KR100871975B1 - pre-painting, before assembling cell guide and improvement of installing scaffold - Google Patents
pre-painting, before assembling cell guide and improvement of installing scaffold Download PDFInfo
- Publication number
- KR100871975B1 KR100871975B1 KR1020040037108A KR20040037108A KR100871975B1 KR 100871975 B1 KR100871975 B1 KR 100871975B1 KR 1020040037108 A KR1020040037108 A KR 1020040037108A KR 20040037108 A KR20040037108 A KR 20040037108A KR 100871975 B1 KR100871975 B1 KR 100871975B1
- Authority
- KR
- South Korea
- Prior art keywords
- cell guide
- painting
- block
- partition wall
- installing
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B41—PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
- B41J—TYPEWRITERS; SELECTIVE PRINTING MECHANISMS, i.e. MECHANISMS PRINTING OTHERWISE THAN FROM A FORME; CORRECTION OF TYPOGRAPHICAL ERRORS
- B41J29/00—Details of, or accessories for, typewriters or selective printing mechanisms not otherwise provided for
- B41J29/46—Applications of alarms, e.g. responsive to approach of end of line
- B41J29/48—Applications of alarms, e.g. responsive to approach of end of line responsive to breakage or exhaustion of paper or approach of bottom of paper
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B41—PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
- B41J—TYPEWRITERS; SELECTIVE PRINTING MECHANISMS, i.e. MECHANISMS PRINTING OTHERWISE THAN FROM A FORME; CORRECTION OF TYPOGRAPHICAL ERRORS
- B41J11/00—Devices or arrangements of selective printing mechanisms, e.g. ink-jet printers or thermal printers, for supporting or handling copy material in sheet or web form
- B41J11/0095—Detecting means for copy material, e.g. for detecting or sensing presence of copy material or its leading or trailing end
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B41—PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
- B41J—TYPEWRITERS; SELECTIVE PRINTING MECHANISMS, i.e. MECHANISMS PRINTING OTHERWISE THAN FROM A FORME; CORRECTION OF TYPOGRAPHICAL ERRORS
- B41J15/00—Devices or arrangements of selective printing mechanisms, e.g. ink-jet printers or thermal printers, specially adapted for supporting or handling copy material in continuous form, e.g. webs
- B41J15/04—Supporting, feeding, or guiding devices; Mountings for web rolls or spindles
Landscapes
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
본 발명은 컨테이너선의 셀가이드 조립전 도장 및 발판 설치 방법이며, 그 목적은 셀가이드와 T블록을 조립하여 T격벽을 형성하기 전에 상기 셀가이드를 먼저 도장한 후 T블록에 조립하여 T격벽을 형성함으로써, 우기철에 도장공기가 지연되지 않고, 미리 도장된 셀가이드에 의해 도장 개소가 줄어들어 작업이 용이하며 작업자가 이동하는 발판의 설치와 해체작업이 용이한 컨테이너선의 셀가이드 조립전 도장 및 발판 설치 방법을 제공함에 있다.The present invention is a method of painting and scaffolding before the cell guide assembly of the container ship, the purpose is to assemble the T-block by assembling the cell guide first before assembling the cell guide and the T block to form the T partition wall. Thus, the painting air is not delayed in the rainy season, and the coating point is reduced by the pre-coated cell guide, which facilitates the work, and the installation and disassembly of the container ship, which is easy to install and dismantle, by the operator. In providing.
상기 목적달성을 위한 본 발명은 컨테이너선의 셀가이드(10)와 T블록(20)을 조립한 후 도장하는 방법에 있어서, 상기 셀가이드(10)를 제작한 후 선 도장하는 제1단계와, 다수개의 T블록(20)을 수직으로 위치시키고 상기 T블록의 상하에 T블록(20)과 교차되도록 셀가이드(10)를 조립하여 T격벽(40)을 형성하는 제2단계와, 상기 T격벽(40)의 도장작업을 위해 T블록(20)의 사이에 다수의 지지대를 수평하게 설치한 후 상기 지지대의 상부에 발판을 1단으로 설치하는 제3단계와, 상기 발판(30)상에서 T격벽(40)을 블라스팅 하고 도장작업을 실시하는 제4단계와, 상기 T격벽(40)의 도장작업 후 발판(30)을 해체하고 발판(30)이 설치된 부분에 마무리 도장을 하는 제5단계로 이루어진 것을 그 기술적 요지로 한다.The present invention for achieving the above object is a method of painting after assembling the cell guide 10 and the T block 20 of the container ship, the first step of manufacturing the cell guide 10 and then pre-painted, Positioning two T blocks 20 vertically and assembling the cell guide 10 so as to intersect the T blocks 20 above and below the T blocks to form a T partition wall 40, and the T partition wall ( The third step of installing a plurality of supports horizontally between the T blocks 20 for the painting operation of the 40 block, and then installing the first step in the upper stage of the support, and the T partition wall (on the step 30) And a fourth step of blasting 40 and carrying out a painting operation, and a fifth step of dismantling the scaffold 30 after the painting operation of the T partition wall 40 and finishing coating on a portion where the scaffold 30 is installed. It is to the technical point.
셀가이드, T격벽, T블록, 발판, 도장 Cell Guide, T Bulkhead, T Block, Scaffolding, Painting
Description
도 1 은 본 발명에 따른 T격벽의 예시도,1 is an exemplary view of a T bulkhead according to the present invention;
도 2 는 본 발명에 따른 T격벽의 측면도,2 is a side view of the T bulkhead according to the present invention;
도 3 은 본 발명에 따른 T격벽의 평면도,3 is a plan view of the T bulkhead according to the present invention;
도 4 는 본 발명에 따른 셀가이드 T격벽의 결합부분을 나타낸 예시도,4 is an exemplary view showing a coupling portion of the cell guide T partition wall according to the present invention;
도 5 는 본 발명에 따른 T격벽 조립공정도,5 is a T bulkhead assembly process according to the invention,
도 6 은 본 발명에 따른 완성된 T격벽를 선박에 설치하는 과정을 나타낸 예시도,6 is an exemplary view showing a process of installing a completed T bulkhead in a ship according to the present invention;
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
(10) : 셀가이드 (11) : L형강(10): Cell guide (11): L section steel
(20) : T블록 (21) : 지지구(20): T block (21): support
(30) : 발판 (40) : T격벽30: footrest 40: T bulkhead
(50) : 지지대 (60) : 컨테이너선
50: support 60: container ship
본 발명은 컨테이너선의 셀가이드 조립전 도장 및 발판 설치 방법에 관한 것으로, 보다 상세하게는 컨테이너선에 컨테이너를 적재할 경우 상기 컨테이너를 가이드 해주는 셀가이드와 T블록을 조립하여 T격벽을 형성함에 있어, 소지 및 도장작업이 까다로운 셀가이드를 미리 소지하고 도장한 후 T블록에 조림함으로써, T격벽의 조립 및 도장이 용이해지고, 또한 상기 셀가이드의 소지 및 도장을 위해 별도의 발판을 설치할 필요 없이 1단의 발판만을 설치하여 T격벽과, 셀가이드의 조립, 소지, 도장작업을 할 수 있게 되어 작업효율이 높아지고 발판의 설치와 해체가 간편해진 컨테이너선의 셀가이드 조립전 도장 및 발판 설치 방법에 관한 것이다.The present invention relates to a method for installing the coating and scaffolding before assembly of the cell guide of the container ship, and more particularly, in the case of loading the container in the container ship, assembling the cell guide and the T block for guiding the container to form a T partition wall, By holding and painting the cell guide, which is difficult to carry and paint, and fastening it to the T block, the T partition can be easily assembled and painted, and there is no need to install a separate step for carrying and painting the cell guide. By installing only the scaffolding of the T bulkhead, the cell guide can be assembled, possessed, and painting work, the work efficiency is increased, and the installation and disassembly of the container guide to the container guide before painting and mounting of the disassembly of the container ship is easy.
통상 컨테이너 운반선에는 컨테이너가 적재되는 카고홀드(Cargo Hold)가 설치되어 있으며, 이 카고홀드의 T격벽에 배의 수직방향으로 컨테이너의 승하강시 정확한 위치로 적재시키기 위하여 컨테이너의 모서리를 가이드 하는 셀가이드(Cell Guide)가 설치되어 있다.In general, a container hold ship is provided with a cargo hold (cargo hold) for loading the container, the cell guide for guiding the edge of the container in order to load the container in the vertical position of the container in the vertical direction of the ship to the T bulkhead of the cargo hold ( Cell Guide) is installed.
상기 T격벽의 조립은 수직으로 세워지고 일정간격으로 배열된 T블록의 상하에 T블록과 교차되도록 셀가이드를 조립함으로써 형성된다.The assembly of the T partition wall is formed by assembling the cell guides so as to intersect the T blocks above and below the T blocks vertically arranged and arranged at regular intervals.
이렇게 형성된 T격벽을 소지(blasting)하고 도장작업을 한 후 카고홀드내에 수직으로 세워 설치하였으나, 상기 셀가이드 부분의 소지 및 도장작업이 난해하여 공정지연의 원인이 되었다.The T bulkhead thus formed was blasted and painted, and then vertically installed in the cargo hold. However, the possession and painting of the cell guide part were difficult, causing process delay.
또한 우기철에는 상기 T격벽의 셀가이드 표면에 심한 녹이 발생하기 때문에 T격벽을 도장하기 위해서는 셀가이드의 틈새 사이를 소지하고 도장하는 작업이 어려워 선주검사시 지적사항이 발생되는 문제점이 있다. In addition, in the rainy season, since severe rust occurs on the surface of the cell guide of the T bulkhead, it is difficult to carry and paint between the gaps of the cell guide in order to paint the T bulkhead.
또한 상기 T격벽의 하부 셀가이드를 도장할 경우 작업자가 위쪽을 보는 자세세로 도장작업을 함으로 무리한 동작이 유발되어 산업재해가 발생되는 문제점이 있다.In addition, when painting the lower cell guide of the T-barrier, there is a problem in that an industrial accident occurs due to unreasonable operation by the operator in the posture of looking upwards.
또한 T격벽의 도장시 셀가이드와 T블록의 2개소를 블라스팅하고 도장해야 하므로 발판을 2단으로 설치하여 T블록과, 셀가이드를 각각 도장함으로써 발판의 설치와 해체에 따른 작업시간이 늘어나 전체적인 공정기간이 지연되는 문제점이 있다.
In addition, when painting T bulkhead, two parts of cell guide and T block should be blasted and painted, so that the work time is increased by installing and dismantling the step by installing two steps of scaffold and painting T block and cell guide respectively. There is a problem that the period is delayed.
본 발명은 상기와 같은 종래의 문제점을 해결하기 위하여 창출되는 것으로, 셀가이드와 T블록을 조립하기 전에 상기 셀가이드를 먼저 도장한 후 T블록에 조립함으로써 우기철에 도장공기가 지연되지 않고, 미리 도장된 셀가이드에 의해 1단으리 발판을 설치하여 T블록을 도장해줌으로써 도장 개소가 줄어들어 작업이 용이하며, 작업자가 이동하는 발판의 설치와 해체작업이 용이한 컨테이너선의 셀가이드 조립전 도장 및 발판 설치 방법을 제공함을 목적으로 한다.
The present invention is created in order to solve the conventional problems as described above, before assembling the cell guide and the T block by painting the cell guide first and then assembling on the T block, the painting air is not delayed in the rainy season, the coating in advance It is easy to work because the painting place is reduced by installing T-stage by installing one step with the cell guide, and it is easy to install and dismantle the container guide by the operator. The purpose is to provide a method.
상기 목적을 달성하기 위한 본 발명은 컨테이너선의 셀가이드와 T블록을 조립한 후 도장하는 방법에 있어서, 상기 셀가이드를 제작한 후 선 도장하는 제1단계와, 다수개의 T블록을 수직으로 위치시키고 상기 T블록의 상하에 T블록과 교차되도록 셀가이드를 조립하여 T격벽을 형성하는 제2단계와, 상기 T격벽의 도장작업을 위해 T블록의 사이에 다수의 지지대를 수평하게 설치한 후 상기 지지대의 상부에 발판을 1단으로 설치하는 제3단계와, 상기 발판상에서 T격벽을 블라스팅 하고 도장작업을 실시하는 제4단계와, 상기 T격벽의 도장작업 후 발판을 해체하고 발판이 설치된 부분에 마무리 도장을 하는 제5단계로 이루어진 것을 특징으로 한다.In order to achieve the above object, the present invention provides a method of assembling and painting a cell guide and a T block of a container ship, the first step of pre-painting the cell guide after manufacturing, and placing a plurality of T blocks vertically A second step of forming a T partition wall by assembling a cell guide to intersect the T block above and below the T block, and installing a plurality of supports horizontally between the T blocks for painting the T partition wall; The third step of installing the first step of the scaffold in the first step, the fourth step of blasting the T bulkhead on the scaffolding and performing the painting work, after dismantling the scaffolding after the painting of the T bulkhead and finishing the part where the scaffold is installed It is characterized by consisting of a fifth step of painting.
이하, 본 발명에 대하여 첨부도면과 연계하여 그 구성 및 작용을 상세히 설명한다.Hereinafter, the configuration and operation of the present invention in connection with the accompanying drawings will be described in detail.
도 1 은 본 발명에 따른 T격벽의 예시도이고, 도 2 는 본 발명에 따른 T격벽의 측면도이며, 도 3 은 본 발명에 따른 T격벽의 평면도이고, 도 4 는 본 발명에 따른 셀가이드 T격벽의 결합부분을 나타낸 예시도로서, 컨테이너선의 셀가이드(10)는 일정간격으로 수직하게 놓여진 다수의 T블록(20) 상하부에 T블록(20)과 교차되도록 조립되어 컨테이너선에 설치된다.1 is an exemplary view of the T partition wall according to the present invention, FIG. 2 is a side view of the T partition wall according to the present invention, FIG. 3 is a plan view of the T partition wall according to the present invention, and FIG. 4 is a cell guide T according to the present invention. As an exemplary view showing the coupling portion of the partition wall, the
이와 같은 셀가이드(10)는 일반적으로 L형강(11)이 사용되고 있으며 도 4 에서와 같이 L형강(11)은 소정의 거리를 유지한 상태로 T블록(20)에 형성되어 있는 지지구(21)에 서로 대칭되도록 설치한다. 이때 서로 대칭된 L형강(11)은 소정의 틈 을 유지한 상태로 지지구(21)에 설치되기 때문에, 상기 틈내의 소지작업과 도장작업이 매우 까다로워, 셀가이드(10)를 T블록(20)에 조립하기 전에 미리 셀가이드(10)의 외부를 소지 및 도장한 후 상기 T블록(20)의 상하부에 일정간격으로 조립하여 T격벽(40)을 형성한다.As the
한편 상기 수직하게 놓여진 T블록(20)에는 수평방향으로 다수의 관통구(도시없음)가 형성되어 있어 상기 관통구에 끼워지도록 다수의 지지대(50)를 일정간격으로 설치하고, 상기 지지대(50)의 상부에 받쳐지도록 발판(30)을 설치한다. 이와 같이 발판(30)은 지지대(50)에 양단이 받쳐지도록 설치됨으로써 지지대(50)의 상부에서 균형을 유지할 수 있고 작업자는 발판(30) 상에서 이동하면서 T블록(20)을 소지하고, 도장하게 된다.On the other hand, the vertically placed
이와 같이 작업자는 T블록(20)에 조립되는 셀가이드(10)가 미리 도장되어 있기 때문에 T격벽(40)의 T블록(20)만을 블라스팅하고 도장함에 따라 도장개소가 줄어들어 종래와 같이 셀가이드(10)의 도장을 위해 셀가이드(10) 상에 발판을 설치할 필요 없이 T블록(20) 내측으로만 발판(30)을 설치하여 사용함으로써 발판(30)의 설치 및 제거가 용이하다.In this way, since the operator is prepainted with the
도 6 은 본 발명에 따른 완성된 T격벽를 선박에 설치하는 과정을 나타낸 예시도로서, 완성된 T격벽(40)을 컨테이너선(60)의 내부에 수직으로 세워 용접 설치한다.
6 is an exemplary view showing a process of installing a completed T bulkhead in a ship according to the present invention, the completed
한편 본 발명의 셀가이드(10)와, T블록(20)의 조립공정을 도 5 와 같이 설명하면 다음과 같다.Meanwhile, the assembling process of the
먼저 컨테이너선에 설치되는 셀가이드(10)와 T블록(20)을 제작하고, 상기 제 작된 셀가이드(10)와 T블록(20)을 조립하기 전에 셀가이드(10)를 선 도장하며, 이렇게 도장된 셀가이드(10)를 일정간격으로 수직하게 위치되어 있는 T블록(20)의 상하부에 조립하여 T격벽(40)을 형성한 후 상기 T격벽(40)의 도장작업을 위해 T블록(20)에 형성된 관통구에 수평방향으로 지지대(50)를 설치하고, 상기 지지대(50)의 상부에 발판(30)을 설치한다.First, the
작업자는 이렇게 설치된 발판(30)상에서 이동하면서 T격벽(40)의 T블록(20)을 블라스팅 한 후 도장작업을 하며, 상기 T격벽(40)의 도장작업이 완료되면 발판(30)과 지지대(50)를 해체하고, 상기 발판(30)이 설치된 부분에 도장을 하여 T격벽(40) 전체를 도장하는 것으로 완성되며, 이렇게 도장된 T격벽(40)을 컨테이선(60)의 내부에 수직으로 세워 용접하여 설치한다.
The worker moves on the
본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.
The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.
상기와 같은 구성 및 작용에 의해 기대할 수 있는 본 발명의 효과는, 셀가이드와 T블록을 조립하기 전에 셀가이드를 선 도장 후 조립함으로써, 상기 셀가이드의 틈새의 소지 및 도장이 용이하여 작업이 간편하고, 셀가이드에 선 도장이 되어 있어 상기 셀가이드에 녹이 발생되지 않아 우기철 녹 제거로 인해 발생되는 작업공정의 지연현상이 방지되며, 셀가이드와 T블록의 조립 후 T블록을 도장함에 따라 도장개소가 줄어들어 도장을 위한 발판 설치시 1단의 발판만을 T블록 내부에 설치하여 작업하여 발판의 설치 및 해체가 손쉽게 이루어져 작업공정 간편해 지는 매우 유용한 발명이다.
The effect of the present invention can be expected by the configuration and action as described above, by assembling the cell guide after pre-painting the cell guide before assembling the cell guide and the T block, easy to carry and paint the gap of the cell guide is easy to work. Since the cell guide is pre-painted, rust does not occur in the cell guide, thus preventing the delay of the work process caused by rust removal of the ferrous iron, and painting the T block after assembling the cell guide and the T block. It is a very useful invention that the installation and disassembly of the scaffold is easy to install and dismantle by easily installing the first step of the scaffold when installing the scaffold for painting.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040037108A KR100871975B1 (en) | 2004-05-25 | 2004-05-25 | pre-painting, before assembling cell guide and improvement of installing scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040037108A KR100871975B1 (en) | 2004-05-25 | 2004-05-25 | pre-painting, before assembling cell guide and improvement of installing scaffold |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20050112194A KR20050112194A (en) | 2005-11-30 |
KR100871975B1 true KR100871975B1 (en) | 2008-12-08 |
Family
ID=37287126
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040037108A KR100871975B1 (en) | 2004-05-25 | 2004-05-25 | pre-painting, before assembling cell guide and improvement of installing scaffold |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100871975B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105691564B (en) * | 2016-03-04 | 2018-04-06 | 上海外高桥造船有限公司 | Tool part and the segmentation carrier mechanism containing it |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010001522U (en) * | 1999-06-29 | 2001-01-15 | 추호석 | Painting Die for VLCC D/HULL Side Shell Block |
KR200305863Y1 (en) * | 2002-11-26 | 2003-03-03 | 대우조선해양 주식회사 | cell guide |
JP2007009504A (en) * | 2005-06-30 | 2007-01-18 | Jfe Engineering Kk | Harbor structure |
JP2007008625A (en) * | 2005-06-29 | 2007-01-18 | Duplo Corp | Paper direction conversion device and paper treatment system |
-
2004
- 2004-05-25 KR KR1020040037108A patent/KR100871975B1/en not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010001522U (en) * | 1999-06-29 | 2001-01-15 | 추호석 | Painting Die for VLCC D/HULL Side Shell Block |
KR200305863Y1 (en) * | 2002-11-26 | 2003-03-03 | 대우조선해양 주식회사 | cell guide |
JP2007008625A (en) * | 2005-06-29 | 2007-01-18 | Duplo Corp | Paper direction conversion device and paper treatment system |
JP2007009504A (en) * | 2005-06-30 | 2007-01-18 | Jfe Engineering Kk | Harbor structure |
Also Published As
Publication number | Publication date |
---|---|
KR20050112194A (en) | 2005-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101303870B1 (en) | PFP execution method for grating facilities of offshore platform | |
KR100871975B1 (en) | pre-painting, before assembling cell guide and improvement of installing scaffold | |
CN109057219A (en) | A kind of construction method of assembled decoration wall | |
KR100918042B1 (en) | Size-adjustable Gang Form | |
CN105735603A (en) | Mounting device for movable decorative plate | |
KR101708000B1 (en) | Prefabricated anti-vibration frame | |
CN108177731B (en) | Method for building main pipe platform of liquid cargo ship | |
KR101794530B1 (en) | Panel construction structure of building outer wall | |
KR20120000257U (en) | Ceiling of clean room | |
KR200439000Y1 (en) | Block affix ladder | |
CN109610724B (en) | Roof joist and prefabricating process thereof | |
CN215612511U (en) | Just, move closed fire prevention coating construction equipment | |
CN214461678U (en) | Assembled furred ceiling mounting member | |
CN214461679U (en) | Finished product furred ceiling falls grade mounting structure | |
JP2000145154A (en) | Attaching method for alc panel for wall | |
JP5574335B2 (en) | Seismic reinforcement method for roof | |
KR102145286B1 (en) | Soundproof wall with polyurea-coated column and repairing method thereof | |
JP2006052564A (en) | Panel carrier and panel constructing method using the same | |
CN216889719U (en) | Exempt from to weld adjustable H shaped steel roof beam and hang fastener | |
CN221046371U (en) | Fixing tool for spraying steel belt | |
CN221245712U (en) | Auxiliary tool | |
EP3245385B1 (en) | Housing for a compressor or expander installation, vacuum pump, generator or the like | |
CN203666802U (en) | Platform plate and special vehicle chassis | |
KR102303991B1 (en) | Painting zig for vehicle having transfer car | |
KR20130002397A (en) | Assembly method of hull blocks to be used the floatingpower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20111115 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20131113 Year of fee payment: 7 |
|
LAPS | Lapse due to unpaid annual fee |