KR100871975B1 - pre-painting, before assembling cell guide and improvement of installing scaffold - Google Patents

pre-painting, before assembling cell guide and improvement of installing scaffold Download PDF

Info

Publication number
KR100871975B1
KR100871975B1 KR1020040037108A KR20040037108A KR100871975B1 KR 100871975 B1 KR100871975 B1 KR 100871975B1 KR 1020040037108 A KR1020040037108 A KR 1020040037108A KR 20040037108 A KR20040037108 A KR 20040037108A KR 100871975 B1 KR100871975 B1 KR 100871975B1
Authority
KR
South Korea
Prior art keywords
cell guide
painting
block
partition wall
installing
Prior art date
Application number
KR1020040037108A
Other languages
Korean (ko)
Other versions
KR20050112194A (en
Inventor
정대근
안병종
황성규
Original Assignee
현대중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대중공업 주식회사 filed Critical 현대중공업 주식회사
Priority to KR1020040037108A priority Critical patent/KR100871975B1/en
Publication of KR20050112194A publication Critical patent/KR20050112194A/en
Application granted granted Critical
Publication of KR100871975B1 publication Critical patent/KR100871975B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B41PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
    • B41JTYPEWRITERS; SELECTIVE PRINTING MECHANISMS, i.e. MECHANISMS PRINTING OTHERWISE THAN FROM A FORME; CORRECTION OF TYPOGRAPHICAL ERRORS
    • B41J29/00Details of, or accessories for, typewriters or selective printing mechanisms not otherwise provided for
    • B41J29/46Applications of alarms, e.g. responsive to approach of end of line
    • B41J29/48Applications of alarms, e.g. responsive to approach of end of line responsive to breakage or exhaustion of paper or approach of bottom of paper
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B41PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
    • B41JTYPEWRITERS; SELECTIVE PRINTING MECHANISMS, i.e. MECHANISMS PRINTING OTHERWISE THAN FROM A FORME; CORRECTION OF TYPOGRAPHICAL ERRORS
    • B41J11/00Devices or arrangements  of selective printing mechanisms, e.g. ink-jet printers or thermal printers, for supporting or handling copy material in sheet or web form
    • B41J11/0095Detecting means for copy material, e.g. for detecting or sensing presence of copy material or its leading or trailing end
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B41PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
    • B41JTYPEWRITERS; SELECTIVE PRINTING MECHANISMS, i.e. MECHANISMS PRINTING OTHERWISE THAN FROM A FORME; CORRECTION OF TYPOGRAPHICAL ERRORS
    • B41J15/00Devices or arrangements of selective printing mechanisms, e.g. ink-jet printers or thermal printers, specially adapted for supporting or handling copy material in continuous form, e.g. webs
    • B41J15/04Supporting, feeding, or guiding devices; Mountings for web rolls or spindles

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

본 발명은 컨테이너선의 셀가이드 조립전 도장 및 발판 설치 방법이며, 그 목적은 셀가이드와 T블록을 조립하여 T격벽을 형성하기 전에 상기 셀가이드를 먼저 도장한 후 T블록에 조립하여 T격벽을 형성함으로써, 우기철에 도장공기가 지연되지 않고, 미리 도장된 셀가이드에 의해 도장 개소가 줄어들어 작업이 용이하며 작업자가 이동하는 발판의 설치와 해체작업이 용이한 컨테이너선의 셀가이드 조립전 도장 및 발판 설치 방법을 제공함에 있다.The present invention is a method of painting and scaffolding before the cell guide assembly of the container ship, the purpose is to assemble the T-block by assembling the cell guide first before assembling the cell guide and the T block to form the T partition wall. Thus, the painting air is not delayed in the rainy season, and the coating point is reduced by the pre-coated cell guide, which facilitates the work, and the installation and disassembly of the container ship, which is easy to install and dismantle, by the operator. In providing.

상기 목적달성을 위한 본 발명은 컨테이너선의 셀가이드(10)와 T블록(20)을 조립한 후 도장하는 방법에 있어서, 상기 셀가이드(10)를 제작한 후 선 도장하는 제1단계와, 다수개의 T블록(20)을 수직으로 위치시키고 상기 T블록의 상하에 T블록(20)과 교차되도록 셀가이드(10)를 조립하여 T격벽(40)을 형성하는 제2단계와, 상기 T격벽(40)의 도장작업을 위해 T블록(20)의 사이에 다수의 지지대를 수평하게 설치한 후 상기 지지대의 상부에 발판을 1단으로 설치하는 제3단계와, 상기 발판(30)상에서 T격벽(40)을 블라스팅 하고 도장작업을 실시하는 제4단계와, 상기 T격벽(40)의 도장작업 후 발판(30)을 해체하고 발판(30)이 설치된 부분에 마무리 도장을 하는 제5단계로 이루어진 것을 그 기술적 요지로 한다.The present invention for achieving the above object is a method of painting after assembling the cell guide 10 and the T block 20 of the container ship, the first step of manufacturing the cell guide 10 and then pre-painted, Positioning two T blocks 20 vertically and assembling the cell guide 10 so as to intersect the T blocks 20 above and below the T blocks to form a T partition wall 40, and the T partition wall ( The third step of installing a plurality of supports horizontally between the T blocks 20 for the painting operation of the 40 block, and then installing the first step in the upper stage of the support, and the T partition wall (on the step 30) And a fourth step of blasting 40 and carrying out a painting operation, and a fifth step of dismantling the scaffold 30 after the painting operation of the T partition wall 40 and finishing coating on a portion where the scaffold 30 is installed. It is to the technical point.

셀가이드, T격벽, T블록, 발판, 도장 Cell Guide, T Bulkhead, T Block, Scaffolding, Painting

Description

컨테이너선의 셀가이드 조립전 도장 및 발판 설치 방법{pre-painting, before assembling cell guide and improvement of installing scaffold}  Pre-painting, before assembling cell guide and improvement of installing scaffold}             

도 1 은 본 발명에 따른 T격벽의 예시도,1 is an exemplary view of a T bulkhead according to the present invention;

도 2 는 본 발명에 따른 T격벽의 측면도,2 is a side view of the T bulkhead according to the present invention;

도 3 은 본 발명에 따른 T격벽의 평면도,3 is a plan view of the T bulkhead according to the present invention;

도 4 는 본 발명에 따른 셀가이드 T격벽의 결합부분을 나타낸 예시도,4 is an exemplary view showing a coupling portion of the cell guide T partition wall according to the present invention;

도 5 는 본 발명에 따른 T격벽 조립공정도,5 is a T bulkhead assembly process according to the invention,

도 6 은 본 발명에 따른 완성된 T격벽를 선박에 설치하는 과정을 나타낸 예시도,6 is an exemplary view showing a process of installing a completed T bulkhead in a ship according to the present invention;

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

(10) : 셀가이드 (11) : L형강(10): Cell guide (11): L section steel

(20) : T블록 (21) : 지지구(20): T block (21): support

(30) : 발판 (40) : T격벽30: footrest 40: T bulkhead

(50) : 지지대 (60) : 컨테이너선

50: support 60: container ship

본 발명은 컨테이너선의 셀가이드 조립전 도장 및 발판 설치 방법에 관한 것으로, 보다 상세하게는 컨테이너선에 컨테이너를 적재할 경우 상기 컨테이너를 가이드 해주는 셀가이드와 T블록을 조립하여 T격벽을 형성함에 있어, 소지 및 도장작업이 까다로운 셀가이드를 미리 소지하고 도장한 후 T블록에 조림함으로써, T격벽의 조립 및 도장이 용이해지고, 또한 상기 셀가이드의 소지 및 도장을 위해 별도의 발판을 설치할 필요 없이 1단의 발판만을 설치하여 T격벽과, 셀가이드의 조립, 소지, 도장작업을 할 수 있게 되어 작업효율이 높아지고 발판의 설치와 해체가 간편해진 컨테이너선의 셀가이드 조립전 도장 및 발판 설치 방법에 관한 것이다.The present invention relates to a method for installing the coating and scaffolding before assembly of the cell guide of the container ship, and more particularly, in the case of loading the container in the container ship, assembling the cell guide and the T block for guiding the container to form a T partition wall, By holding and painting the cell guide, which is difficult to carry and paint, and fastening it to the T block, the T partition can be easily assembled and painted, and there is no need to install a separate step for carrying and painting the cell guide. By installing only the scaffolding of the T bulkhead, the cell guide can be assembled, possessed, and painting work, the work efficiency is increased, and the installation and disassembly of the container guide to the container guide before painting and mounting of the disassembly of the container ship is easy.

통상 컨테이너 운반선에는 컨테이너가 적재되는 카고홀드(Cargo Hold)가 설치되어 있으며, 이 카고홀드의 T격벽에 배의 수직방향으로 컨테이너의 승하강시 정확한 위치로 적재시키기 위하여 컨테이너의 모서리를 가이드 하는 셀가이드(Cell Guide)가 설치되어 있다.In general, a container hold ship is provided with a cargo hold (cargo hold) for loading the container, the cell guide for guiding the edge of the container in order to load the container in the vertical position of the container in the vertical direction of the ship to the T bulkhead of the cargo hold ( Cell Guide) is installed.

상기 T격벽의 조립은 수직으로 세워지고 일정간격으로 배열된 T블록의 상하에 T블록과 교차되도록 셀가이드를 조립함으로써 형성된다.The assembly of the T partition wall is formed by assembling the cell guides so as to intersect the T blocks above and below the T blocks vertically arranged and arranged at regular intervals.

이렇게 형성된 T격벽을 소지(blasting)하고 도장작업을 한 후 카고홀드내에 수직으로 세워 설치하였으나, 상기 셀가이드 부분의 소지 및 도장작업이 난해하여 공정지연의 원인이 되었다.The T bulkhead thus formed was blasted and painted, and then vertically installed in the cargo hold. However, the possession and painting of the cell guide part were difficult, causing process delay.

또한 우기철에는 상기 T격벽의 셀가이드 표면에 심한 녹이 발생하기 때문에 T격벽을 도장하기 위해서는 셀가이드의 틈새 사이를 소지하고 도장하는 작업이 어려워 선주검사시 지적사항이 발생되는 문제점이 있다. In addition, in the rainy season, since severe rust occurs on the surface of the cell guide of the T bulkhead, it is difficult to carry and paint between the gaps of the cell guide in order to paint the T bulkhead.

또한 상기 T격벽의 하부 셀가이드를 도장할 경우 작업자가 위쪽을 보는 자세세로 도장작업을 함으로 무리한 동작이 유발되어 산업재해가 발생되는 문제점이 있다.In addition, when painting the lower cell guide of the T-barrier, there is a problem in that an industrial accident occurs due to unreasonable operation by the operator in the posture of looking upwards.

또한 T격벽의 도장시 셀가이드와 T블록의 2개소를 블라스팅하고 도장해야 하므로 발판을 2단으로 설치하여 T블록과, 셀가이드를 각각 도장함으로써 발판의 설치와 해체에 따른 작업시간이 늘어나 전체적인 공정기간이 지연되는 문제점이 있다.
In addition, when painting T bulkhead, two parts of cell guide and T block should be blasted and painted, so that the work time is increased by installing and dismantling the step by installing two steps of scaffold and painting T block and cell guide respectively. There is a problem that the period is delayed.

본 발명은 상기와 같은 종래의 문제점을 해결하기 위하여 창출되는 것으로, 셀가이드와 T블록을 조립하기 전에 상기 셀가이드를 먼저 도장한 후 T블록에 조립함으로써 우기철에 도장공기가 지연되지 않고, 미리 도장된 셀가이드에 의해 1단으리 발판을 설치하여 T블록을 도장해줌으로써 도장 개소가 줄어들어 작업이 용이하며, 작업자가 이동하는 발판의 설치와 해체작업이 용이한 컨테이너선의 셀가이드 조립전 도장 및 발판 설치 방법을 제공함을 목적으로 한다.
The present invention is created in order to solve the conventional problems as described above, before assembling the cell guide and the T block by painting the cell guide first and then assembling on the T block, the painting air is not delayed in the rainy season, the coating in advance It is easy to work because the painting place is reduced by installing T-stage by installing one step with the cell guide, and it is easy to install and dismantle the container guide by the operator. The purpose is to provide a method.

상기 목적을 달성하기 위한 본 발명은 컨테이너선의 셀가이드와 T블록을 조립한 후 도장하는 방법에 있어서, 상기 셀가이드를 제작한 후 선 도장하는 제1단계와, 다수개의 T블록을 수직으로 위치시키고 상기 T블록의 상하에 T블록과 교차되도록 셀가이드를 조립하여 T격벽을 형성하는 제2단계와, 상기 T격벽의 도장작업을 위해 T블록의 사이에 다수의 지지대를 수평하게 설치한 후 상기 지지대의 상부에 발판을 1단으로 설치하는 제3단계와, 상기 발판상에서 T격벽을 블라스팅 하고 도장작업을 실시하는 제4단계와, 상기 T격벽의 도장작업 후 발판을 해체하고 발판이 설치된 부분에 마무리 도장을 하는 제5단계로 이루어진 것을 특징으로 한다.In order to achieve the above object, the present invention provides a method of assembling and painting a cell guide and a T block of a container ship, the first step of pre-painting the cell guide after manufacturing, and placing a plurality of T blocks vertically A second step of forming a T partition wall by assembling a cell guide to intersect the T block above and below the T block, and installing a plurality of supports horizontally between the T blocks for painting the T partition wall; The third step of installing the first step of the scaffold in the first step, the fourth step of blasting the T bulkhead on the scaffolding and performing the painting work, after dismantling the scaffolding after the painting of the T bulkhead and finishing the part where the scaffold is installed It is characterized by consisting of a fifth step of painting.

이하, 본 발명에 대하여 첨부도면과 연계하여 그 구성 및 작용을 상세히 설명한다.Hereinafter, the configuration and operation of the present invention in connection with the accompanying drawings will be described in detail.

도 1 은 본 발명에 따른 T격벽의 예시도이고, 도 2 는 본 발명에 따른 T격벽의 측면도이며, 도 3 은 본 발명에 따른 T격벽의 평면도이고, 도 4 는 본 발명에 따른 셀가이드 T격벽의 결합부분을 나타낸 예시도로서, 컨테이너선의 셀가이드(10)는 일정간격으로 수직하게 놓여진 다수의 T블록(20) 상하부에 T블록(20)과 교차되도록 조립되어 컨테이너선에 설치된다.1 is an exemplary view of the T partition wall according to the present invention, FIG. 2 is a side view of the T partition wall according to the present invention, FIG. 3 is a plan view of the T partition wall according to the present invention, and FIG. 4 is a cell guide T according to the present invention. As an exemplary view showing the coupling portion of the partition wall, the cell guide 10 of the container ship is assembled to intersect the T block 20 in the upper and lower portions of the plurality of T blocks 20 placed vertically at a predetermined interval and installed in the container ship.

이와 같은 셀가이드(10)는 일반적으로 L형강(11)이 사용되고 있으며 도 4 에서와 같이 L형강(11)은 소정의 거리를 유지한 상태로 T블록(20)에 형성되어 있는 지지구(21)에 서로 대칭되도록 설치한다. 이때 서로 대칭된 L형강(11)은 소정의 틈 을 유지한 상태로 지지구(21)에 설치되기 때문에, 상기 틈내의 소지작업과 도장작업이 매우 까다로워, 셀가이드(10)를 T블록(20)에 조립하기 전에 미리 셀가이드(10)의 외부를 소지 및 도장한 후 상기 T블록(20)의 상하부에 일정간격으로 조립하여 T격벽(40)을 형성한다.As the cell guide 10 is generally used L-shaped steel 11, as shown in Figure 4, the L-shaped steel 11 is a support 21 formed in the T block 20 while maintaining a predetermined distance ) To be symmetrical to each other. At this time, since the symmetrical L-shaped steel 11 is installed in the support 21 while maintaining a predetermined gap, the holding and painting work in the gap are very demanding, and the cell guide 10 has a T block 20. ) Before assembling to the outside of the cell guide 10 is carried and painted and then assembled at regular intervals on the upper and lower portions of the T block 20 to form a T partition wall 40.

