KR100888926B1 - Anchorage establishment method for bridge maintenance and management - Google Patents

Anchorage establishment method for bridge maintenance and management Download PDF

Info

Publication number
KR100888926B1
KR100888926B1 KR1020080054622A KR20080054622A KR100888926B1 KR 100888926 B1 KR100888926 B1 KR 100888926B1 KR 1020080054622 A KR1020080054622 A KR 1020080054622A KR 20080054622 A KR20080054622 A KR 20080054622A KR 100888926 B1 KR100888926 B1 KR 100888926B1
Authority
KR
South Korea
Prior art keywords
maintenance
fixing unit
slab
bridge
steel
Prior art date
Application number
KR1020080054622A
Other languages
Korean (ko)
Inventor
노윤근
박근화
노경범
Original Assignee
노윤근
박근화
노경범
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 노윤근, 박근화, 노경범 filed Critical 노윤근
Priority to KR1020080054622A priority Critical patent/KR100888926B1/en
Application granted granted Critical
Publication of KR100888926B1 publication Critical patent/KR100888926B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Abstract

An anchorage construction method for maintaining the bridge is provided to improve the external beauty and to make the construction easy since the separate anchorage block is not necessary. An anchorage construction method for maintaining the bridge comprises following steps: a step for establishing a maintenance anchorage(14) to the recess shape in the PSC girder(10) upper flange(12) both end part upper side; a step for inserting and installing a filler block(16) in the maintenance anchorage; a step for coating to sealing material; a step for forming a slab to the concrete the slab reinforcement is set up; a step for packing an ascon in slab; a step that the maintenance draws out the filler block from the anchorage and inserted if necessary.

Description

교량 유지관리용 정착부 시공방법{Anchorage establishment method for bridge maintenance and management}Anchorage establishment method for bridge maintenance and management}

본 발명은 교량 유지관리용 정착부 시공방법에 관한 것이다.The present invention relates to a method for constructing a fixing unit for bridge maintenance.

일반적으로 프리스트레스트 철근콘크리트 교량이나 철근콘크리트 교량에 있어, 공용 중 보수 및 보강을 위한 유지관리용 정착부는 주로 거더의 복부 측면에 돌출된 콘크리트 블록을 설치하여 그 콘크리트 블록 내에 설치하고 있다.In general, in prestressed reinforced concrete bridges or reinforced concrete bridges, maintenance fixing units for maintenance and reinforcement during common use are mainly installed in the concrete blocks by protruding concrete blocks protruding on the ventral side of the girder.

이와 같은 유지관리용 정착부는 교량의 유지관리를 위한 효율성은 좋으나, 교량미관을 약화시키는 측면이 있다.Such maintenance fixing unit has good efficiency for maintenance of the bridge, but has a side that weakens the bridge aesthetics.

또한, 상기 유지관리용 정착부는 추후 유지관리를 위한 PS강선 긴장시 별도의 비계구조물 설치나 크레인 등을 동원하여 거더 복부 측면에 설치된 유지관리용 정착부에 접근하여 PS강선을 삽입, 긴장하여야 하는 관계로 작업이 복잡할 뿐만 아니라 까다로운 문제점이 있다.In addition, the maintenance fusing unit should be inserted into the PS steel wire to tension the PS steel wire for future maintenance to approach the maintenance fixing unit installed on the side of the girder by mobilizing a separate scaffolding structure or a crane, etc. Not only is the work complicated, but there are also difficult problems.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로 서, 공용중 빔의 유지관리를 위한 유지관리용 정착부의 PS강선의 긴장작업을 교량 상부슬래브에서 별도의 추가장비 투입없이 유지관리용 정착부에서 PS강선 긴장만으로도 용이하게 긴장할 수 있도록 한 교량 유지관리용 정착부 시공방법을 제공하는데 그 목적이 있다.Thus, the present invention was devised to solve the problems as described above, maintaining the tension work of the PS steel wire of the maintenance fixing unit for the maintenance of the beam in common without maintaining additional additional equipment in the bridge upper slab The purpose of the present invention is to provide a method for constructing a bridge for maintenance of bridges, which makes it easy to tension the steel wire in the management fixing unit.

상기한 목적을 달성하기 위한 본 발명에 따른 교량 유지관리용 정착부 시공방법은 PSC 거더 상부플랜지 양단부 상면에 오목한 형상으로 유지관리용 정착부를 설치하는 단계(Ⅰ); 상기 유지관리용 정착부에 미리 제작된 유지관리용 정착부 충전블록을 삽입 설치하는 단계(Ⅱ); 상기 유지관리용 정착부와 유지관리용 정착부 충전블록과의 사이를 실링재로 도포하는 단계(Ⅲ); 슬래브 철근을 배근하고 콘크리트를 타설하여 슬래브를 형성하는 단계(Ⅳ); 상기 슬래브상에 아스콘을 포장하여 공용하는 단계(Ⅴ)로 이루어짐을 특징으로 한다.Bridge maintenance fixing unit construction method according to the present invention for achieving the above object comprises the steps of installing the maintenance fixing unit in a concave shape on the upper surface of both ends of the upper flange of the PSC girder (I); Inserting and installing the maintenance fixing unit charging block prepared in advance in the maintenance fixing unit (II); Applying a sealing material between the maintenance fixing unit and the maintenance fixing unit filling block (III); Reinforcing the slab reinforcing bars and pouring concrete to form a slab (IV); It is characterized by consisting of the step (V) to share the ascon on the slab.

이상에서 설명한 바와 같이, 본 발명에 따른 교량 유지관리용 정착부 시공방법은 다음과 같은 효과가 있다.As described above, the construction method for fixing the bridge maintenance according to the present invention has the following effects.

첫째, 본 발명은 유지관리용 정착부를 교량 상면에 설치함으로써, 추후 공용 중 유지관리시 별도의 가시설 설치나 중장비의 동원없이 교량 상면의 유지관리용 정착부에서 PS강선을 삽입 설치하여 긴장하므로 시공을 용이하게 할 수 있는 이점이 있다.First, the present invention by installing the maintenance fixing unit on the upper surface of the bridge, the installation of the PS steel wire in the maintenance fixing unit of the upper surface of the bridge without the installation of additional temporary facilities or mobilization of heavy equipment during the maintenance of the common use, so that the construction There is an advantage that can be facilitated.

둘째, 본 발명은 기존과 같이 교량의 측면에 별도의 정착블록을 설치하지 않 으므로 교량의 미관도 증대되는 이점이 있다.Second, since the present invention does not install a separate fixing block on the side of the bridge as conventional, there is an advantage that the aesthetics of the bridge is also increased.

셋째, 본 발명은 유지관리용 정착부 충전을 콘크리트블록으로 하므로 추후 유지관리시 현장타설 콘크리트 등으로 충전하였을 경우 충전부를 절삭기로 철거하여야 하는 시공과정을 생략할 수 있어 간단하게 유지보수를 할 수 있고, 유지관리용 정착부 충전블록을 손상없이 재사용이 가능하므로 저비용으로 유지보수를 수행할 수 있는 장점이 있다. Third, the present invention, because the filling of the maintenance fixing unit to the concrete block, when the maintenance in the future, when the filling of the cast concrete, such as the construction process to remove the filling unit with a cutting machine can be omitted simply to maintain In addition, there is an advantage that the maintenance can be performed at low cost because it can be reused without damage to the fixing unit charging block for maintenance.

이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.

도 1은 본 발명에 따른 교량 유지관리용 정착부를 도시한 예시도이며, 도 2는 도 1의 유지관리용 정착부에 PS강선를 긴장한 상태를 도시한 예시도이며, 도 3은 본 발명에 따른 교량 유지관용 정착부가 PSC 거더에 형성후 유지관리용 정착부 충전 철근콘크리트 블록이 설치되는 상태를 도시한 사시도이며, 도 4는 본 발명에 따른 교량 유지관리용 정착부의 유지관리용 정착부 충전블록을 도시한 사시도이며, 도 5는 본 발명에 따른 교량 유지관리용 정착부가 단순교 PSC거더에 설치된 상태를 도시한 예시도이며, 도 6은 본 발명에 따른 교량 유지관리용 정착부가 연속교 PSC거더에 설치된 상태를 도시한 예시도이며, 도 7은 본 발명에 따른 교량 유지관리용 정착부가 PSC 슬래브(라멘)교에 설치된 상태를 도시한 예시도이다.1 is an exemplary view showing a bridge maintenance fixing unit according to the present invention, Figure 2 is an exemplary view showing a tension state of the PS steel wire to the maintenance fixing unit of Figure 1, Figure 3 is a bridge according to the present invention Figure 4 is a perspective view showing a state in which a maintenance tube fixing reinforcement reinforced concrete block is installed after the holding tube fixing unit is formed on the PSC girder, Figure 4 is a view showing a fixing unit charging block for maintenance of the fixing unit for bridge maintenance according to the present invention 5 is an exemplary view illustrating a state in which the bridge maintenance fixing unit according to the present invention is installed in a simple bridge PSC girder, and FIG. 6 is a bridge maintenance fixing unit according to the present invention installed in a continuous bridge PSC girder. 7 is an exemplary view illustrating a state, and FIG. 7 is an exemplary view illustrating a state in which a bridge maintenance unit according to the present invention is installed in a PSC slab (ramen) bridge.

이들 도면에 도시된 바와 같이, 본 발명에 따른 교량 유지관리용 정착부 시공방법은 PSC 거더(10) 상부플랜지(12) 양단부 상면에 오목한 형상으로 유지관리용 정착부(14)를 설치하는 단계(Ⅰ); 상기 유지관리용 정착부(14)에 미리 제작된 유지 관리용 정착부 충전블록(16)을 삽입 설치하는 단계(Ⅱ); 상기 유지관리용 정착부(14)와 유지관리용 정착부 충전블록(16)과의 사이를 실링재(18)로 도포하는 단계(Ⅲ); 슬래브 철근을 배근하고 콘크리트를 타설하여 슬래브(20)를 형성하는 단계(Ⅳ); 상기 슬래브(20)상에 아스콘(22)을 포장하여 공용하는 단계(Ⅴ)로 이루어진다.As shown in these drawings, the bridge maintenance fixing unit construction method according to the present invention comprises the steps of installing the maintenance fixing unit 14 in a concave shape on the upper surface of both ends of the upper flange 12 of the PSC girder 10 ( I); Inserting and installing the maintenance fixing unit charging block (16) prepared in advance into the maintenance fixing unit (14); Coating (III) between the maintenance fixing unit 14 and the maintenance fixing unit filling block 16 with a sealing material 18; Reinforcing the slab reinforcement and pouring concrete to form the slab 20 (IV); Packaging (A) is performed by wrapping the ascon 22 on the slab 20.

또한, 상기 슬래브(20) 상에 아스콘(22)을 포장하여 공용중에 유지관리가 필요한 경우에는 유지관리용 정착부(14)의 상부에 포장되어 있는 슬래브(20)와 아스콘(22)을 절삭기로 절삭하고, 상기 유지관리용 정착부(14)로부터 유지관리용 정착부 충전블록(16)을 인출하는 단계(Ⅵ); 상기 유지관리용 정착부(14)에 기설치된 쉬스(36)와 콘크리트 성형 강재정착구(38)에 PS강선(24)과 강재정착구(26)를 삽입하고, PS강선(24)을 긴장하는 단계(Ⅶ); 상기 PS강선(24) 긴장 후 강재정착구헤드(28)를 정리하고, 쉬스(36)에 무수축 몰탈(30)로 그라우팅 충전하는 단계(Ⅷ); 상기 유지관리용 정착부(14)에 유지관리용 정착부 충전블록(16)을 재삽입하는 단계(Ⅸ); 절삭기로 절삭된 부분을 슬래브(20)와 아스콘(22)으로 되메우고, 재공용하는 단계(Ⅹ)를 추가한다.In addition, when the ascon 22 is packaged on the slab 20 and the maintenance is required during common use, the slab 20 and the ascon 22 which are packaged on the upper part of the maintenance fixing unit 14 are cut into a cutting machine. Cutting and withdrawing the maintenance fixing unit charging block 16 from the maintenance fixing unit 14; Inserting the PS steel wire 24 and the steel fixing hole 26 into the sheath 36 and the concrete molded steel fixing hole 38 pre-installed in the maintenance fixing unit 14, and tensioning the PS steel wire 24 ( Iii); Arranging the steel fixture head 28 after tensioning the PS steel wire 24, and grouting filling the sheath 36 with non-shrink mortar 30; Reinserting the maintenance fixing unit charging block 16 into the maintenance fixing unit 14; The step cut back into the slab 20 and the asphalt concrete 22 by the cutter was added, and re-incorporation is added.

그리고, 상기 유지관리용 정착부 충전블록(16)은 전체적으로 직육면체 구조체로 이루어지고, 상기 구조체의 상면에 인양용 강재고리(32)가 정착되고, 상기 구조체의 하면에 강재정착구헤드(28)가 접촉되는 부분에 오목부(34)가 형성된 구조이다. And, the maintenance fixing unit filling block 16 is made of a rectangular parallelepiped structure as a whole, the lifting steel ring 32 is fixed to the upper surface of the structure, the steel fixture head 28 is in contact with the lower surface of the structure It is a structure in which the recessed part 34 was formed in the part to become.

즉, 본 발명에 따른 교량 유지관리용 정착부 시공방법은 교량에 유지관리용 정착부(14)를 설치하여 유지관리를 위한 PS강선(24)을 긴장함에 있어서, PSC 거더(10)의 상부플랜지(12) 양단부 상면에 오목한 형태로 유지관리용 정착부(14)를 형성하고, 그 유지관리용 정착부(14)에는 미리 제작된 유지관리용 정착부 충전블록(16)을 삽입 설치하여 유지관리용 정착부(14)를 메우고, 슬래브(20) 및 아스콘(22)을 형성한 후, 공용 중 유지관리시에는 포장된 슬래브(20)와 아스콘(22)을 절삭기로 절삭하여 제거하고, 상기 유지관리용 정착부(14)로부터 유지관리용 정착부 충전블록(16)을 인출한 후, 상기 유지관리용 정착부(14) 내에 기설치된 쉬스(36)와 콘크리트 성형 강재정착구 삽입부(38)에 PS강선(24)과 강재정착구(26)를 삽입 설치하여 PS강선(24)를 긴장한 후에 다시 인출된 유지관리용 정착부 충전블록(16)을 유지관리용 정착부(14)에 삽입하여 유지관리용 정착부(14)를 되메우는 것을 특징으로 한다.That is, according to the present invention, the method for constructing a bridge for maintenance of the bridge maintains the upper flange of the PSC girder 10 in the tension of the PS steel wire 24 for maintenance by installing the maintenance fixing unit 14 on the bridge. (12) The maintenance fixing unit 14 is formed in a concave shape on the upper surface of both ends, and the maintenance fixing unit 14 is inserted into the maintenance fixing unit charging block 16, which is manufactured in advance, for maintenance. After filling the fixing unit 14 and forming the slab 20 and the ascon 22, and during maintenance during the common use, the paved slab 20 and the ascon 22 are cut by a cutting machine and removed, After the maintenance fixing unit charging block 16 is withdrawn from the management fixing unit 14, the sheath 36 and the concrete molded steel fixing unit insert 38, which are already installed in the maintenance fixing unit 14, are removed. The PS steel wire 24 and the steel fixing hole 26 are inserted and installed to keep the PS steel wire 24 pulled out again. By inserting a fixing portion Lyon charge block 16 to maintain the fixing section (14) it is characterized in that the filling being maintained fixing section (14).

따라서, 상기한 바와 같은 본 발명에 따른 교량 유지관리용 정착부 시공방법은 유지관리용 정착부(14)를 교량의 상면에 설치하므로 추후 공용 중 유지관리시 별도의 가시설 설치나 중장비의 동원없이 교량의 상면에서 PS강선(24)을 삽입 설치하여 긴장하므로 시공을 용이하게 할 수 있고, 별도의 측면 정착블록을 설치하지 않으므로 교량의 미관도 증대되고, 유지관리용 정착부 충전블록(16)을 재사용할 수 있으므로 저비용으로 유지보수를 수행할 수 있는 작용효과가 있다.Therefore, the method for constructing the bridge maintenance fixing unit according to the present invention as described above is to install the maintenance fixing unit 14 on the upper surface of the bridge, so that the bridge without additional installation or mobilization of heavy equipment during maintenance in the future PS steel wire 24 is inserted into the upper surface of the tension to facilitate the construction, and because a separate side fixing block is not installed, the aesthetics of the bridge is increased, and the maintenance fixing unit charging block 16 is reused. As a result, maintenance can be performed at low cost.

도 1은 본 발명에 따른 교량 유지관리용 정착부를 도시한 예시도,1 is an exemplary view showing a fixing unit for bridge maintenance according to the present invention,

도 2는 도 1의 유지관리용 정착부에 PS강선를 긴장한 상태를 도시한 예시도,Figure 2 is an exemplary view showing a state in which the PS steel wire tensioned to the maintenance fixing unit of FIG.

도 3은 본 발명에 따른 교량 유지관용 정착부가 PSC 거더에 형성후 유지관리용 정착부 충전 철근콘크리트 블록이 설치되는 상태를 도시한 사시도,3 is a perspective view showing a state in which a bridge retaining tube fixing part according to the present invention is formed on the PSC girder and the maintenance-filled-filled reinforced concrete block is installed;

도 4는 본 발명에 따른 교량 유지관리용 정착부의 유지관리용 정착부 충전블록을 도시한 사시도,Figure 4 is a perspective view of the maintenance unit charging block for maintenance of the fixing unit for bridge maintenance according to the present invention,

도 5는 본 발명에 따른 교량 유지관리용 정착부가 단순교 PSC거더에 설치된 상태를 도시한 예시도,5 is an exemplary view showing a state in which a bridge maintenance unit fixing unit according to the present invention is installed in a simple bridge PSC girder,

도 6은 본 발명에 따른 교량 유지관리용 정착부가 연속교 PSC거더에 설치된 상태를 도시한 예시도,6 is an exemplary view showing a state in which a bridge maintenance unit fixing unit according to the present invention is installed in a continuous bridge PSC girder,

도 7은 본 발명에 따른 교량 유지관리용 정착부가 PSC 슬래브(라멘)교에 설치된 상태를 도시한 예시도.Figure 7 is an exemplary view showing a state in which the bridge maintenance fixing unit according to the present invention is installed on the PSC slab (ramen) bridge.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10: PSC 거더 12: 상부플랜지10: PSC girder 12: upper flange

14: 유지관리용 정착부 16: 유지관리용 정착부 충전블록14: Maintenance fusing unit 16: Maintenance fusing unit charging block

18: 실링재 20: 슬래브18: sealing material 20: slab

22: 아스콘 24: PS강선22: Ascon 24: PS steel wire

26: 강재정착구 28: 강재정착구헤드26: steel stopper 28: steel stopper head

30: 무수축몰탈 32: 강재고리30: no shrinkage mortar 32: steel ring

34: 오목부 36: 쉬스34: recess 36: sheath

38: 콘크리트 성형 강재정착구 삽입부38: concrete molded steel fitting insertion part

40: 하부플랜지 42: 2차 인장정착부40: lower flange 42: secondary tension fixing part

44: PSC 슬래브44: PSC slab

Claims (5)

PSC 거더(10) 상부플랜지(12) 양단부 상면에 오목한 형상으로 유지관리용 정착부(14)를 설치하는 단계(Ⅰ);Installing (I) a maintenance fixing unit 14 in a concave shape on both upper ends of the upper flange 12 of the PSC girder 10; 상기 유지관리용 정착부(14)에 미리 제작된 유지관리용 정착부 충전블록(16)을 삽입 설치하는 단계(Ⅱ); Inserting and installing the maintenance fixing unit charging block (16) prepared in advance into the maintenance fixing unit (14); 상기 유지관리용 정착부(14)와 유지관리용 정착부 충전블록(16)과의 사이를 실링재(18)로 도포하는 단계(Ⅲ);Coating (III) between the maintenance fixing unit (14) and the maintenance fixing unit filling block (16) with a sealing material (18); 슬래브 철근을 배근하고 콘크리트를 타설하여 슬래브(20)를 형성하는 단계(Ⅳ);Reinforcing the slab reinforcement and pouring concrete to form the slab 20 (IV); 상기 슬래브(20)상에 아스콘(22)을 포장하여 공용하는 단계(Ⅴ)로 이루어짐을 특징으로 하는 교량 유지관리용 정착부 시공방법.Method of constructing the anchorage maintenance for bridge maintenance characterized in that it consists of the step (V) to share the ascon (22) on the slab (20). 제 1항에 있어서,The method of claim 1, 상기 슬래브(20) 상에 아스콘(22)을 포장하여 공용하는 단계(Ⅴ)에서 유지관리가 필요한 경우 유지관리용 정착부(14)의 상부에 포장된 슬래브(20)와 아스콘(22)을 절삭기로 절삭하고, 상기 유지관리용 정착부(14)로부터 유지관리용 정착부 충전블록(16)을 인출하는 단계(Ⅵ); In the step (V) of packaging the ascon 22 on the slab 20, when the maintenance is required, the slab 20 and the ascon 22 packed on the upper part of the maintenance fixing unit 14 are cut. Cutting with a drawer and extracting the maintenance fixing unit charging block 16 from the maintenance fixing unit 14; 상기 유지관리용 정착부(14)에 기설치된 쉬스(36)와 콘크리트 성형 강재정착구 삽입부(38)에 PS강선(24)과 강재정착구(26)를 삽입하고, 상기 PS강선(24)을 긴장하는 단계(Ⅶ);The PS steel wire 24 and the steel fixing hole 26 are inserted into the sheath 36 and the concrete molded steel fixing hole inserting portion 38 provided in the maintenance fixing unit 14, and the PS steel wire 24 is tensioned. (Iii) performing; 상기 PS강선(24) 긴장 후 강재정착구헤드(28)를 정리하고, 쉬스(36)에 무수축 몰탈(30)로 그라우팅 충전하는 단계(Ⅷ); Arranging the steel fixture head 28 after tensioning the PS steel wire 24, and grouting filling the sheath 36 with non-shrink mortar 30; 상기 유지관리용 정착부(14)에 유지관리용 정착부 충전블록(16)을 재삽입하는 단계(Ⅸ);Reinserting the maintenance fixing unit charging block 16 into the maintenance fixing unit 14; 절삭기 절삭된 부분을 슬래브(20)와 아스콘(22)으로 되메우고, 재공용하는 단계(Ⅹ)를 추가함을 특징으로 하는 교량 유지관리용 정착부 시공방법.Cutting machine A method for constructing a bridge for maintenance of bridges, characterized in that the step of filling up the slab (20) and the asphalt concrete (22) and re-sharing. 제 2항에 있어서,The method of claim 2, 상기 유지관리용 정착부 충전블록(16)은 전체적으로 직육면체 구조체로 이루어지고, 상기 구조체의 상면에 인양용 강재고리(32)가 정착되고, 상기 구조체의 하면에 강재정착구헤드(28)가 접촉되는 부분에 오목부(34)가 형성됨을 특징으로 하는 교량 유지관리용 정착부 시공방법.The maintenance fixing unit filling block 16 is composed of a rectangular parallelepiped structure as a whole, and the lifting steel ring 32 is fixed to the upper surface of the structure, and the steel fixing fixture head 28 is in contact with the lower surface of the structure. A method for constructing a fixing part for bridge maintenance, characterized in that the concave portion 34 is formed in the recess. 삭제delete 삭제delete
KR1020080054622A 2008-06-11 2008-06-11 Anchorage establishment method for bridge maintenance and management KR100888926B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080054622A KR100888926B1 (en) 2008-06-11 2008-06-11 Anchorage establishment method for bridge maintenance and management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080054622A KR100888926B1 (en) 2008-06-11 2008-06-11 Anchorage establishment method for bridge maintenance and management

Publications (1)

Publication Number Publication Date
KR100888926B1 true KR100888926B1 (en) 2009-03-16

Family

ID=40698297

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080054622A KR100888926B1 (en) 2008-06-11 2008-06-11 Anchorage establishment method for bridge maintenance and management

Country Status (1)

Country Link
KR (1) KR100888926B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101083601B1 (en) 2009-10-20 2011-11-16 한국건설기술연구원 Bridge construction method using arch hybrid girders manufactured by separated concrete filling in the girder
KR101272047B1 (en) * 2012-12-07 2013-06-25 주식회사 노빌테크 Prestressed concrete girder for multiple prestress and multiple prestressing method of prestressed concrete girder
KR101272046B1 (en) * 2012-12-07 2013-06-25 주식회사 노빌테크 Psc girder with cut off end
KR101283535B1 (en) * 2012-12-18 2013-07-15 오병환 Fully-precast prestressed concrete girder bridges and construction method of such bridges
CN107574746A (en) * 2017-09-08 2018-01-12 天津城建大学 Prefabricated bridge space concrete filled steel tube truss combination beamss attachment means and construction method
KR102458322B1 (en) * 2021-12-10 2022-10-24 (주)브릿지팩토리 Psc girder in which the strand distribution apparatus is applied to and psc girder bridge including the same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07180110A (en) * 1993-12-22 1995-07-18 Oriental Constr Co Ltd Prestress introduction and reinforcement method of structure having girder installed in parallel
KR200302128Y1 (en) 2002-10-10 2003-01-24 동국강재주식회사 prestressed preflex steel composite beam possible to retensioning
KR100374284B1 (en) 1999-12-10 2003-03-28 김우종 A psc beam having above typed anchor blocks and connecting method thereof
KR200428022Y1 (en) 2006-07-11 2006-10-04 (주)한맥기술 Prestressed Concrete Girder having Top-anchoring and Continuous Structure of the Girder

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07180110A (en) * 1993-12-22 1995-07-18 Oriental Constr Co Ltd Prestress introduction and reinforcement method of structure having girder installed in parallel
KR100374284B1 (en) 1999-12-10 2003-03-28 김우종 A psc beam having above typed anchor blocks and connecting method thereof
KR200302128Y1 (en) 2002-10-10 2003-01-24 동국강재주식회사 prestressed preflex steel composite beam possible to retensioning
KR200428022Y1 (en) 2006-07-11 2006-10-04 (주)한맥기술 Prestressed Concrete Girder having Top-anchoring and Continuous Structure of the Girder

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101083601B1 (en) 2009-10-20 2011-11-16 한국건설기술연구원 Bridge construction method using arch hybrid girders manufactured by separated concrete filling in the girder
KR101272047B1 (en) * 2012-12-07 2013-06-25 주식회사 노빌테크 Prestressed concrete girder for multiple prestress and multiple prestressing method of prestressed concrete girder
KR101272046B1 (en) * 2012-12-07 2013-06-25 주식회사 노빌테크 Psc girder with cut off end
KR101283535B1 (en) * 2012-12-18 2013-07-15 오병환 Fully-precast prestressed concrete girder bridges and construction method of such bridges
CN107574746A (en) * 2017-09-08 2018-01-12 天津城建大学 Prefabricated bridge space concrete filled steel tube truss combination beamss attachment means and construction method
KR102458322B1 (en) * 2021-12-10 2022-10-24 (주)브릿지팩토리 Psc girder in which the strand distribution apparatus is applied to and psc girder bridge including the same

Similar Documents

Publication Publication Date Title
KR100888926B1 (en) Anchorage establishment method for bridge maintenance and management
JP5266291B2 (en) Construction method of bridge deck and joint structure of precast deck
CN103016029B (en) Grouped second liner construction method for large cross-section tunnel
KR101207786B1 (en) Precast concrete deck module
KR101395129B1 (en) Precast panel and slab construction method using the same
CN106460797A (en) Wind towers construction system
CN101962933A (en) Splicable flange plate of bridge
JP2001003602A (en) Replacing method of electric pole
KR101272047B1 (en) Prestressed concrete girder for multiple prestress and multiple prestressing method of prestressed concrete girder
CN204780799U (en) Prestressing force gate pier anchor block structure
CN209760310U (en) Basement outer wall post-cast strip
CN209741665U (en) Continuous structure of bridge floor shears
KR101389821B1 (en) Prestressed concrete girder with means to add additional stress and method of production and maintenance thereof
AU2012101074A4 (en) A component tunnel ceiling structure and method of installing the same
JP4403189B2 (en) Precast concrete plate construction method and precast concrete plate and sliding plate used in the construction method
KR101208088B1 (en) rifling beam for prestressing bridge and device for manufacturing thereof
CN115302623B (en) Prestressed tensioning process for narrow space beam end and continuous box beam structure
CN210629019U (en) Cable preset holding tank for high-rise building
JP5687162B2 (en) Overhang head rail structure in concrete dam and overhang head rail construction method
KR102241713B1 (en) Precast end block, concrete girder for rahmen with the same, bridge with the concrete girder for rahmen and construction method of the concrete girder for rahmen using the same
KR20120072446A (en) Precast segment of the stress ribbon bridge and system/method constructing the stress ribbon bridge by it
CN212052151U (en) Precast concrete pavement slab
KR100629905B1 (en) Reinforcement method for existing bridges and bridges production it
Kustarto BOX GIRDER BALANCE CANTILEVER CONSTRUCTION METHOD
KR20130094390A (en) The device of fixing for dowel bar and dowel bar cap and construction method

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130305

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20140305

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20150304

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20160304

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20170307

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20180306

Year of fee payment: 10