KR100959553B1 - Connecting structure of steel pipe strut - Google Patents

Connecting structure of steel pipe strut Download PDF

Info

Publication number
KR100959553B1
KR100959553B1 KR1020070115844A KR20070115844A KR100959553B1 KR 100959553 B1 KR100959553 B1 KR 100959553B1 KR 1020070115844 A KR1020070115844 A KR 1020070115844A KR 20070115844 A KR20070115844 A KR 20070115844A KR 100959553 B1 KR100959553 B1 KR 100959553B1
Authority
KR
South Korea
Prior art keywords
steel pipe
band
hole
pipe brace
fastening
Prior art date
Application number
KR1020070115844A
Other languages
Korean (ko)
Other versions
KR20090049663A (en
Inventor
서승권
Original Assignee
(주)핸스
서승권
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=40858313&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR100959553(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by (주)핸스, 서승권 filed Critical (주)핸스
Priority to KR1020070115844A priority Critical patent/KR100959553B1/en
Publication of KR20090049663A publication Critical patent/KR20090049663A/en
Application granted granted Critical
Publication of KR100959553B1 publication Critical patent/KR100959553B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • E02D17/083Shoring struts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/15Geometrical or physical properties including at least a hinge
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

본 발명은 강관 버팀보 연결구조에 관한 것으로서, 더욱 상세하게는 토류벽의 붕괴를 방지하기 위하여 H파일(pile) 사이에 설치되는 강관 버팀보를 띠장에 연결하고, 강관 버팀보와 강관 버팀보를 상호 연결하는 강관 버팀보 연결구조에 관한 것이다.The present invention relates to a steel pipe reinforcement connection structure, more specifically, to prevent the collapse of the earth wall connecting the steel pipe reinforcement is installed between the H (pile) to the band, and the steel pipe reinforcement for connecting the steel pipe reinforcement and the steel pipe reinforcement mutually It relates to the connection structure.

따라서 본 발명은 공사현장에서 흙막이 공사에 사용되는 버팀보를 기존의 H형강과는 다르게 약축과 강축의 구분 없이 강성이 커서 별도의 보강재가 필요치 않으며, 강관 버팀보의 설치가 원활하여 흙막이 공사가 간편하고 편리하게 시공되는 효과가 있다.Therefore, the present invention is different from the existing H-shaped steel for the braces used in the construction site, the rigidity without the distinction between the weak axis and steel shafts do not require a separate reinforcement, the installation of steel pipe braces is smooth and convenient construction of the soil barrier construction The construction is effective.

강관 버팀보, 연결구조, 연결부재, 이음부재, 밴드 Steel pipe brace, connecting structure, connecting member, joint member, band

Description

강관 버팀보 연결구조 { Connecting structure of steel pipe strut }{Connecting structure of steel pipe strut}

본 발명은 강관 버팀보 연결구조에 관한 것으로서, 더욱 상세하게는 토류벽의 붕괴를 방지하기 위하여 H파일(pile) 사이에 설치되는 강관 버팀보를 띠장에 연결하고, 강관 버팀보와 강관 버팀보를 상호 연결하는 강관 버팀보 연결구조에 관한 것이다.The present invention relates to a steel pipe reinforcement connection structure, more specifically, to prevent the collapse of the earth wall connecting the steel pipe reinforcement is installed between the H (pile) to the band, and the steel pipe reinforcement for connecting the steel pipe reinforcement and the steel pipe reinforcement mutually It relates to the connection structure.

건설현장에서 지하 건물의 기초나, 지하실 또는 콘크리트 벽체를 축조하기 위하여 해당 지반을 굴토한 후, 굴토면이 토압에 의해 붕괴되는 것을 방지하기 위하여 흙막이 공사를 하게 된다.At the construction site, after excavating the ground to build the foundation of basement, basement or concrete wall, the earthen wall is constructed to prevent the earth surface from collapse by earth pressure.

이러한 흙막이는 소정 간격으로 지반에 설치되는 H파일에 굴토면을 받치는 토류벽을 형성하고 H파일의 일측면에 상하로 일정 간격을 가지면서 수평으로 복수의 띠장이 설치되며, 서로 마주보는 띠장과 띠장 사이에 일정간격으로 수평으로 버팀보가 설치된다.These mudstones are formed in the H pile installed on the ground at a predetermined interval to support the earthen wall to support the pit soil surface, and a plurality of bands are installed horizontally at regular intervals up and down on one side of the H pile, between the bands and the bands facing each other Bracing is installed horizontally at regular intervals.

이 경우에 H파일 사이의 간격이 비교적 멀리 떨어져 있는 경우에는 버팀보와 버팀보가 수평으로 연결되어 띠장과 띠장 사이에 연결된다.In this case, when the spacing between H piles is relatively far apart, the brace and the brace are connected horizontally and are connected between the girdle and the girdle.

상기 버팀보에 의해 일정 간격으로 유지되는 띠장이 지지되어 토류벽이 토압을 견디게 되고, 이 경우에 횡방향으로 미치는 토압 등을 지지하기 위하여 설치되는 버팀보를 토류벽 방향으로 밀착시키기 위해 띠장과 버팀보 사이에는 연결잭이 설치된다.The support belt is maintained at a predetermined interval by the support, so that the earth wall withstands the earth pressure, and in this case, the connecting jack is connected between the belt and the support beam to closely contact the support wall installed in the direction of the earth wall. Is installed.

그런데 종래에는 버팀보로 H형강을 사용하고 H형강 버팀보의 연결시 H형강 버팀보와 기초판을 용접하므로 현장으로 운반하는 경우에 기초판의 찌그러짐이 발생하고, 현장의 용접으로 품질이 저하되거나 고소 작업 시 작업자의 안전 확보가 어려우며, 재활용 시 길이 조정의 불편함 등으로 인한 경제적 손실과 공사 지연이 나타나는 문제점이 있었다.However, conventionally, H-beam is used as a brace, and when H-beam brace is connected, H-beam brace and base plate are welded, so when it is transported to the site, distortion of the base plate occurs, It is difficult to secure workers' safety, and there is a problem in that economic loss and construction delay are caused due to inconvenience of adjusting the length during recycling.

또한, 버팀보로 H형강을 사용하는 경우에 H형강 버팀보의 약축(Y-Y) 방향으로 좌굴이 발생하여, 이를 보강하기 위해 수평 및 수직으로 보강재를 설치해야만 하는 불편함이 있었다.
따라서 방향에 무관하게 강성의 차이가 없고 압축강성이 우수한 강관 버팀보를 사용하고 상기 강관 버팀보에 대한 새로운 연결구조가 필요하게 되었다.
In addition, in the case of using the H-beam as the brace, the buckling occurs in the direction of the weak axis (YY) of the H-beam brace, there was an inconvenience that must be installed in the horizontal and vertical reinforcement to reinforce it.
Therefore, there is no difference in stiffness regardless of the direction, and use a steel pipe brace having excellent compressive rigidity, and a new connection structure for the steel pipe brace is required.

삭제delete

본 발명은 상술한 문제점을 해결하기 위하여 안출된 것으로서, 본 발명은 방향별 강성의 차이가 없고 압축강성이 우수한 강관 버팀보의 연결이 원활하여, 흙막 이 공사가 간편하고 편리한 강관 버팀보 연결구조를 제공하는데 그 목적이 있다.The present invention has been made to solve the above-described problems, the present invention is a smooth connection of the steel pipe reinforcement has no difference in direction rigidity and excellent compression stiffness, to provide a simple and convenient steel pipe reinforcement structure for earthwork construction The purpose is.

상기 목적을 달성하기 위한 본 발명의 제 1 일실시예에 따르면, 강관 버팀보 연결구조는; 지반에 설치되는 엄지말뚝 측면에 고정되게 설치되는 띠장과; 상기 띠장과 결합된 상기 엄지말뚝을 지지하며 일측 끝단부에 관통된 제 1 및 제 2 관통홀이 형성되는 제 1 강관 버팀보와; 상기 띠장과 일측이 나사 결합되는 십자 보강판과, 일측이 상기 십자 보강판의 타측과 강제 결합되는 제 1 기초판과, 상기 제 1 기초판의 타측과 강제 결합되고 상기 제 1 강관 버팀보의 일측 하반구을 거치하며 제 5 관통홀이 형성된 제 1 하단밴드, 상기 제 1 기초판의 타측과 강제 결합되고 상기 제 1 하단밴드에 거치된 제 1 강관 버팀보의 일측 상반구을 덮어씌우며 제 6 관통홀이 형성된 제 1 상단밴드로 구성되는 연결부재; 및 상기 강관버팀보에 형성된 제 1 관통홀과 상기 제 1 상단밴드에 형성된 제 6 관통홀을 일치시키고 상기 강관버팀보에 형성된 제 2 관통홀과 상기 제 1 하단밴드에 형성된 제 5 관통홀을 일치시켜서, 상기 제 6 관통홀, 제 1 관통홀, 제 2 관통홀 및 제 5 관통홀을 관통하여 체결하는 제 1 체결부재로 이루어진 것을 특징으로 한다.According to a first embodiment of the present invention for achieving the above object, the steel pipe support structure is; A belt long and fixedly installed on the side of the thumb pile installed on the ground; A first steel pipe brace supporting the thumb pile coupled to the belt and having first and second through-holes formed at one end thereof; A cross reinforcement plate on which one side of the cross section is screwed together, a first base plate on which one side is forcibly coupled to the other side of the cross reinforcement plate, and a bottom side of the first steel pipe brace, which is forcibly coupled to the other side of the first base plate. A first lower band formed through a hemisphere and having a fifth through hole formed therein; and a sixth through hole formed by a sixth through hole formed on the first lower band and covering the upper hemisphere of one side of the first steel pipe brace mounted on the first lower band. A connection member composed of a first upper band; And matching the first through hole formed in the steel pipe support with the sixth through hole formed in the first upper band, and matching the second through hole formed in the steel pipe support with the fifth through hole formed in the first lower band. And a first fastening member for fastening through the sixth through hole, the first through hole, the second through hole, and the fifth through hole.

본 발명의 제 2 실시예에 따르면, 강관 버팀보 연결구조는; 지반에 설치되는 엄지말뚝 측면에 고정되게 설치되는 띠장과; 상기 띠장과 결합된 상기 엄지말뚝을 지지하는 원통형으로 형성된 제 1 강관 버팀보; 및 상기 띠장과 일측이 나사 결합되는 십자 보강판과, 일측이 상기 십자 보강판의 타측에 강제 결합되는 제 1 기초판과, 상기 제 1 기초판의 타측에 강제 결합되어 상기 제 1 강관 버팀보의 일측 하반구를 거치하며 일측 끝단부가 제 1 T형 나사결합부에 의하여 체결되고 타측 끝단부가 제 1 경첩에 의하여 체결되는 제 1 하단밴드와, 상기 제 1 하단밴드에 거치된 제 1 강관 버팀보의 일측 상반구를 덮어씌우고 일측 끝단부가 상기 제 1 하단밴드와 제 1 T형 나사결합부에 의하여 체결되며 타측 끝단부가 제 1 하단밴드와 제 1 경첩에 의하여 체결되는 제 1 상단밴드로 구성되는 연결부재로 이루어진 것을 특징으로 한다.According to a second embodiment of the present invention, the steel pipe support structure is; A belt long and fixedly installed on the side of the thumb pile installed on the ground; A first steel pipe brace formed in a cylindrical shape to support the thumb pile coupled to the belt long; And a cross reinforcement plate on which one side of the cross section is screwed together, a first base plate on one side of which is forcibly coupled to the other side of the cross reinforcement plate, and one side of the first steel pipe brace forcibly coupled to the other side of the first base plate. A first lower band having one lower end fastened by a first T-shaped screw coupling part and the other end fastened by a first hinge, and an upper half of a first steel pipe support mounted on the first lower band Covering the sphere, one end is fastened by the first lower band and the first T-shaped screw engaging portion and the other end is composed of a connecting member consisting of a first upper band fastened by the first lower band and the first hinge It is characterized by.

본 발명의 제 3 실시예에 따르면, 강관 버팀보 연결구조는; 지반에 설치되는 엄지말뚝 측면에 고정되게 설치되는 띠장과; 상기 띠장과 결합된 상기 엄지말뚝을 지지하고 원통형으로 형성되며, 일측 외주면에 볼트와 너트에 의하여 결합되는 제 1, 제 2 체결편이 형성되는 제 1 강관 버팀보; 및 상기 띠장과 일측이 나사 결합되는 십자 보강판과, 일측이 상기 십자 보강판의 타측에 강제 결합되는 제 1 기초판과, 상기 제 1 기초판의 타측에 강제 결합되어 상기 제 1 강관 버팀보의 일측이 삽입되며 외주면에 상기 제 1, 제 2 체결편과 각각 볼트와 너트에 의하여 결합되는 제 5, 제 6 체결편이 형성된 제 1 밴드로 구성되는 연결부재로 이루어진 것을 특징으로 한다.According to a third embodiment of the present invention, the steel pipe support structure is; A belt long and fixedly installed on the side of the thumb pile installed on the ground; A first steel pipe brace supporting the thumb pile coupled to the belt and being formed in a cylindrical shape and having first and second fastening pieces formed on one outer circumferential surface thereof by a bolt and a nut; And a cross reinforcement plate on which one side of the cross section is screwed together, a first base plate on one side of which is forcibly coupled to the other side of the cross reinforcement plate, and one side of the first steel pipe brace forcibly coupled to the other side of the first base plate. It is inserted and characterized in that consisting of a connecting member consisting of a first band formed on the outer circumferential surface and the fifth and sixth fastening pieces coupled to the first and second fastening pieces by bolts and nuts, respectively.

본 발명의 제 4 실시예에 따르면, 강관 버팀보 연결구조는; 지반에 설치되는 엄지말뚝 측면에 고정되게 설치되는 띠장과; 상기 띠장과 결합된 상기 엄지말뚝을 지지하고 원통형으로 형성되어 일측 외주면에 볼트와 너트에 의하여 결합되는 제 1, 제 2 관통홀이 형성된 제 1 강관 버팀보와; 상기 띠장과 일측이 나사 결합되는 레듀사와, 상기 레듀사의 타측에 강제 결합되는 제 1 기초판과, 상기 제 1 기초판의 타측에 강제 결합되어 상기 제 1 강관 버팀보에 삽입되며 외주면에 볼트와 너트에 의하여 결합되는 제 3, 제 4 관통홀을 형성하는 제 1 밴드로 구성되는 연결부재; 및 상기 제 1 강관 버팀보의 제 1 관통홀과 상기 제 1 밴드의 제 4 관통홀을 일치시키고, 상기 제 1 강관 버팀보의 제 2 관통홀과 상기 제 1 밴드의 제 3 관통홀을 일치시켜서, 상기 제 1 관통홀, 제 4 관통홀, 제 3 관통홀 및 제 2 관통홀을 관통하여 체결하는 제 1 체결부재로 이루어진 것을 특징으로 하는 강관 버팀보 연결구조. 이루어진 것을 특징으로 한다.According to the fourth embodiment of the present invention, the steel pipe support structure is; A belt long and fixedly installed on the side of the thumb pile installed on the ground; A first steel pipe brace supporting the thumb pile coupled to the belt and having a cylindrical shape and having first and second through holes formed on one outer circumferential surface thereof by a bolt and a nut; Redunda threaded on one side of the strip and the thread, a first base plate forcibly coupled to the other side of the redundant, and is forcibly coupled to the other side of the first base plate is inserted into the first steel pipe brace and bolts and nuts on the outer peripheral surface A connecting member including a first band forming third and fourth through holes coupled by the first band; And matching the first through hole of the first steel pipe brace with the fourth through hole of the first band, and matching the second through hole of the first steel pipe brace with the third through hole of the first band. And a first fastening member for fastening through the first through hole, the fourth through hole, the third through hole, and the second through hole. Characterized in that made.

이상에서 설명한 바와 같이, 본 발명은 공사현장에서 흙막이 공사에 사용되는 버팀보를 기존의 H형강과는 다르게 약축과 강축의 구분 없이 강성이 커서 별도의 보강재가 필요치 않으며, 강관 버팀보의 설치가 원활하여 흙막이 공사가 간편하고 편리하게 시공되는 효과가 있다.As described above, the present invention is different from the existing H-beams in the construction site used for the earthquake construction in the construction site, the stiffness without the distinction between the weak axis and the steel shaft does not need a separate reinforcement, smooth installation of the steel pipe bracing beams There is an effect that construction is simple and convenient.

이하 본 발명의 최적 실시예에 대하여 첨부된 도면을 참고로 하여 그 구성 및 작용을 설명한다.Best Mode for Carrying Out the Invention Hereinafter, configurations and operations will be described with reference to the accompanying drawings.

도 1a 내지 도 1f는 본 발명의 제 1 실시예에 따른 강관 버팀보 연결구조이다. 도 1a 내지 도 1c는 본 발명의 제 1 실시예에 따른 강관 버팀보 연결구조 중에서 연결부재의 측면도와, 평면도, 및 단면도로서, 도시된 바와 같이 상기 제 1 실시예에 따른 강관 버팀보 연결구조는 띠장(100)과, 제 1 강관 버팀보(200) 및 연결부재(300)로 이루어진다.1a to 1f is a steel pipe brace connection structure according to a first embodiment of the present invention. 1a to 1c is a side view, a plan view, and a cross-sectional view of the connecting member of the steel pipe support structure according to the first embodiment of the present invention, as shown in the steel pipe support structure according to the first embodiment is a band ( 100) and the first steel pipe brace 200 and the connecting member 300.

또한, 도 1d 내지 도 1f는 본 발명의 제 1 실시예에 따른 강관 버팀보 연결구조 중에서 이음부재의 측면도와 평면도로서, 도시된 바와 같이, 상기 띠장(100)과, 제 1 강관 버팀보(200) 및 연결부재(300)로 이루어진 강관 버팀보 연결구조에 상기 제 1 강관 버팀보(200)에 인접하여 연결되는 제 2 강관 버팀보(800)와 상기 제 1 강관 버팀보(200)를 이어주는 이음부재(400)를 더 구비하여 구성하는 것이 바람직하다.In addition, Figures 1d to 1f is a side view and a plan view of the joint member in the steel pipe brace connection structure according to the first embodiment of the present invention, as shown, the band 100, the first steel pipe brace 200 and The joint member 400 which connects the second steel pipe brace 800 and the first steel pipe brace 200 to be adjacent to the first steel pipe brace 200 to the steel pipe brace connection structure consisting of a connecting member 300 is further. It is preferable to comprise.

더욱 상세하게는, 지반에 설치되는 엄지말뚝의 측면에 상하로 일정 간격을 유지하면서 수평하게 띠장(100)이 설치되며, 상기 띠장(100)에 연결부재(300)가 설치되고 상기 연결부재(300)에 제 1 강관 버팀보(200)가 체결되어 고정된다.More specifically, the strip 100 is installed horizontally while maintaining a predetermined interval up and down on the side of the thumb pile is installed on the ground, the connecting member 300 is installed on the strip 100 and the connecting member 300 ) Is fastened to the first steel pipe brace 200 is fastened.

상기 제 1 강관 버팀보(200)는 일측 끝단부에 제 1, 제 2 관통홀이 형성되고 상기 제 1 관통홀을 제 1 상단밴드(340)에 형성된 제 6 관통홀에 일치시키고 상기 제 2 관통홀을 제 1 하단밴드(330)에 형성된 제 5 관통홀에 일치시키고, 제 1 체결부재(350)에 의하여 제 6 관통홀과 제 1 관통홀, 및 제2 관통홀과 제 5 관통홀을 차례로 통과시켜서 상기 연결부재(300)와 상기 제 1 강관 버팀보(200)의 일측을 고정되게 체결된다.The first steel pipe support 200 has first and second through-holes formed at one end thereof, and matches the first through-hole to the sixth through-hole formed in the first upper band 340 and the second through-hole. To the fifth through hole formed in the first lower band 330, and passes through the sixth through hole, the first through hole, and the second through hole and the fifth through hole by the first fastening member 350. One side of the connecting member 300 and the first steel pipe brace 200 is fixed to be fixed.

또한, 상기 제 1 강관 버팀보(200)는 일측 끝단부에 형성된 제 1 관통홀 및 제 2 관통홀과 대응되게 타측 끝단부에 제 3 관통홀과 제 4 관통홀을 형성한다.In addition, the first steel pipe brace 200 forms a third through hole and a fourth through hole at the other end thereof to correspond to the first through hole and the second through hole formed at one end thereof.

상기 연결부재(300)는 띠장(100)과 일측이 나사 결합되는 십자 보강판(310)과, 일측이 상기 십자 보강판(310)의 타측과 강제 결합되는 제 1 기초판(320)과, 상기 제 1 기초판(320)의 타측과 강제 결합되며 제 1 강관 버팀보(200)의 일측 하반구를 거치하여 체결하기 위한 제 5 관통홀이 형성되는 제 1 하단밴드(330), 상기 제 1 기초판(320)의 타측과 강제 결합되며 상기 제 1 하단밴드(330)에 거치된 제 1 강관 버팀보(200)의 상반구를 덮어씌우고 상기 제 5 관통홀과 대응되게 제 6 관통홀이 형성되는 제 1 상단밴드(340)로 구성된다.The connecting member 300 is a cross reinforcement plate 310, the one side is screw-coupled with the strip length 100, the first base plate 320 is one side is forcibly coupled to the other side of the cross reinforcement plate 310, and The first lower band 330, the first base plate is forcibly coupled to the other side of the first base plate 320 and is formed with a fifth through hole for fastening through one of the lower hemispheres of the first steel pipe support 200; The first force is coupled to the other side of the 320 and covers the upper hemisphere of the first steel pipe brace 200 mounted on the first lower band 330 and the sixth through-hole is formed to correspond to the fifth through-hole The upper band 340 is configured.

즉, 상기 십자 보강판(310)의 일측이 볼트, 너트 등으로 띠장(100)과 나사 결합되고, 상기 제 1 기초판(320)의 일측은 십자 보강판(310)의 타측과 상기 제 1 기초판(320)의 타측은 제 1 하단밴드(330) 및 제 1 상단밴드(340)와 용접결합 등과 같이 강제 결합되며, 상기 제 1 하단밴드(330)는 제 1 강관 버팀보(200)의 일측 하반구가 거치되도록 반원형으로 형성되고 반원형의 하단 중심부에 제 5 관통홀이 형성되는 것이 바람직하며, 상기 제 1 상단밴드(340)는 상기 제 1 하단밴드(330)에 거치된 제 1 강관 버팀보(200)의 상반구를 덮어씌우고 상기 제 5 관통홀과 대응되는 제 6 관통홀이 형성된다.That is, one side of the cross reinforcement plate 310 is screwed with the strip 100 with a bolt, nut, etc., one side of the first base plate 320 is the other side of the cross reinforcement plate 310 and the first base The other side of the plate 320 is forcedly coupled to the first lower band 330 and the first upper band 340 by welding, and the like, and the first lower band 330 is lower than one side of the first steel pipe brace 200. It is preferable that the hemisphere is formed in a semi-circular shape and a fifth through hole is formed in the lower center of the semi-circular shape. The first upper band 340 is a first steel pipe brace 200 mounted on the first lower band 330. The sixth through-holes covering the upper hemisphere of the second through hole and corresponding to the fifth through-holes are formed.

이와 같이 형성된 제 1 관통홀과 제 6 관통홀을 일치시키고 제 2 관통홀과 제 5 관통홀을 일치시켜서 제 6 관통홀과 제 1 관통홀 및 제 2 관통홀과 제 5 관통홀을 차례로 통과시켜서 제 1 체결부재(350)에 의하여 상기 연결부재(300)와 상기 제 1 강관 버팀보(200)의 일측을 상호 관통되게 체결하여 고정하는 것이 바람직하다.The first through-hole and the sixth through-hole formed as described above are coincident with the second through-hole and the fifth through-hole to pass through the sixth through-hole, the first through-hole, the second through-hole and the fifth through-hole. It is preferable to fasten and fix the connection member 300 and one side of the first steel pipe brace 200 through each other by the first fastening member 350.

더욱이, 도 1b에 도시된 바와 같이, 상기 연결부재(300)와 제 1 강관 버팀보(200)를 체결하는 제 1 체결부재(350)의 길이방향에 대하여 직각으로 교차되게 제 2 체결부재(360)를 더 구비하는 것이 바람직하다.Furthermore, as shown in FIG. 1B, the second fastening member 360 intersects at a right angle with respect to the longitudinal direction of the first fastening member 350 for fastening the connecting member 300 and the first steel pipe brace 200. It is preferable to further provide.

아울러, 도 1b 또는 도 1c에 도시된 바와 같이, 상기 제 1 상단밴드(340)를 제 1 기초판(220)과 보다 견고하게 결합하기 위하여 제 1 상단밴드(340)의 외주면에는 제 1 나사체결편(341)을 더 구비하여 제 1 기초판(220)과 제 1 상단밴드(340)를 상호 나사 결합하는 것이 바람직하다.In addition, as shown in FIG. 1B or 1C, a first screw is fastened to an outer circumferential surface of the first upper band 340 to more firmly couple the first upper band 340 to the first base plate 220. It is preferable to further include a piece 341 to screw the first base plate 220 and the first top band 340 to each other.

또한, 도 1b 또는 도 1c에 도시된 바와 같이, 상기 제 1 하단밴드(330)를 상기 제 1 기초판(220)과 보다 견고하게 결합하기 위하여 제 1 하단밴드(300)의 외주면에도 제 1 고정편(331)을 더 구비하여 제 1 기초판(220)과 제 1 하단밴드(340)를 용접 결합 등으로 강제 결합하는 것이 바람직하다.In addition, as shown in FIG. 1B or 1C, the first lower band 330 is fixed to the outer circumferential surface of the first lower band 300 to more firmly couple the first base plate 220. It is preferable to further include a piece 331 to forcibly couple the first base plate 220 and the first lower band 340 by welding or the like.

도 1c에 도시된 바와 같이, 상기 연결부재(300)에 체결되는 제 1 밴드(500)는 제 1 하단밴드(330)와 제 1 상단밴드(340)가 제 1 체결부재(350)에 의하여 체결되어도 제 1 강관 버팀보(200)가 흔들릴 수 있음으로 제 1 하단밴드(330)와 제 1 상단밴드(340)의 외주면을 감싸서 조여 주는 제 1 나사조임부(510)를 구비하여 제 1 강관 버팀보(200)와 상기 연결부재(300)의 상기 제 1 하단밴드(330)와 제 1 상단밴드(340)가 더욱 견고하게 고정하는 것이 바람직하다.As shown in FIG. 1C, the first band 500 fastened to the connection member 300 is fastened by the first fastening member 350 to the first lower band 330 and the first upper band 340. Even if the first steel pipe brace 200 can be shaken by having a first screw tightening portion 510 to wrap around the outer peripheral surface of the first lower band 330 and the first upper band 340 and tighten the first steel pipe brace ( The first lower band 330 and the first upper band 340 of the 200 and the connecting member 300 may be more firmly fixed.

이상과 같이, 상기 제 1 나사조임부(510)가 구비되어 있기 때문에 나사 조임에 의하여 제 1 하단밴드(330)와 제 1 상단밴드(340)의 내경이 작아지기 때문에 상기 제 1 하단밴드(330)와 제 1 상단밴드(340)가 상기 제 1 강관 버팀보(200)에 더욱 견고하게 고정된다.As described above, since the first screw tightening part 510 is provided, the inner diameters of the first lower band 330 and the first upper band 340 are reduced by screwing, so that the first lower band 330 is smaller. ) And the first upper band 340 is more firmly fixed to the first steel pipe brace 200.

도 1d에 도시된 바와 같이, 상기 이음부재(400)는, 제 1 강관 버팀보(200)의 타측 하반구가 거치되고 제 7 관통홀이 형성된 제 2 하단밴드(410), 상기 제 2 하단밴드(410)에 거치된 제 1 강관 버팀보(200)의 타측 상반구를 덮어씌우고 제 8 관통홀이 형성된 제 2 상단밴드(420)와, 일측이 상기 제 2 하단밴드(410)와 강제 결합되는 제 2 기초판(430)과, 상기 제 2 기초판(430)의 타측에 강제 결합되며 제 2 강관 버팀보(800)의 일측 하반구가 거치되고 제 9 관통홀이 형성된 제 3 하단밴드(440), 상기 제 2 기초판(430)의 타측에 강제 결합되고 상기 제 3 하단밴드(440)에 일측 하반구가 거치되는 제 2 강관 버팀보(800)의 일측 상반구를 덮어씌우고 제 10 관통홀이 형성된 제 3 상단밴드(450)로 구성된다.As shown in FIG. 1D, the joint member 400 includes a second lower band 410 on which the other lower hemisphere of the first steel pipe brace 200 is mounted and a seventh through hole is formed, and the second lower band ( A second upper band 420 covering the other upper hemisphere of the first steel pipe brace 200 mounted on the 410 and having an eighth through hole, and one side of which is forcibly coupled to the second lower band 410; Base plate 430 and the third lower band 440, which is forcibly coupled to the other side of the second base plate 430, one lower hemisphere of the second steel pipe brace 800 is mounted and the ninth through hole is formed, A third, which is forcibly coupled to the other side of the second base plate 430 and covers one upper hemisphere of the second steel pipe brace 800 on which one lower hemisphere is mounted on the third lower band 440 and the tenth through hole is formed; The upper band 450 is configured.

또한, 상기 이음부재(400)는 상기 제 2 하단밴드(410)에 거치된 상기 제 1 강관 버팀보(200)의 제 4 관통홀 및 상기 제 2 하단밴드(410)에 형성된 제 7 관통홀을 일치시키고, 상기 제 2 하단밴드(410)에 거치된 제 1 강관 버팀보(200)의 제 3 관통홀 및 상기 제 2 상단밴드(420)에 형성된 제 8 관통홀을 일치시켜서 상기한 제 1 체결부재(350)와 마찬가지로 동일한 방법에 의하여 제 8 관통홀과 제 3 관통홀 및 제 4 관통홀과 제 7 관통홀을 차례로 통과시켜서 상기 이음부재(400)의 상기 제 2 하단밴드(410) 및 상기 제 2 상단밴드(420)와 상기 제 1 강관 버팀보(200)의 타측을 제 3 체결부재(460)로 체결하여 고정하는 것이 바람직하다.In addition, the joint member 400 coincides with a fourth through hole of the first steel pipe brace 200 mounted on the second lower band 410 and a seventh through hole formed in the second lower band 410. And the first fastening member described above by matching the third through hole of the first steel pipe brace 200 mounted on the second lower band 410 and the eighth through hole formed in the second upper band 420. In the same manner as in 350, the second lower band 410 and the second lower band 410 of the joint member 400 are sequentially passed through the eighth through third holes, the fourth through holes, and the seventh through holes. It is preferable to fasten the other side of the upper band 420 and the first steel pipe brace 200 by a third fastening member 460.

더욱이, 상기 이음부재(400)는 제 2 강관 버팀보(800)의 일측 끝단부에 관통되게 형성된 제 11 관통홀과 제 12 관통홀을 통하여 제 3 체결부재(460)의 체결방법과 동일한 방법으로 이음부재(400)의 상기 제 3 하단밴드(440)에 형성된 제 9 관통홀과 상기 제 2 강관 버팀보(800)에 형성된 제 12 관통홀을 일치시키고, 상기 제 3 상단밴드(450)에 형성된 제 10 관통홀과 상기 제 2 강관 버팀보(800)에 형성된 제 11 관통홀을 일치시켜서 제 10 관통홀과 제 11 관통홀 및 제 12 관통홀과 제 9 관통홀을 차례로 통과시켜서 제 5 체결부재(470)에 의하여 상기 제 1 강관 버팀보(200)에 인접하여 연결되는 제 2 강관 버팀보(800)와 상기 이음부재(400)의 상기 제 3 하단밴드(440) 및 상기 제 3 상단밴드(450)가 체결되어 고정된다.Furthermore, the joint member 400 is jointed in the same manner as the method of fastening the third fastening member 460 through the eleventh through twelfth through holes and the twelfth through holes formed to penetrate at one end of the second steel pipe brace 800. The tenth through hole formed in the third lower band 440 of the member 400 coincides with the twelfth through hole formed in the second steel pipe support 800, and the tenth formed in the third upper band 450. The fifth fastening member 470 by passing the tenth through hole, the eleventh through hole, the twelfth through the ninth through hole, and the like by matching the through hole with the eleventh through hole formed in the second steel pipe brace 800. The second lower pipe brace 800 and the third lower band 440 and the third upper band 450 of the joint member 400 are connected to the first steel pipe brace 200 adjacent to each other by It is fixed.

또한, 도 1e에 도시된 바와 같이 이음부재(400)에 체결되는 제 3 체결부재(460)의 길이 방향에 대하여 직각으로 교차되도록 상기 제 3 체결부재(460)의 체결방법과 동일한 방법으로 상기 제 1 강관 버팀보(200)와 상기 이음부재(400)를 제 4 체결부재(480)에 의하여 체결하는 것이 바람직하고 상기 제 1 강관 버팀보(200)에 인접하여 연결되는 상기 제 2 강관 버팀보(800) 역시 상기 제 5 체결부재(470)와 동일한 방법으로 상기 제 5 체결부재와 직각으로 교차되게 제 6 체결부재(490)에 의하여 체결하는 것이 바람직하다. In addition, as shown in FIG. 1E, the third fastening member 460 intersects at a right angle with respect to the longitudinal direction of the third fastening member 460 fastened to the joint member 400 in the same manner as the fastening method of the third fastening member 460. It is preferable to fasten the first steel pipe brace 200 and the joint member 400 by the fourth fastening member 480, and the second steel pipe brace 800 connected to the first steel pipe brace 200 is also connected. In the same manner as the fifth fastening member 470, the sixth fastening member 490 may be fastened to cross at a right angle with the fifth fastening member.

아울러, 도 1f에 도시된 바와 같이 상기 제 2 하단밴드(410)와 제 2 상단밴드(420)가 상기 제 3 체결부재(460) 및 제 4 체결부재(480)에 의해서 체결된 이후에 상기 제 2 상단밴드(420)와 제 2 하단밴드(410)의 외주면을 감싸서 조여 주는 제 2 나사조임부(610)가 형성된 제 2 밴드(600)가 더 구비되어 상기 제 1 강관 버팀보(200)와 상기 이음부재(400)를 더욱 견고하게 고정하는 것이 바람직하며, 한편, 상기 제 3 하단밴드(440)와 제 3 상단밴드(450)가 제 3 체결부재(470) 및 제 5 체결부재(490)에 의하여 체결된 이후에 상기 제 3 상단밴드(450)와 제 3 하단밴드(440)의 외주면을 감싸서 조여주는 제 3 나사조임부(710)가 형성된 제 3 밴드(700)가 더 구비되어 상기 제 1 강관 버팀보(200)에 인접하여 연결되는 상기 제 2 강관 버팀보(500)와 상기 이음부재(400)를 더욱 견고하게 고정하는 것이 바람직하다.In addition, as shown in FIG. 1F, the second lower band 410 and the second upper band 420 are fastened by the third fastening member 460 and the fourth fastening member 480. 2 is further provided with a second band 600 formed with a second screw fastening part 610 for wrapping and tightening the outer circumferential surfaces of the upper band 420 and the second lower band 410. It is preferable to fix the joint member 400 more firmly, while the third lower band 440 and the third upper band 450 are connected to the third fastening member 470 and the fifth fastening member 490. After being fastened by the third upper band 450 and the third lower band 440 is further provided with a third band 700 is formed with a third screw tightening portion 710 is wrapped around the outer peripheral surface tightening It is more firmly fixing the second steel pipe brace 500 and the joint member 400 which is connected adjacent to the steel pipe brace 200 Preferable.

특히, 상기 제 2 상단밴드(420) 외주면에 제 2 기초판(430)과 제 2 상단밴드(420)를 나사 결합하기 위한 제 2 나사체결편(420-1)을 더 구비하여 제 2 상단밴드(420)와 제 2 기초판(430)을 나사 결합함으로써 더욱 견고하게 고정한다.In particular, the second upper band further comprises a second screwing piece 420-1 for screwing the second base plate 430 and the second upper band 420 on the outer circumferential surface of the second upper band 420. The screw 420 and the second base plate 430 are more firmly fixed.

상기 제 2 하단밴드(410) 역시 외주면에 제 2 기초판(430)과 용접 결합에 의하여 강제 결합되는 제 2 고정편(410-1)을 더 구비하는 것이 바람직하다.It is preferable that the second lower band 410 further includes a second fixing piece 410-1 that is forcibly coupled to the second base plate 430 by welding on an outer circumferential surface thereof.

도 2a 내지 도 2c는 본 발명의 제 2 실시예에 따른 강관 버팀보 연결구조이다. 도 2a는 본 발명의 제 2 실시예에 따른 강관 버팀보 연결구조 중에서 연결부재의 측면도, 평면도, 및 단면도로서, 도시된 바와 같이 상기 제 2 실시예에 따른 상기 강관 버팀보 연결구조는 띠장(110)과, 제 1 강관 버팀보(210) 및 연결부재(300-1)로 이루어진다.2a to 2c is a steel pipe brace connection structure according to a second embodiment of the present invention. Figure 2a is a side view, a plan view, and a cross-sectional view of the connecting member of the steel pipe support structure according to the second embodiment of the present invention, as shown in the steel pipe support structure according to the second embodiment is a band 110 and , The first steel pipe brace 210 and the connecting member 300-1.

또한, 도 2b는 본 발명의 제 2 실시예에 따른 강관 버팀보 연결구조 중에서 이음부재의 측면도와 평면도로서, 도시된 바와 같이 상기 띠장(110)과 제 1 강관 버팀보(210) 및 연결부재(300-1)에 상기 제 1 강관 버팀보(210)와 상기 제 1 강관 버팀보(210)에 인접하여 연결되는 강관 버팀보인 제 2 강관 버팀보(810)를 이어주는 이음부재(400-1)를 더 구비하여 구성하는 것이 바람직하다.In addition, Figure 2b is a side view and a plan view of the joint member of the steel pipe brace support structure according to the second embodiment of the present invention, as shown in the strip 110 and the first steel pipe brace 210 and the connecting member 300- 1) further comprising a joint member 400-1 connecting the first steel pipe brace 210 and the second steel pipe brace 810 which is a steel pipe brace connected adjacent to the first steel pipe brace 210. It is preferable.

더욱 상세하게는, 지반에 설치되는 엄지말뚝의 측면에 상하로 일정 간격을 가지면서 수평하게 띠장(110)이 설치되며, 상기 띠장(110)에 연결부재(300-1)가 설치되고 상기 연결부재(300-1)에 제 1 강관 버팀보(210)가 체결되어 고정된다.More specifically, the strip 110 is installed horizontally with a predetermined interval up and down on the side of the thumb pile is installed on the ground, the connecting member 300-1 is installed on the strip length 110 and the connecting member The first steel pipe brace 210 is fastened to 300-1.

상기 제 1 강관 버팀보(210)는 연결부재(300-1)에 체결되고 상기 연결부재(300-1)에 체결된 띠장(110)에 의하여 엄지말뚝을 지지한다.The first steel pipe brace 210 is fastened to the connection member 300-1, and supports the thumb pile by the band long 110 is fastened to the connection member (300-1).

상기 연결부재(300-1)는 띠장(110)과 일측이 나사 결합되는 십자 보강판(311)과, 일측이 상기 십자 보강판(311)의 타측에 강제 결합되는 제 1 기초판(312)과, 상기 제 1 기초판(312)의 타측에 강제 결합되어 제 1 강관 버팀보(210)의 일측 하반구를 거치하며 일측 끝단부가 제 1 T형 나사결합부(315)에 의해서 체결되고 타측 끝단부가 제 1 경첩(316)에 의해서 체결되는 제 1 하단밴드(313)와, 상기 제 1 하단밴드(313)에 거치된 제 1 강관 버팀보(210)의 일측 상반구를 덮어씌우고 일측 끝단부가 상기 제 1 하단밴드(313)와 제 1 T형 나사결합부(315)에 의해서 체결되고 타측 끝단부가 제 1 하단밴드(313)와 제 1 경첩(316)에 의하여 체결되는 제 1 상단밴드(314)로 이루어진다.The connecting member 300-1 has a cross reinforcement plate 311, one side of which is connected to the strip 110, and a first base plate 312 on which one side is forcibly coupled to the other side of the cross reinforcement plate 311. , Is forcedly coupled to the other side of the first base plate 312 to mount one lower hemisphere of the first steel pipe brace 210, one end is fastened by the first T-type screw coupling portion 315 and the other end is first 1 covers the upper hemisphere of one side of the first lower band 313 fastened by the hinge 316 and the first steel pipe brace 210 mounted on the first lower band 313 and one end of the first lower band 313. The first end band 314 is fastened by the band 313 and the first T-type screw engaging portion 315 and the other end is fastened by the first lower band 313 and the first hinge 316.

도 2c는 T형 나사결합부의 사시도로서, 도시된 바와 같이 상기 제 1 하단밴드(313) 및 제 1 상단밴드(314)가 제 1 T형 볼트에 의하여 체결되는 제 1 T형 나사결합부(315)에 대하여 보다 상세하게 설명하면, 제 1 T형 볼트가 제 1 하단밴드(313)에 형성된 제 1 스티프너(315-1)의 제 1 홀에 삽입되고 상기 제 1 스티프너(315-1)의 제 1 홀에 삽입된 제 1 T형 볼트(315-2)는 상기 제 1 스티프너(315-1)와 동일하게 제 1 하단밴드(313)에 형성된 제 2 스티프너(315-3)의 제 2 홀에 삽입된다.Figure 2c is a perspective view of the T-shaped screw coupling portion, as shown in the first lower band 313 and the first upper band 314, the first T-shaped screw coupling portion 315 is fastened by the first T-type bolt In more detail, the first T-shaped bolt is inserted into the first hole of the first stiffener 315-1 formed in the first lower band 313 and the first stiffener 315-1 is formed. The first T-shaped bolt 315-2 inserted into the first hole is formed in the second hole of the second stiffener 315-3 formed in the first lower band 313 in the same manner as the first stiffener 315-1. Is inserted.

이상과 같이 제 1 스티프너(315-1)와 제 2 스티프너(315-3)에 제 1 T형 볼트(315-2)가 삽입되어 결합되면 상기 제 1 T형 볼트(315-2)는 도 2c에 도시된 화살표 방향과 같이 상, 하로 움직인다.As described above, when the first T-type bolt 315-2 is inserted into and coupled to the first stiffener 315-1 and the second stiffener 315-3, the first T-type bolt 315-2 is shown in FIG. 2C. It moves up and down as shown by arrow direction.

이후, 제 1 스티프너(315-1)와 제 2 스티프너(315-3)와 체결된 제 1 T형 볼트(315-2)는 제 1 상단밴드(314)에 제 1 T형 볼트(315-2)가 삽입되도록 강제 결합된 제 3 스티프너(315-4)와 제 4 스티프너(315-5) 사이에 체결되며 제 1 T형 볼트(315-2)에 체결되는 너트를 조여서 제 1 상단밴드(314)와 제 1 하단밴드(313)가 고정되게 체결되고 상기 너트를 풀면 제 1 스티프너(315-1)와 제 2 스티프너(315-3)에 의하여 체결된 제 1 T형 볼트(315-2)가 상, 하로 움직임으로 제 1 상단밴드(314)와 분리되어 제 1 강관 버팀보(210)가 쉽게 해체된다.Subsequently, the first T-type bolt 315-2 fastened to the first stiffener 315-1 and the second stiffener 315-3 is connected to the first upper band 314 by the first T-type bolt 315-2. ) Is fastened between the third stiffener (315-4) and the fourth stiffener (315-5) forced to be inserted into the first upper band (314) by tightening the nut fastened to the first T-shaped bolt (315-2) ) And the first lower band 313 is fixed and the first T-type bolt 315-2 fastened by the first stiffener 315-1 and the second stiffener 315-3 is loosened. The first steel pipe brace 210 is easily dismantled by being separated from the first upper band 314 by moving up and down.

특히, 제 3, 제 4 스티프너(315-4, 315-5)에 턱을 형성하여 너트(315-7)가 조립되기 전에 사각 와샤(315-6)를 먼저 조립함으로써 상기 사각 와샤(315-6)가 상기 턱에 걸리도록 구성하는 것이 바람직하다.In particular, the square washer 315-6 is formed by first assembling the square washer 315-6 before the nut 315-7 is assembled by forming a jaw in the third and fourth stiffeners 315-4 and 315-5. ) Is preferably configured to be caught by the jaw.

상기 제 1 상단밴드(314)는 제 1 하단밴드(313)에 일측 하반구가 거치된 제 1 강관 버팀보(210)의 일측 상반구를 덮어씌우고 제 1 하단밴드(313)와 체결되도록 반원형으로 형성되며 일측 끝단부가 제 1 경첩(316)과 체결되고 타측 끝단부는 제 1 T형 나사결합부의 제 3 스티프너(315-4) 및 제 4 스티프너(315-5)가 형성되어 상기 제 3, 제 4 스티프너(315-4, 315-5) 사이에 제 1 T형 볼트(315-2)가 끼워진다.The first upper band 314 is formed in a semi-circular shape so as to cover one upper hemisphere of the first steel pipe brace 210, one lower hemisphere is mounted on the first lower band 313 and fastened to the first lower band 313. One end is fastened to the first hinge 316, and the other end is formed with the third stiffener 315-4 and the fourth stiffener 315-5 of the first T-shaped threaded portion to form the third and fourth stiffeners. A first T-shaped bolt 315-2 is sandwiched between 315-4 and 315-5.

또한, 상기 제 1 상단밴드(314)에는 제 1 기초판(312)과 나사 결합되는 제 1 나사체결편(317)을 구비하여 나사 결합함으로써 제 1 상단밴드(314)의 흔들림을 방지한다.In addition, the first upper band 314 is provided with a first screw fastening piece 317 that is screwed with the first base plate 312 to prevent the shaking of the first upper band 314 by screwing.

특히, 상기 제 1 나사체결편(317)은 상기 제 1 상단밴드(314)에 다수개 구비하는 것이 바람직하다.In particular, it is preferable that the first screw fastening piece 317 is provided in plural in the first upper band 314.

한편, 도 2b는 본발명의 제 2 실시예에 따른 강광 버팀보의 연결구조 중에서 이음부재의 측면도 및 평면도로서, 도시된 바와 같이 상기 이음부재(400-1)는 제 2, 제 3 하단 밴드(411, 412)와, 제 2 기초판(413)과 제 2, 3 상단 밴드(414, 415)로 구성된다.On the other hand, Figure 2b is a side view and a plan view of the joint member in the connection structure of the strong beam support according to the second embodiment of the present invention, as shown in the joint member 400-1 is the second, third lower band 411 , 412, a second base plate 413, and second and third upper bands 414 and 415.

더욱 상세하게 설명하면, 제 2 하단밴드(411)는 제 1 강관 버팀보(210)의 타측 끝단부가 거치되도록 반원형으로 형성되며 상기 반원형으로 형성된 제 2 하단밴드(411)의 일측 끝단부가 제 2 T형 나사결합부(417)에 의하여 나사 결합되고 제 2 기초판(413)의 일측과 강제 결합되며, 상기 반원형으로 형성된 제 2 하단밴드(411)의 타측 끝단부는 제 2 경첩(361-1)에 의하여 결합되며, 체결구조는 상기한 제 1 하단밴드(313) 및 제 1 상단밴드(314)의 체결 구조와 동일하다.In more detail, the second lower band 411 is formed in a semi-circular shape so that the other end of the first steel pipe support 210 is mounted, and one end of the second lower band 411 formed in the semi-circular shape is the second T-type. Screwed by a screwing portion 417 and forcibly coupled to one side of the second base plate 413, the other end of the second lower band 411 formed in the semi-circular shape by a second hinge (361-1) Is coupled, the fastening structure is the same as the fastening structure of the first lower band 313 and the first upper band 314 described above.

상기 제 3 하단밴드(412)는 이음부재(400-1)에 체결되는 제 1 강관 버팀보(210)에 인접하여 연결되는 제 2 강관 버팀보(810)의 일측 하반구가 거치되도록 반원형으로 형성되며 상기 반원형으로 형성된 제 3 하단밴드(412)의 일측 끝단부가 제 3 T형 나사결합부(418)에 의하여 나사 결합되고 제 2 기초판(413)의 타측과 강제 결합되며, 상기 반원형으로 형성된 제 3 하단밴드(412)의 타측 끝단부가 제 3 경첩(361-2)에 의하여 결합되며, 체결구조는 상기한 제 1 하단밴드(313)와 제 1 상단밴드(314)의 체결구조와 동일하다.The third lower band 412 is formed in a semi-circular shape so that one lower hemisphere of the second steel pipe brace 810 connected adjacent to the first steel pipe brace 210 fastened to the joint member 400-1 is mounted thereon. One end of the third lower band 412 formed in a semi-circular shape is screwed by the third T-shaped screw engaging portion 418 and is forcibly coupled to the other side of the second base plate 413, and the third lower end formed in the semi-circular shape The other end of the band 412 is coupled by a third hinge 361-2, and the fastening structure is the same as that of the first lower band 313 and the first upper band 314.

상기 제 2 기초판(413)은 상기 제 2, 제 3 하단밴드(411, 412)와 강제 결합되고 제 2, 제 3 상단밴드(414, 415) 사이에 제 2 나사체결편(416)을 구비하여 나사 결합함으로써, 제 2, 제 3 상단밴드(414, 415)가 흔들림 없이 보다 견고히 고정되도록 하며 상기 제 2 나사체결편(416)은 다수 개 구비되는 것이 바람직하다.The second base plate 413 is forcibly coupled to the second and third lower bands 411 and 412 and has a second screwing piece 416 between the second and third upper bands 414 and 415. By screwing, the second and third upper bands 414 and 415 are more firmly fixed without shaking, and the second screw fastening piece 416 is preferably provided with a plurality.

상기 제 2 상단밴드(414)는 상기 제 2 하단밴드(411)에 타측 하반구가 거치된 제 1 강관 버팀보(210)의 타측 상반구를 덮을 수 있도록 반원형으로 형성되며 상기 반원형으로 형성된 제 2 상단밴드(414)의 일측 끝단부가 제 2 경첩(361-1)으로 연결되고 타측 끝단부는 제 2 T형 나사결합부(417)와 나사 결합된다.The second upper band 414 is formed in a semi-circular shape so as to cover the other upper hemisphere of the first steel pipe brace 210, the other lower hemisphere is mounted on the second lower band 411, the second upper end formed in the semi-circular shape One end of the band 414 is connected to the second hinge (361-1) and the other end is screwed with the second T-type screw engaging portion 417.

즉, 제 2 하단밴드(411)와 제 2 상단밴드(414)에 의해서 형성되는 제 2 T형 나사결합부(417)는 상기한 제 1 T형 나사결합부(315)와 동일한 구조이며, 도 2c의 T형 나사 결합부 사시도를 참조하여 설명하면, 상기 제 2 T형 나사결합부(417)는 상기 제 2 하단밴드(411)에 형성되고 제 3 홀을 갖는 제 5 스티프너(315-1)와, 제 2 하단밴드(411)에 형성되고 제 4 홀을 갖는 제 6 스티프너(315-3)와, 제 2 상단밴드(414)에 형성된 제 7 스티프너(315-4)와, 제 2 상단밴드(414)에 형성된 제 8 스티프너(315-5)로 이루어지며, 제 2 T형 볼트(315-2)가 상기 제 2 하단밴드(411)에 형성된 제 3 홀과 제 4 홀에 삽입되어 제 7 및 제 8 스티프너(315-4, 315-5) 사이에 끼워져서, 상기 제 2 하단밴드(411)와 상기 제 2 상단밴드(414)가 상기 제 2 T형 볼트(315-2)에 의하여 너트(315-7)로 체결 고정된다.That is, the second T-type screw engaging portion 417 formed by the second lower band 411 and the second upper band 414 has the same structure as the first T-type screw engaging portion 315 described above. Referring to the perspective view of the T-type screw engaging portion of 2c, the second T-type screw engaging portion 417 is formed in the second lower band 411 and the fifth stiffener 315-1 having the third hole. A sixth stiffener 315-3 formed in the second lower band 411 and having a fourth hole, a seventh stiffener 315-4 formed in the second upper band 414, and a second upper band And an eighth stiffener 315-5 formed at 414, and a second T-shaped bolt 315-2 is inserted into the third and fourth holes formed in the second lower band 411 to be inserted into the seventh hole. And an eighth stiffener (315-4, 315-5), so that the second lower band 411 and the second upper band 414 are nutted by the second T-shaped bolt 315-2. (315-7) is fastened and fixed.

상기 제 3 상단밴드(415)는 상기 제 2 상단밴드(414)에 거치되는 제 1 강관 버팀보(210)에 인접하여 연결되는 제 2 강관 버팀보(810)의 일측 상반구를 덮을 수 있도록 반원형으로 형성되며 상기 반원형으로 형성된 제 3 상단밴드(415)의 일측 끝단부가 제 3 경첩(361-2)으로 연결되고 타측 끝단부는 제 3 T형 나사결합부(418)와 나사 결합된다.The third upper band 415 is formed in a semi-circular shape so as to cover the upper hemisphere on one side of the second steel pipe brace 810 connected adjacent to the first steel pipe brace 210 mounted on the second upper band 414. One end of the third upper band 415 formed in the semi-circular shape is connected to the third hinge 361-2 and the other end is screwed to the third T-type screwing portion 418.

즉, 제 3 하단밴드(412)와 제 3 상단밴드(415)에 의해서 형성되는 제 3 T형 나사결합부(418)는 상기한 제 1, 제 2 T형 나사결합부(315)와 동일한 구조이며, 도 2c의 T형 나사 결합부 사시도를 참조하여 설명하면, 상기 제 3 T형 나사결합부(418)는 상기 제 3 하단밴드(412)에 형성되고 제 5 홀을 갖는 제 9 스티프너(315-1)와, 제 3 하단밴드(412)에 형성되고 제 6 홀을 갖는 제 10 스티프너(315-3)와, 제 3 상단밴드(415)에 형성된 제 11 스티프너(315-4)와, 제 3 상단밴드(414)에 형성된 제 12 스티프너(315-5)로 이루어지며, 제 3 T형 볼트(315-2)가 상기 제 3 하단밴드(412)에 형성된 제 5 홀과 제 6 홀에 삽입되어 제 11 및 제 12 스티프너(315-4, 315-5) 사이에 끼워져서, 상기 제 3 하단밴드(412)와 상기 제 3 상단밴드(415)가 상기 제 3 T형 볼트(315-2)에 의하여 너트(315-7)로 체결 고정된다. That is, the third T-type threaded portion 418 formed by the third lower band 412 and the third upper band 415 has the same structure as the first and second T-type threaded portions 315 described above. 2C, the third T-type screw coupling part 418 is formed in the third lower band 412 and has a ninth stiffener 315 having a fifth hole. -1), a tenth stiffener 315-3 formed in the third lower band 412 and having a sixth hole, an eleventh stiffener 315-4 formed in the third upper band 415, and It consists of a twelfth stiffener 315-5 formed in the third upper band 414, and a third T-shaped bolt 315-2 is inserted into the fifth and sixth holes formed in the third lower band 412. And between the eleventh and twelfth stiffeners 315-4 and 315-5, such that the third lower band 412 and the third upper band 415 are connected to the third T-shaped bolt 315-2. By the nut 315-7.

한편, 상기 제 2 상단밴드(414)에는 상기 제 2 기초판과 나사 결합되는 제 2 나사체결편(416)을 더 구비하여 제 2 상단밴드(414)와 제 2 기초판(413)을 더욱 견고히 고정하는 것이 바람직하다.On the other hand, the second top band 414 further includes a second screw fastening piece 416 screwed with the second base plate to further firmly secure the second top band 414 and the second base plate 413. It is preferable to fix it.

도 3a 내지 도 3c는 본 발명의 제 3 실시예에 따른 강관 버팀보 연결구조이다. 도 3a는 본 발명의 제 3 실시예에 따른 강관 버팀보 연결구조의 측면도, 평면도, 및 단면도로서, 도시된 바와 같이 상기 제 3 실시예에 따른 상기 강관 버팀보 연결구조는 띠장(120)과, 제 1 강관 버팀보(220) 및 연결부재(300-2)로 이루어진다.3a to 3c is a steel pipe support structure according to a third embodiment of the present invention. 3A is a side view, a plan view, and a cross-sectional view of a steel pipe support structure according to a third embodiment of the present invention. As shown in the drawing, the steel pipe support structure according to the third embodiment includes a belt 120 and a first structure. It consists of a steel pipe brace 220 and the connecting member (300-2).

또한, 도 3b는 본 발명의 제 3 실시예에 따른 강관 버팀보의 연결구조 중에서 변형된 체결편을 도시한 단면도로서, 도시된 바와 같이 상기 띠장(120)과, 제 1 강관 버팀보(220) 및 연결부재(300-2)에 상기 제 1 강관 버팀보(220)와 상기 제 1 강관 버팀보(220)에 인접하여 연결되는 강관 버팀보인 제 2 강관 버팀보(820)를 이어주는 이음부재(400-2)를 더 구비하여 구성하는 것이 바람직하다.In addition, Figure 3b is a cross-sectional view showing a deformed fastening piece of the connection structure of the steel pipe brace according to the third embodiment of the present invention, as shown in the strip 120, the first steel pipe brace 220 and the connection The member 300-2 further includes a joint member 400-2 connecting the first steel pipe brace 220 and the second steel pipe brace 820 which is a steel pipe brace connected adjacent to the first steel pipe brace 220. It is preferable to comprise.

더욱 상세하게는, 지반에 설치되는 엄지말뚝의 측면에 상하로 일정 간격을 가지면서 수평하게 띠장(120)이 설치되며, 상기 띠장(120)에 연결부재(300-2)가 설치되어 상기 연결부재(300-2)에 제 1 강관 버팀보(220)가 체결되어 고정된다.More specifically, the strip 120 is installed horizontally with a predetermined interval on the side of the thumb pile installed on the ground, the connecting member 300-2 is installed on the strip 120 is the connection member The first steel pipe brace 220 is fastened to 300-2.

상기 제 1 강관 버팀보(220)는 일측 끝단부에 연결부재(300-2) 제 1 밴드의 외주면에 형성된 제 5, 제 6 체결편(323-1, 323-2)과 볼트와 너트에 의하여 결합되는 제 1, 제 2 체결편(220-1, 220-2)이 형성되어 연결부재(300-2)와 체결되어 고정되고, 또한 상기 이음부재(400-2)와 체결되기 위하여 타측 끝단부에 제 3, 제 4 체결편(421-1, 421-2)이 형성된다.The first steel pipe support 220 is coupled to the fifth and sixth fastening pieces 323-1 and 323-2 formed on the outer circumferential surface of the first band of the connecting member 300-2 at one end by a bolt and a nut. The first and second fastening pieces 220-1 and 220-2 are formed to be fastened and fixed to the connection member 300-2, and to the other end part to be fastened to the joint member 400-2. Third and fourth fastening pieces 421-1 and 421-2 are formed.

상기 연결부재(300-2)는 상기 띠장(120)과 일측이 나사 결합되는 십자 보강판(321)과, 일측이 상기 십자 보강판(321)의 타측과 강제 결합되는 제 1 기초판(322)과, 상기 제 1 기초판(322)과 일측이 강제 결합되는 제 1 밴드(323)로 이루어진다.The connecting member 300-2 is a cross reinforcement plate 321 in which one side is screw-coupled with the belt long 120, and a first base plate 322 in which one side is forcibly coupled to the other side of the cross reinforcement plate 321. And, the first base plate 322 and one side is made of a first band 323 forcibly coupled.

도 3a를 참조로 하여 상기 제 1 연결부재(300-2)의 제 1 밴드(323)를 더욱 상세하게 설명하면, 원형 밴드로 형성되어 내측으로 제 1 강관 버팀보(220)의 일측이 삽입되고, 그 외주면에 강관 버팀보의 길이방향에 대하여 수직하게 돌출된 제 5 체결편(323-1)이 형성되고 상기 제 5 체결편(323-1)과 대응되는 반대편 외주면에 강관 버팀보의 길이방향에 대하여 수직하게 돌출된 제 6 체결편(323-2)이 형성된다.Referring to FIG. 3A, the first band 323 of the first connection member 300-2 will be described in more detail. One side of the first steel pipe brace 220 is inserted into an inner side of the first band 323. A fifth fastening piece 323-1 protruding perpendicularly to the longitudinal direction of the steel pipe brace is formed on the outer circumferential surface thereof and is perpendicular to the longitudinal direction of the steel pipe brace on the opposite outer circumferential surface corresponding to the fifth fastening piece 323-1. The sixth fastening piece 323-2 protrudingly is formed.

따라서, 제 5 체결편(323-1)에는 볼트공을 형성하고 형성된 볼트공에 직선형 볼트를 삽입하고 상기 삽입된 직선형 볼트를 제 1 강관 버팀보(220)의 제 1 체결편(220-1)에 형성된 볼트공에 삽입하여 제 1 밴드(323)와 제 1 강관 버팀보(220)가 분리되지 않도록 너트로 고정한다.Accordingly, a bolt hole is formed in the fifth fastening piece 323-1, a straight bolt is inserted into the formed bolt hole, and the inserted straight bolt is inserted into the first fastening piece 220-1 of the first steel pipe brace 220. Inserted into the formed bolt hole is fixed with a nut so that the first band 323 and the first steel pipe brace 220 is not separated.

아울러, 도 3b에 도시된 바와 같이 연결부재(300-2)에 형성된 제 5 체결편(323-1)이 제 1 강관 버팀보(220)의 길이 방향으로 상기 제 1 강관 버팀보(220) 외주면에 수형하게 돌출 형성되고, 상기 제 1 강관 버팀보(220)에 형성된 제 1 체결편(220-1) 역시 제 1 강관 버팀보(220)의 길이 방향으로 형성하여 상기 제 1, 5 체결편(220-1, 323-1)의 볼트공에'ㄷ'형 볼트로 체결한 후 각각에 너트로 조여 상기 제 1 강관 버팀보(220)와 연결부재(300-2)의 제 1 밴드(323)를 체결하는 것도 바람직하다.In addition, as shown in FIG. 3B, the fifth fastening piece 323-1 formed on the connecting member 300-2 is male on the outer circumferential surface of the first steel pipe brace 220 in the longitudinal direction of the first steel pipe brace 220. Protrudingly formed, the first fastening piece 220-1 formed in the first steel pipe brace 220 is also formed in the longitudinal direction of the first steel pipe brace 220 to the first and fifth fastening pieces 220-1, It is also preferable to fasten the first band 323 of the first steel pipe brace 220 and the connecting member 300-2 by tightening with a nut on each of the bolts of the 323-1) with the 'c' type bolt. Do.

또한, 제 1 밴드(323)는 볼트공이 형성되고 상기 볼트공과 일치되게 제 1 너트를 강제 결합하고 상기 볼트공과 일치된 제 1 너트에 제 1 볼트가 삽입되어 체결된다.In addition, the first band 323 has a bolt hole is formed and is forcibly coupled to the first nut to match the bolt hole and the first bolt is inserted into the first nut matched with the bolt hole is fastened.

즉, 도 3a의 측면도에 도시된 A를 확대한 확대도와 같이, 제 1 밴드(323)에 제 1 강관 버팀보(220)의 일측 끝단부가 삽입되면 상기 제 1 너트(10)에 삽입되는 제 1 볼트(11)를 조임으로써, 제 1 볼트(11)가 제 1 강관 버팀보(220)에 압착을 가하게 됨으로 제 1 밴드(323)가 제 1 강관 버팀보(220)에 밀착 고정하게 된다. That is, as shown in an enlarged view in which A is enlarged in the side view of FIG. 3A, when one end of the first steel pipe support 220 is inserted into the first band 323, the first bolt is inserted into the first nut 10. By tightening (11), the first bolt 11 is pressed against the first steel pipe brace 220, so that the first band 323 is tightly fixed to the first steel pipe brace 220.

더욱이, 상기 볼트공은 다수 개 형성하여 다수의 제 1 볼트(11)로 제 1 강관 버팀보(220)에 압착을 가하여 고정하는 것이 바람직하다.In addition, it is preferable that a plurality of bolt holes are formed and pressed to fix the first steel pipe support 220 with a plurality of first bolts 11.

도 3c에 도시된 바와 같이 상기 이음부재(400-2)는 제 2 밴드(421)와 제 2 기초판(422)과 제 3 밴드(423)로 이루어지며, 상기 제 2 밴드(421)와 제 2 기초판(422)의 일측이 강제 결합되며, 상기 제 2 기초판(422)의 타측에 제 3 밴드(423)가 강제 결합된다.As shown in FIG. 3C, the joint member 400-2 includes a second band 421, a second base plate 422, and a third band 423, and the second band 421 and the second band 421. One side of the second base plate 422 is forcibly coupled, and the third band 423 is forcibly coupled to the other side of the second base plate 422.

더욱 상세하게는, 상기 제 2, 제 3 밴드(421, 423)는 상기 제 1 밴드(323)와 동일한 구조로 형성 및 동작되고 제 2 기초판(422)에 강제 결합되며 다만, 제 2 밴드(421)에는 상기 제 1 밴드(323)에 삽입 체결되는 제 1 강관 버팀보(220)의 타측 끝단부가 삽입 체결되고 제 3 밴드(423)는 제 2 밴드(421)에 삽입 체결되는 제 1 강관 버팀보(220)에 인접하여 연결되는 제 2 강관 버팀보(820)가 삽입되어 체결된다.More specifically, the second and third bands 421 and 423 are formed and operated in the same structure as the first band 323 and are forcibly coupled to the second base plate 422, except that the second band ( The other end of the first steel pipe support 220 inserted into and fastened to the first band 323 is inserted into and fastened to the first band 323, and the third band 423 is inserted into and fastened to the second band 421. A second steel pipe brace 820 connected adjacent to 220 is inserted and fastened.

상기 제 1 강관 버팀보(220)의 타측 외주면에는 제 3, 제 4 체결편(220-3, 220-4)이 형성되고, 상기 제 2 밴드(421)의 일측 외주면에는 제 7 체결편(421-1)이 타측 외주면에는 제 8 체결편(421-2)이 형성되며, 상기 제 2 밴드(421)에 상기 제 1 강관 버팀보(220)의 타측이 삽입되면, 상기 제 3 체결편(220-3)과 제 7 체결편(421-1)이 볼트와 너트에 의하여 결합되며, 상기 제 4 체결편(220-4)은 제 8 체결편(421-2)과 볼트와 너트에 의하여 결합된다.Third and fourth fastening pieces 220-3 and 220-4 are formed on the other outer circumferential surface of the first steel pipe support 220, and a seventh fastening piece 421-is formed on one outer circumferential surface of the second band 421. 1) The eighth fastening piece 421-2 is formed on the other outer circumferential surface thereof, and when the other side of the first steel pipe brace 220 is inserted into the second band 421, the third fastening piece 220-3 is formed. ) And the seventh fastening piece 421-1 are coupled by a bolt and a nut, and the fourth fastening piece 220-4 is coupled by an eighth fastening piece 421-2 and a bolt and a nut.

상기 제 2 기초판(422)의 타측에 강제 결합되는 상기 이음부재(400-2)의 제 3 밴드(423)의 외주면에는 제 9, 제 10 체결편(423-1, 423-2)이 형성되며, 제 3 밴드(423)에 제 1 강관 버팀보(220)에 인접하여 연결되며, 외주면에 제 11, 제 12 체결편(423-3, 423-4)이 형성된 제 2 강관 버팀보(820)가 삽입되면, 상기 제 9 체결편(423-1)과 제 11 체결편(423-3)이 볼트와 너트에 의하여 결합되며, 상기 제 10 체결편(423-2)은 제 12 체결편(423-4)과 볼트와 너트에 의하여 체결되어 결합된다. Ninth and tenth fastening pieces 423-1 and 423-2 are formed on an outer circumferential surface of the third band 423 of the joint member 400-2 that is forcibly coupled to the other side of the second base plate 422. The second steel pipe brace 820 is connected to the third band 423 adjacent to the first steel pipe brace 220, and the eleventh and twelfth fastening pieces 423-3 and 423-4 are formed on the outer circumferential surface thereof. When inserted, the ninth fastening piece 423-1 and the eleventh fastening piece 423-3 are coupled by bolts and nuts, and the tenth fastening piece 423-2 is the twelfth fastening piece 423-. 4) and is fastened and coupled by bolts and nuts.

아울러, 제 1 강관 버팀보(220) 및 제 2 강관 버팀보(820)와 제 2 및 제 3 밴드(421, 423)를 체결하기 위한 다수의 체결편들(220-3, 220-4, 421-1, 421-2, 423-1, 423-2, 423-3, 423-4)은 상기한 바와 같이 제 1 강관 버팀보(220)의 길이방향에 대하여 수직으로 돌출되게 형성하여'일자'형 볼트로 체결하거나 또는 제 1 강관 버팀보(220)의 길이방향에 대하여 수평으로 돌출되게 형성하여'ㄷ'형 볼트로 체결하는 것이 바람직하다.In addition, a plurality of fastening pieces 220-3, 220-4, and 421-1 for fastening the first steel pipe brace 220 and the second steel pipe brace 820 with the second and third bands 421 and 423. , 421-2, 423-1, 423-2, 423-3, and 423-4 are formed to protrude perpendicularly to the longitudinal direction of the first steel pipe brace 220 as described above to form a 'date' bolt Fastening or it is preferable to be formed to protrude horizontally with respect to the longitudinal direction of the first steel pipe brace 220 to fasten with the 'c' type bolt.

또한, 제 2 밴드(421) 및 제 3 밴드(423) 역시도, 제 1 밴드(323)와 동일하게 도 3a의 측면도에 도시된 A를 확대한 확대도와 같이, 제 2 밴드(421)에 볼트공을 형성하여 상기 제 1 강관 버팀보(220)의 타측 끝단부가 삽입되면 제 2 밴드(421)에 너트를 강제 결합하고 볼트를 조임으로써, 제 2 밴드(421)가 제 1 강관 버팀보(220)에 밀착 고정하도록 하며, 제 3 밴드(423)에도 볼트공을 형성하고 이에 일치되는 너트를 강제 결합하고 볼트를 조임으로써 제 3 밴드(423)가 제 2 강관 버팀보(820)에 밀착 고정하는 것이 바람직하다. Also, the second band 421 and the third band 423 are also bolted to the second band 421 in the same manner as the enlarged view in which A shown in the side view of FIG. 3A is enlarged similarly to the first band 323. When the other end of the first steel pipe brace 220 is inserted to force the nut to the second band 421 and tighten the bolt, the second band 421 is in close contact with the first steel pipe brace 220 The third band 423 is preferably tightly fixed to the second steel pipe brace 820 by forming a bolt hole in the third band 423 and forcibly coupling a nut corresponding thereto and tightening the bolt.

도 4a 내지 도 4c는 본 발명의 제 4 실시예에 따른 강관 버팀보 연결구조이다. 도 4a는 본 발명의 제 4 실시예에 따른 강관 버팀보 연결구조의 측면도, 평면도, 및 단면도로서, 도시된 바와 같이 상기 제 4 실시예에 따른 상기 강관 버팀보 연결구조는 띠장(130)과, 제 1 강관 버팀보(230) 및 연결부재(300-3)로 이루어진다.4a to 4c is a steel pipe brace connection structure according to a fourth embodiment of the present invention. 4A is a side view, a plan view, and a cross-sectional view of a steel pipe support structure according to a fourth embodiment of the present invention. As shown in the drawing, the steel pipe support structure according to the fourth embodiment includes a belt 130, and a first view. It consists of a steel pipe brace 230 and the connecting member (300-3).

또한, 도 4c는 본 발명의 제 4 실시예에 따른 강관 버팀보 연결구조 중에서 이음부재의 측면도, 단면도 및 평면도로서, 도시된 바와 같이 상기 제 1 강관 버팀보(230)가 연결부재(300-3)에 일측이 체결되는 한 측 이외의 다른 한 측인 타측과 상기 제 1 강관 버팀보(230)에 인접하여 연결되는 제 2 강관 버팀보(830)가 체결되는 다수의 L형강(431)을 더 포함하는 것이 바람직하다.4C is a side view, a cross-sectional view, and a plan view of a joint member in a steel pipe support structure according to a fourth embodiment of the present invention. As shown in the drawing, the first steel pipe support 230 is connected to the connection member 300-3. It is preferable to further include a plurality of L-shaped steel 431 to which the other side and the second steel pipe brace 830 connected adjacent to the first steel pipe brace 230 is connected to one side other than the one side is fastened. .

더욱 상세하게는, 지반에 설치되는 엄지말뚝의 측면에 상하로 일정 간격을 가지면서 수평하게 띠장(130)이 설치되며, 상기 띠장(130)에 연결부재(300-3)가 설치되어 상기 연결부재(300-3)에 제 1 강관 버팀보(220)의 일측이 체결되어 고정된다.More specifically, the strip 130 is horizontally installed with a predetermined interval up and down on the side of the thumb pile is installed on the ground, the connecting member 300-3 is installed on the strip 130 is the connection member One side of the first steel pipe brace 220 is fastened to 300-3.

상기 제 1 강관 버팀보(230)는 일측 끝단부에 관통된 제 1, 제 2 관통홀이 형성되어 연결부재(300-3)와 체결될 뿐만 아니라 타측 끝단부는 제 2 강관 버팀보(830)와 L형강(431)에 의하여 용접 결합과 같은 방식으로 강제 결합된다.The first steel pipe brace 230 is formed with the first and second through-holes penetrating at one end portion thereof to be connected to the connecting member 300-3, and the other end portion of the first steel pipe brace 830 and the L-shaped steel. 431 is forcibly coupled in the same manner as a welded joint.

상기 연결부재(300-3)는 내부에 공간이 형성되고 상기 공간을 통하여 띠장(130)과 일측이 나사 결합되는 레듀샤(304)와, 일측이 상기 레듀사(304)의 타측과 강제 결합되는 제 1 기초판(332)과, 상기 제 1 기초판(332)의 타측과 강제 결합되고 제 1 강관 버팀보(230)에 삽입되는 제 1 밴드(333)로 이루어진다.The connecting member 300-3 has a space formed therein and a redundancy 304 in which one side is screw-coupled with the belt long 130 through the space, and one side of the connecting member 300-3 is forcibly coupled to the other side of the redux yarn 304. The first base plate 332 and the first band 333 is forcibly coupled to the other side of the first base plate 332 and inserted into the first steel pipe brace 230.

상기 연결부재(300-3)를 보다 상세하게 설명하면, 상기 레듀샤(304)는 내부에 형성된 공간을 통하여 띠장과 접하는 일측이 에 볼트, 너트 등을 이용하여 결합하고 또한 레듀샤(304)의 타측은 제 1 기초판(332)의 일측에 강제 결합된다.When the connection member 300-3 will be described in more detail, the reduxia 304 is coupled to one side of the redundancy 304 using a bolt, a nut, etc. through a space formed therein, and furthermore, The other side is forcibly coupled to one side of the first base plate 332.

특히, 도 4b는 본 발명의 제 4 실시예에 따른 강관 버팀보 연결구조 중에서 띠장과 연결되는 레듀샤의 변형된 형태를 나타낸 평면도 및 단면도로서, 도시된 바와 같이 띠장(130)과 접하는 부분인 레듀샤(304)의 일측 길이를 넓힌 후 넓어진 부분을 나사 결합하는 것이 바람직하다.In particular, Figure 4b is a plan view and a cross-sectional view showing a modified form of the reddish connected to the strip in the steel pipe reinforcement connection structure according to the fourth embodiment of the present invention, as shown in the contact with the strip length 130 as shown After extending the length of one side of 304, it is preferable to screw the widened portion.

상기 제 1 기초판(332)의 일측은 상기 레듀샤(304)의 타측과 강제 결합될 뿐만 아니라, 상기 제 1 기초판의 타측은 제 1 강관 버팀보(230)에 삽입되는 제 1 밴드(333)와 강제 결합된다.One side of the first base plate 332 is not only forcibly coupled to the other side of the reducer 304, the other side of the first base plate is inserted into the first steel pipe brace 230, the first band 333 Is forced to be combined with.

상기 제 1 밴드(333)는 상기 제 1 강관 버팀보(230)에 삽입된 이후에 제 1 밴드(333)에 의 외주면에 관통되게 형성된 제 3, 제 4 관통홀이 제 1 강관 버팀보(230)의 일측 끝단부 형성된 제 1, 제 2 관통홀을 일치시켜서 제 1 체결부재(333-1)에 의하여 체결된다. 즉, 상기 제 1 체결부재(333-1)에 의하여 상기 제 1 강관 버팀보(230)의 제 1 관통홀과 상기 제 1 밴드(333)의 제 4 관통홀을 일치시키고, 상기 제 1 강관 버팀보(230)의 제 2 관통홀과 상기 제 1 밴드(333)의 제 3 관통홀을 일치시켜서, 상기 제 1 관통홀과 제 4 관통홀 및 제 3 관통홀과 제 2 관통홀을 차례로 관통하여 체결된다.After the first band 333 is inserted into the first steel pipe brace 230, the third and fourth through holes formed to penetrate the outer circumferential surface of the first band 333 are formed in the first steel pipe brace 230. It is fastened by the first fastening member 333-1 by matching the first and second through-holes formed at one end. That is, the first through hole of the first steel pipe brace 230 and the fourth through hole of the first band 333 are matched by the first fastening member 333-1, and the first steel pipe brace ( The second through hole of 230 and the third through hole of the first band 333 coincide with each other to be fastened through the first through hole, the fourth through hole, and the third through hole and the second through hole. .

아울러, 제 1 밴드(333)가 상기 제 1 강관 버팀보(230)에 삽입되면 제 1 밴드(333)와 제 1 강관 버팀보(230) 사이에 발생하는 틈에 의하여 제 1 강관 버팀보(230)가 흔들릴 수 있기 때문에 쐐기(900)를 삽입하여 상기 제 1 강관 버팀보(230)와 제 1 밴드(33)을 보다 더 견고하게 고정하는 것이 바람직하다.
도 4c에 도시된 바와 같이, 상기 다수의 L형강(431)은 제 1 강관 버팀보(230)와 제 2 강관 버팀보(830)를 연결하는 것으로서, 상기 제 1 강관 버팀보(230)와 제 2 강관 버팀보(830)가 연결되기 위하여 접하는 부분인 제 1, 제 2 강관 버팀보(230, 830)의 길이방향으로 길게 형성된 다수의 L형강(431)을 용접 결합함으로써 강제 결합되어 고정된다.
이상 도면과 상세한 설명에서 최적 실시예들이 개시되고, 이상에서 사용된 특정한 용어는 단지 본 발명을 설명하기 위한 목적에서 사용된 것일 뿐 의미 한정이나 특허청구범위에 기재된 본 발명의 범위를 제한하기 위하여 사용된 것이 아니다.
그러므로 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하고, 본 발명의 진정한 기술적 보호 범위는 특허청구범위의 기술적 사상에 의해 정해져야 할 것이다.
In addition, when the first band 333 is inserted into the first steel pipe brace 230, the first steel pipe brace 230 may be shaken by a gap generated between the first band 333 and the first steel pipe brace 230. Since it is possible to insert the wedge 900, it is preferable to more firmly fix the first steel pipe brace 230 and the first band 33.
As shown in Figure 4c, the plurality of L-shaped steel 431 is to connect the first steel pipe brace 230 and the second steel pipe brace 830, the first steel pipe brace 230 and the second steel pipe brace The 830 is forcedly coupled and fixed by welding a plurality of L-shaped steels 431 elongated in the longitudinal direction of the first and second steel pipe braces 230 and 830 which are in contact with each other to be connected.
Embodiments of the present invention are disclosed in the drawings and the detailed description, and the specific terms used above are used only for the purpose of describing the present invention, and are used to limit the scope of the present invention as defined in the meaning or claims. It is not.
Therefore, those skilled in the art can be various modifications and other equivalent embodiments from this, and the true technical protection scope of the present invention should be determined by the technical spirit of the claims.

도 1a 내지 도 1c는 본 발명의 제 1 실시예에 따른 강관 버팀보 연결구조 중에서 연결부재의 측면도, 평면도, 단면도1a to 1c is a side view, a plan view, a cross-sectional view of the connecting member of the steel pipe support structure according to the first embodiment of the present invention

도 1d 내지 도 1f는 본 발명의 제 1 실시예에 따른 강관 버팀보 연결구조 중에서 이음부재의 측면도, 평면도1D to 1F are a side view and a plan view of a joint member in a steel pipe support structure according to a first embodiment of the present invention.

도 2a는 본 발명의 제 2 실시예에 따른 강관 버팀보 연결구조 중에서 연결부재 측면도, 평면도, 단면도Figure 2a is a side view, plan view, cross-sectional view of the connecting member of the steel pipe support structure according to the second embodiment of the present invention

도 2b는 본 발명의 제 2 실시예에 따른 강관 버팀보 연결구조 중에서 이음부재 측면도, 평면도Figure 2b is a side view, a plan view of the joint member of the steel pipe support structure according to the second embodiment of the present invention

도 2c는 본 발명에 따른 T형 나사결합부 사시도Figure 2c is a perspective view of the T-type screw coupling portion according to the present invention

도 3a는 본 발명의 제 3 실시예에 따른 강관 버팀보 연결구조 중에서 연결부재 측면도, 평면도, 단면도Figure 3a is a side view, plan view, cross-sectional view of the connecting member of the steel pipe support structure according to the third embodiment of the present invention

도 3b는 본 발명에 따른 제 3 실시에 따른 강관 버팀보 연결구조 중에서 변형된 체결편을 도시한 단면도Figure 3b is a cross-sectional view showing a deformed fastening piece of the steel pipe support structure according to the third embodiment according to the present invention

도 3c는 본 발명의 제 3 실시예에 따른 강관 버팀보 연결구조 중에서 이음부재 측면도, 평면도Figure 3c is a side view, a plan view of the joint member of the steel pipe support structure according to the third embodiment of the present invention

도 4a는 본 발명의 제 4 실시예에 따른 강관 버팀보 연결구조 중에서 연결부재 측면도, 평면도, 단면도Figure 4a is a side view, a plan view, a cross-sectional view of the connecting member of the steel pipe support structure according to the fourth embodiment of the present invention

도 4b는 본 발명의 제 4 실시예에 따른 강관 버팀보 연결구조 중에서 띠장과 연결되는 레듀샤의 변형된 형태의 평면도, 단면도Figure 4b is a plan view, a cross-sectional view of a modified form of the reducer connected to the band in the steel pipe support structure according to the fourth embodiment of the present invention

도 4c는 본 발명의 제 4 실시예에 따른 강관 버팀보 연결구조 중에서 이음부재 측면도, 단면도, 평면도Figure 4c is a side view, sectional view, a plan view of the joint member of the steel pipe support structure according to the fourth embodiment of the present invention

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10 : 너트 11 : 볼트10: Nut 11: Bolt

100, 110, 120, 130 : 띠장100, 110, 120, 130

200, 210, 220, 230 : 제 1 강관 버팀보200, 210, 220, 230: first steel pipe brace

220-1 : 제 1 체결편 220-2 : 제 2 체결편220-1: First Fastener 220-2: Second Fastener

300, 300-1, 300-2, 300-3 : 연결부재 304 : 레듀사300, 300-1, 300-2, 300-3: Connection member 304: Redux

310, 311, 321 : 십자 보강판 310, 311, 321 cross reinforcement plate

312. 320, 322, 332 : 제 1 기초판 312.320, 322, 332: First base plate

313, 330 : 제1 하단밴드 314, 340 : 제 1 상단밴드313, 330: first lower band 314, 340: first upper band

315-1 : 제 1 , 5, 9 스티프너 315-1: 1st, 5, 9 stiffeners

315-2 : 제 1, 제 2, 제3 T형 볼트 315-2: 1st, 2nd, 3rd T-type bolt

315-3 : 제 2, 6, 10 스티프너 315-3: 2nd, 6, 10 stiffeners

315-4 : 제 3, 7, 11 스티프너 315-4: 3rd, 7, 11 stiffeners

315-5 : 제 4, 8, 12 스티프너 315-5: 4th, 8th, 12th stiffener

315-6 : 사각와샤 315-7 : 너트315-6: Square Washer 315-7: Nut

316 : 제 1 경첩 317, 341, : 제 1 나사체결편316: first hinge 317, 341: first screw fastening

323, 333 : 제 2 밴드 323-1 : 제 5 체결편323, 333: Second band 323-1: Fifth fastening

323-2 : 제 6 체결편 331 : 제 1 고정편323-2: 6th fastening piece 331: 1st fixing piece

331-1, 350 : 제 1 체결부재 360 : 제 2 체결부재331-1, 350: first fastening member 360: second fastening member

361-1 : 제 2 경첩 361-2 : 제 3 경첩361-1: Second hinge 361-2: Third hinge

400, 400-1, 400-2 : 이음부재 410, 411 : 제 2 하단밴드400, 400-1, 400-2: joint member 410, 411: second lower band

410-1 : 제 2 고정편 412, 440 : 제 3 하단밴드410-1: second fixing piece 412, 440: third lower band

413, 422, 430 : 제 2 기초판 414, 420 : 제 2 상단밴드413, 422, 430: second base plate 414, 420: second upper band

415, 450 : 제 3 상단밴드 416, 420-1 : 제 2 나사체결편415, 450: third upper band 416, 420-1: second screw fastening

417 : 제 2 T형 나사결합부 418 : 제 3 T형 나사결합부417: second T-type screw connection 418: third T-type screw coupling

421 : 제 2 밴드 421-1 : 제 7 체결편421: 2nd band 421-1: 7th fastening piece

421-2 : 제 8 체결편 423 : 제 3 밴드421-2: 8th fastener 423: 3rd band

423-1 : 제 9 체결편 423-2 : 제 10 체결편 423-1: 9th fastener 423-2: 10th fastener

423-3 : 제 11 체결편 423-4 : 제 12 체결편 423-3: 11th fastener 423-4: 12th fastener

431 : L형강431: L section steel

460 : 제 3 체결부재 470 : 제 5 체결부재
480 : 제 4 체결부재 490 : 제 6 체결부재
500 : 제 1 밴드 510 : 제 1 나사조임부
600 : 제 2 밴드 610 : 제 2 나사조임부
700 : 제 3 밴드 710 : 제 3 나사조임부
800, 810, 820, 830 : 제2 강관 버팀보 900 : 쐐기
460: third fastening member 470: fifth fastening member
480: fourth fastening member 490: sixth fastening member
500: first band 510: first screw tightening part
600: second band 610: second screw tightening part
700: third band 710: third screw tightening portion
800, 810, 820, 830: second steel pipe brace 900: wedge

Claims (31)

지반에 설치되는 엄지말뚝 측면에 고정되게 설치되는 띠장과;A belt long and fixedly installed on the side of the thumb pile installed on the ground; 상기 띠장과 결합된 상기 엄지말뚝을 지지하며 일측 끝단부에 제 1 및 제 2 관통홀이 형성되는 제 1 강관 버팀보와; A first steel pipe brace supporting the thumb pile coupled to the belt and having first and second through holes formed at one end thereof; 상기 띠장과 일측이 나사 결합되는 십자 보강판과, 일측이 상기 십자 보강판의 타측과 강제 결합되는 제 1 기초판과, 상기 제 1 기초판의 타측과 강제 결합되고 상기 제 1 강관 버팀보의 일측 하반구을 거치하며 제 5 관통홀이 형성된 제 1 하단밴드, 상기 제 1 기초판의 타측과 강제 결합되고 상기 제 1 하단밴드에 거치된 제 1 강관 버팀보의 일측 상반구을 덮어씌우며 제 6 관통홀이 형성된 제 1 상단밴드로 구성되는 연결부재; 및A cross reinforcement plate on which one side of the cross section is screwed together, a first base plate on which one side is forcibly coupled to the other side of the cross reinforcement plate, and a bottom side of the first steel pipe brace, which is forcibly coupled to the other side of the first base plate. A first lower band formed through a hemisphere and having a fifth through hole formed therein; and a sixth through hole formed by a sixth through hole formed on the first lower band and covering the upper hemisphere of one side of the first steel pipe brace mounted on the first lower band. A connection member composed of a first upper band; And 상기 강관버팀보에 형성된 제 1 관통홀과 상기 제 1 상단밴드에 형성된 제 6 관통홀을 일치시키고 상기 강관버팀보에 형성된 제 2 관통홀과 상기 제 1 하단밴드에 형성된 제 5 관통홀을 일치시켜서, 상기 제 6 관통홀과 제 1 관통홀 및 제 2 관통홀과 제 5 관통홀을 관통하여 체결하는 제 1 체결부재로 이루어진 것을 특징으로 하는 강관 버팀보 연결구조.By matching the first through-hole formed in the steel pipe support and the sixth through-hole formed in the first upper band, by matching the second through-hole formed in the steel pipe support and the fifth through-hole formed in the first lower band, And a first fastening member for fastening through the sixth through hole, the first through hole, and the second through hole and the fifth through hole. 청구항 1에 있어서,The method according to claim 1, 상기 제 1 체결부재의 길이 방향에 대하여 직각으로 교차되게 상기 제 1 강관 버팀보와 상기 연결부재를 체결하는 제 2 체결부재가 더 구비된 것을 특징으로 하는 강관 버팀보 연결구조.And a second fastening member for fastening the first steel pipe brace and the connecting member to cross at right angles with respect to the longitudinal direction of the first fastening member. 청구항 2에 있어서,The method according to claim 2, 상기 제 1 상단밴드의 외주면에는 상기 제 1 기초판과 상기 제 1 상단밴드를 나사에 의하여 결합하는 제 1 나사체결편이 더 구비된 것을 특징으로 하는 강관 버팀보 연결구조.The outer circumferential surface of the first upper band is a steel pipe support structure, characterized in that further provided with a first screw fastening member for coupling the first base plate and the first upper band by a screw. 청구항 3에 있어서,The method according to claim 3, 상기 제 1 하단밴드의 외주면에는 상기 제 1 기초판과 상기 제 1 하단밴드를 강제 결합하는 제 1 고정편이 더 구비된 것을 특징으로 하는 강관 버팀보 연결구조.Steel outer brace structure, characterized in that the outer peripheral surface of the first lower band is further provided with a first fixing piece for forcibly coupling the first base plate and the first lower band. 청구항 4에 있어서,The method according to claim 4, 상기 제 1 상단밴드와 상기 제 1 하단밴드의 외주면에 접하여 형성되고 상기 제 1 상단밴드와 제 1 하단밴드를 감싸서 조여 주는 제 1 나사조임부를 형성하는 제 1 밴드가 더 구비되는 것을 특징으로 하는 강관 버팀보 연결구조.A first band is formed in contact with the outer circumferential surface of the first upper band and the first lower band, and further comprising a first band for forming a first screw fastening portion surrounding the first upper band and the first lower band. Steel pipe brace connection structure. 청구항 5에 있어서, The method according to claim 5, 상기 제 1 강관 버팀보의 타측 끝단부에 제 3 및 제 4 관통홀이 형성되고;Third and fourth through-holes are formed at the other end of the first steel pipe support; 상기 제 1 강관 버팀보의 타측 하반구가 거치되고 제 7 관통홀이 형성되는 제 2 하단밴드와, 상기 제 2 하단밴드에 거치된 제 1 강관 버팀보의 타측 상반구를 덮어씌우고 제 8 관통홀이 형성되는 제 2 상단밴드와, 일측 이 상기 제 2 하단밴드 및 상기 제 2 상단밴드에 강제 결합되는 제 2 기초판과, 상기 제 2 기초판의 타측에 강제 결합되고 제 9 관통홀이 형성된 제 3 하단밴드와, 상기 제2 기초판의 타측에 강제 결합되고 제 10 관통홀이 형성된 제 3 상단밴드로 이루어진 이음부재와; The second lower band is mounted on the other lower hemisphere of the first steel pipe brace and the seventh through hole is formed, and the other upper hemisphere of the first steel pipe brace mounted on the second lower band covers the eighth through hole. A second upper band to be formed, a second base plate one side of which is forcibly coupled to the second lower band and the second top band, and a third lower end which is forcibly coupled to the other side of the second base plate and a ninth through hole is formed. A joint member formed of a band and a third upper band forcibly coupled to the other side of the second base plate and having a tenth through hole; 상기 이음부재의 제 3 하단밴드에 일측 하반구가 거치되고 상기 이음부재의 제 3 상단밴드에 일측 상반구가 덮어 씌워지는 제 2 강관 버팀보; 및 A second steel pipe brace supporting one lower hemisphere on the third lower band of the joint member and one upper hemisphere on the third upper band of the joint member; And 상기 제 1 강관 버팀보에 형성된 제 3 관통홀과 상기 제 2 상단밴드에 형성된 제 8 관통홀을 일치시키고, 제 1 강관 버팀보에 형성된 제 4 관통홀과 상기 제 2 하단밴드에 형성된 제 7 관통홀을 일치시켜서, 상기 제 8 관통홀과 제 3 관통홀 및 상기 제 4 관통홀과 제 7 관통홀을 관통하여 체결하는 제 3 체결부재로 이루어진 것을 특징으로 하는 강관 버팀보 연결구조.Matching the third through hole formed in the first steel pipe brace and the eight through hole formed in the second upper band, the fourth through hole formed in the first steel pipe brace and the seventh through hole formed in the second lower band In accordance with, the steel pipe brace connection structure consisting of a third fastening member for fastening through the eighth through the third and the fourth through hole and the fourth through hole and the seventh through hole. 청구항 6에 있어서,The method according to claim 6, 상기 제 2 강관 버팀보의 일측 끝단부에 제 11 및 제 12 관통홀이 형성되며;Eleventh and twelfth through holes are formed at one end of the second steel pipe brace; 상기 제 3 하단밴드에 형성된 제 9 관통홀과 상기 제 2 강관 버팀보의 일측 끝단부에 형성된 제 12 관통홀을 일치시키고, 제 3 상단밴드에 형성된 제 10 관통홀과 상기 제 2 강관 버팀보의 일측 끝단부에 형성된 제 11 관통홀을 일치시켜서, 상기 제 10 관통홀과 제 11 관통홀 및 상기 제 12 관통홀과 제 9 관통홀을 관통하여 체결하는 제 5 체결부재가 더 구비되는 것을 특징으로 하는 강관 버팀보 연결구조.The ninth through-hole formed in the third lower band coincides with the twelfth through-hole formed in one end of the second steel pipe brace, and is formed in the third upper band. With the tenth through hole A fifth fastening member for fastening the tenth through hole and the eleventh through hole and the twelfth through ninth through hole by matching the eleventh through hole formed at one end of the second steel pipe brace. Steel pipe support structure, characterized in that further provided. 청구항 7에 있어서,The method of claim 7, 상기 제 3 체결부재의 길이 방향에 대하여 직각으로 교차되게 상기 제 1 강관 버팀보와 상기 연결부재를 체결하는 제 4 체결부재가 더 구비된 것을 특징으로 하는 강관 버팀보 연결구조.And a fourth fastening member for fastening the first steel pipe brace and the connecting member to cross at a right angle with respect to the longitudinal direction of the third fastening member. 청구항 7에 있어서,The method of claim 7, 제 5 체결부재의 길이 방향에 대하여 직각으로 교차되게 상기 제 2 강관 버팀보와 상기 연결부재를 체결하는 제 6 체결부재가 더 구비된 것을 특징으로 하는 강관 버팀보 연결구조.And a sixth fastening member for fastening the second steel pipe brace and the connecting member to cross at a right angle with respect to the longitudinal direction of the fifth fastening member. 청구항 8에 있어서,The method according to claim 8, 상기 제 2 상단밴드와 제 2 하단밴드의 외주면을 감싸서 조여 주는 제 2 나사조임부를 형성하는 제 2 밴드가 더 구비되는 것을 특징으로 하는 강관 버팀보 연결구조.And a second band forming a second screw tightening portion that wraps and tightens the outer circumferential surfaces of the second upper band and the second lower band. 청구항 9에 있어서,The method according to claim 9, 상기 제 3 상단밴드와 제 3 하단밴드의 외주면을 감싸서 조여 주는 제 3 나사조임부를 형성하는 제 3 밴드가 더 구비되는 것을 특징으로 하는 강관 버팀보 연결구조.And a third band forming a third screw tightening portion that wraps and tightens the outer circumferential surfaces of the third upper band and the third lower band. 청구항 10에 있어서,The method according to claim 10, 상기 제 2 상단밴드의 외주면에는 상기 제 2 기초판과 상기 제 2 상단밴드를 나사에 의하여 결합하는 제 2 나사체결편이 더 구비된 것을 특징으로 하는 강관 버팀보 연결구조.The outer circumferential surface of the second upper band is a steel pipe support structure, characterized in that further provided with a second screw fastening member for coupling the second base plate and the second upper band by a screw. 청구항 10에 있어서 The method according to claim 10 제 2 하단밴드 외주면에는 상기 제 2 기초판과 상기 제 2 하단밴드를 강제 결합하는 제 2 고정편이 더 구비된 것을 특징으로 하는 강관 버팀보 연결구조.And a second fixing piece for forcibly coupling the second base plate and the second bottom band to the second lower band outer circumferential surface. 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020070115844A 2007-11-14 2007-11-14 Connecting structure of steel pipe strut KR100959553B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070115844A KR100959553B1 (en) 2007-11-14 2007-11-14 Connecting structure of steel pipe strut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070115844A KR100959553B1 (en) 2007-11-14 2007-11-14 Connecting structure of steel pipe strut

Related Child Applications (3)

Application Number Title Priority Date Filing Date
KR1020090088418A Division KR100937643B1 (en) 2009-09-18 2009-09-18 Connecting structure of steel pipe strut
KR1020090088411A Division KR100937642B1 (en) 2009-09-18 2009-09-18 Connecting structure of steel pipe strut
KR1020090088421A Division KR100937644B1 (en) 2009-09-18 2009-09-18 Connecting structure of steel pipe strut

Publications (2)

Publication Number Publication Date
KR20090049663A KR20090049663A (en) 2009-05-19
KR100959553B1 true KR100959553B1 (en) 2010-05-27

Family

ID=40858313

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070115844A KR100959553B1 (en) 2007-11-14 2007-11-14 Connecting structure of steel pipe strut

Country Status (1)

Country Link
KR (1) KR100959553B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101956162B1 (en) * 2018-05-28 2019-03-08 김중돈 Steel pipe connection device for soldier pile support and steel pipe connection method using same
KR20190115235A (en) 2018-04-02 2019-10-11 장남종 Connecting Structure of Steel Pipe Strut

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115288157B (en) * 2022-08-30 2023-07-18 中国一冶集团有限公司 Foundation pit bottom plate support changing device and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050075314A (en) * 2005-04-29 2005-07-20 이선애 Connecting structure of strut
KR200414056Y1 (en) 2005-12-29 2006-04-14 (주)핸스건설 Connecting Structure of Steel Pipe Strut
KR100675985B1 (en) 2006-06-16 2007-02-02 김찬수 A bracing for reinforcing support
KR100761742B1 (en) 2006-07-31 2007-09-28 재단법인 포항산업과학연구원 Connection structure for steel pipe strut

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050075314A (en) * 2005-04-29 2005-07-20 이선애 Connecting structure of strut
KR200414056Y1 (en) 2005-12-29 2006-04-14 (주)핸스건설 Connecting Structure of Steel Pipe Strut
KR100675985B1 (en) 2006-06-16 2007-02-02 김찬수 A bracing for reinforcing support
KR100761742B1 (en) 2006-07-31 2007-09-28 재단법인 포항산업과학연구원 Connection structure for steel pipe strut

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190115235A (en) 2018-04-02 2019-10-11 장남종 Connecting Structure of Steel Pipe Strut
KR101956162B1 (en) * 2018-05-28 2019-03-08 김중돈 Steel pipe connection device for soldier pile support and steel pipe connection method using same

Also Published As

Publication number Publication date
KR20090049663A (en) 2009-05-19

Similar Documents

Publication Publication Date Title
KR100595965B1 (en) Connecting structure of strut
KR101117546B1 (en) Structure for connecting and jointing square still supporting beam in temporary soil sheathing and reinforcing members for the same
KR100675985B1 (en) A bracing for reinforcing support
KR102012486B1 (en) A earthquake proof reinforcement structure possible to install on pilotis construction variably and construction method using the same
KR101354857B1 (en) Strut having angle pipe section symmetrical with neural axis
KR100937643B1 (en) Connecting structure of steel pipe strut
KR20130112387A (en) Apparatus for connecting struts using end plate
KR101289149B1 (en) Structure and apparatus for connecting steel pipe struts
KR100777212B1 (en) A h-beam joint
JP4683579B1 (en) Reinforcement structure for wooden buildings
KR101953595B1 (en) Modular strut reinforcement apparatus
KR100959553B1 (en) Connecting structure of steel pipe strut
KR100937642B1 (en) Connecting structure of steel pipe strut
KR101066583B1 (en) Flange-type connection apparatus steel pipe
KR102001116B1 (en) Apparatus for reinforcing concrete structure and Construction method thereof
KR102213361B1 (en) Connection device for strut
KR100937644B1 (en) Connecting structure of steel pipe strut
KR20120104798A (en) Apparatus for connecting struts to each other
KR100581610B1 (en) Coupling Structure of Supporting Beam
KR102275450B1 (en) Cover band of connection device for steel pipe strut and connection device for steel pipe strut having the same
KR200399887Y1 (en) Connecting structure of strut
KR20120131996A (en) Structure of temporary installation for land-side protection wall, and construction method thereof
KR100958426B1 (en) Fixing device for support beam
KR100714434B1 (en) A bracing for reinforcing support
KR102169828B1 (en) Joint of columns

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
A107 Divisional application of patent
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J204 Invalidation trial for patent
FPAY Annual fee payment

Payment date: 20140515

Year of fee payment: 5

J301 Trial decision

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20131106

Effective date: 20150130

J2X1 Appeal (before the patent court)

Free format text: INVALIDATION

J202 Request for trial (for correction)
J301 Trial decision

Free format text: TRIAL DECISION FOR CORRECTION REQUESTED 20150316

Effective date: 20150420

FPAY Annual fee payment

Payment date: 20150518

Year of fee payment: 6

J203 Request for trial (for invalidation of correction)

Free format text: TRIAL FOR INVALIDATION OF CORRECTION FOR INVALIDATION OF CORRECTION

J302 Written judgement (patent court)

Free format text: JUDGMENT (PATENT COURT) FOR INVALIDATION REQUESTED 20150213

Effective date: 20151126

J303 Written judgement (supreme court)

Free format text: JUDGMENT (SUPREME COURT) FOR INVALIDATION REQUESTED 20160105

Effective date: 20160412

J301 Trial decision

Free format text: TRIAL DECISION FOR INVALIDATION OF CORRECTION REQUESTED 20151222

Effective date: 20160425

FPAY Annual fee payment

Payment date: 20160517

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170511

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180517

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20190510

Year of fee payment: 10