KR100840928B1 KR1020060053620A KR20060053620A KR100840928B1 KR 100840928 B1 KR100840928 B1 KR 100840928B1 KR 1020060053620 A KR1020060053620 A KR 1020060053620A KR 20060053620 A KR20060053620 A KR 20060053620A KR 100840928 B1 KR100840928 B1 KR 100840928B1
Authority
KR
South Korea
Prior art keywords
water supply
faucet
water
pipe
hot water
Prior art date
Application number
KR1020060053620A
Other languages
Korean (ko)
Other versions
KR20070109749A (en
Inventor
윤자중
Original Assignee
주식회사 국민에너지
(주)오폼프
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 국민에너지, (주)오폼프 filed Critical 주식회사 국민에너지
Publication of KR20070109749A publication Critical patent/KR20070109749A/en
Application granted granted Critical
Publication of KR100840928B1 publication Critical patent/KR100840928B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • E03C2001/026Plumbing installations for fresh water with flow restricting devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/02Branch units, e.g. made in one piece, welded, riveted
    • F16L41/023Y- pieces
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Domestic Plumbing Installations (AREA)

Abstract

본 발명은 공동주택과 아파트, 목욕탕 등의 건물내 배관 시공 기술에 관한 것이다.The present invention relates to a pipe construction technology in buildings, such as apartment houses, apartments, bathrooms.

이 같은 본 발명은, 사용자가 직접 느끼지 못하는 수전들을 별도 배관 분기하여 연결하고 사용자가 직접 온도와 유량 변화를 느끼는 수전에는 급수 공급량을 보충하기 위한 라인을 연결함으로써, 다수 구비되는 수전의 동시 사용시 자연 압력에 의해 수전에서의 유량 부족 현상을 최대한 해결하고 그에 따른 온수의 온도 편차를 효과적으로 방지함은 물론, 급수의 급격한 유량변화로 인해 진동과 충격음이 발생하는 수격 현상을 방지할 수 있도록 하는 온수의 온도편차 보정을 위한 배관 시공방법을 제공하는 것이다.The present invention is connected to the faucet that does not feel the user directly by connecting a separate pipe and the user directly feels the temperature and flow rate by connecting a line for replenishing the supply of water supply, the natural pressure at the same time using a plurality of faucets By solving the water shortage phenomenon in the faucet to the maximum and effectively prevent the temperature deviation of the hot water according to the temperature deviation of the hot water to prevent the water hammer phenomenon caused by vibration and impact sound due to the rapid flow rate change of the water supply It is to provide a pipe construction method for correction.

급수관, 온수관, 점검함, 분배기, 이중관, Water pipe, hot water pipe, check box, distributor, double pipe,

Description

온수의 온도 편차 보정을 위한 배관 시공방법{Piping form of construction work for temperature anomaly revision of warm water}Piping form of construction work for temperature anomaly revision of warm water}

도 1은 본 발명의 제 1 실시예에 따른 온수의 온도편차 보정을 위한 배관 시공 경로의 평면도.1 is a plan view of a piping construction path for the temperature deviation correction of hot water according to a first embodiment of the present invention.

도 2는 본 발명의 제 1 실시예로 화장실 벽체내에서의 배관 시공 단면.Figure 2 is a cross-sectional view of the pipe construction in the toilet wall in the first embodiment of the present invention.

도 3은 본 발명의 제 1 실시예로 계량기 및 분배기에서의 이중관 연결상태를 보인 개략도.Figure 3 is a schematic diagram showing a double pipe connection state in the meter and distributor in the first embodiment of the present invention.

도 4는 본 발명의 제 1 실시예로 보일러의 배관 연결 상태도.Figure 4 is a pipe connection state diagram of the boiler in a first embodiment of the present invention.

도 5는 본 발명의 제 2 실시예로 화장실이 복수로 이루어진 세대내에서 온수의 온도편차 보정을 위한 배관 시공 경로의 평면도.FIG. 5 is a plan view of a pipe construction path for correcting a temperature deviation of hot water in a household in which a toilet is formed in plural as a second embodiment of the present invention. FIG.

*도면의 주요부분에 사용된 부호의 설명** Explanation of symbols used in the main part of the drawing *

1 ; 인입 계량기One ; Incoming meter

2 ; 급수분배기2 ; Water distributor

3a,3b,3c,3d,3e,3f,3g; 점검함3a, 3b, 3c, 3d, 3e, 3f, 3g; Checked

4 ; 급수이중관4 ; Water supply double pipe

4a; 급수관4a; feed pipe

5 ; 차단밸브5; Shut-off valve

6; 정유량 조절밸브6; Constant flow control valve

7 ; Y자형 이음부7; Y-shaped joint

8 ; 온수 이중관8 ; Hot water double pipe

8a; 온수관8a; Hot water pipe

본 발명은 공동주택과 아파트, 목욕탕 등의 건물내 배관 시공 기술에 관한 것으로서, 보다 상세하게는 건물내의 각 수요처로 분배기를 통해 이중관을 분배한 후 이에 수전을 연결하는 배관의 시공방법에 있어, 분배기를 통해 분배되는 각 수요처의 수전을 동시에 사용할 경우 수전(특히 샤워기)마다 적정한 유량을 공급시켜 온수를 사용하는 수전에서의 온수 온도 편차를 방지하는 온수의 온도편차 보정을 위한 배관 시공방법에 관한 것이다.The present invention relates to a pipe construction technology in buildings, such as apartments, apartments, bathrooms, and more particularly, in the construction method of the pipe connecting the faucet after distributing the double pipe through the distributor to each demand in the building. When using the faucet of each demand source distributed through through at the same time to provide an appropriate flow rate for each faucet (particularly the shower) relates to the piping construction method for the temperature deviation correction of the hot water to prevent the hot water temperature deviation in the faucet using hot water.

근래 들어 주택, 아파트, 목욕탕 등의 주거 공간에 마감재의 고급화로 인하여 배관 누수시 건축마감재의 손상이 문제화됨으로 매립형 검검함을 이용한 이중관 공법이 채택되어 시공되어지는 추세이다.Recently, due to the high quality of finishing materials in residential spaces such as houses, apartments and bathhouses, the damage of building finishing materials becomes a problem when leaking plumbing, and the double pipe method using a buried inspection system is adopted.

또한, 급수 방식이 예전에는 고가 수조 방식이었지만, 급수 유량 부족 현상으로 인하여 부스터 펌프 방식으로 전환되었다.In addition, the water supply method was previously a high-cost water tank method, but was switched to the booster pump method due to the lack of water supply flow rate.

그러나, 현재 이중관을 시공하고 이에 각종 수전을 연결하여 사용하는 이중 관 시공방식은, 여러개의 수전을 동시에 사용할 경우 온수를 사용하는 수전에서의 온수 온도 편차를 효과적으로 예방하지는 못하였다.However, the present double pipe construction method of constructing double pipes and connecting them to various faucets does not effectively prevent the hot water temperature variation in the faucet using hot water when several faucets are used at the same time.

일예로, 샤워기 수전에서 온수를 사용하고 있는 상태에서 주방이나 화장실의 수전이 사용되는 경우, 샤워기 수전으로의 유량이 부족해지면서 샤워기 수전에서 분출되는 온수의 온도가 갑자기 상승된 상태로 분출되거나, 또는 주방이나 화장실의 수전 사용이 중지되면 샤워기 수전에서 온도가 하강된 온수(거의 냉탕)가 분출되는 등, 건물내에 구비된 다수의 수전 사용조건에 따라 온수의 온도편차가 심하게 발생하면서 사용자가 온수 사용시 상당한 불쾌감을 느끼는 경우가 종종 있었다.For example, when the faucet of the kitchen or the bathroom is used while hot water is used in the shower faucet, the temperature of the hot water spouted from the shower faucet suddenly rises as the flow rate to the shower faucet becomes insufficient, or the kitchen When the faucet in the bathroom or toilet is stopped, the hot water (nearly cold) of the shower faucet is ejected, and the temperature difference of the hot water occurs according to the many faucet use conditions in the building. There was often a feeling.

또한, 종래의 이중관 시공방식은 세탁기 수전, 손빨래 수전, 앞발코니 수전등 필요 이상의 과유량 현상 때문에 경제적 손실을 초래하는 경우가 많았다.In addition, the conventional double pipe construction method has often caused economic losses due to excessive flow rate phenomenon, such as washing machine faucet, hand wash faucet, forefoot faucet faucet.

따라서, 본 발명은 상기와 같은 종래의 문제점을 해결하기 위해 안출된 것으로서, 분배기로부터 분배되어 각 수요처에서 수전이 연결되는 이중관을 시공시 온수 사용량이 많은 수전으로 급수의 공급유량을 보상하는 복수의 급수관을 연결한 후 복수의 급수관을 서로 연결 구성함으로써, 다수 구비되는 수전의 동시 사용시 자연 압력에 의해 온수사용량이 많은 수전에서의 유량 부족 현상을 최대한 해결하고 그에 따른 온수의 온도 편차를 효과적으로 방지함은 물론, 급수의 급격한 유량변화로 인해 진동과 충격음이 발생하는 수격 현상을 방지할 수 있도록 하는 온수의 온도편차 보정을 위한 배관 시공방법을 제공하려는데 그 목적이 있는 것이다.Accordingly, the present invention has been made to solve the above-mentioned conventional problems, a plurality of water supply pipe to compensate for the supply flow rate of the water supply to the faucet with a large amount of hot water used when constructing a double pipe distributed from the distributor and connected to the faucet at each demand destination By connecting a plurality of water supply pipes connected to each other, by using a plurality of faucets at the same time when the use of natural pressure to solve the shortage of flow rate in the faucet with a large amount of hot water use, as well as effectively prevent the temperature deviation of the hot water accordingly The purpose is to provide a pipe construction method for temperature deviation correction of hot water that prevents water hammer caused by rapid flow changes in water supply and vibration.

상기 목적 달성을 위한 본 발명 온수 온도 편차 보정을 위한 배관 시공방법은, 세대 인입 계량기와 연결되는 급수분배기로부터 보일러 및, 건물내의 각 수요처에 마련된 수전 연결용의 점검함으로 다수의 급수 이중관을 분기시켜 연결하고, 상기 보일러에서 온수 사용이 필요로 하는 수전 연결용의 점검함으로 온수 이중관을 연결한 후, 그 급수 및 온수 이중관내에 급수관과 온수관을 인입하여 수전과 연결시키는 배관 시공방법에 있어서, 상기 온수 이중관은 보일러로부터 인출된 후 온수 사용량이 많은 복수의 수전연결용 점검함들에 순차적으로 연결하되,Piping construction method for the hot water temperature deviation correction of the present invention for achieving the above object, by connecting a plurality of feed water pipes by branching the water supply distributor connected to the household intake meter and for the faucet connection provided to each demand in the building. And connecting the hot water double pipe by checking the connection for the faucet requiring the use of hot water in the boiler, and then introducing the water supply pipe and the hot water pipe into the water supply and the hot water double pipe to connect the faucet with the hot water. After the double pipe is drawn out from the boiler, the pipes are sequentially connected to a plurality of faucet connection check boxes with high water consumption.

상기 급수 이중관은 급수분배기로부터 보일러를 통해 온수 사용량이 적은 세탁기용 수전과 손빨래용 수전 및 발코니용 수전이 연결되는 점검함들에 순차적으로 연결되는 제 1 급수라인; 급수분배기로부터 온수 사용량이 많은 세면기용 수전과 샤워기용 수전이 연결되는 점검함들에 순차적으로 연결되는 제 2 급수라인; 급수분배기로부터 온수 사용량이 많은 상기 샤워기용 수전이 연결되는 점검함으로 연결되는 제 4 급수라인; 상기 제 4 급수라인과 폐루프를 이루면서 샤워기용 수전과 세면기용 수전의 급수유량을 보충하도록, 상기 급수분배기로부터 상기 세면기용 수전이 연결되는 점검함으로 연결되는 제 3 급수라인; 으로 분기되는 것을 특징으로 한다.The water supply double pipe may include a first water supply line sequentially connected to the check boxes connected to the washing machine faucet, the hand washing faucet, and the balcony faucet with less hot water from the water distributor through the boiler; A second water supply line sequentially connected to check boxes connected to a faucet for a wash basin and a shower faucet with a large amount of hot water from the water distributor; A fourth water supply line connected to a check box to which the shower faucet with a large amount of hot water is used from the water distributor; A third water supply line connected to a checker connected to the wash basin faucet from the water distributor to form a closed loop with the fourth water supply line to replenish the water flow rates of the shower faucet and the basin faucet; It is characterized by branching to.

다른 일면에 따라, 상기 제 1 급수라인의 급수 이중관은 보일러와 Y자형의 이음부를 통해 연결된 후 수전연결용의 점검함들에 순차적으로 연결되는 것을 특징으로 한다.According to another aspect, the water supply double pipe of the first water supply line is characterized in that it is sequentially connected to the check boxes for the faucet connection after being connected to the boiler and the Y-shaped joint.

또 다른 일면에 따라, 상기 제 3,4 급수라인의 급수 이중관으로 인입되는 급수관은 서로 Y자형의 이음부를 통해 연결되는 것을 특징으로 한다.According to another aspect, the water supply pipe introduced into the water supply double pipe of the third, fourth water supply line is characterized in that connected to each other through the Y-shaped joint.

또 다른 일면에 따라, 상기 분배기로부터 분기되는 제 1 내지 제 4 급수라인의 급수관에는 차단밸브를 설치하되, 상기 제 3,4 급수라인의 급수관에는 정유량 조절밸브를 설치 구성하는 것을 특징으로 한다.According to yet another aspect, the first and fourth water supply line of the water supply line branched from the distributor is provided with a shut-off valve, the water supply pipe of the third and fourth water supply line is characterized in that the installation of the constant flow rate control valve.

이하, 첨부된 도면에 의하여 본 발명의 실시예를 설명하면 다음과 같다.Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명의 제 1 실시예에 따른 온수의 온도편차 보정을 위한 배관 시공 경로의 평면도이고, 도 2는 본 발명의 제 1 실시예로 화장실 벽체내에서의 배관 시공 단면도이며, 도 3은 본 발명의 제 1 실시예로 계량기 및 분배기에서의 이중관 연결상태를 보인 개략도이고, 도 4는 본 발명의 제 1 실시예로 보일러의 배관 연결 상태도 이다.1 is a plan view of a pipe construction path for the temperature deviation correction of hot water according to a first embodiment of the present invention, Figure 2 is a cross-sectional view of the pipe construction in the toilet wall in a first embodiment of the present invention, Figure 3 4 is a schematic diagram showing a double pipe connection state in a meter and a distributor according to the first embodiment of the present invention, and FIG. 4 is a pipe connection state diagram of the boiler in the first embodiment of the present invention.

도 1 내지 도 4를 참조하면, 본 발명의 제 1 실시예에 따른 이중관 시공은 다음과 같다.1 to 4, the double pipe construction according to the first embodiment of the present invention is as follows.

먼저, 건물내의 각 수요처에 배관 보수용의 점검함(3a,3b,3c,3d,3e,3f,3g)으로, 화장실의 벽체내에는 양변기, 세면기, 그리고 샤워기용 수전이 연결되는 점검함(3a,3b,3c)을 매립하고, 다용도실(또는 발코니)에는 보일러(3)를 설치하면서 그 벽체내에는 세탁기용 수전이 연결되는 점검함(3d)과 손빨래용 수전이 연결되는 점검함(3e) 및 발코니용 수전이 연결되는 점검함(3g)을 매립하며, 주방의 벽체내에는 주방용 수전이 연결되는 점검함(3f)을 매립시킨다.First, checks for plumbing repairs (3a, 3b, 3c, 3d, 3e, 3f, 3g) in each building in the building, and checks that toilets, washbasins, and shower faucets are connected to the bathroom walls (3a). , 3b and 3c, and the boiler 3 is installed in the utility room (or balcony), and the check box connected to the washing machine faucet (3d) and the hand wash faucet connected to the wall (3e). And a check box (3g) to which the faucet for the balcony is connected, and a check box (3f) to which the kitchen faucet is connected in the wall of the kitchen.

이후, 세대 인입 계량기(1)와 연결되는 급수분배기(2)로부터 급수 이중관(4)을 분기하는 한편, 상기 분기되는 급수 이중관(4)내에는 급수관(4a)을 인입한 후, 상기 급수관(4a)을 각 점검함(3a,3b,3c,3d,3e,3f,3g)의 수전에 연결한다.Subsequently, the water supply double pipe 4 is branched from the water supply distributor 2 connected to the household inlet meter 1, while the water supply pipe 4a is introduced into the branched water supply double pipe 4, and then the water supply pipe 4a is opened. ) Is connected to the power supply of each check box (3a, 3b, 3c, 3d, 3e, 3f, 3g).

이때, 상기 급수분배기(2)로부터 급수 이중관(4)이 분기될 때, 상기 급수 이중관(4)에 인입되는 급수관(4a)에는 차단밸브(5)를 설치하는 한편, 온수의 온도 편 차 보정을 위한 급수관(4a)에는 정유량 조절밸브(6)를 설치한다.At this time, when the water supply double pipe 4 is branched from the water supply distributor 2, the water supply pipe 4a introduced into the water supply double pipe 4 is provided with a shutoff valve 5, while correcting the temperature deviation of the hot water. A constant flow rate control valve 6 is installed in the water supply pipe 4a.

즉, 상기 급수분배기(2)로부터 급수 이중관(4)은 제 1 내지 제 4 급수라인(L1,L2,L3,L4)으로 분기되는데, 상기 제 1 급수라인(L1)은 보일러(3)를 통해 온수 사용량이 적은 다수의 수전 연결용 점검함 즉, 세탁기용 수전이 연결되는 점검함(3d)과 손빨래용 수전이 연결되는 점검함(3e) 및 발코니용 수전이 연결되는 점검함(3g)에 순차적으로 연결시킨다.That is, the water supply double pipe 4 is branched from the water supply distributor 2 to the first to fourth water supply lines L1, L2, L3, and L4, and the first water supply line L1 is connected to the boiler 3 through the boiler 3. In the check box for connecting the faucet with a small amount of hot water, that is, the check box for connecting the washing machine faucet (3d), the check box for connecting the hand wash faucet (3e), and the check box for the balcony faucet (3g). Connect sequentially.

이때, 도 1에서와 같이 상기 급수분배기(2)로부터 분배되는 제 1 급수라인(L1)의 급수 이중관(4)은 도 4에서와 같이 보일러(3)에 연결된 Y자형 이음부(7)의 일측단에 연결하고, 상기 Y자형 이음부(7)의 타측단에는 또 다른 제 1 급수라인(L1)의 급수 이중관(4)을 연결한 것으로, 상기 또 다른 제 1 급수라인(L1)은 세탁기용 수전이 연결되는 점검함(3d)→손빨래용 수전이 연결되는 점검함(3e)→주방용 수전이 연결되는 점검함(3f)→발코니용 수전이 연결되는 점검함(3g)의 수순으로 그 연결이 진행되는 것이다.At this time, the water supply double pipe 4 of the first water supply line (L1) distributed from the water supply distributor (2) as shown in Figure 1 is one side of the Y-shaped joint 7 connected to the boiler (3) as shown in FIG. It is connected to the end, and the other end of the Y-shaped joint 7 is connected to the water supply double pipe (4) of another first water supply line (L1), the first first water supply line (L1) is for washing machines The check box is connected to the faucet (3d) → the check box is connected to the hand washing faucet (3e) → the check box is connected to the kitchen faucet (3f) → the check box is connected to the balcony faucet (3g) This is going on.

다음으로, 상기 제 2 급수라인(L2)은 온수 사용량이 많은 복수의 수전 연결용 점검함 즉, 세면기용 수전이 연결되는 점검함(3b)에 연결시킨다.Next, the second water supply line (L2) is connected to a check box for connecting a plurality of faucet, that is, a wash basin faucet 3b is connected to the hot water consumption.

다음으로, 상기 제 3,4 급수라인(L3)(L4)은 각각 온수 사용량이 많은 수전 즉, 샤워기용 수전이 연결되는 점검함(3c)에 연결한 상태에서, 상기 샤워기용 수전이 연결되는 점검함(3c)과 세면기용 수전이 연결되는 점검함(3b)을 별도의 라인을 이루는 온수 이중관(8)으로 연결시킨다.Next, the third and fourth water supply lines (L3) (L4) are each connected to the check box (3c) is connected to the faucet for hot water consumption, that is, the shower faucet, the shower faucet for the shower is connected The check box (3b) is connected to the box (3c) and the basin faucet is connected to the hot water double pipe (8) forming a separate line.

즉, 상기 제 3,4 급수라인(L3)(L4)을 이루는 복수의 급수 이중관(4)에는 각각 급수관(4a)이 인입되어 있고, 상기의 급수관(4a)은 다시 점검함(3c)의 내부로 인입되는 구조인 바, 상기 복수의 급수관(4a)을 Y자형 이음부(7)를 통해 연결하는 것이다.That is, a plurality of feed water pipes 4a are respectively introduced into the plurality of feed water double pipes 4 forming the third and fourth water supply lines L3 and L4, and the water supply pipe 4a is again inspected (3c). The structure is introduced into the bar, it is to connect the plurality of water supply pipe (4a) through the Y-shaped joint (7).

그러면, 상기 제 3,4 급수라인(L3)(L4)을 이루는 급수 이중관(4)내의 급수관(4a)은 폐루프를 이루고, 이에따라 상기 급수분배기(2)에서 제 3,4 급수라인(L3)(L4)의 급수관(4a)을 통해 샤워기용 수전으로 급수 공급이 이루어지며, 아울러 상기 샤워기용 수전이 연결되는 점검함(3c)에 별도의 라인인 온수 이중관(8)을 통해 세면기용 수전이 연결되는 점검함(3b)이 연결되면서, 상기 세면기용 수전으로도 급수 공급이 이루어지는 바, 상기 샤워기용 수전과 세면기용 수전을 동시에 사용하더라도, 급수분배기(2)를 기준으로 하여 폐루프를 이루는 상기 샤워기용 수전에 의해, 상기 세면기용 수전에서는 샤워기용 수전에 의해 급수 보충이 이루어지는 것이다.Then, the water supply pipe 4a in the water supply double pipe 4 constituting the third and fourth water supply lines L3 and L4 forms a closed loop, and accordingly, the third and fourth water supply lines L3 in the water supply distributor 2 are formed. Water supply is supplied to the shower faucet through the water supply pipe 4a of (L4), and the faucet for the washbasin is connected to the check box (3c) to which the shower faucet is connected through a separate line of hot water. While the check box (3b) is connected, the water supply is also supplied to the faucet for the washbasin, even when the shower faucet and the faucet for the washbasin are used at the same time, the shower to form a closed loop based on the water distributor (2) In the faucet for the basin, the water supply is supplemented by the faucet for the shower.

또한, 상기 보일러(3)에서는 온수관(8a)이 인입된 온수 이중관(8)의 인출이 이루어진 후 온수 사용량이 많은 세면기용 수전이 연결되는 점검함(3b)을 거친 후 샤워기용 수전이 연결되는 점검함(3c)으로 연결되는 구조로 시공한다.In addition, the boiler 3 is connected to the shower faucet after passing through the check box (3b) is connected to the basin faucet with a large amount of hot water after the hot water pipe (8a) is drawn out of the hot water double pipe (8) Construct with a structure connected to the check box (3c).

그러면, 상기 샤워기용 수전에서 점검함(3b→3c)을 통해 공급되는 온수를 사용시, 상기 급수분배기(2)로부터 분기된 후 폐루프를 이루는 제 3,4 급수라인(L3)(L4)의 급수관(4a)을 통해 이루어지는 급수의 보충량으로부터 상기 샤워기용 수전에서의 유량 부족 현상은 해소되는 것이다.Then, when using hot water supplied through the shower faucet (3b → 3c), the water supply pipe of the third and fourth water supply line (L3) (L4) branched from the water distributor (2) and forms a closed loop The lack of flow rate in the shower faucet is eliminated from the replenishment amount of the water supply made through (4a).

즉, 상기 폐루프를 이루는 제 3,4 급수라인(L3)(L4)의 급수관(4a)에서는, 보일러(3) 및 온수관(8a)을 통해 세면기용 수전이 연결되는 점검함(3b)을 거치면서 점검함(3c)에 연결되는 샤워기용 수전으로 온수를 공급할 때, 상기 샤워기용 수전에서는 급수분배기(2)으로부터 급수 유량을 보충받는 바,That is, in the water supply pipe 4a of the third and fourth water supply lines L3 and L4 forming the closed loop, the check box 3b to which the faucet for the wash basin is connected through the boiler 3 and the hot water pipe 8a is checked. When the hot water is supplied to the shower faucet connected to the check box (3c) while passing through, the shower faucet is supplemented with the water flow rate from the water distributor (2),

상기 보충이 이루어지는 급수유량으로부터 샤워기용 수전에서의 온수 사용시 물 부족으로 인해 온수의 온도가 갑자기 높아지는 등의 온도편차를 방지함은 물론, 급수의 급격한 유량변화로 인한 수격현상 즉, 진동과 충격음의 발생을 억제시킬 수 있게 되는 것이다.When the hot water is used in the shower faucet from the replenishment water supply, which is replenished, it prevents the temperature deviation such as the temperature of the hot water suddenly rises due to the lack of water, as well as the water hammer phenomenon, that is, the vibration and the impact sound caused by the rapid flow rate change of the water supply. It will be able to suppress.

여기서, 상기 폐루프를 이루는 제 3,4 급수라인(L3)(L4)의 급수관(4a)을 통해 이루어지는 급수의 공급량은 제 3,4 급수라인(L3)(L4)을 이루는 급수관(4a)에 설치된 정유량 조절밸브(6)를 통해 조절되며, 이는 수동조작에 의해 이루어지는 것이다.Here, the supply amount of water supplied through the water supply pipe 4a of the third and fourth water supply lines L3 and L4 constituting the closed loop is supplied to the water supply pipe 4a constituting the third and fourth water supply lines L3 and L4. It is controlled through the installed flow rate control valve (6), which is made by manual operation.

일예로, 온수를 많이 사용하는 샤워기용 수전을 제외한 기타 수전들의 온수 온도편차에 대하여는 사용자들이 민감하게 반응하지 않지만, 샤워기용 수전을 사용하고 있는 상태에서 다른 수전 즉, 주방이나 세탁기용 수전을 사용하는 경우, 상기 샤워기용 수전에는 급수 공급량이 떨어지고, 이와동시에 온수의 온도는 높아지게 된다.For example, users are not sensitive to hot water temperature deviations of other faucets except for shower faucets that use a lot of hot water. However, when using a faucet for a shower, a faucet for a kitchen or a washing machine is used. In this case, the amount of water supplied to the shower faucet is reduced, and at the same time the temperature of the hot water is increased.

그러므로, 상기의 급수 공급량을 폐루프를 이루는 제 3,4 급수라인(L3)(L4)의 급수관(4a)을 통해 상호 보충함으로써, 상기 샤워기용 수전에서의 유량 부족 현상 및, 그에따른 온수의 온도편차를 방지할 수 있게 되는 것이다.Therefore, by supplying the above water supply amount to each other through the water supply pipe 4a of the third and fourth water supply lines L3 and L4 forming a closed loop, the flow rate shortage phenomenon in the shower faucet and the temperature of the hot water accordingly. The deviation can be prevented.

즉, 본 발명은 여러 수전에서의 급수 사용량이 증가하더라도, 온수를 사용하는 수전에서의 급수 공급량이 저하되는 것을 방지함으로써, 온수를 사용시 갑작스럽게 온수의 온도가 높아져 사용자에게 화상 등의 상해를 입히는 문제를 방지함은 물론, 급수의 급격한 유량 변화로 인한 배관에서의 충격 소음을 방지하려는데 그 특징이 있는 것이다.That is, the present invention prevents a decrease in the amount of water supply in a faucet using hot water, even if the amount of water used in various faucets increases, causing a sudden increase in the temperature of the hot water when using hot water, causing injury to the user. Of course, to prevent the impact noise in the pipe due to the sudden change in flow rate of water supply is characterized by.

한편, 도 5는 본 발명의 제 2 실시예로, 이는 양변기와 세면기 및 샤워기용 수전이 세대내에 복수로 이루어지는 경우, 급수분배기(2)에서는 온수의 사용량이 많은 복수의 샤워기용 수전이 연결되는 점검함(3c)(3c')에 각각 급수이중관(4)을 분기시킨 제 5,6 급수라인(L5)(L6)을 구성하는 한편, 상기 복수의 점검함(3c)(3c')을 리턴라인(L7)으로 서로 연결시켜, 상기 분배기(2)로부터 제 5,6 급수라인(L5)(L6)과 리턴라인(L7)이 폐루프를 이루도록 한 것이다.On the other hand, Figure 5 is a second embodiment of the present invention, which is a toilet and wash basin and shower faucet consists of a plurality in the generation, the water distribution distributor (2) checks that a plurality of shower faucet for a large amount of hot water is connected The fifth and sixth feed water lines L5 and L6 branching the water supply double pipes 4 into the boxes 3c and 3c ', respectively, and the plurality of check boxes 3c and 3c' are returned. L7 is connected to each other so that the fifth and sixth feed lines L5 and L6 and the return line L7 form a closed loop from the distributor 2.

여기서, 상기 제 5,6 급수라인(L5)(L6)을 이루는 급수이중관(4)으로 인입되는 급수관(4a)은 각각의 점검함(3c)(3c')내에서 리턴관(L7)과 서로 Y자형 이음부(7)를 통해 연결된다.Here, the water supply pipe 4a introduced into the water supply double pipe 4 forming the fifth and sixth water supply lines L5 and L6 is mutually different from the return pipe L7 in each of the check boxes 3c and 3c '. It is connected via the Y-shaped joint 7.

그리고, 상기 급수분배기(2)로부터 분기되는 제 1,2,5,6 급수라인(L1)(L2)(L5)(L6)이루는 급수관(4a)들에는 각각 본 발명의 제 1 실시예에서와 동일하게 차단밸브가 설치되고, 상기 제 5,6 급수라인(L5)(L6)을 이루는 급수관(4a)들에도 본 발명의 제 1 실시예에서와 동일하게 정유량 조절밸브가 설치된다.In addition, the first, second, fifth and sixth water supply lines L1, L2, L5, and L6 branched from the water distributor 2 are respectively provided in the first embodiment of the present invention. In the same way, a shutoff valve is installed, and the water supply pipes 4a constituting the fifth and sixth water supply lines L5 and L6 are also provided with a constant flow rate control valve as in the first embodiment of the present invention.

이하, 본 발명의 제 1 실시예에서와 그 작용은 동일하므로 중복되는 부분에 대하여는 동일부호로 표시하여 그 설명을 생략하였다.Hereinafter, since the operation is the same as in the first embodiment of the present invention, overlapping portions are denoted by the same reference numerals and description thereof is omitted.

이상 설명한 바와 같이 본 발명은 사용자가 직접 느끼지 못하는 수전들을 별도 배관 분기하여 연결하고 사용자가 직접 온도와 유량 변화를 느끼는 수전에는 급수 공급량을 보충하기 위한 라인을 연결시킨 것으로, 이를 통해 다수 구비되는 수전의 동시 사용시 자연 압력에 의해 수전에서의 유량 부족 현상을 최대한 해결하고 그에 따른 온수의 온도 편차를 효과적으로 방지함은 물론, 급수의 급격한 유량변화로 인해 진동과 충격음이 발생하는 수격 현상을 방지하는 효과를 얻을 수 있는 것이다.As described above, the present invention connects the faucets which are not directly felt by the user to separate pipes, and connects a line for supplementing the water supply to the faucet where the user directly feels the temperature and flow rate change. Simultaneous use of natural pressure resolves the water shortage in the faucet as much as possible and effectively prevents the temperature fluctuation of the hot water, and also prevents the water hammer, which generates vibration and shock noise due to the rapid flow rate change of the water supply. It can be.

본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이고, 그와같은 변경은 청구범위 기재의 범위내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

Claims (7)

세대 인입 계량기와 연결되는 급수분배기로부터 보일러 및, 건물내의 각 수요처에 마련된 수전 연결용의 점검함으로 다수의 급수 이중관을 분기시켜 연결하고, 상기 보일러에서 온수 사용이 필요로 하는 수전 연결용의 점검함으로 온수 이중관을 연결한 후, 그 급수 및 온수 이중관내에 급수관과 온수관을 인입하여 수전과 연결시키는 배관 시공방법에 있어서,The water supply distribution pipe connected to the household intake meter is connected to the boiler and the faucet provided for each demand source in the building to branch and connect a plurality of water supply double pipes, and to check the faucet connection required for the use of hot water in the boiler. In the piping construction method of connecting the water pipe and the hot water pipe into the water supply and hot water double pipe after connecting the double pipe, 상기 온수 이중관은 보일러로부터 인출된 후 온수 사용량이 많은 세면기용 수전과 샤워기용 수전이 연결되는 점검함들에 순차적으로 연결하되,The hot water double pipe is drawn out from the boiler and then sequentially connected to the check boxes to which the hot water consumption basin faucet and shower faucet is connected, 상기 급수 이중관은 급수분배기로부터 보일러를 통해 온수 사용량이 적은 세탁기용 수전과 손빨래용 수전 및 주방용 수전, 그리고 발코니용 수전이 연결되는 점검함들에 순차적으로 연결되는 제 1 급수라인;The water supply double pipe may include a first water supply line sequentially connected to a check box connected to a washing machine faucet, a hand washing faucet, a kitchen faucet, and a balcony faucet with a small amount of hot water from the water distributor through a boiler; 급수분배기로부터 온수 사용량이 많은 세면기용 수전이 연결되는 점검함에 연결되는 제 2 급수라인;A second water supply line connected to a check box to which a faucet for a washbasin with a large amount of hot water is used from the water distributor; 상기 샤워기용 수전에서 온수를 사용시 급수 유량을 보충받을 수 있도록, 상기 급수분배기로부터 온수 사용량이 많은 샤워기용 수전이 연결되는 점검함으로 연결되어 폐루프를 제 3,4 급수라인; 으로 분기 구성하는 것을 특징으로 하는 온수의 온도 편차 보정을 위한 배관 시공방법.A third and fourth water supply lines connected to a check box to which a shower faucet with a large amount of hot water is connected from the water distributor to connect the water supply flow rate when the hot water is used in the shower faucet; Piping construction method for temperature deviation correction of hot water, characterized in that the branch configuration. 제 1 항에 있어서, 상기 제 1 급수라인을 이루는 급수 이중관은 보일러에 연결된 Y자형 이음부의 일측단에 연결되고, 상기 Y자형 이음부의 타측단에는 또 다른 제 1 급수라인의 급수 이중관이 연결된 상태에서 수전연결용의 점검함들에 순차적으로 연결되는 것을 특징으로 하는 온수의 온도 편차 보정을 위한 배관 시공방법.According to claim 1, wherein the water supply double pipe constituting the first water supply line is connected to one end of the Y-shaped joint connected to the boiler, the other end of the Y-shaped joint is connected to the water supply double pipe of another first water supply line Pipe construction method for temperature deviation correction of hot water, characterized in that connected to the check boxes for the faucet connection sequentially. 제 1 항에 있어서, 상기 제 3,4 급수라인을 이루는 급수 이중관으로 인입되는 급수관들은 샤워기용 수전이 연결되는 점검함내에서 서로 Y자형 이음부를 통해 연결되는 것을 특징으로 하는 온수의 온도 편차 보정을 위한 배관 시공방법.The method of claim 1, wherein the water supply pipes introduced into the water supply double pipe forming the third and fourth water supply lines are connected to each other through a Y-shaped joint in a check box to which a shower faucet is connected. Piping construction method. 제 1 항에 있어서, 상기 분배기로부터 분기되는 제 1 내지 제 4 급수라인을 이루는 급수관들에는 차단밸브를 설치하되, 상기 제 3,4 급수라인을 이루는 급수관들에는 정유량 조절밸브를 더 설치 구성한 것을 특징으로 하는 온수의 온도 편차 보정을 위한 배관 시공방법.The water supply pipe of the first to fourth water supply lines branching from the distributor is provided with a shutoff valve, and the water supply pipes forming the third and fourth water supply lines further include a constant flow rate control valve. Piping construction method for temperature deviation correction of hot water characterized in that. 세대 인입 계량기와 연결되는 급수분배기로부터 보일러 및, 건물내의 각 수요처에 마련된 수전 연결용의 점검함으로 다수의 급수 이중관을 분기시켜 연결하고, 상기 보일러에서 온수 사용이 필요로 하는 수전 연결용의 점검함으로 온수 이중관을 연결한 후, 그 급수 및 온수 이중관내에 급수관과 온수관을 인입하여 수전과 연결시키는 배관 시공방법에 있어서,The water supply distribution pipe connected to the household intake meter is connected to the boiler and the faucet provided for each demand source in the building to branch and connect a plurality of water supply double pipes, and to check the faucet connection required for the use of hot water in the boiler. In the piping construction method of connecting the water pipe and the hot water pipe into the water supply and hot water double pipe after connecting the double pipe, 상기 온수 이중관은 보일러로부터 인출된 후 온수 사용량이 많은 세면기용 수전과 샤워기용 수전이 연결되는 점검함들에 순차적으로 연결하되,The hot water double pipe is drawn out from the boiler and then sequentially connected to the check boxes to which the hot water consumption basin faucet and shower faucet is connected, 상기 급수 이중관은 급수분배기로부터 보일러를 통해 온수 사용량이 적은 세탁기용 수전과 손빨래용 수전 및 주방용 수전, 그리고 발코니용 수전이 연결되는 점검함들에 순차적으로 연결되는 제 1 급수라인;The water supply double pipe may include a first water supply line sequentially connected to a check box connected to a washing machine faucet, a hand washing faucet, a kitchen faucet, and a balcony faucet with a small amount of hot water from the water distributor through a boiler; 급수분배기로부터 온수 사용량이 많은 세면기용 수전이 연결되는 점검함에 연결되는 제 2 급수라인;A second water supply line connected to a check box to which a faucet for a washbasin with a large amount of hot water is used from the water distributor; 그리고, 세대내에 양변기와 세면기 및 샤워기용 수전이 연결되는 점검함들이 복수로 이루어질 때, 상기 급수분배기에서 상기 샤워기용 수전이 연결되는 점검함으로 각각 급수이중관을 분기시킨 제 5,6 급수라인; 으로 분기하고,And a fifth and sixth water supply lines each branching a water supply double pipe by checking that the shower faucet is connected to the shower faucet when a plurality of check boxes are connected to a toilet and a basin and a shower faucet within a household. Branch to, 상기 샤워기용 수전이 연결되는 복수의 점검함은 리턴라인으로 연결하여, 상기 리턴라인과 급수분배기로부터 분기되는 제 5,6 급수라인이 폐루프를 이루면서 급수량을 보충하도록 구성함을 특징으로 하는 온수의 온도 편차 보정을 위한 배관 시공방법.The plurality of check boxes connected to the shower faucet is connected to the return line, the fifth and the sixth water supply line branched from the return line and the water distribution distributor is configured to replenish the water supply while forming a closed loop Piping construction method for temperature deviation correction. 제 5 항에 있어서, 상기 제 5,6 급수라인을 이루는 급수이중관으로 인입되는 급수관은 각각의 점검함내에서 리턴관과 서로 Y자형 이음부를 통해 연결되는 것을 특징으로 하는 온수의 온도 편차 보정을 위한 배관 시공방법.The water supply pipe leading to the water supply double pipe forming the fifth and sixth water supply line is connected to the return pipe and each other through the Y-shaped joint in each check box, the pipe for temperature deviation correction of hot water Construction method. 제 5 항에 있어서, 상기 분배기로부터 분기되는 제 1,2,5,6 급수라인을 이루는 급수관들에는 각각 차단밸브를 설치하되, 상기 제 5,6 급수라인을 이루는 급수관들에는 정유량 조절밸브를 더 설치 구성한 것을 특징으로 하는 온수의 온도 편차 보정을 위한 배관 시공방법.The water supply pipe forming the first, second, fifth, and sixth water supply lines branching from the distributor, respectively, is provided with a shutoff valve, and the water supply pipes forming the fifth, sixth water supply lines have a constant flow control valve. Pipe construction method for temperature deviation correction of hot water, characterized in that the installation further configured.
KR1020060053620A 2006-05-09 2006-06-14 Piping form of construction work for temperature anomaly revision of warm water KR100840928B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020060041280 2006-05-09
KR20060041280 2006-05-09

Publications (2)

Publication Number Publication Date
KR20070109749A KR20070109749A (en) 2007-11-15
KR100840928B1 true KR100840928B1 (en) 2008-06-26

Family

ID=39064220

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060053620A KR100840928B1 (en) 2006-05-09 2006-06-14 Piping form of construction work for temperature anomaly revision of warm water

Country Status (1)

Country Link
KR (1) KR100840928B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101458604B1 (en) * 2012-11-21 2014-11-07 코오롱글로벌 주식회사 Water supplying system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07167370A (en) * 1993-12-17 1995-07-04 Tokyo Gas Co Ltd Water-hammer phenomenon preventing device in water and hot water feed header
KR100620454B1 (en) * 2006-05-02 2006-09-06 (주)남호건업 Double pipe form of construction work for temperature anomaly revision of warm water and protectingness thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07167370A (en) * 1993-12-17 1995-07-04 Tokyo Gas Co Ltd Water-hammer phenomenon preventing device in water and hot water feed header
KR100620454B1 (en) * 2006-05-02 2006-09-06 (주)남호건업 Double pipe form of construction work for temperature anomaly revision of warm water and protectingness thereof

Also Published As

Publication number Publication date
KR20070109749A (en) 2007-11-15

Similar Documents

Publication Publication Date Title
US10604917B2 (en) Flushing station for a ring-pipe or series-pipe system, ring-pipe system as well as series-pipe system
WO2009131399A3 (en) Temperature-controlled mixed water and cold/hot water supply system
KR100840928B1 (en) Piping form of construction work for temperature anomaly revision of warm water
KR100643084B1 (en) Piping system and the form of construction work of building
KR100620454B1 (en) Double pipe form of construction work for temperature anomaly revision of warm water and protectingness thereof
KR20080043182A (en) Wall water open panel
CN205857814U (en) A kind of assembled toilet
KR100780797B1 (en) That inspect piping of wall reclamation styleand form of double pipe
Grant Water conservation products
KR101162072B1 (en) Hot and cold water supply system that can utilize residual water
JP2017003215A (en) Water supply hot water supply system
KR20080004166A (en) Piping form of construction work for temperature anomaly revision of warm water
KR100901131B1 (en) Water piping system with multi-directional water supply function for stable water supply
Vaverka et al. Consumption and Savings of Drinking Water in Selected Objects
KR101458604B1 (en) Water supplying system
KR100741571B1 (en) Dispensing unit for bath which has unificated opening and shutting valve
KR20080071239A (en) Cold and hot water distributor of wall filled-up type room
KR200464054Y1 (en) a hot water distributor
KR20230011067A (en) Water supply system and water supply method for uniformly distributing flow rate to a plurality of final water supply sources in a building
KR20050033807A (en) Water supply system having drainpipe
KR102495531B1 (en) Piping structure and construction method thereof
KR100749955B1 (en) Piping system for bathroom
KR200338636Y1 (en) Water softening system for apartment
Nguyen Smartening up on product testing methods
KR100615840B1 (en) Wall concealed-type water distribution case

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120618

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20130618

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee