KR101019979B1 - Method and Apparatus of existing pier placing concrete using the sliding form - Google Patents

Method and Apparatus of existing pier placing concrete using the sliding form Download PDF

Info

Publication number
KR101019979B1
KR101019979B1 KR1020080023400A KR20080023400A KR101019979B1 KR 101019979 B1 KR101019979 B1 KR 101019979B1 KR 1020080023400 A KR1020080023400 A KR 1020080023400A KR 20080023400 A KR20080023400 A KR 20080023400A KR 101019979 B1 KR101019979 B1 KR 101019979B1
Authority
KR
South Korea
Prior art keywords
jack
formwork
support
leader
concrete
Prior art date
Application number
KR1020080023400A
Other languages
Korean (ko)
Other versions
KR20090098179A (en
Inventor
김종민
김승규
Original Assignee
구일건설(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 구일건설(주) filed Critical 구일건설(주)
Priority to KR1020080023400A priority Critical patent/KR101019979B1/en
Publication of KR20090098179A publication Critical patent/KR20090098179A/en
Application granted granted Critical
Publication of KR101019979B1 publication Critical patent/KR101019979B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete

Abstract

본 발명은 기존교각 확대시 이동식 거푸집을 이용한 콘크리트 타설장치 및 방법에 관한 것으로, 슬래브의 상부에 설치되는 유압잭을 이용하여 이동식 거푸집을 일정하게 이동시키면서 기존 교각을 확대해줌으로써 고소작업으로 인한 안전성 확보가 용이하고 공사기간을 단축시키며 품질관리가 용이한, 기존교각 확대시 이동식 거푸집을 이용한 콘크리트 타설장치 및 방법에 관한 것이다.The present invention relates to a concrete placing device and method using a movable formwork when expanding the existing piers, by securing the safety of the aerial work by expanding the existing piers by constantly moving the movable formwork using a hydraulic jack installed on the top of the slab. The present invention relates to a concrete placing device and method using a movable formwork when expanding an existing pier, which is easy, shorten the construction period, and easy quality control.

상기 목적 달성을 위한 본 발명은교각 상부의 슬래브에 설치되는 잭; 상기 잭의 상부에 놓여져 잭의 작동에 의해 상승 또는 하강되며 상기 슬래브의 폭방향으로 형성되는 잭인상 지지부; 상기 교각을 보수 보강할 경우 콘크리트의 타설이 가능하도록 상기 교각의 둘레를 따라 설치되는 거푸집; 상기 잭인상 지지부와 거푸집을 상하로 연결하여 잭의 작동에 의해 잭인상 지지부의 승,하강시 상기 거푸집이 연동되도록 하되, 상기 잭인상 지지부와 거푸집에 분리 및 결합이 가능하도록 설치되는 다수의 리더; 상기 다수의 리더들을 측면방향으로 연결하여 리더들 간의 간격을 유지하고 리더가 휘어지는 것을 방지하는 간격유지대; 상기 리더의 분리 및 결합이 가능하도록 슬래브 양측의 연석에 설치되어 상기 리더에 연결된 거푸집을 지지해주는 지지브래킷부; 를 포함하여 구성되는 것을 그 기술적 요지로 한다.The present invention for achieving the above object is a jack installed in the upper slab; A jack lift support portion placed on the jack and being raised or lowered by the operation of the jack and formed in the width direction of the slab; Formwork is installed along the circumference of the pier to enable the concrete pouring when the reinforcement of the pier; A plurality of readers connected to the jack lift support and the die up and down so that the die is interlocked when the jack lift support is moved up and down by the operation of the jack, and the jack lift support and the die are separated and coupled to each other; A spacing holder for connecting the plurality of leaders in a lateral direction to maintain a spacing between the leaders and to prevent the leader from bending; A support bracket part installed on the curb on both sides of the slab to support the leader, and supporting the formwork connected to the leader; What is configured to include, as the technical gist.

교각, 잭인상 지지부, 잭, 이동식 거푸집, 리더, 고정핀 Pier, Jack Impression Support, Jack, Movable Formwork, Reader, Fixing Pin

Description

기존교각 확대시 이동식 거푸집을 이용한 콘크리트 타설장치 및 방법{Method and Apparatus of existing pier placing concrete using the sliding form}Method and Apparatus of existing pier placing concrete using the sliding form}

본 발명은 기존교각 확대시 이동식 거푸집을 이용한 콘크리트 타설장치 및 방법에 관한 것으로, 교각에 설치되는 거푸집을 슬래브에서 유압잭을 이용하여 이동시키면서 콘크리트를 타설함으로써 공사기간을 단축시켜 교통통제기간을 줄이고 고소작업으로 인한 안전성을 확보할 수 있는 기존교각 확대시 이동식 거푸집을 이용한 콘크리트 타설장치 및 방법에 관한 것이다.The present invention relates to a concrete placing apparatus and method using a movable formwork when expanding the existing pier, by placing the concrete while moving the formwork installed in the pier using a hydraulic jack from the slab to shorten the construction period by reducing the traffic control period and height work The present invention relates to a concrete placing device and method using a movable formwork when expanding the existing piers that can ensure the safety.

일반적으로 철근 콘크리트 교량의 교각은 장기간 사용하도록 설계 시공된 구조물로써, 시간이 경과함에 따라 다양한 원인에 의해 피로현상이 발생하게 되는 바, 그 원인의 대표성을 살펴보면 설계당시의 설계하중(DB-18)과 그 교통량, 근래의 설계하중(DB-24)과 그 교통량을 비교해 보면 상당한 차이를 보임에 따라 설계당시의 설계하중으로 가설된 교량이 심한 피로 현상으로 붕괴위험에 도달하게 된다.Generally, the bridge piers of reinforced concrete bridges are constructed for long-term use, and fatigue occurs due to various causes over time. The representative loads of the design loads (DB-18) Comparison between the traffic volume, the recent design load (DB-24) and the traffic volume shows a considerable difference, and the bridge, which is assumed as the design load at the time of design, is at risk of collapse due to severe fatigue.

종래에는 상기 기존 교각을 보수 또는 일부 훼손된 부분만을 보수보강 하기 때문에 기존 콘크리트와의 부착력 부족으로 보수 보강된 콘크리트와 기존 콘크리트가 접하는 부분이 탈락하거나 침하현상이 발생되기 쉬우며 교각이 보수 보강 후 수중에 노출되기 때문에 계속하여 손상이 발생될 뿐만 아니라, 단일 강재 원형 거푸집을 순차적으로 쌓아 설치하여 콘크리트를 타설하는 국부보강에 한정되어 있어 임시방편적인 보강은 가능하나 원천적인 보강이 이루질 수 없어 구조체 자체의 내구성 및 내하력 증대시키지 못하는 문제점이 있다.Conventionally, since the existing bridges are repaired or partially damaged and repaired, it is easy for the reinforced and concrete to be in contact with the existing concrete to fall out or settle due to lack of adhesion to the existing concrete, and the bridges are repaired and reinforced in water. As it is exposed, it not only causes damage continuously, but also it is limited to local reinforcement where concrete is laid by installing and stacking single steel circular formwork in order, so temporary reinforcement is possible, but original reinforcement cannot be achieved. There is a problem that does not increase the durability and load capacity.

또한 국부보강시에도 강재 원형 거푸집을 순차적으로 쌓아올려 콘크리트를 타설하는 관계로 고소작업을 통한 안전사고가 빈번하게 발생되고 품질관리, 시공의 정확성을 확보하기에는 매우 어려운 문제점이 있다.In addition, even in the case of local reinforcement, since steel circular formwork is piled up sequentially and concrete is poured, safety accidents are frequently caused by working at high places, and it is very difficult to ensure the accuracy of quality control and construction.

상기와 같은 문제점을 해결하기 위한 본 발명의 목적은 슬래브의 상부에 설치되는 잭을 이용하여 교각의 둘레에 설치되는 이동식 거푸집을 일정하게 상부방향으로 이동시키면서 콘크리트를 타설하여 기존 교각을 확대하고 보강, 보수해줌으로써 구조체 자체의 내구성 및 내하력 증대시켜 주고, 고소작업으로 인한 안전성 확보가 용이하며 공사기간을 단축시켜 교통 통제 기간을 줄여주고 품질관리가 용이한 기존교각 확대시 이동식 거푸집을 이용한 콘크리트 타설장치 및 방법을 제공함에 있다.An object of the present invention for solving the above problems is to expand and reinforce the existing pier by pouring concrete while moving the movable formwork installed around the pier to the upper direction constantly by using a jack installed on the top of the slab, It improves the durability and load-bearing capacity of the structure itself by repairing, it is easy to secure safety by height work, shorten the construction period, shorten the traffic control period, and concrete placing device using movable formwork when expanding existing pier which is easy for quality control. In providing a method.

상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명은, 교각 상부의 슬래브에 설치되는 잭; 상기 잭의 상부에 놓여져 잭의 작동에 의해 인상되며 상기 슬래브의 폭보다 넓은 폭으로 형성되는 잭인상 지지부; 상기 교각을 보수 보강할 경우 콘크리트의 타설이 가능하도록 상기 교각의 둘레를 따라 설치되는 거푸집; 상기 잭인상 지지부와 거푸집을 상하로 연결해주어 잭의 작동에 의해 잭인상 지지부가 상승될 경우 상기 거푸집이 연동되어 상승되도록 해주는 다수의 리더; 상기 리더를 고정할 수 있도록 상기 슬래브의 양측에 형성되는 연석에 설치되어 상기 리더에 연결된 거푸집을 지지해주는 지지브래킷부; 를 포함하여 구성되는 것을 특징으로 한다.The present invention to achieve the object as described above and to perform the problem for eliminating the conventional defects, the jack is installed on the slab on the top of the pier; A jack impression support portion which is placed on top of the jack and is lifted by the operation of the jack and formed to have a width wider than the width of the slab; Formwork is installed along the circumference of the pier to enable the concrete pouring when the reinforcement of the pier; A plurality of readers for connecting the jack lift support and the die up and down so that the die is interlocked when the jack lift support is raised by the operation of the jack; A support bracket portion installed on the curb formed on both sides of the slab to support the leader to support the formwork connected to the leader; And a control unit.

상기 리더는, 상기 잭인상 지지부, 지지브래킷부, 거푸집에 고정핀을 통해 결합되어 상기 유압잭에 의한 거푸집의 상승 및 잭인상 지지부의 하강시 분리가 가능하도록 구성되는 것을 특징으로 한다.The leader is coupled to the jack lift support, the support bracket portion, the formwork through a fixing pin is characterized in that configured to be separated when the rise of the formwork by the hydraulic jack and the lower jack lift support.

또한 상기 거푸집은, 교각을 확대 및 보강하고자 하는 형상에 따라 교각의 둘레에 설치되어 콘크리트의 타설이 가능하도록 하는 거푸집부재; 상기 거푸집부재에 연결되어 거푸집부재를 지지해주되, 상기 리더에 의해 잭인상 지지부와 연결되도록 상기 슬래브의 폭보다 넓은 길이로 형성되는 트러스부재; 를 포함하여 구성되는 것을 특징으로 한다.In addition, the formwork is formed in the circumference of the pier according to the shape to expand and reinforce the pier formwork for enabling the casting of concrete; A truss member connected to the formwork member to support the formwork member, the truss member being formed to a length wider than the width of the slab to be connected to the jack-in support by the leader; And a control unit.

또한 상기 거푸집은, 교각에 설치가 용이하도록 거푸집부재의 중심을 분리하여 서로 마주하는 2개의 조각으로 구성하며, 분리된 거푸집부재의 결합면에는 지수판을 더 설치하여 콘크리트가 누출되는 것을 방지해주는 것을 특징으로 한다.In addition, the formwork is composed of two pieces facing each other by separating the center of the formwork member to facilitate installation on the piers, characterized in that to prevent the leakage of concrete by further installing a water stop plate on the bonding surface of the separated formwork member It is done.

또한 상기 거푸집의 외측에 설치되어 상기 분리된 거푸집부재 및 트러스부재를 일체화시켜주는 거푸집연결바; 를 더 포함하여 구성되는 것을 특징으로 한다.Also provided on the outside of the formwork connecting bar for integrating the separated formwork member and the truss member; Characterized in that further comprises.

또한 상기 다수의 리더들을 측면방향으로 연결하여 리더들 간의 간격을 유지하고 리더가 휘어지는 것을 방지하는 간격유지대; 를 더 포함하도록 구성되는 것을 특징으로 한다.In addition, the spacing holder for connecting the plurality of leaders in the lateral direction to maintain the spacing between the leaders and to prevent the leader from bending; Characterized in that configured to further include.

또한 상기 잭에 의해 잭인상 지지부에 가해지는 응력을 분산시켜줄 수 있도록 상기 잭인상 지지부의 하부에 응력분산판을 더 설치하여 구성되는 것을 특징으로 한다.In addition, it is characterized in that it is configured to further install a stress distribution plate in the lower portion of the jack impression support to distribute the stress applied to the jack impression support by the jack.

한편 본 발명은 교각의 둘레에 확대 및 보강하고자 하는 폭 만큼 이격되도록 하여 거푸집을 설치하고, 상기 교각 상부의 슬래브에 잭을 통해 높이조절이 가능하도록 잭인상 지지부를 설치하며, 상기 교량 슬래브의 양측에 형성된 연석에 지지브래킷을 설치하는 장비설치단계; 상기 거푸집에 콘크리트를 타설하여 양생하고 상기 잭인상 지지부와 상기 거푸집을 리더를 이용하여 연결한 후 잭을 작동하여 상기 거푸집을 다음 콘크리트 타설 높이까지 상승시키는 콘크리트 타설 및 거푸집상승 단계; 상기 거푸집이 상승되면 상기 지지브래킷에 상기 리더를 체결하여 상승된 거푸집을 지지해주는 리더 고정단계; 상기 지지브래킷에 리더가 체결되면 상기 잭인상 지지부에 연결된 리더를 분리한 후 상기 잭을 하강시켜 잭인상 지지부가 하강되도록 하는 잭인상 지지부 하강단계; 상기 콘크리트 타설 및 거푸집상승 단계, 리더 설치단계, 잭인상 지지부 하강단계를 반복 시행하여 교각을 보강 및 보수하는 반복시행단계; 를 포함하여 구성되는 것을 특징으로 한다.Meanwhile, the present invention installs the formwork so as to be spaced apart by the width to expand and reinforce the circumference of the piers, and install a jack lift support to the height adjustment through the jack on the upper slab of the piers, on both sides of the bridge slab Equipment installation step of installing the support bracket on the curb formed; Placing concrete to the mold to cure and connect the jack lifting support and the form using a leader and then operating the jack to raise the form to the next concrete placing height concrete placing and formwork raising step; A leader fixing step of supporting the risen formwork by fastening the leader to the support bracket when the formwork rises; A jack lift support lowering step of separating a leader connected to the jack lift support when the leader is fastened to the support bracket, and then lowering the jack to lower the jack lift support; A repetitive trial step of reinforcing and repairing the piers by repeatedly performing the concrete placing and the formwork raising step, the leader installation step, and the jack lifting support lowering step; And a control unit.

본 발명은 기존교량의 교각을 확대할 때 기존 슬래브상에 설치되는 잭을 작동함으로써 교각에 설치되는 거푸집을 이동시키면서 콘크리트를 타설 할 수 있어 기존 교각 확대시 고소작업으로 인한 안정성이 확보되고 시공이 매우 간편하며, 고정핀을 이용하여 리더를 간편하게 고정하고 분리할 수 있어 거푸집의 상승작업을 간편하고 빠르게 수행할 수 있어 전체적인 공사기간을 단축시켜 주고 기존 교각 확대시 시공 정밀도를 높일수 있는 매우 유용한 발명이다.The present invention can be cast concrete while moving the formwork installed on the pier by operating the jack installed on the existing slab when expanding the pier of the existing bridge is secured stability due to the height work when expanding the existing pier and construction is very It is a very useful invention that can shorten the overall construction period and increase the construction precision when expanding the existing piers because it can be easily and quickly carried out the formwork as it can be easily fixed and detached by using a pin.

이하 본 발명의 실시 예인 구성과 그 작용을 첨부도면에 연계시켜 상세히 설명하면 다음과 같다. 또한 본 발명을 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명은 생략한다.Hereinafter, the configuration and the operation of the embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

도 1 은 본 발명에 의한 기존교각 확대시 콘크리트 타설장치를 나타낸 정면도, 도 2 는 본 발명에 의한 기존교각 확대시 콘크리트 타설장치를 나타낸 측면도, 도 2 는 본 발명에 의한 잭인상 지지부를 나타낸 평면도, 도 3 은 본 발명에 의한 거푸집을 나타낸 평면도, 도 4 는 본 발명에 의한 거푸집을 나타낸 측면도, 도 5 는 본 발명에 의한 간격유지대를 나타낸 예시도로서,1 is a front view showing a concrete placing device when expanding the existing piers according to the present invention, Figure 2 is a side view showing a concrete placing device when expanding the existing piers according to the present invention, Figure 2 is a plan view showing a jack impression support according to the present invention 3 is a plan view showing the formwork according to the present invention, Figure 4 is a side view showing the formwork according to the present invention, Figure 5 is an exemplary view showing a spacing holder according to the present invention,

본 발명은 도면에서와 같이 교량의 슬래브(101) 위에 설치되어 상부에 놓여지는 구조물을 상승시켜주는 잭(40)과, 상기 잭(40)의 상부에 놓여져 잭(40)의 작동에 의해 인상되는 잭인상 지지부(10)와, 상기 교량의 교각(100)을 보수 보강할 경우 콘크리트의 타설이 가능하도록 상기 교각(100)의 둘레를 따라 설치되는 거푸집(20)과, 상기 잭인상 지지부(10)와 거푸집(20)을 상하로 연결하여 잭(40)의 작동시 잭인상 지지부(10)가 상승되면 이에 연동되어 거푸집(20)이 상승되도록 하는 다수의 리더(50)와, 상기 리더(50)를 고정할 수 있도록 상기 슬래브(101)의 양측단에 형성되는 연석(102)에 설치되어 상기 리더(50)에 연결된 거푸집(20)을 지지해주는 지지브래킷부(30)를 포함하여 구성된다.The present invention is mounted on the slab 101 of the bridge as shown in the drawing jack 40 to raise the structure placed on top, and is placed on top of the jack 40 is lifted by the operation of the jack 40 Jack lift support 10 and the formwork 20 is installed along the circumference of the bridge 100 to enable the concrete in the case of reinforcement of the bridge pier 100, and the jack lift support 10 And a plurality of readers 50 for connecting the dies 20 up and down so that the jack 20 is raised during operation of the jack 40, the dies 20 are linked to the dies 20, and the leader 50. It is installed on the curb 102 formed on both sides of the slab 101 so as to fix the support bracket portion 30 for supporting the formwork 20 connected to the leader 50 is configured.

이때 상기 잭인상 지지부(10)와 거푸집(20)은 상기 슬래브(101)의 폭보다 넓 은 폭을 가지도록 형성하고 상기 잭인상 지지부(10)와 거푸집(20)의 모서리에 리더(50)가 연결된다. At this time, the jack impression support 10 and the formwork 20 is formed to have a wider width than the width of the slab 101 and the leader 50 at the corner of the jack impression support 10 and formwork 20 Connected.

이와 같이 상기 잭인상 지지부(10)와 거푸집(20)이 슬래브의 폭보다 넓게 형성됨으로써 상기 리더(50)가 교량 슬래브(101) 외측으로 설치되어 거푸집(20)의 인상이 가능하게 되는 것이다.As such, the jack impression support 10 and the formwork 20 are formed wider than the width of the slab, so that the leader 50 is installed outside the bridge slab 101 so that the formwork 20 can be pulled out.

또한 상기 리더(50)가 삽입되어 고정될 수 있도록 상기 잭인상 지지부(10)의 모서리에는 고리형태로 형성되는 리더 고정부(11)가 구비되고, 상기 리더 고정부(11)에 삽입된 리더(50)는 리더 고정부(11)와 리더(50)를 관통하도록 설치되는 고정핀(14)에 의해 고정된다.In addition, the leader fixing part 11 formed in a ring shape is provided at the corner of the jack-in support 10 so that the leader 50 is inserted and fixed, and the leader inserted into the leader fixing part 11 ( 50 is fixed by a fixing pin 14 installed to penetrate the leader fixing part 11 and the reader 50.

한편 상기 잭(40)은 통상 유압잭을 사용하며 슬래브(101)의 폭에 따라 다수개를 설치하여 응력을 분산시켜주면서 상기 잭인상 지지부(10)를 상승시켜 주게 된다.On the other hand, the jack 40 uses a hydraulic jack in general and installs a plurality in accordance with the width of the slab 101 to raise the jack impression support 10 while dispersing the stress.

상기 잭인상 지지부(10)는 상기 거푸집을 지지할 수 있을 정도의 구조물이면 가능하며, 강도유지 및 자재 절감을 위해서 트러스형태로 형성하는 것이 바람직하다.The jack lift support 10 may be any structure that can support the formwork, and is preferably formed in a truss shape for strength maintenance and material reduction.

또한 상기 잭인상 지지부(10)의 하부에는 상기 잭(40)에 의해 잭인상 지지부(10)에 가해지는 응력을 분산시킬 수 있도록 강재로 이루어진 판재형태의 응력분산판(12)이 더 설치된다.In addition, the lower portion of the jack-in support 10 is further provided with a stress distribution plate 12 in the form of a plate made of steel to disperse the stress applied to the jack-in support 10 by the jack 40.

또한 상기 응력분산판(12)에는 상기 잭(40)의 작동시 잭(40)이 전도거나 응력분산판(12)에서 미끄러지지 않도록 잭(40)의 램이 끼워지는 잭고정캡(13)이 구비 된다.In addition, the stress distribution plate 12 is provided with a jack fixing cap 13 to which the ram of the jack 40 is fitted so that the jack 40 does not fall or slip on the stress distribution plate 12 when the jack 40 is operated. do.

한편 상기 거푸집(20)은 교각(100)의 형상에 대응되도록 형성되어 교각(100)의 둘레를 따라 설치되어 콘크리트의 타설이 가능하도록 하는 거푸집부재(21)와, 상기 거푸집부재(21)에 연결되어 거푸집부재(21)를 지지해주고 상기 리더(50)가 연결되는 트러스부재(22)를 포함하여 구성된다.Meanwhile, the formwork 20 is formed to correspond to the shape of the pier 100 and is installed along the circumference of the pier 100 to connect the formwork member 21 and the formwork member 21 to enable concrete pouring. It is configured to include a truss member 22 to support the formwork member 21 and the leader 50 is connected.

상기 트러스부재(22)에는 상기 리더(50)가 연결될 수 있도록 고리형태의 리더 고정부(23)가 구비되고, 상기 리더 고정부(23)에 삽입된 리더(50)는 리더 고정부(23)와 리더(50)를 관통하도록 설치되는 고정핀(14)에 의해 고정된다.The truss member 22 is provided with an annular reader fixing part 23 so that the reader 50 can be connected, and the reader 50 inserted into the leader fixing part 23 is a leader fixing part 23. And fixed by a fixing pin 14 installed to penetrate through the reader 50.

한편 상기 거푸집(20)은 분리 및 결합이 가능하도록 다수의 조각으로 분리되어 볼트(25) 및 너트(26)에 의해 결합되며 결합된다.On the other hand, the formwork 20 is separated into a plurality of pieces to be separated and coupled to be coupled and coupled by the bolt 25 and the nut 26.

바람직하게는 교각(100)의 형상에 대응되도록 형성되는 거푸집부재(21)의 중심을 분리하여 2개의 조각으로 분리하고 볼트(25) 및 너트(26)를 이용하여 상호 결합한다.Preferably, the center of the formwork member 21 formed to correspond to the shape of the pier 100 is separated into two pieces and coupled to each other using a bolt 25 and a nut 26.

이와 같이 분리되는 거푸집부재(21)의 결합면에는 교각의 보수 및 보강을 위해 타설되는 콘크리트 모르타르가 누출되지 않도록 지수판(23)을 더 설치한다.The index plate 23 is further installed on the coupling surface of the formwork member 21 separated in this way so that concrete mortar that is poured for repair and reinforcement of the piers does not leak.

한편 상기 2개의 조각으로 분리된 거푸집(20)을 보다 안정적으로 지지해주고, 상기 유압잭(40)의 상승을 통해 거푸집(20)이 상승할 경우 분리된 거푸집(20)이 보다 안정적으로 고정될 수 있도록 상기 거푸집부재(21)의 외측에 설치되는 거푸집연결바(24)를 더 포함하여 구성된다.Meanwhile, the formwork 20 separated into two pieces is more stably supported, and the formwork 20 is more stably fixed when the formwork 20 is raised through the elevation of the hydraulic jack 40. It further comprises a formwork connecting bar 24 which is installed on the outside of the formwork member 21.

상기 거푸집연결바(24)는 상기 볼트(25) 및 너트(26)만으로 결합되고, 슬래브의 보다 크게 형성하기위해 폭방향으로 넓게 제조되는 거푸집의 수평상태를 유지해주고 거푸집(20)을 보다 견고하게 일체화시켜주어 거푸집(20)을 보다 견고하게 일체화시켜주어 잭(40)의 작동으로 인해 거푸집(20)이 상승될 경우 거푸집(20)이 변형되거나 결합부위가 파손되는 것을 방지해준다. The formwork connecting bar 24 is coupled to only the bolt 25 and the nut 26, and maintains the horizontal state of the formwork made wide in the width direction to form a larger of the slab and more firmly the formwork 20 Integrates the formwork 20 more firmly and prevents the formwork 20 from being deformed or damaged when the formwork 20 is raised due to the operation of the jack 40.

한편 상기 지지브래킷부(30)는 난간이 설치될 수 있도록 교량의 슬래브(101) 양단에 형성되는 연석(102)에 설치되는 것으로, 상기 리더(50)를 지지해줌으로서 상기 리더(50)에 연결된 거푸집(20)을 지지해주게 된다. On the other hand, the support bracket portion 30 is installed on the curb 102 formed on both ends of the slab 101 of the bridge so that the handrail can be installed, and is connected to the leader 50 by supporting the leader 50. Will support the formwork (20).

이러한 지지브래킷부(30)는 상기 거푸집(20)의 하중을 지지할 수 있도록 상기 연석(102)에 설치되는 고정틀(31)과 상기 고정틀(31)의 상부에 형성되어 상기 리더(50)를 고정하기 위해 설치되는 고정핀(14)이 체결되는 고정핀 체결부(32)를 포함하여 구성된다.The support bracket part 30 is formed on the fixing frame 31 installed on the curbstone 102 and the fixing frame 31 so as to support the load of the formwork 20 to fix the leader 50. It is configured to include a fixing pin fastening portion 32 to which the fixing pin 14 is installed to be fastened.

상기와 같이 구성되는 본 발명의 리더(50)는 상기 잭인상 지지부(10), 거푸집(20), 지지브래킷부(30)에 고정핀(14)을 통해 착탈 가능하도록 결합됨으로써 후술되는 잭인상 작업이 용이하게 이루어지도록 하는 것이다.The leader 50 of the present invention configured as described above is coupled to the jack lift support 10, the formwork 20, the support bracket 30 to be detachable through the fixing pin 14 to be described later jack lift operation This is to make it easy.

한편 상기 거푸집(20)의 하부에는 작업자들 올라가 거푸집 설치 및 콘크리트 타설 작업을 용이하게 수행할 수 있도록 하는 작업대(70)가 더 설치된다.On the other hand, the lower portion of the formwork 20 is further provided with a workbench 70 to facilitate the workers to easily perform the formwork and concrete placing work.

한편 본 발명은 상기 다수의 리더(50)들을 측면방향으로 연결하여 리더(50) 들간의 간격을 유지하고 리더(50)가 휘어지는 것을 방지하는 간격유지대(60)를 더 포함하여 구성된다.On the other hand, the present invention is configured to further include a spacer 60 to maintain the distance between the reader 50 by connecting the plurality of readers 50 in the lateral direction and to prevent the leader 50 is bent.

상기 간격유지대(60)는 상기 리더(50)에 결합될 수 있도록 일측단에 걸림고리(62)가 형성되는 한 쌍의 봉부재(61)와, 상기 봉부재(61)가 양측으로 각각 결합되어 봉부재(61)를 연결해주는 간격조절부재(63)를 포함하여 구성된다.The spacing holder 60 has a pair of rod members 61 having a hook ring 62 formed at one end thereof to be coupled to the leader 50, and the rod members 61 are coupled to both sides, respectively. It is configured to include a gap adjusting member 63 for connecting the rod member (61).

상기 봉부재(61)는 상기 간격조절부재(63)에 나사형태로 결합되어 간격조절부재(63)를 회전할 경우 봉부재(61)의 간격을 좁아지게 하거나 넓혀지게 하여 상기 리더(50)의 간격을 일정하게 유지해주게 된다.The rod member 61 is coupled to the gap adjusting member 63 in the form of a screw to narrow or widen the gap of the rod member 61 when the gap adjusting member 63 is rotated. It will keep the interval constant.

즉 상기 간격유지대(60)는 턴버클 형태로 형성되는 것으로 상기 리더(50)를 측면방향으로 연결하고 지지해주게 되는 것이다.That is, the spacing holder 60 is formed in a turnbuckle shape to connect and support the leader 50 in the lateral direction.

상기와 같이 구성되는 본 발명의 콘크리트 타설장치를 이용하여 교각을 보수, 보강하는 방법을 설명하면 다음과 같다.Referring to the method of repairing, reinforcing the piers using the concrete placing device of the present invention configured as described above are as follows.

도 6 은 본 발명에 의한 콘크리트 타설장치의 1차 인상상태를 나타낸 예시도, 도 7 은 본 발명에 의한 콘크리트 타설장치의 하강상태를 나타낸 예시도, 도 8 은 본 발명에 의한 콘크리트 타설장치의 2차 인상상태를 나타낸 예시도로서, 교각(100)의 둘레에 보수 및 보강하고자 하는 폭 만큼 이격되도록 하여 거푸집(20)을 설치한다. 또한 슬래브(101) 상부에 잭(40)을 설치하고 상기 잭(40)의 상부에 잭(40)에 의해 인상 및 하강되는 잭인상 지지부(10)를 설치하며, 상기 슬래브(101)의 양측에 형성되는 연석(102)에 지지브래킷부(30)를 설치한다.6 is an exemplary view showing a primary lifting state of the concrete pouring apparatus according to the present invention, Figure 7 is an exemplary view showing a falling state of the concrete placing apparatus according to the present invention, Figure 8 is a concrete placing apparatus 2 of the present invention As an exemplary view showing the state of pulling up, the formwork 20 is installed around the pier 100 so as to be spaced apart by a width to be repaired and reinforced. In addition, the jack 40 is installed on the upper part of the slab 101, and the jack lift support part 10 which is raised and lowered by the jack 40 is installed on the upper part of the jack 40, and on both sides of the slab 101. The support bracket portion 30 is installed on the curbstone 102 to be formed.

여기서 상기 거푸집(20)은 2개의 조각으로 분리되는 것으로 교각의 형상에 대응되도록 형성되는 거푸집부재(21)를 서로 마주보도록 결합하고 상기 거푸집부재(21)의 결합면 사이로 콘크리트가 누출되지 않도록 지수판(23)을 더 설치하여 연결한다.Wherein the formwork (20) is separated into two pieces to combine the formwork members 21 formed to correspond to the shape of the pier facing each other and to prevent the leakage of concrete between the mating surface of the formwork member 21 ( 23) Install and connect more.

또한 거푸집(20)의 상승시 2개의 조각으로 분리된 거푸집(20)이 안정적으로 결합되고 상승될 수 있도록 거푸집(20)의 외측에 거푸집연결바(24)를 더 설치한다.In addition, the formwork connecting bar 24 is further installed on the outside of the formwork 20 so that the formwork 20 separated into two pieces can be stably coupled and ascended when the formwork 20 is raised.

상기 잭(40)은 슬래브(101)상에 일정간격으로 1개 이상 설치하고 상기 잭인상 지지부(10)는 상기 잭(40)에 높여지도록 설치한다. 이때 상기 잭인상 지지부(10)의 하부에 설치된 응력분산판(12)이 잭(40)의 램에 받쳐지도록 설치하고, 또한 응력분산판(12)에 구비된 잭고정캡(13)에 램이 끼워지도록 하여 잭(40)이 전도되는 것을 방지해주도록 한다.  One or more jacks 40 are installed on the slab 101 at predetermined intervals, and the jack-in support 10 is installed to be elevated on the jacks 40. At this time, the stress distribution plate 12 installed in the lower portion of the jack lift support 10 is installed so as to support the ram of the jack 40, and the ram is fixed to the jack fixing cap 13 provided in the stress distribution plate 12 It is to be fitted to prevent the jack 40 from falling.

한편 상기와 거푸집(20)이 설치되면 1차 콘크리트를 타설하고 양생한다.On the other hand, when the formwork and the 20 is installed, the primary concrete is poured and cured.

상기 타설된 콘크리트가 양생되면 2차 콘크리트 타설을 위해 리더(50)를 이용하여 상기 잭인상 지지부(10)와 거푸집(20)을 연결하고, 상기 잭(40)을 작동하여 잭인상 지지부(10)를 상승시켜 준다. When the poured concrete is cured, the jack impression support 10 and the formwork 20 are connected by using the leader 50 for secondary concrete placement, and the jack 40 is operated to support the jack impression support 10. Raise the.

이렇게 잭인상 지지부(10)가 상승되면 상기 잭인상 지지부(10)에 연결된 거푸집(20)이 잭인상 지지부(10)의 상승작용에 연동되어 상부로 이동하게 되고, 잭인상 지지부(10)가 상승되면 상기 리더(50)를 고정핀(14)을 이용하여 상기 지지브래킷부(30)에 고정한다.When the jack impression support 10 is raised in this way, the formwork 20 connected to the jack impression support 10 is moved upward in conjunction with the synergy of the jack impression support 10, and the jack impression support 10 is raised. When the leader 50 is fixed to the support bracket portion 30 by using the fixing pin (14).

그런 다음 상기 잭인상 지지부(10)에 연결된 고정핀(14)을 분리하여 상기 잭(40)을 하강시킨다.Then, the jack 40 is lowered by removing the fixing pin 14 connected to the jack lift support 10.

이와 같이 잭(40)의 하강에 의해 잭인상 지지부(10)가 하강되면 상기 리더(50)를 다시 상기 잭인상 지지부(10)에 고정핀(14)을 이용하여 고정하고 거푸집(20)을 상승시킬 수 있도록 항기 지지브래킷부(30)에서 리더(50)를 분리한다.When the jack lift support 10 is lowered by the lowering of the jack 40 as described above, the leader 50 is fixed to the jack lift support 10 again using the fixing pin 14 and the formwork 20 is raised. Separate the leader 50 from the aircraft support bracket portion 30 so that it can be.

그런 다음 다시 잭(40)을 상승시키면 잭인상 지지대(10)와 상기 잭인상 지지대(10)에 리더(50)에 의해 연결된 거푸집(20)이 상승하게 되는 것이다.Then, when the jack 40 is raised again, the die 20 connected to the jack impression support 10 and the jack impression support 10 by the leader 50 is raised.

상기와 같은 방법으로 거푸집(20)을 반복적으로 상승시켜 2차 콘크리트 타설 높이까지 위치시키고, 거푸집(20)이 2차 타설높이에 위치되면 2차 콘크리트를 타설하여 양생한다.By repeatedly raising the formwork 20 in the same manner as described above to position the secondary concrete placing height, when the formwork 20 is positioned at the secondary placing height, the secondary concrete is poured and cured.

이렇게 2차 콘크리트의 타설 및 양생이 완료되면 상기와 같은 방법으로 교각(100)의 보강 및 보수하고자 하는 높이까지 콘크리트를 타설함으로써 완료된다. When the casting and curing of the secondary concrete is completed in this way is completed by placing the concrete to the height to the reinforcement and repair of the pier 100 in the same manner as described above.

한편 상기 리더(50)의 설치시 상기 리더(50)들을 턴버클 형태로 구성되는 간격유지대(60)를 이용하여 측면으로 연결해줌으로써 리더(50)들간의 간격을 일정하게 유지하여 리더(50)의 휨을 방지하게 된다.On the other hand, when the leader 50 is installed by connecting the leader 50 to the side by using the interval holder 60 is configured in the form of a turnbuckle to maintain a constant distance between the reader 50 of the leader 50 This prevents warping.

이와 같은 본 발명은 상기 고정핀(14)의 간편한 설치 및 해체를 통해 상기 리더(50)를 잭인상 지지부(10)에 결합하거나 또는 지지브래킷부(30)에 결합할 수 있어 잭(40)의 인상 및 하강작업이 매우 간편하게 이루어지게 되고, 이로 인해 교각의 보수, 보강시 공사기간을 단축할 수 있게 되는 것이다.In the present invention as described above, the reader 50 may be coupled to the jack-in support 10 or the support bracket 30 by a simple installation and disassembly of the fixing pin 14. The lifting and lowering work is made very easy, which can shorten the construction period during the repair and reinforcement of the piers.

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

도 1 은 본 발명에 의한 기존교각 확대시 콘크리트 타설장치를 나타낸 정면도,1 is a front view showing a concrete pouring apparatus when expanding the existing piers according to the present invention,

도 2 는 본 발명에 의한 기존교각 확대시 콘크리트 타설장치를 나타낸 측면도,Figure 2 is a side view showing a concrete pouring device when expanding the existing piers according to the present invention,

도 3 은 본 발명에 의한 잭인상 지지부를 나타낸 평면도,3 is a plan view showing the jack impression support according to the present invention,

도 4 는 본 발명에 의한 거푸집을 나타낸 평면도,4 is a plan view showing a formwork according to the present invention,

도 5 는 본 발명에 의한 간격유지대를 나타낸 예시도,5 is an exemplary view showing a spacing zone according to the present invention;

도 6 은 본 발명에 의한 콘크리트 타설장치의 1차 인상상태를 나타낸 예시도,6 is an exemplary view showing a primary pulling state of the concrete pouring apparatus according to the present invention,

도 7 은 본 발명에 의한 콘크리트 타설장치의 하강상태를 나타낸 예시도,7 is an exemplary view showing a descent state of the concrete pouring apparatus according to the present invention,

도 8 은 본 발명에 의한 콘크리트 타설장치의 2차 인상상태를 나타낸 예시도,8 is an exemplary view showing a secondary pulling state of the concrete pouring apparatus according to the present invention,

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

(10) : 잭인상 지지부 (11)(23) : 리더 고정부(10): jack up support (11) (23): leader fixing

(12) : 응력분산판 (13) : 잭고정캡(12): stress distribution plate (13): jack fixing cap

(14) : 고정핀 (20) : 거푸집(14): fixed pin (20): formwork

(21) : 거푸집부재 (22) : 트러스부재21: formwork member 22: truss member

(23) : 지수판 (24) : 거푸집 연결바(23): index plate (24): formwork connecting bar

(25) : 볼트 (26) : 너트25: bolt 26: nut

(30) : 지지브래킷부 (31) : 고정틀(30): support bracket portion 31: fixing frame

(32) : 고정핀 체결부 (40) : 잭(32): fixing pin fastening portion 40: jack

(50) : 리더 (60) : 간격유지대50: Leader 60: Spacing Zone

(61) : 봉부재 (62) : 걸림고리(61): rod member 62: hook

(63) : 간격조절부재 (70) : 작업대 (63): spacing member (70): working table

(100) : 교각 (101) : 슬래브100: Pier 101: Slab

(102) : 연석102: curb

Claims (5)

교각(100) 상부의 슬래브(101)에 설치되는 잭(40);A jack 40 installed on the slab 101 above the pier 100; 상기 잭(40)의 상부에 놓여져 잭(40)의 작동에 의해 상승 또는 하강되며 상기 슬래브(101)의 폭방향으로 형성되는 잭인상 지지부(10);A jack lift support part 10 placed on the jack 40 and being raised or lowered by the operation of the jack 40 and formed in the width direction of the slab 101; 상기 교각(100)을 보수 보강할 경우 콘크리트의 타설이 가능하도록 상기 교각(100)의 둘레를 따라 설치되는 거푸집(20);Formwork 20 which is installed along the circumference of the pier 100 so that when the reinforcement of the pier 100 can be poured concrete; 상기 잭인상 지지부(10)와 거푸집(20)을 상하로 연결하여 잭(40)의 작동에 의해 잭인상 지지부(10)의 승,하강시 상기 거푸집(20)이 연동되도록 하되, 상기 잭인상 지지부(10)와 거푸집(20)에 분리 및 결합이 가능하도록 설치되는 다수의 리더(50);While connecting the jack impression support 10 and the die 20 up and down by the operation of the jack 40 to raise and lower the jack impression support 10, the die 20 is interlocked, the jack impression support A plurality of readers 50 installed to be separated and coupled to the 10 and the formwork 20; 상기 다수의 리더(50)들을 측면방향으로 연결하여 리더(50)들 간의 간격을 유지하고 리더(50)가 휘어지는 것을 방지하는 간격유지대(60);A spacing holder 60 for connecting the plurality of readers 50 in a lateral direction to maintain a gap between the readers 50 and to prevent the leader 50 from bending; 상기 리더(50)의 분리 및 결합이 가능하도록 슬래브(101) 양측의 연석(102)에 설치되어 상기 리더(50)에 연결된 거푸집(20)을 지지해주는 지지브래킷부(30); 를 포함하여 구성되는 것을 특징으로 하는 기존교각 확대시 이동식 거푸집을 이용한 콘크리트 타설장치. A support bracket portion 30 installed on the curb 102 on both sides of the slab 101 to support the formwork 20 connected to the leader 50 so that the leader 50 can be separated and combined; Concrete pouring device using a movable formwork when expanding the existing piers, characterized in that comprising a. 제 1 항에 있어서,The method of claim 1, 상기 리더(50)는, 잭(40)의 상승 또는 하강시 상기 잭인상 지지부(10), 지지브래킷부(30), 거푸집(20)에서 분리 및 결합이 가능하도록 고정핀(14)을 통해 결합되는 것을 특징으로 하는 기존교각 확대시 이동식 거푸집을 이용한 콘크리트 타설장치.The leader 50 is coupled via a fixing pin 14 so that the jack 40 can be separated and combined at the jack-up support 10, the support bracket 30, and the form 20 when the jack 40 is raised or lowered. Concrete pouring device using a movable formwork when expanding the existing piers characterized in that it is. 제 1 항에 있어서,The method of claim 1, 상기 잭(40)의 상승 및 하강에 따라 잭인상 지지부(10)에 가해지는 응력을 분산시켜줄 수 있도록 상기 잭인상 지지부(10)의 하부에 설치되는 응력분산판(12)을 더 포함하여 구성되는 것을 특징으로 하는 기존교각 확대시 이동식 거푸집을 이용한 콘크리트 타설장치.It is further configured to further include a stress distribution plate 12 which is installed in the lower portion of the jack lift support 10 to distribute the stress applied to the jack lift support 10 in accordance with the rise and fall of the jack 40 Concrete placing device using a movable formwork when expanding the existing piers. 제 3 항에 있어서,The method of claim 3, wherein 상기 잭(40)의 램이 끼워질 수 있도록 응력분산판(12)의 하부에 설치되어 상기 잭(40)의 램의 이탈되는 것을 방지해주는 잭고정캡(13)을 더 포함하여 구성되는 것을 특징으로 하는 기존교각 확대시 이동식 거푸집을 이용한 콘크리트 타설장치.It is characterized in that it further comprises a jack fixing cap 13 is installed in the lower portion of the stress distribution plate 12 so that the ram of the jack 40 is fitted to prevent the ram of the jack 40 from being separated. Concrete pouring device using movable formwork when expanding existing piers. 교각(100)의 둘레에 확대 및 보강하고자 하는 폭 만큼 이격되도록 하여 거푸집(20)을 설치하고, 상기 교각(100) 상부의 슬래브(101)에 잭(40)을 통해 높이조절이 가능하도록 잭인상 지지부(10)를 설치하며, 슬래브(101)의 양측에 형성되는 연석(102)에 지지브래킷부(30)를 설치하는 장비설치단계;Install the formwork 20 so as to be spaced apart by the width to expand and reinforce around the pier 100, jack elevation to enable the height adjustment through the jack 40 to the slab 101 of the upper pier 100 Installing the support 10, the equipment installation step of installing the support bracket portion 30 to the curb 102 formed on both sides of the slab 101; 상기 거푸집(20)에 콘크리트를 타설하여 양생하고 상기 잭인상 지지부(10)와 상기 거푸집(20)을 리더(50)를 이용하여 연결한 후 잭(40)을 작동하여 상기 거푸집(20)을 다음 콘크리트 타설 높이까지 상승시키는 콘크리트 타설 및 거푸집상승 단계;Placing concrete on the formwork 20 to cure and connect the jack impression support 10 and the formwork 20 using the leader 50 and then operate the jack 40 to the formwork 20 Concrete placing and formwork raising step up to the concrete placing height; 상기 거푸집(20)이 상승되면 상기 지지브래킷(30)에 상기 리더(50)를 체결하여 상승된 거푸집(20)을 지지해주는 리더 고정단계;A leader fixing step of supporting the raised formwork 20 by fastening the leader 50 to the support bracket 30 when the formwork 20 is raised; 상기 지지브래킷(30)에 리더(50)가 체결되면 상기 잭인상 지지부(10)에 연결된 리더(50)를 분리한 후 상기 잭(40)을 하강시켜 잭인상 지지부(10)가 하강되도록 하는 잭인상 지지부 하강단계;When the leader 50 is fastened to the support bracket 30, after separating the leader 50 connected to the jack lift support 10, the jack 40 is lowered so that the jack lift support 10 is lowered. Raise support lowering step; 상기 콘크리트 타설 및 거푸집상승 단계, 리더 설치단계, 잭인상 지지부 하강단계를 반복 시행하여 교각(100)을 보강 및 보수하는 반복시행단계; 를 포함하여 구성되는 것을 특징으로 하는 기존교각 확대시 이동식 거푸집을 이용한 콘크리트 타설방법.Repeating the step of reinforcing and repairing the piers 100 by repeatedly performing the concrete placing and the formwork raising step, the leader installation step, and the jack-up support lowering step; Concrete placing method using a movable formwork when expanding the existing piers, characterized in that comprising a.
KR1020080023400A 2008-03-13 2008-03-13 Method and Apparatus of existing pier placing concrete using the sliding form KR101019979B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080023400A KR101019979B1 (en) 2008-03-13 2008-03-13 Method and Apparatus of existing pier placing concrete using the sliding form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080023400A KR101019979B1 (en) 2008-03-13 2008-03-13 Method and Apparatus of existing pier placing concrete using the sliding form

Publications (2)

Publication Number Publication Date
KR20090098179A KR20090098179A (en) 2009-09-17
KR101019979B1 true KR101019979B1 (en) 2011-03-09

Family

ID=41357306

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080023400A KR101019979B1 (en) 2008-03-13 2008-03-13 Method and Apparatus of existing pier placing concrete using the sliding form

Country Status (1)

Country Link
KR (1) KR101019979B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209602965U (en) * 2019-01-09 2019-11-08 山东恒堃机械有限公司 A kind of novel cross-beam structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11210224A (en) 1998-01-21 1999-08-03 Ohbayashi Corp Self-lifting type form device
KR100378382B1 (en) 2000-12-01 2003-03-31 코벡주식회사 Juck-supporting apparatus for mending and substituting for the bearing structure and the bearing apparatus of a bridge with its established performance
KR200324558Y1 (en) 2003-05-16 2003-08-25 주식회사 유원거푸집 Slip-form improving device for construction of bridge
KR200433170Y1 (en) 2006-09-29 2006-12-07 김호연 Device of a bent construction using multi-bent-form

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11210224A (en) 1998-01-21 1999-08-03 Ohbayashi Corp Self-lifting type form device
KR100378382B1 (en) 2000-12-01 2003-03-31 코벡주식회사 Juck-supporting apparatus for mending and substituting for the bearing structure and the bearing apparatus of a bridge with its established performance
KR200324558Y1 (en) 2003-05-16 2003-08-25 주식회사 유원거푸집 Slip-form improving device for construction of bridge
KR200433170Y1 (en) 2006-09-29 2006-12-07 김호연 Device of a bent construction using multi-bent-form

Also Published As

Publication number Publication date
KR20090098179A (en) 2009-09-17

Similar Documents

Publication Publication Date Title
CN106812120B (en) Hydraulic self-lifting truss type cantilever heavy arch dam template system
KR100726163B1 (en) Apparatus for supporting an upper structure of a bridge
KR20090040712A (en) Steel materials mold for underground box construction formation
KR101243775B1 (en) Apparatus of Constructing Bridge and Method of Constructing Bridge by Using the Same
CN102239302B (en) The method of concrete blinding is peeled off from concrete surface
KR100647977B1 (en) Lifting method of a formwork working platform equipped with removable cylinder and mobile hydraulic pump
CN112458918A (en) High-pier hydraulic jacking integral steel frame platform formwork turnover construction system and construction method
KR101889064B1 (en) Construction method of a long span bridge main tower
CN111749140A (en) Truss integral lifting type bridge high pier creeping formwork device and construction method
CN107724671A (en) A kind of monoblock type climbing form system and its construction method
CN202064281U (en) Slip form frame
CN106836146B (en) Hydraulic self-lifting cantilever heavy arch dam template working platform
KR101019979B1 (en) Method and Apparatus of existing pier placing concrete using the sliding form
KR20180075178A (en) Moving device for system support and form for upper slab
KR101232704B1 (en) The installation and dismantlement method of main girder for bridge temporary
KR20090070852A (en) Method and apparatus for constructing boader stones between footway and roadway
KR100817883B1 (en) Slab mold setting structure
CN106812121B (en) Mold stripping and closing device for self-climbing cantilever template
KR20210063914A (en) Automatic concrete form lifting apparatus having guide member and automatic concrete form lifting method using the same
CN113073556B (en) Construction method of movable formwork of downlink beam formwork combination
KR100791991B1 (en) Temporary bridge consruction method using composite slab girder
CN209907206U (en) Auxiliary device for installing dumbbell-shaped arch ribs
CN106812122B (en) Hydraulic self-lifting cantilever heavy formwork
KR200391232Y1 (en) Main Girder Launching System with Temporary Scaffolding
CN212026326U (en) Quick mounting and dismounting device for beam falling cushion block

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee