP에 저장되어 있는 기존 실적 BOM으로서, 선정된 표준 모델의 BOM을 등록하여 PROJECT BOM의 구성 시 활용할 수 있도록 저장해 놓은 선종 별 대표 BOM을 의미한다.* MASTER BOM: It is the existing performance BOM stored in PLM / ERP. It means the representative BOM for each line type that has been registered so that the selected standard model can be registered and used when constructing the project BOM.

* STANDARD BOM : 이는 각 부문별로 협의된 표준 데이터 구조로서, 선종별 공통 BOM 구조로 구분하여 관리하는 것이다. PROJECT BOM 구성 시 STANDARD BOM을 참조로 BOM을 구성한다. STANDARD BOM에는 작업지시 단위(JOB ORDER)까지만 구성되어 있다.* STANDARD BOM: This is a standard data structure negotiated by each department and managed by classifying common BOM structure by ship type. When constructing PROJECT BOM, BOM is constructed by referring to STANDARD BOM. The STANDARD BOM consists only of the work order unit (JOB ORDER).

* 선체 BOM : BLOCK DIVISION을 참조하여 선체구조(탑재PE, 선PE, BLOCK 등)만 활용하여 BOM으로 구성한 것이다.* Hull BOM: Refers to BLOCK DIVISION and uses only hull structure (mounted PE, ship PE, BLOCK, etc.)

* JOB ORDER : 본 발명의 실적처리 기준 CODE이다. 생산을 위한 공정 기준 정보로서, 공정의 구성에 필요한 작업부서, 공정 유효일, 자재 출고 방식, 자원명, 원가부과 방식, 자원 사용 원단위, 스케줄링 방법, 기타 BOM에 정의되지 않는 생산 관련 정보를 정의해 둔 것으로, BOM과 더불어 작업지시 및 자재 수급 계획 수립을 위한 기초 정보로 활용된다.
JOB ORDER: Performance code of the present invention. Process-based information for production, which defines work units, process expiration dates, material release methods, resource names, costing methods, resource usage units, scheduling methods, and other production-related information that are not defined in the BOM. In addition to the BOM, it is used as basic information for work order and material supply and demand planning.

본 발명은, 조선소에서 유사선, 동형선 또는 신조선 설계업무를 진행함에 있어서 MASTER BOM을 활용하여 설계 계획용 PRELIMINARY BOM을 정보처리장치 상에서 조기에 구성할 수 있도록 구현하는 방법으로서, 각 부분별 대상 참조 호선을 지정하는 ‘MASTER BOM 지정’ 단계; ERP에 존재하는 DATA로 특정 MODEL을 기준으로 영구 추가로 구조화된 MASTER BOM에서 현재 생성하고자 하는 PROJECT BOM과 유사한 구조를 갖는 DATA를 추출하는 ‘MASTER BOM 추출’ 단계; 추출한 DATA를 기준으로 선체 BOM에 의장품 BOM을 추가 구성하는 ‘의장품 표준구조 생성’ 단계; 추출한 DATA를 참조로 구성된 의장품 BOM 하부에 속성값이 포함된 PENDING ITEM을 생성하는 ‘PENDING ITEM 생성’ 단계 및; 상기 ‘MASTER BOM 지정’ 단계부터 ‘PENDING ITEM 생성’ 단계까지의 과정을 통해 생성된 PROJECT BOM을 일괄 채번하여, PLM에 반영하고 TPI에 관련 정보를 전송하는 ‘BOM 일괄 채번’ 단계;를 포함하는 표준 BOM 구조 자동 생성 방법을 제시한다(도 2 참조).
The present invention, as a way to implement a design plan PRELIMINARY BOM early on the information processing device by using a master BOM in the design of similar ships, copper wire boats or new ships in shipyards, see the target of each part 'MASTER BOM Assignment' step of designating line; A 'MASTER BOM extraction' step of extracting DATA having a structure similar to the PROJECT BOM to be currently generated from the MASTER BOM that is permanently additionally structured based on a specific MODEL as the DATA existing in the ERP; 'Generating a design standard structure' to add a design BOM to the hull BOM based on the extracted DATA; A 'PENDING ITEM generation' step of generating a PENDING ITEM including attribute values at the bottom of the design bill of materials consisting of the extracted DATA; Standard 'BOM batch number' step to batch process the PROJECT BOM created through the 'MASTER BOM designation' step to 'PENDING ITEM generation' step, reflect to the PLM and transmit the relevant information to the TPI; A method of automatically generating a BOM structure is presented (see FIG. 2).

‘MASTER BOM 지정’ 단계는 F.BODY, MID DECK, D/H, E/ROOM 등 각 부분별 대상 참조 호선을 지정하는 단계이다.'MASTER BOM designation' step is to designate target reference line for each part such as F.BODY, MID DECK, D / H, E / ROOM.

이러한 ‘MASTER BOM 지정’ 단계는, PROJECT BOM에서 BLOCK 생산과정의 STAGE(대조립/중조립/소조립)를 F.BODY, MID DECK, DECK HOUSE & FUNNEL CASING, ENGINE ROOM로 분리한 4개 부문과 PE 생산 STAGE 1개 부문을 합하여 총 5가지 입력값으로 분리하는 ‘STAGE/ZONE별 입력값 분리’ 단계; 상기 5가지 입력 인자를 기준으로 MODEL이 동일한 PROJECT 중 BLOCK DIVISION이 일치하는 참조 PROJECT를 선택하는 ‘ZONE별 PROJECT 선택’ 단계 및; 참조 BOM의 JOB ORDER가 생성되어 있을 시 ERP JOB ORDER 완료 BOM만 추출하는 ‘ERP JOB ORDER 완료 기준 추출’ 단계;로 이루어진다. 한편, ‘ERP JOB ORDER 완료기준 추출’ 단계는, 참조 BOM의 JOB ORDER가 미생성되어 있을 시 해당 MASTER BOM 전체를 추출하는 ‘MASTER BOM 모두 추출’ 단계로 대체된다.This 'MASTER BOM designation' step consists of four divisions that separate STAGE (large assembly / heavy assembly / small assembly) of block production process into F.BODY, MID DECK, DECK HOUSE & FUNNEL CASING, ENGINE ROOM in PROJECT BOM. 'Separation of input values by STAGE / ZONE' step of adding one division of PE production STAGE and separating it into 5 input values; A 'selection of PROJECT for each zone' step of selecting a reference project in which BLOCK DIVISION is identical among PROJECTs having the same MODEL based on the five input factors; When the JOB ORDER of the reference BOM is created, the ERP JOB ORDER completion BOM extraction step extracts only the complete BOM. Meanwhile, the 'ERP JOB ORDER Complete Criteria Extraction' step is replaced by the 'Extract all MASTER BOM' step, which extracts the entire MASTER BOM when the JOB ORDER of the reference BOM is not generated.

기존 MASTER 활용을 위해서는 수작업이 필요하지만, 본 단계를 통하여 효율적인 MASTER 활용이 가능해진다. 이하 각 단계별로 설명한다(도 3 참조).Manual work is required to utilize the existing master, but this step enables efficient master application. Each step will be described below (see FIG. 3).

‘STAGE/ZONE별 입력값 분리’ 단계 : 본 발명에서는 선박에서 유사한 특성을 가지는 부위를 5개 구역으로 설정하여 MASTER BOM을 관리한다. 그 5가지 부분은 PROJECT BOM에서 BLOCK 생산과정의 STAGE(대조립/중조립/소조립)를 F.BODY, MID DECK, DECK HOUSE & FUNNEL CASING, ENGINE ROOM로 분리한 4개 부문과 PE 생산 STAGE 1개 부문을 합하여 총 5가지다. 'Separation of input values by STAGE / ZONE' step: In the present invention, the MASTER BOM is managed by setting five areas having similar characteristics in the vessel. The five parts are divided into four divisions of FLOCK BODY, MID DECK, DECK HOUSE & FUNNEL CASING, ENGINE ROOM, and PE Production STAGE 1 There are a total of five categories.

한편, 본 발명에서 BOM은 선박건조 공정과 유사한 구조로 구성되어 있다. 선박건조 공정은 ‘가공공사 → 조립공사(소조립 → 중조립 → 대조립) → 선행 탑재(PE, PRE ERECTION) → 탑재(ERECTION) → 안벽공사(QUEY)’의 순서로 진행되며, 각 공정에 의장/도장공사가 포함되어 있다. 여기서 대조립 단계에 의장품 설치가 완료되면 BLOCK이 된다. 이 BLOCK들을 조기에 JOINT 하는 작업(선PE작업)을 한 후 DOCK장에 들어가기 직전 대형 BLOCK(OPTION)으로 최종 PE작업을 하게 된다. 그 후 DOCK장에서 골리앗크레인으로 대형 BLOCK(OPTION)을 들어서 탑재작업(용접)을 하게 된다.On the other hand, the BOM in the present invention is composed of a structure similar to the ship drying process. Shipbuilding process proceeds in the order of 'Processing work → Assembly work (Small assembly → Heavy assembly → Contrast) → Preliminary mounting (PE, PRE ERECTION) → Mounting (ERECTION) → Quay wall construction (QUEY). Design / painting work is included. Here, when the installation of the equipment is completed in the contrasting stage, it becomes a block. After doing the JOINT of these blocks early (line PE work), the final PE work is done with a large block (OPTION) just before entering the DOCK. After that, a large block (OPTION) is lifted into the goliath crane at the DOCK site to carry out mounting work (welding).

‘ZONE별 PROJECT 선택’ 단계 : 상기 5가지 입력 인자를 기준으로 MODEL이 동일한 PROJECT 중 BLOCK DIVISION이 일치하는 참조 PROJECT를 선택한다. 'Select PROJECT by ZONE' step: Based on the above five input factors, select the reference project with the same block division among the projects with the same MODEL.

ERP JOB ORDER 완료기준 추출’ 단계 : BOM을 구성하면 이를 PLM에서 ERP SYSTEM으로 모두 보내게 되며, 생산에서 해당 호선이 완료될 시 BOM에서 JOB ORDER에 실적처리를 하게 된다. 그러한 실적이 완료된 CODE를 기준으로 활용한다. '' ERP JOB Extraction of ORDER Completion Criteria 'Step: When the BOM is constructed, it is sent from PLM to ERP SYSTEM. When the relevant line is completed in production, the BOM is processed in JOB ORDER. The code is used based on the completed code.

MASTER BOM 모두 추출’ 단계 : 본 단계는 일부 ERP에서 실적처리가 되어 있지 않은 시점이거나 ERP SYSTEM이 정립이 되어 있지 않을 경우를 대비하여 구현된 것이다. 예를 들면, ERP SYSTEM 반영이 늦어서 아직 실적처리 SYSTEM이 제대로 구축되지 않은 상태이거나, 실적처리는 일이 끝났을 때 입력되는 관계로 아직 진행 중인 호선이라면 ERP에 해당 DATA가 없을 경우 등을 대비한 것이다.
' MASTER Extract all BOM 'step: This step is implemented in case that some ERP's performance is not processed or ERP system is not established. For example, if the ERP SYSTEM is too late to reflect the results, the system has not yet been properly constructed, or the earnings process is input when work is completed.

‘MASTER BOM 추출’ 단계는 ERP에 존재하는 DATA로 특정 MODEL을 기준으로 영구 추가로 구조화된 MASTER BOM에서 현재 생성하고자 하는 PROJECT BOM과 유사한 구조를 갖는 DATA를 추출하는 단계이다.'MASTER BOM Extraction' is the data existing in ERP. It is a step of extracting DATA having a structure similar to the project BOM that is to be created from MASTER BOM that is additionally structured based on specific MODEL.

이러한 ‘MASTER BOM 추출’ 단계는, MASTER 추출 DATA에서 JOB ORDER 하위 1 LEVEL ITEM까지 LOADING하는 ‘의장품 LIST 추출’ 단계; LOADING BOM과 동일 위치에 의장품 ITEM을 신규 생성하는 ‘의장품 신규 생성’ 단계 및; 특정 PROJECT에 특정 STAGE와 ZONE에 따라서 공통으로 적용되는 의장품 표준구조(표준구조: System 내부에 Data화 하여 관리함)를 자동 UPDATE하는 ‘호선 공통 구조 UPDATE’ 단계;로 이루어로 이루어진다.This 'MASTER BOM extraction' step, the 'extract the cosmetics list' to load from the MASTER extraction data to the JOB ORDER lower 1 LEVEL ITEM; A 'Create New Apparel' step of creating a new Apparel ITEM at the same location as the LOADING BOM; It consists of a 'line common structure UPDATE' step that automatically updates the standard structure of equipment (standard structure: data is managed inside the system) that is commonly applied according to a specific stage and zone in a specific project.

