KR101065842B1 - Device for correcting dust in furnace - Google Patents

Device for correcting dust in furnace Download PDF

Info

Publication number
KR101065842B1
KR101065842B1 KR1020040112376A KR20040112376A KR101065842B1 KR 101065842 B1 KR101065842 B1 KR 101065842B1 KR 1020040112376 A KR1020040112376 A KR 1020040112376A KR 20040112376 A KR20040112376 A KR 20040112376A KR 101065842 B1 KR101065842 B1 KR 101065842B1
Authority
KR
South Korea
Prior art keywords
dust
pipe
cover
induction pipe
blast furnace
Prior art date
Application number
KR1020040112376A
Other languages
Korean (ko)
Other versions
KR20060073239A (en
Inventor
박용권
이찬효
Original Assignee
주식회사 포스코
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 포스코 filed Critical 주식회사 포스코
Priority to KR1020040112376A priority Critical patent/KR101065842B1/en
Publication of KR20060073239A publication Critical patent/KR20060073239A/en
Application granted granted Critical
Publication of KR101065842B1 publication Critical patent/KR101065842B1/en

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/22Dust arresters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D25/00Devices or methods for removing incrustations, e.g. slag, metal deposits, dust; Devices or methods for preventing the adherence of slag
    • F27D25/008Devices or methods for removing incrustations, e.g. slag, metal deposits, dust; Devices or methods for preventing the adherence of slag using fluids or gases, e.g. blowers, suction units

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

본 발명의 목적은 용선 배출을 위한 배출구 개방작업시 발생되는 분진을 용이하게 포집처리할 수 있도록 된 고로의 분진 포집장치를 제공함에 있다. An object of the present invention is to provide a dust collecting device of the blast furnace to be able to easily collect the dust generated during the opening operation for discharging molten iron.

이에 본 발명은 고로의 대탕도 커버에 회동가능하게 연결되어 대탕도의 커버를 통해 분진이 유통되는 분진유도관과, 상기 분진유도관에 연결설치되어 분진유도관 선단을 유,잔선탕도로 회동시키기 위한 구동실린더, 상기 유,잔선탕도 상부의 커버에 연통가능하게 설치되고 상단은 상기 분진유도관 선단과 연결되는 삽입배관을 포함하는 고로의 분진 포집장치를 제공한다.Therefore, the present invention is rotatably connected to the large hot water cover of the blast furnace is connected to the dust induction pipe through which the dust is distributed through the cover of the large hot water, and connected to the dust induction pipe to rotate the tip of the dust induction pipe to Yu, Janseontang. The driving cylinder for the oil, the residual suntang is also communicatively installed on the cover of the upper and provides an dust collecting device of the blast furnace including an insertion pipe connected to the tip of the dust induction pipe.

커버, 분진유도관, 구동실린더, 삽입배관, 개공홀, 회동실린더Cover, Dust Induction Pipe, Driving Cylinder, Insertion Pipe, Opening Hole, Rotating Cylinder

Description

고로의 분진 포집장치{Device for correcting dust in furnace}Device for correcting dust in furnace

도 1은 본 발명의 실시예에 따른 고로의 분진 포집장치를 도시한 개략적인 사시도이다.1 is a schematic perspective view showing a dust collecting apparatus of the blast furnace according to an embodiment of the present invention.

도 2는 본 발명의 실시예에 따른 분진 포집장치의 일부 구성 단면도이다.2 is a partial cross-sectional view of a dust collecting device according to an embodiment of the present invention.

도 3과 도 4는 본 발명의 실시예에 따른 분진 포집장치의 일부 구성 사시도이다.3 and 4 is a perspective view of a part of the dust collecting device according to an embodiment of the present invention.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10 : 대탕도 11,14 : 커버10: large bath 11,14: cover

12 : 배재구 13 : 유,잔선탕도12: Bae Jae-gu 13: Yu, Janseontang

20 : 베어링블럭 21 : 분진유도관20: bearing block 21: dust induction pipe

22 : 구동실린더 23 : 홀22: driving cylinder 23: hole

24 : 개공홀 25 : 삽입배관24: opening hole 25: insertion piping

26 : 안내레일 27 : 구동롤26: guide rail 27: driving roll

28 : 회동실린더28: rotating cylinder

본 발명은 고로의 대탕도에 관한 것으로, 더욱 상세하게는 잔선 배출작업 중에 발생되는 분진을 포집 처리하기 위한 고로의 분진 포집장치에 관한 것이다.The present invention relates to a large hot water of the blast furnace, and more particularly to a dust collecting apparatus of the blast furnace for collecting the dust generated during the afterglow discharge operation.

일반적으로 알려져 있는 고로의 작업은 용광로의 상부로부터 철광석과 코크스를 장입한후 열풍로 설비에서 보내온 고온1200℃ 상태의 열풍을 하부로부터 불어넣어 그 열로서 철광석을 용융, 환원시켜 쇳물을 생산하게 되며, 상기와 같이 생성되는 쇳물은 고로의 측면에 형성되는 출선구를 개공기로서 천공한후 출선구를 통하여 배출시키고, 이때 상기 쇳물은 그 비중차에 의해서 슬래그는 상측에 용선은 하측에 모이는 상태로 대탕도에 흐르게 된다.In general, the operation of the blast furnace is charged with iron ore and coke from the upper part of the furnace, and blows hot air of 1200 ° C from the lower part of the furnace to produce iron and iron by melting and reducing the iron ore as heat. The molten water produced as described above is drilled through the outlet formed in the side of the blast furnace as an opening machine, and then discharged through the outlet. Will flow in the road.

또한, 상기 대탕도의 일측에 설치되는 스키머를 통과할때 비중이 적은 슬래그는 스키머의 전면에서 슬래그탕도로 유입되어 유선베드(슬래그 중에 함유된 용선을 포집하기 위하여 슬래그탕도에 설치되는 웅덩이)에서 오버플로우 되어 슬래그탕도를 따라 흘러 수재 및 괴재 처리되는 작업공정에 투입된다.In addition, the slag having a low specific gravity when passing through the skimmer installed on one side of the large bathway flows into the slag bath from the front of the skimmer, and in the wired bed (a pond installed in the slag bath to collect molten iron contained in the slag). It overflows and flows along the slag trough to the work process where the water and the aggregate are treated.

그리고, 상기 대탕도에서 비중이 큰 용선은 스키머의 하부를 통과하여 용선탕도와 경주통을 경유하여 용선의 이동차량인 혼선차(TCL)에 투입되어 후공정으로 이송된다.In addition, the molten iron having a large specific gravity in the large hot water flows through the lower portion of the skimmer and is introduced into a mixed car (TCL), which is a moving vehicle of the molten steel, through the molten iron and the raceway, and is transferred to a later process.

상기와 같은 일상조업중 대탕도를 시공하는 내화물의 점검 및 보수시에는 대탕도내의 잔류용융물(약30TON)을 배출하게 되며, 상기 잔류용융물을 배출하기 위해 스키머의 일측에 연결되는 용선탕도에 잔선공을 형성하여 개공기(미도시)를 이용 개공하여 배출을 수행하고, 배출완료후 수작업에 의해 폐쇄작업을 수행한다.During the inspection and repair of the refractory for the construction of the large hot water during the above-mentioned daily operation, the residual melt (about 30 tons) in the large hot water is discharged, and the molten hot water connected to one side of the skimmer is discharged to discharge the residual melt. Forming the vacant holes to perform opening by using an opening machine (not shown), and after the discharge is completed, the closing operation is performed by manual labor.

그리고 슬래그가 배출되는 배재구 내의 슬래그 중에 포함되는 용선을 포집하 기위하여 상기 배재구에서 유,잔선 탕도로 배출구를 개방하여 배출을 시키게 된다.In addition, in order to capture the molten iron included in the slag in the discharge hole discharged from the slag, the discharge port is opened by opening the discharge hole with oil and residual water in the discharge hole.

이때, 상기 개공기를 이용 굴착중 미관통시에는 산소를 이용한 개공작업으로 다량의 용융물이 비산되어 작업자의 안전사고와 함께 산소개공시 발생되는 분진에 의해 환경이 오염되는 단점이 있는 것이다.At this time, when unperforated during the excavation using the air hole, a large amount of melt is scattered by the hole opening work using oxygen, and there is a disadvantage in that the environment is contaminated by dust generated during oxygen opening with a safety accident of the worker.

또한 상기한 작업은 산소 개공 작업으로 발생되는 분진이 작업자 시야장애를 발생시켜 작업자가 유,잔선탕도로 실족할 위험이 대단히 높으며, 자연 공냉냉각방식으로 냉각시간이 오래걸려 공냉 중 냉각수 살수 후 냉각작업을 실시하게 되므로 작업부하가 가중되는 문제점이 있다.In addition, the above work is very high risk of the operator's stepping into oil and residual hot water due to dust generated by the oxygen opening work, and the cooling time after spraying the coolant during the air cooling due to the long cooling time by natural air cooling method Since there is a problem that the workload is increased.

본 발명은 위에서 설명한 종래 기술의 문제점을 해결하기 위하여 발명된 것으로서, 본 발명의 목적은 용선 배출을 위한 배출구 개방작업시 발생되는 분진을 용이하게 포집처리할 수 있도록 된 고로의 분진 포집장치를 제공함에 있다.The present invention has been invented to solve the problems of the prior art described above, an object of the present invention is to provide a dust collecting device of the blast furnace to be able to easily collect the dust generated during the opening operation for the discharge of molten iron. have.

상기한 목적을 달성하기 위하여 본 발명은 대탕도의 커버에 회동가능하게 연결되어 대탕도의 커버를 통해 분진이 유통되는 분진유도관과, 상기 분진유도관을 회동시켜 필요시 유,잔선탕도 상부의 커버 상에 연결시키기 위한 회동수단을 포함한다.In order to achieve the above object, the present invention is rotatably connected to the cover of Daetangdo, and dust induction pipe through which the dust is distributed through the cover of Daetangdo, and when necessary, by rotating the dust induction pipe, Rotating means for connecting on the cover of the.

상기 회동수단은 상기 분진유도관 일측에 설치되어 분진유도관을 회동시키기 위한 구동실린더를 포함할 수 있다.The rotating means may include a driving cylinder installed at one side of the dust induction pipe to rotate the dust induction pipe.

또한, 본 발명은 상기 유,잔선탕도 상부의 커버에 연통가능하게 설치되고 상 단은 상기 분진유도관 선단과 연결되며 표면에는 배출구 개방을 위한 산소파이프가 삽입되는 개공홀이 형성된 삽입배관이 더욱 설치될 수 있다.In addition, the present invention is installed so as to be in communication with the upper cover of the oil, residual tantang, the upper end is connected to the end of the dust induction pipe and the insertion pipe is formed on the surface is formed with a hole opening for inserting the oxygen pipe for opening the outlet. Can be installed.

이에 따라 상기 분진유도관은 필요시 회동되어 대탕도의 커버 내부와 상기 유,잔선탕도의 커버 내부를 연통시켜 산소파이프에 의한 배출구 개방시 발생되는 분진을 포집 처리할 수 있게 되는 것이다.Accordingly, the dust induction pipe is rotated if necessary, so that the inside of the cover of the large hot water and the inside of the cover of the oil and residual water can be collected to collect the dust generated when opening the outlet by the oxygen pipe.

여기서 본 발명은 상기 삽입배관을 회동시켜 삽입배관에 형성된 개공홀의 위치를 배재구 또는 대탕도로 전환하여 산소파이프를 배재구쪽 또는 대탕도쪽으로 전환시킬 수 있도록 전환수단을 더욱 포함할 수 있다.Here, the present invention may further include a switching means to rotate the insertion pipe to convert the position of the opening hole formed in the insertion pipe into an outlet or large tap to convert the oxygen pipe to the outlet or large tap.

상기 전환수단은 유,잔선탕도 커버에 대해 상기 삽입배관을 회동가능하게 설치하고, 상기 커버와 상기 삽입배관 측면 사이에 설치되는 회동실린더를 포함할 수 있다.The switching means may include a rotation cylinder which is rotatably installed to the insertion pipe with respect to the oil and residual water bath cover, and installed between the cover and the insertion pipe side.

이하, 본 발명의 바람직한 실시예를 첨부된 도면을 참조하여 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 실시예에 따른 고로의 분진 포집장치를 도시한 개략적인 사시도이고, 도 2는 본 발명의 실시예에 따른 분진 포집장치의 일부 구성 단면도이며, 도 3과 도 4는 본 발명의 실시예에 따른 분진 포집장치의 일부 구성 사시도이다.1 is a schematic perspective view showing a dust collecting device of the blast furnace according to an embodiment of the present invention, Figure 2 is a partial cross-sectional view of the dust collecting device according to an embodiment of the present invention, Figures 3 and 4 Partial configuration perspective view of the dust collecting device according to the embodiment of the.

상기한 도면에 의하면, 본 실시예의 분진 포집장치는 배재구(12)를 지난 대탕도(10)의 커버(11) 측면에 일정 크기의 홀(도시되지 않음)이 가공되고 이 홀에 설치되는 고정측 원형 베어링블럭(20)과, 이 베어링블럭(20)을 매개로 회동가능하 게 설치되고 상기 베어링블럭(20)을 통해 대탕도(10)의 커버(11) 내측과 연통되는 분진유도관(21), 설비상에 설치되고 상기 분진유도관(21) 일측에 연결되어 필요시 상기 분진유도관(21)을 상기 베어링블럭(20)을 매개로 회동시키기 위한 구동실린더(22), 상기 대탕도(10)와 배재구(12) 사이에 설치되는 유,잔선탕도(13)의 커버(14), 상기 커버(14) 상에 형성된 홀(23)에 연통되도록 설치되고 상단은 상기 분진유도관(21) 회동시 분진유도관(21)의 선단과 연결되며 표면에는 배출구 개방을 위한 산소파이프가 삽입되는 개공홀(24)이 형성된 삽입배관(25) 및 상기 삽입배관(25)을 회동시켜 필요시 상기 개공홀(24)의 위치를 대탕도(10)측 또는 배재구(12)측으로 향하도록 하는 전환수단을 포함한다.According to the above drawings, the dust collecting device of the present embodiment is fixed to a hole of a predetermined size (not shown) on the side of the cover 11 of the large waterway 10 past the discharge hole 12 is processed and installed in this hole. A dust induction pipe which is rotatably installed through the side circular bearing block 20 and the bearing block 20 and communicates with the inside of the cover 11 of the large bathway 10 through the bearing block 20. 21) is installed on the installation and connected to one side of the dust induction pipe 21, the drive cylinder 22 for rotating the dust induction pipe 21 through the bearing block 20, if necessary It is installed so as to communicate with the cover 14 of the oil, the residual suntangdo 13, the hole 23 formed on the cover 14, the upper end is the dust induction pipe is installed between the 10 and the exhaust outlet 12 (21) When the rotation is connected to the tip of the dust induction pipe 21, the opening hole 24 is inserted into the surface to insert the oxygen pipe for opening the outlet By rotating the input pipe 25 and the insert pipe 25 includes a switching means to face the position of the porous holes 24 as required toward daetang Figure 10 side or excluded port 12.

여기서 상기 분진유도관(21)은 회동시 선단이 정확하게 유,잔선탕도(13)의 커버(14)상에 설치된 삽입배관(25)의 상단과 일치할 수 있는 정도의 길이를 가지고 있으며 회동시 상기 배재구(12)와 간섭이 일어나지 않도록 배재구(12) 외측을 감싸도록 절곡되어 형성된다.Here, the dust induction pipe 21 has a length such that the tip at the time of rotation exactly matches the upper end of the insertion pipe 25 installed on the cover 14 of the oil and residual water bath 13, and when rotating It is formed to be bent to surround the outside of the outlet 12 so that interference with the outlet 12 does not occur.

그리고 상기 분진유도관(21)의 선단은 하향 절곡되어 분진유도관(21) 회동에 따라 최종적으로 상기 삽입배관(25)과 연결시 수직으로 위쪽을 향해 형성된 삽입배관(25)의 선단에 정확하게 끼워져 연결될 수 있도록 한다.And the tip of the dust induction pipe 21 is bent downward and precisely fitted to the tip of the insertion pipe 25 formed vertically upward when connected to the insertion pipe 25 in accordance with the dust induction pipe 21 is rotated To be connected.

또한, 상기 삽입배관(25)의 상단은 내부에 베어링이 설치되고 상부로 갈수록 직경이 커지도록 측면이 경사지게 형성되어 상기 분진유도관(21)의 선단이 용이하게 상기 삽입배관(25) 내부로 진입할 수 있도록 한다.In addition, the upper end of the insertion pipe 25 has a bearing installed therein, the side is formed to be inclined so as to increase in diameter toward the top, so that the tip of the dust induction pipe 21 easily enters the insertion pipe 25. Do it.

이에 따라 구동실린더(22) 신축작동에 따라 분진유도관(21)이 회동되어 그 선단을 상기 유,잔선탕도(13)의 커버(14)에 설치된 삽입배관(25)과 연결시키게 되면 대탕도(10)의 커버(11)와 상기 유,잔선탕도(13)의 커버(14)가 분진유도관(21)으로 연결되어 유선배출구 또는 잔선배출구 개방시 발생되는 분진을 분진유도관(21)을 통해 포집 처리할 수 있게 된다.Accordingly, the dust induction pipe 21 is rotated according to the expansion and contraction of the driving cylinder 22, and the front end thereof is connected to the insertion pipe 25 installed in the cover 14 of the oil and residual water bath 13. The cover 11 of (10) and the cover 14 of the oil and remnant runway 13 are connected to the dust induction pipe 21, so that the dust generated when the wired outlet or the remnant discharge outlet is opened is a dust induction pipe 21. It can be collected through.

한편, 본 실시예에 따르면 상기 삽입배관(25)에 형성된 개공홀(24)을 통해 산소파이프를 진입시켜 대탕도(10) 또는 배재구(12)의 하부를 개공하여 유선 또는 잔선을 유,잔선탕도(13)로 유도하게 되는 데, 상기 전환수단을 통해 상기 개공홀(24)의 위치를 대탕도(10) 또는 배재구(12)쪽으로 향하도록 상기 삽입배관(25)을 회동시킬 수 있게 된다.On the other hand, according to the present embodiment by entering the oxygen pipe through the opening hole 24 formed in the insertion pipe 25 to open the lower waterway 10 or the lower end of the outlet 12 to the wire or residual wire It is guided to the runway 13, so that the insertion pipe 25 can be rotated to direct the position of the opening hole 24 toward the large runway 10 or the outlet 12 through the switching means. do.

이를 위한 상기 전환수단은 상기 유,잔선탕도(13)의 커버(14) 상에 형성된 홀(23) 외주면을 따라 형성되는 링형태의 안내레일(26)과, 상기 삽입배관(25) 하단에 설치되어 상기 안내레일(26)에 놓여지는 구동롤(27), 상기 유,잔선탕도(13)의 커버(14) 상에 설치되고 상기 삽입배관(25) 측면에 연결되어 삽입배관(25)을 안내레일(26)을 따라 회동시키기 위한 회동실린더(28)를 포함한다.The switching means for this is a guide rail 26 in the form of a ring formed along the outer circumferential surface of the hole 23 formed on the cover 14 of the oil, residual tangtang 13, and the lower end of the insertion pipe 25 It is installed on the drive roll 27 installed on the guide rail 26, the cover 14 of the oil and residual water supply 13, and connected to the insertion pipe 25 side insertion pipe 25 Rotating cylinder 28 for rotating along the guide rail 26.

이에 따라 회동실린더(28)가 신축작동되면 삽입배관(25)이 안내레일(26)을 따라 회동되어 삽입배관(25) 측면에 형성된 개공홀(24)의 위치를 대탕도(10)쪽 또는 배재구(12)쪽으로 전환시키게 되는 것이다.Accordingly, when the rotation cylinder 28 is stretched and operated, the insertion pipe 25 is rotated along the guide rail 26 so that the position of the opening hole 24 formed on the side of the insertion pipe 25 is increased toward or away from the counter 10. Will be switched to the sphere (12).

여기서 상기 삽입배관(25)은 분진유도관(21)에 대해 원활하게 회동될 수 있도록 상기 분진유도관(21)과 접하는 삽입배관(25)의 상단 내주면에는 베어링이 더욱 설치됨이 바람직하다. Here, the insertion pipe 25 is preferably a bearing is further installed on the upper inner peripheral surface of the insertion pipe 25 in contact with the dust induction pipe 21 so as to be smoothly rotated with respect to the dust induction pipe 21.                     

이하, 본 발명의 작용에 대해 설명하면 다음과 같다.Hereinafter, the operation of the present invention will be described.

고로의 대탕도(10)에 고인 용융물 배출시 본 장치가 가동되어 고로의 대탕도(10) 또는 배재구(12)의 용융물 배출을 위해 유선배출구 또는 잔선배출구 개방시 발생되는 분진을 분진유도관(21)을 통해 대탕도(10)를 덮는 커버(11) 내부로 흡입 배출시킬 수 있게 된다. When discharging the melt accumulated in the blast furnace 10, the apparatus is operated so that dust generated at the opening of the wired outlet or the remnant outlet for discharging the melt of the blast furnace 10 or the exhaust outlet 12 is separated from the dust induction pipe ( It is possible to suck out and discharge into the cover 11 covering the large bath 10 through 21).

구동실린더(22)가 작동되면 구동실린더(22)에 연결되어 있는 분진유도관(21)이 대탕도(10)의 커버(11) 측면에 설치된 베어링블럭(20)을 매개로 회동되어 선단이 상기 유,잔선탕도(13) 상부로 이동하게 된다.When the driving cylinder 22 is operated, the dust induction pipe 21 connected to the driving cylinder 22 is rotated through the bearing block 20 installed on the side of the cover 11 of the large water source 10 so that the tip is moved. Yu, Janseontang is also moved to the upper portion (13).

이와같이 회동되는 분진유도관(21)은 최종적으로 그 선단이 유,잔선탕도(13)의 커버(14) 상부에 설치된 삽입배관(25) 상단에 끼워지면서 상호 연결되어 유,잔선탕도(13) 내부와 상기 대탕도(10)의 커버911) 내부를 상호 연통시키게 된다.The dust induction pipe 21 rotated as described above is connected to each other while the front end of the dust induction pipe 21 is inserted into the upper end of the insertion pipe 25 installed on the cover 14 of the oil and residual water supply line 13. ) And the inside of the cover 911 of the large bath 10 is in communication with each other.

이 상태에서 작업자는 상기 삽입배관(25) 측면에 형성된 개공홀(24)을 통해 산소파이프를 삽입시켜 유선 배출구 또는 잔선배출구를 용해한다.In this state, the operator inserts an oxygen pipe through the opening hole 24 formed in the insertion pipe 25 to dissolve the wired outlet or the residual discharge outlet.

이와같은 용해작업시 발생되는 분진은 분진유도관(21)을 통해 흡입되어 대탕도(10)의 분진을 집진하는 집진흡입기로 유도됨으로써 분진이 외부로 배출되는 것을 방지할 수 있게 되는 것이다.The dust generated during the dissolving operation is sucked through the dust induction pipe 21 to be guided to the dust collector to collect the dust of the large tap water 10, thereby preventing the dust from being discharged to the outside.

여기서 작업자는 유선 배출구 또는 잔선 배출구의 선택에 따라 상기 삽입배관(25)에 형성된 개공홀(24)의 위치를 전환할 수 있게 된다.Here, the operator can switch the position of the opening hole 24 formed in the insertion pipe 25 according to the selection of the streamline outlet or the residual line outlet.

예컨대, 잔선배출구를 개공하고자 하는 경우에는 상기 회동실린더(28)의 작동에 따라 삽입배관(25)에 형성된 개공홀(24)의 위치를 상기 배재구(12)쪽으로 이 동시킬 수 있게 되는 데, 상기 회동실린더(28)가 작동되면 회동실린더(28)에 연결된 삽입배관(25)이 유,잔선탕도(13)의 커버(14) 상에 형성된 안내레일(26)을 따라 상기 삽입배관(25)의 하부에 설치된 구동롤(27)이 구르면서 상기 삽입배관(25)이 커버(14)에 대해 용이하게 회동되고, 이에 따라 삽입배관(25)에 형성된 개공홀(24)이 원하는 위치로 이동되는 것이다.For example, when it is desired to open a residual discharge outlet, the position of the opening hole 24 formed in the insertion pipe 25 can be moved toward the discharge hole 12 according to the operation of the rotation cylinder 28. When the rotation cylinder 28 is operated, the insertion pipe 25 connected to the rotation cylinder 28 is inserted along the guide rails 26 formed on the cover 14 of the oil and residual water bath 13. The insertion pipe 25 is easily rotated with respect to the cover 14 as the driving roll 27 installed at the lower part of the roll, and thus the opening hole 24 formed in the insertion pipe 25 is moved to a desired position. Will be.

이때, 상기 삽입배관(25) 상단과 상기 분진유도관(21) 선단은 베어링을 매개로 설치되어 분진유도관(21)의 간섭없이 상기 삽입배관(25)은 회동이 가능하게 된다.At this time, the upper end of the insertion pipe 25 and the tip of the dust induction pipe 21 is installed via a bearing so that the insertion pipe 25 can be rotated without interference of the dust induction pipe 21.

이와같이 배출구 개방시 발생되는 분진은 분진유도관(21)을 통해 배출처리됨으로써 외부로의 유출이 방지되며 유선 또는 잔선의 배출이 완료되고 일정시간이 경과되면 분진유도관(21)의 고열이 흡입되면서 강제 공랭식 냉각으로 용융물 냉각시간이 단축되어 작업 부호를 경감할 수 있게 된다.In this way, the dust generated at the opening of the discharge port is discharged through the dust induction pipe 21 to prevent leakage to the outside, and when the discharge of the wired or residual wire is completed and a predetermined time elapses, the high temperature of the dust induction pipe 21 is sucked in. Forced air cooling reduces the melt cooling time and reduces the work code.

그리고 작업자는 구동실린더(22)를 작동하여 분진유도관(21)을 회동시킴으로써 삽입배관(25)과 분진유도관(21)을 분리시키고 유,잔선탕도(13)의 커버(14)를 탕도로부터 취외하여 냉각된 용융물 덩어리를 용이하게 제거할 수 있게 된다.Then, the operator operates the driving cylinder 22 to rotate the dust induction pipe 21 to separate the insertion pipe 25 and the dust induction pipe 21, and to clean the cover 14 of the oil and residual water flow path 13. It is possible to easily remove the melt mass cooled by taking out from the drawing.

위에서 설명한 바와 같이 본 발명에 의한 고로의 분진 포집장치에 의하면, 고열, 분진, 가스등이 다량 발생하는 작업장소에서 안전사고를 미연에 방지할 수 있게 된다.As described above, according to the dust collecting apparatus of the blast furnace according to the present invention, it is possible to prevent a safety accident in a work place where a large amount of high heat, dust, gas and the like occurs.

또한, 배출구 개공시 발생되는 분진을 포집처리하여 외부로 비산되는 것을 방지함으로써 대기 오염을 줄이고 작업장 환경을 개선할 수 있게 된다.In addition, it is possible to reduce the air pollution and improve the workplace environment by collecting the dust generated when opening the discharge port to prevent the scattering to the outside.

또한, 용융물의 냉각효율을 높여 작업부하를 줄일 수 있게 된다.In addition, it is possible to reduce the workload by increasing the cooling efficiency of the melt.

Claims (5)

고로의 대탕도 커버에 회동가능하게 연결되어 대탕도의 커버를 통해 분진이 유통되는 분진유도관과,A dust induction pipe connected to the blast furnace so that it can be rotated, and the dust is circulated through the cover of the great bath; 상기 분진유도관에 연결설치되어 분진유도관 선단을 유,잔선탕도로 회동시키기 위한 구동실린더, A driving cylinder which is connected to the dust induction pipe and rotates the tip of the dust induction pipe into an oil and residual water bath; 상기 유,잔선탕도 상부의 커버에 연통가능하게 설치되고 상단은 상기 분진유도관 선단과 연결되는 삽입배관The oil and residual suntang is also installed in communication with the upper cover and the upper end is inserted pipe connected to the dust induction pipe tip 을 포함하는 고로의 분진 포집장치.Dust collector of the blast furnace comprising a. 제 1 항에 있어서, 상기 삽입배관 측면에 산소파이프가 삽입되는 개공홀이 형성된 것을 특징으로 하는 고로의 분진 포집장치.According to claim 1, Dust collecting device of the blast furnace, characterized in that the opening hole is formed in the side of the insertion pipe oxygen pipe is inserted. 제 1 항에 있어서, 상기 삽입배관 외측 선단 내측면은 상부로 갈수록 직경이 커지도록 측면이 경사지게 형성된 것을 특징으로 하는 고로의 분진 포집장치.The dust collecting apparatus according to claim 1, wherein the side surface of the insertion pipe outer end inner side is inclined so as to increase in diameter toward the top. 제 1 항에 있어서, 상기 유,잔선탕도 커버에 대해 상기 삽입배관이 회동가능하게 설치되고, 상기 커버와 상기 삽입배관 측면 사이에 회동실린더가 설치되어 상기 삽입배관 측면에 형성된 개공홀의 위치를 전환할 수 있도록 된 것을 특징으로 하는 고로의 분진 포집장치.According to claim 1, wherein the insertion pipe is rotatably installed with respect to the oil and residual water bath cover, and a rotation cylinder is installed between the cover and the insertion pipe side to switch the position of the opening hole formed in the insertion pipe side Dust collecting device of the blast furnace, characterized in that it is possible. 제 4 항에 있어서, 상기 유,잔선탕도의 커버 상에 형성된 홀 외주면을 따라 형성되는 링형태의 안내레일과, 상기 삽입배관 하단에 설치되어 상기 안내레일에 놓여지는 구동롤을 더욱 포함하는 것을 특징으로 하는 고로의 분진 포집장치.According to claim 4, It further comprises a ring-shaped guide rail is formed along the outer peripheral surface of the hole formed on the cover of the oil, residual tantang, and a drive roll installed on the guide rail at the lower end of the insertion pipe A dust collecting device of a blast furnace.
KR1020040112376A 2004-12-24 2004-12-24 Device for correcting dust in furnace KR101065842B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040112376A KR101065842B1 (en) 2004-12-24 2004-12-24 Device for correcting dust in furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040112376A KR101065842B1 (en) 2004-12-24 2004-12-24 Device for correcting dust in furnace

Publications (2)

Publication Number Publication Date
KR20060073239A KR20060073239A (en) 2006-06-28
KR101065842B1 true KR101065842B1 (en) 2011-09-19

Family

ID=37166350

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040112376A KR101065842B1 (en) 2004-12-24 2004-12-24 Device for correcting dust in furnace

Country Status (1)

Country Link
KR (1) KR101065842B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61175289U (en) 1985-04-19 1986-10-31
KR920000589Y1 (en) * 1989-11-14 1992-01-15 포항종합제철 주식회사 Dust collection apparatus
JPH06330123A (en) * 1993-05-25 1994-11-29 Nippon Steel Corp Device and method for removing demolished waste of tapping runner in blast furnace
KR950007181Y1 (en) * 1993-12-09 1995-09-02 포항종합제철 주식회사 Transfer dust collector of blast f'ce

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61175289U (en) 1985-04-19 1986-10-31
KR920000589Y1 (en) * 1989-11-14 1992-01-15 포항종합제철 주식회사 Dust collection apparatus
JPH06330123A (en) * 1993-05-25 1994-11-29 Nippon Steel Corp Device and method for removing demolished waste of tapping runner in blast furnace
KR950007181Y1 (en) * 1993-12-09 1995-09-02 포항종합제철 주식회사 Transfer dust collector of blast f'ce

Also Published As

Publication number Publication date
KR20060073239A (en) 2006-06-28

Similar Documents

Publication Publication Date Title
CN110306003A (en) Cast house totally enclosed type dust excluding hood before a kind of State of Blast Furnace
CN107828429B (en) Environment-friendly vehicle for wet quenching and wet quenching method
CN113755665A (en) Slag removal method for converter smoke hood
KR101242173B1 (en) Molten slag cooling treatment apparatus
KR101065842B1 (en) Device for correcting dust in furnace
CN216073885U (en) Masonry fixing device for taphole
CN102912075A (en) Method for improving coal gas recovery of semi-steel steel-making dry dedusting system
CN216989097U (en) Hot stuffy dust removal exhaust apparatus of steel slag
AU698803B2 (en) Device for the transport of molten metal in the casting bay of a blast furnace and a method to operate this device
CN211637676U (en) Ladle hot repair dust arrester installation
CN106702089A (en) Dust exhausting technology and device for wire feeding station of ladle furnace (LF)
KR950007181Y1 (en) Transfer dust collector of blast f'ce
CN213739543U (en) Closed dust excluding hood in iron notch area of blast furnace front cast house
JP2007205606A (en) Dust generation suppressing device
JP2007177269A (en) Method for preventing gas from leaking from chute for charging auxiliary material in molten metal smelting furnace, and apparatus for preventing gas leakage
KR100889502B1 (en) Method and Device for treatmenting dust in refining furnace
RU2775977C1 (en) Covering extraction complex of the main duct of the blast furnace
RU2738324C1 (en) Cap used at discharge of molten silicon metal from furnace, and method of producing silicon using such cap
CN220352164U (en) Molten iron desulfurization system
CN213335469U (en) Forehearth of cupola
KR100644909B1 (en) Adhesion metal remove apparatus of blast funrnace tapping hole
CN219059016U (en) Environment-friendly metallurgical furnace tap hole dust fall dust collection device
CN209752385U (en) Dust removal and purification device for smelting furnace
CN215050439U (en) Front mouth gag for blast furnace
CN207831942U (en) It is a kind of industry aluminium smelting waste be quickly cooled down transmitting device

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140902

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20150709

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160810

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170725

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180709

Year of fee payment: 8