KR100888926B1 - Anchorage establishment method for bridge maintenance and management - Google Patents
Anchorage establishment method for bridge maintenance and management Download PDFInfo
- Publication number
- KR100888926B1 KR100888926B1 KR1020080054622A KR20080054622A KR100888926B1 KR 100888926 B1 KR100888926 B1 KR 100888926B1 KR 1020080054622 A KR1020080054622 A KR 1020080054622A KR 20080054622 A KR20080054622 A KR 20080054622A KR 100888926 B1 KR100888926 B1 KR 100888926B1
- Authority
- KR
- South Korea
- Prior art keywords
- maintenance
- fixing unit
- slab
- bridge
- steel
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
Abstract
Description
본 발명은 교량 유지관리용 정착부 시공방법에 관한 것이다.The present invention relates to a method for constructing a fixing unit for bridge maintenance.
일반적으로 프리스트레스트 철근콘크리트 교량이나 철근콘크리트 교량에 있어, 공용 중 보수 및 보강을 위한 유지관리용 정착부는 주로 거더의 복부 측면에 돌출된 콘크리트 블록을 설치하여 그 콘크리트 블록 내에 설치하고 있다.In general, in prestressed reinforced concrete bridges or reinforced concrete bridges, maintenance fixing units for maintenance and reinforcement during common use are mainly installed in the concrete blocks by protruding concrete blocks protruding on the ventral side of the girder.
이와 같은 유지관리용 정착부는 교량의 유지관리를 위한 효율성은 좋으나, 교량미관을 약화시키는 측면이 있다.Such maintenance fixing unit has good efficiency for maintenance of the bridge, but has a side that weakens the bridge aesthetics.
또한, 상기 유지관리용 정착부는 추후 유지관리를 위한 PS강선 긴장시 별도의 비계구조물 설치나 크레인 등을 동원하여 거더 복부 측면에 설치된 유지관리용 정착부에 접근하여 PS강선을 삽입, 긴장하여야 하는 관계로 작업이 복잡할 뿐만 아니라 까다로운 문제점이 있다.In addition, the maintenance fusing unit should be inserted into the PS steel wire to tension the PS steel wire for future maintenance to approach the maintenance fixing unit installed on the side of the girder by mobilizing a separate scaffolding structure or a crane, etc. Not only is the work complicated, but there are also difficult problems.
이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로 서, 공용중 빔의 유지관리를 위한 유지관리용 정착부의 PS강선의 긴장작업을 교량 상부슬래브에서 별도의 추가장비 투입없이 유지관리용 정착부에서 PS강선 긴장만으로도 용이하게 긴장할 수 있도록 한 교량 유지관리용 정착부 시공방법을 제공하는데 그 목적이 있다.Thus, the present invention was devised to solve the problems as described above, maintaining the tension work of the PS steel wire of the maintenance fixing unit for the maintenance of the beam in common without maintaining additional additional equipment in the bridge upper slab The purpose of the present invention is to provide a method for constructing a bridge for maintenance of bridges, which makes it easy to tension the steel wire in the management fixing unit.
상기한 목적을 달성하기 위한 본 발명에 따른 교량 유지관리용 정착부 시공방법은 PSC 거더 상부플랜지 양단부 상면에 오목한 형상으로 유지관리용 정착부를 설치하는 단계(Ⅰ); 상기 유지관리용 정착부에 미리 제작된 유지관리용 정착부 충전블록을 삽입 설치하는 단계(Ⅱ); 상기 유지관리용 정착부와 유지관리용 정착부 충전블록과의 사이를 실링재로 도포하는 단계(Ⅲ); 슬래브 철근을 배근하고 콘크리트를 타설하여 슬래브를 형성하는 단계(Ⅳ); 상기 슬래브상에 아스콘을 포장하여 공용하는 단계(Ⅴ)로 이루어짐을 특징으로 한다.Bridge maintenance fixing unit construction method according to the present invention for achieving the above object comprises the steps of installing the maintenance fixing unit in a concave shape on the upper surface of both ends of the upper flange of the PSC girder (I); Inserting and installing the maintenance fixing unit charging block prepared in advance in the maintenance fixing unit (II); Applying a sealing material between the maintenance fixing unit and the maintenance fixing unit filling block (III); Reinforcing the slab reinforcing bars and pouring concrete to form a slab (IV); It is characterized by consisting of the step (V) to share the ascon on the slab.
이상에서 설명한 바와 같이, 본 발명에 따른 교량 유지관리용 정착부 시공방법은 다음과 같은 효과가 있다.As described above, the construction method for fixing the bridge maintenance according to the present invention has the following effects.
첫째, 본 발명은 유지관리용 정착부를 교량 상면에 설치함으로써, 추후 공용 중 유지관리시 별도의 가시설 설치나 중장비의 동원없이 교량 상면의 유지관리용 정착부에서 PS강선을 삽입 설치하여 긴장하므로 시공을 용이하게 할 수 있는 이점이 있다.First, the present invention by installing the maintenance fixing unit on the upper surface of the bridge, the installation of the PS steel wire in the maintenance fixing unit of the upper surface of the bridge without the installation of additional temporary facilities or mobilization of heavy equipment during the maintenance of the common use, so that the construction There is an advantage that can be facilitated.
둘째, 본 발명은 기존과 같이 교량의 측면에 별도의 정착블록을 설치하지 않 으므로 교량의 미관도 증대되는 이점이 있다.Second, since the present invention does not install a separate fixing block on the side of the bridge as conventional, there is an advantage that the aesthetics of the bridge is also increased.
셋째, 본 발명은 유지관리용 정착부 충전을 콘크리트블록으로 하므로 추후 유지관리시 현장타설 콘크리트 등으로 충전하였을 경우 충전부를 절삭기로 철거하여야 하는 시공과정을 생략할 수 있어 간단하게 유지보수를 할 수 있고, 유지관리용 정착부 충전블록을 손상없이 재사용이 가능하므로 저비용으로 유지보수를 수행할 수 있는 장점이 있다. Third, the present invention, because the filling of the maintenance fixing unit to the concrete block, when the maintenance in the future, when the filling of the cast concrete, such as the construction process to remove the filling unit with a cutting machine can be omitted simply to maintain In addition, there is an advantage that the maintenance can be performed at low cost because it can be reused without damage to the fixing unit charging block for maintenance.
이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.
도 1은 본 발명에 따른 교량 유지관리용 정착부를 도시한 예시도이며, 도 2는 도 1의 유지관리용 정착부에 PS강선를 긴장한 상태를 도시한 예시도이며, 도 3은 본 발명에 따른 교량 유지관용 정착부가 PSC 거더에 형성후 유지관리용 정착부 충전 철근콘크리트 블록이 설치되는 상태를 도시한 사시도이며, 도 4는 본 발명에 따른 교량 유지관리용 정착부의 유지관리용 정착부 충전블록을 도시한 사시도이며, 도 5는 본 발명에 따른 교량 유지관리용 정착부가 단순교 PSC거더에 설치된 상태를 도시한 예시도이며, 도 6은 본 발명에 따른 교량 유지관리용 정착부가 연속교 PSC거더에 설치된 상태를 도시한 예시도이며, 도 7은 본 발명에 따른 교량 유지관리용 정착부가 PSC 슬래브(라멘)교에 설치된 상태를 도시한 예시도이다.1 is an exemplary view showing a bridge maintenance fixing unit according to the present invention, Figure 2 is an exemplary view showing a tension state of the PS steel wire to the maintenance fixing unit of Figure 1, Figure 3 is a bridge according to the present invention Figure 4 is a perspective view showing a state in which a maintenance tube fixing reinforcement reinforced concrete block is installed after the holding tube fixing unit is formed on the PSC girder, Figure 4 is a view showing a fixing unit charging block for maintenance of the fixing unit for bridge maintenance according to the present invention 5 is an exemplary view illustrating a state in which the bridge maintenance fixing unit according to the present invention is installed in a simple bridge PSC girder, and FIG. 6 is a bridge maintenance fixing unit according to the present invention installed in a continuous bridge PSC girder. 7 is an exemplary view illustrating a state, and FIG. 7 is an exemplary view illustrating a state in which a bridge maintenance unit according to the present invention is installed in a PSC slab (ramen) bridge.
이들 도면에 도시된 바와 같이, 본 발명에 따른 교량 유지관리용 정착부 시공방법은 PSC 거더(10) 상부플랜지(12) 양단부 상면에 오목한 형상으로 유지관리용 정착부(14)를 설치하는 단계(Ⅰ); 상기 유지관리용 정착부(14)에 미리 제작된 유지 관리용 정착부 충전블록(16)을 삽입 설치하는 단계(Ⅱ); 상기 유지관리용 정착부(14)와 유지관리용 정착부 충전블록(16)과의 사이를 실링재(18)로 도포하는 단계(Ⅲ); 슬래브 철근을 배근하고 콘크리트를 타설하여 슬래브(20)를 형성하는 단계(Ⅳ); 상기 슬래브(20)상에 아스콘(22)을 포장하여 공용하는 단계(Ⅴ)로 이루어진다.As shown in these drawings, the bridge maintenance fixing unit construction method according to the present invention comprises the steps of installing the
또한, 상기 슬래브(20) 상에 아스콘(22)을 포장하여 공용중에 유지관리가 필요한 경우에는 유지관리용 정착부(14)의 상부에 포장되어 있는 슬래브(20)와 아스콘(22)을 절삭기로 절삭하고, 상기 유지관리용 정착부(14)로부터 유지관리용 정착부 충전블록(16)을 인출하는 단계(Ⅵ); 상기 유지관리용 정착부(14)에 기설치된 쉬스(36)와 콘크리트 성형 강재정착구(38)에 PS강선(24)과 강재정착구(26)를 삽입하고, PS강선(24)을 긴장하는 단계(Ⅶ); 상기 PS강선(24) 긴장 후 강재정착구헤드(28)를 정리하고, 쉬스(36)에 무수축 몰탈(30)로 그라우팅 충전하는 단계(Ⅷ); 상기 유지관리용 정착부(14)에 유지관리용 정착부 충전블록(16)을 재삽입하는 단계(Ⅸ); 절삭기로 절삭된 부분을 슬래브(20)와 아스콘(22)으로 되메우고, 재공용하는 단계(Ⅹ)를 추가한다.In addition, when the
그리고, 상기 유지관리용 정착부 충전블록(16)은 전체적으로 직육면체 구조체로 이루어지고, 상기 구조체의 상면에 인양용 강재고리(32)가 정착되고, 상기 구조체의 하면에 강재정착구헤드(28)가 접촉되는 부분에 오목부(34)가 형성된 구조이다. And, the maintenance fixing
즉, 본 발명에 따른 교량 유지관리용 정착부 시공방법은 교량에 유지관리용 정착부(14)를 설치하여 유지관리를 위한 PS강선(24)을 긴장함에 있어서, PSC 거더(10)의 상부플랜지(12) 양단부 상면에 오목한 형태로 유지관리용 정착부(14)를 형성하고, 그 유지관리용 정착부(14)에는 미리 제작된 유지관리용 정착부 충전블록(16)을 삽입 설치하여 유지관리용 정착부(14)를 메우고, 슬래브(20) 및 아스콘(22)을 형성한 후, 공용 중 유지관리시에는 포장된 슬래브(20)와 아스콘(22)을 절삭기로 절삭하여 제거하고, 상기 유지관리용 정착부(14)로부터 유지관리용 정착부 충전블록(16)을 인출한 후, 상기 유지관리용 정착부(14) 내에 기설치된 쉬스(36)와 콘크리트 성형 강재정착구 삽입부(38)에 PS강선(24)과 강재정착구(26)를 삽입 설치하여 PS강선(24)를 긴장한 후에 다시 인출된 유지관리용 정착부 충전블록(16)을 유지관리용 정착부(14)에 삽입하여 유지관리용 정착부(14)를 되메우는 것을 특징으로 한다.That is, according to the present invention, the method for constructing a bridge for maintenance of the bridge maintains the upper flange of the
따라서, 상기한 바와 같은 본 발명에 따른 교량 유지관리용 정착부 시공방법은 유지관리용 정착부(14)를 교량의 상면에 설치하므로 추후 공용 중 유지관리시 별도의 가시설 설치나 중장비의 동원없이 교량의 상면에서 PS강선(24)을 삽입 설치하여 긴장하므로 시공을 용이하게 할 수 있고, 별도의 측면 정착블록을 설치하지 않으므로 교량의 미관도 증대되고, 유지관리용 정착부 충전블록(16)을 재사용할 수 있으므로 저비용으로 유지보수를 수행할 수 있는 작용효과가 있다.Therefore, the method for constructing the bridge maintenance fixing unit according to the present invention as described above is to install the
도 1은 본 발명에 따른 교량 유지관리용 정착부를 도시한 예시도,1 is an exemplary view showing a fixing unit for bridge maintenance according to the present invention,
도 2는 도 1의 유지관리용 정착부에 PS강선를 긴장한 상태를 도시한 예시도,Figure 2 is an exemplary view showing a state in which the PS steel wire tensioned to the maintenance fixing unit of FIG.
도 3은 본 발명에 따른 교량 유지관용 정착부가 PSC 거더에 형성후 유지관리용 정착부 충전 철근콘크리트 블록이 설치되는 상태를 도시한 사시도,3 is a perspective view showing a state in which a bridge retaining tube fixing part according to the present invention is formed on the PSC girder and the maintenance-filled-filled reinforced concrete block is installed;
도 4는 본 발명에 따른 교량 유지관리용 정착부의 유지관리용 정착부 충전블록을 도시한 사시도,Figure 4 is a perspective view of the maintenance unit charging block for maintenance of the fixing unit for bridge maintenance according to the present invention,
도 5는 본 발명에 따른 교량 유지관리용 정착부가 단순교 PSC거더에 설치된 상태를 도시한 예시도,5 is an exemplary view showing a state in which a bridge maintenance unit fixing unit according to the present invention is installed in a simple bridge PSC girder,
도 6은 본 발명에 따른 교량 유지관리용 정착부가 연속교 PSC거더에 설치된 상태를 도시한 예시도,6 is an exemplary view showing a state in which a bridge maintenance unit fixing unit according to the present invention is installed in a continuous bridge PSC girder,
도 7은 본 발명에 따른 교량 유지관리용 정착부가 PSC 슬래브(라멘)교에 설치된 상태를 도시한 예시도.Figure 7 is an exemplary view showing a state in which the bridge maintenance fixing unit according to the present invention is installed on the PSC slab (ramen) bridge.
-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing
10: PSC 거더 12: 상부플랜지10: PSC girder 12: upper flange
14: 유지관리용 정착부 16: 유지관리용 정착부 충전블록14: Maintenance fusing unit 16: Maintenance fusing unit charging block
18: 실링재 20: 슬래브18: sealing material 20: slab
22: 아스콘 24: PS강선22: Ascon 24: PS steel wire
26: 강재정착구 28: 강재정착구헤드26: steel stopper 28: steel stopper head
30: 무수축몰탈 32: 강재고리30: no shrinkage mortar 32: steel ring
34: 오목부 36: 쉬스34: recess 36: sheath
38: 콘크리트 성형 강재정착구 삽입부38: concrete molded steel fitting insertion part
40: 하부플랜지 42: 2차 인장정착부40: lower flange 42: secondary tension fixing part
44: PSC 슬래브44: PSC slab
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080054622A KR100888926B1 (en) | 2008-06-11 | 2008-06-11 | Anchorage establishment method for bridge maintenance and management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080054622A KR100888926B1 (en) | 2008-06-11 | 2008-06-11 | Anchorage establishment method for bridge maintenance and management |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100888926B1 true KR100888926B1 (en) | 2009-03-16 |
Family
ID=40698297
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080054622A KR100888926B1 (en) | 2008-06-11 | 2008-06-11 | Anchorage establishment method for bridge maintenance and management |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100888926B1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101083601B1 (en) | 2009-10-20 | 2011-11-16 | 한국건설기술연구원 | Bridge construction method using arch hybrid girders manufactured by separated concrete filling in the girder |
KR101272047B1 (en) * | 2012-12-07 | 2013-06-25 | 주식회사 노빌테크 | Prestressed concrete girder for multiple prestress and multiple prestressing method of prestressed concrete girder |
KR101272046B1 (en) * | 2012-12-07 | 2013-06-25 | 주식회사 노빌테크 | Psc girder with cut off end |
KR101283535B1 (en) * | 2012-12-18 | 2013-07-15 | 오병환 | Fully-precast prestressed concrete girder bridges and construction method of such bridges |
CN107574746A (en) * | 2017-09-08 | 2018-01-12 | 天津城建大学 | Prefabricated bridge space concrete filled steel tube truss combination beamss attachment means and construction method |
KR102458322B1 (en) * | 2021-12-10 | 2022-10-24 | (주)브릿지팩토리 | Psc girder in which the strand distribution apparatus is applied to and psc girder bridge including the same |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07180110A (en) * | 1993-12-22 | 1995-07-18 | Oriental Constr Co Ltd | Prestress introduction and reinforcement method of structure having girder installed in parallel |
KR200302128Y1 (en) | 2002-10-10 | 2003-01-24 | 동국강재주식회사 | prestressed preflex steel composite beam possible to retensioning |
KR100374284B1 (en) | 1999-12-10 | 2003-03-28 | 김우종 | A psc beam having above typed anchor blocks and connecting method thereof |
KR200428022Y1 (en) | 2006-07-11 | 2006-10-04 | (주)한맥기술 | Prestressed Concrete Girder having Top-anchoring and Continuous Structure of the Girder |
-
2008
- 2008-06-11 KR KR1020080054622A patent/KR100888926B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07180110A (en) * | 1993-12-22 | 1995-07-18 | Oriental Constr Co Ltd | Prestress introduction and reinforcement method of structure having girder installed in parallel |
KR100374284B1 (en) | 1999-12-10 | 2003-03-28 | 김우종 | A psc beam having above typed anchor blocks and connecting method thereof |
KR200302128Y1 (en) | 2002-10-10 | 2003-01-24 | 동국강재주식회사 | prestressed preflex steel composite beam possible to retensioning |
KR200428022Y1 (en) | 2006-07-11 | 2006-10-04 | (주)한맥기술 | Prestressed Concrete Girder having Top-anchoring and Continuous Structure of the Girder |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101083601B1 (en) | 2009-10-20 | 2011-11-16 | 한국건설기술연구원 | Bridge construction method using arch hybrid girders manufactured by separated concrete filling in the girder |
KR101272047B1 (en) * | 2012-12-07 | 2013-06-25 | 주식회사 노빌테크 | Prestressed concrete girder for multiple prestress and multiple prestressing method of prestressed concrete girder |
KR101272046B1 (en) * | 2012-12-07 | 2013-06-25 | 주식회사 노빌테크 | Psc girder with cut off end |
KR101283535B1 (en) * | 2012-12-18 | 2013-07-15 | 오병환 | Fully-precast prestressed concrete girder bridges and construction method of such bridges |
CN107574746A (en) * | 2017-09-08 | 2018-01-12 | 天津城建大学 | Prefabricated bridge space concrete filled steel tube truss combination beamss attachment means and construction method |
KR102458322B1 (en) * | 2021-12-10 | 2022-10-24 | (주)브릿지팩토리 | Psc girder in which the strand distribution apparatus is applied to and psc girder bridge including the same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100888926B1 (en) | Anchorage establishment method for bridge maintenance and management | |
JP5266291B2 (en) | Construction method of bridge deck and joint structure of precast deck | |
CN103016029B (en) | Grouped second liner construction method for large cross-section tunnel | |
KR101207786B1 (en) | Precast concrete deck module | |
KR101395129B1 (en) | Precast panel and slab construction method using the same | |
CN106460797A (en) | Wind towers construction system | |
CN101962933A (en) | Splicable flange plate of bridge | |
JP2001003602A (en) | Replacing method of electric pole | |
KR101272047B1 (en) | Prestressed concrete girder for multiple prestress and multiple prestressing method of prestressed concrete girder | |
CN204780799U (en) | Prestressing force gate pier anchor block structure | |
CN209760310U (en) | Basement outer wall post-cast strip | |
CN209741665U (en) | Continuous structure of bridge floor shears | |
KR101389821B1 (en) | Prestressed concrete girder with means to add additional stress and method of production and maintenance thereof | |
AU2012101074A4 (en) | A component tunnel ceiling structure and method of installing the same | |
JP4403189B2 (en) | Precast concrete plate construction method and precast concrete plate and sliding plate used in the construction method | |
KR101208088B1 (en) | rifling beam for prestressing bridge and device for manufacturing thereof | |
CN115302623B (en) | Prestressed tensioning process for narrow space beam end and continuous box beam structure | |
CN210629019U (en) | Cable preset holding tank for high-rise building | |
JP5687162B2 (en) | Overhang head rail structure in concrete dam and overhang head rail construction method | |
KR102241713B1 (en) | Precast end block, concrete girder for rahmen with the same, bridge with the concrete girder for rahmen and construction method of the concrete girder for rahmen using the same | |
KR20120072446A (en) | Precast segment of the stress ribbon bridge and system/method constructing the stress ribbon bridge by it | |
CN212052151U (en) | Precast concrete pavement slab | |
KR100629905B1 (en) | Reinforcement method for existing bridges and bridges production it | |
Kustarto | BOX GIRDER BALANCE CANTILEVER CONSTRUCTION METHOD | |
KR20130094390A (en) | The device of fixing for dowel bar and dowel bar cap and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
N231 | Notification of change of applicant | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130305 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20140305 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20150304 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20160304 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20170307 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20180306 Year of fee payment: 10 |