본 단계에 따르면, 의장품 VIRTUAL CODE를 조기에 일괄 생성하여, 설계 부서간의 혼선 방지, BOM 구조의 효율적인 표준화가 가능해진다. 이하 각 단계별로 설명한다(도 4 참조).According to this step, it is possible to collectively generate the design VIRTUAL CODE early to prevent cross talk between design departments and to efficiently standardize the BOM structure. Each step will be described below (see FIG. 4).

‘의장품 LIST 추출’ 단계 : MASTER BOM을 추출할 시 JOB ORDER 하위 1 LEVEL 구조까지 추출한다. 왜냐하면, 하위 1 LEVEL에 그 작업에 투입되고 발주될 품목들이 연계되어 있기 때문이다. 하위에 품목들이 없다면 실제 설치작업은 없다는 뜻이다. 그래도 MANHOUR가 반드시 투입되어야 한다면 별도의 협의구조로 관리하게 된다. "EQUIPMENT LIST extraction" step: extraction to extract the MASTER BOM to ORDER JOB 1 LEVEL lower structure. This is because the lower 1 level has items linked to and ordered for the work. If there are no items at the bottom, it means no actual installation work. However, if MANHOUR must be put in place, it will be managed in a separate consultation structure.

‘의장품 신규 생성’ 단계 : ‘의장품 LIST 추출’ 단계에서 실적처리 되었으며, 하위에 품목까지 있는 BOM이 있을 경우 현재 작업하는 호선의 동일한 BOM 구조 위치에 JOB ORDER CODE를 신규 생성한다. 즉, 현재 작업 대상인 호선도 참조호선과 해당 부문에 동일한 작업이 있다고 가정한다는 뜻이다. 'New creation of design' step: In the 'process of design list extraction' step, if there is a BOM under the item, the new JOB ORDER CODE is created in the same BOM structure location of the currently working ship. In other words, it is assumed that the line currently being worked on has the same work in the reference line and the corresponding section.

‘호선 공통 구조 UPDATE ’ 단계 : ‘의장품 LIST 추출’ 단계와 같이 설치작업이 없어도 MANHOUR가 들어가는 경우와 기타 선종별로 협의된 구조를 별도로 생성한다.
'Structure common structure UPDATE ' step: Create a structure negotiated by MANHOUR and other ship types even if there is no installation work like the 'extract design list' step.

‘의장품 표준구조 생성’ 단계는 추출한 DATA를 기준으로 선체 BOM에 의장품 BOM을 추가 구성하는 단계이다.'Generating design standard structure' step is to construct additional design BOM in hull BOM based on extracted data.

이러한 ‘의장품 표준구조 생성’ 단계는, JOB ORDER 하부 자재 ITEM이 존재하는지 여부를 판단하는 ‘PENDING 참조 ITEM 유무 판단’ 단계; 상기 ‘PENDING 참조 ITEM 유무 판단’ 단계에서 JOB ORDER 하부 자재 ITEM이 존재하는 경우 PENDING ITEM을 생성하는 ‘PENDING 생성’ 단계; JOB ORDER 하부 자재 ITEM을 참조 ITEM으로 지정하는 ‘참조 ITEM 선택’ 단계 및; ERP 확정 후 WBS-Activity 일정값(생산기획부서에서 PROJECT BOM에서 WBS-ACTIVITY 값을 기준으로 생산중일정을 산출한다. 여기서 WBS는 Work breakdown Structure라고 하며, 3개 Level로 선박 건조 작업을 구조화 시킨 Structure이다.)을 Loading 및 계산하여 자동 입력하는 ‘PENDING 해지일 등록’ 단계;로 이루어진다. 한편, ‘PENDING 생성’ 단계는, 상기 ‘PENDING 참조 ITEM 유무 판단’ 단계에서 JOB ORDER 하부 자재 ITEM이 존재하지 않는 경우 PENDING ITEM을 생성하지 않는 ‘PENDING 미생성’ 단계로 대체된다.This 'creation of the standard structure of the furniture' step, 'determining the presence of the PENDING reference ITEM' judging whether there is an ITEM under JOB ORDER material; A 'PENDING generation' step of generating a PENDING ITEM when the JOB ORDER lower material ITEM exists in the 'determining PENDING reference ITEM' step; A 'select reference ITEM' step of designating the JOB ORDER submaterial ITEM as a reference ITEM; After ERP is finalized, WBS-Activity constant value (Calculation schedule is calculated based on WBS-ACTIVITY value from PROJECT BOM in the Production Planning Department. WBS is called Work breakdown Structure. 'PENDING termination date registration' step of loading and calculating and automatically inputting. On the other hand, the PENDING generation step is replaced by a PENDING non-generation step that does not generate a PENDING ITEM when the JOB ORDER lower material ITEM does not exist in the PENDING reference ITEM determination.

PENDING ITEM 생성을 위해서 년간 약 4375MANHOUR가 소비되는데, 본 단계에 따라 이를 혁신적으로 감소시킬 수 있다. 이하 각 단계별로 설명한다(도 5 참조).Approximately 4375 MANHOUR is consumed per year to produce the PENDING ITEM, which can be reduced innovatively by this step. Each step will be described below (see FIG. 5).

PENDING 참조 ITEM 유무 판단’ 단계 : PENDING 참조 ITEM은 실제 품목이 정해져서 연계되기 전까지 계획/물량 산출용으로 임시로 JOB ORDER 하위에 연결해 놓는다. 따라서 참조할 JOB ORDER 실적 CODE 하부에 품목이 존재한다면, 그 CODE를 참조값으로 PENDING 참조 ITEM을 생성하게 된다. PENDING ITEM의 주요 입력값은 참조호선, 참조품목 CODE, PENDING ITEM 삭제 및 실제 CODE 연계일 등이다. 'PENDING See ITEM determine whether or not "phase: PENDING See ITEM sets connected temporarily to the calculation plan / orders until they are linked to the actual item jeonghaejyeoseo JOB ORDER children. Therefore, if there is an item under the JOB ORDER performance code to refer to, a PENDING reference ITEM is created with that code as a reference value. PENDING ITEM's main input values are reference line, reference item CODE, PENDING ITEM deletion and actual CODE linkage date.

PENDING 생성’ 단계 : ‘의장품 LIST 추출’ 단계에서와 같이 JOB ORDER 하위 1 LEVEL에 품목 존재 시 그 ITEM을 참조 ITEM으로 PENDING ITEM을 연계한다. ' PENDING generation' step: As in the 'extract design list' step, if there is an item in the lower level of JOB ORDER, the PENDING ITEM is linked to the ITEM as a reference ITEM.

‘참조 ITEM 선택’ 단계 : JOB ORDER 하위 1 LEVEL의 품목을 참조 ITEM으로 입력한다. ' Select reference ITEM ' step: Enter the item of JOB ORDER sub 1 LEVEL as reference ITEM.

PENDING 해지일 등록’ 단계 : ERP로 전송 후 계획된 각 JOB ORDER 일정에 맞추어 해지일을 자동 등록한다. 이는 향후 작업자가 실제 ITEM을 연결할 때 시점관리가 용이하도록 하기 위함이다. ' PENDING Termination Date Registration' Step: After sending to ERP, the termination date is automatically registered according to the planned JOB ORDER schedule. This is to make time management easier when the worker connects the actual ITEM in the future.

PENDING 미생성’ 단계 : 만약 JOB ORDER 하위 1 LEVEL에 품목이 없을 시 PENDING ITEM을 생성하지 않는다. 물량이 없으므로 참조 대상에 제외하는 것이다.
'No PENDING ' step: If there is no item in JOB ORDER 1 level LEVEL, PENDING ITEM is not created. Since there is no quantity, it is excluded from the reference.

‘PENDING ITEM 생성’ 단계에서는 추출한 DATA를 참조로 구성된 의장품 BOM 하부에 속성값이 포함된 PENDING ITEM을 생성한다.
In the 'Generating Pending ITEM' step, create a Pending ITEM with attribute values under the design BOM that consists of extracted data.

‘BOM 일괄 채번’ 단계에서는 상기 ‘MASTER BOM 지정’ 단계부터 ‘PENDING ITEM 생성’ 단계까지의 과정을 통해 생성된 PROJECT BOM을 일괄 채번하여, PLM에 반영하고 TPI에 관련 정보를 전송한다.In the 'BOM batch collection' step, the PROJECT BOM generated through the process of 'MASTER BOM designation' to 'PENDING ITEM generation' is collected and reflected in the PLM and transmitted to the TPI.

작업 대상 호선의 BOM이 PROJECT부터 PENDING ITEM까지 구성 완료되면 최종적으로 ITEM 생성 작업을 일괄 진행한다. PLM에서는 각각의 ITEM 별로 생성이 가능하지만, 전체 ITEM 정보, BOM 연계정보를 일괄 입력하여, BOM을 동시에 모두 채번할 수 있도록 한다. 본 단계에 따르면 BOM을 일괄 생성함으로써 시간을 단축시킬 수 있다.
When BOM of the target ship is completed from PROJECT to PENDING ITEM, ITEM creation work is carried out at the end. In PLM, each ITEM can be created, but the entire ITEM information and BOM connection information can be input at once, so that the BOM can be simultaneously numbered. According to this step, the time can be shortened by generating the BOM collectively.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위 내에서 다양한 수정, 변경 및 치환이 가능할 것이다. 따라서, 본 발명에 개시된 실시예 및 첨부된 도면들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예 및 첨부된 도면에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.The above description is merely illustrative of the technical idea of the present invention, and various modifications, changes, and substitutions may be made by those skilled in the art without departing from the essential characteristics of the present invention. will be. Accordingly, the embodiments disclosed in the present invention and the accompanying drawings are not intended to limit the technical spirit of the present invention but to describe the present invention, and the scope of the technical idea of the present invention is not limited by the embodiments and the accompanying drawings. . The protection scope of the present invention should be interpreted by the following claims, and all technical ideas within the equivalent scope should be interpreted as being included in the scope of the present invention.

Claims (7)

조선소에서 유사선, 동형선 또는 신조선 설계업무를 진행함에 있어서 MASTER BOM을 활용하여 설계 계획용 PRELIMINARY BOM을 정보처리장치 상에서 조기에 구성할 수 있도록 구현하는 방법으로서,
각 부분별 대상 참조 호선을 지정하는 ‘MASTER BOM 지정’ 단계;
ERP에 존재하는 DATA로 특정 MODEL을 기준으로 영구 추가로 구조화된 MASTER BOM에서 현재 생성하고자 하는 PROJECT BOM과 유사한 구조를 갖는 DATA를 추출하는 ‘MASTER BOM 추출’ 단계;
추출한 DATA를 기준으로 선체 BOM에 의장품 BOM을 추가 구성하는 ‘의장품 표준구조 생성’ 단계;
추출한 DATA를 참조로 구성된 의장품 BOM 하부에 속성값이 포함된 PENDING ITEM을 생성하는 ‘PENDING ITEM 생성’ 단계 및;
상기 ‘MASTER BOM 지정’ 단계부터 ‘PENDING ITEM 생성’ 단계까지의 과정을 통해 생성된 PROJECT BOM을 일괄 채번하여, PLM에 반영하고 TPI에 관련 정보를 전송하는 ‘BOM 일괄 채번’ 단계;
를 포함하는 표준 BOM 구조 자동 생성 방법.
As a way to implement the design plan PRELIMINARY BOM early on the information processing device by using MASTER BOM in designing similar ships, moving ships or new ships at shipyards,
'MASTER BOM designation' step of designating target reference line for each part;
A 'MASTER BOM extraction' step of extracting DATA having a structure similar to the PROJECT BOM to be currently generated from the MASTER BOM that is permanently additionally structured based on a specific MODEL as the DATA existing in the ERP;
'Generating a design standard structure' to add a design BOM to the hull BOM based on the extracted DATA;
A 'PENDING ITEM generation' step of generating a PENDING ITEM including attribute values at the bottom of the design bill of materials consisting of the extracted DATA;
A 'BOM batch numbering' step of collectively numbering the PROJECT BOM generated through the process of 'MASTER BOM designation' step to 'PENDING ITEM generation' step, reflecting to PLM and transmitting related information to TPI;
Automatic creation of standard BOM structure, including.
제 1 항에 있어서,
상기 ‘MASTER BOM 지정’ 단계는,
PROJECT BOM에서 BLOCK 생산과정의 STAGE(대조립/중조립/소조립)를 F.BODY, MID DECK, DECK HOUSE & FUNNEL CASING, ENGINE ROOM로 분리한 4개 부문과 PE 생산 STAGE 1개 부문을 합하여 총 5가지 입력값으로 분리하는 ‘STAGE/ZONE별 입력값 분리’ 단계;
상기 5가지 입력 인자를 기준으로 MODEL이 동일한 PROJECT 중 BLOCK DIVISION이 일치하는 참조 PROJECT를 선택하는 ‘ZONE별 PROJECT 선택’ 단계 및;
참조 BOM의 JOB ORDER가 생성되어 있을 시 ERP JOB ORDER 완료 BOM만 추출하는 ‘ERP JOB ORDER 완료 기준 추출’ 단계;
로 이루어지는 것을 특징으로 하는 표준 BOM 구조 자동 생성 방법.
The method of claim 1,
The 'MASTER BOM designation' step,
In the project BOM, four divisions of block production process (large assembly / medium assembly / small assembly) are divided into F.BODY, MID DECK, DECK HOUSE & FUNNEL CASING, ENGINE ROOM, and one division of PE production 'Separation of input values for each stage / zone' for separating into five input values;
Selecting a PROJECT for each zone based on the five input factors to select a reference project having a same block division among the same projects;
'ERP JOB ORDER completion criteria extraction' step of extracting only ERP JOB ORDER completed BOM when JOB ORDER of reference BOM is created;
Standard BOM structure automatic generation method characterized in that consisting of.
제 2 항에 있어서,
상기 ‘ERP JOB ORDER 완료기준 추출’ 단계는,
참조 BOM의 JOB ORDER가 미생성되어 있을 시 해당 MASTER BOM 전체를 추출하는 ‘MASTER BOM 모두 추출’ 단계로 대체되는 것을 특징으로 하는 표준 BOM 구조 자동 생성 방법.
The method of claim 2,
The 'ERP JOB ORDER completion criteria extraction' step,
When the JOB ORDER of reference BOM is not created, standard BOM structure automatic generation method is replaced by 'Extract all MASTER BOM' step that extracts the entire MASTER BOM.
제 1 항에 있어서,
상기 ‘MASTER BOM 추출’ 단계는,
MASTER 추출 DATA에서 JOB ORDER 하위 1 LEVEL ITEM까지 LOADING하는 ‘의장품 LIST 추출’ 단계;
LOADING BOM과 동일 위치에 의장품 ITEM을 신규 생성하는 ‘의장품 신규 생성’ 단계 및;
특정 PROJECT에 특정 STAGE와 ZONE에 따라서 공통으로 적용되는 의장품 표준구조를 자동 UPDATE하는 ‘호선 공통 구조 UPDATE’ 단계;
로 이루어지는 것을 특징으로 하는 표준 BOM 구조 자동 생성 방법.
The method of claim 1,
The 'MASTER BOM extraction' step,
'Extract design list' to load from master extraction data to JOB ORDER lower level LEVEL ITEM;
A 'Create New Apparel' step of creating a new Apparel ITEM at the same location as the LOADING BOM;
A 'line common structure UPDATE' step of automatically updating a design standard structure commonly applied to a specific PROJECT according to a specific STAGE and ZONE;
Standard BOM structure automatic generation method characterized in that consisting of.
제 1 항에 있어서,
상기 ‘의장품 표준구조 생성’ 단계는,
JOB ORDER 하부 자재 ITEM이 존재하는지 여부를 판단하는 ‘PENDING 참조 ITEM 유무 판단’ 단계;
상기 ‘PENDING 참조 ITEM 유무 판단’ 단계에서 JOB ORDER 하부 자재 ITEM이 존재하는 경우 PENDING ITEM을 생성하는 ‘PENDING 생성’ 단계;
JOB ORDER 하부 자재 ITEM을 참조 ITEM으로 지정하는 ‘참조 ITEM 선택’ 단계 및;
ERP 확정 후 WBS-Activity 일정값을 Loading 및 계산하여 자동 입력하는 ‘PENDING 해지일 등록’ 단계;
로 이루어지는 것을 특징으로 하는 표준 BOM 구조 자동 생성 방법.
The method of claim 1,
The 'creation of the standard structure of the article' step,
Determining whether there is a PENDING reference ITEM to determine whether there is a JOB ORDER lower material ITEM;
A 'PENDING generation' step of generating a PENDING ITEM when the JOB ORDER lower material ITEM exists in the 'determining PENDING reference ITEM'step;
A 'select reference ITEM' step of designating the JOB ORDER submaterial ITEM as a reference ITEM;
'PENDING termination date registration' step of loading and calculating the WBS-Activity schedule value automatically after ERP confirmation;
Standard BOM structure automatic generation method characterized in that consisting of.
제 5 항에 있어서,
상기 ‘PENDING 생성’ 단계는,
상기 ‘PENDING 참조 ITEM 유무 판단’ 단계에서 JOB ORDER 하부 자재 ITEM이 존재하지 않는 경우 PENDING ITEM을 생성하지 않는 ‘PENDING 미생성’ 단계로 대체되는 것을 특징으로 하는 표준 BOM 구조 자동 생성 방법.
The method of claim 5, wherein
The 'PENDING generation' step,
Method for automatically generating a standard BOM structure, characterized in that the 'PENDING non-created' step that does not generate a PENDING ITEM when the JOB ORDER lower material ITEM does not exist in the 'PENDING reference ITEM determination step'.
삭제delete
KR1020100006097A 2010-01-22 2010-01-22 Standard bom structure auto generation method KR101091407B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100006097A KR101091407B1 (en) 2010-01-22 2010-01-22 Standard bom structure auto generation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100006097A KR101091407B1 (en) 2010-01-22 2010-01-22 Standard bom structure auto generation method

Publications (2)

Publication Number Publication Date
KR20110086387A KR20110086387A (en) 2011-07-28
KR101091407B1 true KR101091407B1 (en) 2011-12-07

Family

ID=44922798

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100006097A KR101091407B1 (en) 2010-01-22 2010-01-22 Standard bom structure auto generation method

Country Status (1)

Country Link
KR (1) KR101091407B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112650798A (en) * 2019-10-11 2021-04-13 沅圣科技股份有限公司 Data interfacing method, electronic device and storage medium
KR102315635B1 (en) * 2021-03-16 2021-10-21 코오롱베니트 주식회사 Apparatus for planning management and estimating profit and loss and method thereof
CN115130699B (en) * 2022-08-09 2024-05-21 南京维拓科技股份有限公司 BOM optional calculation and regulation requirement identification method based on heavy-duty car industry

Also Published As

Publication number Publication date
KR20110086387A (en) 2011-07-28

Similar Documents

Publication Publication Date Title
AN et al. Improving cost and time control in construction using building information model (BIM): a review
Jupp 4D BIM for environmental planning and management
Getuli et al. A BIM-based construction supply chain framework for monitoring progress and coordination of site activities
KR101754328B1 (en) Construction work management system based on BIM and management method of the same
Akcamete et al. Potential utilization of building information models for planning maintenance activities
KR101662651B1 (en) Construction work management system based on BIM and management method of the same
Ahankoob et al. BIM perspectives on construction waste reduction
Nam et al. SCP-Matrix based shipyard APS design: Application to long-term production plan
KR101690211B1 (en) Bim-based construction value engineering (ve) processing system
Bataglin et al. Application of bim for supporting decisionmaking related to logistics in prefabricated building systems
KR101091407B1 (en) Standard bom structure auto generation method
Cho et al. Development of production planning system for shipbuilding using component-based development framework
Taghaddos et al. Simulation-based multiple heavy lift planning in industrial construction
KR20080004061A (en) A method of managing technical change for a ship design
Zijm Manufacturing systems
KR20130134590A (en) Method and system for managing an information of material in the ship
KR20080004247A (en) A method of laying long period plans for a ship production
KR20080004058A (en) A method of laying plans for going ahead with a ship design
KR101052000B1 (en) How to objectiveize the working hours when building a ship
KR20130134589A (en) Method and system for constructing a material information in the ship
Rambabu et al. Gap analysis and optimization of process involved in product design and development by integrating enterprise resource planning & product lifecycle management
Shen et al. Design of an Integrated Production Planning System Framework Based on Simulation Using a Production Information Model
Saad et al. Fundamentals of Construction Project Management
KR101834448B1 (en) A method of 3D volume based automatically work order system using 3D modeling
KR20080004056A (en) A method of drawing up a pre-project bom for a ship design

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141118

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20151201

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee