KR100963425B1 - Modular device for foundation bolt anchorage - Google Patents
Modular device for foundation bolt anchorage Download PDFInfo
- Publication number
- KR100963425B1 KR100963425B1 KR1020080011070A KR20080011070A KR100963425B1 KR 100963425 B1 KR100963425 B1 KR 100963425B1 KR 1020080011070 A KR1020080011070 A KR 1020080011070A KR 20080011070 A KR20080011070 A KR 20080011070A KR 100963425 B1 KR100963425 B1 KR 100963425B1
- Authority
- KR
- South Korea
- Prior art keywords
- foundation bolt
- foundation
- fixer
- spacer
- anchorage device
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/005—Individual couplings or spacer elements for joining the prefabricated units
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/66—Mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/1685—Shapes cylindrical
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/1692—Shapes conical or convex
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
본 발명은 기초볼트 앵커리지 장치에 관한 것으로, 다수개의 기초볼트 및 각 기초볼트 사이에 종 스페이서와 횡 스페이서를 조립하여 설치함으로써 길이방향으로 연속되게 설치되는 콘크리트 기초 거푸집 내부의 기초볼트 앵커리지 작업을 수행함에 있어 각각의 기초볼트 사이의 필요 간격 확보가 용이함은 물론 좌, 우에 위치하는 콘크리트 거푸집을 고정단으로 하여 정해진 위치에 기초볼트의 고정이 용이한 조립식 기초볼트 앵커리지 장치를 제공하기 위한 것으로서, 그 기술적 구성은 방음벽 지주 등과 같은 도로 시설물의 고정을 위해 옹벽 형식의 콘크리트 기초 내부에 설치되는 기초볼트 앵커리지 장치에 있어서, L자 형상으로 절곡형성되는 다수개의 기초볼트; 및 상기 각 기초볼트 사이에 각각 구비되되, 그 양 단부 일측면에 한 쌍의 파지부재로 이루어지는 기초볼트 그립을 갖는 종 스페이서와 횡 스페이서; 상기 횡 스페이서의 양 단부에 결합되며, 그 단부가 외측을 향하여 직경이 감소하는 형상을 갖도록 제작된 픽서를 포함하는 구성으로 이루어지되, 상기 종 스페이서와 횡 스페이서의 각 기초볼트 그립을 기초볼트에 결합시킴으로써 각 기초볼트 사이의 필요 간격을 유지시킴은 물론 횡 스페이서의 양 단에 결합된 픽서에 의하여 기초볼트의 콘크리트 거푸집 내부 고정을 용이하도록 함을 특징으로 한다.The present invention relates to a foundation bolt anchorage device, to perform the foundation bolt anchorage work in the concrete foundation formwork is installed continuously in the longitudinal direction by assembling the longitudinal spacer and the horizontal spacer between the plurality of foundation bolt and each foundation bolt It is to provide a prefabricated foundation bolt anchorage device that is easy to secure the necessary distance between each foundation bolt, as well as easy to fix the foundation bolt at a predetermined position by using concrete formwork located at the left and right sides, the technical configuration The anchor bolt anchorage device is installed in the retaining wall-type concrete foundation for fixing the road facilities such as soundproof wall struts, comprising: a plurality of foundation bolts bent in an L shape; And longitudinal spacers and horizontal spacers respectively provided between the foundation bolts and having foundation bolt grips formed of a pair of holding members on one side of both ends thereof. It is coupled to both ends of the lateral spacers, the end portion is composed of a configuration including a fixture manufactured to have a shape of decreasing diameter toward the outside, each base bolt grip of the longitudinal spacer and the lateral spacer coupled to the foundation bolt By maintaining the necessary spacing between the foundation bolts as well as characterized in that to facilitate the internal fixing of the concrete formwork of the foundation bolts by the fixer coupled to both ends of the transverse spacers.
조립식 기초볼트 앵커리지 장치, 기초볼트, 횡 스페이서, 종 스페이서, 기초볼트 그립, 픽서, 고정침 Prefabricated foundation bolt anchorage device, foundation bolt, transverse spacer, longitudinal spacer, foundation bolt grip, fixer, fixing needle
Description
본 발명은 방음벽 지주 등과 같은 도로 시설물의 콘크리트 기초 상에 고정을 위하여 설치되는 기초볼트 앵커리지 장치에 관한 것으로서, 보다 상세하게는 다수개의 기초볼트 및 각 기초볼트 사이에 종 스페이서와 횡 스페이서를 조립하여 설치함으로써 길이방향으로 연속되게 설치되는 콘크리트 기초 거푸집 내부의 기초볼트 앵커리지 작업을 수행함에 있어 각각의 기초볼트 사이의 필요 간격 확보가 용이함은 물론 좌, 우에 위치하는 콘크리트 거푸집을 고정단으로 하여 정해진 위치에 기초볼트를 손쉽게 설치할 수 있는 조립식 기초볼트 앵커리지 장치에 관한 것이다.The present invention relates to a foundation bolt anchorage device that is installed for fixing on a concrete foundation of a road facility, such as soundproof wall struts, and more specifically, installed by assembling longitudinal spacers and transverse spacers between a plurality of foundation bolts and each foundation bolt. In this way, it is easy to secure the necessary spacing between the foundation bolts in performing foundation bolt anchorage work in the concrete foundation formwork which is installed continuously in the longitudinal direction, and based on the fixed position using the concrete formwork located at the left and right sides as a fixed end. The prefabricated foundation bolt anchorage device that can be easily installed bolts.
일반적으로, 방음벽은 소리를 차단하기 위한 것으로서, 소음원과 수음점 사이에 위치하여 소음을 반사, 회절 또는 흡수함으로써 수음점에 도달하는 소음의 크기를 약화시키는 기능을 담당하며, 도로 옆에 설치되는 도로 시설물이다.In general, the sound barrier is to block the sound, and is located between the noise source and the sound collection point, and serves to attenuate the amount of noise reaching the sound collection point by reflecting, diffracting, or absorbing the sound, and is a road facility installed next to the road. .
여기서, 방음벽은 다수개의 단위 방음판들이 H-형 지주 사이에 상, 하로 적층되고, 이러한 단위 방음판들이 좌, 우로 연속되어 장벽 형태를 형성함으로써 설치가 완료된다.Here, the soundproof wall is installed by completing a plurality of unit soundproof plates are stacked up and down between the H-shaped pillars, these unit soundproof plates are continuous left and right to form a barrier form.
이때, H-형 지주는 설계풍하중에 대해 충분히 저항할 수 있도록 옹벽 형식의 콘크리트 기초 상에 단단히 고정설치되어야 한다.At this time, the H-shaped struts should be firmly installed on the retaining wall type concrete foundation to sufficiently resist the design wind load.
이러한 방음벽용 H-형 지주는 일반적으로 다수의 L-형 기초볼트에 의해 하부 콘크리트 기초 상에 고정설치되는데 상부 구조물의 선형 확보를 위해서는 각각의 기초볼트가 요구되는 위치에 정확하게 시공되는 것이 매우 중요하다.These H-shaped pillars for soundproof walls are generally fixed on the lower concrete foundation by a number of L-shaped foundation bolts. In order to secure the linear structure of the upper structure, it is very important that each foundation bolt is correctly installed at the required position. .
지금까지는 기초볼트의 설치가 각각의 기초볼트를 사각링 또는 철근 조각 등을 이용하여 용접하되, 상호 필요한 간격을 확보하도록 용접하고, 용접 접합된 앵커리지 장치를 거푸집 내 주변 철근에 용접으로 접합함으로써 기초볼트의 최종 위치를 확보하는 방법이 현장에서 주로 적용되고 있다.Until now, the installation of the foundation bolts welded each foundation bolt with a square ring or a piece of reinforcing bars, but welded to secure a mutually necessary gap, and the foundation bolts were welded to the peripheral bars in the formwork by welding The method of securing the final location of the is mainly applied in the field.
그러나, 상술한 바와 같은 기초볼트 앵커리지 장치의 설치 방식은 현장에서 용접 작업을 수반하므로 시공성이 저하되고, 시공 속도면에서도 효율성이 매우 낮은 방법으로 꾸준히 그 문제점들이 지적되어 오고 있다.However, since the installation method of the basic bolt anchorage device as described above involves welding work in the field, the workability is reduced, and the problems have been steadily pointed out in a very low efficiency in terms of construction speed.
또한, 현장 콘크리트 타설작업 시 기초볼트 앵커리지 장치가 용접 고정된 철근의 위치에 변화가 발생하며, 이로 인해 상부 방음벽 지주의 설치가 매우 어려워진다는 문제점이 있었다.In addition, there is a problem that the change of the position of the reinforcing bar is fixed to the anchor bolt anchorage device welded on site concrete, the installation of the upper soundproof wall struts was very difficult.
본 발명은 상기한 바와 같은 문제점을 해결하기 위하여 안출된 것으로, 다수개의 기초볼트 및 각 기초볼트 사이에 종 스페이서와 횡 스페이서를 조립설치함으로써 길이방향으로 연속되게 설치되는 콘크리트 기초 거푸집 내부의 기초볼트 앵커리지 작업을 수행함에 있어 각각의 기초볼트 사이의 필요 간격 확보가 용이함은 물론 좌, 우에 위치하는 콘크리트 거푸집을 고정단으로 하여 정해진 위치에 손쉽게 설치가 가능하고, 각 스페이서의 양 단에 기초볼트 그립이 각각 형성되어 각 기초볼트에 결합 및 설치되도록 이루어짐으로써 기초볼트와 각 스페이서의 결합을 위한 별도의 용접 작업이 필요치 않으며, 콘크리트 기초 거푸집 내부에 간단하면서도 신속하게 기초볼트를 설치할 수 있는 조립식 기초볼트 앵커리지 장치를 제공하는 것을 목적으로 한다.The present invention has been made to solve the problems described above, the foundation bolt anchorage in the concrete foundation formwork is installed continuously in the longitudinal direction by assembling the longitudinal spacer and the horizontal spacer between the plurality of foundation bolts and each foundation bolt In carrying out the work, it is easy to secure the necessary distance between each foundation bolt, and it can be easily installed at a fixed position using concrete formwork located at the left and right sides, and foundation bolt grips are provided at both ends of each spacer. It is formed to be combined and installed on each foundation bolt, so that no separate welding work for joining the foundation bolt and each spacer is required, and a prefabricated foundation bolt anchorage device that can be installed simply and quickly within the concrete foundation formwork For the purpose of providing .
상기한 바와 같은 목적을 달성하기 위하여 본 발명은, 방음벽 지주 등과 같은 도로 시설물의 콘크리트 기초 상 고정을 위하여 설치되는 기초볼트 앵커리지 장치에 있어서, L자 형상으로 절곡형성되는 다수개의 기초볼트; 및 상기 각 기초볼트 사이에 각각 구비되되, 그 양 단부 일측면에 한 쌍의 파지부재로 이루어지는 기초볼트 그립을 갖는 종 스페이서와 횡 스페이서; 를 포함하는 구성으로 이루어지되, 상기 종 스페이서와 횡 스페이서의 각 기초볼트 그립을 기초볼트에 결합시킴으로써 각 기초볼트 사이의 필요 간격을 유지시키도록 이루어지는 것을 특징으로 한다.In order to achieve the above object, the present invention, the foundation bolt anchorage device is installed for fixing on the concrete foundation of the road facility, such as soundproof wall struts, a plurality of foundation bolts bent to form an L-shape; And longitudinal spacers and horizontal spacers respectively provided between the foundation bolts and having foundation bolt grips formed of a pair of holding members on one side of both ends thereof. It is made of a configuration including, characterized in that it is made to maintain the necessary spacing between each of the foundation bolts by coupling the foundation bolt grip of each of the longitudinal spacer and the horizontal spacer to the foundation bolt.
바람직하게는, 상기 횡 스페이서의 양 단부에 그 단부가 외측을 향하여 직경이 감소하는 원뿔형상을 갖는 원통형상의 픽서가 구비되어 상기 픽서에 의하여 기초볼트가 콘크리트 거푸집에 고정되는 구조로 이루어진다.Preferably, both ends of the transverse spacers are provided with a cylindrical fixer having a conical shape whose diameter decreases toward the outside thereof so that the foundation bolt is fixed to the concrete formwork by the fixer.
여기서, 상기 횡 스페이서의 양 단부에 픽서 위치 조정나사가 구비되되, 상기 픽서 위치 조정나사에 상기 픽서가 나사결합되어 그 위치가 횡방향으로 이동 및 조정되는 구조로 이루어진다.Here, a fixer position adjusting screw is provided at both ends of the lateral spacer, and the fixer is screwed to the fixer position adjusting screw so that the position thereof is moved and adjusted laterally.
한편, 상기 픽서의 단부에 픽서 고정침이 구비되되, 상기 픽서 고정침의 압입에 의해 콘크리트 거푸집 목재 표면 상에 고정되는 구조로 이루어진다.On the other hand, the end of the fixer is provided with a fixture fixing needle, it is made of a structure that is fixed on the concrete formwork wood surface by the press-fit of the fixture fixing needle.
이때, 상기 픽서는 원통형상 또는 육면체형상 또는 직육면체형상 중 적어도 어느 하나 이상의 형상으로 형성되어 상기 픽서 고정침의 콘크리트 거푸집 상에 고정을 위한 힘의 가력을 용이하게 하는 구조로 이루어진다.In this case, the fixer is formed in at least one of a cylindrical shape, a cube shape, or a rectangular parallelepiped shape, and has a structure that facilitates the force of the force for fixing on the concrete formwork of the fixer fixing needle.
본 발명은 상기한 바와 같은 문제점을 해결하기 위한 것으로, 다수개의 기초볼트 사이에 기초볼트 그립이 양단에 각각 형성되는 종 스페이서와 횡 스페이서를 조립설치함으로써 기초볼트와 각 스페이서의 결합을 위한 별도의 용접 작업이 필요치 않을 뿐만 아니라, 각 기초볼트 사이의 필요 간격을 유지시키기 용이하고, 이들 기초볼트와 스페이서의 결합체를 횡 스페이서의 양 단에 부착되는 픽서에 의해 콘크리트 거푸집에 직접 고정함으로써 기초볼트 앵커리지 작업이 간단하면서도 신속하게 설치할 수 있어 시공성을 향상시킴과 동시에 설치 기간을 단축시킬 수 있는 등의 효과를 거둘 수 있다.The present invention is to solve the problems as described above, by assembling the longitudinal spacer and the horizontal spacer is formed on both ends of the foundation bolt grip between the plurality of foundation bolts separate welding for coupling the foundation bolt and each spacer Not only is the work not necessary, it is easy to maintain the necessary spacing between the respective foundation bolts, and the foundation bolt anchorage operation is performed by directly fixing the combination of these foundation bolts and spacers to the concrete formwork by the fixer attached to both ends of the transverse spacers. Simple and quick installation can improve the workability and shorten the installation time.
이하, 본 발명에 의한 바람직한 실시예를 첨부된 도면을 참조하면서 상세히 설명한다. 또한, 본 실시예는 본 발명의 권리범위를 한정하는 것은 아니고 단지 예시로 제시된 것이며, 그 기술적 요지를 이탈하지 않는 범위 내에서 다양한 변경이 가능하다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In addition, the present embodiment is not intended to limit the scope of the present invention, but is presented by way of example only, and various modifications may be made without departing from the technical gist of the present invention.
도 1은 본 발명에 의한 조립식 기초볼트 앵커리지 장치를 개략적으로 나타내는 사시도이고, 도 2는 본 발명에 의한 조립식 기초볼트 앵커리지 장치의 종 스페이서를 개략적으로 나타내는 사시도이고, 도 3은 본 발명에 의한 조립식 기초볼트 앵커리지 장치의 횡 스페이서를 개략적으로 나타내는 사시도이고, 도 4는 본 발명에 의한 조립식 기초볼트 앵커리지 장치가 옹벽 형식의 콘크리트 기초 거푸집 내부에 설치된 모습을 개략적으로 나타내는 사시도이다.1 is a perspective view schematically showing a prefabricated foundation bolt anchorage device according to the present invention, Figure 2 is a perspective view schematically showing a longitudinal spacer of the assembled foundation bolt anchorage device according to the present invention, Figure 3 is a prefabricated foundation according to the present invention Figure 4 is a perspective view schematically showing the transverse spacer of the bolt anchorage device, Figure 4 is a perspective view schematically showing a state in which the prefabricated foundation bolt anchorage device according to the present invention is installed inside the concrete foundation formwork of the retaining wall type.
도면에서 도시하고 있는 바와 같이, 본 발명에 의한 조립식 기초볼트 앵커리지 장치(1)는 기초볼트(10a, 10b, 10c, 10d)와 종 스페이서(30a) 및 횡 스페이서(30b)를 포함하는 구성으로 이루어진다.As shown in the figure, the assembled foundation
상기 기초볼트(10a, 10b, 10c, 10d)는 L자 형상으로 절곡형성되되, 절곡형성되는 그 단부가 하방에 위치하고, 수직되게 구비되는 기초볼트(10a, 10b, 10c, 10d)의 단부에 너트(도번 미도시)가 체결되기 위한 나사부(도번 미도시)가 형성된다.The foundation bolts (10a, 10b, 10c, 10d) is bent into an L-shape, the end of the bent is formed downward, the nut at the ends of the foundation bolts (10a, 10b, 10c, 10d) are provided vertically A screw portion (not shown) for fastening (not shown) is formed.
상기 종 스페이서(30a)와 횡 스페이서(30b)는 각각의 기초볼트(10a, 10b, 10c, 10d) 사이의 간격을 일정하게 유지시켜주는 역할을 수행하기 위한 것으로서, 그 양 단부 일측면에 각 기초볼트(10a, 10b, 10c, 10d)에 결합되기 위한 기초볼트 그립(31a, 31b)이 각각 형성된다.The
여기서, 상기 각 기초볼트 그립(31a, 31b)은 기초볼트(10a, 10b, 10c, 10d)의 직경에 대응되도록 각각 한 쌍의 파지부재(32a, 33a, 32b, 33b)를 갖는다. 즉, 상기 각 기초볼트 그립(31a, 31b)은 상기 각 기초볼트(10a, 10b, 10c, 10d)에 결합되기 위하여 상기 각 기초볼트(10a, 10b, 10c, 10d)의 외주연에 대응되도록 각 내측면이 라운딩형상으로 형성되는 한 쌍의 파지부재(32a, 33a, 32b, 33b)를 갖는다.Here, each of the
본 발명의 일 실시예에서는 상기 종 스페이서(30a)와 횡 스페이서(30b)의 각 기초볼트 그립(31a, 31b)이 기초볼트(10a, 10b, 10c, 10d)의 외주연에 대응되도록 라운딩 형상으로 형성되는 한 쌍의 파지부재(32a, 33a, 32b, 33b)로 이루어져 있으나, 상기 종 스페이서(30a)와 횡 스페이서(30b)가 각 기초볼트(10a, 10b, 10c, 10d)의 외주연에 결합되어 각 기초볼트(10a, 10b, 10c, 10d)를 고정시키기 용이하다면 상기 기초볼트 그립(31a, 31b)이 기타 다양한 형상으로 형성되는 것도 가능하다.In an embodiment of the present invention, each of the
이때, 상기 종 스페이서(30a)와 횡 스페이서(30b)에 형성되는 각 기초볼트 그립(31a, 31b)은 각 기초볼트(10a, 10b, 10c, 10d)의 외주연 형상과 대응되게 형 성되어 결합가능하게 이루어지는 것이 바람직하다.In this case, each of the
한편, 상기 횡 스페이서(30b)의 양 단부에 원통형상으로 형성되는 픽서(37)가 구비되되, 상기 픽서(37)는 그 단부가 외측을 향하여 직경이 감소하는 원뿔형상으로 형성된다.On the other hand, both ends of the horizontal spacer (30b) is provided with a fixer (37) formed in a cylindrical shape, the fixer (37) is formed in a conical shape whose diameter is reduced toward the outside.
상기한 바와 같은 구조 및 형태로 이루어지는 픽서(37)에 의하여 본 발명에 의한 조립식 기초볼트 앵커리지 장치(1)가 콘크리트 거푸집에 고정된다.The prefabricated foundation
여기서, 상기 횡 스페이서(30b)의 양 단부에 픽서 위치 조정나사(35)가 구비되되, 상기 픽서 위치 조정나사(35)에 상기 픽서(37)가 나사결합되어 픽서(37)의 위치가 횡방향으로 이동 및 조정된다.Here, a fixer
즉, 상기 횡 스페이서(30b)의 양 단부에 횡 스페이서(30b)와 픽서(37)를 상호 연결하기 위한 픽서 위치 조정나사(35)가 구비되되, 상기 픽서 위치 조정나사(35)에 픽서(37)가 회전가능하게 나사결합되어 픽서(37)의 시계방향 또는 반시계방향 회전에 따라 픽서 위치 조정나사(35)의 길이방향으로 전, 후진되어 그 위치가 이동 및 조정된다.That is, a fixer
본 발명의 일 실시예에서는 상기 횡 스페이서(30b)의 양 단부에 픽서 위치 조정나사(35)가 구비되고, 상기 픽서 위치 조정나사(35)에 픽서(37)가 나사결합되어 시계방향 또는 반시계방향으로 회전됨으로써 그 위치가 이동 및 조정되도록 이루어져 있으나, 상기 횡 스페이서(30b)의 양 단부에 나사홈(미도시)이 형성되고, 상기 픽서(37)가 일체로 형성되는 픽서 조정 나사(35)가 나사홈 나사결합되어 픽서 위치 조정나사(35) 및 이에 일체로 형성되는 픽서(37)를 시계방향 또는 반시계방향 으로 회전시켜 픽서(37)의 위치를 이동 및 조정하도록 이루어지는 것도 가능하다.In one embodiment of the present invention, a fixer
여기서, 상기 픽서(37)의 단부에 픽서 고정침(38)이 구비되되, 상기 픽서 고정침(38)의 압입에 의해 콘크리트 거푸집의 목재 표면 상에 본 발명에 의한 조립식 기초볼트 앵커리지 장치(1)가 고정된다.Here, a
즉, 상기 각 픽서(37)의 원뿔형상으로 형성되는 단부에 픽서 고정침(38)이 구비되고, 상기 픽서 고정침(38)은 콘크리트 거푸집(3)의 표면 상에 본 발명에 의한 조립식 기초볼트 앵커리지 장치(1)의 설치 시 조립식 기초볼트 앵커리지 장치(1)의 양 측에 기 설치된 거푸집(3)에 일정부분 삽입설치되도록 이루어짐으로써 조립식 기초볼트 앵커리지 장치(1)를 고정시키는 역할을 수행한다.That is, the
본 발명의 일 실시예에서는 상기 픽서(37)가 원통형상으로 형성되도록 이루어져 상기 픽서 고정침(38)의 콘크리트 거푸집 상에 고정을 위한 힘의 가력을 갖는 구조로 이루어져 있으나, 상기 픽서 고정침(38)의 고정을 위한 힘의 가력이 용이하다면 상기 픽서(37)가 육면체형상 또는 직육면체형상으로 형성되는 것도 바람직하다.In one embodiment of the present invention, the
이하, 본 발명에 의한 조립식 기초볼트 앵커리지 장치(1)의 결합과정 및 설치과정을 설명한다.Hereinafter, the coupling process and installation process of the assembled base
먼저, 다수개의 기초볼트(10a, 10b, 10c, 10d)를 준비한 후 각각의 기초볼트(10a, 10b, 10c, 10d)에 종 스페이서(30a)와 횡 스페이서(30b)를 설치한다. 즉, 4개의 기초볼트(10a, 10b, 10c, 10d)를 준비한 후 각각의 기초볼트(10a, 10b, 10c, 10d) 중 어느 한 쌍의 기초볼트(10a, 10b) 사이 및 다른 한 쌍의 기초볼트(10c, 10d) 사이에 종 스페이서(30a)를 설치하고, 어느 한 쌍의 기초볼트(10a, 10d)와 다른 한 쌍의 기초볼트(10b, 10c) 사이에 횡 스페이서(30b)를 설치한다.First, after preparing a plurality of foundation bolts (10a, 10b, 10c, 10d), each of the foundation bolts (10a, 10b, 10c, 10d) is provided with a
이때, 상기 종 스페이서(30a)와 횡 스페이서(30b)는 각각의 단부 일측면에 형성되되, 한 쌍의 파지부재(32a, 33a, 32b, 33b)로 이루어지는 기초볼트 그립(31a, 31b)에 의해 각 기초볼트(10a, 10b, 10c, 10d) 사이에 결합되며, 이로 인해 각 기초볼트(10a, 10b, 10c, 10d)의 필요 간격을 유지시킨다.At this time, the
여기서, 각 기초볼트(10a, 10b, 10c, 10d) 상에 설치되는 횡 스페이서(30b)가 종 스페이서(30a)의 상측에 위치되도록 설치하는 것이 바람직하나, 이에 한정하지 아니하는 것이 바람직하다.Here, the
상기한 바와 같이, 각각의 기초볼트(10a, 10b, 10c, 10d)에 종 스페이서(30a)와 횡 스페이서(30b)를 설치함으로써 본 발명에 의한 조립식 기초볼트 앵커리지 장치(1)의 결합과정이 완료된다.As described above, the coupling process of the assembled base
이렇게 기초볼트(10a, 10b, 10c, 10d)에 종 스페이서(30a)와 횡 스페이서(30b)를 결합하여 제작된 조립식 기초볼트 앵커리지 장치(1)의 설치과정은, 먼저 콘크리트 타설 전의 거푸집(3)에 본 발명에 의한 조립식 기초볼트 앵커리지 장치(1)를 설치한다.The installation process of the prefabricated foundation
이때, 본 발명에 의한 조립식 기초볼트 앵커리지 장치(1)를 콘크리트 기초 거푸집(3) 내부의 정해진 위치에 고정시키되, 상기 횡 스페이서(30b)의 양 단부에 각각 설치되는 각 픽서(37)가 각 거푸집(3)의 일측면에 맞닿도록 위치시킨다.At this time, the prefabricated foundation
그 다음, 상기 횡 스페이서(30b) 양 단부의 픽서 위치 조정나사(35)에 나사결합된 픽서(37)를 시계방향 또는 반시계방향으로 회전시켜 상기 픽서(37)의 위치를 횡방향으로 이동 및 조정함으로써 거푸집(3)과 거푸집(3) 사이에 설치되는 조립식 기초볼트 앵커리지 장치(1)를 거푸집(3) 내에 안정적으로 고정 및 위치시킨다.Next, the
이때, 상기 횡 스페이서(30b)의 각 픽서 위치 조정나사(35)에 나사결합되어 회전가능하게 이루어지는 픽서(37)를 시계방향 또는 반시계방향으로 회전시켜 상기 각 픽서(37)를 거푸집(3)측으로 이동시킬 경우, 상기 각 픽서(37)의 단부에 구비되는 픽서 고정침(38)이 픽서(37)를 따라 이동되어 목재질로 이루어지는 거푸집(3)에 일정 깊이 박히도록 이루어짐으로써 본 발명에 의한 조립식 기초볼트 앵커리지 장치(1)를 거푸집 내에 작업자가 원하는 위치에 신속하면서도 용이하게 고정시킬 수 있다.At this time, each of the
본 발명은 특정의 실시예와 관련하여 도시 및 설명하였지만, 첨부 특허청구의 범위에 의해 나타난 발명의 사상 및 영역으로부터 벗어나지 않는 한도 내에서 다양한 개조 및 변화가 가능하다는 것을 당업계에서 통상의 지식을 가진 자라면 누구나 쉽게 알 수 있을 것이다.While the invention has been shown and described with respect to particular embodiments, it will be understood by those skilled in the art that various modifications and changes can be made without departing from the spirit and scope of the invention as indicated by the appended claims. Anyone can grow up easily.
도 1은 본 발명에 의한 조립식 기초볼트 앵커리지 장치를 개략적으로 나타내는 사시도,1 is a perspective view schematically showing a prefabricated foundation bolt anchorage device according to the present invention,
도 2는 본 발명에 의한 조립식 기초볼트 앵커리지 장치의 종 스페이서를 개략적으로 나타내는 사시도,Figure 2 is a perspective view schematically showing a longitudinal spacer of the assembled foundation bolt anchorage device according to the present invention,
도 3은 본 발명에 의한 조립식 기초볼트 앵커리지 장치의 횡 스페이서를 개략적으로 나타내는 사시도,3 is a perspective view schematically showing a horizontal spacer of the assembled foundation bolt anchorage device according to the present invention;
도 4는 본 발명에 의한 조립식 기초볼트 앵커리지 장치가 옹벽 형식의 콘크리트 기초 거푸집 내부에 설치된 모습을 개략적으로 나타내는 사시도.Figure 4 is a perspective view showing a schematic view of the prefabricated foundation bolt anchorage device installed in the retaining wall type concrete foundation form according to the present invention.
< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>
1 : 조립식 기초볼트 앵커리지 장치, 3 : 거푸집,1: prefabricated foundation bolt anchorage device, 3: formwork,
10a, 10b, 10c, 10d : 기초볼트, 30a : 종 스페이서,10a, 10b, 10c, 10d: basic bolt, 30a: longitudinal spacer,
30b : 횡 스페이서, 30b: transverse spacer,
31a, 31b : 기초볼트 그립, 31a, 31b: Foundation bolt grip,
32a, 32b, 33a, 33b : 파지부재, 32a, 32b, 33a, 33b: holding member,
35 : 픽서 위치 조정나사,35: Fixer position adjusting screw
37 : 픽서, 38 : 픽서 고정침.37: fixer, 38: fixer fixation needle.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080011070A KR100963425B1 (en) | 2008-02-04 | 2008-02-04 | Modular device for foundation bolt anchorage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080011070A KR100963425B1 (en) | 2008-02-04 | 2008-02-04 | Modular device for foundation bolt anchorage |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090085267A KR20090085267A (en) | 2009-08-07 |
KR100963425B1 true KR100963425B1 (en) | 2010-06-15 |
Family
ID=41205314
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080011070A KR100963425B1 (en) | 2008-02-04 | 2008-02-04 | Modular device for foundation bolt anchorage |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100963425B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101501521B1 (en) * | 2014-06-13 | 2015-03-12 | 아이컨 주식회사 | a precast connection structure of a soundproof walls post |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0393837U (en) * | 1989-12-30 | 1991-09-25 | ||
JPH07317082A (en) * | 1994-05-23 | 1995-12-05 | Matsushita Electric Works Ltd | Anchor frame |
KR100574064B1 (en) | 2006-02-02 | 2006-04-27 | (주)진우종합건축사사무소 | Assembly anchor structure for apartment house |
KR100684707B1 (en) | 2005-12-30 | 2007-02-22 | (주)앙카코리아 | Apparatus for mounting anchor bolt |
-
2008
- 2008-02-04 KR KR1020080011070A patent/KR100963425B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0393837U (en) * | 1989-12-30 | 1991-09-25 | ||
JPH07317082A (en) * | 1994-05-23 | 1995-12-05 | Matsushita Electric Works Ltd | Anchor frame |
KR100684707B1 (en) | 2005-12-30 | 2007-02-22 | (주)앙카코리아 | Apparatus for mounting anchor bolt |
KR100574064B1 (en) | 2006-02-02 | 2006-04-27 | (주)진우종합건축사사무소 | Assembly anchor structure for apartment house |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101501521B1 (en) * | 2014-06-13 | 2015-03-12 | 아이컨 주식회사 | a precast connection structure of a soundproof walls post |
Also Published As
Publication number | Publication date |
---|---|
KR20090085267A (en) | 2009-08-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5961778B1 (en) | Anchor bolt installation base | |
JP6111922B2 (en) | Column base reinforcement method and apparatus | |
JP2012067524A (en) | Base isolation foundation and construction method therefor | |
KR100963425B1 (en) | Modular device for foundation bolt anchorage | |
JP2014077319A (en) | Solar panel frame and construction method of solar panel frame | |
JP6057579B2 (en) | Seismic isolation device support structure and construction method of seismic isolation device support structure | |
JP5523421B2 (en) | Template position correction tool | |
JP6570412B2 (en) | Anchor bolt structure | |
JP5819449B2 (en) | Solar panel support jig | |
JP5721221B2 (en) | Steel column construction method | |
JP3165719U (en) | Infrastructure for facilities | |
JP2008255632A (en) | Construction method for guard fence or soundproof wall against avalanche and rock fall, precast concrete block constituting upper section of retaining wall or foundation block, and temporary fixing member for support for use in construction method for guard fence or soundproof wall against avalanche and rock fall | |
JP2006265830A (en) | Construction method for form | |
JP5345238B1 (en) | Construction method of base-isolated base structure and base-isolated base structure | |
JP2010216196A (en) | Anchor bolt installation method for continuous footing, and anchor bolt-tool set | |
JP2009299419A (en) | Construction method for preventing displacement of form, and installment tool | |
JP4723920B2 (en) | Anchor bolt positioning device | |
JP5828572B2 (en) | How to build steel columns | |
JP6357332B2 (en) | Construction method of seismic isolation foundation | |
JP6454591B2 (en) | Construction method of seismic isolation foundation | |
JP2015101890A (en) | Support structure and construction method | |
KR20130025568A (en) | Basic structure for sound-insulation wall enabling easy assembly and deviation correction | |
JP2013181334A (en) | Earthquake strengthening method of building | |
KR101460276B1 (en) | Modular device for foundation bolt anchorage | |
JP5635939B2 (en) | Construction method of column beam frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130605 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20140603 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20150602 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20160603 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20170602 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20180601 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20190531 Year of fee payment: 10 |