KR100908676B1 - Assembly block devris barrier - Google Patents

Assembly block devris barrier Download PDF

Info

Publication number
KR100908676B1
KR100908676B1 KR1020080132758A KR20080132758A KR100908676B1 KR 100908676 B1 KR100908676 B1 KR 100908676B1 KR 1020080132758 A KR1020080132758 A KR 1020080132758A KR 20080132758 A KR20080132758 A KR 20080132758A KR 100908676 B1 KR100908676 B1 KR 100908676B1
Authority
KR
South Korea
Prior art keywords
block
prefabricated block
prefabricated
coupling pin
groove
Prior art date
Application number
KR1020080132758A
Other languages
Korean (ko)
Inventor
허경태
Original Assignee
대한민국
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대한민국 filed Critical 대한민국
Priority to KR1020080132758A priority Critical patent/KR100908676B1/en
Application granted granted Critical
Publication of KR100908676B1 publication Critical patent/KR100908676B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/08Wall dams
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

A prefabricated block debris barrier is provided to construct a debris barrier within a short period without the concrete curing process. A prefabricated block debris barrier has a prefabricated block which is combined in longitudinal and width direction to form a unit horizontal layer(B), a soil and stone barrier portion(A) is built by a unit horizontal layer combined above another unit horizontal layer, a two connecting grooves are formed in the upper side of the block body(10) of the prefabricated block, a combining pin(20) is fixed and combined to the top in the central part in which the linking groove is crossed. A fitting groove is formed in the lower-part of the block body of the prefabricated block faced with the combining pin, a connecting plate(30) is settled in the connecting groove, a plurality of coupling holes are formed in the combining plate to combine the combining groove to the combining pin.

Description

조립식블록 사방댐{Assembly Block Devris Barrier}Assembly Block Devris Barrier

본 발명은 조립식블록 사방댐에 관한 것으로서, 보다 상세하게는 조립식블록이 길이방향 및 폭방향으로 결합되어 단위수평층이 형성되고, 상기 단위수평층의 상부에 또 다른 단위수평층이 결합되어 토석차단부가 구성됨으로써 운반과 시공이 간편하고 공기가 단축되도록 하는 조립식블록 사방댐에 관한 것이다.The present invention relates to a prefabricated block four-sided dam, more specifically, the prefabricated block is combined in the longitudinal direction and the width direction to form a unit horizontal layer, another unit horizontal layer is coupled to the upper portion of the unit horizontal layer earth block It is related to the prefabricated block four-sided dam to simplify the transportation and construction by being shortened by the configuration.

일반적으로 하천이나 계곡에는 흙이나 모래가 하류로 흘러내리지 못하도록 하거나 산사태 및 홍수로 인한 하류의 피해를 방지하기 위한 방안으로 하천의 상류 또는 계곡에 하천이나 계곡을 가로지르는 사방댐이 설치되어 있다.In general, rivers and valleys are provided with four-sided dams across rivers and valleys upstream or in the valleys to prevent soil or sand from flowing downstream or to prevent damages caused by landslides and floods.

상기 사방댐은 대부분 철근콘크리트 또는 무근콘크리트로 시공되는데, 그 시공과정이 먼저 시공되어질 지면을 절토하여 다짐질하고, 다짐질된 지반의 상부로 댐어깨와 토석차단부가 시공되어질 거푸집을 설치한 후 적절히 철근을 배근하고 콘크리트를 타설, 양생하는 등의 복잡한 과정을 거치게 됨으로써 시공 기간이 길고, 예산이 많이 소요되는 등의 문제점이 있었다. The four-sided dam is mostly constructed of reinforced concrete or bare concrete, and the construction process is first cut into the ground to be constructed, and then compacted, and the dam shoulder and the soil block are installed to the upper part of the compacted ground. There are problems such as long construction period and a lot of budget by going through a complex process such as placing and curing concrete and curing.

또한, 계곡 상층부의 지반이 붕괴되어 토석이 밀려 내려와 점점 많아진 토석이 계곡 하층부를 일시에 덮치는 계곡사태를 방지하기 위하여는 5부능선 이상에 있 는 계곡에 작은 규모의 사방댐을 다수개 설치하여 작은 돌의 낙석부터 방지해야 하나, 계곡 상류에 시공에 필요한 자원 및 장비들을 운반하기 위해서는 별도의 길을 내야 하므로 자연환경의 훼손이 심하고 인근의 논밭이나 임야를 지나야 하기 때문에 지당세를 많이 요구하는 주민들을 설득하는 데 많은 시간이 소요되는 문제점이 있었다.In addition, in order to prevent a valley situation in which the soil is collapsed due to the collapse of the upper part of the valley and more and more soil is temporarily hitting the lower part of the valley, a large number of small stones are installed in the valley above the five ridges. To prevent rocks from falling down, but to transport resources and equipment needed for construction upstream of the valley, it is necessary to take a separate route, which persuades residents who demand a lot of land tax due to severe damage to the natural environment and passing through nearby fields or forests. There was a problem that took a long time to do.

그리고, 길이 없는 곳에서 케이블이나 헬기로 자재를 운반할 경우에는 콘크리트 양생에 필요한 물을 운반하기 어려워 산 중턱 이상에는 사방댐을 설치하기 어려운 등의 많은 문제점이 있었다.In addition, when transporting materials by cable or helicopter in a place where there is no road, there are many problems such as difficult to transport water necessary for curing concrete, and it is difficult to install a four-sided dam above the mountainside.

아울러 여름에 수해가 발생하여 이를 복구하기 위한 사방댐을 시공할 경우 통상적으로 늦가을에 발주되어 동절기에 콘크리트 양생을 해야 하기 때문에 항상 다음해로 시공예산을 이월시키는 등 당해년도에 시공을 끝내기 어려운 문제점이 있었다.In addition, when construction of four-sided dams to recover from floods in summer occurs, it is usually difficult to finish construction in the same year, such as always carrying over the construction budget to the next year, because concrete curing must be ordered in late autumn. .

따라서 상기한 종래의 문제점을 해소하기 위한 본 발명의 목적은 조립식블록 및 경사블록을 결합하여 토석차단부를 구성함으로써 복잡한 콘크리트 양생과정을 거치지 않고 단기간에 시공이 가능한 조립식 사방댐을 제공하는 것이다.Therefore, an object of the present invention for solving the above problems is to provide a prefabricated four-sided dam that can be constructed in a short period of time without a complex concrete curing process by combining the prefabricated block and the inclined block to form a soil block.

또한, 거푸집 타설이나 기초 공사에 필요한 중장비 및 부대시설 등의 필요없이 미리 제작된 조립식블록과 경사블록을 조립하여 시공함으로써 운반비용, 인건비 등을 절약할 수 있음은 물론 시공성이 우수한 조립식 사방댐을 제공하는 것이다.In addition, by prefabricating prefabricated blocks and inclined blocks without the need for heavy equipment and foundation facilities for formwork or foundation work, construction costs can be reduced and labor costs can be saved. will be.

상기한 목적을 달성하기 위한 본 발명에 따른 조립식블록 사방댐은, 조립식블록(1)이 길이방향 및 폭방향으로 결합되어 단위수평층(B)이 형성되고, 상기 단위수평층(B)의 상부에 또 다른 단위수평층(B)이 결합되어 토석차단부(A)가 구성되어지는 조립식블록 사방댐에 있어서,In the prefabricated block four-sided dam according to the present invention for achieving the above object, the prefabricated block 1 is combined in the longitudinal direction and the width direction to form a unit horizontal layer (B), the upper portion of the unit horizontal layer (B) In the prefabricated block four-side dam that is combined with another unit horizontal layer (B) is composed of earth block (A),

상기 조립식블록(1)의 블록몸체(10) 상면에는 중앙부를 중심으로 2개의 연결홈(11)이 서로 대각선 방향으로 형성되고, 상기 연결홈(11)이 교차되어지는 중앙부에는 상부로 결합핀(20)이 고정결합되며, 상기 결합핀(20)과 대향되어지는 조립식블록(1)의 블록몸체(10) 하면에는 끼움홈(12)이 형성되고, 상기 조립식블록(1)과 전, 후, 좌, 우로 이웃하는 조립식블록(1)이 서로 연결되도록 상기 조립식블록(1)의 연결홈(11)에 연결판(30)이 안착되어지되, 상기 연결판(30)에는 다수개의 결합공(31)이 형성되어 상기 연결홈(11)의 결합핀(20)에 상기 연결판(30)의 결합공(31) 이 끼워져 결합되고, 상기 단위수평층(B)의 조립식블록(1)의 상부에 또 다른 단위수평층(B)의 조립식블록(1)이 끼움결합되어 구성되어짐을 특징으로 한다.On the upper surface of the block body 10 of the prefabricated block 1, two connecting grooves 11 are formed in a diagonal direction with respect to a central portion, and a coupling pin upwards at a central portion where the connecting grooves 11 cross. 20 is fixedly coupled to the bottom surface of the block body 10 of the prefabricated block 1 opposite to the coupling pin 20, the fitting groove 12 is formed, before and after the prefabricated block (1), Left and right neighboring prefabricated block (1) is connected to each other connecting plate 30 is seated in the connecting groove 11 of the prefabricated block (1), the connecting plate 30 a plurality of coupling holes (31) ) Is formed and the coupling hole 31 of the connecting plate 30 is fitted to the coupling pin 20 of the connecting groove 11, and is coupled to the upper part of the prefabricated block 1 of the unit horizontal layer B. Another unit horizontal layer (B) is characterized in that the prefabricated block (1) is configured by fitting.

또한, 상기 조립식블록(1)의 블록몸체(10)는 원통형의 형상 또는 육면체의 형상으로 형성되어지는 것을 특징으로 한다.In addition, the block body 10 of the prefabricated block (1) is characterized in that it is formed in the shape of a cylindrical or hexahedron.

그리고, 상기 조립식블록(10)의 블록몸체(10)가 원통형의 형상일 경우 상기 토석차단부(A)의 일측 또는 양측에 원형경사블록(5a)이 결합되어지고, 상기 조립식블록(10)의 블록몸체(10)가 육면체의 형상일 경우 상기 토석차단부(A)의 일측 또는 양측에 사각형경사블록(5b)이 결합되어지는 것을 특징으로 한다.In addition, when the block body 10 of the prefabricated block 10 has a cylindrical shape, the circular inclination block 5a is coupled to one side or both sides of the earth blockage part A, and the prefabricated block 10 of When the block body 10 is in the shape of a hexahedron, it characterized in that the rectangular inclination block (5b) is coupled to one side or both sides of the earth block (A).

또한, 상기 끼움홈(12)의 내부가 암나사로 형성되고, 상기 결합핀(20) 상부의 돌출부는 숫나사로 형성거나, 상기 끼움홈(12)의 내부는 테이퍼 형태로 형성되고, 상기 결합핀(20)의 상부는 테이퍼 형태로 형성되는 것을 특징으로 한다.In addition, the inside of the fitting groove 12 is formed of a female screw, the protrusion of the upper portion of the coupling pin 20 is formed of a male screw, or the interior of the fitting groove 12 is formed in a tapered shape, the coupling pin ( The upper portion of 20) is characterized in that it is formed in a tapered shape.

본 발명에 따르면 조립식블록과 경사블록을 결합시켜 조립식으로 사방댐을 시공함으로써 시공이 간편하고 공기가 단축되는 효과가 있고, 헬기를 이용하면 깊은 계곡이나 산꼭대기 등에서도 설비의 운반이 가능하여 5부능선 이상의 계곡에 계곡사태 방지댐을 설치하거나 긴급을 요하는 수해복구용 사방댐 등에 재빨리 투입이 가능하도록 함과 동시에 자재운반 비용 및 인건비가 절약됨으로써 예산이 절감되는 등의 유용한 효과를 제공한다.According to the present invention by combining the prefabricated block and the inclined block to construct the four-sided dam in the prefabricated structure, the construction is simple and the effect of shortening the air, the use of a helicopter can be transported in the deep valley or mountain top, etc. It is possible to quickly install valley prevention dams in the above valleys, or to quickly put flood disaster recovery alleys at the same time, as well as to reduce budgets by saving material transportation costs and labor costs.

또한, 기존의 사방댐은 훼손 시 전체를 재시공하여야 함으로써 막대한 예산과 시간이 소요되었으나 본 발명의 조립식 사방댐은 블록 별로 개별 교체가 가능하 므로 보수가 용이하고 시간이 절약되는 장점이 있다. In addition, the existing four-sided dam was required a huge budget and time by rebuilding the entire damage, but the prefabricated four-sided dam of the present invention has the advantage that it is easy to repair and save time because it can be replaced individually by block.

이하, 본 발명을 첨부된 도면을 참고로 하여 상세히 설명하도록 한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

본 발명의 조립식블록 사방댐은 조립식블록 및 원형 경사블록 또는 사각형 경사블록이 길이방향 또는 폭방향으로 결합되어 토석차단부가 구성되는 것으로써, 먼저 본 발명의 조립식블록, 원형경사블록 및 사각형경사블록을 살펴보도록 한다.The prefabricated block four-sided dam of the present invention is a prefabricated block and a circular inclined block or a square inclined block are combined in the longitudinal direction or the width direction is composed of earth block, first look at the prefabricated block, circular inclined block and rectangular inclined block of the present invention. Let's see.

도 1 내지 도 3은 본 발명의 조립식블록 사방댐에 사용되는 조립식블록의 실시예들을 도시한 것이다.1 to 3 illustrate embodiments of the prefabricated block used in the prefabricated block four-side dam of the present invention.

먼저 조립식블록(1)은 원통형으로 형성되고, 상기 조립식블록(1)의 블록몸체(10)(10')상면에는 중앙부를 중심으로 서로 대각선 방향으로 2개 이상의 연결홈(11)이 형성된다. 상기 연결홈(11)에는 후술하는 연결판(30)이 끼워지게 되는데, 2개 이상의 연결판(30)이 안착되어야 하므로, 상기 연결홈(11)의 깊이는 연결판(30) 2개의 두께보다 더 깊게 형성되도록 하여 상기 연결홈(11)에 연결판(30)이 끼워진 후 너트로 조이는 부분의 두께를 감안하여 상기 조립식블록(1)의 상면이 돌출부 없이 평평하게 마무리 되도록 한다.First, the prefabricated block 1 is formed in a cylindrical shape, and two or more connecting grooves 11 are formed on the block bodies 10 and 10 'of the prefabricated block 1 in a diagonal direction with respect to the center part. The connection groove 11 is inserted into the connection plate 30 to be described later, since two or more connection plates 30 should be seated, the depth of the connection groove 11 is greater than the thickness of the two connection plate 30 In order to be formed deeper so that the connecting plate 30 is inserted into the connecting groove 11, the upper surface of the prefabricated block (1) is finished flat without the projection in view of the thickness of the tightening portion with a nut.

그리고, 상기 연결홈(11)이 교차되어지는 중앙부에는 결합핀(20)(20')이 고정결합된다. 상기 결합핀(20)(20')은 상기 조립식블록(1)의 제작시 앵커 등으로 고정시켜 상기 조립식블록(1)과 일체로 형성되게 하거나, 상기 연결홈(11)이 교차되어지는 부분에 결합핀 고정홈을 형성시킨 후 시공현장에서 결합핀(20)(20')을 별도로 고정결합할 수도 있다. In addition, the coupling pins 20 and 20 'are fixedly coupled to the center portion where the connection grooves 11 cross. The coupling pins 20 and 20 ′ are fixed to anchors when the prefabricated block 1 is manufactured, so as to be integrally formed with the prefabricated block 1, or at a portion where the connecting grooves 11 intersect. After forming the coupling pin fixing groove may be separately fixed to the coupling pin 20, 20 'in the construction site.

상기 결합핀(20)(20')의 상부는 경우에 따라서 숫나사로 형성되거나 테이퍼형태로 형성될 수 있다.The upper portion of the coupling pins 20, 20 'may be formed with a male screw or tapered in some cases.

상기 결합핀(20)(20')의 상부는 상기 조립식블록(1)의 상부에 위치되는 또 다른 조립식블록(1) 하면의 끼움홈(12)에 결합되는 것으로써, 상기 결합핀(20)의 상부가 숫나사로 형성되는 경우 상부에 위치되는 조립식블록(1)의 몸체를 돌려서 끼움홈(12)의 암나사에 끼움결합하고, 상기 결합핀(20')의 상부가 테이퍼형태로 형성되는 경우에는 상기 끼움홈(12)의 내부도 테이퍼형태로 되어 상부에 위치되는 조립식블록(1)이 그대로 얹혀지도록 하여 중력에 의해 결합되도록 한다.The upper portion of the coupling pins 20, 20 'is coupled to the fitting groove 12 of the lower surface of the other prefabricated block 1 located on the prefabricated block 1, the coupling pin 20 When the upper portion of the male screw is formed by turning the body of the prefabricated block (1) located in the upper portion is fitted to the female screw of the fitting groove 12, when the upper portion of the coupling pin (20 ') is formed in a tapered shape The interior of the fitting groove 12 also has a tapered shape so that the prefabricated block 1 located on the upper portion is mounted as it is to be coupled by gravity.

상기와 같이 조립식블록(1)의 블록몸체(10)(10')(10")는 원통형으로 형성될 수도 있으나, 도 5에서와 같이 육면체형상으로 형성될 수도 있다.As described above, the block bodies 10, 10 ′ and 10 ″ of the prefabricated block 1 may be formed in a cylindrical shape, but may also be formed in a hexahedral shape as shown in FIG. 5.

육면체형상으로 형성된 조립식블록(1)은 블록몸체(10")의 형태만 육면체형상이고, 몸체의 상부면에 대각선방향으로 연결홈(11)이 형성되고, 상기 연결홈(11)이 교차되어지는 중앙부에 결합핀(20)이 결합되는 것과, 상기 결합핀(20)과 대향되어지는 조립식블록(1)의 하면에 끼움홈(12)이 형성되는 것은 원통형 형태의 조립식블록과 모두 동일하다. The prefabricated block 1 formed in a hexahedral shape has a hexahedron shape only in the shape of a block body 10 ", and a connecting groove 11 is formed in a diagonal direction on an upper surface of the body, and the connecting groove 11 is crossed. The coupling pin 20 is coupled to the central portion, and the fitting groove 12 is formed on the lower surface of the prefabricated block 1 opposite to the coupling pin 20 is the same as the prefabricated block of the cylindrical form.