한편 상기 수직하게 놓여진 T블록(20)에는 수평방향으로 다수의 관통구(도시없음)가 형성되어 있어 상기 관통구에 끼워지도록 다수의 지지대(50)를 일정간격으로 설치하고, 상기 지지대(50)의 상부에 받쳐지도록 발판(30)을 설치한다. 이와 같이 발판(30)은 지지대(50)에 양단이 받쳐지도록 설치됨으로써 지지대(50)의 상부에서 균형을 유지할 수 있고 작업자는 발판(30) 상에서 이동하면서 T블록(20)을 소지하고, 도장하게 된다.On the other hand, the vertically placed T block 20 is formed with a plurality of through holes (not shown) in the horizontal direction to install a plurality of supports 50 at regular intervals so as to fit in the through holes, the support 50 Install the footrest 30 to be supported on the top of the. As such, the footrest 30 may be installed to support both ends of the support 50 so that the top of the support 50 may be balanced and the worker may carry and paint the T block 20 while moving on the footrest 30. do.

이와 같이 작업자는 T블록(20)에 조립되는 셀가이드(10)가 미리 도장되어 있기 때문에 T격벽(40)의 T블록(20)만을 블라스팅하고 도장함에 따라 도장개소가 줄어들어 종래와 같이 셀가이드(10)의 도장을 위해 셀가이드(10) 상에 발판을 설치할 필요 없이 T블록(20) 내측으로만 발판(30)을 설치하여 사용함으로써 발판(30)의 설치 및 제거가 용이하다.In this way, since the operator is prepainted with the cell guide 10 assembled to the T block 20, the coating area is reduced by blasting and painting only the T block 20 of the T partition 40, thereby reducing the cell guide (as shown in the related art). It is easy to install and remove the scaffold 30 by installing and using the scaffold 30 only inside the T block 20 without the need to install the scaffold on the cell guide 10 for painting 10).

도 6 은 본 발명에 따른 완성된 T격벽를 선박에 설치하는 과정을 나타낸 예시도로서, 완성된 T격벽(40)을 컨테이너선(60)의 내부에 수직으로 세워 용접 설치한다.
6 is an exemplary view showing a process of installing a completed T bulkhead in a ship according to the present invention, the completed T bulkhead 40 is installed vertically in the interior of the container ship 60 and welded.

한편 본 발명의 셀가이드(10)와, T블록(20)의 조립공정을 도 5 와 같이 설명하면 다음과 같다.Meanwhile, the assembling process of the cell guide 10 and the T block 20 of the present invention will be described with reference to FIG. 5.

먼저 컨테이너선에 설치되는 셀가이드(10)와 T블록(20)을 제작하고, 상기 제 작된 셀가이드(10)와 T블록(20)을 조립하기 전에 셀가이드(10)를 선 도장하며, 이렇게 도장된 셀가이드(10)를 일정간격으로 수직하게 위치되어 있는 T블록(20)의 상하부에 조립하여 T격벽(40)을 형성한 후 상기 T격벽(40)의 도장작업을 위해 T블록(20)에 형성된 관통구에 수평방향으로 지지대(50)를 설치하고, 상기 지지대(50)의 상부에 발판(30)을 설치한다.First, the cell guide 10 and the T block 20 installed in the container ship are manufactured, and the cell guide 10 is pre-painted before assembling the manufactured cell guide 10 and the T block 20. After the painted cell guide 10 is assembled to the upper and lower portions of the T block 20 vertically positioned at a predetermined interval to form a T partition wall 40, the T block 20 for the painting work of the T partition wall 40. The support 50 is installed in the horizontal direction in the through hole formed in the), and the footrest 30 is installed on the upper portion of the support 50.

작업자는 이렇게 설치된 발판(30)상에서 이동하면서 T격벽(40)의 T블록(20)을 블라스팅 한 후 도장작업을 하며, 상기 T격벽(40)의 도장작업이 완료되면 발판(30)과 지지대(50)를 해체하고, 상기 발판(30)이 설치된 부분에 도장을 하여 T격벽(40) 전체를 도장하는 것으로 완성되며, 이렇게 도장된 T격벽(40)을 컨테이선(60)의 내부에 수직으로 세워 용접하여 설치한다.
The worker moves on the footrest 30 installed in this way and performs painting after blasting the T block 20 of the T bulkhead 40. When the painting work of the T bulkhead 40 is completed, the footrest 30 and the support ( 50 is dismantled and finished by painting the entire T bulkhead 40 by painting the part on which the scaffold 30 is installed. The T bulkhead 40 thus coated is perpendicular to the inside of the container 60. It is installed by welding.

본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.
The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

상기와 같은 구성 및 작용에 의해 기대할 수 있는 본 발명의 효과는, 셀가이드와 T블록을 조립하기 전에 셀가이드를 선 도장 후 조립함으로써, 상기 셀가이드의 틈새의 소지 및 도장이 용이하여 작업이 간편하고, 셀가이드에 선 도장이 되어 있어 상기 셀가이드에 녹이 발생되지 않아 우기철 녹 제거로 인해 발생되는 작업공정의 지연현상이 방지되며, 셀가이드와 T블록의 조립 후 T블록을 도장함에 따라 도장개소가 줄어들어 도장을 위한 발판 설치시 1단의 발판만을 T블록 내부에 설치하여 작업하여 발판의 설치 및 해체가 손쉽게 이루어져 작업공정 간편해 지는 매우 유용한 발명이다.














The effect of the present invention can be expected by the configuration and action as described above, by assembling the cell guide after pre-painting the cell guide before assembling the cell guide and the T block, easy to carry and paint the gap of the cell guide is easy to work. Since the cell guide is pre-painted, rust does not occur in the cell guide, thus preventing the delay of the work process caused by rust removal of the ferrous iron, and painting the T block after assembling the cell guide and the T block. It is a very useful invention that the installation and disassembly of the scaffold is easy to install and dismantle by easily installing the first step of the scaffold when installing the scaffold for painting.














Claims (1)

컨테이너선의 셀가이드(10)와 T블록(20)을 조립한 후 도장하는 방법에 있어서,In the method of painting after assembling the cell guide 10 and the T block 20 of the container ship, 상기 셀가이드(10)를 제작한 후 선 도장하는 제1단계와,A first step of pre-painting the cell guide 10 after manufacture; 다수개의 T블록(20)을 수직으로 위치시키고 상기 T블록(20)의 상하에 T블록(20)과 교차되도록 셀가이드(10)를 조립하여 T격벽(40)을 형성하는 제2단계와,Positioning a plurality of T blocks 20 vertically and assembling the cell guide 10 to intersect the T blocks 20 above and below the T blocks 20 to form a T partition wall 40; 상기 T격벽(40)의 도장작업을 위해 T블록(20)의 사이에 다수의 지지대를 수평하게 설치한 후 상기 지지대의 상부에 발판을 1단으로 설치하는 제3단계와,A third step of horizontally installing a plurality of supports between the T blocks 20 for painting work of the T partition wall 40 and installing a single step on the support; 상기 발판(30)상에서 T격벽(40)을 블라스팅 하고 도장작업을 실시하는 제4단계와,A fourth step of blasting the T partition 40 on the scaffold 30 and performing painting work; 상기 T격벽(40)의 도장작업 후 발판(30)을 해체하고 발판(30)이 설치된 부분에 마무리 도장을 하는 제5단계로 이루어진 것을 특징으로 하는 컨테이너선의 셀가이드 조립전 도장 및 발판 설치 방법.Method of installing the container guide before and after the cell guide assembly of the container ship, characterized in that consisting of the fifth step of dismantling the scaffold (30) after the painting operation of the T bulkhead (40) and the finish coating on the portion where the scaffold (30) is installed.
KR1020040037108A 2004-05-25 2004-05-25 pre-painting, before assembling cell guide and improvement of installing scaffold KR100871975B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040037108A KR100871975B1 (en) 2004-05-25 2004-05-25 pre-painting, before assembling cell guide and improvement of installing scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040037108A KR100871975B1 (en) 2004-05-25 2004-05-25 pre-painting, before assembling cell guide and improvement of installing scaffold

Publications (2)

Publication Number Publication Date
KR20050112194A KR20050112194A (en) 2005-11-30
KR100871975B1 true KR100871975B1 (en) 2008-12-08

Family

ID=37287126

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040037108A KR100871975B1 (en) 2004-05-25 2004-05-25 pre-painting, before assembling cell guide and improvement of installing scaffold

Country Status (1)

Country Link
KR (1) KR100871975B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105691564B (en) * 2016-03-04 2018-04-06 上海外高桥造船有限公司 Tool part and the segmentation carrier mechanism containing it

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010001522U (en) * 1999-06-29 2001-01-15 추호석 Painting Die for VLCC D/HULL Side Shell Block
KR200305863Y1 (en) * 2002-11-26 2003-03-03 대우조선해양 주식회사 cell guide
JP2007009504A (en) * 2005-06-30 2007-01-18 Jfe Engineering Kk Harbor structure
JP2007008625A (en) * 2005-06-29 2007-01-18 Duplo Corp Paper direction conversion device and paper treatment system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010001522U (en) * 1999-06-29 2001-01-15 추호석 Painting Die for VLCC D/HULL Side Shell Block
KR200305863Y1 (en) * 2002-11-26 2003-03-03 대우조선해양 주식회사 cell guide
JP2007008625A (en) * 2005-06-29 2007-01-18 Duplo Corp Paper direction conversion device and paper treatment system
JP2007009504A (en) * 2005-06-30 2007-01-18 Jfe Engineering Kk Harbor structure

Also Published As

Publication number Publication date
KR20050112194A (en) 2005-11-30

Similar Documents

Publication Publication Date Title
KR101303870B1 (en) PFP execution method for grating facilities of offshore platform
KR100871975B1 (en) pre-painting, before assembling cell guide and improvement of installing scaffold
CN109057219A (en) A kind of construction method of assembled decoration wall
KR100918042B1 (en) Size-adjustable Gang Form
CN105735603A (en) Mounting device for movable decorative plate
KR101708000B1 (en) Prefabricated anti-vibration frame
CN108177731B (en) Method for building main pipe platform of liquid cargo ship
KR101794530B1 (en) Panel construction structure of building outer wall
KR20120000257U (en) Ceiling of clean room
KR200439000Y1 (en) Block affix ladder
CN109610724B (en) Roof joist and prefabricating process thereof
CN215612511U (en) Just, move closed fire prevention coating construction equipment
CN214461678U (en) Assembled furred ceiling mounting member
CN214461679U (en) Finished product furred ceiling falls grade mounting structure
JP2000145154A (en) Attaching method for alc panel for wall
JP5574335B2 (en) Seismic reinforcement method for roof
KR102145286B1 (en) Soundproof wall with polyurea-coated column and repairing method thereof
JP2006052564A (en) Panel carrier and panel constructing method using the same
CN216889719U (en) Exempt from to weld adjustable H shaped steel roof beam and hang fastener
CN221046371U (en) Fixing tool for spraying steel belt
CN221245712U (en) Auxiliary tool
EP3245385B1 (en) Housing for a compressor or expander installation, vacuum pump, generator or the like
CN203666802U (en) Platform plate and special vehicle chassis
KR102303991B1 (en) Painting zig for vehicle having transfer car
KR20130002397A (en) Assembly method of hull blocks to be used the floatingpower

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20111115

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20131113

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee