KR100945561B1 - Method and apparatus for constructing pole of tower-type facilities - Google Patents

Method and apparatus for constructing pole of tower-type facilities Download PDF

Info

Publication number
KR100945561B1
KR100945561B1 KR1020090077278A KR20090077278A KR100945561B1 KR 100945561 B1 KR100945561 B1 KR 100945561B1 KR 1020090077278 A KR1020090077278 A KR 1020090077278A KR 20090077278 A KR20090077278 A KR 20090077278A KR 100945561 B1 KR100945561 B1 KR 100945561B1
Authority
KR
South Korea
Prior art keywords
pole
fastening
flange
main pole
tower
Prior art date
Application number
KR1020090077278A
Other languages
Korean (ko)
Inventor
곽양일
Original Assignee
조일전기공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 조일전기공업 주식회사 filed Critical 조일전기공업 주식회사
Priority to KR1020090077278A priority Critical patent/KR100945561B1/en
Application granted granted Critical
Publication of KR100945561B1 publication Critical patent/KR100945561B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/345Arrangements for tilting up whole structures or sections thereof
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/604Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings
    • E01F9/608Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings for guiding, warning or controlling traffic, e.g. delineator posts or milestones
    • E01F9/61Special features of delineator posts, e.g. with parts cantilevered toward the roadway or fixed vertically on a tilted surface
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/18Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic
    • E04H12/187Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic with hinged sections
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21SNON-PORTABLE LIGHTING DEVICES; SYSTEMS THEREOF; VEHICLE LIGHTING DEVICES SPECIALLY ADAPTED FOR VEHICLE EXTERIORS
    • F21S8/00Lighting devices intended for fixed installation
    • F21S8/08Lighting devices intended for fixed installation with a standard
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V21/00Supporting, suspending, or attaching arrangements for lighting devices; Hand grips
    • F21V21/36Hoisting or lowering devices, e.g. for maintenance

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Electric Cable Installation (AREA)

Abstract

PURPOSE: A method and a device for installing poles of tower facilities are provided to effectively install a pole even in a narrow space without using heavy equipment. CONSTITUTION: A method for installing poles of tower facilities is as follows. A foundation part is built with an anchor bolt. The anchor bolt is protruded from the foundation part and fixed using a connection flange(20). Connection bars(30) are hinge-coupled to one side of a connection pipe. The bottom of a vertical auxiliary pole(40) is coupled to the bottom end of a horizontal main pole(50). The front end of the auxiliary pole and the middle part of the main pole are connected by a wire. A coupling part of the auxiliary pole and the main pole is hinge-coupled to the front end of the connection bars. The auxiliary pole moves to a horizontal position and the main pole moves to a vertical position due to the pulling of a tow wire connected to the front end of the auxiliary pole. A flange unit(51) is formed on the bottom of the main pole and fixed to the anchor bolt. Coupling states of the auxiliary pole and the main pole and a connection flange and the connection bars are disassembled. The connection flange coupled to the anchor bolt is removed. A fastening nut is tightened to securely fix the main pole to the foundation part.

Description

타워형 시설물의 폴 설치방법 및 이를 위한 설치장치 {Method and apparatus for constructing pole of tower-type facilities}Pole installation method of tower type facility and installation device for same {Method and apparatus for constructing pole of tower-type facilities}

본 발명은 조명탑이나 전광판 및 각종 광고물과 같이 타워형태를 갖는 시설물을 위한 폴을 설치함에 있어, 크레인과 같은 중장비가 접근하지 못하는 골목이나 협소한 공간의 현장에서 보조폴과 연결플랜지 및 연결대를 이용하여 수평 상태의 폴을 수직으로 세워 설치할 수 있게 한 것으로서, 윈치나 차량 등을 이용하여 폴과 와이어 연결 상태인 보조폴을 잡아당겨 수평 상태의 폴이 수직으로 세워져 기초부의 앵커볼트와 용이하게 체결 및 고정 설치되게 한 것이다.In the present invention, in installing a pole for a facility having a tower shape, such as a light tower or an electric signboard and various advertisements, an auxiliary pole, a connecting flange, and a connecting rod are used in an alley or a narrow space where heavy equipment such as a crane cannot access. The pole in the horizontal state can be installed vertically, and by using a winch or a vehicle to pull the auxiliary pole in the wire connection state, the pole in the horizontal state is erected vertically and easily fastened with the anchor bolt of the foundation and It is fixed.

이전부터 공원이나 공항 또는 항만과 같이 야간에 밝은 조명이 필요한 야외의 공간에는 지주의 상단에 복수개의 조명등이 부설된 조명타워를 설치 운용하여 왔다. 또한, 각종 안내 또는 광고나 홍보, 계도를 목적으로 한 전광판이나 광고물과 같은 타워형 시설물이 널리 설치되고 있는 것이다.In the past, outdoor spaces requiring bright lighting at night, such as parks, airports, or harbors, have been installed and operated with light towers with a plurality of lamps mounted on the top of the props. In addition, tower-type facilities such as billboards and advertisements for the purpose of various guides, advertisements, public relations, and roads are widely installed.

이와 같은 조명탑이나 전광판 및 광고물과 같은 타워형 시설물에서는 필수적 으로 이들 조명수단 및 전광판과 광고물을 지지 고정하기 위한 폴(지주;Pole)이 설치되어야 하는 것이다.In such tower-type installations such as lighting towers or billboards and advertisements, poles for supporting and fixing these lighting means and billboards and advertisements must be installed.

상기와 같이 타워형 시설물에 적용되는 폴은 통상적으로 10미터 내외의 길이를 갖고 있는 것이어서, 견고한 기초부의 시공은 물론 다양한 중장비를 동원하여 이들을 시공 설치하게 되는 것이다.As described above, the poles applied to the tower-type facilities have a length of about 10 meters, so that the installation of a solid foundation as well as a variety of heavy equipment to install them.

즉, 폴을 설치하고자 하는 장소에 충분한 크기와 깊이의 콘크리트 기초부를 양생하되, 상기 기초부에는 선단이 돌출된 상태의 앵커볼트를 원형으로 배치하여 함께 양생시키게 된다. 이와 같은 기초부가 완성되면 크레인 등의 양중기를 동원하여 고중량체인 폴을 들어올린 후 상기 폴의 하단에 형성된 체결플랜지부를 기초부에 체결함으로써 폴의 설치가 이루어지게 된다.That is, while curing the concrete foundation of a sufficient size and depth at the place where the pole is to be installed, the foundation is to cure together by arranging the anchor bolt of the protruding state in a circular shape. When such a base part is completed, the poles are lifted by lifting heavy poles such as cranes, and then fastening the fastening flange formed on the bottom of the pole to the base part to install the poles.

상기의 폴 하단에 형성된 체결플랜지부에는 선행되어진 기초부의 앵커볼트와 동일한 배열로 이루어진 체결장공이 형성되어 있으므로 폴의 체결장공으로 앵커볼트의 노출 단부가 삽입되게 한 후 별도의 체결너트를 앵커볼트의 선단에 견고하게 나사 체결함에 따라 상기의 폴에 대한 수직 설치가 완료되는 것이다.The fastening flange portion formed at the bottom of the pole is formed with a fastening hole made of the same arrangement as the anchor bolt of the base portion of the preceding base, so that the exposed end of the anchor bolt is inserted into the fastening hole of the pole, and then a separate fastening nut of the anchor bolt As the screw is firmly screwed to the tip, the vertical installation of the pole is completed.

그러나, 상기와 같은 폴은 길이가 매우 길고 금속재로 이루어져 있으므로 중량 또한 매우 많이 나가므로 필수적으로 크레인 등의 중장비가 동원되어야 하는 것인데, 골목길 또는 협소한 공간만을 허락하는 현장에서는 크레인 등의 중장비가 접근하지 못하게 되므로 설치가 아예 불가능하거나 매우 복잡하고 난해한 시공이 이루어지고 있는 것이 현실이다.However, as the pole is very long and made of metal, the weight is also very heavy, so that heavy equipment such as cranes must be mobilized, but heavy equipment such as cranes are not accessible at alleys or sites that allow narrow spaces. Since it is impossible to install at all, the construction is very complicated and difficult construction.

즉, 크레인이 접근하지 못하는 경우에는 현장 인근에서 초대형 크레인을 동원하여 원거리에서의 양중이 이루어지도록 하거나 폴의 설치 위치를 변경 설계하는 등의 폐단이 뒤따르게 되는 것이고, 이와 같이 부적합한 시공방법으로 인해 시공 현장에서는 안전사고가 끊임없이 발생하고 있는 것이다.In other words, if the crane is not accessible, it will be followed by a closed end such as mobilizing a super-large crane in the vicinity of the site so that it can be lifted from a distance or changing the installation location of the pole. Safety accidents are constantly occurring in the field.

특히, 크레인과 같은 중장비는 작업시간에 비하여 고비용의 작업비가 소요되므로 공사비의 상승 요인으로 지적되어 있는 것이고, 대부분 외부로부터 중장비를 일시적으로 임대하는 형태이므로 공사 시간을 정확히 책정하는데 어려움이 뒤따르면서도 폴을 시공하기 위해서는 중장비의 가용시간을 조율하여야 하는 불편함이 있어 결국 공사기간을 지연시키는 원인이 되고 있는 것이다.In particular, heavy equipment such as cranes have been pointed out as an increase factor in construction costs because of the high cost of work compared to working hours, and since most of them are temporarily leased from outside, it is difficult to accurately set the construction time. In order to construct the construction, it is inconvenient to adjust the available time of heavy equipment, which in turn causes a delay in the construction period.

따라서, 타워형 시설물을 설치하고 있는 각종 현장에서는 협소한 공간이라 할지라도 효과적이고 경제적으로 폴을 세워 설치할 수 있게 한 설치방법 및 이를 위한 설치장비를 절실하게 요구하고 있는 실정이다.Therefore, in various sites in which tower-type facilities are installed, even in a narrow space, there is an urgent need for an installation method and installation equipment for installing a pole effectively and economically.

본 발명은 전기한 바와 같은 문제점을 개선한 것으로서, 기초부에 임시 체결되는 연결플랜지와 연결대 및 메인폴의 하부를 고정하는 수직의 보조폴을 구비하고, 상기 보조폴의 하단을 연결대에 고정한 상태에서 견인와이어를 끌어당겨 수평상태인 메인폴이 기초부의 상측에 수직방향으로 세워 설치될 수 있게 함으로써,The present invention is to solve the problems as described above, provided with a connecting flange temporarily connected to the base portion and a vertical auxiliary pole for fixing the connecting rod and the lower part of the main pole, while fixing the lower end of the auxiliary pole to the connecting rod By pulling the towing wire so that the horizontal main pole can be installed vertically above the foundation,

종래와 같이 크레인 등의 중장비를 동원하지 않아도 폴에 대한 설치가 가능하여 골목이나 협소한 공간의 현장에서 효과적인 폴의 설치가 이루어질 수 있도록 한 타워형 시설물의 폴 설치방법 및 이를 위한 설치장치를 제공함에 본 발명의 목적이 있는 것이다.It is possible to install a pole without mobilizing heavy equipment such as a crane as in the prior art, and to provide a pole installation method of the tower-type facilities that can be installed in an alley or narrow space effective site and installation device for the same. It is an object of the invention.

상기한 바와 같은 목적을 달성하기 위한 본 발명은, 기초부에 매립 돌출된 앵커볼트와 대응하는 삽입홈을 갖는 연결플랜지와; 상기 연결플랜지의 상부 일측으로 힌지 결합되는 연결대와; 상기 연결대와 힌지 결합되는 보조폴;을 각기 구비하되, 기초부의 앵커볼트에 연결플랜지가 결합되게 하고, 연결플랜지의 상부 일측에는 연결대의 하부를 힌지 결합하며, 연결대에는 수평방향의 메인폴 하단이 결합된 수직상태인 보조폴의 하단을 힌지 결합하며, 보조폴의 선단과 메인폴은 와이어에 의해 연결 형성하여,The present invention for achieving the object as described above, the connection flange having an insertion groove corresponding to the anchor bolt embedded in the base portion; A connecting rod hinged to an upper side of the connecting flange; Auxiliary pole is hinged with the connecting rod; respectively provided, the connection flange is coupled to the anchor bolt of the base, the upper one side of the connecting flange is hinged to the bottom of the connecting rod, the connecting rod is coupled to the bottom of the main pole in the horizontal direction Hinged to the lower end of the auxiliary pole in the vertical state, the front end and the main pole of the auxiliary pole is formed by a wire,

수직방향인 보조폴의 선단에 고정된 별도의 견인와이어를 잡아당겨, 수평상 태인 메인폴이 수직상태가 되며 메인폴의 하부에 형성된 체결플랜지부가 기초부의 앵커볼트상에 위치하여 이들을 서로 체결 고정하여 이루어지는 것이다.By pulling the separate towing wire fixed to the tip of the auxiliary pole in the vertical direction, the main pole in the horizontal state becomes vertical and the fastening flange formed on the lower part of the main pole is located on the anchor bolt of the foundation to fasten them together. It is done.

본 발명은, 윈치나 소형 차량 등을 이용하여 보조폴과 연결된 견인와이어를 끌어당기는 작업만으로도 지렛대의 원리에 의해 수평 상태인 고중량의 메인폴을 수직으로 세워 기초부에 고정 설치할 수 있으므로 매우 합리적인 작업이 이루어지는 것이고, 골목길이나 협소한 공간만을 제공하는 현장과 같이 대형의 중장비가 접근할 수 없는 지역에 효과적인 작업이 가능한 것이며, 반복적인 재사용은 물론 고비용의 중장비를 동원하지 않아도 되어 시공비의 절감이 가능한 것이고, 현장에서 필요에 따라 즉시 운용이 가능하므로 더욱 효과적인 시공이 가능한 것이다.The present invention is very rational because the main pole of the horizontal state can be installed vertically fixed by the principle of the lever just by pulling the towing wire connected to the auxiliary pole using a winch or a small vehicle. It is possible to work effectively in areas where large heavy equipment is inaccessible, such as sites that provide only alleys and narrow spaces, and it is possible to reduce construction costs by not having to repeatedly reuse and expensive heavy equipment. Since it can be operated immediately on site as needed, more effective construction is possible.

본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms or words used in this specification and claims are not to be construed as being limited to the common or dictionary meanings, and the inventors can appropriately define the concept of terms in order to explain their invention in the best way. Based on the principle, it should be interpreted as meaning and concept corresponding to the technical idea of the present invention.

이하 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 폴 설치장치의 전체 구성도이고, 도 2는 본 발명에 따른 폴 설치장치의 연결플랜지 및 연결대의 전체도이며, 도 3은 본 발명에 따른 폴 설치장치의 보조폴에 대한 사시도, 도 4는 본 발명에 따른 폴의 전체 사시도이다.1 is an overall configuration diagram of a pole installation device according to the present invention, Figure 2 is an overall view of the connection flange and connecting rod of the pole installation device according to the present invention, Figure 3 is an auxiliary pole of the pole installation device according to the invention 4 is a perspective view of the pawl in accordance with the present invention.

도시와 같이 본 발명의 폴 설치장치는, 단일의 구성품인 연결플랜지(20)와 두 개가 하나의 세트로 이루어진 연결대(30) 및 지렛대 역할을 하는 보조폴(40)과 타워형 시설물을 시공하기 위한 메인폴(50)의 구성으로 이루어지는 것이다.Pole installation device of the present invention as shown, the main component for the construction of a single component connecting flange 20 and two pairs of connecting rods 30 and a secondary pole 40 serving as a lever and tower-type facilities It consists of the structure of the pole 50.

상기의 연결플랜지(20)는 금속판재로서, 일측으로 다수의 삽입홈(21)(21')이 형성되어 있는 것인데 상기의 삽입홈(21)(21')은 기초부에 매립되어 선단이 돌출되는 앵커볼트(11)(11')가 횡방향으로 삽입될 수 있도록 일정한 간격을 갖고 있는 것이다. 또한, 상기의 연결플랜지(20)는 상부 일측으로 상향 경사상의 브라켓(22)(22')이 돌출 형성되어 있는데 상기의 브라켓(22)(22') 선단에는 관통의 연결공(23)이 형성되어 있는 것이다.The connection flange 20 is a metal plate material, which has a plurality of insertion grooves 21 and 21 'formed at one side thereof, and the insertion grooves 21 and 21' are embedded in the base portion, and the tip thereof protrudes. The anchor bolts 11 and 11 'are to have a predetermined interval so that they can be inserted in the transverse direction. In addition, the connecting flange 20 has an upwardly inclined bracket 22, 22 ′ protruding from one side of the upper flange 20, and a through hole 23 is formed at the tip of the bracket 22, 22 ′. It is.

상기의 연결대(30)는 금속판재로서, 장방형의 일단에는 제1힌지공(31)이 관통되어 있고 타단에는 제2힌지공(32)이 관통되어 있는 것이다.The connecting table 30 is a metal plate material, and the first hinge hole 31 penetrates one end of the rectangular shape, and the second hinge hole 32 penetrates the other end thereof.

상기의 보조폴(40)은, 금속재로 된 사각강관의 수직지지대(41) 하측으로 수평대(42)가 고정되고 수평대(42)의 양단에는 하향의 수직대(43)(43')가 연결되어 있는 것이다. 이때 상기 수직대(43)(43')의 하단에는 횡방향으로 돌출된 힌지결합편(44)이 형성되어 있고, 수평대(42)와 수직대(43)(43')의 경계에는 일측면으로 경사상의 받침판(45)이 고정 설치되어 있으며, 수직지지대(41)의 선단에는 양측으로 걸이공(46)을 갖는 돌출편(47)이 형성되어 있는 것이다. 이때의 수직지지대(41)는 필요에 다라 상,하방향으로의 길이조절이 가능하도록 이중관의 형태로 구성하여 세워 설치하고자 하는 메인폴(50)의 중량 및 길이에 따라 조절 사용할 수 있도록 하는 것이 이상적이다.The auxiliary pole 40, the horizontal support 42 is fixed to the lower side of the vertical support 41 of the rectangular steel pipe made of a metal material, and the vertical vertical support 43, 43 'is provided at both ends of the horizontal support 42. It is connected. At this time, a hinge coupling piece 44 protruding in the horizontal direction is formed at the lower end of the vertical stand 43, 43 ', and one side surface at the boundary between the horizontal stand 42 and the vertical stand 43, 43'. The inclined support plate 45 is fixedly installed, and the protruding pieces 47 having the hook holes 46 on both sides are formed at the front end of the vertical support 41. At this time, the vertical support 41 is ideally configured to be used in accordance with the weight and length of the main pole 50 to be built up in the form of a double tube to enable the length adjustment in the up and down direction as needed. to be.

상기의 메인폴(50)은 조명탑이나 전광판 또는 광고물 등을 공중 설치하기 위하여 5~15미터 가량의 길이를 갖고 있는 지주의 형태를 갖고 있는 것인데, 하단에는 확장된 형태의 체결플랜지부(51)가 형성되어 있고 체결플랜지부(51)에는 사방으로의 체결장공(52)(52')이 관통되어 있으며, 체결플랜지부(51)의 하부 일측에는 체결공(54)을 갖고 하향 돌출된 힌지체결판(53)이 돌출되어 있는 것이다. 또한, 상기 메인폴(50)의 중간부에는 걸이부(55)가 돌출되어 있는 것이다.The main pole 50 is in the form of a strut having a length of about 5 to 15 meters in order to install a light tower, an electric signboard or advertisements, etc., the lower end of the fastening flange portion 51 of the expanded form Is fastened to the fastening flange portion 51, the fastening holes 52 and 52 'in all directions are penetrated, and the lower side of the fastening flange portion 51 has a fastening hole 54 with a hinge fastening downwardly. The plate 53 protrudes. In addition, the hook portion 55 protrudes from the middle portion of the main pole 50.

이외의 추가 구성으로서, 보조폴(40)과 메인폴(50)을 연결하기 위한 와이어(60)와, 보조폴(40)과 견인장치(윈치 또는 차량 등)를 연결하기 위한 견인와이어(70) 및 다수의 힌지핀(80)과 체결너트(81,82,83)의 구성으로 이루어져 있는 것이다.As another additional configuration, the wire 60 for connecting the auxiliary pole 40 and the main pole 50, the towing wire 70 for connecting the auxiliary pole 40 and the towing device (such as a winch or a vehicle). And a plurality of hinge pins 80 and fastening nuts 81, 82, and 83.

이와 같은 구성으로 된 본 발명의 폴 설치장치를 이용하여 다양한 목적으로 사용되는 폴에 대한 시공과정을 순차적으로 설명하기로 한다.Using the pole installation device of the present invention having such a configuration will be described in sequence the construction process for the pole used for various purposes.

먼저, 도 5의 도시와 같이 다양한 목적으로 사용되기 위한 지주(이하, 메인폴)을 세워 설치하기 위한 기초부(10)를 시공한다. 이때의 기초부(10)는 콘크리트를 타설하여 충분한 크기와 강도를 갖도록 수평 양생시켜야 하는 것이고, 기초 부(10)의 내측에는 앵커볼트(11)(11')가 매립되어 있고 앵커볼트(11)(11')의 선단은 기초부(10)의 상면으로부터 돌출형태로 노출되어 있는 것이다. 또한, 기초부(10)의 상면에는 금속판재로 된 가이드 플레이트(도면에서의 부호는 생략함)를 함께 시공하여 상기 앵커볼트(11)(11')에 대한 균일한 간격과 수직도 및 매립성을 향상시키게 된다.First, as shown in FIG. 5, the foundation 10 is installed to stand and install a support (hereinafter, the main pole) to be used for various purposes. At this time, the base portion 10 is to be horizontally cured to have sufficient size and strength by pouring concrete, anchor bolts 11, 11 'is embedded inside the base portion 10 and anchor bolts 11 The tip of 11 'is exposed from the upper surface of the base portion 10 in the form of a protrusion. In addition, the upper surface of the base portion 10 is provided with a guide plate made of a metal plate (not shown in the drawings) together, uniform spacing, verticality and embedding properties with respect to the anchor bolts 11, 11 '. Will improve.

상기와 같이 기초부(10)에 대한 시공이 완료되면, 돌출된 앵커볼트(11)(11')를 이용하여 도 6의 도시와 같이 별도의 연결플랜지(20)를 고정 설치하면 된다. 이때, 상기 앵커볼트(11)(11')에는 제1체결너트(81)를 나사 체결하되 상기의 제1체결너트(81)는 기초부(10)의 상부면으로부터 상향 이격된 상태를 갖게 한 후, 상기 제1체결너트(81) 상에 연결플랜지(20)가 올려지도록 하면 된다. 즉, 상기 연결플랜지(20)의 삽입홈(21)(21')으로 앵커볼트(11)(11')가 끼워지도록 한 상태에서 별도의 제2체결너트(82)를 앵커볼트(11)(11')에 나사 결합하면 제1체결너트(81)와 제2체결너트(82)의 사이에 위치한 연결플랜지(20)는 견고한 조립상태가 이루어지는 것이다.When the construction for the base portion 10 is completed as described above, by using a protruding anchor bolt (11) (11 ') as shown in Figure 6, the separate connection flange 20 may be fixedly installed. At this time, the first fastening nut 81 is screwed to the anchor bolts 11 and 11 ', but the first fastening nut 81 is spaced upwardly from the upper surface of the base 10. Thereafter, the connecting flange 20 may be placed on the first fastening nut 81. That is, in the state where the anchor bolts 11 and 11 'are inserted into the insertion grooves 21 and 21' of the connection flange 20, the second bolts 82 are additionally anchored to the anchor bolts 11 ( 11 '), the coupling flange 20 located between the first fastening nut 81 and the second fastening nut 82 is a solid assembly state.

이어 도 7의 도시와 같이 고정상태인 연결플랜지(20)로부터 상부 일측으로 돌출된 브라켓(22)(22')에 별도의 연결대(30) 하단을 힌지 고정하면 되는 것으로, 상기의 브라켓(22)(22')에는 관통의 연결공(23)이 형성되어 있고 연결대(30)의 하단에는 제1힌지공(31)이 관통 형성되어 있으므로 별도의 힌지핀(80)을 이들 제1힌지공(31)과 연결공(23)에 삽입함에 따라 상기의 연결플랜지(20)과 연결대(30)는 상호간의 힌지 결합이 이루어지는 것이다.Subsequently, as shown in FIG. 7, the lower end of the connecting rod 30 may be hinged to the brackets 22 and 22 ′ protruding from one side of the connecting flange 20 fixed to the upper side. The connecting hole 23 is formed in the through hole 22 ', and the first hinge hole 31 is formed in the lower end of the connecting table 30 so that a separate hinge pin 80 is used. And the connection hole 23, the connection flange 20 and the connecting table 30 is a hinge coupling between each other.

또한, 도 8의 도시와 같이 보조폴(40)과 메인폴(50)과의 체결작업을 수행하는 것으로서, 보조폴(40)의 수평대(42)와 수직대(43)(43')에 의한 내측 공간으로 메인폴(50)의 체결플랜지부(51)를 삽입한 상태에서 도 9의 도시와 같이 보조폴(40)의 수직대(43)(43')에 형성된 힌지결합편(44)과 체결플랜지부(51)에 형성된 힌지체결판(53)을 상기의 연결대(30)에 형성된 제2힌지공(32)에 동시 결합하는 것이다.In addition, as shown in Figure 8 to perform the fastening operation between the auxiliary pole 40 and the main pole 50, the horizontal pole 42 and the vertical pole 43, 43 'of the auxiliary pole 40. Hinge coupling piece 44 formed on the vertical poles 43 and 43 'of the auxiliary pole 40 as shown in FIG. 9 in a state in which the fastening flange portion 51 of the main pole 50 is inserted into the inner space by And the hinge fastening plate 53 formed on the fastening flange portion 51 are simultaneously coupled to the second hinge hole 32 formed on the connecting table 30.

즉, 제2힌지공(32)과 힌지결합편(44) 및 힌지체결판(53)의 체결공(54)이 서로 일치되게 한 상태에서 별도의 힌지핀(80)을 외측으로부터 삽입하면 이들이 서로 동시에 결합되는 것으로서 보조폴(40)은 수직지지대(41)가 수평상태인 반면 메인폴(50)은 지상에 높혀진 수평상태를 유지하고 있게 된다.That is, when the second hinge hole 32 and the hinge coupling piece 44 and the fastening hole 54 of the hinge fastening plate 53 are aligned with each other, when the separate hinge pins 80 are inserted from the outside, they As it is coupled at the same time, the auxiliary pole 40 is a vertical support 41 is in a horizontal state while the main pole 50 is maintained in a horizontal state raised on the ground.

이때, 상기 보조폴(40)의 수직지지대(41) 선단에는 걸이공(46)을 갖는 돌출편(47)이 양측으로 형성되어 있는 것으로서, 이들 돌출편(47)에는 각각 와이어(60) 및 견인와이어(70)의 단부를 결합하여 고정하게 된다. 또한, 상기의 와이어(60)는 도 10의 도시와 같이 메인폴(50)의 중간부에 형성된 걸이부(55)에 걸어 고정하고 상기의 견인와이어(70)는 윈치나 차량 등의 견인수단에 고정하게 된다.At this time, protruding pieces 47 having hook holes 46 are formed at both ends of the vertical support 41 of the auxiliary pole 40, and the protruding pieces 47 have wires 60 and towing, respectively. The ends of the wire 70 are combined and fixed. In addition, the wire 60 is fixed to the hook portion 55 formed in the middle portion of the main pole 50, as shown in Figure 10 and the towing wire 70 is towing means such as winch or vehicle It will be fixed.

이와 같은 상태에서 도 11의 도시와 같이 견인수단을 작동시키거나 전진 주행시키면 상기의 견인와이어(70)에 작용하는 인장력은 수직지지대(41)를 수평방향으로 회전시키게 되는 것이고 이와 같은 수직지지대(41)에 작용하는 회전력은 와이어(60)를 통해 메인폴(50)에 전달됨으로써 상기의 메인폴(50)은 수직방향으로 회전하며 세워지는 것이다. 즉, 상기와 같은 견인수단으로부터 와이어를 통해 보조폴(40)의 회전 및 메인폴(50)의 회전 작용은 보조폴(40)이 지렛대의 역할을 하여 길고 무거운 메인폴(50)을 효과적으로 회전시켜 세울 수 있는 것이다.In this state, as shown in FIG. 11, when the towing means is operated or moved forward, the tensile force acting on the towing wire 70 causes the vertical support 41 to be rotated in the horizontal direction. The rotational force acting on) is transmitted to the main pole 50 through the wire 60 so that the main pole 50 is erected while rotating in the vertical direction. That is, the rotation of the auxiliary pole 40 and the rotation of the main pole 50 through the wire from the traction means as described above to effectively rotate the long and heavy main pole 50 by the secondary pole 40 serves as a lever. It can be built.

또한, 상기와 같이 견인작용으로 인해 수직방향의 보조폴(40)은 수평상태가 되는 것이고 수평상태의 메인폴(50)은 수직상태가 되면서 메인폴(50)의 하부에 형성된 체결플랜지부(51)는 기초부(10)의 상측으로 자연스럽게 위치하게 되는 것이다. 특히, 상기와 같이 수직방향으로 세워진 메인폴(50)로부터 작용하는 하중은 보조폴(40)의 수평대(42)와 수직대(43)(43') 경계부에 형성된 받침판(45)에 의해 지지되면서 안정적인 세움 상태를 유지할 수 있게 된다. 더욱이 상기의 메인폴(50)이 수직상태가 됨과 동시에 체결플랜지부(51)에 형성된 체결장공(52)(52')으로는 기초부(10)의 앵커볼트(11)(11') 선단이 자연스럽게 삽입되는 것이고, 상기의 체결플랜지부(51)는 앵커볼트(11)(11')에 나사 결합된 제2체결너트(82) 상에 올려지게 되므로 세움 과정에서의 메인폴(50)에 대한 전도나 기울어짐이 방지되는 것이다.In addition, the auxiliary pole 40 in the vertical direction is in a horizontal state due to the traction action as described above and the fastening flange portion 51 formed in the lower portion of the main pole 50 while the main pole 50 is in a vertical state ) Is naturally positioned above the base 10. In particular, the load acting from the main pole 50 erected in the vertical direction as described above is supported by the support plate 45 formed at the boundary of the horizontal pole 42 and the vertical pole 43 (43 ') of the auxiliary pole 40. It is possible to maintain a stable upright state. In addition, the main pole 50 is in the vertical state and at the same time as the fastening holes 52, 52 'formed in the fastening flange portion 51, the ends of the anchor bolts 11, 11' of the base portion 10 It is inserted naturally, the fastening flange 51 is mounted on the second fastening nut 82 screwed to the anchor bolt (11) (11 '), so that the main pole 50 in the Falling or tilting is prevented.

이와 같이 메인폴(50)에 대한 세움 작업이 이루어진 상태에서 메인폴(50)의 체결플랜지부(51)를 관통하여 돌출된 앵커볼트(11)(11')에 도 12의 도시와 같이 제3체결너트(83)를 나사 결합함에 따라 상기의 메인폴(50)은 기초부(10)와의 임시 조립상태가 완료되는 것이다.As shown in FIG. 12, the anchor bolts 11 and 11 ′ protrude through the fastening flange portion 51 of the main pole 50 in a state in which the upright operation is performed on the main pole 50. As the fastening nut 83 is screwed together, the main pole 50 is temporarily assembled with the base 10.

상기와 같이 메인폴(50)에 대한 세움 작업이 이루어진 상태에서 상기 보조폴(40)과 연결플랜지(20)를 제거하면 되는 것인데, 보조폴(40)과 메인폴(50) 및 연결대(30)를 결합하고 있는 힌지핀(80)을 제거하면 상호 간의 결합 관계가 해제되므로 상기의 메인폴(50)로부터 보조폴(40)의 제거가 가능하게 된다. 또한, 상기의 기초부(10) 상에 고정된 연결플랜지(20)는 도 13의 도시와 같이 제1체결너트(81)를 기초부(10)의 상부면을 향하여 하향 회전시키면 연결플랜지(20)를 고정하고 있던 힘이 상실되므로 상기의 연결플랜지(20)는 자유롭게 기초부(10)로부터 분리될 수 있는 것이다.In this case, the auxiliary pole 40 and the connecting flange 20 may be removed in the state in which the upright is made on the main pole 50, and the auxiliary pole 40 and the main pole 50 and the connection table 30 may be removed. Removing the hinge pin 80 is coupled to the release relationship between each other is released, so that it is possible to remove the auxiliary pole 40 from the main pole 50. In addition, the connection flange 20 fixed on the base portion 10 is the connection flange 20 when the first fastening nut 81 is rotated downward toward the upper surface of the base portion 10 as shown in FIG. ), The connection flange 20 can be freely separated from the base 10 because the force that was fixed) is lost.

또한, 상기와 같이 연결플랜지(20)에 대한 제거가 이루어지면 도 14의 도시와 같이 제1체결너트(81) 및 제2체결너트(82)와 제3체결너트(83)에 대한 하향 회전작업을 수행하여 상기의 메인폴(50)이 기울어지거나 유동없이 안정적인 고정 및 설치상태를 유지할 수 있도록 함으로써 메인폴(50)에 대한 설치가 완료되는 것이다.In addition, when the removal of the connection flange 20 is made as described above, as shown in FIG. 14, the downward rotation operation of the first fastening nut 81, the second fastening nut 82, and the third fastening nut 83 is performed. By performing the main pole 50 to maintain a stable fixed and installed state without the inclination or flow is to complete the installation on the main pole 50.

이에 따라 본 발명의 폴 설치방법 및 그에 따른 설치장치는 골목길이나 협소한 장소만이 하락된 현장에서 간편하면서도 신속하게 그리고 안전한 작업이 이루어질 수 있도록 하므로 매우 경제적이면서도 합리적인 설치와 시공이 이루어지는 것이다.Accordingly, the pole installation method of the present invention and the installation apparatus according to it are very economical and reasonable installation and construction is made so that easy, quick and safe work can be done at the site where only alleys or narrow places are dropped.

이상과 같은 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 이들을 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.The embodiments described in the present specification and the drawings shown in the drawings are only the most preferred embodiments of the present invention and do not represent all of the technical idea of the present invention, and various equivalents and modifications that may be substituted for them are provided. It should be understood that there may be examples.

도 1은 본 발명에 따른 폴 설치장치의 전체 구성도1 is an overall configuration diagram of a pole installation apparatus according to the present invention

도 2는 본 발명에 따른 폴 설치장치의 연결플랜지 및 연결대의 전체도Figure 2 is an overall view of the connection flange and connecting rod of the pole mounting apparatus according to the present invention

도 3은 본 발명에 따른 폴 설치장치의 보조폴에 대한 사시도Figure 3 is a perspective view of the auxiliary pole of the pole installation device according to the present invention

도 4는 본 발명에 따른 폴의 전체 사시도4 is an overall perspective view of a pawl in accordance with the present invention.

도 5는 본 발명의 기초부 단면도5 is a cross-sectional view of the basic portion of the present invention

도 6은 본 발명의 기초부와 연결플랜지의 결합도Figure 6 is a coupling diagram of the base and the connecting flange of the present invention

도 7은 본 발명의 연결플랜지와 연결대의 결합도7 is a coupling view of the connection flange and the connecting rod of the present invention

도 8은 본 발명의 보조폴과 메인폴의 결합도8 is a coupling view of the auxiliary pole and the main pole of the present invention

도 9는 본 발명의 연결대와 보조폴의 결합도9 is a coupling diagram of the connecting pole and the auxiliary pole of the present invention

도 10은 본 발명의 보조폴과 메인폴의 와이어 결합도10 is a wire coupling diagram of the auxiliary pole and the main pole of the present invention

도 11은 본 발명의 메인폴의 수직 견인 작동도Figure 11 is a vertical pull operation of the main pole of the present invention

도 12는 본 발명의 메인폴이 수직인 상태의 상세도12 is a detailed view of a state in which the main pole of the present invention is vertical

도 13은 본 발명의 연결플랜지를 제거하는 과정도Figure 13 is a process diagram for removing the connection flange of the present invention

도 14는 본 발명의 메인폴이 설치 완료된 상태도14 is a state diagram in which the main pole of the present invention is installed

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10 : 기초부 11,11' : 앵커볼트10: foundation 11,11 ': anchor bolt

20 : 연결플랜지 21,21' : 삽입홈20: connection flange 21,21 ': insertion groove

22,22' : 브라켓 23 : 연결공22,22 ': Bracket 23: Connector

30 : 연결대 31 : 제1힌지공30: connecting rod 31: the first hinge ball

32 : 제2힌지공32: second hinge ball

40 : 보조폴 41 : 수직지지대40: auxiliary pole 41: vertical support

42 : 수평대 43,43' : 수직대42: horizontal bar 43,43 ': vertical bar

44 : 힌지결합편 45 : 받침판44: hinge coupling piece 45: support plate

46 : 걸이공 47 : 돌출편46: hook hole 47: protrusion

50 : 메인폴 51 : 체결플랜지부50: main pole 51: fastening flange

52,52' : 체결장공 53 : 힌지체결판52,52 ': Fastener 53: Hinge fastener

54 : 체결공 55 : 걸이부54: fastener 55: hook portion

60 : 와이어60: wire

70 : 견인와이어70: tow wire

80 : 힌지핀 81 : 제1체결너트80: hinge pin 81: first tightening nut

82 : 제2체결너트 83 : 제3체결너트82: 2nd tightening nut 83: 3rd tightening nut

Claims (10)

앵커볼트를 갖는 기초부의 시공단계와;A construction step of the base portion having an anchor bolt; 기초부로부터 돌출된 앵커볼트에 연결플랜지를 너트 고정하는 단계와;Fixing the connection flange to the anchor bolt protruding from the base portion; 연결플랜지의 상부 일측에 연결대의 하부를 힌지 결합하는 단계와;Hinge coupling a lower portion of the connecting rod to an upper side of the connecting flange; 수직상태인 보조폴의 하부에 수평상태의 메인폴 하단을 결합하고, 보조폴의 선단과 메인폴의 중간부를 와이어로 연결하는 단계와;Coupling a lower end of the main pole in a horizontal state to a lower part of the auxiliary pole in a vertical state, and connecting the front end of the auxiliary pole and a middle part of the main pole with a wire; 보조폴과 메인폴의 결합부를 연결대의 선단에 힌지 결합하는 단계와;Hinge engaging a coupling of the auxiliary pole and the main pole to the tip of the connecting rod; 보조폴의 선단에 연결된 견인와이어를 잡아당겨 수직인 보조폴은 수평상태가 되고 하고 수평인 메인폴은 수직상태가 되게 하는 견인단계와;A towing step of pulling the towing wire connected to the tip of the auxiliary pole so that the vertical auxiliary pole becomes horizontal and the horizontal main pole is vertical; 메인폴의 하부에 형성된 체결플랜지부를 앵커볼트에 고정하는 임시체결단계와;A temporary fastening step of fixing the fastening flange formed on the lower portion of the main pole to the anchor bolt; 보조폴과 메인폴 및 연결플랜지와 연결대의 체결상태를 해제하는 단계와;Releasing the fastening state of the auxiliary pole, the main pole and the connecting flange and the connecting rod; 앵커볼트에 결합된 연결플랜지를 제거하는 단계와;Removing the connection flange coupled to the anchor bolt; 메인폴이 기초부 상에 견고한 고정이 이루어지도록 하는 체결너트의 조임단계;가 순차적으로 이루짐을 특징으로 하는 타워형 시설물의 폴 설치방법.The method of installing a pole of a tower-type facility, characterized in that the tightening step of the fastening nut to ensure that the main pole is firmly fixed on the foundation. 제 1항에 있어서,The method of claim 1, 노출상태인 앵커볼트에는 기초부의 상부면으로부터 상향 이격되도록 제1체결너트를 결합한 후 상기 제1체결너트 상에 연결플랜지를 위치시켜 별도의 제2체결너 트의 결합을 통해 상기 연결플랜지를 고정하고,After coupling the first fastening nut to the anchor bolt in the exposed state to be spaced upward from the upper surface of the base portion, and then to position the connection flange on the first fastening nut to secure the connection flange through the coupling of a second second fastening nut. , 와이어 견인을 통해 세워진 메인폴의 체결플랜지부가 앵커볼트를 통해 제2체결너트 상에 올려지면 별도의 제3체결너트를 노출된 앵커볼트에 나사 결합하여 메인폴의 전도가 방지되게 한 후,If the fastening flange of the main pole, which is erected through wire traction, is placed on the second fastening nut through the anchor bolt, a separate third fastening nut is screwed onto the exposed anchor bolt to prevent the fall of the main pole. 기초부의 상부면으로부터 상향 이격된 상태의 상기 제1체결너트를 하향 회전시켜 제2체결너트와의 사이에서 고정되었던 상태인 연결플랜지를 분리 제거한 후, 제1 내지 제3체결너트의 하향 회전을 통해 메인폴이 기초부와 견고한 조립 체결상태가 이루어지도록 함을 특징으로 하는 타워형 시설물의 폴 설치방법.After rotating the first fastening nut spaced downward from the upper surface of the base portion to remove the connecting flange that was fixed between the second fastening nut, and then through the downward rotation of the first to third fastening nuts The pole installation method of the tower-type facility, characterized in that the main pole is made of a solid assembly and fastening state. 기초부(10)에 매립 돌출된 앵커볼트(11)(11')와 대응하는 삽입홈(21)(21')을 갖는 연결플랜지(20)와; 상기 연결플랜지(20)의 상부 일측으로 힌지 결합되는 연결대(30)와; 상기 연결대(30)와 힌지 결합되는 보조폴(40);을 각기 구비하되,A connecting flange 20 having anchor bolts 11 and 11 'embedded in the base portion 10 and insertion grooves 21 and 21' corresponding to each other; A connection table 30 hinged to an upper side of the connection flange 20; Auxiliary pole 40 which is hinged to the connecting table 30; respectively provided, 기초부(10)의 앵커볼트(11)(11')에 연결플랜지(20)가 결합되게 하고, 연결플랜지(20)의 상부 일측에는 연결대(30)의 하부를 힌지 결합하며, 연결대(30)의 선단에는 수평방향의 메인폴(50) 하단이 결합된 수직상태인 보조폴(40)의 하단을 힌지 결합하며, 보조폴(40)의 선단과 메인폴(50)은 와이어(60)에 의해 연결 형성하여,The connection flange 20 is coupled to the anchor bolts 11 and 11 ′ of the base 10, the upper one side of the connection flange 20 is hinged to the lower portion of the connecting table 30, and the connecting table 30. Hinges are coupled to the lower end of the auxiliary pole 40 in the vertical state coupled to the bottom of the main pole 50 in the horizontal direction, the front end and the main pole 50 of the auxiliary pole 40 by the wire 60 By forming a connection, 수직방향인 보조폴(40)의 선단에 고정된 별도의 견인와이어(70)를 잡아당겨, 수평상태인 메인폴(50)이 수직상태가 되며 메인폴(50)의 하부에 형성된 체결플랜지부(51)가 기초부(10)의 앵커볼트(11)(11')상에 위치하여 서로 체결 고정할 수 있도 록 구성함을 특징으로 하는 타워형 시설물의 폴 설치장치.Pulling a separate towing wire 70 fixed to the tip of the auxiliary pole 40 in the vertical direction, the main pole 50 in a horizontal state is in a vertical state and a fastening flange portion formed in the lower portion of the main pole 50 ( 51 is installed on the anchor bolt (11) (11 ') of the base portion 10 so that the pole installation device of the tower-type facility, characterized in that configured to be fastened to each other. 제 3항에 있어서,The method of claim 3, wherein 연결플랜지(20)는, 앵커볼트(11)(11')가 측부로부터 끼워지도록 한 삽입홈(21)(21')을 일측에 형성하고 상부 일측에는 연결공(23)을 갖는 상향 경사상의 브라켓(22)(22')을 돌출 형성하여, 상기 브라켓(22)(22')의 선단에 연결대(30)의 하단이 힌지 결합되도록 구성함을 특징으로 하는 타워형 시설물의 폴 설치장치.The connecting flange 20 has an upwardly inclined bracket having insertion grooves 21 and 21 'formed at one side to allow the anchor bolts 11 and 11' to be fitted from the side and a connection hole 23 at the upper one side. (22) (22 ') protruding to form a pole installation device of the tower-type facility, characterized in that the lower end of the connecting rod 30 is hinged to the front end of the bracket (22) (22'). 제 3항에 있어서,The method of claim 3, wherein 연결대(30)는, 장방형의 금속판재로서 일단에는 연결플랜지(20)와 힌지 결합되는 제1힌지공(31)이 관통 형성되고 타단에는 보조폴(40)과 메인폴(50)이 힌지 결합되는 제2힌지공(32)이 관통 형성됨을 특징으로 하는 타워형 시설물의 폴 설치장치.The connecting table 30 is a rectangular metal plate material having a first hinge hole 31 hingedly coupled to the connecting flange 20 at one end thereof, and the auxiliary pole 40 and the main pole 50 hinged to the other end thereof. Pole installation device of the tower-type facility, characterized in that the second hinge hole 32 is formed through. 제 3항에 있어서,The method of claim 3, wherein 보조폴(40)은, 수직지지대(41)의 하단에 결합된 수평대(42)와 수평대(42)의 양단으로부터 하향 연장된 수직대(43)(43')로 이루어지고, 수직대(43)(43')의 하단에는 일측으로 힌지결합편(44)을 돌출 형성하여 구성함을 특징으로 하는 타워형 시설물의 폴 설치장치.The auxiliary pole 40 is composed of a horizontal bar 42 coupled to the lower end of the vertical support 41 and vertical bars 43 and 43 'extending downward from both ends of the horizontal support 42, and 43) (43 ') at the lower end of the pole installation device of the tower-type facility, characterized in that formed by forming a hinge coupling piece 44 to one side. 제 6항에 있어서,The method of claim 6, 수평대(42)와 수직대(43)(43')의 연결부에는 경사상의 받침판(45)을 고정 형성하여, 메인폴(50)의 견인시 체결플랜지부(51)에 작용하는 하중을 상기 받침판(45)이 지지하도록 구성함을 특징으로 하는 타워형 시설물의 폴 설치장치.An inclined support plate 45 is fixedly formed at the connection portion between the horizontal stand 42 and the vertical stand 43, 43 'so that the load acting on the fastening flange 51 when the main pole 50 is pulled out is supported. Pawl installation device of the tower-type facility, characterized in that configured to support (45). 제 3항에 있어서,The method of claim 3, wherein 보조폴(40)은, 선단에 걸이공(46)을 갖는 돌출편(47)을 형성하여 구성함을 특징으로 하는 타워형 시설물의 폴 설치장치.Auxiliary pole (40), pole installation device of the tower-type facility, characterized in that formed by forming a protruding piece (47) having a hook hole at the tip. 제 3항에 있어서,The method of claim 3, wherein 메인폴(50)의 체결플랜지부(51)는, 사방으로의 체결장공(52)(52')이 형성되고, 체결플랜지부(51)의 하부 일측에는 체결공(54)을 갖는 힌지체결판(53)을 하향 돌출하여, 연결대(30)와 힌지체결판(53)이 서로 힌지 결합될 수 있도록 구성함을 특징으로 하는 타워형 시설물의 폴 설치장치.The fastening flange 51 of the main pole 50 has fastening holes 52 and 52 ′ formed in all directions, and a hinge fastening plate having fastening holes 54 at one lower side of the fastening flange 51. Protruding downward (53), the pole installation device of the tower-type facility, characterized in that the connecting table 30 and the hinge fastening plate 53 is configured to be hinged to each other. 제 3항에 있어서,The method of claim 3, wherein 메인폴(50)은, 중간부에 와이어(60)를 걸어 고정할 수 있게 한 걸이부(55)를 돌출 형성하여 구성함을 특징으로 하는 타워형 시설물의 폴 설치장치.The main pole 50 is a pole installation device of the tower-type facility, characterized in that configured to protrude to form a hook portion (55) that can be fixed by hanging the wire 60 in the middle.
KR1020090077278A 2009-08-20 2009-08-20 Method and apparatus for constructing pole of tower-type facilities KR100945561B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090077278A KR100945561B1 (en) 2009-08-20 2009-08-20 Method and apparatus for constructing pole of tower-type facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090077278A KR100945561B1 (en) 2009-08-20 2009-08-20 Method and apparatus for constructing pole of tower-type facilities

Publications (1)

Publication Number Publication Date
KR100945561B1 true KR100945561B1 (en) 2010-03-08

Family

ID=42182955

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090077278A KR100945561B1 (en) 2009-08-20 2009-08-20 Method and apparatus for constructing pole of tower-type facilities

Country Status (1)

Country Link
KR (1) KR100945561B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223700A (en) * 2016-08-25 2016-12-14 杭州德宝机电制造有限公司 Many poles communication shaft tower
CN106337596A (en) * 2016-08-25 2017-01-18 杭州德宝机电制造有限公司 Communication pole tower with adjustable holding poles
CN108868298A (en) * 2018-06-26 2018-11-23 通号工程局集团有限公司 A kind of steel column assembling apparatus and its application method
KR20190074045A (en) 2017-12-19 2019-06-27 전남도립대학교산학협력단 Portable trailer cam device for adjusting antenna direction for wireless data transmission and reception
KR20200058771A (en) 2018-11-20 2020-05-28 주식회사 유디피시스 safety pole for airport
EP3931414A4 (en) * 2019-02-27 2022-12-07 OPS Solutions AS Foundation and tool for installing a composite pole

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0042738A1 (en) 1980-06-20 1981-12-30 Jaquith Industries, Inc. Base support for a tripod tower
US4677444A (en) 1984-06-18 1987-06-30 Perek Jean P Device for raising a mast
WO1994023161A1 (en) 1993-04-06 1994-10-13 Abacus Holdings Limited Raising and lowering columns
KR200347869Y1 (en) 2004-01-10 2004-04-29 김종근 A installation pole for meteorological appliances

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0042738A1 (en) 1980-06-20 1981-12-30 Jaquith Industries, Inc. Base support for a tripod tower
US4677444A (en) 1984-06-18 1987-06-30 Perek Jean P Device for raising a mast
WO1994023161A1 (en) 1993-04-06 1994-10-13 Abacus Holdings Limited Raising and lowering columns
KR200347869Y1 (en) 2004-01-10 2004-04-29 김종근 A installation pole for meteorological appliances

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223700A (en) * 2016-08-25 2016-12-14 杭州德宝机电制造有限公司 Many poles communication shaft tower
CN106337596A (en) * 2016-08-25 2017-01-18 杭州德宝机电制造有限公司 Communication pole tower with adjustable holding poles
CN106223700B (en) * 2016-08-25 2018-09-14 杭州德宝机电制造有限公司 More poles communicate shaft tower
KR20190074045A (en) 2017-12-19 2019-06-27 전남도립대학교산학협력단 Portable trailer cam device for adjusting antenna direction for wireless data transmission and reception
CN108868298A (en) * 2018-06-26 2018-11-23 通号工程局集团有限公司 A kind of steel column assembling apparatus and its application method
CN108868298B (en) * 2018-06-26 2024-03-15 通号工程局集团有限公司 Steel column assembling device and use method thereof
KR20200058771A (en) 2018-11-20 2020-05-28 주식회사 유디피시스 safety pole for airport
EP3931414A4 (en) * 2019-02-27 2022-12-07 OPS Solutions AS Foundation and tool for installing a composite pole

Similar Documents

Publication Publication Date Title
KR100945561B1 (en) Method and apparatus for constructing pole of tower-type facilities
CA2998110C (en) System and method for installing a tensioning tendon in a wind turbine tower
CA2814602C (en) Methods and apparatuses of supporting and bracing a pole
MX2011002576A (en) Dismantling device and dismantling method of rotating electric machine.
CN209856499U (en) Municipal administration water supply and drainage pipeline optimizes laying device
RU111566U1 (en) FAST SUPPORT FOR TWO-CHAIN ELECTRIC TRANSMISSION LINES
US20120049140A1 (en) APPARATUS (Sheave) FOR GUIDING CABLE IN AND OUT OF MANHOLES AND CONDUITS
KR200433150Y1 (en) upholder for street lamppost
KR101314649B1 (en) Structures having rotating means
WO2014175803A1 (en) Solar panel support structure & method
US3504464A (en) Tower structure and method of erecting the same
CN112664034B (en) Integral installation method of wind power generation tower
KR20100101799A (en) Elementary block for supporting of steel pipe
AU2016228198A1 (en) Improvements to serviceable pole assemblies
CN112049020A (en) Method for vertically installing large steel pipe upright post
CN108691452B (en) Split type electric pole operation, inspection and maintenance device and construction method
RU120683U1 (en) FAST-MOUNTED SUPPORT FOR ELECTRIC TRANSMISSION LINES
CN115045558B (en) Temporary telegraph pole easy to construct and install
CN215888236U (en) Pile lifter based on lever principle
CN201723387U (en) Column type small-sized wind driven generator tower capable of automatically standing
CN109838087A (en) Reusable assembled architecture support device
CN213086631U (en) Multifunctional rod support arm body connecting structure
CN212245897U (en) Whole fine-tuning installation gallows of major diameter reinforcing bar
CN220645489U (en) Assembled temporary construction encloses fender structure
CN214143725U (en) Foundation ditch supporting device for highway construction

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130107

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20131210

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150204

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20151216

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170110

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180308

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20181227

Year of fee payment: 10