또한, 상기 육면체형상의 조립식블록(1)의 블록몸체(10") 하면에 형성된 끼움홈(12)의 내부가 암나사로 형성되는 경우 블록몸체(10")의 상면에 돌출부의 상부가 숫나사로 형성된 결합핀(20)이 고정결합되고, 끼움홈(12)의 내부가 테이퍼형태로 형성되는 경우 블록몸체(10")의 된 결합핀(20')의 상부 또한 테이퍼형태로 형성된 것이 끼워져 상기 조립블록(1)이 조립식으로 상, 하로 결합되도록 한다.In addition, when the interior of the fitting groove 12 formed on the lower surface of the block body 10 "of the prefabricated block 1 of the hexahedron shape is formed with a female screw, the upper part of the protrusion is formed with a male screw on the upper surface of the block body 10". When the coupling pin 20 is fixedly coupled and the inside of the fitting groove 12 is formed in a tapered shape, the upper part of the coupling pin 20 'of the block body 10 " (1) is assembled prefabricated up and down.

도 4 및 도 5는 본 발명의 조립식블록 사방댐의 일측 또는 양측에 결합되는 원형경사블록 및 사각형경사블록을 도시한 것으로서, 상기 원형경사블록(5a)은 원통형 블록몸체(50)가 대각선 방향으로 절단되어 일측면에 경사면(51)이 형성되고, 사각형경사블록(5b)는 육면체형상의 블록몸체(50")가 대각선 방향으로 절단되어 일측면에 경사면(51)이 형성된 것이다.4 and 5 illustrate a circular inclined block and a square inclined block coupled to one side or both sides of the assembled block four-side dam of the present invention, wherein the circular inclined block 5a is a cylindrical block body 50 cut in a diagonal direction. Thus, the inclined surface 51 is formed on one side, and the rectangular inclined block 5b is formed in the inclined surface 51 on one side by cutting the block body 50 ″ in a diagonal direction.

상기 원형경사블록(5a)와 사각형경사블록(5b)의 경사면(51)의 중앙에는 가로방향으로 안착홈(52)이 길게 형성되고, 상기 안착홈(52)의 중앙에 결합핀(20)이 고정결합된다.In the center of the inclined surface 51 of the circular inclined block 5a and the square inclined block 5b, a seating groove 52 is formed long in the horizontal direction, and a coupling pin 20 is formed at the center of the seating groove 52. It is fixedly coupled.

상기 원형경사블록(5a) 및 사각형경사블록(5b)의 하면에는 끼움홈(53)이 형성되어 상기 원형경사블록(5a) 및 사각형경사블록(5b)의 하측에 위치하는 조립식블록(1)의 결합핀(20)(20')에 끼움결합되도록 한다.A fitting groove 53 is formed on the lower surface of the circular inclined block 5a and the square inclined block 5b so that the prefabricated block 1 is located below the circular inclined block 5a and the square inclined block 5b. Fit to the coupling pins 20, 20 '.

상기 안착홈(52)은 비워두어 흙이 채워지게 하거나 식생공간으로도 사용될 수 있고, 상기 안착홈(52)에 후술하는 제2고정부재(60)가 결합되도록 하여 조립식블록 사방댐의 결속을 강화하는 데 사용하기도 한다. The seating groove 52 may be left empty or filled with soil or used as a vegetation space, and the second fixing member 60, which will be described later, is coupled to the seating groove 52 to strengthen the binding of the prefabricated block four-side dam. Also used to.

상기 조립식블록(1), 원형경사블록(5a) 및 사각형경사블록(5b)은 콘크리트, 벽돌, 목재 등으로 될 수 있음은 자명하며 이를 반드시 제한하지는 않는다.It is apparent that the prefabricated block 1, the circular slope block 5a and the square slope block 5b may be made of concrete, brick, wood, etc., but are not necessarily limited thereto.

상기와 같이 구성된 조립식블록(10) 및 원형경사블록(5a)또는 사각형경사블록(5b)이 조립식으로 결합되어 토석차단부(A)가 구성된 조립식블록 사방댐이 형성되는 것으로서, 조립식블록 사방댐은 규모가 조금 큰 경우 댐어깨(D) 사이에 설치될 수도 있고, 상류의 좁은 계곡(V)에 바닥과 양기슭의 흙을 댐의 두께에 맞추어 깊이 파고 조립식블록을 2~3단계로 쌓은 블록 기초 위에 바로 설치될 수도 있다. The prefabricated block 10 and the circular inclined block 5a or the square inclined block 5b configured as described above are assembled in a prefabricated block four-sided dam formed by the earth block (A), and the prefabricated block four-sided dam is scaled. If it is a little larger, it may be installed between the dam shoulders (D), in the upstream narrow valley (V) to dig deep in the bottom and both sides of the soil according to the thickness of the dam, and the prefabricated block is directly stacked on the block foundation in two or three steps. It may be installed.

또한, 경우에 따라서는 댐어깨를 설치하지 않고 흙다짐 위에 철근 콘크리트로 기초공사만을 한 후 설치될 수도 있는데 본 설명에서는 기초공사 부분은 생략하고 토석차단부(A)의 구성에 대하여만 실시예를 통하여 설명하도록 한다.In addition, in some cases, it may be installed only after the foundation construction with reinforced concrete on the soil compaction without installing the dam shoulder. In this description, the foundation construction is omitted and only the configuration of the soil blocking portion A is shown. Explain through.

도 6은 본 발명의 조립식블록 사방댐에 따른 일실시예의 사시도이고, 도 7은 본 발명의 조립식블록 사방댐에 따른 일실시예의 분해사시도이며, 도 8은 본 발명의 조립식블록 사방댐에 따른 일실시예의 평면도이다.Figure 6 is a perspective view of one embodiment according to the prefabricated block four-side dam of the present invention, Figure 7 is an exploded perspective view of one embodiment according to the prefabricated block four-sided dam of the present invention, Figure 8 is a plan view of one embodiment according to the prefabricated block four-sided dam of the present invention to be.

먼저 블록몸체(10)가 원통형으로 형성된 조립식블록(1)을 길이방향 및 폭 방향으로 나란히 위치시킨다. 그리고, 상기 조립식블록(1)이 전, 후, 좌, 우로 서로 연결되도록 상기 조립식블록(1)의 연결홈(11)에 연결판(30)을 끼우는 바, 상기 연결판(30)에는 다수개의 결합홀(31)이 형성되어, 상기 조립식블록(1)의 결합홈(12)에 결합된 결합핀(20)에 상기 결합홀(31)이 끼워지도록 한다.First, the prefabricated block 1 formed in a cylindrical shape with the block body 10 is positioned side by side in the longitudinal direction and the width direction. Then, the prefabricated block 1 is inserted into the connecting plate 30 in the connecting groove 11 of the prefabricated block 1 so as to be connected to each other before, after, left, right, a plurality of connecting plate 30 A coupling hole 31 is formed so that the coupling hole 31 is fitted into the coupling pin 20 coupled to the coupling groove 12 of the prefabricated block 1.

또한, 상기 연결판(30)의 단부는 하부방향으로 절곡되어 걸림편(32)이 형성되어있다.In addition, the end of the connecting plate 30 is bent in the downward direction is formed with a locking piece (32).

상기 조립식블록(1)의 연결홈(11)에 연결판(30)을 끼운 후 결합핀(20)의 상부를 너트(40)로 한 번 조여줄 수도 있고, 바로 상부에 조립식블록(1)을 결합한 후 최상단의 결합핀(20)에만 너트(40)를 결합하여 고정시킬 수도 있다.After inserting the connecting plate 30 into the connecting groove 11 of the prefabricated block 1, the upper part of the coupling pin 20 may be tightened once with the nut 40, or the prefabricated block 1 may be directly on the top. After coupling, the nut 40 may be fixed only to the uppermost coupling pin 20.

상기 조립식블록(1)의 상면에는 상부가 숫나사로 된 결합핀(20)이나 테이퍼형태로 된 결합핀(20') 중 하나가 결합되는데, 토석차단부(A)의 최상단에는 숫나사로 된 결합핀(20)이 결합되어 너트(40)로 고정되도록 하는 것이 바람직하다.The upper surface of the prefabricated block 1 is coupled to one of the coupling pin 20 of the male thread or the coupling pin 20 'of the tapered shape, the top of the earth block (A) coupling pin of the male screw It is preferable that the 20 is coupled and fixed with the nut 40.

이렇게 연결판(30)으로 조립식블록(1)이 서로 연결되어 단위수평층(B)이 형성되고, 상기 단위수평층(B) 상부에 또 다시 조립식블록(1)을 결합하여 연결판(30)으로 연결시키는 과정을 반복하여 토석차단부(A)를 구성한다.Thus, the prefabricated block 1 is connected to each other by the connecting plate 30 to form a unit horizontal layer B, and the prefabricated block 1 is further coupled to the upper unit horizontal layer B to connect the connecting plate 30. By repeating the process of connecting to construct a block cut (A).

그리고, 최상단에 위치한 조립식블록(1)의 결합핀(20)에 고정홀(71)이 형성된 제1고정부재(70)가 가로방향으로 결합되어 설치된다.In addition, the first fixing member 70 having the fixing hole 71 formed in the coupling pin 20 of the prefabricated block 1 located at the top thereof is installed in the horizontal direction.

상기 제1고정부재(70)의 높이는 상기 조립식블록(1) 상부에 결합된 결합핀(20)의 높이보다 조금 낮게하여 상기 결합핀(20)이 제1고정부재(70)의 고정홀(71)에 관통되어 상기 제1고정부재(70)의 상면으로 돌출된 결합핀(20)에 너트(40)가 결합되어 고정되도록 한다.The height of the first fixing member 70 is slightly lower than the height of the coupling pin 20 coupled to the prefabricated block (1) so that the coupling pin 20 is a fixing hole 71 of the first fixing member (70) The nut 40 is coupled to and fixed to the coupling pin 20 protruding through the upper surface of the first fixing member 70.

상기 제1고정부재(70)는 철근콘크리트, 철재, 목재, 플라스틱 등의 재료 중 어느 한 가지로 사용될 수 있는데 상기 조립식블록(1)이 거센 비바람이나 바위 등의 충격에도 흔들리지 않도록 다시 한번 고정하는 역할을 한다. The first fixing member 70 may be used as any one of materials such as reinforced concrete, iron, wood, plastic, etc. The prefabricated block (1) is fixed once again so as not to shake in the impact of heavy rain or rock Do it.

토석차단부(A)의 일측, 또는 양측이 경사지도록 구성되는 경우에는 외부로 노출되는 단면적을 줄이기 위하여 원형경사블록(5a)이 설치된다.When one side or both sides of the earth blockage portion (A) is configured to be inclined, a circular slope block 5a is installed to reduce the cross-sectional area exposed to the outside.

상기 원형경사블록(5a)에 형성된 안착홈(52)은 비워두어 흙이 채워지게 하거나, 도시된 바와 같이 제2고정부재(60)가 결합되도록 하여 상기 원형경사블록(5a)끼리 연결되어 고정되도록 한다.The mounting groove 52 formed in the circular inclined block 5a is left empty so that the soil is filled or the second fixing member 60 is coupled as shown, so that the circular inclined blocks 5a are connected and fixed to each other. do.

상기 원형경사블록(5a)의 안착홈(52)에 제2고정부재(60)가 결합되는 경우, 상기 원형경사블록(5a)의 안착부에 고정결합된 결합핀(20)에 상기 제2고정부재(60)의 고정홀(61)이 관통되어 끼워진 후 상기 제2고정부재(60)의 상부로 돌출된 결합 핀(20)의 상부에 너트(40)를 끼워 결합시킨다.When the second fixing member 60 is coupled to the seating groove 52 of the circular inclined block 5a, the second fixing member is coupled to the coupling pin 20 fixedly coupled to the seating portion of the circular inclined block 5a. After the fixing hole 61 of the member 60 is inserted therethrough, the nut 40 is fitted to the upper portion of the coupling pin 20 protruding to the upper portion of the second fixing member 60.

상기 제2고정부재(60) 또한 철근콘크리트, 철재, 목재, 플라스틱 등의 재료 중 어느 한 가지로 사용될 수 있는데, 가장 바람직하게는 한 개로 구성되어 결합되는 것이 좋으나, 둘 이상을 연결하여 결합하여야 하는 경우 보강판을 덧대어 서로 연결시킬 수 있다.The second fixing member 60 may also be used as any one of materials such as reinforced concrete, iron, wood, plastic, etc. Most preferably, the second fixing member 60 is composed of one, but the two fixing members 60 are connected to each other. In this case, the reinforcement plates may be padded to connect with each other.

도 9a 내지 도 9c는 본 발명의 조립식블록 사방댐에 따른 측단면도로써, 도 9a에서와 같이 토석차단부(A)의 양측이 경사지도록 하여 피라미드 형태를 이루도록 구성할 수도 있고, 도 9b에서처럼 일측만 경사지게 할 수도 있으며, 경우에 따라서는 도 9c에서와 같이 직육면체형상으로 구성할 수 있다.9A to 9C are side cross-sectional views according to the prefabricated block four-sided dam of the present invention. As shown in FIG. 9A, both sides of the earth blockage portion A may be inclined to form a pyramid shape, and only one side may be inclined as shown in FIG. 9B. In some cases, it may be configured in a rectangular parallelepiped shape as shown in FIG. 9C.

도 10 및 도 11은 본 발명의 조립식블록 사방댐에 따른 다른 실시예의 사시도 및 평면도로써, 블록몸체(10') 상면에 형성된 연결홈(11)의 각도가 수직이 아닌 60도와 180도를 이루는 조립식블록(1)을 이용하여 도 11에서와 같이 상기 조립식블록(1)이 폭방향으로 지그재그로 결합된 토석차단부(A)를 구성한 것이다.10 and 11 are a perspective view and a plan view of another embodiment according to the prefabricated block four-sided dam of the present invention, the prefabricated block of the angle of the connecting groove 11 formed on the upper surface of the block body 10 'forms a 60 degree and 180 degrees rather than vertical As shown in FIG. 11, the prefabricated block 1 is constituted by (1), and constitutes a soil block A that is zigzag-coupled in the width direction.

도 12 및 도 13은 본 발명의 조립식블록 사방댐에 따른 또 다른 실시예의 사시도 및 분해사시도로써 조립식블록(1)의 블록몸체(10")가 육면체형상인 경우를 도시한 것이다.12 and 13 are a perspective view and an exploded perspective view of another embodiment according to the prefabricated block four-sided dam of the present invention showing the case in which the block body 10 "of the prefabricated block 1 is hexahedral.

특히, 도 13은 댐어깨(D)에 설치된 상태를 도시한 것이다. In particular, Figure 13 shows a state installed in the dam shoulder (D).

조립식블록(1)이 길이방향 및 폭방향으로 결합되어 단위수평층(B)이 형성되고, 상기 단위수평층이 반복적으로 결합되어 토석차단부(A)가 구성되며, 상기 토석 차단부(A)의 최상단에 제1고정부재(70)가 결합되어지되, 상기 토석차단부(A)가 댐어깨(D)에 설치되어지는 경우에는 상기 댐어깨(D)에 형성된 고정턱(80) 하단에 상기 제1고정부재(70)가 끼워지도록 하는 것이다.Prefabricated block (1) is coupled in the longitudinal direction and the width direction to form a unit horizontal layer (B), the unit horizontal layer is repeatedly coupled to constitute a soil blocking portion (A), the earth block (A) The first fixing member 70 is coupled to the uppermost end of the case, when the earth block (A) is installed on the dam shoulder (D) the lower end of the fixing jaw (80) formed in the dam shoulder (D) The first fixing member 70 is to be fitted.

조립식블록(1)의 블록몸체(10")가 육면체형상으로 형성되는 경우, 최상단을 제외한 나머지 조립식블록(1)의 결합홈(12)에는 상부가 테이퍼형태로 형성된 결합핀(20')이 결합되는 것이 바람직한다.When the block body 10 "of the prefabricated block 1 is formed in a hexahedral shape, the coupling pins 20 'formed in a tapered shape are coupled to the coupling grooves 12 of the prefabricated block 1 except for the top end thereof. It is desirable to be.

토석차단부(A)의 일측, 또는 양측이 경사지도록 구성되는 경우에는 외부로 노출되는 단면적을 줄이기 위하여 사각형경사블록(5b)이 설치되고, 상기 사각형경사블록(5b)의 안착홈(52)에 제2고정부재(60)가 결합되도록 하여 상기 사각형경사블록(5b)이 서로 연결되어 고정되도록 한다.When one side or both sides of the earth blockage portion (A) is configured to be inclined, the inclined oblique block (5b) is installed in order to reduce the cross-sectional area exposed to the outside, in the seating groove 52 of the rectangular inclined block (5b) The second fixing member 60 is coupled so that the square inclined blocks 5b are connected to each other and fixed.

상기 사각형경사블록(5b)의 안착홈(52)에 제2고정부재(60)가 결합되는 경우, 상기 사각형경사블록(5b)의 안착부에 고정결합된 결합핀(20)에 상기 제2고정부재(60)의 고정홀(61)이 관통되어 끼워진 후 상기 제2고정부재(60)의 상부로 돌출된 결합핀(20)의 상부에 너트(40)를 끼워 결합시킨다.When the second fixing member 60 is coupled to the seating groove 52 of the rectangular inclined block 5b, the second fixing member 20 is coupled to the coupling pin 20 fixed to the seating portion of the rectangular inclined block 5b. After the fixing hole 61 of the member 60 is inserted therethrough, the nut 40 is fitted to the upper portion of the coupling pin 20 protruding to the upper portion of the second fixing member 60.

도 14는 본 발명의 조립식블록 사방댐에 따른 또 다른 실시예의 정면도로써 계곡(V)에 설치된 상태에서 하류측에서 바라본 사용상태를 도시한 것이다.Figure 14 is a front view of another embodiment according to the prefabricated block four-sided dam of the present invention showing the use state viewed from the downstream side in the state installed in the valley (V).

이미 언급한 바와 같이 가장 바람직하게는 기초 콘크리트 공사나 댐어깨(D)의 시공없이 바로 계곡(V)에 바닥과 양기슭의 흙을 댐의 두께에 맞추어 깊이 파고 조립식블록(1)을 2~3단계로 쌓은 블록 기초 위에 상기 조립식블록(1)과 사각형경사 블록(5b)을 결합시켜 토석차단부(A)를 구성하는 것이다. As already mentioned, most preferably, the ground and the bottom of the pit are dug deeply to the thickness of the dam in the valley (V) without the foundation concrete construction or the construction of the dam shoulder (D). By combining the prefabricated block (1) and the square inclined block (5b) on the block basis stacked in a step to form a soil block (A).

상기와 같이 미리 제작된 소단위의 조립식블록(1) 및 원형경사블록(5a) 또는 사각형경사블록(5b)을 결합하여 조립식으로 사방댐을 시공함으로써 공기를 단축시키고 시공성을 향상시킬 수 있다.By combining the prefabricated block 1 and the circular slope block 5a or the square slope block 5b of the prefabricated unit as described above, the construction of the four-sided dam can be shortened and the construction can be improved.

이상에서와 같이 본 발명은 상기한 실시예에 한하여 설명하였지만, 본 발명을 이에 한정하지는 않는 것으로, 본 발명의 범주와 사상을 벗어나지 않는 범위 내에서 다양한 변형 실시가 가능함은 물론이다.As described above, the present invention has been described with reference to the above embodiments, but the present invention is not limited thereto, and various modifications can be made without departing from the scope and spirit of the present invention.

도 1은 본 발명의 조립식블록에 따른 일실시예의 사시도.1 is a perspective view of one embodiment according to the prefabricated block of the present invention.

도 2 및 도 3은 본 발명의 조립식블록에 따른 다른 실시예의 사시도.2 and 3 is a perspective view of another embodiment according to the prefabricated block of the present invention.

도 4는 본 발명의 원형경사블록에 따른 사시도.Figure 4 is a perspective view according to the circular slope block of the present invention.

도 5는 본 발명의 사각형경사블록에 따른 사시도.5 is a perspective view according to the rectangular inclination block of the present invention.

도 6은 본 발명의 조립식블록 사방댐에 따른 일실시예의 사시도Figure 6 is a perspective view of one embodiment according to the prefabricated block four-sided dam of the present invention

도 7은 본 발명의 조립식블록 사방댐에 따른 일실시예의 분해사시도.Figure 7 is an exploded perspective view of one embodiment according to the prefabricated block four-sided dam of the present invention.

도 8은 본 발명의 조립식블록 사방댐에 따른 일실시예의 평면도.8 is a plan view of one embodiment according to the prefabricated block four-sided dam of the present invention.

도 9a 내지 도 9c는 본 발명의 조립식블록 사방댐에 따른 측단면도.9a to 9c is a side cross-sectional view according to the prefabricated block four-sided dam of the present invention.

도 10은 본 발명의 조립식블록 사방댐에 따른 다른 실시예의 사시도.10 is a perspective view of another embodiment according to the prefabricated block four-sided dam of the present invention.

도 11은 본 발명의 조립식블록 사방댐에 따른 다른 실시예의 평면도.Figure 11 is a plan view of another embodiment according to the prefabricated block four-sided dam of the present invention.

도 12는 본 발명의 조립식블록 사방댐에 따른 또 다른 실시예의 사용상태 사시도.Figure 12 is a perspective view of the use of another embodiment according to the prefabricated block four-sided dam of the present invention.

도 13은 본 발명의 조립식블록 사방댐에 따른 또 다른 실시예의 분해사시도.Figure 13 is an exploded perspective view of another embodiment according to the prefabricated block four-sided dam of the present invention.

도 14는 본 발명의 조립식블록 사방댐에 따른 또 다른 실시예의 사용상태 정면도.Figure 14 is a front view of the use state of another embodiment according to the prefabricated block four-sided dam of the present invention.

<도면의 주요 부호에 대한 설명><Description of Major Symbols in Drawing>

A : 토석차단부 B : 단위수평층A: Earth Block B: Unit Level Floor

1 : 조립식블록 10, 10', 10" : 블록몸체1: Prefabricated block 10, 10 ', 10 ": Block body

11 : 연결홈 12 : 끼움홈11: connecting groove 12: fitting groove

20 : 결합핀 30 : 연결판 20: coupling pin 30: connecting plate

31 : 결합홀 32 : 걸림편 31: engaging hole 32: locking piece

40 : 너트 5a : 원형경사블록40 Nut 5a Round Slope Block

5b : 사각형경사블록 50, 50' : 블록몸체 5b: Square inclined block 50, 50 ': Block body

60 : 제2고정부재 70 : 제1고정부재60: second fixing member 70: first fixing member

Claims (6)

조립식블록(1)이 길이방향 및 폭방향으로 결합되어 단위수평층(B)이 형성되고, 상기 단위수평층(B)의 조립식블록(1) 상부에 또 다른 단위수평층(B)의 조립식블록(1)이 결합되어 토석차단부(A)가 구성되어지는 조립식블록 사방댐에 있어서,Prefabricated block (1) is combined in the longitudinal direction and the width direction to form a unit horizontal layer (B), the prefabricated block of another unit horizontal layer (B) on top of the prefabricated block (1) of the unit horizontal layer (B) In the prefabricated block four-sided dam (1) is coupled to constitute the earth block (A), 상기 조립식블록(1)의 블록몸체(10) 상면에는 중앙부를 중심으로 2개의 연결홈(11)이 서로 대각선 방향으로 형성되고, 상기 연결홈(11)이 교차되어지는 중앙부에는 상부로 결합핀(20)이 고정결합되며, 상기 결합핀(20)과 대향되어지는 조립식블록(1)의 블록몸체(10) 하면에는 끼움홈(12)이 형성되고, 상기 조립식블록(1)과 전, 후, 좌, 우로 이웃하는 조립식블록(1)이 서로 연결되도록 상기 조립식블록(1)의 연결홈(11)에 연결판(30)이 안착되어지되, 상기 연결판(30)에는 다수개의 결합공(31)이 형성되어 상기 연결홈(11)의 결합핀(20)에 상기 연결판(30)의 결합공(31)이 끼워져 결합되고, 상기 연결판(30)의 단부는 하부방향으로 절곡되어 걸림편(32)이 형성되며, On the upper surface of the block body 10 of the prefabricated block 1, two connecting grooves 11 are formed in a diagonal direction with respect to a central portion, and a coupling pin upwards at a central portion where the connecting grooves 11 cross. 20 is fixedly coupled to the bottom surface of the block body 10 of the prefabricated block 1 opposite to the coupling pin 20, the fitting groove 12 is formed, before and after the prefabricated block (1), Left and right neighboring prefabricated block (1) is connected to each other connecting plate 30 is seated in the connecting groove 11 of the prefabricated block (1), the connecting plate 30 a plurality of coupling holes (31) ) Is formed so that the coupling hole 31 of the connecting plate 30 is fitted into the coupling pin 20 of the connecting groove 11, and the end of the connecting plate 30 is bent downward to the engaging piece. 32 is formed, 상기 조립식블록(1)의 블록몸체(10)는 원통형의 형상으로 되고, 상기 토석차단부(A)의 일측 또는 양측에 원형경사블록(5a)이 결합되어지는 것을 특징으로 하는 조립식블록 사방댐.Block body 10 of the prefabricated block (1) has a cylindrical shape, prefabricated block four sides dam characterized in that the circular inclination block (5a) is coupled to one or both sides of the earth block (A). 삭제delete 삭제delete 삭제delete 제 1 항에 있어서,The method of claim 1, 상기 끼움홈(12)의 내부는 암나사로 형성되고, 상기 결합핀(20) 상부의 돌출부는 숫나사로 형성되는 것을 특징으로 하는 조립식블록 사방댐.The interior of the fitting groove 12 is formed of a female screw, the protruding portion of the upper portion of the coupling pin 20, prefabricated block four sides dam, characterized in that formed by a male screw. 제 1 항에 있어서,The method of claim 1, 상기 끼움홈(12)의 내부는 테이퍼 형태로 형성되고, 상기 결합핀(20)의 상부는 테이퍼 형태로 형성되는 것을 특징으로 하는 조립식블록 사방댐.The interior of the fitting groove 12 is formed in a tapered shape, the upper portion of the coupling pin 20 is prefabricated block, characterized in that formed in a tapered shape.
KR1020080132758A 2008-12-24 2008-12-24 Assembly block devris barrier KR100908676B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080132758A KR100908676B1 (en) 2008-12-24 2008-12-24 Assembly block devris barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080132758A KR100908676B1 (en) 2008-12-24 2008-12-24 Assembly block devris barrier

Publications (1)

Publication Number Publication Date
KR100908676B1 true KR100908676B1 (en) 2009-07-22

Family

ID=41337826

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080132758A KR100908676B1 (en) 2008-12-24 2008-12-24 Assembly block devris barrier

Country Status (1)

Country Link
KR (1) KR100908676B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190097459A (en) 2018-02-12 2019-08-21 가톨릭관동대학교산학협력단 A bolck-assembly type eco pillar debris barrier and construction method thereof
KR20210056770A (en) 2019-11-11 2021-05-20 주식회사 자안 Block assembly for anti-erosion

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0243416A (en) * 1988-08-03 1990-02-14 Furii Kogyo Kk Assembly retaining wall construction method
JP2001200520A (en) 2000-01-19 2001-07-27 Ozawa Concrete Industries Co Ltd Porous concrete product, method for producing the same, and method for installing the same
KR200247955Y1 (en) * 2001-06-14 2001-10-29 권창성 Inter Locking Multi-Function Block
KR100699700B1 (en) * 2006-12-06 2007-03-26 동남이엔씨(주) Structure of breast wall for river

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0243416A (en) * 1988-08-03 1990-02-14 Furii Kogyo Kk Assembly retaining wall construction method
JP2001200520A (en) 2000-01-19 2001-07-27 Ozawa Concrete Industries Co Ltd Porous concrete product, method for producing the same, and method for installing the same
KR200247955Y1 (en) * 2001-06-14 2001-10-29 권창성 Inter Locking Multi-Function Block
KR100699700B1 (en) * 2006-12-06 2007-03-26 동남이엔씨(주) Structure of breast wall for river

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190097459A (en) 2018-02-12 2019-08-21 가톨릭관동대학교산학협력단 A bolck-assembly type eco pillar debris barrier and construction method thereof
KR20210056770A (en) 2019-11-11 2021-05-20 주식회사 자안 Block assembly for anti-erosion

Similar Documents

Publication Publication Date Title
KR100794922B1 (en) The beam creen rhombic dam which h-steel and screen are combined
KR100925886B1 (en) Ecotype Block Devris Barrier
KR101418998B1 (en) Column structure for debris flow prevention, Safety fences and Construction Method thereof
JP4932748B2 (en) Riverbed protection structure
KR100908676B1 (en) Assembly block devris barrier
KR100901886B1 (en) Block fixing foundation for assembly block deveris barrier
JP6240625B2 (en) Retaining wall, creation site and creation method of creation site
KR101149362B1 (en) Retaining wall with prestressed concrete tie and method for constructing the same
KR100925887B1 (en) Devris Barrier using Block and Screen
KR101173505B1 (en) Debris barrier
KR101097055B1 (en) Debris barrier and plastering between rafters constructed by the cast iron panel and method of debris barrier
KR100908673B1 (en) Assembly w-type block debris barrier
CN106400643A (en) High polymer grouting reinforcement and water prevention three-dimensional protective structure for cutting
KR20130062586A (en) Retaining wall form of construction work of block for retaining wall and block for retaining wall
KR100662028B1 (en) Construction bio-block for retaining wall
KR102426108B1 (en) Prefabricated Covering Block for Breakwater
KR20060082370A (en) Slope Reinforcement Block for Landscaping
KR200410820Y1 (en) Structure of prevent boring
KR102325897B1 (en) Prefabricated Covering Block
KR101419000B1 (en) Column structure for debris flow prevention, Safety fences and Construction Method thereof
JP5457210B2 (en) Steel frame for sabo structure, sabo structure constructed thereby, and construction method thereof
KR102478778B1 (en) Integrated structure and its manufacturing method by block assemble type caisson construction method using round bar anchor
KR100950092B1 (en) A retaining wall structure and construction method
CN214737838U (en) A block structure for mud-rock flow disaster is administered
KR102483537B1 (en) Seawater penetrating block caisson and its installation method

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant