KR101022161B1 - 제어봉 낙하시간 측정방법 - Google Patents
제어봉 낙하시간 측정방법 Download PDFInfo
- Publication number
- KR101022161B1 KR101022161B1 KR1020100083774A KR20100083774A KR101022161B1 KR 101022161 B1 KR101022161 B1 KR 101022161B1 KR 1020100083774 A KR1020100083774 A KR 1020100083774A KR 20100083774 A KR20100083774 A KR 20100083774A KR 101022161 B1 KR101022161 B1 KR 101022161B1
- Authority
- KR
- South Korea
- Prior art keywords
- control rod
- current
- coil
- winding
- time
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C17/00—Monitoring; Testing ; Maintaining
- G21C17/10—Structural combination of fuel element, control rod, reactor core, or moderator structure with sensitive instruments, e.g. for measuring radioactivity, strain
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R15/00—Details of measuring arrangements of the types provided for in groups G01R17/00 - G01R29/00, G01R33/00 - G01R33/26 or G01R35/00
- G01R15/14—Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks
- G01R15/20—Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks using galvano-magnetic devices, e.g. Hall-effect devices, i.e. measuring a magnetic field via the interaction between a current and a magnetic field, e.g. magneto resistive or Hall effect devices
- G01R15/202—Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks using galvano-magnetic devices, e.g. Hall-effect devices, i.e. measuring a magnetic field via the interaction between a current and a magnetic field, e.g. magneto resistive or Hall effect devices using Hall-effect devices
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Plasma & Fusion (AREA)
- General Engineering & Computer Science (AREA)
- High Energy & Nuclear Physics (AREA)
- General Physics & Mathematics (AREA)
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
따라서, 본 발명에 의하면 발전소가 운용되는 동안 제어봉 코일에 흐르는 전류파형을 실시간으로 취득하여 체계적으로 관리할 수 있고, 제어봉 낙하시험시 작업자가 원자로 격납 건물 내로 들어가지 않고 배선해체도 할 필요없이 용이하게 낙하시험을 실시할 수 있다.
Description
도 2는 본 발명에 따른 제어봉제어계통 코일전류 감시장치의 구성도;
도 3은 본 발명에 따른 션트저항의 전압측정회로를 나타내는 회로도;
도 4는 본 발명에 따른 제어봉 낙하시험에서 나타나는 정지권선의 전류파형을 나타내는 그래프;
도 5는 솔레노이드 모델을 나타내는 예시도;
도 6은 솔레노이드 모델에서 솔레노이드 전류의 특성을 나타내는 그래프;
도 7은 본 발명에 따른 제어봉 낙하시험의 구성을 나타내는 개념도;
도 8은 종래기술에 따른 제어봉 낙하시험에서 이동권선에 유기되는 전류파형을 나타내는 그래프.
120 : 션트저항 200 : 제어봉코일
210 : 정지권선 220 : 이동권선
300 : 신호처리장치 310 : 신호취득제어기
320 : 코일전류감시분석기 400 : 제어봉
500 : 제동호
Claims (4)
- 삭제
- 삭제
- 원자로 내의 제어봉 낙하시간 측정방법에 있어서,
상기 제어봉을 일정 위치로 유지시키는 정지권선에 흐르는 전류를 측정하는 전류센서를 설치하는 단계;
상기 제어봉을 최상단으로 인출하는 단계;
상기 정지권선에 유지전류를 공급하여 상기 제어봉을 유지하는 단계;
상기 유지전류를 차단하여 상기 제어봉을 낙하시키는 단계;
상기 전류센서로부터 전류가 감소되는 시점부터 전류가 다시 증가하는 피크점까지의 시간을 측정하는 단계를 포함하는 것을 특징으로 하는 제어봉 낙하시간 측정방법. - 제3항에 있어서,
상기 전류센서는 비접촉식인 홀전류센서 또는 CT센서인 것을 특징으로 하는 제어봉 낙하시간 측정방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100083774A KR101022161B1 (ko) | 2010-08-30 | 2010-08-30 | 제어봉 낙하시간 측정방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100083774A KR101022161B1 (ko) | 2010-08-30 | 2010-08-30 | 제어봉 낙하시간 측정방법 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101022161B1 true KR101022161B1 (ko) | 2011-03-24 |
Family
ID=43938922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020100083774A KR101022161B1 (ko) | 2010-08-30 | 2010-08-30 | 제어봉 낙하시간 측정방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101022161B1 (ko) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102280150A (zh) * | 2011-08-18 | 2011-12-14 | 国核自仪系统工程有限公司 | 核电站棒位检测系统及其自由落棒时间测试方法 |
KR101250749B1 (ko) * | 2011-01-18 | 2013-04-04 | 한국수력원자력 주식회사 | 제어봉제어계통 코일전류 감시장치를 이용한 제어봉 낙하시간 측정방법 |
KR101406849B1 (ko) | 2012-12-27 | 2014-06-13 | 한국전력기술 주식회사 | 제어봉 삽입시간 측정을 위한 시뮬레이션 구축 방법 |
CN112599263A (zh) * | 2020-12-05 | 2021-04-02 | 核电运行研究(上海)有限公司 | 一种不需切断激励电源的控制棒落棒时间测量方法 |
CN112599255A (zh) * | 2020-12-05 | 2021-04-02 | 核电运行研究(上海)有限公司 | 控制棒落棒参考信号产生装置及其方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200440958Y1 (ko) * | 2007-06-21 | 2008-07-11 | 한국수력원자력 주식회사 | 제어봉 구동장치의 코일전류 감시장치 |
-
2010
- 2010-08-30 KR KR1020100083774A patent/KR101022161B1/ko active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200440958Y1 (ko) * | 2007-06-21 | 2008-07-11 | 한국수력원자력 주식회사 | 제어봉 구동장치의 코일전류 감시장치 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101250749B1 (ko) * | 2011-01-18 | 2013-04-04 | 한국수력원자력 주식회사 | 제어봉제어계통 코일전류 감시장치를 이용한 제어봉 낙하시간 측정방법 |
CN102280150A (zh) * | 2011-08-18 | 2011-12-14 | 国核自仪系统工程有限公司 | 核电站棒位检测系统及其自由落棒时间测试方法 |
KR101406849B1 (ko) | 2012-12-27 | 2014-06-13 | 한국전력기술 주식회사 | 제어봉 삽입시간 측정을 위한 시뮬레이션 구축 방법 |
US10192006B2 (en) | 2012-12-27 | 2019-01-29 | Kepco Engineering & Construction Company, Inc. | Simulation construction method for the measurement of control rod insertion time |
CN112599263A (zh) * | 2020-12-05 | 2021-04-02 | 核电运行研究(上海)有限公司 | 一种不需切断激励电源的控制棒落棒时间测量方法 |
CN112599255A (zh) * | 2020-12-05 | 2021-04-02 | 核电运行研究(上海)有限公司 | 控制棒落棒参考信号产生装置及其方法 |
CN112599255B (zh) * | 2020-12-05 | 2023-02-10 | 核电运行研究(上海)有限公司 | 控制棒落棒参考信号产生装置及其方法 |
CN112599263B (zh) * | 2020-12-05 | 2023-02-14 | 核电运行研究(上海)有限公司 | 一种不需切断激励电源的控制棒落棒时间测量方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101022161B1 (ko) | 제어봉 낙하시간 측정방법 | |
US5999583A (en) | Method and apparatus for control rod drive mechanism analysis using coil current signals | |
CN108414861B (zh) | 电热故障自检方法、装置、系统及计算机可读存储介质 | |
US20090252272A1 (en) | Advanced Digital Control Rod Position Indication System with Rod Drop Monitoring for Nuclear Power Plants | |
CN104332195A (zh) | 一种用于测量反应堆控制棒落棒时间的方法 | |
KR101250749B1 (ko) | 제어봉제어계통 코일전류 감시장치를 이용한 제어봉 낙하시간 측정방법 | |
CN103368261A (zh) | 变电站用在线监测和巡检系统 | |
CN111609950A (zh) | 电能表的接线端测温功能校验装置及校验方法 | |
Yan et al. | Research on measurement technology of transformer no-load loss based on Internet of Things | |
CN204462243U (zh) | 主变铁芯接地电流在线监测装置 | |
KR101209181B1 (ko) | 제어봉제어계통 감시장치 및 그 방법 | |
CN107843763B (zh) | 一种多功能验电器 | |
CN110208631A (zh) | 一种变压器过载测试系统 | |
US20140368219A1 (en) | In-Situ Determination of Rod Control System Coil and Cable Impedances for Nuclear Power Plants | |
CN111562450A (zh) | 一种用于监测电抗器寿命的系统及方法 | |
KR100529520B1 (ko) | 원자로의 제어봉 구동장치의 시험장치 | |
KR20210112703A (ko) | 제어봉 구동장치(crdm)를 모니터링 하는 방법 및 이를 위한 시스템 | |
KR100273170B1 (ko) | 원자로제어봉구동장치내의 전자기권선을 이용한 제어봉낙하 시간측정방법 | |
CN210514502U (zh) | 电抗器测试系统 | |
KR101194717B1 (ko) | 초전도 토카막 장치의 켄치 검출을 위한 코일전류 측정장치 | |
CN110987226A (zh) | 基于分布式光纤传感的干式电抗器过热故障预警系统 | |
CN204461614U (zh) | 一种高压断路器热故障的光纤红外有线远程报警装置 | |
CN105303065B (zh) | 一种电流互感器的运行工况检验方法 | |
CN217060284U (zh) | 一种控制棒自带电缆检查维护连接装置 | |
KR102525040B1 (ko) | 이중 유지 해제 시 제어봉 낙하 방지 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20140220 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20150120 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20160307 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20170307 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20180305 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20190306 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20200305 Year of fee payment: 10 |