Application number
KR1020070053130A
Other languages
Korean (ko)
Inventor
이정환
손명원
Original Assignee
삼목정공주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼목정공주식회사 filed Critical 삼목정공주식회사
Priority to KR1020070053130A priority Critical patent/KR100840847B1/en
Application granted granted Critical
Publication of KR100840847B1 publication Critical patent/KR100840847B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/16Members, e.g. consoles, for attachment to the wall to support girders, beams, or the like carrying forms or moulds for floors, lintels, or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G2011/067Integrated forms comprising shuttering skin, bracing or strutting arrangements, workplatforms and railings

Abstract

A connecting structure of a rail and a gang form is provided to move a gang form unit and a rail unit together by connecting the gang form unit with the rail unit via a connection member, and first and second hinge shafts. A connecting structure of a rail and a gang form comprises a gang form unit(100), a connection member(500),a rail unit(400), and a concrete wall(800). The connection member is connected with the gang form unit by a fist hinge shaft(510). The rail unit, which is connected with the connection member via a second hinge shaft(520), moves with the gang form unit. When the gang form unit is placed to a position to make the concrete wall, the first hinge shaft is located higher than the second hinge shaft. At this moment, the first shafts are on a line with the second hinge shaft in parallel the concrete wall. The rail unit includes a first hole and a first stopper pin(524). When the connection member rotates downwards, the gang form unit moves backwards away from the concrete wall.

Description

갱폼과 레일의 연결구조{Connecting Structure Of Rail And Gang Form}Connecting Structure Of Rail And Gang Form}

도 1은 종래 갱폼과 레일의 연결구조가 적용된 측면도.1 is a side view of the conventional gangform and rail connection structure applied.

도 2는 본 발명인 갱폼과 레일의 연결구조가 적용된 제 1 실시예를 나타내는 측면도.Figure 2 is a side view showing a first embodiment to which the connection structure of the gangform and rail of the present invention is applied.

도 3은 도 2에 제 1 구멍이 마련된 것을 나타내는 측면도.3 is a side view showing that the first hole is provided in FIG.

도 4는 본 발명의 제 2 실시예를 나타내는 측면도.4 is a side view showing a second embodiment of the present invention.

도 5는 본 발명의 제 3 실시예를 나타내는 측면도.Fig. 5 is a side view showing a third embodiment of the present invention.

도 6은 도 5의 제 3 실시예가 적용되는 상태도.6 is a state diagram in which the third embodiment of FIG. 5 is applied.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100: 갱폼유닛 110: 갱폼100: Gang Foam Unit 110: Gang Foam

120: 갱폼브레이스 400: 레일유닛120: Gang Foam Brace 400: Rail unit

410: 레일 420: 레일브레이스410: rail 420: rail race

500: 연결부재 510: 제 1 힌지축500: connecting member 510: first hinge shaft

520: 제 2 힌지축520: second hinge axis

본 발명은 갱폼과 레일의 연결구조에 관한 것이다. 더욱 상세하게는 레일과 갱폼 사이에 힌지축을 갖는 연결부재가 마련되어, 갱폼이 상기 연결부재의 힌지축을 축으로 이동한 후 레일과 갱폼이 함께 상승할 수 있는 갱폼과 레일의 연결구조에 관한 것이다.The present invention relates to a connection structure of the gangform and the rail. More specifically, the connecting member having a hinge shaft is provided between the rail and the gang form, and the gang form and the connecting structure of the rail can be raised together with the rail after the gang form moves the hinge axis of the connecting member to the shaft.

최근에는 고층 아파트 등의 높은 건물을 건축할 경우에 갱폼을 이용하는데, 갱폼(GANG FORM)이란 건축 구조물 또는 대형 토목 구조물을 시공하기 위해 각 구조물의 형태대로 제작된 대형화된 판넬이나 각각의 부재를 하나로 연결하여 완성시킨 폼(Form)을 말한다.Recently, gangforms are used to build high buildings such as high-rise apartments. GANG FORM is a large-size panel or each member manufactured in the form of each structure to construct an architectural structure or a large-scale civil engineering structure. It is a form completed by connecting.

도 1은 종래 갱폼과 레일의 연결구조가 적용된 측면도이다.1 is a side view to which the connection structure of the conventional gangform and rail is applied.

도 1과 같이 종래에 사용되는 갱폼과 레일의 연결구조는 갱폼유닛(10)과, 상기 갱폼유닛(10)의 후방에 마련된 갱폼이동부(20)와, 상기 갱폼이동부(20)를 하부에서 지지하는 레일유닛(30)을 포함하여 구성된다.Connection structure of the gangform and the rail used in the prior art as shown in Figure 1 is a gangform unit 10, the gangform moving unit 20 provided in the rear of the gangform unit 10, and the gangform moving unit 20 from the bottom It comprises a rail unit 30 for supporting.

상기 갱폼유닛(10)은 갱폼(12)과 상기 갱폼(12)의 후방에 마련된 갱폼브레이스(14)를 포함하여 이루어진다.The gang foam unit 10 includes a gang foam 12 and a gang foam bra 14 provided at the rear of the gang foam 12.

그리고 상기 갱폼이동부(20)는 상기 갱폼브레이스(14)를 후방에서 지지하는 제 1 경사지지대(22) 및 제 2 경사지지대(24)와, 상기 제 1 경사지지대(22) 및 제 2 경사지지대(24)의 하단에 위치되는 수평이동부재(26)를 포함하여 구성된다.The gangform moving part 20 may include a first inclined support 22 and a second inclined support 24 supporting the gangform brake 14 from the rear, and the first inclined support 22 and a second inclined support. It comprises a horizontal moving member 26 located at the lower end of the (24).

또한 상기 제 1 경사지지대(22) 및 제 2 경사지지대(24)의 하단에는 랙기어(28)가 마련되고, 상기 수평이동부재(26)에는 피니언기어(29)가 마련된다.In addition, rack gears 28 are provided at lower ends of the first inclined support 22 and the second inclined support 24, and the pinion gear 29 is provided in the horizontal movable member 26.

한편, 상기 레일유닛(30)은 상기 수평이동부재(26)를 지지하는 하부지지대(32)와, 상기 하부지지대(32)의 하단을 받쳐주는 지지부재(34)와, 상기 지지부재(34)가 고정되는 레일(36)과, 상기 레일(36)에 소정 간격으로 연결된 슈(38)와, 상기 슈(38)와 연결된 앵커(39)를 포함하여 이루어진다.On the other hand, the rail unit 30 has a lower support 32 for supporting the horizontal movable member 26, a support member 34 for supporting the lower end of the lower support 32, and the support member 34 It comprises a rail 36 is fixed, a shoe 38 connected to the rail 36 at a predetermined interval, and an anchor 39 connected to the shoe 38.

상기 레일유닛(30)에는 작업발판(40)이 연결되고, 상기 작업발판(40)에는 수직틀(50)이 열결된다.A working scaffold 40 is connected to the rail unit 30, and a vertical frame 50 is thermally connected to the working scaffold 40.

상기와 같은 구조를 갖는 종래 갱폼과 레일의 연결구조에 대한 작용을 설명하면 다음과 같다.Referring to the operation of the connection structure of the conventional gangform and rail having the above structure is as follows.

콘크리트를 타설하기 위해서 갱폼(12)이 설치되어야 하고, 저층에서 갱폼(12)이 설치되어 콘크리트가 타설되면 갱폼(12)은 상부로 이동된다.Gang form 12 should be installed in order to pour concrete, the gang form 12 is installed in the lower floor and the concrete is placed when the gang form 12 is moved to the top.

저층에서의 갱폼(12) 이동은 레일(36)을 별도로 마련하지 않고 진행되나, 고층에서의 갱폼(12) 이동은 레일(36)을 이용하여 진행된다.The gangform 12 movement in the lower floor proceeds without providing the rail 36 separately, but the gangform 12 movement in the high floor proceeds using the rail 36.

콘크리트 벽을 따라 레일(36)을 상하로 이동시키기 위해서 콘크리트 타설시에 콘크리트 내부에 상기 앵커(39)가 마련되고, 상기 앵커(39)가 콘크리트에 고정되면, 앵커(39)에 상기 슈(38)가 연결되고, 상기 레일(36)은 슈(38)를 발판으로 하여 상승된다.When the anchor 39 is provided inside the concrete at the time of concrete pouring to move the rail 36 up and down along the concrete wall, and the anchor 39 is fixed to the concrete, the shoe 38 in the anchor 39 ) Is connected, and the rail 36 is raised by using the shoe 38 as a scaffold.

따라서, 상기 레일(36)이 슈(38)에 의해 콘크리트벽에 고정된 후에 콘크리트가 타설되는 위치에 갱폼(12)이 위치되고, 콘크리트벽이 타설되면, 상기 갱폼(12)은 콘크리트벽에서 이격된 후에 상층에 콘크리트벽의 타설을 위해 상승된다.Therefore, after the rail 36 is fixed to the concrete wall by the shoe 38, the gang form 12 is positioned at the position where the concrete is placed, and when the concrete wall is poured, the gang form 12 is spaced apart from the concrete wall. After it is raised for placing concrete walls in the upper floors.

이때, 상기 갱폼(12)을 포함한 갱폼유닛(10)이 콘크리트벽에서 이격되기 위 해서 후방으로 이동되는 과정은 상기 랙기어(28)와 피니언기어(29)가 맞물리면서 상기 제 1 경사지지대(22) 및 제 2 경사지지대(24)가 수평이동부재(26) 상에 이동되면서 이루어진다.At this time, the process of moving the gang foam unit 10 including the gang foam 12 to the rear to be spaced apart from the concrete wall is the rack gear 28 and the pinion gear 29 is engaged with the first inclined support 22 And the second inclined support 24 is moved on the horizontal member 26.

그리고 상기 갱폼유닛(10)이 후방으로 이동된 후에는 상기 레일(36)이 다음 층으로 이동되고, 레일(36)의 이동이 있은 후에는 상기 레일(36) 상부에 위치된 상기 갱폼유닛(10)이 다시 앞으로 이동되어 정확한 위치에 고정된 후에 콘크리트의 타설이 이루어진다.After the gangform unit 10 is moved to the rear, the rail 36 is moved to the next layer, and after the movement of the rail 36, the gangform unit 10 located above the rail 36 is moved. ) Is moved forward and fixed in the correct position before concrete is poured.

그러나 상기와 같은 종래의 갱폼과 레일의 연결구조는 갱폼유닛(10)이 이동되기 위해서 수평이동부재(26)가 마련된 공간이 필요하고, 상기 수평이동부재(26)를 지지하기 위하여 하부지지대(32)가 필요하며, 작업자가 직접 갱폼유닛(10)을 이동시켜야 하는 문제가 있다.However, the connection structure of the conventional gangform and the rail as described above requires a space provided with a horizontal movable member 26 to move the gangform unit 10, the lower support 32 to support the horizontal movable member 26 ), And the worker has to move the gangform unit 10 directly.

따라서 본 발명은 이러한 문제점을 해결하기 위해 발명된 것으로서, 별도의 수평이동부재가 마련되지 않고, 따라서 수평이동부재가 마련되는 공간과 하부지지대가 불필요한 갱폼과 레일의 연결구조를 제공하는데 그 목적이 있다.Therefore, the present invention was invented to solve such a problem, and there is no separate horizontal moving member, and therefore, an object of the present invention is to provide a connection structure of a gangform and a rail, which does not require a space and a lower support provided with a horizontal moving member. .

이러한 목적을 달성하기 위하여 본 발명은 갱폼유닛과, 상기 갱폼유닛에 제 1 힌지축에 의하여 연결되는 연결부재와, 상기 연결부재에 제 2 힌지축에 의하여 연결되고, 상기 갱폼유닛과 함께 승강 되는 레일유닛을 포함하여 구성되어지되, 상기 갱폼유닛이 상기 연결부재와 제 1 힌지축 및 제 2 힌지축에 의하여 상기 레일유닛에 연결된 상태로 이동되는 것을 특징으로 하는 갱폼과 레일의 연결구조를 제공한다.In order to achieve the above object, the present invention provides a gangform unit, a connecting member connected to the gangform unit by a first hinge shaft, and a rail connected to the connecting member by a second hinge shaft and being elevated together with the gangform unit. It is configured to include a unit, it provides a connection structure of the gangform and the rail, characterized in that the gangform unit is moved in the state connected to the rail unit by the connecting member and the first hinge shaft and the second hinge shaft.

그리고 상기 갱폼유닛에는 상기 제 1 힌지축이 형성된 갱폼브레이스가 마련되고, 상기 레일유닛에는 상기 제 2 힌지축이 형성된 레일브레이스가 마련될 수 있다.In addition, the gangform unit may be provided with a gangform brake having the first hinge shaft, and the rail unit may be provided with a rail race having the second hinge shaft.

또한, 상기 레일유닛에는 제 1 스톱퍼핀과 제 1 구멍이 마련될 수 있고, 상기 연결부재에는 회전각제한부가 마련될 수 있으며, 상기 회전각제한부에는 제 2 스톱퍼핀이 인입되는 제 2 구멍이 마련될 수 있다.In addition, the rail unit may be provided with a first stopper pin and a first hole, the connection member may be provided with a rotation angle limiting portion, and the rotation angle limiting portion has a second hole into which the second stopper pin is inserted. Can be prepared.

상기 레일유닛에는 제 3 힌지축과, 상기 제 3 힌지축에 체결된 하부가 무거운 회전체 및 제 3 스톱퍼핀이 인입된 제 3 구멍이 마련될 수 있다.The rail unit may be provided with a third hinge shaft, a lower heavy body rotating to the third hinge shaft, and a third hole into which the third stopper pin is inserted.

또한, 본 발명은 갱폼유닛과, 상기 갱폼유닛에 제 1 힌지축에 의하여 연결되고 회전각제한부가 마련된 연결부재와, 상기 연결부재에 제 2 힌지축에 의하여 연결되는 레일유닛과, 상기 레일유닛에 마련된 제 3 힌지축과, 상기 제 3 힌지축에 체결된 하부가 무거운 회전체 및 제 3 스톱퍼핀이 인입된 제 3 구멍를 포함하여 구성되어지되, 상기 갱폼유닛이 상기 연결부재와 제 1 힌지축 및 제 2 힌지축에 의하여 상기 레일유닛의 상부에서 회동되면, 상기 회전각제한부가 상기 제 3 스톱퍼핀에 의해 멈춰있는 회전체를 제 3 힌지축을 축으로 회전시키면서 회전체를 도과하는 것을 특징으로 하는 갱폼과 레일의 연결구조를 제공한다.The present invention also provides a gangform unit, a connecting member connected to the gangform unit by a first hinge shaft and provided with a rotation angle limiter, a rail unit connected to the connecting member by a second hinge shaft, and the rail unit. And a third hinge shaft having a third hinge shaft, and a lower rotating body fastened to the third hinge shaft and a third hole into which a third stopper pin is inserted, wherein the gangform unit includes the connection member and the first hinge shaft. When the rotary shaft is rotated from the upper portion of the rail unit by a second hinge shaft, the gangform characterized in that the rotation angle limiting portion to pass the rotating body while rotating the rotating body stopped by the third stopper pin to the axis of the third hinge axis Provides a connection structure between the rail and the rail.

그리고 상기 레일유닛은 상기 갱폼유닛과 함께 승강될 수 있고, 상기 갱폼유닛에는 상기 제 1 힌지축이 위치되는 갱폼브레이스가 마련되고, 상기 레일유닛에는 상기 제 2 힌지축이 위치되는 레일브레이스가 마련될 수 있다.The rail unit may be elevated together with the gangform unit, and the gangform unit may be provided with a gangform brake on which the first hinge shaft is positioned, and the rail unit may be provided with a rail brake on which the second hinge shaft is located. Can be.

이하, 본 발명의 바람직한 실시예를 첨부된 도면들을 참조하여 상세히 설명한다. 우선 각 도면의 구성요소들에 참조부호를 부가함에 있어서, 동일한 구성요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 가지도록 하고 있음에 유의해야 한다. 또한, 본 발명을 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. First of all, in adding reference numerals to the components of each drawing, it should be noted that the same reference numerals are used as much as possible even if displayed on different drawings. In addition, in describing the present invention, when it is determined that the detailed description of the related well-known configuration or function may obscure the gist of the present invention, the detailed description thereof will be omitted.

도 2는 본 발명인 갱폼과 레일의 연결구조가 적용된 제 1 실시예를 나타내는 측면도이다.Figure 2 is a side view showing a first embodiment to which the connection structure of the gangform and rail of the present invention is applied.

본 발명의 제 1 실시예는 다음과 같다.A first embodiment of the present invention is as follows.

본 발명인 갱폼과 레일의 연결구조는 갱폼유닛(100)과, 상기 갱폼유닛(100)에 제 1 힌지축(510)에 의하여 연결되는 연결부재(500)와, 상기 연결부재(500)에 제 2 힌지축(520)에 의하여 연결되고, 상기 갱폼유닛(100)과 함께 승강 되는 레일유닛(400)을 포함하여 구성된다. 상기 제 1 힌지축(510)은 제 2 힌지축(520)보다 상방에 위치되며, 갱폼유닛(100)이 콘크리트벽(800)이 타설되는 위치에 놓인 상태에서 제 1 힌지축(510)과 제 2 힌지축(520)을 지나는 직선은 타설되는 콘크리트벽(800)과 평행하게 된다.The connection structure of the gangform and the rail according to the present invention is a gangform unit 100, a connecting member 500 connected to the gangform unit 100 by a first hinge shaft 510, and a second to the connecting member 500. Is connected by the hinge shaft 520, and comprises a rail unit 400 which is elevated with the gangform unit 100. The first hinge shaft 510 is located above the second hinge shaft 520, and the first hinge shaft 510 and the first hinge shaft 510 are positioned in a state where the gangform unit 100 is placed at the position where the concrete wall 800 is placed. The straight line passing through the two hinge shafts 520 is parallel to the concrete wall 800 to be poured.

그리고 상기 갱폼유닛(100)에는 갱폼(110)과 상기 제 1 힌지축(510)이 형성된 갱폼브레이스(120)가 마련되고, 상기 레일유닛(400)에는 레일(410)과 상기 제 2 힌지축(520)이 형성된 레일브레이스(420)가 마련된다.In addition, the gangform unit 100 is provided with a gangform brake 120 having a gangform 110 and the first hinge shaft 510, and the rail unit 400 has a rail 410 and the second hinge shaft ( The rail race 420 having the 520 formed thereon is provided.

상기 갱폼브레이스(120)와 레일브레이스(420)는 상기 연결부재(500)와 제 1 힌지축(510) 및 제 2 힌지축(520)의 작용이 보다 원활하게 이루어지는 공간을 확보할 수 있는 역할을 한다.The gang form brake 120 and the rail brace 420 play a role of ensuring a space in which the connection member 500, the first hinge shaft 510, and the second hinge shaft 520 smoothly operate. do.

상기 레일(410)에는 슈(430)가 연결되고, 상기 슈(430)는 콘크리트에 고정된 앵커(440)에 체결된다.A shoe 430 is connected to the rail 410, and the shoe 430 is fastened to an anchor 440 fixed to concrete.

상기와 같은 구조를 갖는 본 발명 중 제 1 실시예의 작용을 설명하면 다음과 같다.Referring to the operation of the first embodiment of the present invention having the structure as described above is as follows.

콘크리트벽(800) 타설을 위한 상기 갱폼유닛(100)이 설치된 후 특정 위치의 콘크리트벽(800) 타설이 종료되면 갱폼유닛(100)은 상층으로 이동 설치되기 위하여 타설된 상기 콘크리트벽(800)과 이격되도록 다음과 같은 과정이 진행된다.After the gangform unit 100 for placing the concrete wall 800 is installed, when the concrete wall 800 is placed in a specific position, the gangform unit 100 is placed on the concrete wall 800 to be installed and moved to an upper floor. In order to be spaced apart, the following process is carried out.

도 2의 (b)와 같이 타워크레인(미도시)에 의하여 상기 갱폼유닛(100)이 후방으로 이동되면 상기 갱폼유닛(100)은 상기 연결부재(500)와 제 1 힌지축(510) 및 제 2 힌지축(520)에 의하여 상기 레일유닛(400)의 상부에서 화살표(511) 방향으로 회동되면서 콘크리트벽(800)에서 이격된다.When the gangform unit 100 is moved to the rear by a tower crane (not shown) as shown in Figure 2 (b), the gangform unit 100 is the connection member 500 and the first hinge shaft 510 and the first 2 is rotated in the direction of the arrow 511 in the upper portion of the rail unit 400 by the hinge shaft 520 is spaced apart from the concrete wall 800.

이때, 상기 갱폼유닛(100)은 연결부재(500)와 제 1 힌지축(510) 및 제 2 힌지축(520)에 의하여 콘크리트벽(800)과 이격된 상태를 유지하면서 레일유닛(400)과 연결된 상태를 이룰 수 있다.In this case, the gangform unit 100 and the rail unit 400 while maintaining the state separated from the concrete wall 800 by the connecting member 500, the first hinge shaft 510 and the second hinge shaft 520 You can achieve a connected state.

또한, 상기 갱폼유닛(100)이 콘크리트벽(800)에 이격된 상태에서 타워크레인(미도시)에 의하여 상방으로 끌어올려지면 갱폼유닛(100)과 레일유닛(400)이 함께 상방으로 이동된다.In addition, when the gangform unit 100 is pulled upward by a tower crane (not shown) in a state spaced apart from the concrete wall 800, the gangform unit 100 and the rail unit 400 is moved upward together.

그리고 상기 갱폼유닛(100)과 레일유닛(400)이 함께 상방으로 이동된 상태에 서 상기 레일(410)을 상층에 위치된 슈(430)에 체결한 후에 갱폼유닛(100)을 상방으로 들어올리면 갱폼유닛(100)이 화살표(511) 반대방향으로 이동되면서 콘크리트가 타설되는 위치에 폼을 형성한다.When the gangform unit 100 and the rail unit 400 are moved upward together, the rail 410 is fastened to the shoe 430 located in the upper layer, and then the gangform unit 100 is lifted upward. Gang form unit 100 is moved in the opposite direction to the arrow 511 to form a foam in the position where the concrete is poured.

만약, 상기 레일유닛(400)이 갱폼유닛(100)과 함께 상방으로 이동되지 않고, 갱폼유닛(100)만 상방으로 이동되는 구조를 가진다면 레일유닛(400)을 시공하고자 하는 건물의 높이만큼 높게 만들거나, 레일유닛(400)을 갱폼유닛(100)과 별도로 올려야 하는 문제점이 발생한다.If the rail unit 400 does not move upward with the gangform unit 100 and has a structure in which only the gangform unit 100 moves upward, the rail unit 400 is as high as the height of the building to be constructed. To make or raise the rail unit 400 and the gangform unit 100 separately occurs a problem.

도 3은 도 2에 제 1 구멍이 마련된 것을 나타내는 측면도이다.3 is a side view illustrating that the first hole is provided in FIG. 2.

한편, 도 3과 같이 상기 레일유닛(400)에는 제 1 스톱퍼핀(524)이 인입되는 제 1 구멍(522)이 마련될 수 있다.Meanwhile, as illustrated in FIG. 3, the rail unit 400 may be provided with a first hole 522 through which the first stopper pin 524 is inserted.

이를 좀더 구체적으로 설명하면 상기 레일유닛(400)의 레일브레이스(420)에 제 1 구멍(522)이 마련되고, 별도로 마련된 제 1 스톱퍼핀(524)은 상기 제 1 구멍(522)에 인출입이 가능하게 형성되며, 상기 제 1 스톱퍼핀(524)은 제 1 구멍(522)에 인입된 상태에서 일부가 외부에 돌출된다.In more detail, the first hole 522 is provided in the rail brace 420 of the rail unit 400, and the first stopper pin 524, which is separately provided, has a draw-out point in the first hole 522. The first stopper pin 524 may be partially protruded to the outside in a state where the first stopper pin 524 is inserted into the first hole 522.

상기와 같이 상기 레일유닛(400)에 제 1 스톱퍼핀(524)과 제 1 구멍(522)이 마련된 경우의 작용상 특징을 설명하면 다음과 같다.Referring to the operational features when the first stopper pin 524 and the first hole 522 is provided in the rail unit 400 as follows.

상기 제 1 스톱퍼핀(524)이 제 1 구멍(522)에서 분리된 상태에서 상기 갱폼유닛(100)을 시계방향으로 회동시키면 연결부재(500)도 시계방향으로 회동되고, 상기 연결부재(500)가 상기 제 1 구멍(522)의 하부로 이동되면 상기 제 1 스톱퍼핀(524)을 제 1 구멍(522)에 연결하고, 상기 갱폼유닛(100)을 상방으로 들어올린 다.When the gangform unit 100 rotates clockwise in a state where the first stopper pin 524 is separated from the first hole 522, the connecting member 500 also rotates clockwise and the connecting member 500. When the lower portion of the first hole 522 is moved, the first stopper pin 524 is connected to the first hole 522, and the gangform unit 100 is lifted upward.

이때, 도 3의 (b)와 같이 상기 연결부재(500)는 제 1 스톱퍼핀(524)에 걸려서 더 이상 상방으로 이동되지 않게되고, 이 상태에서 갱폼유닛(100)과 레일유닛(400)이 함께 상방으로 이동된다.At this time, as shown in (b) of FIG. 3, the connection member 500 is caught by the first stopper pin 524 and is no longer moved upwards, and in this state, the gangform unit 100 and the rail unit 400 are Are moved upwards together.

따라서, 상기 갱폼유닛(100)과 레일유닛(400)이 제 1 스톱퍼핀(524)과 제 1 구멍(522)에 의하여 보다 안정된 상태로 상방으로 함께 이동된다.Accordingly, the gangform unit 100 and the rail unit 400 are moved together upward in a more stable state by the first stopper pin 524 and the first hole 522.

도 4는 본 발명의 제 2 실시예를 나타내는 측면도이다.4 is a side view showing a second embodiment of the present invention.

본 발명의 제 2 실시예의 구성을 설명하면 다음과 같다.The configuration of the second embodiment of the present invention is as follows.

제 2 실시예의 구성은 도 3의 제 1 스톱퍼핀(524)과 제 1 구멍(522)이 마련되지 않은 상태인 도 2와 같은 구성의 제 1 실시예에서 상기 연결부재(500)의 형상에 회전각제한부(532)가 추가로 마련되는 것에 특징이 있다.The configuration of the second embodiment is rotated in the shape of the connecting member 500 in the first embodiment of the configuration as shown in FIG. 2 in which the first stopper pin 524 and the first hole 522 of FIG. 3 are not provided. It is characterized in that the limiting portion 532 is further provided.

좀더 구체적으로 설명하면 상기 연결부재(500)의 형상은 상기 제 1 힌지축(510) 및 제 2 힌지축(520)을 포함하는 로드 형상에 회전각제한부(532)가 추가되어 전체적으로 삼각형 형상이 된다.More specifically, the shape of the connection member 500 has a rotation angle limiting portion 532 added to the rod shape including the first hinge axis 510 and the second hinge axis 520 to form a triangular shape as a whole. do.

상기와 같은 구성을 가진 제 3 실시예의 작용을 제 1 실시예와의 차이를 중심으로 설명하면 다음과 같다.The operation of the third embodiment having the above configuration will be described with reference to the difference from the first embodiment.

상기 갱폼유닛(100)을 화살표(911) 방향으로 소정 범위 이동시키면 상기 회전각제한부(532)가 상기 레일유닛(400)에 접하게 되어 갱폼유닛(100)이 불필요하게 많이 회전되는 것을 방지하고, 과도한 회전으로 인하여 갱폼유닛(100)이 레일유 닛(400)에 충돌하는 것을 방지한다.When the gangform unit 100 moves in a predetermined range in the direction of the arrow 911, the rotation angle limiting part 532 is in contact with the rail unit 400, thereby preventing the gangform unit 100 from being unnecessarily rotated much. Due to excessive rotation prevents the gangform unit 100 from colliding with the rail unit (400).

한편, 상기 레일유닛(400)에는 제 4 구멍(528)이 마련되고, 상기 회전각제한부(532)에 제 2 스톱퍼핀(535)과, 상기 제 2 스톱퍼핀(535)이 인입되는 제 2 구멍(534)이 마련될 수 있다.On the other hand, the rail unit 400 is provided with a fourth hole 528, the second stopper pin 535 and the second stopper pin 535 is introduced into the rotation angle limiting portion 532 A hole 534 may be provided.

상기 제 4 구멍(528)과 제 2 스톱퍼핀(535) 및 제 2 구멍(534)이 마련된 경우의 작용을 설명하면 다음과 같다.An operation in the case where the fourth hole 528, the second stopper pin 535, and the second hole 534 are provided will be described below.

상기 갱폼유닛(100)을 화살표(911) 방향으로 소정 범위 회전시키면 상기 제 2 구멍(534)과 제 4 구멍(528)이 일직선상에 놓이고, 이때 상기 제 2 스톱퍼핀(535)이 상기 제 2 구멍(534)에 인입된 후 제 2 스톱퍼핀(535)의 일부분이 제 2 구멍(534)을 관통하고, 상기 관통된 일부분은 다시 제 4 구멍(528)에 인입되어 도 4의 (b)와 같이 된다.When the gangform unit 100 is rotated in the direction of the arrow 911 by a predetermined range, the second hole 534 and the fourth hole 528 are aligned in a straight line, and the second stopper pin 535 is disposed in the straight line. After being inserted into the second hole 534, a part of the second stopper pin 535 penetrates through the second hole 534, and the penetrated part is again inserted into the fourth hole 528 to be inserted in FIG. 4B. Becomes

이렇게 되면, 상기 갱폼유닛(100)은 콘크리트벽(800)과 이격된 상태에서 유동 없이 고정되게 되고, 갱폼유닛(100)과 레일유닛(400)은 안정되게 상방으로 이동된다.In this case, the gangform unit 100 is fixed without flow in the state separated from the concrete wall 800, the gangform unit 100 and the rail unit 400 is moved upwards stably.

본 발명의 제 3 실시예의 구성을 설명하면 다음과 같다.The configuration of the third embodiment of the present invention is as follows.

도 5는 본 발명의 제 3 실시예를 나타내는 측면도이고, 도 6은 도 5의 제 3 실시예가 적용되는 상태도이다.5 is a side view illustrating a third embodiment of the present invention, and FIG. 6 is a state diagram to which the third embodiment of FIG. 5 is applied.

도 5와 같이 제 3 실시예는 제 2 실시예의 구성에 일부구성이 추가된 형상이 다.As shown in FIG. 5, the third embodiment has a shape in which a partial configuration is added to the configuration of the second embodiment.

제 2 실시예의 구성과의 차이는 회전각제한부(532)에 L자형 오목부분(533)이 마련된 것과, 상기 레일유닛(400)의 레일브레이스(420)에 제 3 힌지축(542)과, 상기 제 3 힌지축(542)에 체결된 회전체(544)와, 상기 회전체(544)의 회전을 저지하는 제 3 스톱퍼핀(546) 및 상기 제 3 스톱퍼핀(546)이 인입된 제 3 구멍(548)이 마련된다는 점이다.The difference from the configuration of the second embodiment is that the L-shaped concave portion 533 is provided in the rotation angle limiting portion 532, the third hinge shaft 542 and the rail brace 420 of the rail unit 400, A third body in which the rotating body 544 fastened to the third hinge shaft 542 and the third stopper pin 546 and the third stopper pin 546 inserted to prevent rotation of the rotating body 544 are inserted. The hole 548 is provided.

그리고 상기 회전체(544)는 비대칭적인 형상이기 때문에 도 5의 (a)에서 상기 제 3 스톱퍼핀(546)을 제 3 구멍(548)에서 제거하면 회전체(544)는 시계방향으로 회전되면서 제 3 힌지축(542)을 중심으로 중력에 의해 정지되는 상태로 돌아가게 된다.In addition, since the rotor 544 is an asymmetrical shape, when the third stopper pin 546 is removed from the third hole 548 in FIG. 5A, the rotor 544 is rotated clockwise and the 3 is returned to the stopped state by gravity about the hinge axis (542).

상기와 같은 구성을 가진 제 3 실시예의 작용을 설명하면 다음과 같다.Referring to the operation of the third embodiment having the above configuration is as follows.

도 6의 (a)와 같은 상태에서 상기 갱폼유닛(100)이 상기 연결부재(500)와 제 1 힌지축(510) 및 제 2 힌지축(520)에 의하여 상기 레일유닛(400)의 상부에서 회동되면, 도 6의 (b), (c) 및 (d)와 같이 상기 회전각제한부(532)가 상기 제 3 스톱퍼핀(546)에 의해 멈춰있는 회전체(544)를 제 3 힌지축(542)을 축으로 회전시키면서 회전체(544)를 도과한다.In the state as shown in FIG. 6A, the gangform unit 100 is connected to the upper portion of the rail unit 400 by the connecting member 500, the first hinge shaft 510, and the second hinge shaft 520. When rotated, as shown in (b), (c) and (d) of FIG. 6, the rotation angle limiting portion 532 stops the rotating body 544 stopped by the third stopper pin 546 on the third hinge shaft. The rotating body 544 is overturned while rotating 542 on the shaft.

상기 회전각제한부(532)가 도과된 후에 회전체(544)는 제 3 스톱퍼핀(546)에 의해 정지될 때까지 이동되어 정지된다.After the rotation angle limiting portion 532 has passed, the rotating body 544 is moved and stopped until it is stopped by the third stopper pin 546.

도 6의 (e)와 같이 상기 회전체(544)가 정지된 상태에서 상기 갱폼유닛(100)이 상승되면 상기 회전각제한부(532)는 약간 이동되다가 오목부분(533)이 회전 체(544)에 걸리게 되어 정지된 상태에서 갱폼유닛(100)과 레일유닛(400)은 안정되게 상부로 함께 이동된다.As shown in FIG. 6E, when the gangform unit 100 is raised in the state in which the rotating body 544 is stopped, the rotation angle limiting part 532 is slightly moved, and the concave portion 533 is the rotating body 544. In the stopped state is caught by the gangform unit 100 and the rail unit 400 is moved together to the top stably.

상층으로 이동된 후에 상기 제 3 구멍(548)에 위치된 제 3 스톱퍼핀(546)을 제거하면, 회전체(544)는 회동이 자유롭게 된다.When the third stopper pin 546 located in the third hole 548 is removed after being moved to the upper layer, the rotating body 544 is free to rotate.

이 상태에서 상기 갱폼유닛(100)이 상승되면 도 6의 (f)와 같이 상기 회전각제한부(532)는 회전체(544)를 도과하고, 갱폼유닛(100)는 콘크리트를 타설하는 틀을 형성하도록 위치된다.In this state, when the gangform unit 100 is raised, as shown in FIG. 6 (f), the rotation angle limiting part 532 passes the rotational body 544, and the gangform unit 100 forms a frame for placing concrete. Positioned to form.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.The above description is merely illustrative of the technical idea of the present invention, and those skilled in the art to which the present invention pertains may make various modifications and changes without departing from the essential characteristics of the present invention. Therefore, the embodiments disclosed in the present invention are not intended to limit the technical idea of the present invention but to describe the present invention, and the scope of the technical idea of the present invention is not limited by these embodiments. The protection scope of the present invention should be interpreted by the following claims, and all technical ideas within the equivalent scope should be interpreted as being included in the scope of the present invention.

이상에서 설명한 바와 같이 본 발명에 의하면, 갱폼유닛을 이동시키기 위한 별도의 수평이동부재와 그 공간이 필요 없고, 갱폼유닛과 레일유닛을 연결한 상태에서 함께 승하강시킬 수 있는 효과가 있다.As described above, according to the present invention, there is no need for a separate horizontal moving member and the space for moving the gangform unit, and there is an effect of lifting up and down together with the gangform unit and the rail unit connected.

그리고 연결부재와 제 1 힌지축 및 제 2 힌지축에 의하여 갱폼유닛이 콘크리트벽과 이격된 상태를 유지하면서 레일유닛과 연결된 상태를 이룰 수 있는 효과가 있다.And by the connecting member, the first hinge shaft and the second hinge shaft has an effect that can be connected to the rail unit while maintaining the state of the gangform unit spaced apart from the concrete wall.

또한, 갱폼브레이스와 레일브레이스는 상기 연결부재와 제 1 힌지축 및 제 2 힌지축의 작용이 보다 원활하게 이루어지는 공간을 확보할 수 있는 역할을 한다.In addition, the gang form and the rail brace serves to secure a space in which the action of the connecting member, the first hinge shaft and the second hinge shaft more smoothly.

한편, 구멍과 상기 구멍에 인입되는 스톱퍼핀은 갱폼유닛이 보다 안정적으로 고정된 상태에서 이동되도록 하는 역할을 한다.On the other hand, the hole and the stopper pin introduced into the hole serves to move the gangform unit in a more stable fixed state.

그리고 회전각제한부는 갱폼유닛이 적당한 위치에 정지되게 하고, 상기 회전각제한부 및 회전체는 갱폼유닛이 안정적으로 고정된 상태에서 이동되도록 하는 역할을 한다.And the rotation angle limiting portion to the gangform unit is stopped at a suitable position, the rotation angle limiting portion and the rotating body serves to move the gangform unit in a stable fixed state.

또한, 제 3 스톱퍼핀은 회전체가 일정범위이상 이동되는 것을 막는 역할을 한다.In addition, the third stopper pin serves to prevent the rotating body from moving over a certain range.

Claims (9)

삭제delete 삭제delete 갱폼유닛(100)과;Gang foam unit 100; 상기 갱폼유닛(100)에 제 1 힌지축(510)에 의하여 연결되는 연결부재(500)와;A connection member 500 connected to the gangform unit 100 by a first hinge shaft 510; 상기 연결부재(500)에 제 2 힌지축(520)에 의하여 연결되고, 상기 갱폼유닛(100)과 함께 승강되는 레일유닛(400)과;A rail unit 400 connected to the connection member 500 by a second hinge shaft 520 and being elevated together with the gangform unit 100; 상기 갱폼유닛(100)이 콘크리트벽(800)이 타설되는 위치에 놓인 상태에서 상기 제 1 힌지축(510)은 제 2 힌지축(520)보다 상방에 위치되며, 상기 제 1 힌지축(510)과 제 2 힌지축(520)을 지나는 직선은 타설되는 콘크리트벽(800)과 평행하게 되며;The first hinge shaft 510 is located above the second hinge shaft 520 in the state in which the gangform unit 100 is placed at the position where the concrete wall 800 is placed, and the first hinge shaft 510 is disposed. A straight line passing through the second hinge axis 520 is parallel to the concrete wall 800 to be poured; 상기 레일유닛(400)에는 제 1 구멍(522)과, 상기 제 1 구멍(522)에 인출입되게 마련된 제 1 스톱퍼핀(524)이 포함되도록 구성되고,The rail unit 400 is configured to include a first hole 522 and a first stopper pin 524 provided to be drawn in and out of the first hole 522. 상기 갱폼유닛(100)이 후방으로 이동되면 상기 갱폼유닛(100)은 상기 연결부재(500)와 제 1 힌지축(510) 및 제 2 힌지축(520)에 의하여 상기 레일유닛(400)의 상부에서 회동되면서 콘크리트벽(800)에서 이격되고, 이 상태에서 갱폼유닛(100)이 상방으로 끌어올려지면 상기 갱폼유닛(100)이 상기 레일유닛(400)과 연결된 상태로 이동되는 것을 특징으로 하는 갱폼과 레일의 연결구조.When the gangform unit 100 is moved to the rear, the gangform unit 100 is the upper portion of the rail unit 400 by the connecting member 500, the first hinge shaft 510 and the second hinge shaft 520. Is rotated in the spaced apart from the concrete wall 800, in this state, if the gangform unit 100 is pulled upwards, the gangform unit 100 is moved in the state connected to the rail unit 400 Structure of rail and rail. 갱폼유닛(100)과;Gang foam unit 100; 상기 갱폼유닛(100)에 제 1 힌지축(510)에 의하여 연결되는 연결부재(500)와;A connection member 500 connected to the gangform unit 100 by a first hinge shaft 510; 상기 연결부재(500)에 제 2 힌지축(520)에 의하여 연결되고, 상기 갱폼유닛(100)과 함께 승강되는 레일유닛(400)과;A rail unit 400 connected to the connection member 500 by a second hinge shaft 520 and being elevated together with the gangform unit 100; 상기 갱폼유닛(100)이 콘크리트벽(800)이 타설되는 위치에 놓인 상태에서 상기 제 1 힌지축(510)은 제 2 힌지축(520)보다 상방에 위치되며, 상기 제 1 힌지축(510)과 제 2 힌지축(520)을 지나는 직선은 타설되는 콘크리트벽(800)과 평행하게 되며;The first hinge shaft 510 is located above the second hinge shaft 520 in the state in which the gangform unit 100 is placed at the position where the concrete wall 800 is placed, and the first hinge shaft 510 is disposed. A straight line passing through the second hinge axis 520 is parallel to the concrete wall 800 to be poured; 상기 연결부재(500)에는 회전각제한부(532)가 포함되도록 구성되고,The connection member 500 is configured to include a rotation angle limiting portion 532, 상기 갱폼유닛(100)이 후방으로 이동되면 상기 갱폼유닛(100)은 상기 연결부재(500)와 제 1 힌지축(510) 및 제 2 힌지축(520)에 의하여 상기 레일유닛(400)의 상부에서 회동되면서 콘크리트벽(800)에서 이격되고, 이 상태에서 갱폼유닛(100)이 상방으로 끌어올려지면 상기 갱폼유닛(100)이 상기 레일유닛(400)과 연결된 상태로 이동되는 것을 특징으로 하는 갱폼과 레일의 연결구조.When the gangform unit 100 is moved to the rear, the gangform unit 100 is the upper portion of the rail unit 400 by the connecting member 500, the first hinge shaft 510 and the second hinge shaft 520. Is rotated in the spaced apart from the concrete wall 800, in this state, if the gangform unit 100 is pulled upwards, the gangform unit 100 is moved in the state connected to the rail unit 400 Structure of rail and rail. 청구항 4에 있어서,The method according to claim 4, 상기 회전각제한부(532)에는 제 2 구멍(534)과, 상기 제 2 구멍(534)에 인출입되는 제 2 스톱퍼핀(535)이 마련되는 것을 특징으로 하는 갱폼과 레일의 연결구조.The rotation angle limiting portion 532 is provided with a second hole 534 and a second stopper pin 535 drawn out to the second hole 534, the connection structure of the gangform and the rail. 청구항 4에 있어서,The method according to claim 4, 상기 레일유닛(400)에는 제 3 힌지축(542)과, 상기 제 3 힌지축(542)에 체결된 하부가 무거운 회전체(544) 및 제 3 스톱퍼핀(546)이 인입된 제 3 구멍(548)이 마련되는 것을 특징으로 하는 갱폼과 레일의 연결구조.The rail unit 400 has a third hole in which a third hinge shaft 542 and a lower rotary body 544 and a third stopper pin 546 fastened to the third hinge shaft 542 are inserted. 548) is provided with a connection structure of the gangform and the rail. 삭제delete 갱폼유닛(100)과;Gang foam unit 100; 상기 갱폼유닛(100)에 제 1 힌지축(510)에 의하여 연결되고 회전각제한부(532)가 마련된 연결부재(500)와;A connecting member 500 connected to the gangform unit 100 by a first hinge shaft 510 and provided with a rotation angle limiting portion 532; 상기 연결부재(500)에 제 2 힌지축(520)에 의하여 연결되는 레일유닛(400)과;A rail unit 400 connected to the connection member 500 by a second hinge shaft 520; 상기 레일유닛(400)에 마련된 제 3 힌지축(542) 및 제 3 구멍(548)과, 상기 제 3 힌지축(542)에 체결된 하부가 무거운 회전체(544) 및 제 3 구멍(548)에 인출입되는 제 3 스톱퍼핀(546); 및The third hinge shaft 542 and the third hole 548 provided in the rail unit 400, and the lower heavy rotor 544 and the third hole 548 fastened to the third hinge shaft 542. A third stopper pin (546) drawn in and out of the; And 상기 갱폼유닛(100)이 콘크리트벽(800)이 타설되는 위치에 놓인 상태에서 상기 제 1 힌지축(510)은 제 2 힌지축(520)보다 상방에 위치되며, 상기 제 1 힌지축(510)과 제 2 힌지축(520)을 지나는 직선은 타설되는 콘크리트벽(800)과 평행하게 되도록 구성되고,The first hinge shaft 510 is located above the second hinge shaft 520 in the state in which the gangform unit 100 is placed at the position where the concrete wall 800 is placed, and the first hinge shaft 510 is disposed. And a straight line passing through the second hinge axis 520 is configured to be parallel to the concrete wall 800 to be poured, 상기 갱폼유닛(100)이 회동되면, 상기 회전각제한부(532)가 회전체(544)에 걸리게 되어 갱폼유닛(100)과 레일유닛(400)은 안정되게 상부로 함께 이동된 후에 상기 제 3 구멍(548)에 위치된 제 3 스톱퍼핀(546)을 제거하면, 회전체(544)는 회동이 자유롭게 되며, 이 상태에서 상기 갱폼유닛(100)이 상승되면 상기 회전각제한부(532)는 회전체(544)를 도과하고, 갱폼유닛(100)은 콘크리트가 타설되는 위치로 이동되는 것을 특징으로 하는 갱폼과 레일의 연결구조.When the gangform unit 100 is rotated, the rotation angle limiting portion 532 is caught by the rotating body 544 so that the gangform unit 100 and the rail unit 400 are stably moved together to the upper side after the third. When the third stopper pin 546 located in the hole 548 is removed, the rotating body 544 is free to rotate, and when the gangform unit 100 is raised in this state, the rotation angle limiting part 532 is Transition of the rotating body (544), the gangform unit 100 is the connection structure of the gangform and rail, characterized in that the concrete is moved to the position to be placed. 청구항 8에 있어서,The method according to claim 8, 상기 갱폼유닛(100)에는 상기 제 1 힌지축(510)이 위치되는 갱폼브레이스(120)가 마련되고, 상기 레일유닛(400)에는 상기 제 2 힌지축(520)이 위치되는 레일브레이스(420)가 마련되는 것을 특징으로 하는 갱폼과 레일의 연결구조.The gang form unit 120 is provided with a gang form brake 120 in which the first hinge shaft 510 is positioned, and the rail unit 400 has a rail race 420 in which the second hinge shaft 520 is located. Gang structure and rail connection structure characterized in that is provided.
KR1020070053130A 2007-05-31 2007-05-31 Connecting structure of rail and gang form KR100840847B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070053130A KR100840847B1 (en) 2007-05-31 2007-05-31 Connecting structure of rail and gang form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070053130A KR100840847B1 (en) 2007-05-31 2007-05-31 Connecting structure of rail and gang form

Publications (1)

Publication Number Publication Date
KR100840847B1 true KR100840847B1 (en) 2008-06-23

Family

ID=39772301

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070053130A KR100840847B1 (en) 2007-05-31 2007-05-31 Connecting structure of rail and gang form

Country Status (1)

Country Link
KR (1) KR100840847B1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101043920B1 (en) 2009-04-10 2011-06-29 진성토건 주식회사 Form elevating apparatus
KR200455026Y1 (en) 2009-11-18 2011-08-10 주식회사 뉴폼코리아 Gangform rail assembly with wall separation
KR101062138B1 (en) 2009-10-29 2011-09-05 금강공업 주식회사 Temporary clamping device and method
KR101177072B1 (en) * 2010-04-16 2012-08-24 주식회사 뉴폼코리아 apparatus for building and removing a gang form and system having the same
KR101574466B1 (en) * 2015-02-02 2015-12-03 삼목에스폼 주식회사 Connecting structure of the gang form and rail and Gang form apparatus adopting the same
KR101612071B1 (en) * 2015-11-18 2016-04-12 해강산업주식회사 Lifting apparatus
KR101969434B1 (en) 2018-11-16 2019-04-17 (주)해일 Connecting unit for gang form and construction method using the same
KR101982699B1 (en) 2018-07-12 2019-05-27 이준용 Rail gang form rise guide apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5481633U (en) 1977-11-21 1979-06-09
JPS62149538U (en) 1986-03-13 1987-09-21
KR200410241Y1 (en) 2005-12-21 2006-03-07 주식회사 근하기공 Gang Form Angle and Hight Adjust Apparatus of Guide Climbing System
KR20070005533A (en) * 2006-12-05 2007-01-10 이병영 Gang form

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5481633U (en) 1977-11-21 1979-06-09
JPS62149538U (en) 1986-03-13 1987-09-21
KR200410241Y1 (en) 2005-12-21 2006-03-07 주식회사 근하기공 Gang Form Angle and Hight Adjust Apparatus of Guide Climbing System
KR20070005533A (en) * 2006-12-05 2007-01-10 이병영 Gang form

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101043920B1 (en) 2009-04-10 2011-06-29 진성토건 주식회사 Form elevating apparatus
KR101062138B1 (en) 2009-10-29 2011-09-05 금강공업 주식회사 Temporary clamping device and method
KR200455026Y1 (en) 2009-11-18 2011-08-10 주식회사 뉴폼코리아 Gangform rail assembly with wall separation
KR101177072B1 (en) * 2010-04-16 2012-08-24 주식회사 뉴폼코리아 apparatus for building and removing a gang form and system having the same
KR101574466B1 (en) * 2015-02-02 2015-12-03 삼목에스폼 주식회사 Connecting structure of the gang form and rail and Gang form apparatus adopting the same
KR101612071B1 (en) * 2015-11-18 2016-04-12 해강산업주식회사 Lifting apparatus
KR101982699B1 (en) 2018-07-12 2019-05-27 이준용 Rail gang form rise guide apparatus
KR101969434B1 (en) 2018-11-16 2019-04-17 (주)해일 Connecting unit for gang form and construction method using the same

Similar Documents

Publication Publication Date Title
KR100840847B1 (en) Connecting structure of rail and gang form
CN102587645B (en) Climbing supporting mechanism having expansion and automatic meshing functions, and construction method thereof
KR100731315B1 (en) Gang form climbing guide and system using the same
CN108252504A (en) Tube shear wall concrete structure large form hoisting type construction method and constructing device
CN107574826A (en) A kind of concrete purlin and the general attachment structure and connection construction method gone along with sb. to guard him
CN208899516U (en) Insert-type steel pipe concrete column installing mechanism
CN205777404U (en) Architecture indoor decoration construction hoistable platform
CN102747842A (en) Turning launching vehicle for curtain wall
KR101213276B1 (en) System form combined with exterior insulation installation, and construction method thereof
CN211572515U (en) Elevator shaft liftable trapezoid operating platform
GB2533142A (en) Hook arrangement
JP5337589B2 (en) Connection structure of horizontal member and column
CN211201156U (en) Super high-rise creeping formwork platform
KR101326143B1 (en) Vacuum Adsorber Dolly
JP2010185211A (en) Framed scaffolding
CN105520681B (en) Flexion-extension formula folding arm window cleaning equipment
CN204252083U (en) Arch dam bracket hangs plate device by the feet entirely
CN103276722A (en) Low-clearance pile frame and application method for same
CN207512744U (en) For the turnable bottom die platform device of underwater concreting construction
CN205306881U (en) Face upward formula of bowing book arm and wipe window machine
CN210738107U (en) Special glider for mounting concrete-filled steel column
CN208699830U (en) A kind of building-construction lifting device
CN205242988U (en) Bottom has diagonal bracing&#39;s shaped steel of encorbelmenting
KR20190106089A (en) Outside wall finishing cage
CN212743313U (en) Integral steel platform of elevartor shaft combination

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
J201 Request for trial against refusal decision
AMND Amendment
B701 Decision to grant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130617

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140514

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150617

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160609

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20170601

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20180605

Year of fee payment: 11