KR100892961B1 - Wall-construction forming apparatus and method of forming a wall-construntion in a vertical excavation using the same - Google Patents

Wall-construction forming apparatus and method of forming a wall-construntion in a vertical excavation using the same Download PDF

Info

Publication number
KR100892961B1
KR100892961B1 KR1020080058542A KR20080058542A KR100892961B1 KR 100892961 B1 KR100892961 B1 KR 100892961B1 KR 1020080058542 A KR1020080058542 A KR 1020080058542A KR 20080058542 A KR20080058542 A KR 20080058542A KR 100892961 B1 KR100892961 B1 KR 100892961B1
Authority
KR
South Korea
Prior art keywords
formwork
wall structure
forming apparatus
fixing
fixing jig
Prior art date
Application number
KR1020080058542A
Other languages
Korean (ko)
Inventor
장영미
Original Assignee
장영미
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 장영미 filed Critical 장영미
Priority to KR1020080058542A priority Critical patent/KR100892961B1/en
Application granted granted Critical
Publication of KR100892961B1 publication Critical patent/KR100892961B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G19/00Auxiliary treatment of forms, e.g. dismantling; Cleaning devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A wall structure molding apparatus is provided to install a mold easily by using an attaching and detaching unit. A wall structure molding apparatus comprises: one or more molds(100); a detaching unit(200) for installing the mold in a structure and separating the mold from the structure, having a mold fixed beam(210) falling down from the mold and a tie bar(220) combined in the fixed beam; and an auxiliary fixing unit(300) for fixing the mold, having a fixed protrusion protruding toward the mold fixed beam, a fixing jig combined in the fixed protrusion, an end portion which can push down one end of the fixing jig when the mold descends, and an elastic body providing the elastic force to one end of the fixing jig.

Description

벽체 구조물 성형 장치 및 이를 이용한 지하 수직구 구조물 시공 방법{WALL-CONSTRUCTION FORMING APPARATUS AND METHOD OF FORMING A WALL-CONSTRUNTION IN A VERTICAL EXCAVATION USING THE SAME}WALL-CONSTRUCTION FORMING APPARATUS AND METHOD OF FORMING A WALL-CONSTRUNTION IN A VERTICAL EXCAVATION USING THE SAME}

본 발명은 건물, 지하, 터널 등의 벽체 구조물을 성형하기 위한 벽체 구조물 성형 장치에 관한 것으로서, 더 상세하게는 벽체 구조물 성형을 위해 용이하게 장착될 수 있을 뿐만 아니라 성형 후 벽체 구조물로부터 용이하게 탈거될 수 있는 벽체 구조물 성형 장치 및 이를 이용한 지하 수직구 구조물 시공 방법에 관한 것이다.The present invention relates to a wall structure forming apparatus for forming a wall structure, such as a building, basement, tunnel, and more particularly, not only can be easily mounted for forming the wall structure, but also easily removed from the wall structure after molding. The present invention relates to a wall structure forming apparatus and a method of constructing a vertical vertical sphere structure using the same.

일반적으로, 건물, 지하, 터널 등의 벽체 구조물을 축조하기 위해서는 철근을 배근한 후 거푸집을 장착하고, 거푸집 내측에 콘크리트를 주입하여 벽체 구조물을 성형하게 된다.In general, in order to build a wall structure such as a building, a basement, and a tunnel, a reinforcing bar is mounted, a formwork is mounted, and concrete is injected into the formwork to form a wall structure.

하지만, 종래에는 벽체 구조물이 축조되어야 하는 위치(즉, 장착 위치)에 거푸집을 수작업으로 설치하여야 하므로 작업이 힘들고 설치하는데 많은 시간이 소요될 수 있고, 벽체 구조물을 성형한 후 거푸집을 또한 수작업으로 탈거하여야 하므로 작업이 힘들고 탈거하는데 많은 시간이 소요될 수 있다.However, since the formwork must be manually installed at the position where the wall structure should be constructed (that is, the mounting position), work is difficult and it may take a long time to install, and after forming the wall structure, the formwork should also be removed manually. This can be difficult and time consuming to remove.

따라서, 거푸집을 수작업이 아닌 별도의 기계적 연결 관계를 이용하여 장착 및 탈거가 용이한 기술의 필요성이 요구된다.Therefore, the need for a technology that is easy to install and remove the formwork by using a separate mechanical connection rather than manual work.

본 발명은 종래기술에 대한 문제점을 해결하기 위한 것으로서, 본 발명의 기술적 과제는, 벽체 구조물 성형을 위해 용이하게 장착될 수 있을 뿐만 아니라 성형 후 벽체 구조물로부터 용이하게 탈거될 수 있는 벽체 구조물 성형 장치 및 이를 이용한 지하 수직구 구조물 시공 방법을 제공하는 것이다.The present invention is to solve the problems of the prior art, the technical problem of the present invention, the wall structure forming apparatus that can be easily removed from the wall structure as well as can be easily mounted for forming the wall structure and It is to provide a method of construction of underground vertical sphere structure using the same.

상기 목적을 달성하기 위하여, 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치는, 적어도 하나의 거푸집과; 그리고 구조물을 성형하기 위해 상기 거푸집을 장착시키거나 성형된 구조물로부터 상기 거푸집을 원활하게 탈거시키기 위한 착탈 유닛을 포함하고, 상기 착탈 유닛은 상기 거푸집과 설정 간격 이격되어 구비되는 거푸집 고정 빔과; 그리고 상기 거푸집에 그 일단이 회동 가능하게 구비되고 상기 거푸집 고정 빔에 그 타단이 회동 가능하게 구비되는 연결바를 포함한다. 따라서, 상기 거푸집을 들어 올리면, 상기 거푸집은 상기 연결바 및 상기 연결바의 회동 가능한 구조에 의해 제1 방향으로 원호 운동을 하면서 상기 거푸집 고정 빔을 향해 후퇴되어 상기 구조물과 분리되고; 그리고 상기 들어 올려진 거푸집을 내리면, 상기 거푸집은 제2 방향으로 원호 운동을 하면서 상기 구조물의 성형 위치로 전진되어 상기 성형 위치에 장착된다.In order to achieve the above object, the wall structure forming apparatus according to an embodiment of the present invention, at least one formwork; And a detachable unit for mounting the formwork to smoothly form the structure, or a detachable unit for smoothly detaching the formwork from the formed structure, wherein the detachable unit includes a formwork fixing beam spaced apart from the formwork at a predetermined interval; And a connecting bar having one end rotatably provided at the formwork and the other end rotatably provided at the formwork fixing beam. Thus, when lifting the formwork, the formwork is retracted toward the formwork fixing beam and separated from the structure while making circular motions in the first direction by the linkage bar and the rotatable structure of the linkage bar; And when the raised formwork is lowered, the formwork is advanced to the forming position of the structure while being arced in the second direction and mounted at the forming position.

또한, 상기 착탈 유닛은 상기 거푸집 고정빔에 나사 결합된 후 상기 거푸집을 가압하는 가압 볼트를 더 포함할 수 있다.In addition, the detachable unit may further include a pressure bolt for pressing the form after being screwed to the form fixing beam.

또한, 상기 거푸집은 상기 구조물의 길이에 따라 그 길이가 조절되도록 서로 분해 조립되는 복수개의 단편으로 이루어질 수 있다.In addition, the formwork may be composed of a plurality of pieces disassembled to each other so that the length is adjusted according to the length of the structure.

또한, 상기 연결바는 상기 복수개의 단편에 각각 구비되고; 그리고 상기 연결바의 일단은 상기 각 단편에 회동 가능하게 구비되고 상기 연결바의 타단은 상기 거푸집 고정 빔에 회동 가능하게 구비될 수 있다.In addition, the connecting bar is provided in each of the plurality of pieces; One end of the connection bar may be rotatably provided in each of the fragments, and the other end of the connection bar may be rotatably provided in the die fixing beam.

또한, 상기 복수개의 단편은 홀수번째 단편과 짝수번째 단편을 포함하고; 그리고 상기 짝수번째 단편의 양단은 상기 홀수번째 단편 중 상기 거푸집 고정 빔을 향하는 면에 위치되도록 절곡된 형상을 가질 수 있다.In addition, the plurality of fragments include odd and even fragments; Both ends of the even-numbered fragment may have a shape bent to be positioned on a surface of the odd-numbered fragment that faces the mold fixing beam.

또한, 상기 가압 볼트는 상기 짝수번째 양단을 가압하는 것일 수 있다.In addition, the pressing bolt may be to press the even-numbered both ends.

또한, 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치는 상기 복수개의 단편 사이에 구비되어 서로 연결된 상기 복수개의 단편 사이를 밀봉시키는 패킹 부재를 더 포함할 수 있다.In addition, the wall structure forming apparatus according to an embodiment of the present invention may further include a packing member provided between the plurality of pieces to seal between the plurality of pieces connected to each other.

또한, 상기 착탈 유닛은 상기 각 단편을 들어 올리거나 내리기 위한 승강부를 더 포함할 수 있다.In addition, the detachable unit may further include a lifting unit for lifting or lowering the respective pieces.

일예로, 상기 승강부는 상기 각 단편 중 상기 거푸집 고정 빔에 마주하는 면에 형성되는 외부 돌출부와; 그리고 상기 외부 돌출부에 승강력을 제공하는 유압 잭을 포함할 수 있다.In one example, the lifting portion and the outer projection formed on the surface of the respective pieces facing the formwork fixed beam; And it may include a hydraulic jack for providing a lifting force to the outer protrusion.

또한, 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치는 상기 착탈 유닛 과 함께 상기 복수개의 단편을 부가적으로 고정시키기 위한 보조 고정 유닛을 더 포함할 수 있다. 일예로, 상기 보조 고정 유닛은 상기 거푸집 고정 빔 중 상기 각 단편을 향하는 면에 돌출 형성되는 고정 돌기와; 상기 고정 돌기에 회전 가능하게 결합되는 갈고리 형상의 고정 지그와; 상기 각 단편에 형성되며, 상기 각 단편이 하강할 경우 상기 고정 지그의 일단을 누르는 단턱과; 그리고 상기 고정 돌기에 구비되어 상기 고정 지그의 일단에 탄성력을 제공하는 탄성체를 포함할 수 있다. 따라서, 상기 각 단편이 하강할 경우, 상기 고정 지그의 일단이 상기 단턱에 의해 눌리면서 상기 고정 지그의 타단이 상기 단편을 밀어 상기 단편이 뒤로 후퇴되는 것을 막고; 그리고 상기 각 단편이 상승할 경우, 상기 고정 지그의 일단이 탄성체에 의해 튕기면서 상기 고정 지그가 원 위치될 수 있다.In addition, the wall structure forming apparatus according to an embodiment of the present invention may further include an auxiliary fixing unit for additionally fixing the plurality of pieces together with the detachable unit. For example, the auxiliary fixing unit may include a fixing protrusion protruding from a surface of the form fixing beam toward the respective fragments; A hook-shaped fixing jig rotatably coupled to the fixing protrusion; A stepped portion formed in each of the fragments and pressing one end of the fixing jig when the respective fragments descend; And an elastic body provided on the fixing protrusion to provide an elastic force to one end of the fixing jig. Thus, when each of the pieces is lowered, one end of the fixing jig is pressed by the step so that the other end of the fixing jig pushes the pieces to prevent the pieces from being back behind; When each of the pieces is raised, the fixing jig may be repositioned while one end of the fixing jig is bounced by the elastic body.

또한, 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치는 상기 구조물에 증기를 공급하여 증기 양생을 촉진시키기 위한 증기 양생 유닛을 더 포함할 수 있다.In addition, the wall structure forming apparatus according to an embodiment of the present invention may further include a steam curing unit for supplying steam to the structure to promote steam curing.

일예로, 상기 증기 양생 유닛은 상기 거푸집 및 상기 구조물을 덮는 양생 커버와; 상기 양생 커버 내에 위치되는 증기 파이프와; 그리고 상기 증기 파이프에 증기를 공급하는 증기 공급원을 포함할 수 있다.For example, the steam curing unit includes a curing cover covering the formwork and the structure; A vapor pipe located within said curing cover; And a steam supply source for supplying steam to the steam pipe.

또한, 상기 거푸집은 우물통 등의 벽체 구조물 성형을 위해 원통 형상을 가질 수 있다.In addition, the formwork may have a cylindrical shape for forming a wall structure such as a well.

한편, 가시설이 설치된 굴착 공간에 내벽 구조물을 형성시킬 경우, 상기 적어도 하나의 거푸집은 상기 내벽 구조물의 두께만큼 상기 가시설과 설정 간격 이격 되어 위치되는 제1 거푸집을 포함할 수 있다.On the other hand, when the inner wall structure is formed in the excavation space in which the temporary facility is installed, the at least one formwork may include a first formwork spaced apart from the temporary facility by the thickness of the inner wall structure.

다른 한편, 상기 적어도 하나의 거푸집은 상기 구조물의 두께만큼 설정 간격을 두고 상기 구조물의 내측 및 외측에 각각 위치되는 내부 및 외부 거푸집을 포함할 수 있다.On the other hand, the at least one formwork may include an inner and an outer formwork, respectively located on the inside and the outside of the structure at a predetermined interval by the thickness of the structure.

한편, 본 발명의 다른 실시예에 따른 벽체 구조물 성형 장치를 이용한 지하 수직구 구조물 시공 방법은 지하 수직구 구조물을 설치하기 위한 굴착 공간을 형성하기 위한 지반 굴착 단계와; 상기 굴착 공간을 지지하기 위하여 가시설을 설치하는 가시설 설치 단계와; 상기 가시설의 내측 굴착 공간에 내벽 구조물을 성형하기 위해, 상기 벽체 구조물 성형 장치의 거푸집을 굴착 공간에 내벽 구조물의 두께에 대응하는 설정 간격 만큼 가시설로부터 이격되도록 설치하는 거푸집 설치 단계와; 상기 가시설과 상기 벽체 구조물 성형 장치의 거푸집 사이 공간에 내벽 구조물을 형성하기 위한 콘크리트 재료가 투입되는 콘크리트 재료 투입 단계와; 상기 콘크리트의 양생 과정을 거친 후에 상기 벽체 구조물 성형 장치의 착탈 유닛을 이용하여 상기 거푸집을 상기 양생된 콘크리트로부터 탈거시키는 거푸집 탈거 단계와; 상기 거푸집이 탈거된 후 상기 벽체 구조물 성형 장치를 상측으로 이동시키는 성형 장치 상향 이동 단계와; 그리고 상단에 내벽 구조물을 연속적으로 성형하도록, 상기 거푸집 설치 단계로부터 상기 성형 장치 상향 이동 단계를 반복 수행하는 단계를 포함하여 이루어지고, 그리고 상기 거푸집 탈거 단계는 상기 거푸집에 승강력을 제공하여 상기 거푸집을 들어 올리는 승강 단계와; 그리고 상기 승강 단계가 진행되는 동안 상기 거푸집은 상기 승강력 및 상기 착탈 유닛의 연결바에 의해 원호 운동을 하면서 상기 착탈 유닛의 거푸집 고정 빔을 향해 후퇴되어 탈거되는 단계를 포함한다.On the other hand, the underground vertical sphere structure construction method using the wall structure forming apparatus according to another embodiment of the present invention includes a ground excavation step for forming an excavation space for installing the underground vertical sphere structure; A provisional installation step of installing a provisional facility to support the excavation space; A mold installation step of installing the formwork of the wall structure forming apparatus so as to be spaced apart from the provisional facility by a predetermined interval corresponding to the thickness of the inner wall structure in the excavation space to form the inner wall structure in the inner excavation space of the temporary facility; A concrete material input step of inserting a concrete material for forming an inner wall structure into a space between the temporary facility and the formwork of the wall structure forming apparatus; A formwork removing step of removing the formwork from the cured concrete using a detachable unit of the wall structure forming apparatus after the curing process of the concrete; A forming apparatus upward movement step of moving the wall structure forming apparatus upward after the formwork is removed; And repeating the forming apparatus upward movement step from the formwork installation step so as to continuously form the inner wall structure on the top, and the formwork removing step provides the formwork by lifting power to the formwork. Lifting step of lifting; And while the lifting step is in progress, the formwork includes the step of being pulled back toward the form fixing beam of the detachable unit while the circular motion by the lifting force and the connecting bar of the detachable unit.

다른 한편, 본 발명의 또 다른 실시예에 따른 벽체 구조물 성형 장치를 이용한 지하 수직구 구조물 시공 방법 지하 수직구 구조물을 설치하기 위한 굴착 공간을 형성하기 위한 지반 굴착 단계와; 상기 굴착 공간을 지지하기 위하여 가시설을 설치하는 가시설 설치 단계와; 상기 가시설의 내측 굴착 공간에 내벽 구조물을 성형하기 위해, 상기 벽체 구조물 성형 장치의 증기 양생 유닛을 설치하면서 상기 벽체 구조물 성형 장치의 거푸집을 내벽 구조물의 두께에 대응하는 설정 간격 만큼 가시설로부터 이격되도록 설치하는 증기 양생 유닛 및 거푸집 설치 단계와; 상기 가시설과 상기 벽체 구조물 성형 장치의 거푸집 사이 공간에 내벽 구조물을 형성하기 위한 콘크리트 재료가 투입되는 콘크리트 재료 투입 단계와; 상기 벽체 구조물 성형 장치의 증기 양생 유닛을 이용하여 증기 양생을 실시하는 증기 양생 단계와; 상기 콘크리트의 증기 양생 과정을 거친 후에 상기 벽체 구조물 성형 장치의 착탈 유닛을 이용하여 상기 거푸집을 상기 양생된 콘크리트로부터 탈거시키는 거푸집 탈거 단계와; 상기 거푸집이 탈거된 후 상기 벽체 구조물 성형 장치를 상측으로 이동시키는 성형 장치 상향 이동 단계와; 그리고 상단에 내벽 구조물을 연속적으로 성형하도록, 상기 증기 양생 유닛 및 거푸집 설치 단계로부터 상기 성형 장치 상향 이동 단계를 반복 수행하는 단계를 포함하여 이루어지고, 그리고 상기 거푸집 탈거 단계는 상기 거푸집에 승강력을 제공하여 상기 거푸집을 들어 올리는 승강 단계와; 그리고 상기 승강 단계가 진행되는 동안 상기 거푸집은 상기 승강력 및 상기 착탈 유닛의 연결바에 의해 원호 운동을 하면서 상기 착탈 유닛의 거푸집 고정 빔을 향해 후퇴되어 탈거되는 단계를 포함하여 이루어진다.On the other hand, the underground vertical sphere structure construction method using the wall structure forming apparatus according to another embodiment of the present invention and ground excavation step for forming an excavation space for installing the underground vertical sphere structure; A provisional installation step of installing a provisional facility to support the excavation space; In order to mold the inner wall structure in the inner excavation space of the temporary facility, while installing the steam curing unit of the wall structure forming apparatus to install the formwork of the wall structure forming apparatus spaced apart from the temporary facility by a predetermined interval corresponding to the thickness of the inner wall structure Steam curing unit and formwork installation step; A concrete material input step of inserting a concrete material for forming an inner wall structure into a space between the temporary facility and the formwork of the wall structure forming apparatus; A steam curing step of performing steam curing using the steam curing unit of the wall structure forming apparatus; A formwork removing step of removing the formwork from the cured concrete using the detachable unit of the wall structure forming apparatus after the steam curing process of the concrete; A forming apparatus upward movement step of moving the wall structure forming apparatus upward after the formwork is removed; And repeating the forming apparatus upward movement step from the steam curing unit and the formwork installation step, so as to continuously form the inner wall structure on the top, and the formwork removing step provides lifting power to the formwork. Lifting step of lifting the formwork; And while the lifting step is in progress, the formwork comprises a step of being pulled back toward the form fixing beam of the detachable unit while the circular motion by the lifting force and the connecting bar of the detachable unit.

이상에서와 같이, 본 발명의 실시예에 의한 벽체 구조물 성형 장치 및 이를 이용한 지하 수직구 구조물 시공 방법은 다음과 같은 효과를 가질 수 있다.As described above, the wall structure forming apparatus and the underground vertical sphere structure construction method using the same according to an embodiment of the present invention may have the following effects.

본 발명의 실시예에 의하면, 착탈 유닛에 의해, 특히 연결바 및 연결바의 원호 운동에 의해, 거푸집이 용이하고 신속하게 장착될 수 있을 뿐만 아니라 성형 후 벽체 구조물로부터 거푸집이 용이하고 신속하게 탈거될 수 있다.According to an embodiment of the present invention, the formwork can be easily and quickly mounted by the detachable unit, in particular by the circular movement of the connecting bar and the connecting bar, as well as the formwork can be easily and quickly removed from the wall structure after molding. Can be.

이하, 첨부한 도면을 참고로 하여 본 발명의 실시예에 대하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art may easily implement the present invention. As those skilled in the art would realize, the described embodiments may be modified in various different ways, all without departing from the spirit or scope of the present invention.

도 1은 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치를 나타낸 종단면도이고, 도 2는 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치가 구조물로부터 탈거된 상태를 나타낸 종단면도이다.1 is a longitudinal sectional view showing a wall structure forming apparatus according to an embodiment of the present invention, Figure 2 is a longitudinal sectional view showing a state in which the wall structure forming apparatus according to an embodiment of the present invention is removed from the structure.

본 발명의 일 실시예에 따른 벽체 구조물 성형 장치는, 도 1에 도시된 바와 같이, 적어도 하나의 거푸집(100)과, 구조물(30)을 성형하기 위해 거푸집(100)을 장착시키거나 성형된 구조물(30)로부터 거푸집(100)을 원활하게 탈거시키기 위한 착탈 유닛(200)을 포함한다. 이하, 도 1 및 도 2를 참조하여 착탈 유닛(200)을 구 체적으로 설명한다.Wall structure forming apparatus according to an embodiment of the present invention, as shown in Figure 1, at least one formwork 100, the structure to which the formwork 100 is mounted or shaped to form the structure 30 And a detachable unit 200 for smoothly removing the formwork 100 from the 30. Hereinafter, the detachable unit 200 will be described in detail with reference to FIGS. 1 and 2.

착탈 유닛(200)은 거푸집 고정 빔(210)과, 그리고 연결바(220)를 포함한다. 보다 구체적으로, 거푸집 고정 빔(210)은 거푸집(100)의 외면[즉, 성형 물질(이하 "콘크리트"라 함)이 유입되는 거푸집(100)의 면(내면)의 반대 면]과 설정 간격 이격되어 구비되고, 그리고 연결바(220)는 거푸집(100)에 그 일단이 회동 가능하게 구비되고 거푸집 고정 빔(210)에 그 타단이 회동 가능하게 구비된다. 따라서, 거푸집(100)을 들어 올리면, 도 2에 도시된 바와 같이, 거푸집(100)은 연결바(220) 및 연결바(220)의 회동 가능한 구조에 의해 시계 방향으로의 원호 운동을 하면서(다시 말해, 연결바의 위치가 도 1의 "220" 위치에서 도 2의 "220" 위치로 변경되면서) 거푸집 고정 빔(210)을 향해 후퇴되어 구조물(30)과 쉽게 분리될 수 있다. 또한, 들어 올려진 거푸집(100)을 내리면, 거푸집(100)은 연결바(220) 및 연결바(220)의 회동 가능한 구조에 의해 반 시계 방향으로의 원호 운동을 하면서(다시 말해, 연결바의 위치가 도 2의 "220" 위치에서 도 1의 "220" 위치로 변경되면서) 구조물(30)의 성형 위치로 전진하여 성형 위치에 쉽게 장착될 수 있다. 궁극적으로, 착탈 유닛(200)을 통해 거푸집(100)의 장착 및 탈거가 용이하고 신속하게 이루어질 수 있다.The detachable unit 200 includes a formwork fixing beam 210 and a connecting bar 220. More specifically, the formwork fixed beam 210 is spaced apart from the outer surface of the formwork 100 (i.e., the opposite surface of the formwork 100 (hereinafter referred to as "concrete") into which the form material (hereinafter referred to as "concrete") flows). And, the connection bar 220 is provided with a rotatable end thereof in the formwork 100 and the other end is rotatably provided in the formwork fixing beam 210. Therefore, when lifting the formwork 100, as shown in Figure 2, the formwork 100 is circular arc movement in the clockwise direction (again again by the connecting structure 220 and the connecting bar 220) In other words, the position of the connecting bar may be retracted toward the form fixing beam 210 by changing the position of the connecting bar from the "220" position of FIG. 1 to the "220" position of FIG. In addition, when the raised formwork 100 is lowered, the formwork 100 has a circular motion in a counterclockwise direction by the rotatable structure of the connecting bar 220 and the connecting bar 220 (that is, of the connecting bar) As the position is changed from the “220” position of FIG. 2 to the “220” position of FIG. 1), it can be easily mounted in the forming position by advancing to the forming position of the structure 30. Ultimately, the mounting and dismounting of the formwork 100 through the detachable unit 200 may be easily and quickly performed.

또한, 상술한 착탈 유닛(200)은 거푸집 고정 빔(210)에 나사 결합된 후 거푸집(100)의 외면을 가압하는 가압 볼트(230)를 더 포함할 수 있다. 따라서, 가압 볼트(230)를 회전시키면, 가압 볼트(230)는 전진하면서 거푸집(100)의 외면을 가압하게 되고, 거푸집(100)은 거푸집 고정 빔(210)에 고정될 수 있다.In addition, the detachable unit 200 may further include a pressure bolt 230 that is screwed to the mold fixing beam 210 to press the outer surface of the formwork 100. Accordingly, when the pressing bolt 230 is rotated, the pressing bolt 230 presses the outer surface of the formwork 100 while advancing, and the formwork 100 may be fixed to the formwork fixing beam 210.

또한, 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치는, 도 1에 도시된 바와 같이, 상술한 착탈 유닛(200)과 함께 거푸집(100)을 부가적으로 고정시키기 위한 보조 고정 유닛(300)을 더 포함할 수 있다. 특히, 이러한 보조 고정 유닛(300)은 후술하는 바와 같이 콘크리트 매입시 거푸집(100)이 뒤로 후퇴되는 현상을 막게 된다. 이하, 도 1 및 도 2를 참조하여, 보조 고정 유닛(300)을 구체적으로 설명한다.In addition, the wall structure forming apparatus according to an embodiment of the present invention, as shown in Figure 1, the auxiliary fixing unit 300 for additionally fixing the formwork 100 with the detachable unit 200 described above. It may further include. In particular, the auxiliary fixing unit 300 prevents the formwork 100 from retreating backward when the concrete is embedded as will be described later. Hereinafter, the auxiliary fixing unit 300 will be described in detail with reference to FIGS. 1 and 2.

보조 고정 유닛(300)은 고정 돌기(310)와, 고정 지그(320)와, 단턱(330)과, 그리고 탄성체(340)를 포함할 수 있다. 보다 구체적으로, 고정 돌기(310)는 거푸집 고정 빔(210) 중 거푸집(100)을 향하는 면에 돌출 형성된다. 고정 지그(320)는 고정 돌기(310)에 회전 가능하게 결합되고 갈고리 형상을 갖는다. 단턱(330)은 거푸집(100)이 하강할 경우 고정 지그(320)의 일단을 누를 수 있도록 거푸집(100)에 형성된다. 탄성체(340)는 고정 돌기(310)에 구비되어 고정 지그(320)의 일단에 탄성력을 제공한다. 따라서, 거푸집(100)이 하강할 경우(즉, 거푸집이 도 2†상태에서 도 1 상태로 이동할 경우), 고정 지그(320)의 일단이 단턱(330)에 의해 눌리면서 고정 지그(320)의 타단이 거푸집(100)을 밀기 때문에 거푸집(100)이 뒤로 후퇴되는 것을 막을 수 있고, 그리고 거푸집(100)이 상승할 경우(즉, 거푸집이 도 1 상태에서 도 2 상태로 이동할 경우), 고정 지그(320)의 일단이 탄성체(340)에 의해 튕기면서 고정 지그(320)가 원 위치될 수 있다. 참고로, 도 1에 도시된 "d"는 고정 지그(320)가 회전되기 위해 필요한 최소 회전 공간이다.The auxiliary fixing unit 300 may include a fixing protrusion 310, a fixing jig 320, a step 330, and an elastic body 340. More specifically, the fixing protrusion 310 protrudes from a surface of the form fixing beam 210 facing the formwork 100. The fixing jig 320 is rotatably coupled to the fixing protrusion 310 and has a hook shape. The step 330 is formed in the formwork 100 to press one end of the fixing jig 320 when the formwork 100 descends. The elastic body 340 is provided on the fixing protrusion 310 to provide an elastic force to one end of the fixing jig 320. Therefore, when the formwork 100 is lowered (that is, when the formwork moves from the state of FIG. 2 † to FIG. 1), one end of the fixing jig 320 is pressed by the step 330 and the other end of the fixing jig 320. Pushing the formwork 100 can prevent the formwork 100 from retreating back, and when the formwork 100 rises (that is, when the formwork moves from FIG. 1 to FIG. 2), the stationary jig ( One end of the 320 may be bounced by the elastic body 340 so that the fixing jig 320 may be repositioned. For reference, "d" shown in FIG. 1 is a minimum rotation space required for the fixing jig 320 to rotate.

또한, 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치, 도 1에 도시된 바와 같이, 구조물(30)에 증기를 공급하여 증기 양생을 촉진시키기 위한 증기 양생 유닛(400)을 더 포함할 수 있다.In addition, the wall structure forming apparatus according to an embodiment of the present invention, as shown in Figure 1, may further include a steam curing unit 400 for supplying steam to the structure 30 to promote steam curing. .

일예로, 증기 양생 유닛(400)은, 도 1에 도시된 바와 같이, 거푸집(100) 및 구조물(30)을 덮는 양생 커버(410)와, 양생 커버(410) 내에 위치되는 증기 파이프(420)와, 그리고 증기 파이프(420)에 증기를 공급하는 증기 공급원(430)을 포함할 수 있다.For example, the steam curing unit 400, as shown in Figure 1, the curing cover 410 covering the formwork 100 and the structure 30, and the steam pipe 420 located in the curing cover 410 And a steam source 430 for supplying steam to the steam pipe 420.

한편, 도 3 내지 도 6를 참조하여, 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치를 보다 구체적으로 설명한다.On the other hand, with reference to Figures 3 to 6, it will be described in more detail the wall structure forming apparatus according to an embodiment of the present invention.

도 3은 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치가 원형의 벽체 구조물을 성형하기 위해 장착된 상태를 나타낸 평면도이고, 도 4는 도 3의 IV-IV 단면도이고, 도 5는 도 4 상태의 벽체 구조물 성형 장치가 구조물로부터 탈거된 상태를 나타낸 도면이며, 그리고 도 6은 도 3의 "A"부 확대도이다.3 is a plan view showing a state in which the wall structure forming apparatus according to an embodiment of the present invention is mounted to form a circular wall structure, FIG. 4 is a cross-sectional view taken along line IV-IV of FIG. 3, and FIG. 5 is a state of FIG. 4. Is a view showing a state in which the wall structure forming apparatus is removed from the structure, and Figure 6 is an enlarged view "A" part of FIG.

상술한 적어도 하나의 거푸집(100)은, 도 3 내지 도 6에 도시된 바와 같이, 구조물(30)의 두께만큼 설정 간격을 두고 구조물(30)의 내측 및 외측에 각각 위치되는 외부 및 내부 거푸집(110)(120)을 포함할 수 있다. 참고로, 외부 거푸집(110)에 부속하는 구성요소들은 내부 거푸집(120)에 부속하는 구성요소들과 동일한 구성을 가지므로, 이하, 설명의 편의상, 외부 거푸집(110) 및 내부 거푸집(120)은 거푸집(100)으로 통칭하기로 한다.The at least one formwork 100 described above, as shown in Figures 3 to 6, the outer and inner formwork (located on the inside and outside of the structure 30, respectively, at a predetermined interval by the thickness of the structure 30 ( 110, 120. For reference, since the components attached to the external formwork 110 have the same configuration as the components attached to the internal formwork 120, hereinafter, the external formwork 110 and the internal formwork 120 are provided for convenience of description. The formwork 100 will be referred to collectively.

또한, 거푸집(100)은, 도 3에 도시된 바와 같이, 우물통 등의 벽체 구조물(30) 성형을 위해 원통 형상을 가질 수 있다.In addition, the formwork 100, as shown in Figure 3, may have a cylindrical shape for forming the wall structure 30, such as a well.

또한, 상술한 거푸집(100)은, 도 6에 도시되 바와 같이, 구조물(30)의 길이에 따라 그 길이가 조절되도록 서로 분해 조립되는 복수개의 단편(111 내지 115)으로 이루어질 수 있다. In addition, the formwork 100 described above, as shown in Figure 6, may be composed of a plurality of pieces (111 to 115) disassembled and assembled with each other so that the length is adjusted according to the length of the structure (30).

이렇게 복수개의 단편(111 내지 115)으로 이루어질 경우, 각 단편(111 내지 115)이 개별적으로 원호 운동되도록(도 4 및 도 5 참조), 상술한 연결바(220)는 복수개의 단편(111 내지 115)에 각각 구비되는 것이 바람직할 것이다. 즉, 연결바(220)의 일단은 각 단편(111 내지 115)에 회동 가능하게 구비되고 연결바(220)의 타단은 거푸집 고정 빔(210)에 회동 가능하게 구비되는 것이 바람직할 것이다. 따라서, 복수개의 단편(111 내지 115)을 각각 들어 올리면(도 4 및 도 5 참조), 각 단편(111)은 연결바(220) 및 연결바(220)의 회동 가능한 구조에 의해 시계 방향으로의 원호 운동을 하면서(다시 말해, 연결바의 위치가 도 4의 "220" 위치에서 도 5의 "220" 위치로 변경되면서) 거푸집 고정 빔(210)을 향해 후퇴되어 구조물(30)과 쉽게 분리될 수 있다. 또한, 들어 올려진 복수개의 단편(111 내지 115)을 각각 내리면(도 4 및 도 5 참조), 각 단편(111)은 연결바(220) 및 연결바(220)의 회동 가능한 구조에 의해 반 시계 방향으로의 원호 운동을 하면서(다시 말해, 연결바의 위치가 도 5의 "220" 위치에서 도 4의 "220" 위치로 변경되면서) 구조물(30)의 성형 위치로 전진하여 성형 위치에 쉽게 장착될 수 있다.When the plurality of fragments 111 to 115 are formed as described above, the connecting bars 220 are formed in a plurality of fragments 111 to 115 such that each of the fragments 111 to 115 is circularly arced (see FIGS. 4 and 5). It will be preferable to be provided in each). That is, one end of the connection bar 220 may be rotatably provided in each of the pieces 111 to 115, and the other end of the connection bar 220 may be rotatably provided to the die fixing beam 210. Accordingly, when the plurality of pieces 111 to 115 are lifted up respectively (see FIGS. 4 and 5), each piece 111 is rotated clockwise by the pivotable structure of the connecting bar 220 and the connecting bar 220. In circular motion (ie, changing the position of the connecting bar from the "220" position in FIG. 4 to the "220" position in FIG. 5), it is retracted toward the formwork fixing beam 210 to be easily separated from the structure 30. Can be. Also, when the plurality of lifted up pieces 111 to 115 are lowered (refer to FIGS. 4 and 5), each piece 111 is counterclockwise by the rotatable structure of the connection bar 220 and the connection bar 220. In an arcing direction (in other words, the position of the connecting bar is changed from the "220" position of FIG. 5 to the "220" position of FIG. 4) to advance to the forming position of the structure 30 and easily mounted in the forming position. Can be.

또한, 상술한 복수개의 단편(111 내지 115)은, 도 6에 도시된 바와 같이, 제1, 제2 및 제3 홀수번째 단편(111)(113)(115)과 제1 및 제2 짝수번째 단편(112)(114)을 포함하고, 제1 짝수번째 단편(112)의 양단은 제1 및 제2 홀수번째 단편(113)(113) 중 상기 거푸집 고정 빔(210)을 향하는 면에 위치되도록 절곡된 형상 즉, 겹치는 형상을 가질 수 있고, 제2 짝수번째 단편(114)의 양단 또한 제2 및 제3 홀수번째 단편(113)(115) 중 상기 거푸집 고정 빔(210)을 향하는 면에 위치되도록 절곡된 형상 즉, 겹치는 형상을 가질 수 있다. 따라서, 복수개의 단편(111 내지 115)을 서로 조립할 경우, 절곡 형상 또는 겹치는 형상을 통해 조립 위치를 쉽게 찾을 수 있어 조립이 빠르고 간편할 수 있다.In addition, the plurality of fragments 111 to 115 described above may include the first, second, and third odd-numbered fragments 111, 113, and 115 and the first and second even-numbered segments, as shown in FIG. 6. Fragments 112 and 114, and both ends of the first even-numbered fragments 112 are positioned on a surface of the first and second odd-numbered fragments 113 and 113 facing the formwork fixing beam 210. It may have a bent shape, that is, an overlapping shape, both ends of the second even-numbered piece 114 is also located on the surface of the second and third odd-numbered pieces 113, 115 facing the die fixing beam 210. It may have a bent shape, that is, overlapping shape. Therefore, when assembling the plurality of pieces 111 to 115, the assembly position can be easily found through the bent shape or the overlapping shape, so that assembly can be quick and simple.

또한, 상술한 가압 볼트(230)는, 도 6에 도시된 바와 같이, 짝수번째 단편(112)의 양단을 가압하는 것일 수 있다. 따라서, 가압 볼트(230)를 회전시키면, 가압 볼트(230)은 전지하면서 홀수번째 단편(111)(113)과 겹쳐진 짝수번째 단편(112)의 양단을 가압하게 되고, 복수개의 단편(111 내지 115)은 거푸집 고정 빔(210)에 고정되게 된다.In addition, the pressing bolt 230 described above, as shown in Figure 6, may be to press both ends of the even-numbered pieces (112). Accordingly, when the pressure bolt 230 is rotated, the pressure bolt 230 presses both ends of the even-numbered fragments 112 overlapped with the odd-numbered fragments 111 and 113 while being charged, and the plurality of fragments 111 to 115. ) Is fixed to the formwork fixing beam 210.

또한, 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치는, 도 6에 도시된 바와 같이, 복수개의 단편(111 내지 115) 사이에 구비되어 서로 연결된 복수개의 단편(111 내지 115) 사이를 밀봉시키는 패킹 부재(500)를 더 포함할 수 있다. 따라서, 콘크리트가 복수개의 단편(111 내지 115) 사이로 새는 것을 막을 수 있다.In addition, the wall structure forming apparatus according to an embodiment of the present invention, as shown in Figure 6, provided between the plurality of pieces (111 to 115) to seal between the plurality of pieces (111 to 115) connected to each other The packing member 500 may further include. Thus, the concrete can be prevented from leaking between the plurality of pieces 111 to 115.

또한, 도 4 및 도 5에 도시된 바와 같이, 상술한 보조 고정 유닛(300) 중 고정 돌기(310)는 거푸집 고정 빔(210) 중 각 단편(111)을 향하는 면에 돌출 형성되고, 고정 지그(320)는 고정 돌기(310)에 회전 가능하게 결합되는 갈고리 형상을 갖고, 단턱(330)은 각 단편(111)이 하강할 경우 고정 지그(320)의 일단을 누를 수 있도록 각 단편(111)에 형성된다. 탄성체(340)는 고정 돌기(310)에 구비되어 고정 지그(320)의 일단에 탄성력을 제공한다. 따라서, 각 단편(111)이 하강할 경우(즉, 도면 부호 "111"로 지시된 단편이 도 5 상태에서 도 4 상태로 이동할 경우), 고정 지그(320)의 일단이 단턱(330)에 의해 눌리면서 고정 지그(320)의 타단이 각 단편(111)을 밀기 때문에 단편(111)이 뒤로 후퇴되는 것을 막을 수 있고, 그리고 각 단편(111)이 상승할 경우(즉, 도면 부호 "111"로 지시된 단편이 도 4 상태에서 도 5 상태로 이동할 경우), 고정 지그(320)의 일단이 탄성체(340)에 의해 튕기면서 고정 지그(320)가 원 위치될 수 있다. 참고로, 도 4에 도시된 "d"는 고정 지그(320)가 회전되기 위해 필요한 최소 회전 공간이다.4 and 5, the fixing protrusion 310 of the above-described auxiliary fixing unit 300 is formed to protrude on a surface of each of the form fixing beams 210 facing the piece 111 and the fixing jig. 320 has a hook shape rotatably coupled to the fixing protrusion 310, the step 330 is each piece 111 so as to press one end of the fixing jig 320 when each piece 111 is lowered. Is formed. The elastic body 340 is provided on the fixing protrusion 310 to provide an elastic force to one end of the fixing jig 320. Therefore, when each piece 111 is lowered (that is, when the piece indicated by reference numeral “111” moves from the state of FIG. 5 to the state of FIG. 4), one end of the fixing jig 320 is moved by the step 330. Since the other end of the fixing jig 320 pushes each piece 111 while being pressed, it is possible to prevent the piece 111 from retreating back, and when each piece 111 is raised (that is, indicated by reference numeral “111”). When the cut piece is moved from the state of FIG. 4 to the state of FIG. 5), one end of the fixing jig 320 may be bounced by the elastic body 340 so that the fixing jig 320 may be repositioned. For reference, "d" shown in FIG. 4 is a minimum rotation space required for the fixing jig 320 to rotate.

또한, 상술한 착탈 유닛(200)은, 도 3 및 도 4에 도시된 바와 같이, 외부 거푸집(110)과 내부 거푸집(120)을 보다 단단히 고정시키기 위해 외부 거푸집(110)과 내부 거푸집(120)을 서로 결합하는 결합 부재(240)를 더 포함할 수 있다.In addition, the detachable unit 200 described above, as shown in FIGS. 3 and 4, the outer formwork 110 and the inner formwork 120 to more firmly fix the outer formwork 110 and the inner formwork 120. It may further include a coupling member 240 for coupling to each other.

한편, 도 7 및 도 8을 참조하여, 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치를 더욱 구체적으로 설명한다.On the other hand, with reference to Figures 7 and 8, it will be described in more detail the wall structure forming apparatus according to an embodiment of the present invention.

도 7은 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치 중 거푸집을 들어 올리거나 내리기 위한 승강부를 나타낸 사시도이고, 도 8은 승강부에 의해 거푸집이 들어올려진 상태 및 들어 올려진 빈 공간에 받침판이 놓여 있는 상태를 나타낸 사시도이다.Figure 7 is a perspective view showing the lifting portion for lifting or lowering the formwork of the wall structure forming apparatus according to an embodiment of the present invention, Figure 8 is a state in which the formwork is raised by the lifting unit and the support plate in the raised empty space A perspective view showing a lying state.

상술한 착탈 유닛(200)은, 도 7 및 도 8에 도시된 바와 같이, 각 단편(111)을 들어 올리거나 내리기 위한 승강부(250)를 더 포함할 수 있다. 일예로, 승강부(250)는 각 단편(111) 중 거푸집 고정 빔(210)에 마주하는 면에 형성되는 외부 돌출부(251)와, 그리고 외부 돌출부(251)에 승강력을 제공하는 유압 잭(252)을 포함할 수 있다. 따라서, 유압 잭(252)에 유압을 인가하면 도 8과 같이 해당 단편(111)이 상승하게 되고, 상승하는 동안 단편(111)은 도 4 및 도 5에 도시된 바와 같이 연결바(220) 및 연결바(220)의 회동 가능한 구조에 의해 원호 운동을 하면서(다시 말하면, 연결바의 위치가 도 4의 "220"의 위치에서 도 5의 "220"의 위치로 변경되면서) 거푸집 고정 빔(210)을 향해 후퇴되어 구조물(30)과 분리될 수 있다. 또한, 일단 단편(111)이 상승되면 단편(111)의 하단에 별도의 받침판(260)을 받칠 수 있으며, 받침판(260)이 있기 때문에 유압 잭(252)은 다른 단편을 들어올리기 위해 다시 사용될 수 있을 것이다.As described above, the detachable unit 200 may further include a lifting unit 250 for lifting or lowering each piece 111 as illustrated in FIGS. 7 and 8. For example, the elevating part 250 may include an external protrusion 251 formed on a surface of the fragment 111 facing the die fixing beam 210, and a hydraulic jack for providing lifting force to the external protrusion 251. 252). Therefore, when the hydraulic pressure is applied to the hydraulic jack 252, the corresponding piece 111 is raised as shown in FIG. 8, and while the piece is raised, the piece 111 is connected to the connecting bar 220 as shown in FIGS. 4 and 5. Forming fixed beam 210 while performing circular motions (ie, changing the position of the connecting bar from the position of "220" in FIG. 4 to the position of "220" in FIG. 5) by the rotatable structure of the connecting bar 220. May be retracted toward and separated from the structure 30. In addition, once the piece 111 is raised, a separate support plate 260 may be supported at the bottom of the piece 111, and since the support plate 260, the hydraulic jack 252 may be used again to lift another piece. There will be.

한편, 도 9 및 도 10을 참조하여, 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치가 지하 수직구 구조물(우물통 기초 등을 포함)의 설치 과정에서 지반 굴착후에 굴착 공간을 지지하기 위하여 미리 설치되는 가시설(40)과 함께 사용된 형태를 설명한다.Meanwhile, referring to FIGS. 9 and 10, the apparatus for forming a wall structure according to an embodiment of the present invention is used in advance to support an excavation space after the ground excavation in the installation process of the underground vertical sphere structure (including the base of the well). The form used with the provisional facility 40 installed is demonstrated.

도 9는 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치가 가시설이 완료된 굴착 공간에 내벽 구조물을 성형하기 위해 장착된 상태를 나타낸 종단면도이고, 도 10은 도 9의 성형 장치가 상승된 상태를 나타낸 종단면도이다.9 is a longitudinal cross-sectional view showing a state in which the wall structure forming apparatus according to an embodiment of the present invention is mounted to form the inner wall structure in the excavation space in which the temporary installation is completed, and FIG. 10 is a state in which the forming apparatus of FIG. 9 is raised. It is a longitudinal cross-sectional view shown.

도 9에 도시된 바와 같이, 가시설(40)이 설치된 굴착 공간(10)에 내벽 구조물(30)을 형성시킬 경우, 상술한 거푸집(100)은 내벽 구조물(30)의 두께만큼 가시설(40)과 설정 간격 이격되어 위치될 수 있으며, 그 외 거푸집(100)에 부속하는 구성요소들은 상술한 바와 같으므로 구체적인 설명은 생략한다. 참고로, 도면부호 "700"은 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치를 지지할 수 있는 지지 브라켓을 나타낸 것이다.As shown in FIG. 9, when the inner wall structure 30 is formed in the excavation space 10 in which the temporary facility 40 is installed, the formwork 100 described above is provided with the temporary facility 40 and the thickness of the inner wall structure 30. The components may be spaced apart from each other by a predetermined interval, and other components attached to the formwork 100 are the same as described above, and thus a detailed description thereof will be omitted. For reference, reference numeral 700 denotes a support bracket capable of supporting a wall structure forming apparatus according to an embodiment of the present invention.

또한, 도 9에 도시된 바와 같이, 내벽 구조물(30) 성형이 완료되면, 도 10에 도시된 바와 같이 거푸집(100) 및 이에 부속하는 구성요소들을 상승시킨 후 다시 내벽 구조물(30)을 성형하게 된다. 이러한 과정은 내벽 구조물(30)이 지표에 도달할 때까지 계속될 수 있다.In addition, as shown in FIG. 9, when the forming of the inner wall structure 30 is completed, as shown in FIG. 10, the mold 100 and its components are raised to form the inner wall structure 30 again. do. This process may continue until the inner wall structure 30 reaches the ground.

이하, 도 9 및 도 10을 참조하여, 상술한 벽체 구조물 성형 장치를 이용한 본 발명의 다른 실시예에 따른 지하 수직구 구조물 시공 방법을 설명한다.Hereinafter, with reference to Figures 9 and 10, will be described a method of construction of underground vertical sphere structure according to another embodiment of the present invention using the above-described wall structure forming apparatus.

먼저, 지하 수직구 구조물을 설치하기 위한 굴착 공간(10)을 형성하기 위해 지반을 굴착하고, 굴착 공간(10)을 지지하기 위하여 가시설(40)을 설치한다. First, the ground is excavated to form the excavation space 10 for installing the underground vertical sphere structure, and the temporary facility 40 is installed to support the excavation space 10.

가시설(40) 설치 후, 가시설(40)의 내측 굴착 공간(10)에 내벽 구조물(30)을 성형하기 위해, 상술한 벽체 구조물 성형 장치의 거푸집(100)을 굴착 공간(10)에 내벽 구조물(30)의 두께에 대응하는 설정 간격 만큼 가시설(40)로부터 이격되도록 설치한다(이하, 이를 "거푸집 설치 과정"이라 함). 이 후, 가시설(40)과 벽체 구조물 성형 장치의 거푸집(100) 사이 공간에 내벽 구조물(30)을 형성하기 위한 콘크리트 재료가 투입되고, 그리고 콘크리트의 양생 과정을 거친 후에 상술한 벽체 구조물 성형 장치의 착탈 유닛(200)을 이용하여 거푸집(100)을 상기 양생된 콘크리트[즉, 내벽 구조물(30)]로부터 탈거시킨다. 구체적으로, 거푸집(100)을 탈거시키기 위해서는, 도 4 및 도 5에 도시된 바와 같이, 거푸집(100)에 승강력을 제공하여 거푸집(100)을 들어 올리고(즉, 거푸집이 도 7의 "111" 위치에서 도 8의 "111" 위 치로 이동되고), 거푸집(100)이 들어 올려지는 동안 거푸집(100)은 승강력, 착탈 유닛(200)의 연결바(220) 및 상술한 연결바(220)의 회동 가능한 구조에 의해 원호 운동을 하면서 거푸집 고정 빔(210)을 향해 후퇴되어(즉, 거푸집이 도 4의 "100" 위치에서 도 5의 "100" 위치로 이동되어) 탈거된다.After the installation of the temporary facility 40, the formwork 100 of the above-described wall structure forming apparatus is formed in the excavation space 10 to form the internal wall structure 30 in the internal excavation space 10 of the temporary facility 40. It is installed so as to be spaced apart from the temporary facility 40 by a predetermined interval corresponding to the thickness of 30) (hereinafter, referred to as "form installation process"). Thereafter, a concrete material for forming the inner wall structure 30 is introduced into the space between the temporary facility 40 and the formwork 100 of the wall structure forming apparatus, and after the curing process of the concrete, The formwork 100 is removed from the cured concrete (ie, the inner wall structure 30) using the detachable unit 200. Specifically, to remove the formwork 100, as shown in Figures 4 and 5, providing the lifting force to the formwork 100 to lift the formwork 100 (ie, the formwork "111 of FIG. 8 is moved to the "111" position in the "position", while the formwork 100 is lifted, the formwork 100 is lifted, the connecting bar 220 of the detachable unit 200 and the connecting bar 220 described above. The pivotable structure is retracted toward the formwork fixing beam 210 (ie, the formwork is moved from the " 100 " position of FIG. 4 to the " 100 " position of FIG.

이렇게 거푸집(100)이 탈거되면, 상술한 벽체 구조물 성형 장치를 상측으로 이동시킨다(이하, 이를 "성형 장치 상향 이동 과정"이라 함). 특히, 상단에 내벽 구조물(30)을 연속적으로 성형하도록, 상술한 거푸집 설치 과정으로부터 상술한 성형 장치 상향 이동 과정을 반복 수행한다.When the formwork 100 is removed in this way, the above-described wall structure forming apparatus is moved upwards (hereinafter, referred to as a "molding apparatus upward movement process"). In particular, in order to continuously mold the inner wall structure 30 on the top, the above-described forming apparatus upward movement process is repeated from the above-described formwork installation process.

이하, 도 9 및 도 10을 다시 참조하여, 상술한 벽체 구조물 성형 장치를 이용한 본 발명의 또 다른 실시예에 따른 지하 수직구 구조물 시공 방법을 설명한다.Hereinafter, referring to FIG. 9 and FIG. 10 again, a method of constructing an underground vertical sphere structure according to another embodiment of the present invention using the above-described wall structure forming apparatus will be described.

먼저, 지하 수직구 구조물을 설치하기 위한 굴착 공간(10)을 형성하기 위해 지반을 굴착하고, 굴착 공간(10)을 지지하기 위하여 가시설(40)을 설치한다. First, the ground is excavated to form the excavation space 10 for installing the underground vertical sphere structure, and the temporary facility 40 is installed to support the excavation space 10.

기시설(40) 설치 후, 가시설(40)의 내측 굴착 공간(10)에 내벽 구조물(30)을 성형하기 위해, 상술한 벽체 구조물 성형 장치의 증기 양생 유닛(400)을 설치하면서 벽체 구조물 성형 장치의 거푸집(100)을 내벽 구조물(30)의 두께에 대응하는 설정 간격 만큼 가시설(40)로부터 이격되도록 설치한다(이하, 이를 "증기 양생 유닛 및 거푸집 설치 과정"이라 함). 이 후, 가시설(40)과 벽체 구조물 성형 장치의 거푸집(100) 사이 공간에 내벽 구조물(30)을 형성하기 위한 콘크리트 재료가 투입되고, 상술한 벽체 구조물 성형 장치의 증기 양생 유닛(400)을 이용하여 증기 양생을 실시한다. 그런 다음, 콘크리트의 양생 과정을 거친 후에 상술한 벽체 구조물 성 형 장치의 착탈 유닛(200)을 이용하여 거푸집(100)을 상기 양생된 콘크리트[즉, 내벽 구조물(30)]로부터 탈거시킨다. 구체적으로, 거푸집(100)을 탈거시키기 위해서는, 거푸집(100)에 승강력을 제공하여 거푸집(100)을 들어 올리고(즉, 거푸집이 도 7의 "111" 위치에서 도 8의 "111" 위치로 이동되고), 거푸집(100)이 들어 올려지는 동안 거푸집(100)은 승강력, 상기 착탈 유닛(200)의 연결바(220) 및 상술한 연결바(200)의 회전 가능한 구조에 의해 원호 운동을 하면서 거푸집 고정 빔(210)을 향해 후퇴되어(즉, 거푸집이 도 4의 "100" 위치에서 도 5의 "100" 위치로 이동되어) 탈거된다.After the installation of the facility 40, the wall structure forming apparatus while installing the steam curing unit 400 of the wall structure forming apparatus described above, in order to form the inner wall structure 30 in the inner excavation space 10 of the temporary facility 40 The formwork 100 is installed so as to be spaced apart from the temporary facility 40 by a predetermined interval corresponding to the thickness of the inner wall structure 30 (hereinafter, referred to as "steam curing unit and formwork installation process"). Thereafter, a concrete material for forming the inner wall structure 30 is introduced into the space between the temporary facility 40 and the formwork 100 of the wall structure forming apparatus, and the steam curing unit 400 of the wall structure forming apparatus is used. Steam curing is performed. Then, after the curing process of concrete, the formwork 100 is removed from the cured concrete (ie, the inner wall structure 30) by using the detachable unit 200 of the above-described wall structure forming apparatus. Specifically, in order to remove the formwork 100, providing the lifting force to the formwork 100 to lift the formwork 100 (ie, the formwork from the "111" position of Figure 7 to the "111" position of Figure 8 Moving), while the formwork 100 is lifted, the formwork 100 is circular arc movement by the lifting force, the connecting bar 220 of the detachable unit 200 and the rotatable structure of the connecting bar 200 described above. While being retracted towards the formwork fixing beam 210 (ie, the formwork is moved from the " 100 " position in FIG. 4 to the " 100 " position in FIG.

이렇게 거푸집(100)이 탈거된 후, 상술한 벽체 구조물 성형 장치를 상측으로 이동시킨다(이하, "성향 장치 상향 이동 과정"이라 함). 특히, 상단에 내벽 구조물(30)을 연속적으로 성형하도록, 상술한 증기 양생 유닛 및 거푸집 설치 과정으로부터 상술한 성형 장치 상향 이동 과정을 반복 수행한다.After the formwork 100 is removed in this way, the above-described wall structure forming apparatus is moved upwards (hereinafter, referred to as a "inclination apparatus upward movement process"). In particular, in order to continuously mold the inner wall structure 30 on the top, the above-described forming apparatus upward movement process is repeatedly performed from the above-described steam curing unit and formwork installation process.

이상에서와 같이, 본 발명의 실시예에 따른 벽체 구조물 성형 장치 및 이를 이용한 지하 수직구 구조물 시공 방법은 다음과 같은 효과를 가질 수 있다.As described above, the wall structure forming apparatus and the underground vertical sphere structure construction method using the same according to an embodiment of the present invention may have the following effects.

본 발명의 실시예에 의하면, 착탈 유닛에 의해, 특히 연결바 및 연결바의 원호 운동에 의해, 거푸집이 용이하고 신속하게 장착될 수 있을 뿐만 아니라 성형 후 벽체 구조물로부터 거푸집이 용이하고 신속하게 탈거될 수 있다.According to an embodiment of the present invention, the formwork can be easily and quickly mounted by the detachable unit, in particular by the circular movement of the connecting bar and the connecting bar, as well as the formwork can be easily and quickly removed from the wall structure after molding. Can be.

이상에서 본 발명의 바람직한 실시예에 대하여 상세하게 설명하였지만 본 발명의 권리범위는 이에 한정되는 것은 아니고 다음의 청구범위에서 정의하고 있는 본 발명의 기본 개념을 이용한 당업자의 여러 변형 및 개량 형태 또한 본 발명의 권리범위에 속하는 것이다.Although the preferred embodiments of the present invention have been described in detail above, the scope of the present invention is not limited thereto, and various modifications and improvements of those skilled in the art using the basic concepts of the present invention defined in the following claims are also provided. It belongs to the scope of rights.

도 1은 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치를 나타낸 종단면도이다.1 is a longitudinal sectional view showing a wall structure forming apparatus according to an embodiment of the present invention.

도 2는 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치가 구조물로부터 탈거된 상태를 나타낸 종단면도이다.Figure 2 is a longitudinal cross-sectional view showing a state in which the wall structure forming apparatus according to an embodiment of the present invention is removed from the structure.

도 3은 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치가 원형의 벽체 구조물을 성형하기 위해 장착된 상태를 나타낸 평면도이다.Figure 3 is a plan view showing a state in which the wall structure forming apparatus according to an embodiment of the present invention is mounted to form a circular wall structure.

도 4는 도 3의 IV-IV 단면도이다.4 is a cross-sectional view taken along line IV-IV of FIG. 3.

도 5는 도 4 상태의 벽체 구조물 성형 장치가 구조물로부터 탈거된 상태를 나타낸 도면이다.5 is a view illustrating a state in which the wall structure forming apparatus of FIG. 4 is removed from the structure.

도 6은 도 3의 "A"부 확대도이다.6 is an enlarged view of a portion “A” of FIG. 3.

도 7은 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치 중 거푸집을 들어 올리거나 내리기 위한 승강부를 나타낸 사시도이다.Figure 7 is a perspective view showing a lifting unit for lifting or lowering the formwork of the wall structure forming apparatus according to an embodiment of the present invention.

도 8은 승강부에 의해 거푸집이 들어올려진 상태 및 들어 올려진 빈 공간에 받침판이 놓여 있는 상태를 나타낸 사시도이다.8 is a perspective view showing a state in which the formwork is lifted by the lifting unit and the support plate is placed in the lifted empty space.

도 9는 본 발명의 일 실시예에 따른 벽체 구조물 성형 장치가 가시설이 완료된 굴착 공간에 내벽 구조물을 성형하기 위해 장착된 상태를 나타낸 종단면도이다.9 is a longitudinal cross-sectional view showing a state in which the wall structure forming apparatus according to an embodiment of the present invention is mounted to form an inner wall structure in an excavation space in which temporary installation is completed.

도 10은 도 9의 성형 장치가 상승된 상태를 나타낸 종단면도이다.10 is a longitudinal sectional view showing a state in which the forming apparatus of FIG. 9 is raised.

도면의 주요부분에 대한 부호의 설명Explanation of symbols for main parts of the drawings

30: 구조물 40: 가시설30: structure 40: temporary

100: 거푸집 200: 착탈 유닛100: die 200: detachable unit

210: 거푸집 고정 빔 220: 연결바210: formwork fixed beam 220: connecting bar

230: 가압 볼트 300: 보조 고정 유닛230: pressure bolt 300: auxiliary fixing unit

400: 증기 양생 유닛 500: 패킹 부재400: steam curing unit 500: packing member

Claims (17)

적어도 하나의 거푸집과;At least one formwork; 구조물을 성형하기 위해 상기 거푸집을 장착시키거나 성형된 구조물로부터 상기 거푸집을 원활하게 탈거시키기 위한 착탈 유닛과; 그리고A detachable unit for mounting the formwork to form the structure or for smoothly detaching the formwork from the formed structure; And 상기 착탈 유닛과 함께 상기 거푸집을 고정시키기 위한 보조 고정 유닛을 포함하고,An auxiliary fixing unit for fixing the formwork with the detachable unit, 상기 착탈 유닛은 상기 거푸집과 설정 간격 이격되어 구비되는 거푸집 고정 빔과; 그리고 상기 거푸집에 그 일단이 회동 가능하게 구비되고 상기 거푸집 고정 빔에 그 타단이 회동 가능하게 구비되는 연결바를 포함하여, 상기 거푸집을 들어 올리면, 상기 거푸집은 상기 연결바 및 상기 연결바의 회동 가능한 구조에 의해 제1 방향으로 원호 운동을 하면서 상기 거푸집 고정 빔을 향해 후퇴되어 상기 구조물과 분리되고; 그리고 상기 들어 올려진 거푸집을 내리면, 상기 거푸집은 제2 방향으로 원호 운동을 하면서 상기 구조물의 성형 위치로 전진되어 상기 성형 위치에 장착되도록 이루어지며, 그리고The detachable unit includes a formwork fixed beam spaced apart from the formwork at a predetermined interval; And a connecting bar having one end rotatably provided at the formwork and the other end rotatably provided at the formwork fixing beam. When the formwork is lifted, the formwork is rotatable structure of the connecting bar and the connecting bar. Retracts toward the formwork fixing beam and separates from the structure while performing an arc motion in a first direction by means of; And when the raised formwork is lowered, the formwork is made to be advanced to the forming position of the structure and mounted in the forming position while performing an arc motion in a second direction, and 상기 보조 고정 유닛은 상기 거푸집 고정 빔 중 상기 거푸집을 향하는 면에 돌출 형성되는 고정 돌기와; 상기 고정 돌기에 회전 가능하게 결합되고 갈고리 형상을 갖는 고정 지그와; 상기 거푸집이 하강할 경우 상기 고정 지그의 일단을 누를 수 있도록 상기 거푸집에 형성되는 단턱과; 그리고 상기 고정 돌기에 구비되어 상기 고정 지그의 일단에 탄성력을 제공하는 탄성체를 포함하여, 상기 거푸집이 하강할 경우, 상기 고정 지그의 일단이 상기 단턱에 의해 눌리면서 상기 고정 지그의 타단이 상기 거푸집을 밀기 때문에 상기 거푸집이 뒤로 후퇴되는 것을 막을 수 있고, 그리고 상기 거푸집이 상승할 경우, 상기 고정 지그의 일단이 상기 탄성체에 의해 튕기면서 상기 고정 지그가 원 위치되도록 이루어지는 벽체 구조물 성형 장치.The auxiliary fixing unit may include a fixing protrusion protruding from a surface of the form fixing beam toward the formwork; A fixing jig rotatably coupled to the fixing protrusion and having a hook shape; A stepped portion formed in the formwork so as to press one end of the fixing jig when the formwork descends; And an elastic body provided on the fixing protrusion to provide an elastic force to one end of the fixing jig. When the formwork descends, the other end of the fixing jig pushes the mold while one end of the fixing jig is pressed by the step. Therefore, the formwork can be prevented from retreating backwards, and when the formwork rises, one end of the fixing jig is bounced by the elastic body so that the fixing jig is formed in the original position. 제1항에서,In claim 1, 상기 착탈 유닛은The detachable unit is 상기 거푸집 고정빔에 나사 결합된 후 상기 거푸집을 가압하는 가압 볼트를 더 포함하는 벽체 구조물 성형 장치.And a press bolt for pressurizing the formwork after being screwed to the formwork fixing beam. 제2항에서,In claim 2, 상기 거푸집은 상기 구조물의 길이에 따라 그 길이가 조절되도록 서로 분해 조립되는 복수개의 단편으로 이루어지는 벽체 구조물 성형 장치.The formwork is a wall structure forming apparatus consisting of a plurality of pieces disassembled to each other so that the length is adjusted according to the length of the structure. 제3항에서,In claim 3, 상기 연결바는 상기 복수개의 단편에 각각 구비되고; 그리고The connecting bars are respectively provided in the plurality of pieces; And 상기 연결바의 일단은 상기 단편에 회동 가능하게 구비되고 상기 연결바의 타단은 상기 거푸집 고정 빔에 회동 가능하게 구비되는 벽체 구조물 성형 장치.One end of the connecting bar is rotatably provided in the fragment and the other end of the connecting bar is provided in the formwork fixed beam wall structure forming apparatus. 제3항에서,In claim 3, 상기 복수개의 단편은 홀수번째 단편과 짝수번째 단편을 포함하고; 그리고The plurality of fragments comprises odd and even fragments; And 상기 짝수번째 단편의 양단은 상기 홀수번째 단편 중 상기 거푸집 고정 빔을 향하는 면에 위치되도록 절곡된 형상을 갖는 벽체 구조물 성형 장치.And both ends of the even-numbered fragments have a shape bent to be located on a surface of the odd-numbered fragments facing the die fixing beam. 제5항에서,In claim 5, 상기 가압 볼트는 상기 짝수번째 양단을 가압하는 것인 벽체 구조물 성형 장치.And the pressing bolt presses the even-numbered both ends. 제6항에서,In claim 6, 상기 복수개의 단편 사이에 구비되어 서로 연결된 상기 복수개의 단편 사이 를 밀봉시키는 패킹 부재를 더 포함하는 벽체 구조물 성형 장치.And a packing member provided between the plurality of pieces to seal the plurality of pieces connected to each other. 제3항에서,In claim 3, 상기 착탈 유닛은The detachable unit is 상기 각 단편을 들어 올리거나 내리기 위한 승강부를 더 포함하는 벽체 구조물 성형 장치.And a lifting part for lifting or lowering each of the fragments. 제8항에서,In claim 8, 상기 승강부는The lifting unit 상기 각 단편 중 상기 거푸집 고정 빔에 마주하는 면에 형성되는 외부 돌출부와; 그리고An outer protrusion formed on a surface of each of the fragments facing the die fixing beam; And 상기 외부 돌출부에 승강력을 제공하는 유압 잭을 포함하는 벽체 구조물 성형 장치.And a hydraulic jack for providing elevating force to the outer protrusion. 제3항에서,In claim 3, 상기 거푸집이 복수개의 단편으로 이루이질 경우,If the formwork consists of a plurality of fragments, 상기 고정 돌기는 상기 거푸집 고정 빔 중 상기 각 단편을 향하는 면에 돌출 형성되고,The fixing protrusion is formed to protrude on the surface facing each of the fragment fixing beam, 상기 고정 지그는 상기 고정 돌기에 회전 가능하게 결합되며 갈고리 형상을 가지고,The fixing jig is rotatably coupled to the fixing protrusion and has a hook shape, 상기 단턱은 상기 각 단편에 형성되며 상기 각 단편이 하강할 경우 상기 고정 지그의 일단을 누르고,The step is formed in each of the pieces and when each piece is lowered, press one end of the fixing jig, 상기 탄성체는 상기 고정 돌기에 구비되어 상기 고정 지그의 일단에 탄성력을 제공하고,The elastic body is provided on the fixing protrusion to provide an elastic force to one end of the fixing jig, 상기 각 단편이 하강할 경우, 상기 고정 지그의 일단이 상기 단턱에 의해 눌리면서 상기 고정 지그의 타단이 상기 단편을 밀어 상기 단편이 뒤로 후퇴되는 것을 막고, 그리고When each of the pieces is lowered, one end of the fixing jig is pressed by the step so that the other end of the fixing jig pushes the pieces to prevent the pieces from being retracted back; and 상기 각 단편이 상승할 경우, 상기 고정 지그의 일단이 탄성체에 의해 튕기면서 상기 고정 지그가 원 위치되는 벽체 구조물 성형 장치.The wall structure forming apparatus in which the fixing jig is repositioned while one end of the fixing jig is bounced by an elastic body when each of the pieces is raised. 제1항 내지 제10항 중 어느 한 항에서,The method according to any one of claims 1 to 10, 가시설이 설치된 굴착 공간에 내벽 구조물을 형성시킬 경우, 상기 적어도 하나의 거푸집은 상기 내벽 구조물의 두께만큼 상기 가시설과 설정 간격 이격되어 위치되는 제1 거푸집을 포함하는 벽체 구조물 성형 장치.When the inner wall structure is formed in the excavation space in which the provisional equipment is installed, the at least one formwork comprises a first formwork spaced apart from the temporary installation by a thickness of the inner wall structure comprising a first form. 제1항 내지 제10항 중 어느 한 항에서,The method according to any one of claims 1 to 10, 상기 적어도 하나의 거푸집은 상기 구조물의 두께만큼 설정 간격을 두고 상기 구조물의 내측 및 외측에 각각 위치되는 내부 및 외부 거푸집을 포함하는 벽체 구조물 성형 장치.The at least one formwork wall structure forming apparatus comprising an inner and outer formwork, respectively located on the inside and the outside of the structure at a predetermined interval by the thickness of the structure. 제1항 내지 제10항 중 어느 한 항에서,The method according to any one of claims 1 to 10, 상기 구조물에 증기를 공급하여 증기 양생을 촉진시키기 위한 증기 양생 유닛을 더 포함하는 벽체 구조물 성형 장치.And a steam curing unit for supplying steam to the structure to promote steam curing. 제13항에서,In claim 13, 상기 증기 양생 유닛은The steam curing unit 상기 거푸집 및 상기 구조물을 덮는 양생 커버와;A curing cover covering the formwork and the structure; 상기 양생 커버 내에 위치되는 증기 파이프와; 그리고A vapor pipe located within said curing cover; And 상기 증기 파이프에 증기를 공급하는 증기 공급원을 포함하는 벽체 구조물 성형 장치.And a steam source for supplying steam to the steam pipe. 제1항 내지 제10항 중 어느 한 항에서,The method according to any one of claims 1 to 10, 상기 거푸집은 원통 형상을 갖는 벽체 구조물 성형 장치.The formwork is a wall structure forming apparatus having a cylindrical shape. 제1항 내지 제10항 중 어느 한 항에 따른 벽체 구조물 성형 장치를 이용하여 지하 수직구 구조물을 시공하는 방법으로서,A method of constructing an underground vertical sphere structure using a wall structure forming apparatus according to any one of claims 1 to 10, 지하 수직구 구조물을 설치하기 위한 굴착 공간을 형성하기 위한 지반 굴착 단계;A ground excavation step for forming an excavation space for installing the underground vertical sphere structure; 상기 굴착 공간을 지지하기 위하여 가시설을 설치하는 가시설 설치 단계;A provisional installation step of installing a provisional facility to support the excavation space; 상기 가시설의 내측 굴착 공간에 내벽 구조물을 성형하기 위해, 상기 벽체 구조물 성형 장치의 거푸집을 굴착 공간에 내벽 구조물의 두께에 대응하는 설정 간격 만큼 가시설로부터 이격되도록 설치하는 거푸집 설치 단계;A mold installation step of installing the formwork of the wall structure forming apparatus so as to be spaced apart from the provisional facility by a predetermined interval corresponding to the thickness of the inner wall structure in the excavation space in order to form the inner wall structure in the inner excavation space of the temporary facility; 상기 가시설과 상기 벽체 구조물 성형 장치의 거푸집 사이 공간에 내벽 구조물을 형성하기 위한 콘크리트 재료가 투입되는 콘크리트 재료 투입 단계;A concrete material input step of inserting a concrete material for forming an inner wall structure in a space between the temporary facility and the formwork of the wall structure forming apparatus; 상기 콘크리트의 양생 과정을 거친 후에 상기 벽체 구조물 성형 장치의 착탈 유닛을 이용하여 상기 거푸집을 상기 양생된 콘크리트로부터 탈거시키는 거푸집 탈거 단계;A formwork removing step of removing the formwork from the cured concrete using a detachable unit of the wall structure forming apparatus after the curing process of the concrete; 상기 거푸집이 탈거된 후 상기 벽체 구조물 성형 장치를 상측으로 이동시키는 성형 장치 상향 이동 단계; 및A forming apparatus upward movement step of moving the wall structure forming apparatus upward after the formwork is removed; And 상단에 내벽 구조물을 연속적으로 성형하도록, 상기 거푸집 설치 단계로부터 상기 성형 장치 상향 이동 단계를 반복 수행하는 단계를 포함하여 이루어지고, 그리고And repeating the forming apparatus upward movement step from the formwork installation step so as to continuously mold the inner wall structure on the top, and 상기 거푸집 탈거 단계는The formwork removing step 상기 거푸집에 승강력을 제공하여 상기 거푸집을 들어 올리는 승강 단계; 및Lifting step of providing the lifting force to the formwork to lift the formwork; And 상기 승강 단계가 진행되는 동안 상기 거푸집이 상기 승강력 및 상기 착탈 유닛의 연결바에 의해 원호 운동을 하면서 상기 착탈 유닛의 거푸집 고정 빔을 향해 후퇴되어 탈거되는 단계를 포함하여 이루어지는 지하 수직구 구조물 시공 방법.Underground vertical sphere structure construction method comprising the step of retreating toward the form fixing beam of the detachable unit while the formwork is circular motion by the lifting force and the connecting bar of the detachable unit during the lifting step. 제13항 또는 제14항에 따른 벽체 구조물 성형 장치를 이용하여 지하 수직구 구조물을 시공하는 방법으로서,A method of constructing an underground vertical sphere structure using a wall structure forming apparatus according to claim 13 or claim 14, 지하 수직구 구조물을 설치하기 위한 굴착 공간을 형성하기 위한 지반 굴착 단계;A ground excavation step for forming an excavation space for installing the underground vertical sphere structure; 상기 굴착 공간을 지지하기 위하여 가시설을 설치하는 가시설 설치 단계;A provisional installation step of installing a provisional facility to support the excavation space; 상기 가시설의 내측 굴착 공간에 내벽 구조물을 성형하기 위해, 상기 벽체 구조물 성형 장치의 증기 양생 유닛을 설치하면서 상기 벽체 구조물 성형 장치의 거푸집을 내벽 구조물의 두께에 대응하는 설정 간격 만큼 가시설로부터 이격되도록 설치하는 증기 양생 유닛 및 거푸집 설치 단계;In order to mold the inner wall structure in the inner excavation space of the temporary facility, while installing the steam curing unit of the wall structure forming apparatus to install the formwork of the wall structure forming apparatus spaced apart from the temporary facility by a predetermined interval corresponding to the thickness of the inner wall structure Steam curing unit and formwork installation step; 상기 가시설과 상기 벽체 구조물 성형 장치의 거푸집 사이 공간에 내벽 구조물을 형성하기 위한 콘크리트 재료가 투입되는 콘크리트 재료 투입 단계;A concrete material input step of inserting a concrete material for forming an inner wall structure in a space between the temporary facility and the formwork of the wall structure forming apparatus; 상기 벽체 구조물 성형 장치의 증기 양생 유닛을 이용하여 증기 양생을 실시하는 증기 양생 단계;A steam curing step of performing steam curing using the steam curing unit of the wall structure forming apparatus; 상기 콘크리트의 증기 양생 과정을 거친 후에 상기 벽체 구조물 성형 장치의 착탈 유닛을 이용하여 상기 거푸집을 상기 양생된 콘크리트로부터 탈거시키는 거푸집 탈거 단계;A formwork removing step of removing the formwork from the cured concrete using a detachable unit of the wall structure forming apparatus after the steam curing process of the concrete; 상기 거푸집이 탈거된 후 상기 벽체 구조물 성형 장치를 상측으로 이동시키는 성형 장치 상향 이동 단계; 및A forming apparatus upward movement step of moving the wall structure forming apparatus upward after the formwork is removed; And 상단에 내벽 구조물을 연속적으로 성형하도록, 상기 증기 양생 유닛 및 거푸집 설치 단계로부터 상기 성형 장치 상향 이동 단계를 반복 수행하는 단계를 포함하여 이루어지고, 그리고And repeating the forming apparatus upward movement step from the steam curing unit and the formwork installation step so as to continuously mold the inner wall structure on the top, and 상기 거푸집 탈거 단계는The formwork removing step 상기 거푸집에 승강력을 제공하여 상기 거푸집을 들어 올리는 승강 단계; 및Lifting step of providing the lifting force to the formwork to lift the formwork; And 상기 승강 단계가 진행되는 동안 상기 거푸집이 상기 승강력 및 상기 착탈 유닛의 연결바에 의해 원호 운동을 하면서 상기 착탈 유닛의 거푸집 고정 빔을 향해 후퇴되어 탈거되는 단계를 포함하여 이루어지는 수직구 구조물 시공 방법.And the formwork is retracted toward the formwork fixing beam of the detachable unit while the formwork is circularly moved by the lifting force and the connecting bar of the detachable unit while the lifting step is performed.
KR1020080058542A 2008-06-20 2008-06-20 Wall-construction forming apparatus and method of forming a wall-construntion in a vertical excavation using the same KR100892961B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080058542A KR100892961B1 (en) 2008-06-20 2008-06-20 Wall-construction forming apparatus and method of forming a wall-construntion in a vertical excavation using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080058542A KR100892961B1 (en) 2008-06-20 2008-06-20 Wall-construction forming apparatus and method of forming a wall-construntion in a vertical excavation using the same

Publications (1)

Publication Number Publication Date
KR100892961B1 true KR100892961B1 (en) 2009-04-10

Family

ID=40757649

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080058542A KR100892961B1 (en) 2008-06-20 2008-06-20 Wall-construction forming apparatus and method of forming a wall-construntion in a vertical excavation using the same

Country Status (1)

Country Link
KR (1) KR100892961B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358410A (en) * 2014-10-29 2015-02-18 中冶建工集团有限公司 Space positioning control method of reverse arc wall template
KR102256813B1 (en) * 2020-12-15 2021-05-28 경북대학교 산학협력단 Construction equipment for structures with curvature

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59126863A (en) 1983-01-06 1984-07-21 岡部株式会社 Moving inner mold frame apparatus for tunnel or culvert
JPS62149538U (en) 1986-03-13 1987-09-21
JPH0280762A (en) * 1989-07-28 1990-03-20 Okabe Co Ltd Arch culvert moving outside form device
JPH08144514A (en) * 1994-11-17 1996-06-04 Hory Corp Form device having scaffold having raising-lowering function, and construction method of concrete wall or the like by using form device having scaffold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59126863A (en) 1983-01-06 1984-07-21 岡部株式会社 Moving inner mold frame apparatus for tunnel or culvert
JPS62149538U (en) 1986-03-13 1987-09-21
JPH0280762A (en) * 1989-07-28 1990-03-20 Okabe Co Ltd Arch culvert moving outside form device
JPH08144514A (en) * 1994-11-17 1996-06-04 Hory Corp Form device having scaffold having raising-lowering function, and construction method of concrete wall or the like by using form device having scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358410A (en) * 2014-10-29 2015-02-18 中冶建工集团有限公司 Space positioning control method of reverse arc wall template
KR102256813B1 (en) * 2020-12-15 2021-05-28 경북대학교 산학협력단 Construction equipment for structures with curvature

Similar Documents

Publication Publication Date Title
JP5308116B2 (en) How to build a tunnel
JP2008208634A (en) Power transmission steel tower reinforcing method
KR100892961B1 (en) Wall-construction forming apparatus and method of forming a wall-construntion in a vertical excavation using the same
JP5232040B2 (en) Tunnel construction method and formwork vibrator
KR100463032B1 (en) Movable Steel Form for Constructing Culvert and Continuous Constructing Method of Culvert Using the Same
JP4661937B2 (en) Segment reinforcing method and segment reinforcing structure
CN104989422A (en) Tunnel half-prefabricated speeded-up middle-wall construction process
JP2009257070A (en) Liner plate and deep foundation construction method
JP2011052375A (en) Device for supporting rear of launched girder, and launching erection method
KR101721579B1 (en) Excavation Propulsion Apparatus of Underground Concrete Structure on Segement Construction Base
JP2010203127A (en) Construction method for steel tower foundation
KR102363061B1 (en) Reinforcing member of precast concrete segment connecting portion by the use of tbm method, segment comprising thereof and and manufacturing method for segment
JP5117369B2 (en) Underpass construction method
KR20090077371A (en) Side mold for tunnel lining form
JP2007321450A (en) Installation structure of lining pc slab and its pc slab
JP7444763B2 (en) Tunnel lining structure and tunnel construction method
JP2006240027A (en) Inner form of concrete
KR20180050201A (en) The underground wall structure and construction method thereof
JP2022021003A (en) PCa BOARD SUPPORT DEVICE AND TUNNEL LINING CONSTRUCTION METHOD
JP2005299265A (en) Installation method of underwater structure, and underwater structure
KR20120042413A (en) Basis structure of steel pole tower for mobile communication using precast concrete panel
JP3956044B2 (en) Tunnel lining method and lining equipment
JP2008157006A (en) Replacing construction method of support device of bridge girder and temporary receiving jack for inside of hole
JP2010174486A (en) Method for constructing side wall of underground tank structure
KR20090116140A (en) Foundation, construction method thereof, and connecting structure between foundation and pier, and construction method thereof

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120404

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee