KR101030128B1 - Truss structures having open box section in upper chords and construction method of truss bridges - Google Patents

Truss structures having open box section in upper chords and construction method of truss bridges Download PDF

Info

Publication number
KR101030128B1
KR101030128B1 KR1020100093079A KR20100093079A KR101030128B1 KR 101030128 B1 KR101030128 B1 KR 101030128B1 KR 1020100093079 A KR1020100093079 A KR 1020100093079A KR 20100093079 A KR20100093079 A KR 20100093079A KR 101030128 B1 KR101030128 B1 KR 101030128B1
Authority
KR
South Korea
Prior art keywords
section
truss structure
steel
chord
cross
Prior art date
Application number
KR1020100093079A
Other languages
Korean (ko)
Inventor
최하정
Original Assignee
최하정
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최하정 filed Critical 최하정
Priority to KR1020100093079A priority Critical patent/KR101030128B1/en
Application granted granted Critical
Publication of KR101030128B1 publication Critical patent/KR101030128B1/en
Priority to CN201180046724.4A priority patent/CN103210148B/en
Priority to SG2013022629A priority patent/SG189118A1/en
Priority to PCT/KR2011/007030 priority patent/WO2012044013A2/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D6/00Truss-type bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • E04C3/294Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete of concrete combined with a girder-like structure extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0486Truss like structures composed of separate truss elements
    • E04C2003/0491Truss like structures composed of separate truss elements the truss elements being located in one single surface or in several parallel surfaces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0486Truss like structures composed of separate truss elements
    • E04C2003/0495Truss like structures composed of separate truss elements the truss elements being located in several non-parallel surfaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bridges Or Land Bridges (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

PURPOSE: A truss structure, having an upper chord of an open cross section, and a construction method thereof are provided to improve the construction of truss bridge and to reduce steel materials. CONSTITUTION: A truss structure comprises an U-shaped upper chord with open cross section(140), a plurality of lower chords(110), a diagonal member(120), and a vertical member. One end of the diagonal member is formed in curved shape to be fixed. The other end of the diagonal member is cut in a straight line to be positioned close to the upper chord. One end of the vertical member is formed on the curved surface to be fixed to the lower chord.

Description

개단면 상현재를 갖는 트러스구조물과 이의 제작방법 및 개단면 상현재를 갖는 트러스구조물을 이용한 트러스교와 이의 시공방법{Truss structures having open box section in upper chords and construction method of truss bridges}Truss structure having open cross section chorus and its construction method and truss bridge using truss structure having open cross section chord and construction method

본 발명은, 트러스교에 관한 것으로, 보다 상세하게는 트러스교를 지지하는 트러스구조물의 개단면 상현재를 상부가 개방되는 'U'자형으로 구성하여 콘크리트가 충진되도록 하고, 개단면 상현재 내부에 설치된 강재가 긴장되는 트러스구조물을 이용한 트러스교를 시공함으로써, 강재의 절감 및 트러스교의 시공성을 개선할 수 있도록 하는 개단면 상현재를 갖는 트러스구조물과 이의 제작방법 및 개단면 상현재를 갖는 트러스구조물을 이용한 트러스교와 이의 시공방법에 관한 것이다.
The present invention relates to a truss bridge, and more particularly, the upper cross section of the truss structure supporting the truss bridge is configured in a 'U' shape in which the upper part is opened so that the concrete is filled, By constructing truss bridge using truss structure where the installed steel is tense, truss structure with open cross section present and truss structure with open cross section present to reduce steel and improve truss bridge construction It relates to the truss bridge used and its construction method.

일반적으로 트러스교는 50 ~ 200M 까지 중.장지간에 폭넓게 적용시킬 수 있는 교량형식으로 모든 부재가 주로 축방향력에 저항하는 구조 특성상 단면효율이 높은 구조형식이다.In general, truss bridge is a bridge type that can be widely applied between 50 ~ 200M between long and medium. It is a structural type with high cross-sectional efficiency due to the structural characteristics that all members mainly resist axial force.

그러나 강판을 이용하여 사각단면을 구성하는 종래의 트러스교는 강판의 제단, 단면내부 보강재의 설치, 각 변의 용접, 부재의 연결, 절점부 거셋 플레이트의 제작 그리고 사재 단부의 복잡한 가공 등으로 인해 구조물의 제작공정이 매우 복잡해 제작이 어렵고 공기가 늘어나며, 제작단가가 상승하여 경제성이 떨어지므로 구조적으로 우수한 트러스 교량의 장점을 살리지 못하고 있는 실정이다.
However, the conventional truss bridges that make up the rectangular cross section using steel sheet have been used for the construction of the structure due to the cutting of the steel sheet, the installation of internal cross-section reinforcement, the welding of each side, the connection of members, the fabrication of the node gusset plate, and the complicated processing of the sand end. As the manufacturing process is very complicated, the production is difficult, the air is increased, and the manufacturing cost is increased and the economical efficiency is low, so the advantages of structurally excellent truss bridges are not utilized.

이에 상술한 바와 같은 종래의 제반 결함을 감안하여 이루어진 것으로, 본 발명의 목적은, 단부가 직선으로 절단된 사재 및 수직재를 상부가 개방된 개단면 상현재에 용접하는 과정이 용이하게 트러스구조물의 제작 효율성을 향상시키면서 강관으로 구성된 폐단면 상현재에서 불가능했던 단면치수의 변경이 가능하므로 보다 경제적인 교량 설계가 가능해 짐을 물론, 각 지점 구간의 개단면 상현재에서 단면의 높이 또는 폭을 키움으로써 개단면 상현재 부재치수를 키우는 재료의 낭비없이 개단면 상현재 내부에 콘크리트를 충진하여 단면강도를 증진시킬 수 있도록 하는 개단면 상현재를 갖는 트러스구조물과 이의 제작방법 및 개단면 상현재를 갖는 트러스구조물을 이용한 트러스교와 이의 시공방법을 제공함에 있다.In view of the above-mentioned conventional defects, the object of the present invention is to easily manufacture a truss structure by welding a yarn and a vertical material whose ends are cut in a straight line on the open side of the open section. It is possible to change the cross sectional dimension which was impossible in the closed section made of steel pipes while improving the efficiency, which enables more economical bridge design, as well as increasing the height or width of the section in the open section of each point section. The truss structure with open cross section chord and its manufacturing method and the truss structure with open cross section chord can be filled to improve the cross-sectional strength by filling concrete inside the open cross section chord without wasting the material to increase the phase current member dimension. It is to provide a truss bridge used and its construction method.

또한, 본 발명의 다른 목적은, 양측 단부지점 사이의 내부지점에 안착되는 트러스구조물의 개단면 상현재 및 양측 단부지점과 각 내부지점 사이의 지간중앙부 트러스구조물 하현재와 이에 연결고정된 조인트 유닛에 강재를 결합하여 긴장시키므로 인장단면력에 대한 내하력을 향상시킬 수 있으며, 내부지점에 안착되는 트러스구조물의 하현재와 이에 연결고정된 조인트 유닛에 콘크리트를 충진하여 압축단면력에 대한 내하력을 증진시킬 수 있는 개단면 상현재를 갖는 트러스구조물과 이의 제작방법 및 개단면 상현재를 갖는 트러스구조물을 이용한 트러스교와 이의 시공방법을 제공함에 있다.Another object of the present invention is to provide an open cross section of a truss structure seated at an internal point between two end points, and an intersecting center truss structure lower chord between both end points and each inner point and a joint unit fixed thereto. By combining and tensioning steels, it is possible to improve the load-bearing capacity for tensile cross-sectional force, and to increase the load-bearing capacity for compressive cross-sectional force by filling concrete in the lower chord of the truss structure seated at the internal point and the joint unit fixed to it. The present invention provides a truss structure having a cross-sectional phase current, a method of manufacturing the same, and a truss bridge using the truss structure having a cross-sectional phase current and a construction method thereof.

또한, 본 발명의 또 다른 목적은, 내부지점에 안착되는 트러스구조물의 하현재와 이에 연결고정된 조인트 유닛에 콘크리트를 충진시켜 압축단면력에 대한 내력을 증진시킬 수 있도록 하는 개단면 상현재를 갖는 트러스구조물과 이의 제작방법 및 개단면 상현재를 갖는 트러스구조물을 이용한 트러스교와 이의 시공방법을 제공함에 있다.
In addition, another object of the present invention, the truss having a cross section top chord to increase the resistance to compressive sectional force by filling the concrete in the lower chord and the joint unit fixed to the truss structure seated at the inner point The present invention provides a truss bridge using a structure, a method of manufacturing the same, and a truss structure having an open cross section and a construction method thereof.

본 발명 개단면 상현재를 갖는 트러스구조물은, The truss structure having the present invention cross section phase current,

중공 원형단면의 강관으로 형성된 다수의 하현재와;A plurality of lower chords formed of steel pipes of hollow circular section;

상기 하현재에 연결고정되도록 일측단부가 곡면으로 형성되며 타측단부는 개단면 상현재에 밀착되어 고정되도록 직선으로 절단되는 중공 원형단면의 사재와;One side end portion is formed in a curved surface so as to be fixed to the lower chord, the other end portion of the hollow circular cross section cut in a straight line to be fixed in close contact with the upper chord of the open end;

상기 하현재에 연결고정되도록 일측단부가 곡면으로 형성되며, 타측단부는 개단면 상현재에 밀착되어 고정되도록 직선으로 절단되는 중공 원형단면의 수직재와;A vertical member having a hollow circular cross section, the one end of which is formed in a curved surface so as to be fixed to the lower chord, and the other end of which is cut in a straight line to be tightly fixed to the upper chord of the open end;

상기 사재 및 수직재가 직선으로 절단된 타측단부에 연결고정되면서 콘크리트가 충진되어 강재 단면과 합성되도록 상부가 개방되는 'U'자형의 개단면 상현재를 포함하여 구성되는 것을 특징으로 하는 것이다.
The sand material and the vertical material is characterized in that it comprises a 'U' shaped open end phase current that the upper portion is open so as to be fixed to the other end is cut in a straight line is filled with concrete to be combined with the steel cross section.

또한, 본 발명 개단면 상현재를 갖는 트러스구조물의 제작방법은,Moreover, the manufacturing method of the truss structure which has an open cross section of this invention,

양측의 단부지점과 내부지점 사이 및 각 내부지점 사이 지간중앙부에 위치하는 하현재와 이에 연결고정된 조인트 유닛에 압축 단면력이 형성되도록 긴장부의 강재를 결합하여 긴장시키는 단계와;Engaging and tensioning the steels of the tension portion such that a compressive cross-sectional force is formed in the lower chord and the joint unit fixed to the lower chord between the end points and the internal points on both sides and between each internal point;

내부지점에 안착되는 하현재와 이에 연결고정된 조인트 유닛에 충진부의 지지판을 설치하는 단계와;Installing a support plate for the filling portion in the joint and the joint unit fixed to the lower chord seated at the inner point;

상부가 개방되는 'U'자형 개단면 상현재 내부에 콘크리트와의 전단연결을 위한 스터드볼트 및 스터럽을 설치하는 단계와;Installing a stud bolt and a stub for shear connection with concrete in the 'U' shaped open end phase current that is open at the top;

내부지점 상부에 위치하는 개단면 상현재 내부에 정착판과 보강리브 및 강재삽입을 위한 쉬스관을 설치하는 단계와;Installing a sheathing pipe for inserting the fixing plate, the reinforcing ribs and the steel in the upper end of the open section located above the inner point;

상기 강재 양측으로 블럭아웃구간이 형성되도록 개단면 상현재 내부에 콘크리트를 타설하여 양생하는 단계와;Pouring concrete to cure the inside of the present section so that block out sections are formed at both sides of the steel;

상기 콘크리트가 양생되면, 상기 쉬스관 내부에 강재를 결합한 후, 블럭아웃구간을 통해 강재를 1차 긴장시키는 단계와;When the concrete is cured, combining the steel in the sheath pipe and then primarily tensioning the steel through a block out section;

상기 긴장부와 충진부를 포함하는 다수의 하현재를 절점지지부에 안착시켜 연결고정하는 단계와;Mounting and fixing a plurality of lower chords including the tension part and the filling part to a node support;

상기 충진부에 콘크리트를 충진하여 양생하는 단계와;Curing the concrete by filling the filling part;

상기 하현재 상면에 타측단부가 직선으로 절단된 사재의 일측단부를 연결고정하는 단계와;Connecting and fixing one end of the yarn having the other end cut in a straight line on the lower chord;

상기 하현재의 상면에 타측단부가 직선으로 절단된 수직재의 일측단부를 연결고정하는 단계와;Connecting one end of the vertical material of which the other end is cut in a straight line to the upper surface of the lower chord;

상기 사재 및 수직재의 타측단부에 개단면 상현재를 안착고정하는 단계를 포함하여 이루어지는 것을 특징으로 하는 것이다.
It characterized in that it comprises a step of fixing the present section on the other end of the yarn and vertical material.

또한, 본 발명 개단면 상현재를 갖는 트러스구조물을 이용한 트러스교는,In addition, the truss bridge using the truss structure having the present cross-section open current,

'U'자형 개단면 상현재가 설치된 트러스구조물을 지지하도록 대향되게 설치되는 단부지점 및 단부지점 사이의 내부지점과;An internal point between the end point and the end point that are oppositely installed to support the truss structure in which the 'U' shaped open end phase chord is installed;

상기 단부지점과 내부지점에 안착된 'U'자형 개단면 상현재가 설치된 트러스구조물과;A truss structure in which a U-shaped open end phase chord mounted on the end point and the inner point is installed;

상기 내부지점 상부의 트러스구조물 개단면 상현재 상부에 철근배근 및 강재가 결합될 쉬스관을 설치하고, 상기 쉬스관과 철근 및 개단면 상현재에 고정된 스터럽이 매몰되도록 콘크리트를 타설 및 양생한 후, 상기 쉬스관에 강재를 결합하여 긴장시키는 제1바닥판과;After installing the sheath pipe to which the reinforcing bar and the steel are combined in the upper section of the truss structure open section of the upper part of the inner point, and after pouring and curing the concrete so that the stub fixed to the sheath pipe and the rebar and open section is buried; And a first bottom plate for tensioning the steel by coupling the steel to the sheath pipe;

상기 단부지점과 내부지점 및 각 내부지점 사이의 트러스구조물 상면에 제1바닥판 양측으로 블럭아웃구간이 형성되도록 철근을 배근하고, 배근된 철근 및 개단면 상현재에 고정된 스터럽이 매몰되도록 콘크리트를 타설 및 양생하는 제2바닥판과;Reinforce the reinforcement to form block out sections on both sides of the first bottom plate on the upper surface of the truss structure between the end point and the inner point and each inner point, and reinforce the concrete so that the stub fixed on the reinforcement of the reinforced bar and the open section is buried. A second bottom plate to be poured and cured;

상기 블럭아웃구간에 타설 및 양생되는 콘크리트를 포함하여 구성되는 것을 특징으로 하는 것이다.
It is characterized in that it comprises a concrete that is poured and cured in the block-out section.

또한, 본 발명 개단면 상현재를 갖는 트러스구조물을 이용한 트러스교 시공방법은,In addition, the truss bridge construction method using a truss structure having an open cross section of the present invention,

양측의 단부지점과 상기 단부지점 사이의 내부지점에 'U'자형 개단면 상현재로 구성된 트러스구조물을 안착시키는 단계와;Mounting a truss structure consisting of a U-shaped open end phase present at an internal point between the end points on both sides and the end point;

상기 트러스구조물의 쉬스관에 결합된 강재를 블럭아웃구간을 통해 2차로 긴장시키는 단계와;Secondly tensioning the steel material coupled to the sheath pipe of the truss structure through a block-out section;

상기 강재가 긴장된 개단면 상현재 상면에 제1바닥판을 형성하는 거푸집을 설치하는 단계와;Installing a formwork to form a first bottom plate on an upper surface of the present section where the steel is tense;

상기 거푸집 내부에 철근배근 및 강재가 결합될 쉬스관을 설치하는 단계와;Installing a sheath pipe to which reinforcement and steel are combined in the formwork;

상기 철근과 쉬스관 및 개단면 상현재에 고정된 스터럽이 매몰되도록 거푸집에 콘크리트를 타설하여 양생시킨 후, 거푸집을 해체하는 제1바닥판 형성단계와;A first bottom plate forming step of pouring concrete into the form to bury the stub fixed to the reinforcing bars and the sheath pipe and the open end surface, and then dismantling the form;

상기 제1바닥판의 쉬스관에 강재를 결합하는 단계와;Coupling steel to the sheath tube of the first bottom plate;

상기 제1바닥판의 쉬스관에 결합된 강재를 블럭아웃구간을 통해 긴장장치에서 긴장시키는 단계와;Tensioning the steel material coupled to the sheath pipe of the first bottom plate in the tension device through a block out section;

상기 단부지점과 내부지점 및 각 내부지점 사이의 트러스구조물 상면에 제1바닥판 양측으로 블럭아웃구간이 형성되도록 제2바닥판을 형성하는 거푸집을 설치하는 단계와;Providing a formwork for forming a second bottom plate on the upper surface of the truss structure between the end point, the inner point and each inner point so that block-out sections are formed on both sides of the first bottom plate;

상기 거푸집 내부에 철근을 배근하고, 상기 철근 및 개단면 상현재에 고정된 스터럽이 매몰되도록 콘크리트를 타설 및 양생시킨 후, 거푸집을 해체하여 형성되는 제2바닥판 형성단계와;Reinforcing the reinforcing bars in the formwork, placing and curing the concrete so that the stub fixed to the reinforcement bar and the cross-section current is buried, and forming a second bottom plate formed by dismantling the formwork;

상기 블럭아웃구간에서 긴장장치를 이탈시킨 후, 상기 블럭아웃구간에 콘크리트를 타설 및 양생하는 단계를 포함하여 이루어지는 것을 특징으로 하는 것이다.
After releasing the tension device in the block out section, it characterized in that it comprises a step of casting and curing concrete in the block out section.

본 발명에 의하면, 상부가 개방된 개단면의 개단면 상현재에 밀착되는 수직재와 사재의 타측단부를 직선으로 절단함으로 수직재와 사재의 단부 곡면 가공 감소로 인한 제작과정의 단순화 및 제작비를 절감함과 아울러 사재 단부의 제단 및 용접이 용이하므로 트러스구조물의 제작 효율성을 향상시키고, 강관의 개단면 상현재에 적용이 불가능한 단면치수의 변경이 가능하므로 보다 경제적인 교량 설계가 가능해 짐을 물론, 각 지점 구간의 개단면 상현재에서 단면의 높이 또는 폭을 조정함으로써 개단면 상현재의 재료가 증가되는 낭비없이 개단면 상현재 내부에 콘크리트를 충진하여 단면강성과 단면강도 증진 및 시공과정을 단순화시켜 시공의 효율성 향상시킴과 아울러 개단면 상현재의 강재를 절감하여 경제성을 향상시킬 수 있는 이점을 가질 수 있는 것이다.According to the present invention, by cutting the other end of the vertical member and the yarn in close contact with the upper edge of the open end of the open end of the upper section in a straight line to simplify the manufacturing process and reduce the manufacturing cost by reducing the end surface processing of the vertical member and the yarn; In addition, it is easy to cut and weld the end of the sand material to improve the production efficiency of the truss structure, and to change the cross sectional dimension which is not applicable to the present section of the steel pipe, so that it is possible to design the bridge more economically. Improving the efficiency of construction by adjusting the height or width of the cross section at the open cross section, by filling concrete inside the open cross section without increasing waste material. In addition, it is possible to reduce the current steel in the open section and improve the economics. It is.

또한, 본 발명에 의하면, 트러스구조물에서 큰 인장력이 발생하는 양측 단부지점과 내부지점 사이 및 각 내부지점 사이의 지간중앙부 하현재 또는 하현재와 연결고정된 조인트 유닛 내부에 강재를 결합하여 긴장시킴으로써, 부재 두께의 증가없이 단면응력을 허용치 이내로 제한하고, 트러스구조물에서 큰 압축력이 발생하는 내부지점 상부의 하현재 또는 하현재와 연결고정된 조인트 유닛에 콘크리트를 충진하여 압축단면력을 강재와 콘크리트가 분담하게 함으로써 단면응력을 허용치 이내로 제한하면서도 경제적인 시공이 가능하도록 하는 이점을 가질 수 있는 것이다.In addition, according to the present invention, by tensioning by joining the steel in the joint unit fixed to the intermediary mid-center lower chord or lower chord between the two end points and the inner point where the large tensile force occurs in the truss structure, and between each inner point, Limit the cross-sectional stress within the allowable value without increasing the member thickness, and fill the joint unit secured with the lower chord or lower chord at the upper point of the internal point where large compressive force is generated in the truss structure to share the compressive cross-sectional force between steel and concrete. By doing so, it is possible to have an advantage of enabling economical construction while limiting the cross-sectional stress within an allowable value.

또한, 본 발명에 의하면, 강재가 긴장된 트러스구조물 상부에 강재의 긴장에 의한 제1바닥판을 형성함으로, 교축방향으로 발생하는 인장력에 의해 바닥판의 횡방향균열을 방지하면서 트러스구조물과 제1바닥판이 완전한 합성을 유지하므로 바닥판의 내구성을 증진시키므로 수명을 연장함과 아울러 강재 및 트러스구조물에 충진된 콘크리트가 외부로 노출되지 않음으로 미관이 미려한 트러스교의 시공이 가능해지는 이점을 가질 수 있는 것이다.
In addition, according to the present invention, by forming the first bottom plate by the tension of the steel on the top of the truss structure of the steel tensioned, the truss structure and the first bottom while preventing transverse cracking of the bottom plate by the tension force generated in the axial direction Since the plate maintains the perfect composite, it enhances the durability of the bottom plate, thereby extending the service life, and the construction of the truss bridge with beautiful aesthetics is possible because the concrete filled with the steel and the truss structure is not exposed to the outside.

도 1은 본 발명의 분리사시도
도 2는 도 1의 측면구성도
도 3은 도 1의 정단면도
도 4는 본 발명의 측단면도
도 5 내지 도 8은 본 발명 트러스구조물을 이용한 트러스교의 시공과정도
1 is an exploded perspective view
2 is a side view of FIG.
3 is a front cross-sectional view of FIG.
4 is a side cross-sectional view of the present invention.
5 to 8 is a construction process diagram of the truss bridge using the truss structure of the present invention

이하, 첨부된 도면에 의거하여 본 발명의 일 실시예를 상세히 설명한다. 도 1은 본 발명의 분리사시도이고, 도 2는 도 1의 측면구성도이며, 도 3은 도 1의 정단면도이고, 도 4는 본 발명의 측단면도이다.Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings. 1 is an exploded perspective view of the present invention, Figure 2 is a side configuration of Figure 1, Figure 3 is a front sectional view of Figure 1, Figure 4 is a side sectional view of the present invention.

본 발명 개단면 상현재를 갖는 트러스구조물은, 중공 원형단면의 강관으로 형성된 다수의 하현재(110)가 구성되고, 상기 하현재(110)에 연결고정되도록 일측단부가 곡면으로 형성되며, 타측단부는 개단면 상현재(140)에 밀착되어 고정되도록 직선으로 절단되는 중공 원형단면의 사재(120)가 구성되고, 상기 하현재(110)에 연결고정되도록 일측단부가 곡면으로 형성되며, 타측단부는 개단면 상현재(140)에 밀착되어 고정되도록 직선으로 절단되는 중공 원형단면의 수직재(130)가 구성되고, 상기 사재(120) 및 수직재(130)가 직선으로 절단된 타측단부에 연결고정되면서 콘크리트가 충진되어 강개 단면과 합성되도록 상부가 개방되는 'U'자형의 개단면 상현재(140)를 포함하여 구성되는 것으로, 이를 좀더 구체적으로 설명하면 다음과 같다.The truss structure having the present invention cross section top choir, a plurality of bottom chord 110 formed of a steel pipe of the hollow circular cross section, one side end is formed in a curved surface to be fixed to the bottom chord 110, the other end Is formed of a yarn 120 of the hollow circular cross-section cut in a straight line to be fixed in close contact with the upper chord 140, the one end is formed in a curved surface to be fixed to the lower chord 110, the other end The vertical member 130 of the hollow circular cross-section is cut in a straight line to be fixed in close contact with the top edge 140 of the open end, and the sand material 120 and the vertical member 130 is connected to the other end cut in a straight line to the concrete It is configured to include a top section 140 of the 'U' shaped open side that is open so that the top is opened to be combined with the elongated cross section, which will be described in more detail as follows.

삭제delete

상기 하현재(110)의 연결을 위하여 하현재(110) 사이에 조인트 유닛(110')을 연결고정하는 것이 바람직하다.In order to connect the lower chord 110, the joint unit 110 ′ is preferably fixed between the lower chord 110.

또한, 상기 단부지점(210)(210')과 내부지점(220) 사이, 상기 각 내부지점(220) 사이의 지간중앙부 트러스구조물(100) 하현재(110) 및 상기 하현재(110)에 연결고정된 조인트 유닛(110')에 강재(152)를 결합하고 긴장시켜 인장단면력에 대응되도록 하는 긴장부(150)와, 상기 내부지점(220)에 안착되는 트러스구조물(100)의 하현재(110) 및 상기 하현재(110)에 연결고정된 조인트 유닛(110')에 콘크리트를 충진시켜 압축단면력에 대응되도록 하는 충진부(160)를 더 포함하여 구성된다.In addition, between the end points 210, 210 'and the inner point 220, connected to the middle chorus truss structure 100 lower chord 110 and the lower chord 110 between the respective internal points 220. The lower chord 110 of the truss structure 100 and the tension unit 150 coupled to the fixed joint unit 110 ′ and tensioned to correspond to the tensile cross-sectional force, and the truss structure 100 seated at the internal point 220. ) And a filling part 160 configured to fill the concrete in the joint unit 110 ′ fixed to the lower chord 110 so as to correspond to the compressive cross-sectional force.

상기 긴장부(150)는, 상기 내부지점(220) 상부의 트러스구조물(100) 하현재(110) 및 상기 하현재(110)에 연결고정된 조인트 유닛(110') 중 어느 하나의 내부에 설치되는 정착판(151)이 구비되고, 상기 정착판(151)의 정착공(151a)에 결합되어 긴장되는 강재(152)를 포함하여 구비된다.The tension unit 150 is installed inside any one of the truss structure 100 lower chord 110 and the joint unit 110 'fixed to the lower chord 110 above the internal point 220. The fixing plate 151 is provided, and the steel plate 152 is coupled to the fixing hole 151a of the fixing plate 151 and is tensioned.

상기 충진부(160)는, 상기 내부지점(220) 상부의 트러스구조물(100) 하현재(110) 및 상기 하현재(110)에 연결고정된 조인트 유닛(110') 중 어느 하나의 내부에 설치되는 지지판(161)이 구비되고, 상기 내부지점(220) 상부의 트러스구조물(100) 하현재(110) 및 상기 하현재(110)에 연결고정된 조인트 유닛(110') 중 어느 하나에 콘크리트가 충진되도록 관통되는 충진공(162)을 포함하여 구비된다.The filling part 160 is installed inside any one of the truss structure 100 lower chord 110 and the joint unit 110 'fixed to the lower chord 110 above the internal point 220. The support plate 161 is provided, and the concrete is provided on any one of the truss structure 100 lower chord 110 and the joint unit 110 ′ fixed to the lower chord 110 on the inner point 220. It is provided including a filling hole 162 to be filled.

상기 지지판(161)이 설치되는 트러스구조물(100) 하현재(110) 및 상기 하현재(110)에 연결고정된 조인트 유닛(110') 내부에 다수의 스터드볼트(163)가 방사상으로 고정되는 것이 바람직하다.A plurality of stud bolts 163 are radially fixed inside the truss structure 100 where the support plate 161 is installed and the joint unit 110 ′ fixed to the lower chord 110 and the lower chord 110. desirable.

또한, 내부지점(220)에 안착되는 상기 트러스구조물(100)의 개단면 상현재(140) 내부에 강재(170)가 결합되는 쉬스관(170')을 더 포함하여 구성된다.In addition, the sheath pipe 170 ′ in which the steel material 170 is coupled to the upper end 140 of the open end surface of the truss structure 100 seated on the inner point 220 is further configured.

상기 개단면 상현재(140) 내부에 제1,2바닥판(230)(240)의 전단연결을 위해 개단면 상현재(140)보다 더 돌출되도록 설치되는 스터럽(180)을 더 포함하여 구성된다.
The stirrup 180 is further configured to protrude more than the open end top current 140 for shear connection of the first and second bottom plates 230 and 240 in the open end top current 140. .

또한, 개단면 상현재를 갖는 트러스구조물을 이용한 트러스교는, 'U'자형 개단면 상현재(140)가 설치된 트러스구조물(100)을 지지하도록 대향되게 설치되는 단부지점(210)(210') 및 단부지점(210)(210') 사이의 내부지점(220)이 구성되고, 상기 단부지점(210)(210')과 내부지점(220)에 안착된 'U'자형 개단면 상현재(140)가 설치된 트러스구조물(100)이 구성되며, 상기 내부지점(220) 상부의 트러스구조물(100) 개단면 상현재(140) 상부에 철근(231) 및 강재(232)가 결합될 쉬스관(233)을 설치하고, 상기 쉬스관(233)과 철근(231) 및 개단면 상현재(140)에 고정된 스터럽(180)이 매몰되도록 콘크리트를 타설 및 양생한 후, 상기 쉬스관(233)에 강재(232)를 결합하여 긴장시키는 제1바닥판(230)이 구성되고, 상기 단부지점(210)(210')과 내부지점(220) 사이 및 각 내부지점(220) 사이의 지간중앙부 트러스구조물(100) 상면에 제1바닥판(230) 양측으로 블럭아웃구간(S')이 형성되도록 철근(241)을 배근하고, 배근된 철근(241) 및 개단면 상현재(140)에 고정된 스터럽(180)이 매몰되도록 콘크리트를 타설 및 양생하는 제2바닥판(240)이 구성되며, 상기 블럭아웃구간(S')에 타설 및 양생되는 콘크리트를 포함하여 구성된다.
In addition, the truss bridge using the truss structure having the open cross-section chorus, the end points 210, 210 'is provided opposite to support the truss structure 100 is installed' U 'shaped open cross-phase chord 140. And an inner point 220 between the end points 210 and 210 ', and the U-shaped open end phase current 140 seated at the end points 210 and 210' and the inner point 220. The truss structure 100 is installed, and the sheath pipe 233 to which the reinforcing bar 231 and the steel 232 are coupled to the upper end of the truss structure 100 of the truss structure 100 above the inner point 220. ), And after placing and curing the concrete so that the stub 180 fixed to the sheath pipe 233 and the reinforcing bar 231 and the open cross-section current column 140 is buried, the steel material in the sheath pipe 233 A first bottom plate 230 is configured to couple and couple the tensions 232 to each other, and the center point portion of the trunk between the end points 210 and 210 'and the inner point 220 and between each inner point 220. Reinforcing bars 241 to form a block-out section (S ') on both sides of the first bottom plate 230 on the upper surface of the structure 100, fixed to the reinforced bar 241 and the open cross section top current 140 A second bottom plate 240 is disposed to pour and cure concrete so that the stub 180 is buried, and includes concrete to be poured and cured in the block-out section S '.

다음은 상기와 같이 구성된 본 발명의 제작과정 및 시공과정을 설명한다.The following describes the manufacturing process and construction process of the present invention configured as described above.

먼저, 도 5 내지 도 8에 도시된 바와 같이, 트러스교(200)가 설치되는 길이에 맞게 양측의 단부지점(210)(210')과 상기 단부지점(210)(210') 사이에 다수의 내부지점(220)을 설치하고, 상기 단부지점(210)(210')과 내부지점(220)에 안착되는 트러스구조물(100)를 제작한다.First, as shown in FIGS. 5 to 8, a plurality of end points 210, 210 ′ and a plurality of end points 210, 210 ′ on both sides of the truss bridge 200 are installed to meet the length of the truss bridge 200. The inner point 220 is installed, and the truss structure 100 seated on the end points 210 and 210 'and the inner point 220 is manufactured.

상기 트러스구조물(100)은, 일정간격으로 구비된 각 절점지지부(미도시) 상면에 중공 원형단면의 강관으로 형성된 하현재(110)를 안착시켜 무응력 상태에서 가조립하고, 상기 하현재(110) 상면에 중공 원형단면의 사재(120) 및 수직재(130)의 일측단부 즉, 곡면으로 형성된 일측단부를 밀착시켜 가조립하며, 상기 사재(120) 및 수직재(130)의 타측단부 즉, 직선으로 절단된 타측단부에 상부로 개구된 개단면 상현재(140)를 안착시키면서 가조립하여 형성한다.The truss structure 100, the lower chord 110 is formed on the upper surface of each node supporting portion (not shown) provided at regular intervals to be assembled in a stress-free state by mounting the lower chord 110 formed of a steel pipe of a hollow circular section, the lower chord 110 One side end of the hollow member 120 and the vertical member 130 of the hollow circular cross section on the upper surface, that is, pre-assembled in close contact with the one end formed in a curved surface, the other end of the yarn 120 and the vertical member 130, that is, cut straight It is formed by temporarily assembling while seating the open end of the upper end 140 is opened to the other end.

여기서, 상기 각 절점지지부에 안착된 하현재(110)의 연결을 위하여 하현재(110) 사이에 조인트 유닛(110')을 연결하여 고정할 수도 있고, 상기 조인트 유닛(110')에 사재(120) 및 수직재(130)의 곡면으로 형성된 일측단부가 가조립될 수도 있는 것이다.Here, in order to connect the lower chord 110 seated on each of the node support parts, the joint unit 110 'may be connected between the lower chord 110 to be fixed, and the yarn 120 may be connected to the joint unit 110'. ) And one side end formed of the curved surface of the vertical member 130 may be temporarily assembled.

이때, 하현재(110) 및 이에 조인트 유닛(110')을 연결하는 트러스구조물(100) 가조립 전, 상기 트러스구조물(100) 하현재(110) 중 큰 인장단면력이 작용하는 단부지점(210)(210')과 내부지점(220) 사이 및 각 내부지점(220) 사이 즉, 지간중앙부의 하현재(110) 또는 상기 하현재(110)에 연결된 조인트 유닛(110') 내부로 긴장부(150)의 정착판(151)을 설치하는데, 상기 정착판(151)의 보강을 위해 보강리브(151b)를 하현재(110) 또는 조인트 유닛(110') 내부에 고정하여 보강할 수도 있다.At this time, before assembling the truss structure 100 connecting the lower chord 110 and the joint unit 110 'to the end point 210 of the truss structure 100, the lower chord 110, the greater tensile cross-sectional force is applied ( 210 ') and the inner point 220 and between each inner point 220, i.e., the tension section 150 into the lower chord 110 in the middle portion of the trunk or into the joint unit 110' connected to the lower chord 110. To install the fixing plate 151, the reinforcing rib 151b may be fixed in the lower chord 110 or the joint unit 110 'for reinforcement of the fixing plate 151 and reinforced.

상기 하현재(110)와 이에 연결된 조인트 유닛(110') 내부에 정착판(151)이 고정되면, 상기 정착판(151)의 정착공(151a)에 강선 또는 강봉의 강재(152)를 결합한 상태에서 긴장부(150)를 구성하는 하현재(110)와 이에 연결된 조인트 유닛(110')을 용접으로 고정한 후, 긴장장치(미도시)로 긴장시키는데, 강선 또는 강봉의 강재(152) 긴장력을 하현재(110) 또는 조인트 유닛(110') 내부에 고정된 정착판(151) 및 보강리브(151b)가 분담하여 지지하고 있으므로 강선 또는 강봉의 강재(152) 긴장력을 유지할 수 있는 것이다.When the fixing plate 151 is fixed inside the lower chord 110 and the joint unit 110 ′ connected thereto, the steel wire 152 of the steel wire or the steel rod is coupled to the fixing hole 151a of the fixing plate 151. In the lower chord 110 constituting the tension unit 150 and the joint unit 110 ′ connected thereto are fixed by welding, and then tensioned with a tension device (not shown). Since the fixing plate 151 and the reinforcing rib 151b fixed inside the current 110 or the joint unit 110 'are supported by sharing, the tension of the steel 152 of the steel wire or the steel bar can be maintained.

또한, 내부지점(220)에 안착되는 상기 트러스구조물(100)의 하현재(110) 또는 상기 하현재(110)에 연결된 조인트 유닛(110')에 사하중에 의한 압축단면력이 발생하는데, 하현재(110) 및 조인트 유닛(110')을 연결하는 트러스구조물(100) 가조립 전, 상기 내부지점(220)에 안착되는 하현재(110) 또는 상기 하현재(110)에 연결된 조인트 유닛(110') 내부로 충진부(160)의 지지판(161)을 설치하고, 상기 지지판(161)의 보강을 위해 지지리브(161a)를 지지판(161)과 하현재(110) 또는 조인트 유닛(110') 내부에 고정하여 보강할 수도 있다.In addition, the compression section force due to dead load is generated in the lower chord 110 or the joint unit 110 ′ connected to the lower chord 110 of the truss structure 100 seated at the internal point 220. Before the truss structure 100 connecting the 110 and the joint unit 110 'is assembled, the lower chord 110 seated at the inner point 220 or the joint unit 110' connected to the lower chord 110 is installed. The support plate 161 of the furnace filling part 160 and fix the support rib 161a to the support plate 161 and the lower chord 110 or the joint unit 110 'for reinforcement of the support plate 161. It can also be reinforced.

여기서, 상기 지지판(161)과 이에 연결된 조인트 유닛(110') 내부에 다수의 스터드볼트(163)를 고정시키는데 상기 스터드볼트(163)는 방사상으로 고정되는 것이 바람직하다.Here, the plurality of stud bolts 163 are fixed in the support plate 161 and the joint unit 110 ′ connected thereto, and the stud bolts 163 are preferably fixed radially.

상기의 과정으로 다수의 하현재(110) 및 이에 연결된 조인트 유닛(110')과 상기 하현재(110) 및 이에 연결된 조인트 유닛(110') 상면에 일측단부가 면접촉되면서 타측단부가 직선으로 절단된 사재(120)를 연결하고, 하현재(110) 및 이에 연결된 조인트 유닛(110') 상면에 일측단부가 면접촉되면서 타측단부가 직선으로 절단된 수직재(130)를 연결하여 가조립한 후, 상기 수직재(130)와 사재(120)의 직선으로 절단된 타측단부에 상부로 개구된 'U'자형 개단면 상현재(140)를 안착시키면서 긴장부(150)와 충진부(160)가 설치되어 가조립된 소정의 길이를 갖는 트러스구조물(100)을 용접으로 고정하여 일체로 형성되도록 한다.Through the above process, one end of the lower chord 110 and the joint unit 110 ′ connected thereto and the upper side of the lower chord 110 and the joint unit 110 ′ connected to the surface is cut in a straight line with the other end. And then preassembled by connecting the vertical member 130 having one side end contacted to the lower chord 110 and the upper surface of the lower unit 110 and the joint unit 110 ′ connected thereto. The tension part 150 and the filling part 160 are installed and preassembled while seating the 'U' shaped open end upper chord 140 opened upwardly at the other end cut in a straight line between the vertical member 130 and the yarn 120. The truss structure 100 having a predetermined length is fixed by welding to be integrally formed.

상기 트러스구조물(100) 내부의 충진부(160)에 콘크리트를 충진하여 양생시키는데, 하현재(110) 및 이에 고정된 조인트 유닛(110')에 관통된 충진공(162)으로 콘크리트를 충진하고, 상기 충진공(162)으로 충진되는 콘크리트가 토출공(162')으로 토출될 때까지 충진한다.Filling and curing the concrete in the filling unit 160 in the truss structure 100, the concrete is filled with the filling hole 162 penetrated through the lower chord 110 and the joint unit 110 'fixed thereto, The concrete is filled until the filling hole 162 is discharged to the discharge hole (162 ').

상기 충진부(160)에 콘크리트가 충진될 때, 지지판(161)의 고정력을 지지리브(161a)가 보강하여 지지하고 있으므로 트러스구조물(100)이 완성된 구조계에서 사하중력 및 외력을 받을 시 콘크리트의 압축력을 지지할 수 있는 것이며, 상기 충전부(160)에 충진되는 콘크리트는 기 설치된 스터드볼트(163)에 견고하게 고정되면서 트러스구조물(100)의 제작이 완성되는 것이다.When the filling part 160 is filled with concrete, the support rib 161a supports the fixing force of the support plate 161 so that the truss structure 100 receives the dead load and the external force in the completed structural system. It can support the compressive force, the concrete is filled in the charging unit 160 is to be firmly fixed to the stud bolt 163 pre-installed to complete the production of the truss structure (100).

상기 충진부(160)의 콘크리트는 트러스구조물(100)이 각 지점에 안착되기 전 상태에서 콘크리트가 충진되는 과정을 설명하였으나, 트러스구조물(100)의 강중이 큰 경우 또는 인양장비의 용량에 여유가 없는 경우에는 충진부(160)에 콘크리트를 충진하지 않은 상태에서 각 지점에 안착시켜 전체 트러스구조물(100)의 교량 구조계를 형성한 후, 콘크리트를 충진하여 양생시킬 수도 있는 것이다.The concrete of the filling unit 160 described the process of filling the concrete in the state before the truss structure 100 is seated at each point, but if the steel weight of the truss structure 100 is large or there is room for the capacity of the lifting equipment If not, the filling unit 160 may be seated at each point in the state without filling concrete to form a bridge structure system of the entire truss structure 100, and then may be filled and cured.

또한, 상기 각 지점(210)(210')(220)에 안착되는 트러스구조물(100)의 'U'자형 개단면 상현재(140) 내부에 스터드볼트(140')와 강선(170)이 결합될 쉬스관(170') 및 다수의 스터럽(180)을 고정시키는데, 상기 강선(170)은 설치판(170a)에 결합되어 설치되며, 상기 스터럽(180)은 상기 쉬스관(170')을 수용하면서 상현재(140)와 제1,2바닥판(230)(240)의 전단연결을 위해 상현재(140)보다 더 돌출되도록 고정시키는 것이 바람직하며, 상기 개단면 상현재(140) 내부에 콘크리트를 타설하여 양생시킨다.In addition, the stud bolt 140 'and the steel wire 170 are coupled to the inside of the U-shaped open end phase current 140 of the truss structure 100 seated at each of the points 210, 210' and 220. The sheath tube 170 ′ and the plurality of stubs 180 to be fixed are fixed. The steel wire 170 is coupled to the installation plate 170 a and the stirrup 180 accommodates the sheath tube 170 ′. While it is preferable to fix so as to protrude more than the upper current 140 for the shear connection of the upper current 140 and the first and second bottom plates 230 and 240, the concrete inside the open end upper current 140 Pour it to cure.

이때, 상기 쉬스관(170')의 단부 양측으로 블럭아웃구간(S)이 형성됨이 바람직하고, 상기 블럭아웃구간(S)을 통해 쉬스관(170')에 강선(170)을 결합한 후, 블럭아웃구간(S)에서 긴장장치(미도시)로 강선(170)을 1차 긴장시키면서 트러스구조물(100)의 제작이 완성되는 것이다.At this time, the block out section (S) is preferably formed on both sides of the end of the sheath pipe (170 '), after the steel wire 170 is coupled to the sheath pipe (170) through the block out section (S), the block Production of the truss structure 100 is completed while firstly tensioning the steel wire 170 with a tension device (not shown) in the out section (S).

여기서, 상기 설치판(170a)은 블럭아웃구간(S)에 타설되는 콘크리트에 매설될 수도 있고, 상기 개단면 상현재(140) 내부에 타설된 콘크리트가 양생되면 거푸집과 함께 해체될 수도 있는 것이다.Here, the installation plate 170a may be embedded in concrete to be placed in the block-out section (S), or may be dismantled together with the formwork when the concrete poured in the open top phase current 140 is cured.

상기 강선(170)의 1차 긴장력은, 트러스구조물(100)이 일체로 연결되기 전, 개단면 상현재(140)의 긴장에 의한 압축단면력이 상현재 단면내하력 이내가 되도록 제한하는 동시에 각 지점(210)(210')(220)에 트러스구조물(100)이 안착되어 전체 구조계가 형성되었을 때, 내부지점(220) 상부의 개단면 상현재(140) 내부에 충진된 콘크리트의 인장균열을 억제할 수 있는 수준으로 조절하는 것이 바람직하다.The primary tension of the steel wire 170, before the truss structure 100 is integrally connected, limiting the compressive cross-sectional force due to the tension of the open cross-section chord 140 to be within the phase current cross-sectional load capacity and at each point ( When the truss structure 100 is seated on the 210, 210 ', and 220, and the entire structural system is formed, it is possible to suppress the tensile cracking of the concrete filled in the upper section 140 of the open end surface of the upper portion of the internal point 220. It is desirable to adjust to a level that can be achieved.

상기 각 지점(210)(210')(220)에 안착된 트러스구조물(100)을 이용한 트러스교(200)의 시공은, 상기 트러스구조물(100)의 강선(170)이 돌출된 블럭아웃구간(S)을 통해 상기 강선(170)을 긴장장치(미도시)로 2차 긴장시킨 후, 상기 블럭아웃구간(S)에 콘크리트를 충진하여 양생시킨다.The construction of the truss bridge 200 using the truss structure 100 seated at each of the points 210, 210 ', 220 is a block out section in which the steel wire 170 of the truss structure 100 protrudes. After the second wire is tensioned by a tension device (not shown) through S), the concrete is filled and cured in the block-out section S.

상기 강선(170)의 2차 긴장력은, 상기 트러스구조물(100) 상면에 바닥판(230)(240) 콘크리트를 타설하여 양생할 때, 내부지점(220) 상부의 상현재(140) 내부에 충진된 콘크리트에 인장균열을 억제할 수 있는 수준으로 조절하는 것이 바람직하다.When the secondary tension of the steel wire 170, the bottom plate 230, 240 concrete is cured by casting the bottom plate 230, 240 on the upper surface of the truss structure 100 is filled in the upper chord 140 of the upper portion of the inner point 220. It is desirable to adjust the level of concrete to a level that can suppress tensile cracking.

상기 개단면 상현재(140)의 불럭아웃구간(S)에 충진되는 콘크리트가 양생되면, 상기 트러스구조물(100) 상면에 제1바닥판(230)의 형성하는 거푸집을 설치하고, 상기 거푸집 내부에 철근(231) 배근 및 강선 또는 강봉의 강재(232)가 결합될 쉬스관(233)을 설치한 후, 상기 철근(231)과 쉬스관(233) 및 개단면 상현재(140)에 고정된 스터럽(180)이 매설되도록 거푸집 내부에 콘트리트를 타설하여 양생시킴으로써, 제1바닥판(230)이 형성된다.When the concrete filled in the block-out section (S) of the open cross-sectional top chord 140 is cured, install the formwork to form the first bottom plate 230 on the top surface of the truss structure 100, the inside of the formwork After installing the sheath pipe 233 to be combined with the reinforcing bar 231 and the steel wire 232 of the steel wire or steel bar, the stirrup fixed to the reinforcing bar 231 and the sheath pipe 233 and the open end phase current 140. The first bottom plate 230 is formed by pouring and curing concrete in the formwork so that 180 is embedded.

상기 제1바닥판(230)이 형성되면, 제1바닥판(230)의 거푸집을 해체한 상태에서 제1바닥판(230)과 블럭아웃구간(S')이 형성되도록 충진부(160) 상부의 콘크리트제2바닥판(240)을 형성하는 거푸집을 설치하고, 상기 거푸집 내부에 철근(241)을 배근한 후, 상기 철근(241) 및 개단면 상현재(140)에 고정된 스터럽(180)이 매설되도록 거푸집 내부에 콘크리트를 타설하여 양생시킴으로써, 제2바닥판(240)이 형성된다.When the first bottom plate 230 is formed, the filling part 160 is formed so that the first bottom plate 230 and the block-out section S 'are formed in a state in which the mold of the first bottom plate 230 is dismantled. After installing the formwork to form the second concrete floor plate 240, the reinforcing bars 241 inside the formwork, the stirrup 180 fixed to the reinforcing bars 241 and the open cross-section chose 140 The second bottom plate 240 is formed by pouring concrete into the form and curing it so as to bury it.

상기 제2바닥판(240)의 형성 전.후, 상기 제1바닥판(230)에 매설된 쉬스관(232)에 강재(232)를 결합한 후, 상기 강재(232)를 블럭아웃구간(S') 내부에서 긴장장치(미도시)로 긴장시키고, 상기 불럭아웃구간(S')에서 긴장장치를 이동시킨 후, 상기 블럭아웃구간(S')에 콘크리트를 타설 및 양생한다.Before and after the formation of the second bottom plate 240, after coupling the steel 232 to the sheath tube 232 embedded in the first bottom plate 230, the steel 232 block-out section (S) ') Tension inside the tension device (not shown), move the tension device in the block out section (S'), and then cast and cure concrete in the block out section (S ').

이상과 같이 본 발명은, 비록 한정된 실시예와 도면에 의해 설명되었으나, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정되어 해석되어서는 아니되며, 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다. 따라서, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 일실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 발명의 청구범위를 벗어나지 않는 한도 내에서 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.
As described above, the present invention, although described by the limited embodiments and drawings, terms or words used in the present specification and claims are not limited to the ordinary or dictionary meanings and should not be interpreted, the technical spirit of the present invention It must be interpreted to mean meanings and concepts. Therefore, the configuration shown in the embodiments and drawings described herein are only one embodiment of the present invention, and do not represent all of the technical spirit of the present invention, various changes within the scope of the claims of the present invention It should be understood that there may be equivalents and variations.

100: 트러스구조물 110: 하현재
120: 사재 130: 수직재
140: 개단면 상현재 150: 긴장부
160: 충진부 170: 강재
180: 스터럽 200: 트러스교
210,210': 단부지점 220: 내부지점
230: 제1바닥판 240: 제2바닥판
100: truss structure 110: lower current
120: yarn 130: vertical
140: open cross section present 150: tension portion
160: filling unit 170: steel
180: Stirrup 200: Truss Bridge
210,210 ': end point 220: internal point
230: first bottom plate 240: second bottom plate

Claims (15)

중공 원형단면의 강관으로 형성된 다수의 하현재와;
상기 하현재에 연결고정되도록 일측단부가 곡면으로 형성되며 타측단부는 개단면 상현재에 밀착되어 고정되도록 직선으로 절단되는 중공 원형단면의 사재와;
상기 하현재에 연결고정되도록 일측단부가 곡면으로 형성되며, 타측단부는 개단면 상현재에 밀착되어 고정되도록 직선으로 절단되는 중공 원형단면의 수직재와;
상기 사재 및 수직재가 직선으로 절단된 타측단부에 연결고정되면서 콘크리트가 충진되어 강재 단면과 합성되도록 상부가 개방되는 'U'자형의 개단면 상현재를 포함하여 구성되는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물.
A plurality of lower chords formed of steel pipes of hollow circular section;
One side end portion is formed in a curved surface so as to be fixed to the lower chord, the other end portion of the hollow circular cross section cut in a straight line to be fixed in close contact with the upper chord of the open end;
A vertical member having a hollow circular cross section, the one end of which is formed in a curved surface so as to be fixed to the lower chord, and the other end of which is cut in a straight line to be tightly fixed to the upper chord of the open end;
Opening section phase current characterized in that it comprises a 'U' shaped open end phase present that the upper part is opened so that the sand and vertical material is connected to the other end cut in a straight line and filled with concrete to be combined with the steel section Truss structure having a.
삭제delete 청구항 1에 있어서,
상기 다수의 하현재 사이에 사재 및 수직재의 곡면으로 형성된 일측단부가 가조립되는 조인트 유닛을 연결고정하는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물.
The method according to claim 1,
Truss structure having an open cross-sectional top choir characterized in that the joint unit is fixed to one side end formed of the curved surface of the sand and vertical material between the plurality of lower chords.
청구항 1에 있어서,
단부지점과 내부지점 사이, 상기 각 내부지점 사이 지간중앙부의 트러스구조물 하현재 및 상기 하현재에 연결고정된 조인트 유닛에 강선 또는 강봉의 강재를 결합하고 긴장시켜 인장단면력에 대응되도록 하는 긴장부와;
상기 내부지점에 안착되는 트러스구조물의 하현재 및 상기 하현재에 연결고정된 조인트 유닛에 콘크리트를 충진시켜 압축단면력에 대응되도록 하는 충진부를 더 포함하여 구성되는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물.
The method according to claim 1,
A tension unit for engaging and tensioning steel wires or steel rods in the joint unit fixed to the truss structure lower chord and the lower chord between the end point and the inner point, and between each inner point and the lower chord;
A truss having an open cross-section chord, characterized in that it further comprises a filling portion for filling the concrete in the lower chord of the truss structure seated at the inner point and the joint unit fixed to the lower chord so as to correspond to the compressive cross-sectional force. structure.
청구항 4에 있어서, 긴장부는,
상기 내부지점 상부의 트러스구조물 하현재 및 상기 하현재에 연결고정된 조인트 유닛 중 어느 하나의 내부에 설치되는 정착판 및 보강리브와;
상기 정착판의 정착공에 결합되어 긴장되는 강선 또는 강봉의 강재를 포함하여 구비되는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물.
The method according to claim 4, wherein the tension portion,
A fixing plate and a reinforcing rib installed in any one of the truss structure lower chords of the inner point and the joint unit fixed to the lower chords;
Truss structure having an open cross-section chord characterized in that it is provided with a steel wire or a steel rod is tensioned to the fixing hole of the fixing plate.
청구항 4에 있어서, 충진부는,
상기 내부지점 상부의 트러스구조물 하현재 및 상기 하현재에 연결고정된 조인트 유닛 중 어느 하나의 내부에 설치되는 지지판 및 지지리브와;
상기 내부지점 상부의 트러스구조물 하현재 및 상기 하현재에 연결고정된 조인트 유닛 중 어느 하나에 콘크리트가 충진되도록 관통되는 충진공을 포함하여 구비되는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물.
The method of claim 4, wherein the filling unit,
A support plate and support ribs installed in any one of the truss structure lower chords on the inner point and a joint unit fixed to the lower chords;
The truss structure having an open cross-sectional top choir characterized in that it comprises a filling hole through which the concrete is filled in any one of the truss structure lower chord and the joint unit fixed to the lower chord above the inner point.
청구항 6에 있어서,
상기 지지판이 설치되는 트러스구조물 하현재 및 상기 하현재에 연결고정된 조인트 유닛에 다수의 스터드볼트가 방사상으로 고정되는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물.
The method of claim 6,
A truss structure having an open cross section chord, characterized in that a plurality of stud bolts are radially fixed to the truss structure lower chord where the support plate is installed and the joint unit fixed to the lower chord.
청구항 4에 있어서,
내부지점에 안착되는 상기 트러스구조물의 개단면 상현재 내부에 강재가 결합되는 쉬스관을 더 포함하여 구성되는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물.
The method according to claim 4,
Truss structure having a cross-sectional top choir characterized in that it further comprises a sheath tube coupled to the steel material inside the open cross section of the truss structure seated at the inner point.
청구항 1에 있어서,
상기 개단면 상현재 내부에 제1,2바닥판의 전단연결을 위해 개단면 상현재보다 더 돌출되도록 설치되는 스터럽을 더 포함하여 구성되는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물.
The method according to claim 1,
The truss structure having a cross-sectional top choir characterized in that it further comprises a stub installed in the open cross-phase chord to protrude more than the open cross-phase current for the shear connection of the first and second bottom plate.
양측의 단부지점과 내부지점 사이 및 각 내부지점 사이 지간중앙부에 위치하는 하현재와 이에 연결고정된 조인트 유닛에 압축 단면력이 형성되도록 긴장부의 강재를 결합하여 긴장시키는 단계와;
내부지점에 안착되는 하현재와 이에 연결고정된 조인트 유닛에 충진부의 지지판을 설치하는 단계와;
상부가 개방되는 'U'자형 개단면 상현재 내부에 콘크리트와의 전단연결을 위한 스터드볼트 및 스터럽을 설치하는 단계와;
내부지점 상부에 위치하는 개단면 상현재 내부에 강재삽입을 위한 쉬스관을 설치하는 단계와;
상기 강재 양측으로 블럭아웃구간이 형성되도록 개단면 상현재 내부에 설치판 및 콘크리트를 타설하여 양생하는 단계와;
상기 콘크리트가 양생되면, 상기 쉬스관 내부에 강재를 결합한 후, 블럭아웃구간을 통해 강재를 1차 긴장시키는 단계와;
상기 긴장부와 충진부를 포함하는 다수의 하현재를 절점지지부에 안착시켜 연결고정하는 단계와;
상기 충진부에 콘크리트를 충진하여 양생하는 단계와;
상기 하현재 상면에 타측단부가 직선으로 절단된 사재의 일측단부를 연결고정하는 단계와;
상기 하현재 상면에 타측단부가 직선으로 절단된 수직재의 일측단부를 연결고정하는 단계와;
상기 사재 및 수직재의 타측단부에 개단면 상현재를 안착고정하는 단계를 포함하여 이루어지는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물 제작방법.
Engaging and tensioning the steels of the tension portion such that a compressive cross-sectional force is formed in the lower chord and the joint unit fixed to the lower chord between the end points and the internal points on both sides and between each internal point;
Installing a support plate for the filling portion in the joint and the joint unit fixed to the lower chord seated at the inner point;
Installing a stud bolt and a stub for shear connection with concrete in the 'U' shaped open end phase current that is open at the top;
Installing a sheath pipe for inserting steel in the upper end of the open section located above the inner point;
Placing and curing the mounting plate and concrete in the upper side of the present section so that block-out sections are formed at both sides of the steel;
When the concrete is cured, combining the steel in the sheath pipe and then primarily tensioning the steel through a block out section;
Mounting and fixing a plurality of lower chords including the tension part and the filling part to a node support;
Curing the concrete by filling the filling part;
Connecting and fixing one end of the yarn having the other end cut in a straight line on the lower chord;
Connecting one end of the vertical material of which the other end is cut in a straight line to the lower chord;
Truss structure manufacturing method having a cross-sectional top choir characterized in that it comprises the step of fixing the open end cross-section chord to the other end of the yarn and vertical material.
청구항 10에 있어서,
상기 하현재 사이에 조인트 유닛을 연결고정하는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물 제작방법.
The method according to claim 10,
Truss structure manufacturing method having an open cross-section chord characterized in that the joint unit is fixed between the lower chord.
청구항 10에 있어서,
상기 콘크리트 충진 전, 하현재 내부에 다수의 스터드볼트를 고정하는 단계를 더 포함하여 이루어지는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물 제작방법.
The method according to claim 10,
Before the concrete filling, truss structure manufacturing method having a cross-sectional top choir characterized in that it further comprises the step of fixing a plurality of stud bolts in the lower chord.
청구항 10에 있어서,
상기 충진부의 콘크리트는 트러스구조물이 각 지점에 안착되기 전 충진되는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물 제작방법.
The method according to claim 10,
The concrete of the filling part is a truss structure manufacturing method having an open cross-section chord characterized in that the truss structure is filled before being seated at each point.
'U'자형 개단면 상현재가 설치된 트러스구조물을 지지하도록 대향되게 설치되는 단부지점 및 단부지점 사이의 내부지점과;
상기 단부지점과 내부지점에 안착된 'U'자형 개단면 상현재가 설치된 트러스구조물과;
상기 내부지점 상부의 트러스구조물 개단면 상현재 상부에 철근배근 및 강재가 결합될 쉬스관을 설치하고, 상기 쉬스관과 철근 및 개단면 상현재에 고정된 스터럽이 매몰되도록 콘크리트를 타설 및 양생한 후, 상기 쉬스관에 강재를 결합하여 긴장시키는 제1바닥판과;
상기 단부지점과 내부지점 사이 및 각 내부지점 사이 지간중앙부의 트러스구조물 상면에 제1바닥판 양측으로 블럭아웃구간이 형성되도록 철근을 배근하고, 배근된 철근 및 개단면 상현재에 고정된 스터럽이 매몰되도록 콘크리트를 타설 및 양생하는 제2바닥판과;
상기 블럭아웃구간에 타설 및 양생되는 콘크리트를 포함하여 구성되는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물을 이용한 트러스교.
An internal point between the end point and the end point that are oppositely installed to support the truss structure in which the 'U' shaped open end phase chord is installed;
A truss structure in which an 'U' shaped open end phase chord mounted on the end point and the inner point is installed;
After installing the sheath pipe to which the reinforcing bar and the steel are combined in the upper section of the truss structure open section of the upper part of the inner point, and after pouring and curing the concrete so that the stub fixed to the sheath pipe and the rebar and open section is buried; And a first bottom plate for tensioning the steel by coupling the steel to the sheath pipe;
Reinforcing bars are formed on the upper surface of the truss structure between the end point and the inner point and between each inner point so as to form block out sections on both sides of the first bottom plate, and the reinforcing bars and the stub fixed on the open section are buried. A second bottom plate for pouring and curing concrete if possible;
A truss bridge using a truss structure having an open cross-section current, characterized in that the concrete comprises a concrete that is poured and cured in the block-out section.
양측의 단부지점과 상기 단부지점 사이의 내부지점에 'U'자형 개단면 상현재로 구성된 트러스구조물을 안착시키는 단계와;
상기 트러스구조물의 쉬스관에 결합된 강재를 블럭아웃구간을 통해 2차로 긴장시키는 단계와;
상기 강재가 긴장된 개단면 상현재 상면에 제1바닥판을 형성하는 거푸집을 설치하는 단계와;
상기 거푸집 내부에 철근배근 및 강재가 결합될 쉬스관을 설치하는 단계와;
상기 철근과 쉬스관 및 개단면 상현재에 고정된 스터럽이 매몰되도록 거푸집에 콘크리트를 타설하여 양생시킨 후, 거푸집을 해체하는 제1바닥판 형성단계와;
상기 제1바닥판의 쉬스관에 강재를 결합하는 단계와;
상기 제1바닥판의 쉬스관에 결합된 강재를 블럭아웃구간을 통해 정착장치에서 긴장시키는 단계와;
상기 단부지점과 내부지점 및 각 내부지점 사이의 트러스구조물 상면에 제1바닥판 양측으로 블럭아웃구간이 형성되도록 제2바닥판을 형성하는 거푸집을 설치하는 단계와;
상기 거푸집 내부에 철근을 배근하고, 상기 철근 및 개단면 상현재에 고정된 스터럽이 매몰되도록 콘크리트를 타설 및 양생시킨 후, 거푸집을 해체하여 형성되는 제2바닥판 형성단계와;
상기 블럭아웃구간에서 긴장장치를 이탈시킨 후, 상기 블럭아웃구간에 콘크리트를 타설 및 양생하는 단계를 포함하여 이루어지는 것을 특징으로 하는 개단면 상현재를 갖는 트러스구조물을 이용한 트러스교 시공방법.
Mounting a truss structure consisting of a U-shaped open end phase present at an internal point between the end points on both sides and the end point;
Secondly tensioning the steel material coupled to the sheath pipe of the truss structure through a block-out section;
Installing a formwork to form a first bottom plate on an upper surface of the present section where the steel is tense;
Installing a sheath pipe to which reinforcement and steel are combined in the formwork;
A first bottom plate forming step of pouring concrete into the form to bury the stub fixed to the reinforcing bars and the sheath pipe and the open end surface, and then dismantling the form;
Coupling steel to the sheath tube of the first bottom plate;
Tensioning the steel material coupled to the sheath pipe of the first bottom plate in the fixing device through a block-out section;
Providing a formwork for forming a second bottom plate on the upper surface of the truss structure between the end point, the inner point and each inner point so that block-out sections are formed on both sides of the first bottom plate;
Reinforcing the reinforcing bars in the formwork, placing and curing the concrete so that the stub fixed to the reinforcement bar and the cross-section current is buried, and forming a second bottom plate formed by dismantling the formwork;
And trussing the truss structure with the open cross-section present, characterized in that it comprises the step of placing and curing concrete in the block out section after the tension device is removed from the block out section.
KR1020100093079A 2010-09-27 2010-09-27 Truss structures having open box section in upper chords and construction method of truss bridges KR101030128B1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
KR1020100093079A KR101030128B1 (en) 2010-09-27 2010-09-27 Truss structures having open box section in upper chords and construction method of truss bridges
CN201180046724.4A CN103210148B (en) 2010-09-27 2011-09-23 Truss structure having an open-section upper chord member and a production method for the same, and a truss bridge using the truss structure having an open-section upper chord member and a method for constructing the same
SG2013022629A SG189118A1 (en) 2010-09-27 2011-09-23 Truss structure having an open-section upper chord member and a production method for the same, and a truss bridge using the truss structure having an open-section upper chord member and a method for constructing the same
PCT/KR2011/007030 WO2012044013A2 (en) 2010-09-27 2011-09-23 Truss structure having an open-section upper chord member and a production method for the same, and a truss bridge using the truss structure having an open-section upper chord member and a method for constructing the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100093079A KR101030128B1 (en) 2010-09-27 2010-09-27 Truss structures having open box section in upper chords and construction method of truss bridges

Publications (1)

Publication Number Publication Date
KR101030128B1 true KR101030128B1 (en) 2011-04-20

Family

ID=44050338

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100093079A KR101030128B1 (en) 2010-09-27 2010-09-27 Truss structures having open box section in upper chords and construction method of truss bridges

Country Status (4)

Country Link
KR (1) KR101030128B1 (en)
CN (1) CN103210148B (en)
SG (1) SG189118A1 (en)
WO (1) WO2012044013A2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101321699B1 (en) * 2012-10-19 2013-10-28 주현규 Composite truss beam using double tube type pipe member and bridge therewith
KR101339609B1 (en) * 2013-01-21 2014-01-07 한우물중공업(주) Truss girder of steel box
KR101581380B1 (en) * 2015-03-30 2015-12-30 우경기술주식회사 Hybrid truss girder
KR101797988B1 (en) * 2017-02-22 2017-12-13 브릿지테크놀러지(주) Truss through bridge and the construction method thereof
CN109944168A (en) * 2019-03-13 2019-06-28 上海市政工程设计研究总院(集团)有限公司 A kind of Large-Span Cantilever assembly steel bridge rod piece
KR20210064479A (en) * 2019-11-25 2021-06-03 한국철도기술연구원 An super- and sub- integral monolithic elevated structure with longitudinal backbone superstructure

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669194B (en) * 2013-12-29 2016-04-06 长安大学 Based on the continuous rigid frame bridge of steel truss-concrete slab composite beam
US9422680B2 (en) 2014-04-14 2016-08-23 Guido FURLANETTO Deck

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0386114U (en) * 1989-12-20 1991-08-30
JP2003147864A (en) * 2001-11-08 2003-05-21 Hitachi Zosen Corp Joint construction and joint portion reinforcing construction for concrete filling steel pipe
KR100689091B1 (en) 2006-08-08 2007-03-02 연세대학교 산학협력단 Continuous bridge using hybrid girder
KR20100063532A (en) * 2008-12-03 2010-06-11 한국건설기술연구원 Concrete filled tube girder reinforced with steel bar and manufacturing method of the same

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3881598B2 (en) * 2002-06-21 2007-02-14 オリエンタル建設株式会社 Composite truss segment and truss bridge with suspension cable using the same and its construction method
JP4039216B2 (en) * 2002-11-07 2008-01-30 鹿島建設株式会社 Composite truss bridge and its construction method
KR20050082325A (en) * 2004-02-18 2005-08-23 주식회사 소원기건 Space frame truss
CN101074553A (en) * 2007-06-15 2007-11-21 四川省交通厅公路规划勘察设计研究院 Medium-spanning steel-pipe concrete truss bridge
KR20090068526A (en) * 2007-12-24 2009-06-29 재단법인 포항산업과학연구원 Construction method of bridge structure and steel composite girder using the same
KR20090090016A (en) * 2008-02-20 2009-08-25 전주대학교 산학협력단 Truss joint system
CN101545242A (en) * 2009-04-29 2009-09-30 中铁大桥勘测设计院有限公司 Batter brace bridge
KR100965750B1 (en) * 2009-05-29 2010-06-24 안경수 Joint unit structure of pipe truss for temporary assembly and method constructing the truss bridge with it

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0386114U (en) * 1989-12-20 1991-08-30
JP2003147864A (en) * 2001-11-08 2003-05-21 Hitachi Zosen Corp Joint construction and joint portion reinforcing construction for concrete filling steel pipe
KR100689091B1 (en) 2006-08-08 2007-03-02 연세대학교 산학협력단 Continuous bridge using hybrid girder
KR20100063532A (en) * 2008-12-03 2010-06-11 한국건설기술연구원 Concrete filled tube girder reinforced with steel bar and manufacturing method of the same

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101321699B1 (en) * 2012-10-19 2013-10-28 주현규 Composite truss beam using double tube type pipe member and bridge therewith
KR101339609B1 (en) * 2013-01-21 2014-01-07 한우물중공업(주) Truss girder of steel box
KR101581380B1 (en) * 2015-03-30 2015-12-30 우경기술주식회사 Hybrid truss girder
KR101797988B1 (en) * 2017-02-22 2017-12-13 브릿지테크놀러지(주) Truss through bridge and the construction method thereof
CN109944168A (en) * 2019-03-13 2019-06-28 上海市政工程设计研究总院(集团)有限公司 A kind of Large-Span Cantilever assembly steel bridge rod piece
KR20210064479A (en) * 2019-11-25 2021-06-03 한국철도기술연구원 An super- and sub- integral monolithic elevated structure with longitudinal backbone superstructure
KR102342316B1 (en) * 2019-11-25 2021-12-22 한국철도기술연구원 An super- and sub- integral monolithic elevated structure with longitudinal backbone superstructure

Also Published As

Publication number Publication date
SG189118A1 (en) 2013-05-31
WO2012044013A2 (en) 2012-04-05
WO2012044013A3 (en) 2012-06-21
CN103210148A (en) 2013-07-17
CN103210148B (en) 2015-04-29

Similar Documents

Publication Publication Date Title
KR101030128B1 (en) Truss structures having open box section in upper chords and construction method of truss bridges
KR101026118B1 (en) Truss structure with high bearing capacity against secondary moment at inner supports and construction method of truss bridge using it
AU2015246120B2 (en) Open web composite shear connector construction
CN109024225B (en) Ultra-high performance concrete truss arch piece unit, truss arch piece bridge and construction method
KR100947306B1 (en) Composite bridge structure with concrete shear connector and construction method of the same
KR101064731B1 (en) Steel-concrete composite girder and constructing method thereof
KR100682794B1 (en) Manufacturing method for prestressed steel composite girder
CN111424546A (en) Inverted T-shaped steel beam-concrete combined beam structure of small and medium-span bridge and construction method
KR101026117B1 (en) Fabrication of truss structures and construction method of truss bridges
KR20120109807A (en) Structural reinforcement of chord members in truss system to enhance load-carrying capacity against flexural stress resultants at supports and fabrication method of it
KR101768056B1 (en) Manufacturing method of prestressed concrete girder for bridge and constructing method of bridge using same
KR101034973B1 (en) Bridge and its construction method using tide arch hybrid girders by connecting precast blocks
KR20120134282A (en) Slab-type box girder with a vertical connecting structure made by precast concrete and method constructing the bridge thereof
KR20190120853A (en) Couple girder
CN219671054U (en) Steel-concrete combined small box girder prefabricated by integral hoisting
KR100522298B1 (en) Improved prestressed steel reinforced concrete beam and bridge construction method using the same beam
KR20140125754A (en) Bridge construction method for forming continuous point part of pier using copping for connecting girder
KR102267643B1 (en) Inverse Tee PSC Girder Prefabricated With Top Saddle PC blocks And Slab Construction Method Using Thereof
KR100878465B1 (en) Girder, bridge and construction process thereof
KR20080111973A (en) Prestressed steel composite beam and a manufacturing method thereof
KR101734304B1 (en) Manufacturing Method of Efficient Steel-Concrete Composite Girder, Construction Method of Continuous Bridges using such Composite Girder, and Continuous Bridges constructed by such Method
KR100462966B1 (en) Prestressed Concrete U-Girder of compositive girder bridge
KR101321699B1 (en) Composite truss beam using double tube type pipe member and bridge therewith
KR101834423B1 (en) Precast concrete beam with variable cross section
KR102327700B1 (en) Girder structure and construction method for continuity of supporting portion of girder using the same

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140411

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160412

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170322

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180425

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190429

Year of fee payment: 9