KR100861022B1 KR1020070066545A KR20070066545A KR100861022B1 KR 100861022 B1 KR100861022 B1 KR 100861022B1 KR 1020070066545 A KR1020070066545 A KR 1020070066545A KR 20070066545 A KR20070066545 A KR 20070066545A KR 100861022 B1 KR100861022 B1 KR 100861022B1
Authority
KR
South Korea
Prior art keywords
sedimentation basin
scum
water
channel
intermediate water
Prior art date
Application number
KR1020070066545A
Other languages
Korean (ko)
Inventor
엄태경
이충원
Original Assignee
(주)범한엔지니어링 종합건축사 사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)범한엔지니어링 종합건축사 사무소 filed Critical (주)범한엔지니어링 종합건축사 사무소
Priority to KR1020070066545A priority Critical patent/KR100861022B1/en
Application granted granted Critical
Publication of KR100861022B1 publication Critical patent/KR100861022B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/02Settling tanks with single outlets for the separated liquid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/0018Separation of suspended solid particles from liquids by sedimentation provided with a pump mounted in or on a settling tank
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/02Settling tanks with single outlets for the separated liquid
    • B01D21/04Settling tanks with single outlets for the separated liquid with moving scrapers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/24Feed or discharge mechanisms for settling tanks
    • B01D21/2433Discharge mechanisms for floating particles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/24Feed or discharge mechanisms for settling tanks
    • B01D21/245Discharge mechanisms for the sediments
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/30Control equipment
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/02Aerobic processes
    • C02F3/12Activated sludge processes
    • C02F3/1205Particular type of activated sludge processes
    • C02F3/1215Combinations of activated sludge treatment with precipitation, flocculation, coagulation and separation of phosphates

Abstract

An improved rectangular sedimentation basin is provided to improve sedimentation efficiency and scum removal efficiency by reducing influence of density currents and transferring scum on the surface of water from a front side of the sedimentation basin to a rear side thereof, thereby removing the scum. An improved rectangular sedimentation basin comprises: an overflow weir(1) installed in an inlet part of the sedimentation basin; an air stripping tank(2) having a length that is the same as a width of the sedimentation basin; an air diffuser(3) installed on a bottom part of the air stripping tank; link canals(4) installed next to the air stripping tank; equal distribution pipes(7) which pass through the link canals, and which include rectangular cross-sectional inlet parts and long channel type distribution parts; adjusting sluice gates(5) installed in front of the equal distribution pipes; inclined parts installed on rear ends of the equal distribution pipes; influent temperature sensors(23) installed in water of the inclined parts; perforated baffle walls(9) installed in front of the sedimentation basin; sedimentation basin structures which have widths limited to less than 6 m, and of which top parts are covered; orifice type overflow weir equipment(11) installed on both sedimentation basin walls(10) of the sedimentation basin; scum preventing plates(11-5) horizontally installed on inner walls of the overflow weir equipment; flight guiding rails installed on the scum preventing plates; orifice holes formed in a constant distance on the inner walls of the overflow weir equipment under the scum preventing plates; overflow water channels formed at an upper side of the overflow weir equipment, and intermediate water channels formed at a lower side thereof; intermediate water collecting pipes(12) installed longitudinally and laterally at a water depth of 1.2 to 1.8 m of the sedimentation basin; orifice holes formed in the intermediate water collecting pipes; temperature sensors(22) installed on the intermediate water collecting pipes; intermediate water adjusting valves(20) installed on ends of the intermediate water channels; sludge collectors(17) which are installed from the front side to the rear side of the sedimentation basin, and of which flights(17-1) move on the scum preventing plates; scum removing channels(15) formed in the width direction of the sedimentation basin; and scum valves(19) installed in through holes of the scum removing channels.

Description

개량된 장방형침전지 {Improved rectangular sedimentation basins }Improved rectangular sedimentation basins

도 1 은 본 발명의 구성 상태를 나타낸 종단면도.1 is a longitudinal sectional view showing a configuration state of the present invention.

도 2 는 본 발명의 구성 상태를 나타낸 평면도2 is a plan view showing a configuration state of the present invention;

도 3 은 본 발명의 구성 상태를 나타낸 횡단면도Figure 3 is a cross-sectional view showing a configuration state of the present invention

도 4 는 본 발명의 상등수 집수 장치 및 스컴 제거 수로의 상세도.4 is a detailed view of the supernatant water collecting device and scum removing channel of the present invention.

도 5 는 본 발명의 스컴 제거수로부의 상세도.5 is a detailed view of the scum removing channel of the present invention.

도 6 은 본 발명의 침전지 유입부의 상세도.Figure 6 is a detailed view of the sedimentation basin inlet of the present invention.

도 7 은 본 발명의 균등 분배관의 설명도.7 is an explanatory view of an even distribution pipe of the present invention.

도 8 은 전형적인 밀도류의 모양을 나타낸 종단면도.8 is a longitudinal sectional view showing the shape of a typical density flow.

도면의 중요부분에 대한 부호의 설명Explanation of symbols for important parts of the drawings

1. 월류 위어 1-1. 위어 판 1-2. 고정나사Monthly Weir 1-1. Weir plate 1-2. Set screw

2. 탈기조2. Degassing tank

3. 파이프 산기 관3. pipe diffuser tube

4. 도수로4. Raceway

5. 조절 수문5. Adjustable Sluice

6. 격벽6. Bulkhead

7. 균등 분배 관 7-1. 분배구멍7. Equal Distribution Tube 7-1. Distribution hole

8. 경사부8. Slope

9. 유공 정류벽 9-1. 보강재 9-2. 정류구멍9. Perforated Commutation Wall 9-1. Stiffener 9-2. Commutation hole

10. 침전지 벽10. Settler wall

11. 상등수 집수장치 11-1. 비 집수부 11-2. 오리피스 구멍11. Super water collecting device 11-1. Non catchment 11-11. Orifice hole

11-3. 상등수 수로 11-4. 중간수 수로 11-5 스컴 방지판11-3. Superiority channel 11-4. Medium channel 11-5 scum prevention plate

12. 중간수 집수관 12-1. 오리피스 구멍12. Medium water collecting pipe 12-1. Orifice hole

13. 상등수 배수로13. Supernatant drainage

14. 상등수 배수관14. Supernatant drainage pipe

15. 스컴 제거수로 15-1. 위어 판 15-2. 관통구멍15. With scum removal water 15-1. Weir Plate 15-2. Through hole

15-3. 스컴 이송수로 15-4. 고정나사15-3. 15-4. Set screw

16. 스컴 배출관16. Scum exhaust pipe

17. 슬러지 수집기 17-1. 플라이트 17-2. 안내레일 17-3. 콜렉터 체인17. Sludge Collector 17-1. Flight 17-2. Information rail 17-3. Collector chain

18. 침전지 바닥18. Settler Bottom

19. 스컴 밸브19. Scum valve

20. 중간수 조절 밸브20. Medium water control valve

21. 슬러지 인발관21. Sludge Drawing Pipe

22. 온도센서.22. Temperature sensor.

23. 유입수 온도센서.23. Influent temperature sensor.

가. 응집지 또는 호기 반응조 나. 침전지 다. 공동구end. Agglomerated paper or aerobic reactor; Sedimentation c. Communal sphere

라. 침전지 슬래브 마. 응집지 슬래브 바. 슬러지 호퍼la. Sedimentation slab e. Agglomerated slab bars. Sludge hopper

본 발명은 상수도 정수장의 장방형 침전지나 생물학적 처리를 하는 하, 폐수처리장의 장방형 2차 침전지에 관한 기술이다.The present invention relates to a rectangular sedimentation basin in a water treatment plant or a rectangular secondary sedimentation basin in a wastewater treatment plant under biological treatment.

종래의 상수도 정수장의 장방형 침전지나 하, 페수처리장의 장방형 2차 침전지는 유입부의 구조가 불합리하여 혼합액중의 플록이 깨지거나 편류가 발생하여 침전성이 나빠지는 경우가 있었다.Conventional rectangular sedimentation basins of tap water treatment plants and rectangular secondary sedimentation basins in wastewater treatment plants may have unreasonable structures, causing flocs in the mixed liquor to break or drift, resulting in poor sedimentation.

또한 침전지 관련 시설의 기계장치나 구조물의 손상으로 해당 부분을 가동 중단하는 경우에, 서로 다른 열의 시설물간에 적정한 연결이 안 되어서, 해당 열의 운전을 중단하는 등 효과적 운전을 할 수가 없었다.In addition, when the parts were shut down due to damage to the machinery or structure of the facilities related to the sedimentation basin, there was no proper connection between the facilities of different heats, and the operation of the heats could not be performed effectively.

상수도 정수장에서 원수 중에 공기가 과도하게 용해된 경우나 생물학적 고도처리를 하는 경우에 호기 반응조에서 유출되는 슬러지에 다량의 가스가 부착되어 있어서 침전이 불량하고 스컴이 과다하게 발생하는 사례도 있었다.In the case of excessive dissolution of air in raw water in a water treatment plant or high biological treatment, a large amount of gas is attached to the sludge flowing out of the aerobic reactor, resulting in poor sedimentation and excessive scum.

상수도 정수장의 장방형 침전지나 생물학적 처리를 하는 하, 폐수 처리장의 2차 침전지에서 발생하는 가장 큰 문제 중의 하나는 밀도류의 영향이다.One of the biggest problems that occurs in rectangular sedimentation basins in water treatment plants or secondary sedimentation basins in wastewater treatment plants under biological treatment is the effect of density flow.

밀도류는 농도차에 의한 것과 원수의 온도차에 의한 것이 있다.Density flows come from concentration differences and from raw water temperatures.

상수도 정수장에서는 평상시의 경우 침전지의 부유물 농도가 불과 수십 mg/L정도로 낮아서 농도차에 의한 밀도류 발생은 비교적 적고, 주로 유입수의 온도 차이에 의한 밀도류가 주로 발생하며, 간헐적으로 발생하는데 비하여 하, 폐수 처리 장의 2차 침전지에서는 통상의 활성 슬러지 공법을 사용하는 경우에는 슬러지 농도가 1,500∼2,500 mg/L 정도이고, 고도처리를 하는 경우에는 공법에 따라 차이가 있으나 3,000∼6,000mg/L로 매우 높으며, 고도 처리를 하는 처리장의 경우 침전지에서 미생물 반응조로 반송하는 유량이 100∼300%이고 유량 조정조를 갖춘 경우도 많아서, 하루 중 수온 변화는 정수장 침전지보다 작기 때문에 하, 폐수처리장에서 발생하는 밀도류는 주로 유입되는 혼합액의 농도차에 의한 밀도류의 영향이 크고, 연 중 계속 발생하는 특징이 있으나 하, 폐수 처리장에서도 지역적 특성이나 주변 여건에 따라서는 유입수의 온도차에 의한 밀도류가 발생하는 경우도 있다.In the waterworks, the concentration of suspended solids in the sedimentation basin is only a few tens of mg / L, so the density flow is relatively small due to the difference in concentration, and the density flow is mainly caused by the temperature difference of the influent. The concentration of sludge is about 1,500-2,500 mg / L in case of using the conventional activated sludge method in the intestinal secondary sedimentation basin, and it is very high as 3,000-6,000 mg / L in case of advanced treatment. In the case of the treatment plant, the flow rate from the sedimentation basin to the microbial reactor is 100-300% and the flow rate adjustment tank is often provided. Since the daily water temperature change is smaller than that of the purification plant sedimentation basin, the density flow generated in the wastewater treatment plant is mainly introduced. The effect of density is greatly influenced by the concentration difference of the mixed liquid, and it is characterized by continuous occurrence throughout the year. And, according to local conditions or the ambient conditions in the wastewater treatment plants is sometimes the mildoryu by the temperature difference between the inlet water occurs.

하, 폐수처리장의 2차 침전지에서는 스컴이 다량 발생하기 때문에 이를 효과적으로 제거하는 것이 매우 중요하고 정수장에서도 주변 여건과 수질에 따라서는 스컴이 발생하기 때문에 스컴 제거는 역시 중요하다.Since scum is generated in secondary sedimentation basin of wastewater treatment plant, it is very important to effectively remove scum, and scum removal is also important because scum is generated depending on the surrounding conditions and water quality in water treatment plant.

밀도류가 발생하면 침전지내의 물은 층류로 서서히 흐르기 때문에 서로 혼합되지 않고, 밀도가 큰 혼합액이 침전지 바닥을 따라 빠른 속도로 흐르다가 침전지 끝의 벽면에 충돌하여 위로 떠오르는 현상이 발생한다.(도면8 참조)When a dense flow occurs, the water in the sedimentation basin flows slowly into the laminar flow, so that they do not mix with each other, and a dense mixture flows rapidly along the bottom of the sedimentation basin, and collides with the wall at the end of the sedimentation basin (see Fig. 8). )

밀도류가 발생하면 온도가 높은 물이 집수 장치를 통하여 침전지 외부로 흘러나가지 않고 계속해서 침전지 내에서 순환함으로써 데드존(사 구역)을 형성하여 침전지의 수리학적 체류시간을 감소시키고, 부분적으로 빠른 흐름을 형성하여 부유물질이 상등수에 포함되어 상등수 수질이 악화된다.When a dense flow occurs, hot water does not flow out of the sedimentation basin through the catchment system, but continues to circulate in the sedimentation basin to form dead zones (four dead zones), reducing the hydraulic retention time of the sedimentation basin. As a result, suspended solids are contained in the supernatant, which deteriorates the supernatant water quality.

본 발명이 이루고자 하는 기술적 과제는 장방형 침전지 유입부에서, 균등한 유량분배와 탈기(air stripping)를 하고, 플록의 파괴 없이 유입수가 균등한 속도로 유입되고, 상등수는 침전지 양쪽 벽 부근의 집수 장치에서 집수하고, 정체수는 중간수 집수장치로 집수하여 배수함으로서, 밀도류의 영향을 저감하고, 수면상의 스컴은 침전지 앞쪽에서 맨 뒤쪽까지 이송하여 제거함으로서, 침전 효율과 스컴 제거 효율을 높인 개량된 장방형 침전지를 제공하는 것이다.The technical problem to be achieved in the present invention is a rectangular sedimentation basin inlet, even flow distribution and degassing (air stripping), the inflow water is introduced at an even rate without destroying the floc, the supernatant in the catchment device near both walls of the sedimentation basin Improved rectangular sedimentation basin by collecting and draining the stagnant water by intermediate water collecting system to reduce the influence of density flow, and removing scum on the surface from the front to the rear of the sedimentation basin to increase sedimentation efficiency and scum removal efficiency. To provide.

본 발명은 상기 기술적 과제를 달성하기 위하여,The present invention to achieve the above technical problem,

장방형 침전지의 입구부에 침전지 폭과 같은 길이의 월류 위어(1)을 설치하되 월류 위어의 윗면은 하향으로 10∼15° 경사지게 하고;Install a monthly weir 1 equal to the width of the sedimentation basin at the inlet of the rectangular sedimentation basin with the top surface of the overflowing weir inclined downward by 10 to 15 °;

월류 위어(1)의 다음에는 탈기조(2)를 침전지 전체 폭과 같은 길이로 형성하고;After the weir (1), the degassing tank (2) is formed in the same length as the entire width of the settling basin;

탈기조(2)의 하부에는 파이프 산기관(3)을 설치하고;A pipe diffuser 3 is installed below the degassing tank 2;

탈기조(2)의 다음에는 도수로(4)를 설치하고, 격벽(6)을 관통되도록 균등분배 관(7)을 설치하고, 균등 분배 관 앞에는 조절수문(5)를 설치하고;After the degassing tank 2, the raceway 4 is installed, the equal distribution pipe 7 is installed so that the partition 6 can penetrate, and the adjustment gate 5 is installed in front of the equal distribution pipe;

균등 분배 관(7)의 출구 쪽은 30∼45˚의 기울기를 가진 경사부(8)을 설치하고, 경사부의 수중에 유입수 온도센서(23)을 설치하고, 경사부의 다음에는 보강재로 지지된 얇은 판재로 되어 있고, 4∼6%의 개구단면적을 가진 유공 정류벽(9)를 설치하고 ;The outlet side of the evenly distributed tube 7 is provided with an inclined portion 8 having an inclination of 30 to 45 degrees, an inflow water temperature sensor 23 is installed in the water of the inclined portion, and a thin portion supported by a reinforcement material after the inclined portion. A porous hole rectifying wall 9 made of a sheet material and having an opening end area of 4 to 6%;

침전지(나)의 폭은 6m 이내로 제한하고, 침전지 상부는 침전지 슬래브(라)로 복개하고, 침전지(나)의 양쪽 침전지 벽(10)에는 수면 부근에 오리피스식 상등수 집수장치(11)을 침전지의 앞쪽 부근부터 침전지 뒤쪽 끝까지 설치하고, 상등수 집수장치의 끝은 상등수 배수로(13)에 연결하고, 상등수 집수장치(11)의 침전지 안쪽방향의 벽에는 폭 100∼300mm의 스컴 방지 판(12)를 수면에서 50∼100mm깊이에 수평으로 설치하되, 상등수 집수장치(11)의 벽에 직각(90°)이 되도록 일체로 형성하여 설치하고 , 스컴 방지 판(12)의 위쪽에는 플라이트(17-1)용 안내 레일(17-2)를 고정하여 설치하고, 상등수 집수위어(11)의 오리피스구멍은(11-2)는 상등수 집수장치(11)의 앞에서부터 뒤쪽으로 일정한 간격으로 천공하여, 상등수 집수장치의 뒤쪽에서 3∼5m 앞의 위치까지만 설치하고;The width of the sedimentation basin (B) is limited to within 6 m, the upper part of the sedimentation basin is covered with the sedimentation slab (D), and the orifice-type supernatant water collecting device 11 near the surface of the sedimentation basin (B) is placed near the water surface. It is installed from the front side to the rear end of the sedimentation basin, and the tip of the supernatant water collecting device is connected to the upper water drainage channel 13, and the scum prevention plate 12 having a width of 100 to 300 mm is formed on the wall of the sedimentation basin inside the supernatant water collecting device 11. Install horizontally at a depth of 50-100 mm from the wall of the supernatant water collecting device 11 so as to be integrally formed at a right angle (90 °), and above the scum prevention plate 12 for flight 17-1. The guide rail 17-2 is fixed and installed, and the orifice hole 11-2 of the upper water collecting weir 11 is drilled at regular intervals from the front of the upper water collecting device 11 to the rear, and the upper water collecting device Install only up to 3 to 5 m from the back of the front;

상기 상등수 집수장치(11)의 수로부분은 위쪽은 상등수 수로(11-3)을 형성하고, 아래쪽은 중간수 수로(11-4)를 형성하고,The upper portion of the canal water collecting device 11 of the upper portion of the upper canal channel 11-3, the lower portion of the water channel 11-4,

상기 침전지의 앞과 뒤쪽 사이에, 수심 1.2∼1.8m 위치에 횡 방향으로 3개, 종 방향으로 2개의 중간수 집수관(12)을 설치하고, 중간수 집수관의 양 끝은 중간수 수로(11-4)에 연결하고, 중간수 집수관에는 수평 방향에 양쪽으로 오리피스 구멍(12-1)을 형성하고, 중간수 집수관위에는 온도센서(22)를 설치하고, 상기 중간수 수로(11-4)의 끝에는 중간수 조절밸브(20)을 설치하고;Between the front and rear of the sedimentation basin, three intermediate water collecting pipes 12 in the transverse direction and two longitudinal directions are installed at a depth of 1.2 to 1.8 m, and both ends of the intermediate water collecting pipes have intermediate water channels ( 11-4), an orifice hole 12-1 is formed in both sides of the intermediate water collecting pipe in the horizontal direction, and a temperature sensor 22 is installed on the intermediate water collecting pipe, and the intermediate water collecting channel 11- At the end of 4), an intermediate water control valve 20 is installed;

침전지의 앞쪽 유공 정류벽(9)부근부터 침전지의 뒤쪽 끝 스컴 제거수로(15)앞까지 슬러지 수집기(17)을 설치하고, 슬러지 수집기의 플라이트(17-1)은 그 끝이 양쪽 상등수 집수장치(11)의 벽에 근접하게 설치하고, 스컴 방지 판(11-5)의 위쪽에 설치하며;The sludge collector 17 is installed from the front pore rectifying wall 9 of the sedimentation basin to the scum removal channel 15 at the rear end of the sedimentation basin, and the flight 17-1 of the sludge collector is at both ends thereof. Is installed close to the wall of (11), and is installed above the scum prevention plate (11-5);

스컴 제거 수로(15)는 수로 벽의 위쪽 끝이 수면에서 1∼2cm잠기게 하고, 침전지 폭 방향으로 수로를 형성하고, 수로 아래에 4각단면의 스컴 이송수로(15-3)을 밀폐구조로 형성하고, 스컴 제거 수로와 스컴 이송수로 사이에 관통구멍(15-2)를 형성하고, 관통구멍(15-2)의 위에는 스컴 밸브(19)를 설치하고, 스컴 이송수로(15-3)의 하부에는 스컴 배출관(16)을 설치하고; 및The scum removal channel 15 has the upper end of the channel wall submerged 1 to 2 cm from the surface of the water, forms a channel in the width direction of the sedimentation basin, and a scum transport channel 15-3 of four cross-sections beneath the channel is sealed. A through hole 15-2 is formed between the scum removal channel and the scum transfer channel, and a scum valve 19 is provided on the through hole 15-2, and the scum transfer channel 15- is formed. A scum discharge pipe 16 is installed in the lower part of 3); And

균등 분배 관(7)은 4각단면의 입구부와 침전지 폭과 같은 긴 수로형의 분배부로 구성하고, 분배부에는 수평으로 미리 정한 크기와 숫자의 원형구멍(7-1)을 형성하고, 원형 구멍의 크기는 중심에서 가장자리 쪽으로 갈수록 점차 더 크게 한 것을 특징으로 하는 개량된 장방형 침전지를 제공한다.The even distribution pipe 7 is composed of a long channel-type distribution part such as an inlet part of a four-sided section and a width of the settling basin, and has a circular hole 7-1 of a predetermined size and number horizontally formed in the distribution part. The size of the hole provides an improved rectangular settler, characterized in that the size is gradually increased from the center to the edge.

본 발명의 구성은 다음과 같다.The configuration of the present invention is as follows.

장방형 침전지의 입구부에 월류 위어(1)을 설치하되, 월류 위어(1)의 윗면은 하향으로 10∼15°의 기울기를 가지도록 하였고, 월류 위어(1)의 다음에는 2∼3분의 체류시간을 가지는 폭과 깊이의 4각단면의 탈기조(2)를 형성하였다.Overflow weir (1) is installed at the inlet of the rectangular sedimentation basin, but the upper surface of the overflow weir (1) has a slope of 10 to 15 ° downward, and stays for 2 to 3 minutes after the overflow weir (1) The degassing tank 2 of the square section of width and depth which has time was formed.

월류 위어(1)의 높이는 최대 통과 유량에 대하여 가장 작은 낙차를 가지도록 정하되, 탈기조쪽의 물이 역류하지는 못하게 정하였다.The height of the overflow weir (1) was determined to have the smallest drop with respect to the maximum flow rate, but not to reflux the water on the degassing tank side.

탈기조(2)의 바닥에는 탈기조내에 공기를 불어 넣을 수 있도록 파이프 산기 관(3)을 탈기조 길이 방향으로 길게 설치하고, 탈기조(2)는 옆의 탈기조와 관통되게 하여 공통 수로를 형성하였다.At the bottom of the degassing tank (2), a pipe diffuser pipe (3) is installed long in the degassing tank length direction so that air can be blown into the degassing tank, and the degassing tank (2) is allowed to penetrate the degassing tank next to the common channel. Formed.

탈기조(3)의 다음에는 유입수중의 고형물이 침전되지 않는 속도를 유지할 수 있도록 얕은 깊이의 도수로(4)를 설치하고, 도수로 다음에는 격벽(6)을 설치하여 유입수가 격벽에 관통되게 설치한 균등 분배 관(7)을 통하여 흐를 수 있게 하고, 균등 분배 관(7) 의 입구부에는 조절수문(5)를 설치하였다.After the degassing tank 3, a shallow waterway 4 is installed to maintain the speed at which solids do not settle in the inflow water, and a partition 6 is installed next to the waterway so that the inflow water penetrates the partition wall. It was allowed to flow through the equal distribution pipe (7), and the adjustment gate (5) was installed at the inlet of the even distribution pipe (7).

균등 분배 관(7)의 다음에는 30∼45°의 하향 경사부(8)을 설치하였고, 경사 부에 유입수 온도센서(23)을 설치하고, 경사부의 끝에서 1.5∼2m거리에는 침전지의 전체 횡 단면적에 대하여 4∼6%의 구멍 단면적을 가지며, 얇은 판재로 된 유공 정류벽(9)를 설치하였다.After the equal distribution pipe 7, a downward inclined portion 8 of 30 to 45 ° is provided, and an inflow water temperature sensor 23 is provided on the inclined portion, and the entire transverse area of the sedimentation basin is 1.5 to 2 m away from the end of the inclined portion. A hole rectifying wall 9 made of a thin plate having a hole cross-sectional area of 4 to 6% with respect to the cross-sectional area was provided.

얇은 판재의 유공 정류벽은 보강재로 지지하여 필요한 강도를 확보하였다.Perforated rectifying wall of thin plate was supported by reinforcement to secure the required strength.

침전지(나)의 내부에는 침전지 벽(10)의 양쪽 수면 부근에 오리피스 식 상등수 집수장치(11)를 침전지(나)의 정류벽 부근에서 침전지 뒤쪽 끝까지 설치하고 상등수 집수장치(11)의 끝은 상등수 배수로(13)에 연결되게 하였다.Inside the sedimentation basin (B), an orifice-type supernatant water collecting unit (11) is installed near both sides of the sedimentation basin wall (10) to the rear end of the sedimentation basin near the rectifying wall of the sedimentation basin (B). It was connected to the drain 13.

상등수 집수장치(11)의 침전지 안쪽 방향에 있는 벽에는 100∼300mm의 폭을 가진 스컴 방지 판(11-5)를 수면에서 50∼100mm깊이에 수평으로 설치하되, 상등수 집수장치(11)의 벽에 직각(90°)으로 일체가 되게 고정하여 설치하고 스컴 방지판(11-5)의 윗면에는 플라이트(17-1)의 안내 레일(17-2)을 고정되게 설치하여 스컴 방지판(11-5)를 안내레일 지지대로 겸용하도록 하였다.The scum prevention plate 11-5 having a width of 100 to 300 mm is installed horizontally at a depth of 50 to 100 mm from the surface of the wall of the supernatant water collecting device 11, but the wall of the upper water collecting device 11 is installed horizontally. And fixed at right angles (90 °) to the unit, and the guide rails (17-2) of the flight (17-1) are fixedly installed on the upper surface of the scum prevention plate (11-5) to prevent scum prevention plate (11-) 5) was used as a guide rail support.

스컴 방지판(11-5)와 관련한 침전지 뒤쪽 구조는 슬러지 수집기(17)의 플라이트(17-1)이 지나 갈수 있도록, 상등수 집수장치(11)위에 설치한 스컴 방지판(11-5)는 슬러지 수집기(17)의 수면부 뒤쪽에 있는 스프라켓 축( 도시 하였으나 도면번호 미부여) 부근 까지만 설치하였다.The structure behind the sedimentation basin in relation to the scum prevention plate 11-5 is the scum prevention plate 11-5 installed on the supernatant water collecting device 11 so that the flight 17-1 of the sludge collector 17 can pass. Only installed near the sprocket shaft (not shown in the drawing, not shown) at the rear of the water surface of the collector 17.

상기 상등수 집수 장치(11)의 수로 부분은 위쪽은 상등수 수로(11-3)을 형성하고, 아래쪽은 중간수 수로(11-4)를 형성하였고, 중간수 수로(11-4)의 뒤쪽 끝에는 중간수 조절밸브(20)을 설치하였다.The upper portion of the upper canal water collecting device 11 forms a upper canal channel 11-3, the lower part has an intermediate channel 11-4, and the rear end of the middle channel 11-4 has an intermediate portion. The water control valve 20 was installed.

장방형 침전지의 수심 1.2∼1.8m 깊이에 (침전지의 깊이에 따라 변한다)중간수 집수관 (12)를 설치하되 침전지의 길이 방향으로 길게 2개, 침전지의 폭 방향으로 3개를 수평으로 설치하고 길이 방향으로 설치한 중간수 집수관(12)의 양끝은 중간수 수로(11-4)에 연결하고, 중간수 집수관(12)의 위에는 온도센서(22)를 설치하였고, 유입수 온도센서(23)과 온도 센서(22) 및 중간수 조절 밸브는 연동하게 하였다.Install a middle water collecting pipe 12 at a depth of 1.2 ~ 1.8m (depending on the depth of the settling) of the rectangular sedimentation basin, and install two horizontally in the longitudinal direction of the sedimentation basin and three horizontally in the width direction of the sedimentation basin Both ends of the intermediate water collecting pipe 12 installed in the direction are connected to the intermediate water channel 11-4, and a temperature sensor 22 is installed on the intermediate water collecting pipe 12, and the influent water temperature sensor 23 is provided. The over temperature sensor 22 and the intermediate water control valve were interlocked.

슬러지 수집기(17)은 체인 플라이트식 슬러지 수집기로 침전지의 유공 정류벽(9)후단부터, 수면에서는 침전지 뒤쪽의 스컴 제거 수로(15)앞까지, 침전지 바닥에서는 침전지 뒤쪽 벽 앞까지 연장되게 설치하여 수면위의 스컴과 침전지 바닥(18)에 침전된 슬러지를 전부 이송할 수 있게 하였다.The sludge collector 17 is a chain-flighted sludge collector, which extends from the rear of the pore rectifying wall 9 of the sedimentation basin to the scum removal channel 15 at the rear of the sedimentation basin and to the rear wall of the sedimentation basin at the sediment bottom. It was possible to transport all the sludge deposited on the scum and sediment bottom 18 above.

스컴 배출 수로(15)는 침전지의 끝에 횡 방향으로 길게 설치하고, 스컴 제거 수로(15) 벽의 위쪽 끝은 수면에서 1∼2cm잠기게 하고, 스컴 배출 수로의 밑에는 4각단면의 스컴 이송 수로(15-3)을 밀폐구조로 설치하고, 관통구멍(15-2)을 통하여 스컴 제거 수로와 관통되게 하였고 관통구멍 위에는 스컴 밸브(19)를 설치하여 개폐할 수 있게 하였다.The scum discharge channel 15 is installed in the transverse direction at the end of the sedimentation basin, and the upper end of the wall of the scum removal channel 15 is submerged 1 to 2 cm from the surface of the water. (15-3) was installed in a sealed structure, and penetrated with the scum removal channel through the through hole (15-2), and a scum valve (19) was installed and opened and closed on the through hole.

이송된 스컴은 스컴 배출관(16)을 통하여 다음 공정으로 이송되어 처리되고, 상등수는 상등수 배수관(14)를 통하여 다음 공정인 응집 침전 공정 또는 소독시설로 이송된다.The transferred scum is transferred to the next process through the scum discharge pipe 16 and processed, and the supernatant water is transferred to a coagulation precipitation process or a disinfection facility, which is the next process, through the supernatant drain pipe 14.

균등 분배 관(7)은 [도면7]과 같은 모양으로 하고, 균등 분배 관(7)은 폭 방향의 끝 쪽으로 갈수록 단면이 축소되게 하였고, 분배구멍(7-1)은 중앙에서 양쪽 끝으로 갈수록 구멍 지름이 크게 하여 균등한 유입수의 분배가 이루어지게 하였다.The equal distribution tube 7 has a shape as shown in [Fig. 7]. The equal distribution tube 7 has a cross section that is reduced toward the end of the width direction, and the distribution hole 7-1 has a central portion at both ends. The large pore diameter ensures an even distribution of influent.

본 발명 의 작용은 다음과 같다.The operation of the present invention is as follows.

정수장의 응집지나 생물학적 하/폐수 처리장의 호기조에서 나온 유입수는 월 류 위어(1)을 통하여 다음의 탈기조(2) 및 도수로(4)를 지나서 균등 분배관(7)을 통하여 균등하게 분배되면서 침전지의 유공 정류벽(9) 쪽으로 이송된다.The influent from the agglomeration basin of the water treatment plant or the aerobic tank of the biological sewage / wastewater treatment plant is distributed evenly through the monthly weir (1) through the equally degassing tank (2) and the waterway (4) through the equal distribution pipe (7). It is conveyed toward the hole rectifying wall 9 of.

월류 위어(1)의 윗면은 하향으로 15° 경사되어 있으므로 위어를 넘는 유입수는 직접 자유낙하하지 않고 월류 위어의 윗면을 타고 흐르므로 유입수 중의 플록은 파괴되지 않기 때문에 침전성이 양호하게 유지된다.Since the upper surface of the weir flow (1) is inclined downward 15 °, the inflow water over the weir flows through the upper surface of the weir flow without directly falling freely, so the floc in the inflow water is not destroyed, and thus the sedimentability is maintained well.

탈기조(2)는 2∼3분이상의 체류시간을 가지고 있고, 파이프 산기관(3)에서 공급되는 공기의 교반 작용으로 유입수중의 슬러지에 부착된 미세 공기방울을 제거하여 슬러지가 떠오르는 것을 방지하여 스컴 발생량을 저감시키고, 충분한 크기의 단면을 가지고 있어 침전지 관련시설에 어느 지이든 설비 고장 등으로 가동을 중지하는 경우에도, 남은 침전지들로 유입수를 균등하게 분배하는 작용을 한다.The degassing tank 2 has a residence time of 2 to 3 minutes or more, and by removing the air bubbles attached to the sludge in the inflow water by the stirring action of the air supplied from the pipe diffuser 3 to prevent the sludge from rising It reduces the amount of scum generated and has a cross section of sufficient size, so that even if the operation is stopped due to a failure in any of the facilities related to the sedimentation basin, the influent is evenly distributed to the remaining sedimentation basins.

균등 분배 관(7)은 유입된 유입수를 침전지 폭 방향으로 일정하게 균등히 분배하는 역할을 하여 침전지에 유입되는 유입수의 편류를 방지한다.The equal distribution pipe 7 serves to uniformly distribute the inflow water inflow in the sedimentation basin width direction to prevent the inflow of inflow water flowing into the sedimentation basin.

균등 분배 관(7)의 분배구멍은 양쪽 끝으로 갈수록 크기가 크므로 손실 수두에 의한 영향을 받지 않고 균등한 유입수를 통과시킨다.The distribution hole of the equal distribution tube 7 is larger in size toward both ends, so that the equally influent water passes through without being affected by the loss head.

도수로(4)는 유입수 통과 시 0.1m/s이상의 유속을 유지하도록 수로 폭과 깊이를 정하였기 때문에 도수로에서 슬러지가 침전되지 않는다.In the raceway 4, the sludge is not precipitated in the raceway because the channel and width are defined so as to maintain a flow rate of 0.1 m / s or more when passing through the influent.

조절 수문은 침전지간의 유입수의 유입량 불균형이나 침전지의 가동 중단 시 해당 침전지로의 유입수의 유입을 차단하는 작용을 한다.The regulating water gate serves to block the inflow of influent into the sedimentation basin when the inflow of the inflows between the sedimentation basins is unbalanced or when the sedimentation basin is shut down.

균등 분배 관(7)의 다음에 설치된 경사부(8)에서는 유입된 유입수가 더욱 확산되면서 균등한 속도로 유공 정류벽(9)에 접근하도록 한다.In the inclined portion 8 installed next to the equal distribution pipe 7, the inflow of the inflow is further spread so as to approach the pore rectifying wall 9 at an even speed.

유공 정류벽(9)는 얇은 판재로 되어 있어 유공 정류벽에 천공되어 있는 정류구멍(9-2)를 통과하는 유입수 중의 슬러지가 정류구멍 내에 침전되어 쌓이거나 막히는 일이 없고, 정류효과가 가장 좋은 유공 면적비 4∼6%로 되어 있어 유공 정류벽(9)를 통과한 유입수는 침전지의 횡단면 전면에 걸쳐 균등한 유속으로 이송되면서 침전 작용이 일어나게 된다.The perforated rectifying wall 9 is made of a thin plate, so that sludge in the inflow water passing through the rectifying hole 9-2 perforated in the perforated rectifying wall does not settle or accumulate in the rectifying hole and has the best rectifying effect. Since the pore area ratio is 4 to 6%, the inflow water passing through the pore rectifying wall 9 is transported at an equal flow rate across the entire cross section of the sedimentation basin, and precipitation occurs.

그러나 정수장의 장방형 침전지에 유입되는 유입수와 침전지내 물의 온도차가 클 경우 [도면 8] 에서 보는 것과 같은 밀도류가 발생하여 유입수가 침전지의 전 횡단면적에 대하여 균등하게 흐르지 않고 밀도류는 침전지의 바닥을 따라 빠른 속도로 이동하여 침전지 후단에 이르고 이동 속도의 영향으로 침전지 후단에서 침전지 수면을 향하여 떠오르게 된다.However, if the temperature difference between the influent and the water in the sedimentation basin of the sewage plant is large, a density flow as shown in [Figure 8] occurs, so that the inflow does not flow evenly over the entire cross-sectional area of the sedimentation basin. It moves at a speed to reach the sedimentation basin and rises from the sedimentation basin towards the sediment basin surface under the influence of travel speed.

[도면 8] 에서 보는 것과 같은 밀도류의 모양을 보면 슬러지를 포함한 밀도류가 침전지의 바닥부분에 전체 길이 방향에 걸쳐 분포되어 있고, 온도가 높은 물은 외부로 유출되지 않고 침전지 내에서 순환되면서 침전지내에 dead zone( 사 구역)을 형성하여 정상적인 침전을 방해한다.As shown in [Fig. 8], the density flow including sludge is distributed over the entire length direction at the bottom of the sedimentation basin, and the high temperature water is circulated in the sedimentation basin without being discharged to the outside. It forms a zone that prevents normal precipitation.

따라서 횡류식 침전지에서 일반적으로 사용하는 침전지 후단에서의 상등수 집수방식을 사용하면 밀도류의 상승 작용을 더욱 촉진하는 결과가 되어 침전이 잘 안되고 상등수 중에 슬러지가 유출될 수 도 있는 것이다.Therefore, the use of the supernatant water collection method at the rear end of the sedimentation basin which is generally used in the cross-flow sedimentation basin may further promote synergy of the density stream, which may not settle well and may cause sludge to be discharged into the supernatant.

그러나 상등수 집수 장치를 침전지의 길이 방향으로 길게 설치하고 침전지 후단에서 일정 거리에서는 상등수를 집수하지 않고, 나머지 구간에서 상등수를 집수하면, 상등수는 침전지의 밀도류가 흐르는 방향에 대하여 직각방향으로 흐르면서 집수되어, 밀도류의 속도에 의한 영향을 받지 않고, 침전작용이 일어나서 밀도류의 영향이 저감되어, 깨끗한 상등수를 얻을 수 있다.However, if the supernatant collecting device is installed in the longitudinal direction of the sedimentation basin and the supernatant is not collected at a certain distance from the rear end of the sedimentation basin and the supernatant is collected in the remaining sections, the supernatant is collected while flowing in a direction perpendicular to the direction of the flow of the density of the sedimentation basin. It is not affected by the speed of the density flow, precipitation action occurs, the influence of the density flow is reduced, and clean supernatant water can be obtained.

그러나 도면8에서 보는 바와 같이 수온차에 의하여 밀도류는 주로 정수장에서 발생하는데 수온차에 의한 밀도류가 발생한 경우는 수온이 높은 물은 침전지의 상층부에서, 뒤쪽에서 앞쪽을 향하여 침전지내에서 계속 순환하기 때문에 온도차에 의한 밀도류의 영향이 완전히 배제되지는 않는다.However, as shown in Fig. 8, the density flow is mainly caused by the water temperature difference, but when the density flow is caused by the temperature difference, the temperature difference is high because the water with high water temperature continuously circulates in the sedimentation basin from the upper part of the sedimentation basin to the rear to the front. The influence of density flows by is not completely excluded.

수온차에 의한 밀도류는 유입수의 온도가 침전지내 물 온도보다 0.5℃만 낮아도 분명한 밀도류를 형성하는 것으로 알려져 있다.The density flow caused by the water temperature difference is known to form a clear density flow even when the temperature of the influent water is only 0.5 ° C lower than the water temperature in the sedimentation basin.

따라서 이 정체된 물( 이하 중간수 라 칭한다)을 제거해야만 밀도류의 영향을 신속하게 줄일 수 있다.Therefore, this stagnant water (hereinafter referred to as intermediate water) must be removed to quickly reduce the influence of the density flow.

본 발명에서는 유입수 온도센서(23)과 중간수의 온도를 측정하는 온도센서(22)의 온도를 비교하여 유입수 온도가 중간수 온도보다 0.4℃이상 낮으면 자동적으로 중간수 조절밸브(20)을 열어 중간수 집수관(12)를 통하여 중간수를 배출하고 중간수와 유입수의 온도차가 0.2℃가 되면 중간수 조절 밸브(21)을 닫는다.In the present invention, by comparing the temperature of the influent temperature sensor 23 and the temperature sensor 22 for measuring the temperature of the intermediate water, if the influent water temperature is lower than 0.4 ℃ or more than the intermediate water temperature automatically opens the intermediate water control valve 20 The intermediate water is discharged through the intermediate water collection pipe 12, and when the temperature difference between the intermediate water and the inflow water becomes 0.2 ° C, the intermediate water control valve 21 is closed.

중간수 조절밸브(20)을 급작히 열면 수리적 충격으로 침전지내의 흐름에 교란이 발생하여 침전을 방해 하므로 중간수 조절 밸브(21)의 개폐는 서서히 이루어지고, 중간수 배출 속도도 매우 느리게 서서히 배출하도록 정하였다.When the intermediate water control valve 20 is suddenly opened, disturbance occurs in the flow in the sedimentation basin due to hydraulic shock, thereby preventing the precipitation, so that the opening and closing of the intermediate water control valve 21 is made slowly, and the medium water discharge rate is also very slowly discharged. Decided.

상기와 같이 중간수를 배출하면 침전지내에서는 침전지 단면에 걸쳐 균등한 유속분포가 일어나서 침전이 효과적으로 일어나며, 온도차가 없는 농도차에 의한 밀도류의 영향은 길이 방향으로 양쪽 벽에 설치한 상등수 집수장치(11)의 작용으로 완화되어 침전이 효과적으로 일어나고 상등수가 깨끗해진다.As described above, when the intermediate water is discharged, the sedimentation basin has an even flow velocity distribution across the sedimentation basin, and sedimentation takes place effectively.The effect of density flow due to the concentration difference without temperature difference is the supernatant water collecting device installed on both walls in the longitudinal direction (11). It is alleviated by the action of), which effectively precipitates and cleans the supernatant.

상등수 집수장치(11)는 오리피스식 집수장치를 사용하고 있어서, 오리피스 구멍(11-1)이 전부 수중에 잠기기만 하면, 오리피스 구멍의 높이차에 관계없이 균등한 집수가 이루어지므로 긴 거리에 걸친 상등수 집수에는 삼각 위어식보다 설치가 용이하고, 균등한 집수가 이루어지고, 바람이나 물결에 의한 영향도 받지 않기 때문에 항상 안정된 상등수 집수가 이루어진다.The supernatant water collecting device 11 uses an orifice type water collecting device, and as long as the orifice holes 11-1 are all submerged in water, even water collection is achieved regardless of the height difference of the orifice holes, so that The catchment is easier to install than the triangular weir type, even water collection is made, and because it is not affected by wind or waves, stable water collection is always performed.

수면 상에 떠오른 스컴은 상등수 집수 장치(11)의 벽에 수평으로 설치된 스컴 방지판(11-5)위에 설치된 슬러지 수집기의 플라이트(17-1)이 상등수 집수장치(11)의 벽 사이에 꼭 맞게 설치되어 있는 상태로 침전지의 앞쪽에서 뒤쪽으로 이동하면서 스컴 제거수로(15)의 앞까지 밀어서 이송하고, 스컴 밸브(19)를 열면 침전지내의 수면상에 있는 물과 스컴이 함께 스컴 제거 수로(19)내로 흘러 들어가고 스컴 이송 수로(15-3)을 통하여 외부로 배출되어 제거되므로, 수면상의 스컴은 남김없이 깨끗하게 제거된다.The scum that floated on the surface of the sludge collector installed on the scum prevention plate 11-5 installed horizontally on the wall of the supernatant water collecting device 11 fits tightly between the walls of the supernatant water collecting device 11. In the installed state, it moves forward from the front of the sedimentation basin to the rear and slides it to the front of the scum removing channel 15, and when the scum valve 19 is opened, the water and the scum on the surface of the sedimentation basin are combined with the scum removing channel (19). The scum on the surface of the water is cleanly removed since it flows into the inside and is discharged to the outside through the scum transfer channel 15-3.

스컴 제거는 슬러지 수집기는 연속해서 가동하고 스컴 밸브(19)를 주기적으로 열었다 닫으면서 제거한다.Scum removal is performed by running the sludge collector continuously and opening and closing the scum valve 19 periodically.

체인 플라이트식 슬러지 수집기(17)은 가동하면서 수면상의 스컴을 이송함과 동시에 침전지 바닥에 침전된 슬러지를 침전지 앞쪽에 있는 슬러지 호퍼(바)로 이송한다.The chain-flighted sludge collector 17 operates to transfer scum on the surface of the water while operating, and transfers sludge deposited at the bottom of the sedimentation basin to a sludge hopper (bar) in front of the sedimentation basin.

슬러지 수집기의 플라이트(17-1)은 상등수 집수장치(11)의 벽에 수평으로 설치한 스컴 방지판(11-5)위에 고정하여 설치한 플라이트 안내레일(17-2)를 타고 움 직이므로, 플라이트 안내레일 지지대 역할도 하고 있으므로, 별도의 플라이트 안내레일(17-2)을 지지하기 위한 지지대를 설치할 필요가 없어 매우 경제적이고 설치가 용이하다.Since the flight 17-1 of the sludge collector moves on a flight guide rail 17-2 fixedly mounted on the scum prevention plate 11-5 installed horizontally on the wall of the supernatant water collecting device 11, Since also serves as a flight guide rail support, there is no need to install a support for supporting a separate flight guide rail 17-2 is very economical and easy to install.

본 발명은 도면을 기준으로 설명하여 특정한 조건을 가진 개량된 생물학적 유입수처리장의 2차침전지에 대하여 주로 설명하였으나 이는 당업자에 의하여 무수한 변형 및 변경이 가능하며 이 모든 변경과 변형은 본 발명의 보호범위에 포함되는 것으로 해석되어야 할 것이다.The present invention has been mainly described with reference to the drawings for the secondary sedimentation battery of the improved biological influent treatment plant with specific conditions, which can be modified and modified innumerable by those skilled in the art all these changes and modifications are within the protection scope of the present invention. It should be interpreted as being included.

본 발명의 개량된 장방형 침전지는 유입부에서 유입수가 탈기되어 스컴 발생이 적고, 유입수가 균등하게 분배되고, 침전지내에서 온도차 및 농도차에 의한 밀도류의 영향이 저감되고, 상등수 집수가 가능하여 침전효율이 높고, 수면상의 스컴을 효과적으로 제거하여 상등수 수질 개선, 시각적 청결 확보, 악취방지 및 유해곤충 서식을 방지하는 효과와 상등수 집수장치와 스컴 방지판에 플라이트의 안내레일을 설치함으로서, 별도의 플라이트 안내레일용 지지대가 필요 없어서 설치가 용이하고 경제적인 효과가 있다.Improved rectangular sedimentation basin of the present invention is less in scum by inlet water degassing in the inlet, evenly distributed inlet, the influence of density flow due to temperature difference and concentration difference in the sedimentation basin, sedimentation efficiency can be collected by the supernatant This high, effective water removal of scum on the surface improves water quality, secures visual cleanliness, prevents bad odors and prevents harmful insects, and installs a separate flight guide rail by installing flight guide rails on the supernatant water collecting device and scum prevention plate. It is easy to install and economical as there is no need for support.

Claims (1)

장방형 침전지의 입구부에 설치하고, 그 윗면은 하향으로 10 ∼ 15°경사지게 설치한 월류위어(1)과;It is provided in the inlet part of the rectangular sedimentation basin, and the upper surface is a weir (1) installed inclined downward 10 to 15 °; 침전지의 폭과 같은 길이로 형성한 탈기조(2)와;A degassing tank 2 formed in the same length as the width of the sedimentation basin; 탈기조의 하부에 설치한 파이프 산기관(3)과;A pipe diffuser 3 installed in the lower part of the degassing tank; 탈기조의 다음에 설치한 도수로(4)와;A raceway 4 provided after the degassing tank; 상기 도수로를 관통하고, 4각단면의 입구부와 침전지폭과 같은 긴 수로형의 분배부로 구성하고, 분배부에는 여러 개의 분배구멍(7-1)이 중심에서 가장자리로 갈수록 커지게 형성한 균등 분배관(7)과;It is divided into the inlet part of the cross section and the long channel type distribution part such as the sedimentation basin width, and the distribution part has an equal part which has several distribution holes 7-1 formed larger from the center to the edge. A pipe 7; 균등분배관 앞에 설치한 조절수문(5)와;An adjustable sluice 5 installed in front of the equal distribution pipe; 균등분배관 후단에 30∼45°의 하향 기울기를 가지고 설치한 경사부(8)과;An inclined portion 8 provided at a rear end of the equally distributed pipe with a downward slope of 30 to 45 degrees; 경사부의 수중에 설치한 유입수 온도센서(23)과;An inflow water temperature sensor 23 installed in the water of the inclined portion; 보강재로 지지된 얇은 판재로 형성하고, 4% 이상의 개구단면적을 가지고, 침전지의 앞쪽에 설치한 유공 정류벽(9)와;A perforated rectifying wall 9 formed of a thin plate supported by a reinforcing material, having an opening cross-sectional area of 4% or more, and installed in front of the sedimentation basin; 그 폭을 6m 이내로 제한하고 그 상부를 복개한 각각의 침전지 구조물과;Each of the sedimentation basin structures whose width is limited to 6 m and covered thereon; 침전지의 양쪽 침전지 벽(10)에 설치한 오리피스식 상등수 집수장치(11)과;An orifice type supernatant water collecting device 11 installed on both settling wall walls 10 of the settling basin; 상등수 집수장치(11)의 안쪽 벽에 수평으로 설치하되, 수면에서 50∼100mm깊이에 설치한 폭100∼300mm의 스컴 방지판(11-5)와;A scum prevention plate 11-5 having a width of 100 to 300 mm installed horizontally on an inner wall of the supernatant water collecting device 11 and installed at a depth of 50 to 100 mm from the water surface; 스컴 방지판위에 설치한 플라이트 용 안내레일(17-2)와;A guide rail 17-2 for flight provided on the scum prevention plate; 상등수 집수장치(11)의 안쪽 벽 스컴 방지판 의 아래에 설치하되, 침전지 앞쪽에서 뒤쪽으로 천공하고, 침전지 뒤쪽에서 3∼5m 위치까지 일정한 간격으로 형성한 오리피수 구멍(11-2)와;Orifice water holes (11-2) installed under the inner wall scum prevention plate of the supernatant water collecting device (11), perforated from the front of the sedimentation basin to the rear, and formed at regular intervals from the rear of the sedimentation basin to 3 to 5 m positions; 상기 상등수 집수장치의 위쪽에 형성한 상등수 수로(11-3)과 아래쪽에 형성한 중간수 수로(11-4)와;A supernatant water channel 11-3 formed above the supernatant water collecting device and an intermediate water channel 11-4 formed below; 침전지의 수심 1.2∼1.8m 위치에 길이 방향과 횡방향으로 설치하되 횡방향으로 설치한 것의 양끝을 중간수 수로에 연결한 중간수 집수관(12)과;An intermediate water collecting pipe 12 installed in the longitudinal direction and the horizontal direction at a depth of 1.2 to 1.8 m of the sedimentation basin, and connecting both ends of the horizontally installed waterway to the intermediate water channel; 중간수 집수관에 형성한 오리피스 구멍(12-1)과;An orifice hole 12-1 formed in the intermediate water collection pipe; 중간수 집수관위에 설치한 온도센서(22)와;A temperature sensor 22 installed on the intermediate water collection pipe; 중간수 수로 끝에 설치한 중간수 조절밸브(20)과;An intermediate water control valve 20 installed at the end of the intermediate water channel; 침전지의 앞쪽에서 뒤쪽까지 설치하여, 플라이트(17-1)이 스컴 방지판 위를 이동하도록 하여 수면의 스컴과 슬러지를 수집하는 슬러지 수집기(17)와;A sludge collector 17 installed from the front to the rear of the sedimentation basin so that the flight 17-1 moves on the scum prevention plate and collects scum and sludge on the water surface; 침전지 폭 방향으로 수로를 형성하되, 수로의 위끝이 수면아래 1∼2cm 잠기게 하고, 수로 아래에 스컴 이송수로(15-3)을 일체로 형성한 스컴 제거 수로(15)와;A scum removal channel 15 in which a channel is formed in the width of the sedimentation basin, and the upper end of the channel is locked by 1 to 2 cm below the surface of the water, and the scum transfer channel 15-3 is formed integrally under the channel; 스컴제거 수로의 관통구멍에 설치한 스컴 밸브(19)로 구성한 것을 특징으로 하는 개량된 장방형 침전지.An improved rectangular sedimentation basin characterized by consisting of a scum valve (19) provided in a through hole of the scum removal channel.
KR1020070066545A 2007-07-03 2007-07-03 Improved rectangular sedimentation basins KR100861022B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070066545A KR100861022B1 (en) 2007-07-03 2007-07-03 Improved rectangular sedimentation basins

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070066545A KR100861022B1 (en) 2007-07-03 2007-07-03 Improved rectangular sedimentation basins

Publications (1)

Publication Number Publication Date
KR100861022B1 true KR100861022B1 (en) 2008-10-02

Family

ID=40152567

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070066545A KR100861022B1 (en) 2007-07-03 2007-07-03 Improved rectangular sedimentation basins

Country Status (1)

Country Link
KR (1) KR100861022B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101201492B1 (en) 2012-07-05 2012-11-14 주식회사 링콘테크놀로지 Front end weir device for purifying discharge water
KR101738092B1 (en) 2016-06-09 2017-05-19 정동하 Sludge collecting apparatus
CN110642381A (en) * 2019-10-29 2020-01-03 北京博汇特环保科技股份有限公司 Sedimentation tank and sewage treatment system using same

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0330804A (en) * 1989-06-27 1991-02-08 Asahi Tec Corp Sediment separating apparatus
KR920017751U (en) * 1991-03-12 1992-10-17 삼양정수공업 주식회사 Chain light type sludge removal device
JPH07328325A (en) * 1994-06-13 1995-12-19 Kubota Corp Scraping machine for sludge in sedimentation basin
JP2000185205A (en) 1998-12-24 2000-07-04 Hitachi Kiden Kogyo Ltd Sludge scraper
KR20050102957A (en) * 2004-04-23 2005-10-27 효림산업주식회사 Rectangle type suction sludge collector

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0330804A (en) * 1989-06-27 1991-02-08 Asahi Tec Corp Sediment separating apparatus
KR920017751U (en) * 1991-03-12 1992-10-17 삼양정수공업 주식회사 Chain light type sludge removal device
JPH07328325A (en) * 1994-06-13 1995-12-19 Kubota Corp Scraping machine for sludge in sedimentation basin
JP2000185205A (en) 1998-12-24 2000-07-04 Hitachi Kiden Kogyo Ltd Sludge scraper
KR20050102957A (en) * 2004-04-23 2005-10-27 효림산업주식회사 Rectangle type suction sludge collector

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101201492B1 (en) 2012-07-05 2012-11-14 주식회사 링콘테크놀로지 Front end weir device for purifying discharge water
KR101738092B1 (en) 2016-06-09 2017-05-19 정동하 Sludge collecting apparatus
CN110642381A (en) * 2019-10-29 2020-01-03 北京博汇特环保科技股份有限公司 Sedimentation tank and sewage treatment system using same

Similar Documents

Publication Publication Date Title
US4446018A (en) Waste treatment system having integral intrachannel clarifier
CN104817209A (en) Buried efficient treater of initial rainwater
KR101288298B1 (en) A rainwater and overflow water treatment apparatus using surplus sludge
CN108423788A (en) Without medicament secondary waterpower coagulation assisted pond
CA1160767A (en) Waste treatment system having integral intrachannel clarifier
KR100904214B1 (en) Improved secondary sedimentation basins of biological sewage and waste water treatment plant.
CN106563298A (en) Waste water sedimentation basin
KR100861022B1 (en) Improved rectangular sedimentation basins
CN204607764U (en) Buried efficient early-stage rainwater treatment unit
EP0659690B1 (en) Water purification plant
KR101956785B1 (en) Secondary settling basin for advanced type wastewater treatment facilities
CN113754118A (en) Adjustable inclined plate flocculation precipitation system and sewage treatment method thereof
JP5468251B2 (en) Supporting bioreactor
CN208577484U (en) Without medicament secondary waterpower coagulation assisted pond
CN103833135B (en) Activated sludge sewage-treatment plant and sewage treatment process
KR20060029765A (en) Packaged inclined clarifier with accelerating flocculation for water treatment plant
KR100647716B1 (en) Flocculation and sedimentation combined device for water treatment
JP6083688B2 (en) Cross-flow sedimentation basin with a ceiling
KR200371161Y1 (en) Packaged inclined clarifier with accelerating flocculation for water treatment plant
CN220845702U (en) High-density sedimentation tank
CN115403186B (en) A filter equipment for softening back waste water treatment
KR200367936Y1 (en) A reacting plant for tertiary sewage treatment system
CN211471044U (en) Automatic rainwater purifying device
CN219646782U (en) Inclined plate sedimentation tank for pin removal system
CN216725901U (en) Horizontal flow sedimentation tank and sedimentation system

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130704

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140702

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150720

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160706

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20170704

Year of fee payment: 10