KR20090040712A - Steel materials mold for underground box construction formation - Google Patents

Steel materials mold for underground box construction formation Download PDF

Info

Publication number
KR20090040712A
KR20090040712A KR1020070106190A KR20070106190A KR20090040712A KR 20090040712 A KR20090040712 A KR 20090040712A KR 1020070106190 A KR1020070106190 A KR 1020070106190A KR 20070106190 A KR20070106190 A KR 20070106190A KR 20090040712 A KR20090040712 A KR 20090040712A
Authority
KR
South Korea
Prior art keywords
support frame
steel formwork
main support
box structure
underground box
Prior art date
Application number
KR1020070106190A
Other languages
Korean (ko)
Inventor
조용교
안치홍
Original Assignee
보림기계공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 보림기계공업 주식회사 filed Critical 보림기계공업 주식회사
Priority to KR1020070106190A priority Critical patent/KR20090040712A/en
Publication of KR20090040712A publication Critical patent/KR20090040712A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/15Geometrical or physical properties including at least a hinge
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Abstract

A steel mold for formation of underground box structure is provided to stably construct with mortar for forming ceiling of underground box structure. A steel mold for forming underground box structure comprises: a step of installing a rail(20) inside the underground box structure in the longitudinal direction; a step of putting a wheel(220, 320), which is installed on the bottom of a main support frame(200) and auxiliary support frame(300), on the rail; a step of hinge-combining a jack bolt(610) on the side of the main support frame and auxiliary support frame at a regular interval; fixing a cylinder(500) and a jack bolt(400) on the upper side of the main support frame and auxiliary support frame; a step of hinge-combining the cylinder and a jack bolt(410) on the side of the main support frame and auxiliary support frame; a step of combining a horizontal steel form(110) upward with the cylinder and jack bolt which are fixed on the upper side of the main support frame and auxiliary support frame; a step of combining an arch steel form(120) with the cylinder and jack bolt which are fixed on the upper side of the main support frame and auxiliary support frame; and a step of combining the horizontal steel form and arch steel form using a hinge(121).

Description

지하 박스 구조물 형성용 강재 거푸집{Steel materials mold for underground box construction formation}Steel materials mold for underground box construction formation

본 발명은 지하에 설치되어 차량이나 사람의 통행을 위한 통로를 형성하는 지하 박스 구조물에서, 상기 지하박스 구조물의 상부를 형성하는 콘크리트를 안전하고 신속하게 형성시키도록 하는 강재 거푸집에 관한 것으로, 지하박스 구조물의 상부를 형성할 때 발생할 수 있는 안전사고를 미연에 방지하는 한편 간편하게 이용할 수 있도록 하는 것이다.The present invention relates to a steel formwork to safely and quickly form the concrete forming the upper portion of the underground box structure in an underground box structure installed underground to form a passage for the passage of a vehicle or a person, the underground box To prevent accidents that may occur when forming the upper part of the structure in advance and to make it easy to use.

지하차도 및 지하보도로 사용되는 지하박스 구조물은 단면이 사각형의 터널 형태를 갖게 되나, 상기 지하박스 구조물은 지반을 파헤친 후 지하박스 구조물을 형성하고, 양측면이나 상층부에 흙을 덮어 차도나 보도 등의 통행로나, 화단 등을 만들고 있다.The underground box structure used as the underground roadway and the underground sidewalk has a rectangular cross section, but the underground box structure forms a underground box structure after digging the ground, and covers soil on both sides or the upper floor to cover the road or sidewalk. I make a passage, a flower bed.

이러한 지하박스 구조물은 일단 지반을 파헤친 후 단면이 사각 형태를 갖는 지하박스 구조물을 형성하기 위하여 목재 또는 유로폼 등의 거푸집을 이용하여 지하박스 구조물을 형성하기 위한 타설공간을 형성하고, 거푸집으로 형성된 타설공간에는 시멘트 몰타르를 투입하여 경화시킨 후 거푸집을 철거하여 원하는 형태의 지 하박스 구조물을 얻도록 되어 있다.The underground box structure is formed by digging the ground and forming a space for forming an underground box structure using formwork such as wood or euroform to form an underground box structure having a rectangular cross section, and a pouring space formed of formwork In the cement mortar is added to harden and then formwork is removed to obtain the underground box structure of the desired shape.

상기 지하박스 구조물은 먼저 목재 또는 유로폼 등의 거푸집을 이용하여 타설공간을 형성하여야 하나, 목재 또는 유로폼의 거푸집을 일일이 수작업으로 설치하고, 거푸집이 무너지지 않도록 잭볼트를 이용하여 받쳐주어야 한다.The underground box structure should first form a pouring space using formwork such as wood or euroform, but manually install formwork of wood or euroform and support it using jack bolts so that the formwork does not collapse.

그러나, 지하박스 구조물의 저면과 측면을 타설하는 경우에는 거푸집의 설치로 타설공간을 만들고, 이를 이용하여 타설을 하는 과정은 크게 어려움이 없으나, 지하박스 구조물의 상층부 즉 천정부분을 만들기 위해서 거푸집으로 타설공간을 만들고, 상기 거푸집이 움직이거나 가라앉지 않도록 받쳐주는 작업이 쉽지 않은 것이었다,However, in case of placing the bottom and side of the underground box structure, it is not difficult to make the casting space by installing the formwork, and the process of placing it by using it, but in order to make the upper part of the underground box structure, namely the ceiling part, It was not easy to make space and to support the formwork not to move or sink.

특히 넓은 면적을 받쳐주어야 하나, 목재 또는 유로폼으로 이루어진 거푸집은 적은 면적을 커버하게 되므로 작업이 어렵고, 또한 무너지지 않게 안정적으로 받쳐주는 작업이 어려우며, 거푸집이 안정적이지 못하여 극히 일부분이 무너지게 되면 도미노처럼 전체가 무너져 걷잡을 수 없는 피해를 초해하는 한편 인명사고가 날 수밖에 없는 것이었다. In particular, a large area should be supported, but the formwork made of wood or euroform covers a small area, making it difficult to support the work, and it is difficult to support it stably without falling down. Was collapsed to harm the irreparable damage, but was forced to death.

즉 지하박스 구조물의 천정은 상당한 면적과 하중을 갖게 되나, 나무 또는 유로폼의 거푸집을 일일이 연결하며 넓은 면적의 천정하부를 받치게 하는 작업이 쉽지 않을 뿐 아니라, 전체적으로 균등한 힘을 받칠 수 있도록 안정되게 설치하기가 어렵고, 또한 지하박스 구조물의 상부를 형성하기 위하여 다량의 몰타르가 타설될 때 이를 안정되게 받치는 작업이 쉽지 않아 안전사고가 발생할 우려가 많은 것이었다.In other words, the ceiling of the underground box structure has a considerable area and load, but it is not easy to connect the formwork of trees or euroforms to support the lower part of the ceiling, and to be able to receive the uniform force as a whole. It was difficult to install, and when a large amount of mortar was poured to form the upper part of the underground box structure, it was not easy to stably support it, so there were many concerns about safety accidents.

본 발명은 지하박스 구조물의 천정을 형성할 때 지하박스 구조물의 내부에서 일정 길이와 폭을 갖는 하나의 구조물인 강재 거푸집을 이용하여 지하박스 구조물의 천정 하부를 안정되게 받쳐줄 수 있도록 함으로써, 지하박스 구조물의 천정을 형성하기 위한 몰타르 타설이 안정되게 이루어질 수 있도록 하는 것이다.The present invention by using the steel formwork, which is a structure having a certain length and width in the interior of the underground box structure when forming the ceiling of the underground box structure, by supporting the lower part of the ceiling of the underground box structure, the underground box structure Mortar casting to form a ceiling of the will be made to be stable.

즉 본 발명은 지하박스 구조물의 천정 하부와 같은 형상을 갖는 일정 길이의 강재 거푸집을 고정시킨 후 그 위에 몰타르 타설이 이루어지도록 함으로써 안정되게 지하박스 구조물의 천정이 타설되게 하는 것이다.In other words, the present invention is to stably pour the ceiling of the underground box structure by fixing the steel formwork of a certain length having the same shape as the lower part of the ceiling of the underground box structure and then placing the mortar on it.

본 발명은 지하박스 구조물의 천정 하부와 같은 형상의 강재 거푸집을 구비하되 상기 강제 거푸집은 길이 방향으로 일정길이를 갖도록 하는 한편 수 개의 조각으로 이루어지게 하고, 상기 강재 거푸집은 잭볼트 및 실린더를 이용하여 들어 올리게 하며, 상기 강재 거푸집의 상부에 몰타르를 타설하여 지하박스 구조물을 형성하도록 하는 것이다.The present invention is provided with a steel formwork having the same shape as the ceiling bottom of the underground box structure, but the forced formwork has a certain length in the longitudinal direction while being made up of several pieces, the steel formwork using jack bolts and cylinders To lift, and to cast the mortar on top of the steel formwork to form an underground box structure.

즉 본 발명은 지하박스 구조물을 형성하기 위하여 지하박스 구조물의 천정 하부와 같은 형상의 강재 거푸집을 잭볼트 및 실린더를 이용하여 안정되게 받쳐주도록 한 상태에서 강재 거푸집의 상부에 몰타르를 타설하여 경화시키도록 하고, 몰타르가 경화되면 강재 거푸집을 하강시킨 후 길이 방향으로 강재 거푸집을 이동하며, 다시 강재 거푸집을 상부로 이동하여 몰타르의 타설이 이루어지도록 하는 것이 다.That is, the present invention in order to form a basement box structure, the steel formwork having the same shape as the lower part of the ceiling of the basement box structure by using a jack bolt and a cylinder in a stable state to pour mortar on the top of the steel formwork to harden. And, when the mortar is hardened, the steel formwork is lowered and then the steel formwork is moved in the longitudinal direction, and the steel formwork is moved to the upper part to make the casting of the mortar.

본 발명은 지하박스 구조물을 콘크리트로 타설하여 제작함에 있어서, 지하박스 구조물의 천정 하부와 같은 형상으로 일정길이를 갖고 수 개의 조각으로 나뉘는 강재 거푸집을 실린더와 잭볼트를 이용하여 안정되게 받쳐주도록 한 상태에서 몰타르 타설이 이루어지게 하는 것으로, 안정되게 일정 면적을 받쳐주게 되어 몰타르 무게로 인한 붕괴가 발생하지 않아 안전사고가 발생할 우려가 없게 된다.In the present invention, when casting the underground box structure in concrete, the steel formwork divided into several pieces with a certain length in the same shape as the ceiling of the underground box structure to be stably supported by using a cylinder and jack bolts. In order to make the mortar in place, it will support a certain area stably and there is no fear of safety accidents because there is no collapse due to the weight of the mortar.

그리고 본 발명은 설치가 간편하고, 강재 거푸집 전체를 하부에서 안정되게 받쳐주게 되며, 상기 강재 거푸집의 무너짐이 방지되어 안전사고가 발생할 우려가 없게 된다.And the present invention is easy to install, and supports the entire steel formwork from the bottom in a stable, the collapse of the steel formwork is prevented there is no fear of a safety accident occurs.

본 발명은 지하차도 또는 지하보도 등의 통로로 활용되는 지하박스 구조물(10)에 관한 것으로, 상기 지하박스 구조물(10)의 천정(11)을 타설할 때 거푸집으로 안정되게 받쳐주어, 거푸집이 무너지게 되는 문제를 없애는 한편 거푸집의 설치가 용이하게 이루어지도록 하는 것이다.The present invention relates to an underground box structure (10) used as a passage of an underground driveway or an underground walkway, and when the ceiling 11 of the underground box structure (10) is poured, it is stably supported by formwork and the form is collapsed. While eliminating the problem, the installation of the formwork is to be made easily.

본 발명의 강재 거푸집(100)은 바닥면과 일정 높이의 측면이 형성된 콘크리트로 지하박스 구조물(10)의 내측에 설치되어 천정(11)의 하부를 받쳐줄 수 있도록 하는 것으로, 지하박스 구조물(100)의 일측에는 강재 프레임으로 제작된 주받침틀(200)과 보조 받침틀(300)을 설치하되 상기 주받침틀(200)과 보조 받침틀(300)은 일정 길이를 갖도록 하는 한편 하나의 통행로에 두 개를 설치하여 통행로의 폭 변 화에 대처할 수 있도록 한다.Steel formwork 100 of the present invention is to be installed on the inside of the basement box structure 10 to the bottom surface and the side is formed of a certain height to support the lower part of the ceiling 11, underground box structure 100 On one side of the main support frame 200 and the auxiliary support frame 300 made of steel frame is installed, but the main support frame 200 and the auxiliary support frame 300 to have a certain length while installing two in one passage Be able to cope with changes in the width of passages.

본 발명의 주받침틀(200)과 보조받침틀(300)은 I빔 또는 ㄷ형 찬넬 등으로 충분한 하중을 견디게 트러스트 형태의 구조물로 이루어지게 되는 것으로, 주받침틀(200)과 보조받침틀(300)의 형상에는 구애받지 않으나, 주받침틀(200)과 보조받침틀(300)이 안정되게 강재 거푸집(100)을 받치고, 몰타르 타설시 하중을 견딜 수 있어야 하며, 상기 주받침틀(200)과 보조받침틀(300)에는 철망 등을 이용하여 작업시 사용되는 받침대(201)(202)(301)(302)를 설치하는 한편 상기 받침대(201)(202)(301)(302)에 오르내릴 수 있도록 사다리(210)(310)를 설치한다.The main support frame 200 and the auxiliary support frame 300 of the present invention is to be made of a structure in the form of a trust to withstand a sufficient load, such as I beam or c-shaped channel, in the shape of the main support frame 200 and the auxiliary support frame 300 It is not limited, but the main support frame 200 and the auxiliary support frame 300 to stably support the steel formwork 100, to withstand the load when placing the mortar, the main support frame 200 and the auxiliary support frame 300 to the wire mesh Ladder 210, 310 to install the pedestal 201 (202) (301) 302 used in the work using the back, and to climb up and down the pedestal 201 (202) (301) (302) Install).

상기 주받침틀(200)과 보조받침틀(300)의 하부에는 휠(220)(320)을 설치하고, 상기 휠(220)(320)은 레일(20)을 타고 이동할 수 있도록 하되 상기 레일(20)은 지하박스 구조물(10)의 통행로 바닥에 침목(21)을 깔고 그 위에 설치될 수 있도록 하며, 상기 주받침틀(200)과 보조받침틀(300)은 레일(20)과의 사이에 일정 간격으로 잭볼트(30)를 설치하여 안정되게 주받침틀(200)과 보조받침틀(300)을 받칠 수 있도록 한다.Wheels 220 and 320 are installed below the main support frame 200 and the auxiliary support frame 300, and the wheels 220 and 320 may move on the rails 20, but the rails 20 may be moved. Is to allow the sleeper 21 is laid on the bottom of the passageway of the underground box structure (10) and be installed thereon. The main support frame 200 and the auxiliary support frame 300 are jacks at regular intervals between the rails 20. By installing the bolt 30 to be able to stably support the main support frame 200 and the auxiliary support frame 300.

여기서 주받침틀(200)과 보조받침틀(300)을 별도로 제작하고, 주받침틀(200)과 보조 받침틀(300) 사이에 틈새를 형성하는 이유는 지하박스 구조물(10)의 설치를 위하여 흙을 파낼 때 흙이 무너지지 않도록 박아주는 H빔(50)이 위치하는 장소이기 때문이다.Here, the main support frame 200 and the auxiliary support frame 300 is manufactured separately, and the reason for forming a gap between the main support frame 200 and the auxiliary support frame 300 when digging soil for installation of the underground box structure (10) This is because it is a place where the H-beam 50 is driven so as not to collapse the soil.

즉 일렬로 연이어 일정간격으로 박혀져 있는 H 빔(50)에 방해를 받지 않고 강재 거푸집(100)을 설치하기 위하여 주받침틀(200)과 보조받침틀(300)로 구분하여 설치하게 된다.That is, in order to install the steel formwork 100 without being disturbed by the H beams 50 that are embedded at a constant interval in a row, the main supporting frame 200 and the auxiliary supporting frame 300 are installed separately.

한편 주받침틀(200)과 보조받침틀(300)의 상부에는 수직방향을 향하게 잭볼트(400)와 실린더(500)를 일정 간격으로 설치하고, 상기 잭볼트(400)와 실린더(500)의 상측에 수평강재 거푸집(110)을 받쳐줄 수 있도록 하며, 여기서 수평강재 거푸집(110)은 평편한 상태를 갖는 한편 일정 길이를 갖도록 하는 한편 상기 수평강재 거푸집(110)의 하부에는 잭볼트(400)와 실린더(500)가 연속적으로 설치되게 한다.On the other hand, the upper part of the main support frame 200 and the auxiliary support frame 300 is installed at a predetermined interval to the jack bolt 400 and the cylinder 500 in a vertical direction, the upper side of the jack bolt 400 and the cylinder 500 The horizontal steel formwork 110 can be supported, where the horizontal steel formwork 110 has a flat state and has a predetermined length, while the lower portion of the horizontal steel formwork 110 has a jack bolt 400 and a cylinder ( 500) are installed continuously.

그리고 주받침틀(200)과 보조받침틀(300)의 측면 상부에는 잭볼트(410)와 실린더(510)의 일측을 힌지 결합시키고, 상기 잭볼트(410)와 실린더(510)의 타측에는 아치강재 거푸집(120)을 힌지 결합시키며, 상기 수평강재 거푸집(110)과 아치강재 거푸집(120)은 힌지(121)로 결합되게 하고, 주받침틀(200)의 상부에 설치되는 수평강재 거푸집(110)과 보조받침틀(300)의 상부에 설치되는 수평강재 거푸집(110)은 서로 분리시키되 양측에서 각각 평철(111)을 일정길이 돌출시킨 뒤 상기 평철(111)의 상측에 각재(140)와 합판(141)을 올려놓아 틈새를 메꾸어 주고, 몰타르 타설이 이루어지도록 한다.And hinge the one side of the jack bolt 410 and the cylinder 510 to the upper side of the main support frame 200 and the auxiliary support frame 300, the other side of the jack bolt 410 and the cylinder 510 is formed of an arch steel formwork Hinge coupling 120, the horizontal steel formwork 110 and the arch steel formwork 120 is coupled to the hinge 121, and the horizontal steel formwork 110 and the auxiliary installed in the upper portion of the main support frame (200). Horizontal steel formwork 110, which is installed on the upper portion of the support frame 300 is separated from each other, but protruding a certain length of the flat iron 111 on both sides, respectively, the angle member 140 and plywood 141 on the upper side of the flat iron 111 Place it up to fill the gap and allow maltar casting.

따라서 H 빔(50)이 연속적으로 설치되어 있더라도, 주받침틀(200)과 보조받침틀(300)을 이용하여 강재 거푸집(100)을 설치할 수 있으며, 본 발명에서 수평강재 거푸집(110)과 아치강재 거푸집(120)을 통칭하여 강재 거푸집(100)이라 한다.Therefore, even if the H beam 50 is installed continuously, the steel formwork 100 can be installed using the main support frame 200 and the auxiliary support frame 300, the horizontal steel formwork 110 and the arch steel formwork in the present invention. Collectively referred to as steel formwork (100).

그리고 주받침틀(200)과 보조받침틀(300)의 서로 대향되는 쪽에는 잭볼트(610)를 일정간격으로 설치하되 상기 잭볼트(610)의 양쪽이 주받침틀(200)과 보 조받침틀(300)에 각각 힌지 결합되게 함으로써 주받침틀(200)과 보조받침틀(300) 사이의 간격을 일정하게 유지할 수 있도록 한다.And the main support frame 200 and the auxiliary support frame 300, the side opposite to each other to install the jack bolt 610 at a predetermined interval, but both sides of the jack bolt 610 main support frame 200 and the auxiliary support frame 300 The hinges are coupled to the main support frame 200 and the auxiliary support frame 300 so as to maintain a constant distance.

이러한 본 발명의 강재 거푸집(100) 설치 과정을 살펴보기로 한다.The process of installing the steel formwork 100 of the present invention will be described.

먼저 본 발명은 지하박스 구조물(10)의 바닥과 일정 높이까지 측면을 타설한 상태(도 1의 점선 하단부만 타설된 상태)에서 설치하게 되는 것으로, 바닥과 일정높이의 측면이 형성된 지하박스 구조물(10)의 바닥에 침목(21)을 깔고 그 위에 레일(20)을 깔아준 후, 상기 레일(20)에 주받침틀(200)과 보조받침틀(300)의 하부에 설치된 휠(220)(320)이 올려 지게 한다.First of all, the present invention is to be installed in a state in which a side of the base box structure 10 is poured to a certain height (only the bottom portion of the dotted line in FIG. 1 is placed), and an underground box structure having a bottom and a side having a predetermined height ( 10) After laying the sleeper 21 on the bottom of the rail 20, the rail 20, the wheel 220, 320 installed in the lower portion of the main support frame 200 and the auxiliary support frame 300 on the rail (20) Let it be raised

이 같이 레일(20)의 상부에 주받침틀(200)과 보조받침틀(300)이 올려 지면, 주받침틀(200)과 보조받침틀(300)의 측면에 일정 간격으로 잭볼트(610)를 힌지 결합시킨 후 상기 잭볼트(610)를 이용하여 주받침틀(200)과 보조받침틀(300) 사이의 간격을 일정하게 유지할 수 있도록 한다.When the main support frame 200 and the auxiliary support frame 300 is raised on the upper portion of the rail 20 as described above, the jack bolt 610 is hinged to the sides of the main support frame 200 and the auxiliary support frame 300 at a predetermined interval. After using the jack bolt 610 to maintain a constant distance between the main support frame 200 and the auxiliary support frame 300.

주받침틀(200)과 보조받침틀(300)을 레일(20)에 올려놓고, 잭볼트(610)로 서로 결합시킨 후에는 주받침틀(200)과 보조받침틀(300)을 원하는 위치로 이동시키게 되며, 원하는 위치로 이동된 주받침틀(200)과 보조받침틀(300)의 하부를 레일(20)과 고정시켜 주받침틀(200)과 보조받침틀(300)이 쉽게 이동하지 않도록 하고, 이 상태에서 레일(20)의 상부에 일정 간격으로 잭볼트(30)를 놓은 후 상기 잭볼트(30)의 상부가 주받침틀(200)과 보조받침틀(300)의 하부를 받치도록 돌려줌으로써, 주받침틀(200)과 보조받침틀(300)이 휠(220)(320)과 잭볼트(30)에 의해 안정되게 받쳐지도록 한다.After placing the main support frame 200 and the auxiliary support frame 300 on the rail 20, and after coupling to each other by the jack bolt 610, the main support frame 200 and the auxiliary support frame 300 is moved to a desired position, The lower part of the main support frame 200 and the auxiliary support frame 300 moved to the desired position and the rail 20 is fixed so that the main support frame 200 and the auxiliary support frame 300 is not easily moved, in this state rail 20 After placing the jack bolts 30 at a predetermined interval on the upper part of the jack) by rotating the upper part of the jack bolts 30 to support the lower part of the main support frame 200 and the auxiliary support frame 300, the main support frame 200 and the auxiliary The support frame 300 is stably supported by the wheels 220 and 320 and the jack bolts 30.

주받침틀(200)과 보조받침틀(300)을 고정시킨 후에는 주받침틀(200)과 보조 받침틀(300)의 상측에 하부가 고정된 실린더(500)를 작동시켜 수평강재 거푸집(111)을 강제로 상측으로 들어 올리게 되고, 이때 수평강재 거푸집(100)과 아치강재 거푸집(120)은 힌지(121)로 결합되어 있어, 실린더(500)를 작동시킴으로써 수평강재 거푸집(110)을 들어 올리게 된다.After fixing the main support frame 200 and the auxiliary support frame 300, the horizontal steel formwork 111 is forcibly operated by operating a cylinder 500 having a lower portion fixed to the upper side of the main support frame 200 and the auxiliary support frame 300. Lifted to the upper side, the horizontal steel formwork 100 and the arch steel formwork 120 is coupled to the hinge 121, by lifting the horizontal steel formwork 110 by operating the cylinder (500).

수평강재 거푸집(110)이 실린더(500)에 의해 들려지게 되면, 실린더(500) 사이에 설치되어 수평강재 거푸집(110)을 받치게 되는 잭볼트(400)를 이용하여 주받침틀(200)과 보조받침틀(300)의 상부에서 수평강재 거푸집(110)을 안정되게 받쳐줄 수 있도록 한다.When the horizontal steel formwork 110 is lifted by the cylinder 500, the main support frame 200 and the auxiliary using the jack bolt 400 installed between the cylinders 500 to support the horizontal steel formwork 110. At the upper portion of the support frame 300 to ensure a stable support for the horizontal steel formwork (110).

즉 잭볼트(400)의 회전 부위를 회전시켜 잭볼트(400)의 길이를 신장시키거나 신축시켜 주받침틀(200)과 보조받침틀(300)의 상부에서 수평강재 거푸집(110)이 일정한 간격을 유지하며 설치될 수 있도록 한다.That is, by rotating or rotating the portion of the jack bolt 400, the length of the jack bolt 400 is stretched or stretched so that the horizontal steel formwork 110 in the upper portion of the main support frame 200 and the auxiliary support frame 300 to maintain a constant interval And can be installed.

그리고 수평강재 거푸집(100) 사이의 틈새는 수평강재 거푸집(110)의 측면으로 돌출된 평철(111)의 상부에 각재(140)를 대고, 그 위에 합판(141)을 설치함으로써 수평강재 거푸집(110) 사이의 틈새를 통하여 몰타르가 빠지지 않게 한다.And the gap between the horizontal steel formwork 100 is placed on the upper portion of the flat iron 111 protruding to the side of the horizontal steel formwork 110, the horizontal steel formwork 110 by installing a plywood 141 thereon. The gap between the) prevents mortar from falling out.

즉 수평강재 거푸집(110) 사이의 틈새에는 H 빔(50)이 일정간격으로 설치되어 있게 되므로, H 빔(50)을 피하여 각재(140)와 합판(141)을 이용하여 수평강재 거푸집(110) 사이를 메꾸어 주는 것이다.That is, since the H beam 50 is installed at a predetermined interval in the gap between the horizontal steel formwork 110, the horizontal steel formwork 110 by using the lumber 140 and the plywood 141 to avoid the H beam 50. It fills in the gap.

그리고 수평강재 거푸집(110)의 양측에는 각각 힌지(121)로 아치강재 거푸집(120)이 결합되어 있게 되고, 상기 아치강재 거푸집(120)은 각각 주받침틀(200) 에 고정된 실린더(500)와 잭볼트(400)에 의해 일정 높이로 받쳐지게 되며, 상기 아치강재 거푸집(120)과 수평강재 거푸집(110)의 상측으로 지하박스 구조물(10)의 천정(11)이 타설되게 된다.And both sides of the horizontal steel formwork 110, the hinge steel formwork 120 is coupled to each of the hinges 121, the arch steel formwork 120 is a cylinder 500 and fixed to the main support frame 200, respectively The jack bolt 400 is supported by a predetermined height, and the ceiling 11 of the underground box structure 10 is poured into the upper side of the arch steel formwork 120 and the horizontal steel formwork 110.

이때 아치강재 거푸집(120)의 하측은 미리 콘크리트 타설되어 경화된 측면의 상부에 닿아, 이미 형성된 벽면의 상부에 이어서 천정(11)이 연속적인 타설이 이루어지도록 한다.At this time, the lower side of the arch steel formwork 120 is in contact with the upper portion of the concrete side is hardened in advance, so that the ceiling 11 is continuously cast following the upper portion of the wall surface already formed.

즉 본 발명은 주받침틀(200)과 보조받침틀(300)을 설치한 후 상기 주받침틀(200)과 보조받침틀(300)의 상부에는 실린더(500)와 잭볼트(400)로 높이가 조절되는 수평강재 거푸집(110)을 설치하고, 상기 수평강재 거푸집(110)의 양쪽에는 힌지(121)로 아치강재 거푸집(120)을 연결하되 상기 아치강재 거푸집(120)은 실린더(500)와 잭볼트(400)로 받쳐주어 천장(11)에서 벽면으로 이어지는 부위에 대한 타설이 이루어지도록 한다.That is, the present invention, after installing the main support frame 200 and the auxiliary support frame 300, the height of the main support frame 200 and the auxiliary support frame 300, the height of the cylinder 500 and the jack bolt 400 is adjusted horizontally Install the steel formwork 110, the both sides of the horizontal steel formwork 110 is connected to the arch steel formwork 120 by a hinge 121, the arch steel formwork 120 is a cylinder 500 and jack bolt 400 ) To make the casting on the part leading from the ceiling 11 to the wall.

이 같이 수평강재 거푸집(110)과 아치강재 거푸집(120)으로 이루어진 강재 거푸집(100)의 준비가 완료되면 상기 강재 거푸집(100)의 상측으로 몰타르를 타설하게 되고, 몰타르가 경화될 때까지 일정 시간을 기다리게 된다.As such, when the preparation of the steel formwork 100 consisting of the horizontal steel formwork 110 and the arch steel formwork 120 is completed, the mortar is poured into the upper side of the steel formwork 100 and a predetermined time until the mortar is cured. Will wait.

일정시간이 경과되어 강재 거푸집(100)에 받쳐져 타설된 몰타르가 경화되게 되면, 잭볼트(400)를 회전시켜 길이를 축소시키도록 하는 한편 주받침틀(200)과 보조받침틀(300)의 상부에 고정된 실린더(500)의 유압을 콘트롤하여 길이를 줄임으로써 수평강재 거푸집(110)을 하강시키도록 하고, 이때 수평강재 거푸집(110)은 잭볼트(400)가 받쳐주지 않고 실린더(500)에서 당기게 되므로, 밑으로 하강하여 지하박 스 구조물(10)의 천정(11)과 분리되게 한다.When a predetermined time has elapsed and the mortar supported by the steel formwork 100 is cured, the length of the main support frame 200 and the auxiliary support frame 300 is reduced while rotating the jack bolt 400 to reduce the length. The horizontal steel formwork 110 is lowered by reducing the length by controlling the hydraulic pressure of the fixed cylinder 500, and the horizontal steel formwork 110 is pulled from the cylinder 500 without being supported by the jack bolt 400. Therefore, it is lowered to be separated from the ceiling 11 of the underground box structure (10).

즉 몰타르가 경화되면 수평강재 거푸집(110)을 받치는 잭볼트(400)의 길이를 수축하여 수평강재 거푸집(110)이 하강할 수 있도록 하고, 잭볼트(400)의 길이를 줄인 후에는 유압으로 실린더(500)를 조절하여 수평강재 거푸집(110)을 하강시키도록 한다.That is, when the mortar is hardened, the length of the jack bolt 400 supporting the horizontal steel formwork 110 is contracted so that the horizontal steel formwork 110 can descend, and after reducing the length of the jack bolt 400, the cylinder is hydraulically applied. Adjust the (500) to lower the horizontal steel formwork (110).

이때 아치강재 거푸집(120)도 잭볼트(410)의 길이를 줄인 후 실린더(510)를 이용하여 하강시키게 되며, 상기 아치강재 거푸집(120)은 힌지(121)를 중심으로 하부로 회동하게 된다.At this time, the arch steel formwork 120 is also reduced by using the cylinder 510 after reducing the length of the jack bolt 410, the arch steel formwork 120 is rotated to the lower portion around the hinge (121).

그리고 수평강재 거푸집(110) 사이에 설치된 각재(140)와 합판(141)을 제거하여, H 빔(50)이 박혀져 있는 상태에서 H 빔(50)이 수평강재 거푸집(110) 사이의 틈새에 위치한 채로 주받침틀(200)과 보조받침틀(300)을 이동시킬 수 있도록 한다.And removing the lumber 140 and the plywood 141 installed between the horizontal steel formwork 110, the H beam 50 in the gap between the horizontal steel formwork 110 in the state that the H beam 50 is stuck. It is possible to move the main support frame 200 and the auxiliary support frame 300 while being located.

이와 같이 강재 거푸집(100)을 하강시켜 지하박스 구조물(10)의 내측에서 강제거푸집(100)을 분리시킨 후에는 레일(20)에서 주받침틀(200)과 보조받침틀(300)을 받치게 되는 잭볼트(30)를 제거한 후 주받침틀(200)과 보조받침틀(300)이 레일(20)을 타고 이동할 수 있도록 한다.As described above, after the steel formwork 100 is lowered to separate the forced formwork 100 from the inside of the underground box structure 10, the jack supporting the main support frame 200 and the auxiliary support frame 300 in the rail 20. After the bolt 30 is removed, the main support frame 200 and the auxiliary support frame 300 may be moved on the rail 20.

즉 강재 거푸집(100)은 일정 길이를 갖고, 지하박스 구조물(10)의 천정(11) 시공이 완료되면 작업을 안 한 쪽으로 주받침틀(200)과 보조 받침틀(300)을 이동시킨 후, 처음과 같이 주받침틀(200)과 보조받침틀(300)을 고정시키는 작업과 강재 거푸집(100)을 들어 올리는 과정을 수행하여 다시 지하박스 구조물(10)의 천정(11) 타설이 이루어지게 한다.That is, the steel formwork 100 has a certain length, and when the construction of the ceiling 11 of the underground box structure 10 is completed, the main support frame 200 and the auxiliary support frame 300 are moved to the side where the work is not completed. As described above, the process of fixing the main support frame 200 and the auxiliary support frame 300 and lifting the steel formwork 100 are carried out so that the ceiling 11 of the underground box structure 10 is placed again.

여기서 주받침틀(200)과 보조 받침틀(300)은 레일(20)과 결합되는 유압 실린더(700)을 이용하여 이동이 용이하게 당기도록 하거나, 고정된 상태를 유지하도록 한다.Here, the main support frame 200 and the auxiliary support frame 300 to be easily pulled by using the hydraulic cylinder 700 coupled to the rail 20, or to maintain a fixed state.

본 발명에서 잭볼트(400)(410)를 풀고 조이는 작업은 사다리(210)(310)를 타고 주받침틀(200)과 보조받침틀(300)에 설치된 받침대(201)(202)(301)(302)을 밟고 이루어지도록 한다.Loosen and tighten the jack bolts 400, 410 in the present invention is a pedestal (201) (202) (301) (302) installed on the main support frame 200 and the auxiliary support frame 300 by riding the ladder (210, 310) Step on).

도 1은 지하박스 구조물의 단면도1 is a cross-sectional view of the underground box structure

도 2는 본 발명의 지하박스 구조물 설치상태 정면도 Figure 2 is a front view of the installation state of the underground box structure of the present invention

도 3은 본 발명의 지하박스 구조물 설치상태 측면도Figure 3 is a side view of the installation state of the underground box structure of the present invention

도 4는 본 발명의 수평강재 거푸집의 이격된 부위를 보인 평면도Figure 4 is a plan view showing the spaced apart portion of the horizontal steel formwork of the present invention

도 5는 본 발명의 수평강재 거푸집의 이격된 부위를 보인 단면도5 is a cross-sectional view showing the spaced apart portion of the horizontal steel formwork of the present invention.

도 6은 본 발명의 지하박스 구조물의 벽면 설치 상태를 보인 부분 정면도Figure 6 is a partial front view showing the wall installation state of the underground box structure of the present invention

도 7은 본 발명의 주받침틀과 보조받침틀의 이격상태를 보인 정면도7 is a front view showing a state of separation between the main support frame and the auxiliary support frame of the present invention.

도 8은 본 발명의 받침틀 하부 확대도Figure 8 is an enlarged view of the lower support frame of the present invention

도 9는 본 발명의 받침틀 선단부 측면도9 is a side view of the support frame front end portion of the present invention

[도면의 주요 부분에 대한 부호의 설명][Description of Symbols for Main Parts of Drawing]

10 : 지하박스 구조물 11 : 천정10: underground box structure 11: ceiling

20 : 레일 30 : 잭볼프20: rail 30: Jack Wolf

100 : 강재 거푸집 110 : 수평강재 거푸집100: steel formwork 110: horizontal steel formwork

120 : 아치강재 거푸집 140 : 각재120: arch steel formwork 140: angle

200 : 주받침틀 300 : 보조 받침틀200: main support frame 300: auxiliary support frame

400 : 잭볼트 500 : 실린더400: Jack Bolt 500: Cylinder

610 : 잭볼트 700 : 실린더610: jack bolt 700: cylinder

Claims (3)

바닥과 측면이 형성된 지하박스 구조물(10)의 내측에 길이방향으로 레일(20)을 두 줄로 설치하고, 상기 레일(20)에는 각각 주받침틀(200)과 보조받침틀(300)의 하부에 설치된 휠(220)(320)이 올려지며, Rails 20 are installed in two rows in the longitudinal direction inside the underground box structure 10 having a bottom and side surfaces, and the wheels 20 are installed on the rails 20 below the main support frame 200 and the auxiliary support frame 300, respectively. 220, 320 is raised, 상기 주받침틀(200)과 보조받침틀(300)이 서로 대향되는 곳에는 잭볼트(610)를 각각 힌지 결합하여 연결하고, Where the main support frame 200 and the auxiliary support frame 300 are opposed to each other, the jack bolt 610 is hinged and connected, respectively, 상기 주받침틀(200)과 보조받침틀(300)의 상부에는 실린더(500)와 잭볼트(400)를 고정시키는 한편 측면으로 실린더(510)와 잭볼트(410)가 힌지 결합되게 하고, While fixing the cylinder 500 and the jack bolt 400 to the upper portion of the main support frame 200 and the auxiliary support frame 300, the cylinder 510 and the jack bolt 410 is hinged to the side, 상기 주받침틀(200)과 보조받침틀(300)의 상부에 고정된 실린더(500)와 잭볼트(400)에는 상측으로 수평강재 거푸집(110)을 결합하고, Couple the horizontal steel formwork 110 to the cylinder 500 and the jack bolt 400 fixed to the upper portion of the main support frame 200 and the auxiliary support frame 300 upwards, 상기 주받침틀(200)과 보조받침틀(300)의 측면에 결합된 실린더(510)와 잭볼트(410)에는 아치강재 거푸집(120)이 결합되게 하며, Arch cylinder formwork 120 is coupled to the cylinder 510 and the jack bolt 410 coupled to the side of the main support frame 200 and the auxiliary support frame 300, 상기 수평강재 거푸집(110)과 아치강재 거푸집(120)은 각각 힌지(121)로 결합되게 하는 것을 특징으로 하는 지하 박스 구조물 형성용 강재 거푸집.The horizontal steel formwork 110 and the arch steel formwork 120 is a steel formwork for forming the underground box structure, characterized in that coupled to each hinge 121. 제1항에 있어서, 주받침틀(200)과 보조받침틀(300)은 지하박스 구조물(10)의 길이방향으로 일정 길이를 갖게 하고, 상기 주받침틀(200)과 보조받침틀(300)에 결합되어 수평강재 거푸집(110)과 아치강재 거푸집(120)을 받치는 실린더(500)(510) 와 잭볼트(400)(410)는 길이방향을 따라 교호로 설치하는 것을 특징으로 하는 지하 박스 구조물 형성용 강재 거푸집.According to claim 1, the main support frame 200 and the auxiliary support frame 300 has a predetermined length in the longitudinal direction of the underground box structure 10, is coupled to the main support frame 200 and the auxiliary support frame 300 horizontal Steel formwork 110 and the arch formwork 120, the cylinder 500, 510 and jack bolts 400, 410 are steel formwork for forming the underground box structure, characterized in that installed alternately along the longitudinal direction . 제1항에 있어서, 주받침틀(200)과 보조받침틀(300)에는 일정 높이로 작업대(201)(202)(301)(302)가 설치되고, 상기 작업대(201)(202)(301)(302)에는 일정 길이를 갖는 사다리(210)(310)가 연결되는 것을 특징으로 하는 지하 박스 구조물 형성용 강재 거푸집.According to claim 1, the main support frame 200 and the auxiliary support frame 300 is provided with a work table 201, 202, 301, 302 at a predetermined height, the work table 201 (202) (301) ( 302) the steel formwork for forming the underground box structure, characterized in that the ladder 210 having a predetermined length is connected (310).
KR1020070106190A 2007-10-22 2007-10-22 Steel materials mold for underground box construction formation KR20090040712A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070106190A KR20090040712A (en) 2007-10-22 2007-10-22 Steel materials mold for underground box construction formation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070106190A KR20090040712A (en) 2007-10-22 2007-10-22 Steel materials mold for underground box construction formation

Publications (1)

Publication Number Publication Date
KR20090040712A true KR20090040712A (en) 2009-04-27

Family

ID=40764018

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070106190A KR20090040712A (en) 2007-10-22 2007-10-22 Steel materials mold for underground box construction formation

Country Status (1)

Country Link
KR (1) KR20090040712A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101025320B1 (en) * 2010-12-31 2011-03-29 (주)유경기술단 Apparatus for forming underground dome concrete structure and constructing method using the same
KR101025317B1 (en) * 2010-12-09 2011-03-29 고엄식 Apparatus for forming underground dome concrete structure and constructing method using the same
KR101640921B1 (en) 2016-02-23 2016-07-19 오병환 Precast Concrete Underground Box Structures for Underground Roads and Construction Method of Such Structures
CN108307704A (en) * 2018-01-19 2018-07-24 陈孝中 A kind of greenhouse omits the reciprocal ridger of head
CN110700313A (en) * 2019-08-31 2020-01-17 中国十七冶集团有限公司 Support hydraulic drive system in special steel integration of piping lane
CN110761323A (en) * 2019-09-30 2020-02-07 中国二十冶集团有限公司 Underground comprehensive pipe gallery sliding formwork construction method
CN110761324A (en) * 2019-10-22 2020-02-07 中国十七冶集团有限公司 Pipe gallery main part construction supporting trolley
KR102086134B1 (en) 2019-08-22 2020-03-09 최해순 Size-controllable steel form
KR102094279B1 (en) 2019-08-22 2020-03-27 최해순 Movable steel form
CN111244832A (en) * 2020-01-16 2020-06-05 中国十七冶集团有限公司 Moving and modifying method for integrally lifting and protecting pipe-jacking type underground high-voltage cable in situ
CN111749270A (en) * 2020-05-25 2020-10-09 中铁隧道集团二处有限公司 Concrete pipe gallery internal mold positioning and demolding method
CN111749269A (en) * 2020-05-25 2020-10-09 中铁隧道集团二处有限公司 Method for carrying out pipe gallery lining construction by combining inner formwork with lifting trolley

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101025317B1 (en) * 2010-12-09 2011-03-29 고엄식 Apparatus for forming underground dome concrete structure and constructing method using the same
KR101025320B1 (en) * 2010-12-31 2011-03-29 (주)유경기술단 Apparatus for forming underground dome concrete structure and constructing method using the same
KR101640921B1 (en) 2016-02-23 2016-07-19 오병환 Precast Concrete Underground Box Structures for Underground Roads and Construction Method of Such Structures
CN108307704A (en) * 2018-01-19 2018-07-24 陈孝中 A kind of greenhouse omits the reciprocal ridger of head
KR102086134B1 (en) 2019-08-22 2020-03-09 최해순 Size-controllable steel form
KR102094279B1 (en) 2019-08-22 2020-03-27 최해순 Movable steel form
CN110700313A (en) * 2019-08-31 2020-01-17 中国十七冶集团有限公司 Support hydraulic drive system in special steel integration of piping lane
CN110761323A (en) * 2019-09-30 2020-02-07 中国二十冶集团有限公司 Underground comprehensive pipe gallery sliding formwork construction method
CN110761324A (en) * 2019-10-22 2020-02-07 中国十七冶集团有限公司 Pipe gallery main part construction supporting trolley
CN111244832A (en) * 2020-01-16 2020-06-05 中国十七冶集团有限公司 Moving and modifying method for integrally lifting and protecting pipe-jacking type underground high-voltage cable in situ
CN111749270A (en) * 2020-05-25 2020-10-09 中铁隧道集团二处有限公司 Concrete pipe gallery internal mold positioning and demolding method
CN111749269A (en) * 2020-05-25 2020-10-09 中铁隧道集团二处有限公司 Method for carrying out pipe gallery lining construction by combining inner formwork with lifting trolley

Similar Documents

Publication Publication Date Title
KR20090040712A (en) Steel materials mold for underground box construction formation
CN109577166B (en) Upper-span active highway door opening support and construction method
CN104878766A (en) Long side slope protection concrete continuous rapid pouring and form-drawing system and construction method
KR20120046919A (en) Boundary stone construction apparatus and the method of construct the boundary stone
CN112177321B (en) Creeping formwork construction equipment and method for building external wall and floor slab
CN107724671B (en) Integral type sliding formwork system and construction method thereof
JP6966853B2 (en) How to place concrete on an inclined surface and mobile formwork equipment
KR200417331Y1 (en) Gangform Lift
KR20040004819A (en) Method for changing steel bridge of supporting rail into concreat bridge
CN111456764B (en) Heavy lining trolley with pushing sliding type disc buckle support and lining formwork construction method
KR100580225B1 (en) Upper structure raising method using bridge upper structure support and lift equipment and this
KR101082418B1 (en) mold apparatus for forming concrete slab of bridge
KR20090070852A (en) Method and apparatus for constructing boader stones between footway and roadway
KR20180075178A (en) Moving device for system support and form for upper slab
CN113931444B (en) Post-cast edge beam integral type template structure and construction method thereof
KR101021945B1 (en) Steel form for forming lining wall of vertical tunnel
JP3166899B2 (en) Inner formwork for caisson construction and its lift-up method
KR102060692B1 (en) Construction method using road soundproof wall concrete retaining wall construction device
CN113338537A (en) Construction method of ultrahigh large-section concrete frame column
JP5437876B2 (en) Method of dismantling and removing support members in the construction process of RC RC ramen structure viaduct
CN219431826U (en) Construction structure for assisting shield to pass through ultra-deep foundation pit through temporary plate support
KR100556629B1 (en) Fabricated temporary junction bridge with easy construction and dismantlement and building method thereof
KR100660036B1 (en) Method of construction for extending a space between bridge piers
KR100445627B1 (en) A road border construction process
KR101756965B1 (en) Height adjusting type maintanable rail track construction method and maintanance method using the same

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application