KR100937700B1 - Pulling eye for extracting power line - Google Patents
Pulling eye for extracting power line Download PDFInfo
- Publication number
- KR100937700B1 KR100937700B1 KR1020090003586A KR20090003586A KR100937700B1 KR 100937700 B1 KR100937700 B1 KR 100937700B1 KR 1020090003586 A KR1020090003586 A KR 1020090003586A KR 20090003586 A KR20090003586 A KR 20090003586A KR 100937700 B1 KR100937700 B1 KR 100937700B1
- Authority
- KR
- South Korea
- Prior art keywords
- hole
- power line
- bolt
- fastening
- fixing
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
- H02G1/08—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling
- H02G1/081—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling using pulling means at cable ends, e.g. pulling eyes or anchors
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G9/00—Installations of electric cables or lines in or on the ground or water
- H02G9/06—Installations of electric cables or lines in or on the ground or water in underground tubes or conduits; Tubes or conduits therefor
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
Description
본 발명은 전력선 인출용 풀링아이에 관한 것으로서, 보다 상세하게는 가로등과 같은 시설물을 설치할 때 콘크리트 매설물 내의 매설관과 시설물 사이의 지중에 매설된 보호관을 통하여 전력선을 견인함에 있어서 인장와이어나 전력선을 피복된 채로 간단하게 고정시킬 수 있고, 매설관과 지중의 보호관을 통과할 때 사방으로 탄성설치된 판스프링 외측면에 축고정되어 회동되는 롤러에 의해 발생하는 마찰이나 회전 등으로 인해 결속이 해제되거나 인장와이어가 끊어질 염려가 없는 전력선 인출용 풀링아이에 관한 것이다. The present invention relates to a pulling eye for pulling out a power line, and more particularly, when a facility such as a street lamp is installed, a tension wire or a power line is covered in towing the power line through a protective tube embedded in the ground between the buried pipe in the concrete buried facility and the facility. It can be easily fixed while the binding is released or the tension wire is caused by friction or rotation generated by the roller which is pivoted on the outer surface of the leaf spring that is elastically installed in all directions when passing through the buried pipe and the protective pipe of the underground. The present invention relates to a pulling eye for pulling out power lines without fear of breaking.
일반적으로 풀링아이(Pulling eye)는 전력선 종단에서 인장와이어와 포설장비를 연결하여 포설작업을 실시할 때 전력선 당기는 것을 용이하게 하고, 규정 포설장력 이상으로 당길 경우에도 전력선 인장와이어에 영향을 미치지 않도록 하여 전력선의 외피가 손상되거나 인장와이어가 늘어나면서 단선되는 것을 방지하기 위하여 사용되는 것이다.In general, the pulling eye connects the tension wire and the installation equipment at the end of the power line to facilitate pulling the power line when laying, and does not affect the power line tension wire even when pulling over the specified laying tension. It is used to prevent the breakage of the outer line of the power line or the disconnection of the tension wire.
가로등을 설치하는 경우와 같이, 전력선 중간 중간에 전력을 사용하는 시설물을 설치할 경우에는, 양측의 콘크리트 매설물 내에 삽입되어 있는 매설관 및 그 사이의 지중에 매설되어 있는 보호관을 통하여 전력선을 분배해야 하는데, 종래에는 인장와이어를 매설관과 보호관을 통과시킨 후, 일측에서 상기 인장와이어를 전력선에 묶은 다음, 타측에서 인장와이어를 당기는 방법에 의해서 전력선을 분배하였다.When installing a facility that uses electric power in the middle of a power line, such as when installing a street lamp, power lines must be distributed through buried pipes inserted in concrete buried on both sides and protection pipes embedded in the ground between them. Conventionally, after passing the tension wire through the buried pipe and the protective tube, the power wire is distributed by tying the tension wire to the power line on one side and pulling the tension wire on the other side.
이러한 방법은 전력선을 묶는 부위의 피복을 벗겨내는바, 이는 인장와이어로 묶은 부위의 부피를 작게 하여서 보호관과 매설관 속을 통과하기 쉽게 하기 위한 것이다.This method strips off the sheathing of the area enclosing the power line, so that the volume of the area enclosed by the tension wire is made small so that it can easily pass through the protective tube and the buried line.
그러나, 이와 같은 종래의 방법은 전력선의 피복을 벗긴 후 작업을 하므로 작업과정이 번거로울 뿐만 아니라, 그 결속력이 약해서 매설관을 통과할 때 주위벽과의 마찰이나 돌출부위에의 걸림에 의하여 인장와이어의 결속이 풀어지게 되어 처음부터 다시 작업을 해야 하는 번거로운 문제점이 있었다.However, this conventional method is not only cumbersome because the work is performed after removing the covering of the power line, but also because the binding force is weak, the binding of the tension wire by the friction with the surrounding wall or the engagement on the protruding part when passing through the buried pipe There was a cumbersome problem that was to be released from the beginning to work again.
본 발명은 상기와 같은 문제점을 해결하기 위한 것으로서, 가로등과 같은 시설물을 설치할 때 콘크리트 매설물 내의 매설관과 시설물 사이의 지중에 매설된 보호관을 통하여 전력선을 견인함에 있어서 인장와이어나 전력선을 피복된 채로 간단하게 고정시킬 수 있고, 매설관과 지중의 보호관을 통과할 때 사방으로 탄성설치된 판스프링 외측면에 축고정되어 회동되는 롤러에 의해 발생하는 마찰이나 회전 등으로 인해 결속이 해제되거나 인장와이어가 끊어질 염려가 없는 전력선 인출용 풀링아이를 제공함에 그 목적이 있다.The present invention is to solve the above problems, when installing the facility, such as street lamps, to pull the power line through the protective pipe buried in the ground between the buried pipe and the facility in the concrete buried in the tension wire or power line simply covered with When passing through the buried pipe and the underground protective pipe, the binding is released or the tension wire is broken due to friction or rotation generated by the roller which is axially fixed to the outer surface of the leaf spring that is elastically installed in all directions. An object of the present invention is to provide a pulling eye for pulling out power lines without concern.
이와 같은 목적을 달성하기 위하여, 본 발명은 중심에 인장와이어 일단이 관통되는 관통공을 갖는 누운 원형바로 사방외주연에는 내측으로 고정요부가 각각 형성되고, 상기 고정요부 전후방측에는 앵커볼트가 각각 돌출형성되며, 후방면 관통공 상하부에는 체결볼트의 머리가 위치되어 유동되는 장홈이 각각 형성되고, 후방면 관통공 좌우측에는 볼트공이 각각 형성되며, 상기 장홈 연장선상에 체결볼트의 머리가 걸림고정되는 걸림유동장홀을 갖고 상기 볼트공 연장선상에 체결공을 갖으며 상기 관통공 연장선상에 통공을 갖고 후방면에 고정볼트로 체결고정되는 고정판이 형성되는 와이어관통구와;In order to achieve the above object, the present invention is a hollow circular bar having a through-hole through which one end of the tension wire penetrates in the center, and fixing recesses are formed inward on the outer periphery, respectively, and anchor bolts protrude on the front and rear sides of the fixing recess. The upper and lower rear surface through-holes are formed with long grooves through which the head of the fastening bolts are positioned and flow, and bolt holes are formed on the left and right rear through-holes, respectively. A wire through hole having a hole and having a fastening hole on the bolt hole extension line, and having a through hole on the through hole extension line and having a fixing plate fastened and fixed to a rear side by a fixing bolt;
상하로 양분되어 앵커볼트가 볼트관통공을 관통하여 너트로 체결고정되는 판체로, 상기 관통공과 통공 연장선상에는 인장와이어가 관통되어 체결고정되는 고정 공이 형성되되 내주연에는 인장와이어의 미끄러짐을 방지하는 다수개의 걸림돌부가 형성되고, 상기 체결볼트 연장선상에는 체결볼트가 관통되어 체결너트에 의해 체결고정되는 볼트체결공이 각각 형성되는 와이어고정구와;It is divided into two parts up and down, the anchor bolt penetrates through the bolt through hole and fastened with a nut, and the through hole and the through-hole extension line is formed with a fixed hole through which the tension wire penetrates and is fixed, but the inner circumference prevents the sliding of the tension wire Two hooking protrusions are formed, and wire fixing tools each having bolt fastening holes through which the fastening bolts are penetrated and fastened by fastening nuts are formed on the fastening bolt extension lines;
중심에 전력선 일단이 관통되는 관통공을 갖는 누운 원형바로, 사방외주연에는 내측으로 고정요부가 각각 형성되고, 상기 고정요부 전후방측에는 앵커볼트가 각각 돌출형성되며, 전방면 관통공 상하부에는 체결볼트의 머리가 위치되어 유동되는 장홈이 각각 형성되고, 전방면 관통공 좌우측에는 볼트공이 각각 형성되며, 상기 장홈 연장선상에 체결볼트의 머리가 걸림고정되는 걸림유동장홀을 갖고 상기 볼트공 연장선상에 체결공을 갖으며 상기 관통공 연장선상에 통공을 갖고 전방면에 고정볼트로 체결고정되는 고정판이 형성되는 전력선관통구와;A flat circular bar having a through hole through which one end of the power line passes. A fixing recess is formed inward on the outer periphery of each side, and anchor bolts are projected on the front and rear sides of the fixing recess, respectively. The head is positioned and flows in each of the long groove is formed, the front through hole is formed on the right and left sides of the bolt hole, respectively, the fastening hole on the bolt hole extension line having a locking flow hole for the head of the fastening bolt is fixed on the long groove extension line A power line through-hole having a through-hole on the through-hole extension line and having a fixing plate fastened and fixed to the front surface by a fixing bolt;
상하로 양분되어 앵커볼트가 볼트관통공을 관통하여 너트로 체결고정되는 판체로, 상기 관통공과 통공 연장선상에는 전력선이 관통되어 체결고정되는 고정공이 형성되되 내주연에는 전력선의 미끄러짐을 방지하는 다수개의 걸림돌부가 형성되고, 상기 체결볼트 연장선상에는 체결볼트가 관통되어 체결너트에 의해 체결고정되는 볼트체결공이 각각 형성되는 전력선고정구와;It is divided into two parts, the anchor bolt penetrates through the bolt through hole and is fastened with a nut. A fixing hole is formed on the through hole and the through hole extending line to secure the fastening by fastening the power line. A power line fixing tool having an additional portion formed thereon, and bolt fastening holes through which the fastening bolt penetrates and are fastened and fastened by fastening nuts;
양단은 상기 와이어관통구와 상기 전력선관통구의 고정요부에 각각 안착되어 고정너트에 의해 체결고정되는 고정공을 갖는 고정판이 형성되고, 고정판 사이에는 외측으로 만곡된 반원형상으로 중심측에는 롤러가 회동가능하게 축고정되는 탄성반원부가 형성되어 매설관이나 보호관에서 마찰을 최소화하는 판스프링을 구비하는 특징이 있다.Both ends of the wire through hole and the power line through holes are respectively fixed to the fixing plate having a fixing hole that is fastened and fastened by a fixing nut is formed, between the fixing plate is formed in a semi-circular curved outwardly in the center side of the roller rotatably shaft It is characterized in that the elastic semicircle to be fixed is provided with a leaf spring to minimize the friction in the buried pipe or protective tube.
이와 같이, 본 발명은 가로등과 같은 시설물을 설치할 때 콘크리트 매설물 내의 매설관과 시설물 사이의 지중에 매설된 보호관을 통하여 전력선을 견인함에 있어서 인장와이어나 전력선을 피복된 채로 간단하게 고정시킬 수 있고, 매설관과 지중의 보호관을 통과할 때 사방으로 탄성설치된 판스프링 외측면에 축고정되어 회동되는 롤러에 의해 발생하는 마찰이나 회전 등으로 인해 결속이 해제되거나 인장와이어가 끊어질 염려가 없는 효과가 있다.As described above, the present invention can be easily fixed while covering the tension wire or the power line in towing the power line through the protective tube embedded in the ground between the buried pipe in the concrete buried facility and the facility when installing the facility, such as street lamps, When passing through the tube and the protective tube of the underground, there is no fear that the binding is released or the tension wire is broken due to friction or rotation generated by the roller which is pivoted on the outer surface of the leaf spring elastically installed in all directions.
본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by those skilled in the art without departing from the gist of the present invention as claimed in the claims. Of course, such changes will fall within the scope of the claims.
이하, 본 발명을 첨부된 도면에 의해 보다 상세하게 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.
도 1은 본 발명 실시 예인 전력선 인출용 풀링아이의 모습을 보인 사시도이고, 도 2는 본 발명 실시 예인 전력선 인출용 풀링아이의 체결모습을 보인 분리 사시도이며, 도 3은 본 발명 실시 예인 전력선 인출용 풀링아이의 모습을 보인 측단면도이고, 도 4는 본 발명 실시 예인 전력선 인출용 풀링아이의 사용상태를 보인 측단면도이다.1 is a perspective view showing a state of the pulling pulley for drawing a power line according to an embodiment of the present invention, Figure 2 is an exploded perspective view showing a fastening of the pulling eye for pulling out a power line according to an embodiment of the present invention, Figure 3 is a power line for drawing the embodiment of the present invention Figure 4 is a side cross-sectional view showing a state of the pulling eye, Figure 4 is a side cross-sectional view showing a state of use of the pulling eye for pulling the power line according to an embodiment of the present invention.
참고로 본 발명을 설명함에 있어 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단될 경우에는 그 상세 한 설명을 생략하였다.For reference, in the following description of the present invention, if it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted.
또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운영자의 의도 또는 관례 등에 따라 달라질 수 있다.In addition, terms to be described below are terms defined in consideration of functions in the present invention, which may vary according to the intention or convention of a user or an operator.
그러므로, 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것임은 물론이다.Therefore, the definition should be made based on the contents throughout the specification.
본 발명의 전력선 인출용 풀링아이는, 인장와이어(18)가 관통되고 판스프링(50,50a,50b,50c) 일단이 고정되는 와이어관통구(10)와, 인장와이어(18) 선단이 고정되는 와이어고정구(20,20a)와, 전력선(38)이 관통되고 판스프링(50,50a,50b,50c) 타단이 고정되는 전력선관통구(30)와, 전력선(38) 선단이 고정되는 전력선고정구(40,40a)와, 인장와이어(18)를 통한 전력선(38)의 인출시 마찰을 최소화하여 신속한 인출을 유도하는 판스프링(50,50a,50b,50c)으로 구성된다.The pulling eye for pulling out the power line of the present invention includes a wire through
상기 와이어관통구(10)는 중심에 인장와이어(18) 일단이 관통되는 관통공(11)을 갖는 누운 원형바로, 사방외주연에는 내측으로 고정요부(12,12a,12b,12c)가 각각 형성되고, 상기 고정요부(12,12a,12b,12c) 전후방측에는 앵커볼트(13,13a)가 각각 돌출형성되며, 후방면 관통공(11) 상하부에는 체결볼트(16,16a)의 머리(16b)가 위치되어 유동되는 장홈(14,14a)이 각각 형성되고, 후방면 관통공(11) 좌우측에는 볼트공(15,15a)이 각각 형성되며, 상기 장홈(14,14a) 연장선상에 체결볼트(16,16a)의 머리(16b)가 걸림고정되는 걸림유동장홀(17d,17e)을 갖고 상기 볼트공(15,15a) 연장선상에 체결공(17b,17c)을 갖으며 상기 관통공(11) 연장선상에 통공(17f)을 갖고 후방면에 고정볼트(17a)로 체결고정되는 고정판(17)이 형성된다. The wire through
상기 와이어고정구(20,20a)는 상하로 양분되어 앵커볼트(22)가 볼트관통공(23)을 관통하여 너트(24)로 체결고정되는 판체로, 상기 관통공(11)과 통공(17f) 연장선상에는 인장와이어(18)가 관통되어 체결고정되는 고정공(21)이 형성되되 내주연에는 인장와이어(18)의 미끄러짐을 방지하는 다수 개의 걸림돌부(21a)가 형성되고, 상기 체결볼트(16,16a) 연장선상에는 체결볼트(16,16a)가 관통되어 체결너트(25b)에 의해 체결고정되는 볼트체결공(25,25a)이 각각 형성된다. The wire fixing tool (20, 20a) is divided into a vertical plate plate anchor bolt 22 is fastened to the
상기 전력선관통구(30)는 중심에 전력선(38) 일단이 관통되는 관통공(31)을 갖는 누운 원형바로, 사방외주연에는 내측으로 고정요부(32,32a,32b,32c)가 각각 형성되고, 상기 고정요부(32,32a,32b,32c) 전후방측에는 앵커볼트(33,33a)가 각각 돌출형성되며, 전방면 관통공(31) 상하부에는 체결볼트(36,36a)의 머리(36b)가 위치되어 유동되는 장홈(34,34a)이 각각 형성되고, 전방면 관통공(31) 좌우측에는 볼트공(35,35a)이 각각 형성되며, 상기 장홈(34,34a) 연장선상에 체결볼트(36,36a)의 머리(36b)가 걸림고정되는 걸림유동장홀(37d,37e)을 갖고 상기 볼트공(35,35a) 연장선상에 체결공(37b,37c)을 갖으며 상기 관통공(31) 연장선상에 통공(37f)을 갖고 전방면에 고정볼트(37a)로 체결고정되는 고정판(37)이 형성된다. The power line through-
상기 전력선고구(40,40a)는 상하로 양분되어 앵커볼트(42)가 볼트관통공(43)을 관통하여 너트(44)로 체결고정되는 판체로, 상기 관통공(31)과 통공(37f) 연장선상에는 전력선(38)가 관통되어 체결고정되는 고정공(41)이 형성되되 내주연에는 전력선(38)의 미끄러짐을 방지하는 다수 개의 걸림돌부(41a)가 형성되고, 상기 체결볼트(36,36a) 연장선상에는 체결볼트(36,36a)가 관통되어 체결너트(45b)에 의해 체결고정되는 볼트체결공(45,45a)이 각각 형성된다. The power wires (40, 40a) is divided into a vertical plate
상기 판스프링(50,50a,50b,50c)은 양단은 상기 와이어관통구(10)와 상기 전력선관통구(30)의 고정요부(12,12a,12b,12c)(32,32a,32b,32c)에 각각 안착되어 고정너트(53c)에 의해 체결고정되는 고정공(53b)을 갖는 고정판(53,53a)이 형성되고, 고정판(53,53a) 사이에는 외측으로 만곡된 반원형상으로 중심측에는 롤러(51a)가 회동가능하게 축고정되는 탄성반원부(51)가 형성되어 매설관(60)이나 보호관(60a)에서 마찰을 최소화하면서 전력선(38)의 인출을 용이하게 유도한다. Both end portions of the
이러한 본 발명은 매설관(60)이나 보호관(60a)에서 인장와이어(18)를 잡아당기면 판스프핑(50,50a,50b,50c) 찬성반원부(51)의 롤러(51a)는 매설관(60)이나 보호관(60a) 내주면에서 원활하게 이동을 유도하게 되면서 전력선고정구(40,40a)에 고정된 전력선(38)을 손쉽게 매설관(60)이나 보호관(60a)에서 인출할 수 있게 된다.In the present invention, when the
도 1은 본 발명 실시 예인 전력선 인출용 풀링아이의 모습을 보인 사시도, 1 is a perspective view showing a state of a pulling eye for pulling out a power line according to an embodiment of the present invention;
도 2는 본 발명 실시 예인 전력선 인출용 풀링아이의 체결모습을 보인 분리 사시도, Figure 2 is an exploded perspective view showing the fastening of the pulling line for pulling out the power line according to an embodiment of the present invention,
도 3은 본 발명 실시 예인 전력선 인출용 풀링아이의 모습을 보인 측단면도, Figure 3 is a side cross-sectional view showing a state of the pull-out eye for power line drawing according to an embodiment of the present invention,
도 4는 본 발명 실시 예인 전력선 인출용 풀링아이의 사용상태를 보인 측단면도.Figure 4 is a side cross-sectional view showing a state of use of the pulling line for pulling out the power line according to an embodiment of the present invention.
*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *
10 : 와이어관통구 11 : 관통공10: wire through hole 11: through hole
12,12a,12b,12c : 고정요부 13,13a : 앵커볼트12,12a, 12b, 12c: Fixing recess 13,13a: Anchor bolt
14,14a : 장홈 15,15a : 볼트공14,14a: Long groove 15,15a: Bolt hole
16,16a : 체결볼트 16b : 머리16,16a: Fastening bolt 16b: Head
17 : 고정판 17a : 고정볼트17: fixing plate 17a: fixing bolt
17b,17c : 체결공 17d,17e : 걸림유동장홀17b, 17c: Fastening hole 17d, 17e: Hanging flow hole
17f : 통공 18 : 인장와이어17f: Through Hole 18: Tension Wire
20,20a: 와이어고정구 21 : 고정공20,20a: wire fixing tool 21: fixing hole
21a : 걸림돌부 22 : 앵커볼트21a: jamming part 22: anchor bolt
23 : 볼트관통공 24 : 너트23: bolt through hole 24: nut
25,25a : 볼트체결공 25b : 체결너트25,25a: Bolt tightening hole 25b: Tightening nut
30 : 전력선관통구 31 : 관통공30: power line through hole 31: through hole
32,32a,32b,32c : 고정요부 33,33a : 앵커볼트32,32a, 32b, 32c: Fixing
34,34a : 장홈 35,35a : 볼트공34,34a:
36,36a : 체결볼트 36b : 머리36,36a: Fastening bolt 36b: Head
37 : 고정판 37a : 고정볼트37: fixing plate 37a: fixing bolt
37b,37c : 체결공 37d,37e : 걸림유동장홀37b, 37c: Fastener 37d, 37e: Hanging hole
37f : 통공 38 : 전력선37f: Through 38: Power line
40,40a: 전력선고정구 41 : 고정공40, 40a: power line fixture 41: fixing hole
41a : 걸림돌부 42 : 앵커볼트41a: protrusion 42: anchor bolt
43 : 볼트관통공 44 : 너트43: bolt through hole 44: nut
45,45a : 볼트체결공 45b : 체결너트45,45a: Bolt tightening hole 45b: Tightening nut
50,50a,50b,50c : 판스프링 51 : 탄성반원부50, 50a, 50b, 50c: leaf spring 51: elastic semicircular portion
51a : 롤러 53,53a : 고정판51a:
53b : 고정공 53c : 고정너트53b: fixing hole 53c: fixing nut
60 : 매설관 60a : 보호관60: buried
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090003586A KR100937700B1 (en) | 2009-01-16 | 2009-01-16 | Pulling eye for extracting power line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090003586A KR100937700B1 (en) | 2009-01-16 | 2009-01-16 | Pulling eye for extracting power line |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100937700B1 true KR100937700B1 (en) | 2010-01-20 |
Family
ID=41810015
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090003586A KR100937700B1 (en) | 2009-01-16 | 2009-01-16 | Pulling eye for extracting power line |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100937700B1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100959776B1 (en) | 2010-04-01 | 2010-05-27 | (주)신명이앤씨 | Pulling eye for extracting power line inside apartment house |
KR100980754B1 (en) | 2010-04-22 | 2010-09-07 | (주)건축사사무소 성우건축 | Pulling eye for extracting power line inside apartment house |
KR101047146B1 (en) | 2011-04-27 | 2011-07-07 | (주)케이제이종합엔지니어링 | Apparatus for laying cable in channel |
CN107800106A (en) * | 2017-12-09 | 2018-03-13 | 胡楠 | A kind of underground coal mine cable fixed traction device |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS56164612U (en) * | 1980-05-10 | 1981-12-07 | ||
JPS63300958A (en) * | 1987-05-30 | 1988-12-08 | Osaka Gas Co Ltd | In-tube cable running tool |
JP2004129361A (en) * | 2002-10-01 | 2004-04-22 | Kyowa Exeo Corp | Cable passing jig |
-
2009
- 2009-01-16 KR KR1020090003586A patent/KR100937700B1/en not_active IP Right Cessation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS56164612U (en) * | 1980-05-10 | 1981-12-07 | ||
JPS63300958A (en) * | 1987-05-30 | 1988-12-08 | Osaka Gas Co Ltd | In-tube cable running tool |
JP2004129361A (en) * | 2002-10-01 | 2004-04-22 | Kyowa Exeo Corp | Cable passing jig |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100959776B1 (en) | 2010-04-01 | 2010-05-27 | (주)신명이앤씨 | Pulling eye for extracting power line inside apartment house |
KR100980754B1 (en) | 2010-04-22 | 2010-09-07 | (주)건축사사무소 성우건축 | Pulling eye for extracting power line inside apartment house |
KR101047146B1 (en) | 2011-04-27 | 2011-07-07 | (주)케이제이종합엔지니어링 | Apparatus for laying cable in channel |
CN107800106A (en) * | 2017-12-09 | 2018-03-13 | 胡楠 | A kind of underground coal mine cable fixed traction device |
CN107800106B (en) * | 2017-12-09 | 2020-12-18 | 徐州新南湖科技有限公司 | Colliery is fixed draw gear of cable in pit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100937700B1 (en) | Pulling eye for extracting power line | |
US10845015B2 (en) | Light fitting bracket | |
KR101852082B1 (en) | Re-tensioning anchorage device | |
KR20170042982A (en) | Rope handrail | |
JP4959416B2 (en) | Underline connector | |
JP6009365B2 (en) | Bird damage prevention tool | |
KR100818623B1 (en) | Pulling eye for extracting power line | |
KR101292617B1 (en) | Coupling Apparatus For Safety Balustrade | |
KR20110003503U (en) | Installation device for cable | |
KR20140121736A (en) | Roller and Bracket Cable Protection | |
KR200435566Y1 (en) | Fixing utensil for ceiling equipment | |
KR20140037503A (en) | Cable protect pipe for high tension wire of corruqated pipe type | |
US9004232B2 (en) | Suspension-means end-fastener with fixing element | |
KR100859323B1 (en) | Pulling eye for extracting power line inside apartment house | |
KR20100006596A (en) | Pulling eye for extracting power line | |
JP5893718B1 (en) | Wiring support bracket | |
KR101027121B1 (en) | Fixing device for gas pipe | |
KR200460979Y1 (en) | Fastening device for cable | |
KR100750719B1 (en) | Electric pole number plate | |
KR101029897B1 (en) | Fixed equipment of illuminator | |
US9093827B2 (en) | Wire pulling device | |
JP5289117B2 (en) | Cable addition device in existing cable stretcher | |
KR101438503B1 (en) | Cable hanger | |
KR20150000297U (en) | guide for laying of cable | |
KR200462071Y1 (en) | Hanging structure for ceiling-embeded type luminaire |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
AMND | Amendment | ||
E601 | Decision to refuse application | ||
AMND | Amendment | ||
J201 | Request for trial against refusal decision | ||
B601 | Maintenance of original decision after re-examination before a trial | ||
E801 | Decision on dismissal of amendment | ||
J301 | Trial decision |
Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20090623 Effective date: 20091230 |
|
S901 | Examination by remand of revocation | ||
GRNO | Decision to grant (after opposition) | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130103 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20140106 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20150105 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |