KR100845441B1 - Installation method of Epoxy resin concrete - Google Patents

Installation method of Epoxy resin concrete Download PDF

Info

Publication number
KR100845441B1
KR100845441B1 KR1020070003144A KR20070003144A KR100845441B1 KR 100845441 B1 KR100845441 B1 KR 100845441B1 KR 1020070003144 A KR1020070003144 A KR 1020070003144A KR 20070003144 A KR20070003144 A KR 20070003144A KR 100845441 B1 KR100845441 B1 KR 100845441B1
Authority
KR
South Korea
Prior art keywords
resin concrete
block structure
permeable
water
resin
Prior art date
Application number
KR1020070003144A
Other languages
Korean (ko)
Other versions
KR20070014215A (en
Inventor
황광욱
김상근
Original Assignee
황광욱
김상근
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 황광욱, 김상근 filed Critical 황광욱
Publication of KR20070014215A publication Critical patent/KR20070014215A/en
Application granted granted Critical
Publication of KR100845441B1 publication Critical patent/KR100845441B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B26/00Compositions of mortars, concrete or artificial stone, containing only organic binders, e.g. polymer or resin concrete
    • C04B26/02Macromolecular compounds
    • C04B26/10Macromolecular compounds obtained otherwise than by reactions only involving carbon-to-carbon unsaturated bonds
    • C04B26/14Polyepoxides
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00241Physical properties of the materials not provided for elsewhere in C04B2111/00
    • C04B2111/00284Materials permeable to liquids
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/74Underwater applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

본 발명은 각기 기계적물성, 강도, 면적, 위치에 의하여 각각의 설계된 목재 및 철재와 플라스틱 구조물을 이용한 모형과 수지 콘크리트를 이용하여 간단한 설치공사로 시공시간 및 인원과 장비를 절감할 수 있는 수지콘크리트를 이용한 투과성 블록구조물 및 설치방법에 관한 것이다.The present invention is a resin concrete that can save construction time, personnel and equipment by simple installation construction using a model and resin concrete using each designed wood and steel and plastic structures by mechanical properties, strength, area, location The present invention relates to a transparent block structure and an installation method.

본 발명은 설계된 철재나 목재 또는 플라스틱 구조물 중 어느 하나에 에폭시수지 프라이머를 도포하고, 골재와 에폭시수지 및 경화제가 혼합된 수지 콘크리트 몰탈을 상기 철재나 목재 또는 플라스틱 구조물 중 어느 하나의 내측에 타설 다짐 후 경화시켜 투수성 수지 콘크리트 블럭구조물을 완성시켜 어로지역에 설치하는 투과성 블록구조의 설치방법에 있어서, 상기 수지 콘크리트 몰탈은, 골재 80∼94중량%, 에폭시수지 5∼19중량%, 경화제 1∼7중량% 로 혼합된 것이고, 상기 어로지역을 커버하는 상기 투수성 수지 콘크리트 블럭구조물(20)은, 각각 대응하는 면에 조립브라켓트(22)가 형성되어 핀축(24)으로 결합되는 복수개로 구성되며, 상기 핀축(24)에 일측을 걸고 각각 나사결합되어 높이 조절이 가능한 한 쌍의 받침대(26)로 지지 설치하는 것을 특징으로 한다.The present invention after applying the epoxy resin primer to any one of the designed steel or wood or plastic structure, and after placing the resin concrete mortar mixed with the aggregate and the epoxy resin and the curing agent inside any one of the steel, wood or plastic structure In the method of installing a permeable block structure which is hardened to complete a water-permeable resin concrete block structure and is installed in a fishing area, the resin concrete mortar may be 80 to 94% by weight of aggregate, 5 to 19% by weight of epoxy resin, and 1 to 7 hardener. The water-permeable resin concrete block structure 20, which is mixed by weight percent and covers the fishing area, is composed of a plurality of assembly brackets 22 formed on the corresponding surfaces, respectively, coupled to the pin shaft 24, Hanging one side to the pin shaft 24, each screw is coupled to support the installation is characterized by a pair of pedestal 26 is adjustable It shall be.

플라스틱구조물, 수지콘크리트몰탈, 투과성블록구조물, 투수블록Plastic Structure, Resin Concrete Mortar, Permeable Block Structure, Permeable Block

Description

수지콘크리트를 이용한 투과성 블록구조물의 설치방법{Installation method of Epoxy resin concrete}Installation method of permeable block structure using resin concrete

도 1은 본 발명에 의한 목재 또는 철재, 플라스틱구조물 중 어느 하나의 사시도이고,1 is a perspective view of any one of wood or steel, plastic structure according to the present invention,

도 2는 본 발명에 의한 수지 콘크리트와 목재 또는 철재, 플라스틱 구조물 중 어느 하나를 이용한 투과성 블럭구조물의 사시도이고,Figure 2 is a perspective view of a transparent block structure using any one of resin concrete and wood or steel, plastic structure according to the present invention,

도 3은 본 발명의 투과성블럭구조물의 조립시 유동을 방지하는 앵커조인트와 지지대의 정면도이고,3 is a front view of the anchor joint and the support to prevent flow during assembly of the permeable block structure of the present invention,

도 4는 본 발명에 의한 투과성 블록구조물을 이용하여 하수 철재 및 빗물받이 뚜껑을 설치한 상태의 평면도이고,4 is a plan view of the sewage iron and rain gutter lid is installed using the permeable block structure according to the present invention;

도 5는 본 발명에 의한 투과성 블록구조물을 이용하여 산악의 낙석방지를 위하여 설치한 돌망태용 구조물의 설치 상태도이고,5 is a state diagram of the installation of the gabion structure installed for preventing rockfall of the mountain by using a permeable block structure according to the present invention,

도 6은 본 발명에 의한 투과성 블록구조물을 이용하여 제방에 방파재 구조물을 설치한 상태도이고,6 is a state diagram in which the breakwater structure is installed on the embankment using the transparent block structure according to the present invention;

도 7은 본 발명에 의한 투과성 블록구조물을 이용하여 절개지 및 비탈면의 토사유출 방지를 위한 토사유출 방지 구조물의 상태도이고,7 is a state diagram of the soil leakage prevention structure for preventing soil leakage of the incision and slope using the permeable block structure according to the present invention,

도 8은 본 발명에 의한 다른 실시예의 어도용블록구조물의 평면도이고,8 is a plan view of an adobe block structure of another embodiment according to the present invention;

도 9는 본 발명에 의한 다른 실시예의 어도용블록구조물을 한 쌍으로 조립한 분해사시도이고,Figure 9 is an exploded perspective view of assembling a pair of adobe block structure of another embodiment according to the present invention,

도 10은 본 발명의 다른 실시예에 의한 어도용블록구조물 받침상태 사시도이고,Figure 10 is a perspective view of the adobe block structure supporting state according to another embodiment of the present invention,

도 11은 본 발명의 다른 실시예에 의한 어도용블록구조물의 각도 조절상태도이다.11 is an angle adjustment state of the block structure for use in accordance with another embodiment of the present invention.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

1:철재 및 목재, 플라스틱 구조물 2:투과성 블록구조물 1: Steel, wood and plastic structures 2: Permeable block structures

3:앵커볼트 조인트와 지지대 4:빗물받이 뚜껑 3: Anchor bolt joint and support 4: Rain gutter lid

5:돌망태용 투수블록 6:방파재용 투수블록5: pitching block for gabion 6: pitcher block for breakwater

본 발명은 수지콘크리트를 이용한 투과성 블록구조물의 설치방법에 관한 것으로서, 더욱 상세하게는 각기 기계적 물성, 강도, 면적, 위치에 의하여 각각 설계된 철재나 목재 및 플라스틱 구조물중 어느 하나와 수지 콘크리트 몰탈을 이용하여 투과성 블럭구조물을 형성하여, 물막이공사 및 기초 부수적인 공사가 필요없이 간단한 설치공사로 시공시간을 단축하며 인원과 장비를 크게 절감하여 경제적이면서 간편한 사용을 이룰 수 있는 수지콘크리트를 이용한 투과성 블록구조물의 설치방법에 관한 것이다.The present invention relates to a method of installing a permeable block structure using resin concrete, and more particularly, using any one of the steel, wood and plastic structures designed by mechanical properties, strength, area, and location, respectively, and resin concrete mortar. Forming the permeable block structure, the installation of the permeable block structure using resin concrete can be achieved economically and conveniently by shortening the construction time and greatly reducing the number of people and equipment by the simple installation construction without the need of water barrier construction and the subsidiary construction. It is about a method.

종래의 블럭구조물은 각종 철근과 시멘트 및 콘크리트를 배합하여 기초공사 및 원 공사를 돌망태와 시멘트콘크리트 등을 사용하여 절개지, 토사유출방지공사와 방조제공사 등을 하였으나, 이는 시멘트의 특성인 알카리성으로 수질을 오염시키고, 생태계 변경의 원인이 되었고, 작업능률의 저하로 인하여 여러 가지 문제점이 있는 공법이었다.In the conventional block structure, a variety of reinforcing bars, cement and concrete were used to cut the foundation, the original construction using gabions and cement concrete, etc. Pollution, causing changes in the ecosystem, and due to the degradation of the work efficiency was a method with a number of problems.

이러한 공법은, 특히 돌망태의 경우에는 우수 등 물은 잘 배출되나 공사가 위험하고 시멘트콘크리트공법은 철근 배근과 양생 등으로 공사기간이 길어지는 문제점이 있었다.This method, especially in the case of gabions, water is well discharged, but construction is dangerous, the cement concrete method has a problem that the construction period is long due to reinforcement and curing.

그리고 종래에 사용되는 어도용블럭구조물은 물막이 공사와 각종 철근과 시멘트, 콘크리트를 배합하여 기초공사 및 원공사를 콘크리트등을 사용하여 회귀성 어종 및 상류에 부화하기 위하여 올라가는 어종의 도로에 이용되었으나 이는 시멘트 특성의 알카리성으로 수질을 오염시키고 생태계 환경변화로 인하여 사용에 여러 가지 문제점이 있었다.In addition, the conventional fish block structure was used in the road of fish species that climbed in order to hatch the reconstructed fish species and the upstream using the concrete, etc. Due to its alkaline nature, there are various problems in use due to pollution of water quality and changes in ecosystem environment.

이러한 어도용블럭구조물은 물흐름에 따른 물살 저항을 조절하지 못하여 회귀성 어종이 상류로 올라가는데 크게 도움이 되지 못하는 실정이었다.These fish block structures could not control the water resistance according to the water flow, so the regressive fish species did not help significantly upstream.

한편, 종래 보도블럭구조물은 각기 분리되어 하중에 의하여 하자 발생이 있었으며 투수성 콘크리트 등을 사용하여 지면에 물이 흘러내리도록 하는 자연 투수방식으로서, 표면에 석재와 골재, 자갈, 모래, 등을 넣고 보도블럭을 설치 마감하는 실정이다.Meanwhile, the conventional sidewalk block structure is separated from each other and there is a defect by load, and it is a natural permeation method that water flows down to the ground using permeable concrete, and put stone, aggregate, gravel, sand, etc. on the surface. The press block is currently being installed.

이러한 공법은 우기 시 일시적인 지표면의 물을 공급할 뿐 지속적인 장마에 따른 홍수 대비책이 되지 못하는 실정이었다.This method only provided temporary surface water during the rainy season and was not prepared for flooding due to the rainy season.

한편, 종래 생활용수 배출용 구조물은 철재 또는 플라스틱으로 물이 하수도로 용이하게 흘러내릴 수 있도록 구조물의 내부에 구멍을 내어 이물질(머리카락 및 음식물 찌꺼기 등)을 걸러내는 정도이나 이는 구멍이 상대적으로 크고 하수구 막힘이 있었으며 하수구의 악취가 역류하여 주변에 심한 냄새가 발생하는 문제가 있다.On the other hand, the conventional structure for discharging water for daily living is made of iron or plastic to filter out foreign substances (such as hair and food dregs) by making holes in the structure so that water can easily flow down into the sewer, but this is a relatively large hole and a sewer. There was a blockage and the bad smell of sewer flows back causing a bad smell around.

이러한 배출용 구조물은 단순한 생활용수의 흐름이 용이하고, 음식물의 찌꺼기중 5mm이상의 것들만 거둬 내는 효과는 있으나 악취를 제거할 수 없어 항상 악취발생이 일어나는 문제점이 있었다.Such a discharge structure has a problem that the flow of simple living water is easy, and the effect of removing only 5mm or more of food residues is not able to remove odors, so that odors always occur.

본 발명은 이러한 종래의 제반 문제점을 해결하기 위해 창안된 것으로서, 각 구조물의 모형과 크기에 따라 투과용 수지 콘크리트를 공장에서 제조하여 현장에서 조립, 설치 사용함으로 작업공수를 절감하여 공사기간을 줄이고, 환경에 무해한 수지 콘크리트를 사용함으로써 생태계를 보존할 수 있도록 개발하여 안정되고 신속한 공사를 이룰 수 있는 수지콘크리트를 이용한 투과성 블록구조물의 설치방법을 제공함에 그 목적이 있다.The present invention was devised to solve these conventional problems, and according to the model and size of each structure to manufacture the permeable resin concrete in the factory to reduce the construction period by reducing the labor time by assembling, installing in the field, The purpose is to provide a method of installing a permeable block structure using resin concrete, which can be developed to preserve the ecosystem by using resin concrete that is harmless to the environment, thereby achieving stable and rapid construction.

본 발명은 다른 목적은, 투과성 수지 콘크리트를 이용한 어도용 블럭구조물을 제조하여, 투과성수지 콘크리트 구조물에 의한 유속을 저하시켜 회귀성 어종이 상류로 원활하게 이동할 수 있도록 하였으며 수질의 오염을 예방하고 생태계를 보존할 수 있으며, 어로의 이동이나 위치 변경이 필요할 시에는 분리하여 원하는 위치에 재설치 사용할 수 있는 수지콘크리트를 이용한 투과성 블록구조물의 설치방법을 제공함에 있다.Another object of the present invention is to manufacture a block structure for the fish using permeable resin concrete, to reduce the flow rate by the permeable resin concrete structure to allow the regressive fish species to move smoothly upstream, to prevent water pollution and preserve the ecosystem When the need to move or change the position of the fish can be separated and reinstalled in the desired position to provide a method of installing the transparent block structure using the resin concrete.

본 발명은 또 다른 목적은, 투과성 수지 콘크리트를 이용한 물저장용 블럭구조물을 제조하여, 현장 설치시에 우기 및 폭우 시의 일정기간 물을 저장하여 건기 시에 서서히 물을 배출하는 구조물로서, 일시적인 홍수피해를 예방하고 지면에 일정량의 물을 보충함으로 수질의 오염을 예방하고, 생태계를 보존할 수 있도록 하고, 또한 학교 운동장 등 대형건물의 주차장 및 공원 등에 설치하여 지하 물탱크로 통로를 연결하면 수량을 더욱 확보할 수 있으며, 이 저장된 물로 정원 또는 화초용수와 세면 및 화장실용수로 활용할 수 있어 물의 재활용이 가능한 수지콘크리트를 이용한 투과성 블록구조물의 설치방법을 제공함에 있다.Another object of the present invention is to manufacture a block structure for water storage using permeable resin concrete, and to store water for a certain period during rainy and heavy rain at the time of site installation, and gradually discharges water during dry season, temporary flooding Preventing damage and replenishing a certain amount of water on the ground prevents water pollution, preserves the ecosystem, and installs it in parking lots and parks of large buildings such as school grounds and connects the passage with underground water tanks. It can be further secured, and the stored water can be utilized as garden or flower water and toilet and toilet water, to provide a method of installing a permeable block structure using resin concrete that can be recycled.

본 발명은 또 다른 목적은, 수지 콘크리트를 이용한 생활용수 블럭구조물을 제조하여, 현장설치시에 하수구로 물흐름을 원활하게 함과 동시에 하수구 막힘을 방지하여 악취도 방지하면서 고강도 투수성 수지 콘크리트를 활용하여 주택 목욕탕 수영장 등의 샤워실 또는 주변에 시공하면 비누 또는 물기로 인한 미끄럼을 방지 할 수 있는 수지콘크리트를 이용한 투과성 블록구조물의 설치방법을 제공함에 있다.Another object of the present invention is to manufacture a living water block structure using resin concrete, while using the high-strength water-permeable resin concrete while preventing the odor by preventing the clogging of the sewer at the same time to facilitate the water flow to the sewer during installation on site The present invention provides a method of installing a permeable block structure using resin concrete that can be prevented from slipping due to soap or water when installed in a shower room or a surrounding such as a swimming pool of a house bathroom.

상기와 같은 목적을 달성하기 위하여 본 발명은 설계된 철재나 목재 또는 플라스틱 구조물 중 어느 하나에 에폭시수지 프라이머를 도포하고, 골재와 에폭시수지 및 경화제가 혼합된 수지 콘크리트 몰탈을 상기 철재나 목재 또는 플라스틱 구조물 중 어느 하나의 내측에 타설 다짐 후 경화시켜 투수성 수지 콘크리트 블럭구조물을 완성시켜 어로지역에 설치하는 투과성 블록구조의 설치방법에 있어서, 상기 수지 콘크리트 몰탈은, 골재 80∼94중량%, 에폭시수지 5∼19중량%, 경화제 1∼7중량% 로 혼합된 것이고, 상기 어로지역을 커버하는 상기 투수성 수지 콘크리트 블럭구조물(20)은, 각각 대응하는 면에 조립브라켓트(22)가 형성되어 핀축(24)으로 결합되는 복수개로 구성되며, 상기 핀축(24)에 일측을 걸고 각각 나사결합되어 높이 조절이 가능한 한 쌍의 받침대(26)로 지지 설치하는 것을 특징으로 하는 수지콘크리트를 이용한 투과성 블록구조물의 설치방법이다.In order to achieve the above object, the present invention is to apply an epoxy resin primer to any one of the designed steel or wood or plastic structure, and the resin concrete mortar mixed with aggregate and epoxy resin and hardener of the steel, wood or plastic structure In the installation method of the permeable block structure to be completed after the compaction of any one of the inside compacted to complete the water-permeable resin concrete block structure to be installed in the fishing area, the resin concrete mortar is 80 to 94% by weight aggregate, 5 to epoxy resin The water-permeable resin concrete block structure 20, which is mixed with 19 wt% and 1-7 wt% of the curing agent, covers the fish area, and an assembly bracket 22 is formed on a corresponding surface thereof to form a pin shaft 24. Consists of a plurality of coupled to each other, one side to the pin shaft (24) is coupled to each one of the pair of height adjustable by screwing Using a resin concrete, characterized in that for supporting installation with a bed 26, it is the installation method of transmitting a block structure.

삭제delete

이하, 본 발명의 바람직한 실시 예를 첨부된 도면을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

그리고, 본 발명을 설명함에 있어, 관련된 공지기능 혹은 구성에 대한 구체적인 설명은 본 발명의 요지를 모호하기 않게 하기 위하여 생략한다.In describing the present invention, detailed descriptions of related well-known functions or configurations are omitted in order not to obscure the subject matter of the present invention.

도 1은 본 발명의 목재나 철재 또는 플라스틱구조물 중 어느 하나이며, 도 2는 본 발명의 수지 콘크리트를 이용한 투과성 블럭구조물을 제조한 상태도이며, 도 3은 본 발명의 앵커보울트 및 지지대를 나타내고 있다.1 is any one of wood, steel or plastic structure of the present invention, Figure 2 is a state diagram of manufacturing a permeable block structure using the resin concrete of the present invention, Figure 3 shows the anchor bolt and the support of the present invention.

도 1 내지 도 3에 도시한 바와 같이, 본 발명의 수지콘크리트를 이용한 투과성 블록구조물 및 그 설치구조는 각기 용도에 맞도록 설계된 철재나 목재 또는 플라스틱 구조물(1) 중 어느 하나에 에폭시수지프라이머를 도포하고, 골재(자갈, 규석 등)와 에폭시수지 및 경화제를 용도에 맞도록 비율을 선정하여 혼합한 수지 콘크리트 몰탈을 상기 철재나 목재 또는 플라스틱구조물(1) 중 어느 하나의 내측에 타설 다짐 후 경화시켜 투과성 블록구조물(2)을 완성하였다.As shown in Figures 1 to 3, the permeable block structure and the installation structure using the resin concrete of the present invention is coated with an epoxy resin primer on any one of the steel, wood or plastic structure (1) designed for each application In addition, the resin concrete mortar mixed with aggregate (gravel, silica, etc.), epoxy resin and hardener according to the purpose is selected to be hardened after being poured into one of the steel, wood, or plastic structure (1). The transparent block structure 2 was completed.

여기서 설계된 철재 및 목재, 플라스틱 구조물(1)은 중 어느 하나의 내측에 상기 수지 콘크리트 몰탈은 골재 80∼94중량%, 에폭시수지 5∼19중량%, 경화제 1∼7중량%를 혼합한 것으로 상기 투과성 블럭구조물(2)의 수지 콘크리트 몰탈은 물이 통과할 수 있도록 형성한다.The designed steel, wood, and plastic structure (1) is a mixture of 80 to 94% by weight of aggregate, 5 to 19% by weight of epoxy resin, and 1 to 7% by weight of hardening agent in the resin concrete mortar. The resin concrete mortar of the block structure 2 is formed to allow water to pass therethrough.

상기 투과성 블록구조물(2)은 설치장소 또는 목적에 따라 각기 기계적 물성, 강도, 면적, 위치에 의하여 각각의 설계된 철재, 목재나 플라스틱구조물 중 어느 하나에 수지콘크리트를 사용하여 공장에서 생산 조정한다.The permeable block structure (2) is produced and adjusted in the factory using resin concrete for each of the designed steel, wood or plastic structure according to the mechanical properties, strength, area, and location, respectively, depending on the installation location or purpose.

여기서 투과성 블록구조물(2)은 투수성 수지콘크리트 블록구조물을 도 4와 같은 빗물받이 뚜껑(4)에 설치하여 사용하거나, 도 5와 같이 돌망태용 투수블럭(5)이나, 도 6과 같이 방파제용 투수블럭(6)이나, 도 7과 같이 토사유출방지용 투수성블럭구조물(7)이나, 도 8 내지 도 11과 같이 어도용 투수성 수지콘크리트 블럭구조물(20)이나, 물저장용 투수성 수지콘크리트 블럭구조물이나, 생활용수 투수성 수지콘크리트 블럭구조물 등으로 완성하여 설치 사용하도록 이루어진다.Here, the permeable block structure 2 is used by installing the water-permeable resin concrete block structure on the rain gutter lid 4 as shown in FIG. 4, or as the permeable block 5 for the gabion as shown in FIG. 5, or for the breakwater as shown in FIG. 6. Water permeable block 6, water permeable block structure 7 for preventing soil outflow as shown in Fig. 7, water permeable resin concrete block structure 20 as shown in Figs. 8 to 11, water permeable resin concrete for water storage Block structure, water-permeable resin concrete block structure, etc. are completed to be used for installation.

일반적으로 투수 또는 투과성 콘크리트는 투수량이 증가할수록 공극의 확장으로 인하여 물성의 기계적 강도(압축, 휨 인장 강도 등)가 현격히 떨어지는 등의 단점이 있다. 이에 비하여 본 투과성 수지 콘크리트는 공재의 입도와 에폭시 수지의 배합비율을 조정하여 투수량의 증가에도 물성의 기계적 강도가 비교적 안정적으로 유지된다. 투과성 콘크리트의 기계적물성은 압축강도 300Kgf/㎠ 이상, 휨강도 100Kgf/㎠ 이상, 우수유출량 500ml/15초 이상이다In general, permeable or permeable concrete has a disadvantage in that the mechanical strength (compression, flexural tensile strength, etc.) of the physical property is significantly decreased due to the expansion of the voids as the permeability increases. On the other hand, in the present permeable resin concrete, the mechanical strength of the physical properties is relatively stably maintained even though the permeability is increased by adjusting the particle size of the common material and the mixing ratio of the epoxy resin. The mechanical properties of the permeable concrete are more than 300Kgf / ㎠ compressive strength, more than 100Kgf / ㎠ flexural strength, and 500ml / 15 seconds excellent runoff.

시멘트의 특성인 강알카리성에 대한 수질오염 및 생태계 변화가 없다. 음료수용에 사용하는 무독성 에폭시 수지 계통의 수지와 규사 등의 골재와 에폭시 수지를 코팅한 철재 및 목재,플라스틱 재료를 사용함으로 수질과 생태계 변화가 전혀 없다. 그 외의 사항으로 투과성 수지 콘크리트의 사용으로 물이 자연적으로 통과됨에 따라 수질의 보호와 더불어 토양 등 자연생태계의 환경 보호에도 도움이 된다.There is no water pollution and ecosystem change for strong alkalinity which is a characteristic of cement. There is no change in water quality and ecosystem by using aggregates such as resin and silica sand of non-toxic epoxy resin system used for drinking water and iron, wood, and plastic materials coated with epoxy resin. In addition, as water passes naturally through the use of permeable resin concrete, it helps to protect the water quality and the environment of the natural ecosystem such as soil.

상기 어도용 투수성수지 콘크리트 블럭구조물(20)은 상기에서와 같이 설치장소 또는 목적에 따라 각기 기계적 물성, 강도, 면적, 위치에 의하여 각각의 설계된 철재, 목재나 플라스틱구조물 중 어느 하나에 수지콘크리트를 사용하여 공장에서 생산하여 도 8과 같이 완성한다.The water-permeable water-permeable resin concrete block structure 20 is a resin concrete to any one of each of the designed steel, wood or plastic structure according to the mechanical properties, strength, area, location according to the installation location or purpose as described above It is produced in the factory using and completed as shown in FIG.

이러한 어도용 투수성수지 콘크리트 블럭구조물(20)을 하나 이상 조립하여 사용할 때에는 도 9와 같이 각각 대응하는 면에 조립브라켓트(22)를 부착하고 핀축(24)을 결합하여 도 10과 같이 받침대(26)를 지지 설치하여 사용할 수 있다.When assembling one or more such water-permeable resin concrete block structures 20 for use, the mounting brackets 22 are attached to the corresponding surfaces as shown in FIG. 9, and the pin shafts 24 are coupled to each other to form a pedestal 26 as shown in FIG. 10. ) Can be used by supporting it.

상기 받침대(26)는 한 쌍으로 이루어지고 각각 나사결합되어 높이 조절이 가능하게 이루어진다.The pedestal 26 is made of a pair and each screw is made possible to adjust the height.

따라서 도 11과 같이 지면이나 골재 등에 상호 필요한 각도로 조절되어 설치하여 어도용이 완성되어 급류에서도 어도 내의 수압은 물고기가 이동하기 적당한 수압을 유지하여 물고기의 이동을 자유롭고 편리하게 한다.Therefore, as shown in Figure 11 is adjusted to the required angle, such as the ground or aggregate, the use of the fish is completed, the water pressure in the fish in the rapids to maintain the proper water pressure for the fish to move freely and convenient to move the fish.

한편, 물저장용 블록구조물을 이용하여 제조 후 시공시 각 구조물의 용량에 따라 물을 저장함으로 홍수 조절 능력을 일정부분 발휘하고 수질 오염 및 생태계를 보존하는 등의 이중효과를 거둘수 있다.On the other hand, by using the water storage block structure when manufacturing and storing the water according to the capacity of each structure during construction can exhibit a dual effect such as exhibiting a certain portion of the flood control capacity and preserve water pollution and ecosystem.

일 실시예 : 보도블럭(10cm*20cm*7cm 일때 50%물저장 500만개 시공시)Example: Covering block (When constructing 5 million pieces of 50% water storage at 10cm * 20cm * 7cm)

10*20*7*0.5=0.7ℓ*500만개=350만ℓ               10 * 20 * 7 * 0.5 = 0.7ℓ * 5 million pcs = 3.5 millionℓ

경계블럭(100cm*30cm*20cm 일때 50%물저장 100만개 시공시)Boundary Block (1 million pieces of 50% water storage at 100cm * 30cm * 20cm)

100*30*20*0.5=30ℓ*100만개=3000만ℓ               100 * 30 * 20 * 0.5 = 30ℓ * 1 million pcs = 30 millionℓ

보도블럭 + 경계블럭 = 350만ℓ +3000만ℓ = 3350만ℓ 를 당분간 일시저장Sidewalk block + Boundary block = 3.5 millionℓ + 30 millionℓ = 33.5 millionℓ

물이 자연적으로 지면에 서서히 통과됨에 따라 수질의 보호와 더불어 토양 등 자연 생태계의 환경보호에도 도움이 된다.As water slowly passes through the ground naturally, it helps not only to protect the water quality but also to protect the environment of natural ecosystems such as soil.

한편, 본 발명의 상세한 설명에서는 구체적인 실시 예에 관해서 설명하였으나, 본 발명의 범위에서 벗어나지 않는 한도 내에서 여러 가지 변형 가능함은 당해 분야에서 통상의 지식을 가진 자에게 있어서 자명하다 할 것이다.On the other hand, the detailed description of the present invention has been described with respect to specific embodiments, it will be apparent to those skilled in the art that various modifications can be made without departing from the scope of the present invention.

이상으로 살펴본 바와 같이, 본 발명에 따른 수지 콘크리트를 이용한 투과성 블록구조물을 이용하여 제조 후 시공시 유량 및 유속에 의하여 각 구조물의 크기에 따라 물의 투과량을 일정부분 조절할 수 있고 수질 오염 및 생태계를 보존하는 등의 이중효과를 거둘 수 있다. 외벽의 문양(돌출 등의 모형)의 제작이 자유롭고, 색상이 다양하게 연출될 수 있어 자연경관을 해치지 않는다.As described above, by using the permeable block structure using the resin concrete according to the present invention can be adjusted according to the size of each structure according to the size of each structure by the flow rate and flow rate during construction and to preserve the water pollution and ecosystem It can have a dual effect. The production of patterns on the exterior walls (models such as protrusions) is free, and the colors can be produced in various ways so as not to harm the natural landscape.

Claims (8)

삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 설계된 철재나 목재 또는 플라스틱 구조물 중 어느 하나에 에폭시수지 프라이머를 도포하고, 골재와 에폭시수지 및 경화제가 혼합된 수지 콘크리트 몰탈을 상기 철재나 목재 또는 플라스틱 구조물 중 어느 하나의 내측에 타설 다짐 후 경화시켜 투수성 수지 콘크리트 블럭구조물을 완성시켜 어로지역에 설치하는 투과성 블록구조의 설치방법에 있어서,Epoxy resin primer is applied to any of the designed steel, wood or plastic structures, and the resin concrete mortar mixed with the aggregate, epoxy resin and hardener is poured into the inside of any one of the steel, wood or plastic structures and then cured. In the installation method of the permeable block structure to complete the resin resin concrete block structure to be installed in the fishing area, 상기 수지 콘크리트 몰탈은, 골재 80∼94중량%, 에폭시수지 5∼19중량%, 경화제 1∼7중량% 로 혼합된 것이고,The resin concrete mortar is a mixture of 80 to 94% by weight aggregate, 5 to 19% by weight epoxy resin, 1 to 7% by weight hardener, 상기 어로지역을 커버하는 상기 투수성 수지 콘크리트 블럭구조물(20)은, 각각 대응하는 면에 조립브라켓트(22)가 형성되어 핀축(24)으로 결합되는 복수개로 구성되며,The water-permeable resin concrete block structure 20 covering the fishing area is composed of a plurality of assembly brackets 22 are formed on the corresponding surface, respectively, coupled to the pin shaft 24, 상기 핀축(24)에 일측을 걸고 각각 나사결합되어 높이 조절이 가능한 한 쌍의 받침대(26)로 지지 설치하는 것을 특징으로 하는 수지콘크리트를 이용한 투과성 블록구조물의 설치방법.Hanging one side to the pin shaft (24), each screw is coupled to support the installation method of the transparent block structure using a resin concrete, characterized in that the support is installed by a pair of pedestal (26). 삭제delete 삭제delete
KR1020070003144A 2006-08-31 2007-01-11 Installation method of Epoxy resin concrete KR100845441B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR2020060023430 2006-08-31
KR20060023430 2006-08-31

Publications (2)

Publication Number Publication Date
KR20070014215A KR20070014215A (en) 2007-01-31
KR100845441B1 true KR100845441B1 (en) 2008-07-14

Family

ID=38013631

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070003144A KR100845441B1 (en) 2006-08-31 2007-01-11 Installation method of Epoxy resin concrete

Country Status (1)

Country Link
KR (1) KR100845441B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108609917B (en) * 2018-06-07 2021-01-05 安徽匠星联创新材料科技有限公司 Epoxy resin water permeable pavement material and preparation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100340821B1 (en) 1995-06-23 2005-01-25 삼성종합화학주식회사 Coating resin comprising acryl urethane resin and curing agent, and synthetic resin packing material comprising aggregate, acryl urethane resin and curing agent
KR200382773Y1 (en) 2005-01-31 2005-04-22 황광욱 Block structure construction device using permeable resin concrete
KR20060084965A (en) * 2005-01-21 2006-07-26 주식회사 유레카특수화학 Block and method for manufacturing thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100340821B1 (en) 1995-06-23 2005-01-25 삼성종합화학주식회사 Coating resin comprising acryl urethane resin and curing agent, and synthetic resin packing material comprising aggregate, acryl urethane resin and curing agent
KR20060084965A (en) * 2005-01-21 2006-07-26 주식회사 유레카특수화학 Block and method for manufacturing thereof
KR200382773Y1 (en) 2005-01-31 2005-04-22 황광욱 Block structure construction device using permeable resin concrete

Also Published As

Publication number Publication date
KR20070014215A (en) 2007-01-31

Similar Documents

Publication Publication Date Title
US20110064517A1 (en) Reinforced pervious concrete
CN106917522B (en) A kind of Outdoor Parking position system based on sponge the idea of the city
KR100663793B1 (en) Jointed facilities keeping rainwater and method for constructing it
KR100720735B1 (en) The rainwater manhole of water permeability type and the making method thereof
DE10000025A1 (en) Water system, especially for rain water for collection and intermediate storage, and for reducing and extended time-throttled delivery of water introduced in water system; has at least one drainage pipe
CN207749602U (en) Rainwater seepage well for greenbelts and sidewalks in building community
CN114606823B (en) Cement-based permeable concrete pavement structure and paving method thereof
KR100845441B1 (en) Installation method of Epoxy resin concrete
KR20140001756U (en) A permeable block and a rainwater pipe permeable structure
JP2008008125A (en) Method for making permeable pavement material and permeable molded/machined product
KR101180458B1 (en) Block structure for rainwater infiltration of side walk
DE10004944A1 (en) Water system, for receiving and intermediate storage of rainwater, also reduction and extended time throttled delivery of water, includes at least one drainage pipe
KR101902890B1 (en) Reinforced waterway pipe having gutter type and rectangular type
JP2011111881A (en) Geo-miracle soil pavement
JP2016148140A (en) Dispersion type water storage method
KR101501733B1 (en) The eco-friendly precast l type retaining wall fixed with an anchor
CN208830083U (en) A kind of overhead type draining floor file structure
KR101755435B1 (en) Salt farm flooring and constructing method thereof
WO2001057317A1 (en) Drainage system
CN212865504U (en) Do benefit to park pavement structure of drainage
JPH072564A (en) Reinforced plastic fiber glass binder
KR200397790Y1 (en) The rainwater manhole of water permeability type
KR101708009B1 (en) Coating light weight buoyant body for blocking off bad smell and grating assembly therewith
CN212688619U (en) Ecological environmental protection's sponge city body-building pavement structure
KR20120117598A (en) Prefabricated road block with storage tank and construction method

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
J201 Request for trial against refusal decision
E902 Notification of reason for refusal
B701 Decision to grant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120629

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20130730

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee