KR100827010B1 - An apparatus of protection for being temporary water - Google Patents

An apparatus of protection for being temporary water Download PDF

Info

Publication number
KR100827010B1
KR100827010B1 KR1020070129051A KR20070129051A KR100827010B1 KR 100827010 B1 KR100827010 B1 KR 100827010B1 KR 1020070129051 A KR1020070129051 A KR 1020070129051A KR 20070129051 A KR20070129051 A KR 20070129051A KR 100827010 B1 KR100827010 B1 KR 100827010B1
Authority
KR
South Korea
Prior art keywords
plate
water
culvert
tube
temporary
Prior art date
Application number
KR1020070129051A
Other languages
Korean (ko)
Inventor
김병우
Original Assignee
(주)창민기술단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)창민기술단 filed Critical (주)창민기술단
Priority to KR1020070129051A priority Critical patent/KR100827010B1/en
Application granted granted Critical
Publication of KR100827010B1 publication Critical patent/KR100827010B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/02Making or lining canals
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B3/00Methods or installations for obtaining or collecting drinking water or tap water
    • E03B3/40Other devices for confining, e.g. trenches, drainage
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Sewage (AREA)

Abstract

A temporary cofferdam of a PC(Pre-cast) culvert for water and sewage works is provided not to give inconvenience to water and sewage works by folding and keeping at ordinary times, and unfolding in use and keeping water flowing along the inside of a PC culvert not to flow any more, to prevent water from flowing to a construction section by making water discharge to the outside of an appointed section, to make a construction site pleasant by making a PC culvert adhered closely to an internal wall and keeping water not to flow out through a temporary cofferdam, and to support strongly by keeping not to be pushed and fall down by water pressure using a retainer. A temporary cofferdam of a PC(Pre-cast) culvert for water and sewage works for cutting off water inside the culvert temporarily not to inconvenience works by water flowing along the inside when connecting and fixing PC culverts at water and sewage works is formed by fixing a horizontal opening plate(30) to be slidable to right and left sides of a central main plate(10), supporting and fixing the upper part of the central main plate to the top inside the culvert, fixing the upper part of the central main plate to be regulated in length by a length regulating bar(20), making the horizontal opening plate to be moved horizontally by a rotary actuator(40), installing a retainer(50) at the backside to prevent the temporary cofferdam from falling down, and installing a connection pipe between two temporary cofferdams and making water pass through the connection pipe.

Description

상하수도 공사의 피씨 암거 임시물막이{An apparatus of protection for being temporary water}An apparatus of protection for being temporary water

본 발명은 상하수도 공사의 피씨 암거 임시물막이에 관한 것으로서, 더욱 상세하게는 상하수도 공사시에 설치하는 피씨 암거에서 공사 도중 내부로 흐르는 물을 다른 곳으로 돌리거나 공사구간을 지나간 곳으로 보내어 공사시에 불편함을 없도록 하는 상하수도 공사의 피씨 암거 임시물막이에 관한 것이다.The present invention relates to PC culvert temporary barriers for water and sewage construction, and more specifically, in the PC culvert installed during water and sewage construction, the water flowing inside the construction during the construction to another place or to pass through the construction section is inconvenient during construction It is about PC culvert temporary barrier of water and sewage construction not to have a box.

상하수도 공사에는 PC 암거를 설치하게 되는데, 이러한 암거를 설치하기 위해서는 암거를 설치할 곳에 터파기를 하고, 터파기 된 곳의 바닥면을 다져 기초콘크리트를 타설하여 양생한 후에 피씨 암거를 운반하여 올려놓는다.Water and sewage works will be installed PC culvert, in order to install such culvert, dig the culvert where the culvert will be installed, the foundation surface of the crushed place, the foundation concrete is laid and cured, and then transported the PC culvert.

이와 같은 방식으로 피씨 암거를 계속 설치하다 보면, 내부에 지하수나 기타 요인으로 인하여 물이 차게 되는데, 이러한 물은 연결 설치할 부분까지 내려와 공사를 어렵게 하므로 물의 진행을 임시물막이로 막아 배수 펌프로 제거한다.If you continue to install the PC culvert in this way, the water is filled by the groundwater or other factors inside, and this water comes down to the connection installation part, making construction difficult, so the water progress is blocked by a temporary barrier and the drainage pump is removed.

현재 공사장에서 사용하는 임시물막이는 도 8에 도시되어 있듯이, 나무판재(2)를 암거의 내부 형상으로 잘라 버팀목으로 고정하고, 나무판재(2)의 배면에 지지대(3)를 고정하여 나무판재(2)를 수직으로 지지하게 한다.As shown in FIG. 8, the temporary barrier used at the current construction site cuts the wood board 2 into an inner shape of the culvert and fixes it with a crutch, and fixes the support 3 on the back of the wood board 2 so that the wood board ( Support 2) vertically.

이때 지지대(3)가 미끌어지는 것을 막기 위해 걸림대(4)를 지지대(3) 하단에 고정하는데, 이러한 임시물막이(1)는 제대로 물을 막을 수 없어서, 임시물막이(1)를 한 이후의 암거에도 물이 어느 정도는 흐르게 되어 작업을 불편하게 한다.At this time, in order to prevent the support (3) from slipping to fix the hanger (4) to the bottom of the support (3), such a temporary barrier (1) can not prevent water properly, even after the culvert after the temporary barrier (1) The water flows to some extent, making the work inconvenient.

그리고 지지대(3)와 걸림대(4)를 고정할 곳이 마땅치 않아 설치하기 불편한 점이 있다. And it is inconvenient to install because the place to fix the support (3) and the hanger (4) is not appropriate.

또한 한번 사용하게 되면, 버려지게 되므로 공사시 마다 일일이 만들어야 하는 불편함도 있다.In addition, once used, it will be discarded, so there is inconvenience to make one by one during construction.

본 발명은 전술한 바와 같은 문제를 해결하기 위하여 안출한 것으로서,평소에는 접어서 보관하다가, 사용시에 펴서 피씨 암거의 내부를 따라 흐르는 물이 더 이상 흐르지 않게 하여 상하수도 공사가 불편하지 않게 하는 상하수도 공사의 피씨 암거 임시물막이를 제공하고자 하는 목적이 있다.The present invention has been made in order to solve the problems as described above, and usually folded and stored, the use of water and sewage construction of the water and sewage construction so that the water flowing along the inside of the PC culvert no longer flows so that the water and sewage construction is not inconvenient The purpose is to provide a culvert temporary barrier.

그리고 물을 일정 구간 밖으로 배출할 수 있게 하여 공사구간에서는 물이 흐르지 않게 할 수 있도록 하는 목적이 있다.In addition, the water can be discharged out of a predetermined section has the purpose to prevent the water flow in the construction section.

피씨 암거와 내측벽면과 밀착되게 하여 물이 임시물막이를 통하여 조금이라도 흐르지 않게 하여 쾌적한 공사 현장을 마련하고자 하는 목적이 있다.The purpose is to provide a pleasant construction site by keeping the PC culvert close to the inner wall so that no water flows through the temporary barrier.

밀림방지구로 혹시 수압에 의해 밀려 넘어지는 것을 방지하여 견고하게 지지할 수 있게 하고자 하는 목적이 있다.It is the purpose of the jungle prevention device to be able to firmly support by preventing the falling by any pressure.

본 발명은 전술한 목적을 달성하기 위하여 판체의 배면에 두개의 가이드레일이 상하부에 각각 횡으로 돌출 형성되고, 가이드레일 사이에 연결관고정부가 돌출 형성되며, 판체의 상단에 두개의 봉고정부가 돌출 형성되되 봉고정부는 상부가 개방된 육각형의 봉홀이 판체 내부까지 형성되고, 봉고정부의 일측에 핀홀이 전후 관통되게 형성되며, 판체의 저면에 고무판이 고정되는 중앙본체판; 중앙본체판의 봉홀에 삽입되는 육각봉의 일측에 다수개의 핀홀이 일정 간격으로 형성되고, 육각봉의 상단에 볼트홀이 형성되어 압착판이 회전가능하게 체결되어 고정되며, 압착판의 하부에는 볼트봉이 회전손잡이에 의해 회전할 수 있게 형성되고, 육각봉이 봉고정부의 봉홀에 삽입되어 봉고정부의 핀홀과 육각봉의 핀홀이 일치된 상태에서 고정핀이 동시에 관통하여 길이가 고정되는 길이조절봉; 암거의 내측면과 동일 형상으로 일측면이 형성된 판체의 배면 상부에 고정부가 돌출 형성되고, 고정부에 내경에 나사산이 형성된 결합홀이 형성되며, 판체의 저면과 외측면에 고무판이 고정되어 암거 내측면과 밀착되고, 판체의 전면에 레일홈이 수평으로 형성되어 중앙본체판의 가이드레일이 슬라이딩되어 결합되는 가로벌림판; 중앙의 육각작동부 양쪽으로 반대방향의 나사산을 가진 볼트봉이 형성되고, 볼트봉이 고정부의 결합홀에 체결되어 가로벌림판을 좌우 이동시키는 회전작동구; 중공의 제1관 일측에 제2관이 삽입되되 제2관의 단부에 볼트부가 형성되어 제1관 내경의 나사산과 체결되어 고정되고, 제1관의 단부 외경에는 손잡이가 형성되며, 제1관과 제2관의 타단부에 각각 압착판이 회전가능하게 고정되고, 압착판의 일측에 지지단이 형성되어 가로벌림판의 배면에 닿아 지지하는 밀림방지구; 로 구성되는 것을 특징으로 하고, 연결관고정부는 중앙본체판의 전후를 관통하는 연결관홀이 형성되고, 연결관홀의 둘레에 관홈이 형성되어 연결관 또는 커버가 삽입되어 고정되며, 연결관고정부의 상부에 핀홀이 형성되어 고정핀으로 삽입된 연결관이나 커버를 고정시키고, 두개의 임시물막이가 일정 구간 끝단에 각각 설치되어 연결관고정부에 고정되는 연결관으로 흐르는 물을 통과시키게 구성되는 것을 특징으로 하는 상하수도 공사의 피씨 암거 임시물막이를 제공한다.In the present invention, in order to achieve the above object, two guide rails are formed to protrude horizontally on the upper and lower sides, respectively, and a connecting pipe fixing part is formed to protrude between the guide rails, and two bongo parts protrude to the top of the plate. The bongo part is formed, the hexagonal rod hole of which the top is opened to the inside of the plate body, the pinhole is formed to penetrate back and forth on one side of the bongo government, the central body plate is fixed to the bottom of the plate body; A plurality of pin holes are formed on one side of the hexagonal bar inserted into the rod hole of the central body plate at regular intervals, and bolt holes are formed at the upper end of the hexagonal bar to fix the pressing plate so as to be rotatable, and the bolt rod is rotated at the bottom of the pressing plate. It is formed to be rotated by, the hexagonal rod is inserted into the rod hole of the bongo government, the length adjustment rod is fixed in length through the fixing pins at the same time in the pinhole of the bongo government and the pinhole of the hexagonal bar coincide; A fixing part protrudes from the upper surface of the rear surface of the plate body having the same side shape as the inner side of the culvert, and a coupling hole having a thread formed in the inner diameter of the fixing part is formed, and a rubber plate is fixed to the bottom and the outer surface of the plate body so A horizontally open plate which is in close contact with the side surface and has a rail groove horizontally formed on the front surface of the plate body so that the guide rails of the central body plate are slid and coupled; Rotating operation mechanism is formed on both sides of the central hexagonal operating portion of the bolt rod having a thread in the opposite direction, the bolt rod is fastened to the coupling hole of the fixed portion to move the horizontal opening plate left and right; The second tube is inserted into one side of the hollow first tube, and a bolt part is formed at the end of the second tube to be fastened and fastened to the thread of the inner diameter of the first tube, and a handle is formed at the end diameter of the first tube. Compression plate is fixed to the other end of the second tube and the second rotatably rotatably, the support end is formed on one side of the pressing plate to contact the back of the horizontal opening plate; Characterized in that consisting of, the connector tube fixing portion is formed with a connector hole penetrating the front and rear of the central body plate, the tube groove is formed around the connector hole is fixed by inserting the connector tube or cover, the upper part of the connector tube fixing portion The pinhole is formed in the fixed connector or cover inserted into the fixing pins, and two temporary barriers are respectively installed at the end of a predetermined section to pass the water flowing through the connection pipe is fixed to the connector tube fixing portion We provide PC culvert temporary barrier of water and sewage construction.

이상과 같이 본 발명은 상하수도 공사에서, 피씨 암거를 설치할 때 발생하는 물을 임시로 막기 위한 임시물막이를 편리하게 구성하여 사용할 수 있는 효과가 있다.As described above, in the water and sewage construction, there is an effect that it is possible to conveniently configure and use a temporary barrier for temporarily blocking the water generated when installing the PC culvert.

현장에서 임시 물막이를 할 곳으로 들고 들어가 회전작동구를 돌려 가로벌림판을 양측벽에 밀착시키고 길이조절봉을 작동하여 중앙본체판을 바닥면에 밀착시키면 설치가 마무리 되므로 현장시공성이 뛰어나고, 일일이 공사 현장마다 나무 판재로 임시물막이를 만들지 않아도 되므로 작업이 줄어드는 효과가 있다.In case of carrying out temporary water gutters at the site, turn the rotary actuator to close the horizontal opening plate to both sides of the wall and operate the length adjusting rod to close the central body plate to the floor so that the installation is completed. Work is reduced because there is no need to make temporary barriers from wooden boards at each site.

고무판에 의해 수밀이 뛰어나므로 임시물막이를 설치한 곳을 넘어서 물이 흐르지 않게 되므로 작업 환경이 좋아지는 효과가 있다.Because of the excellent watertightness by the rubber plate, the water does not flow beyond the place where the temporary barrier is installed, so the working environment is improved.

또한 일정 구간의 시작부분과 끝나는 부분에 임시물막이를 하게 되면 두곳 사이에 연결관을 통해 물이 흐르게 되므로 가운데 부분에서 작업을 할 수 있게 되어 편리한 효과가 있다.In addition, if the temporary barrier at the beginning and end of a certain section of the water flows through the connecting pipe between the two places to work in the center has a convenient effect.

그리고 밀림방지구에 의하여 임시물막이가 밀려 넘어지는 것을 한번 더 잡아주므로 안정성이 뛰어난 효과가 있다.And because it prevents the temporary barrier is pushed down by the jungle protection once again has excellent stability effect.

이하 첨부된 도면을 참조하여 본 발명의 구성을 상세히 설명하면 다음과 같다.Hereinafter, the configuration of the present invention will be described in detail with reference to the accompanying drawings.

본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석하여서는 되지 않고, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms or words used in the present specification and claims should not be interpreted as being limited to the ordinary or dictionary meanings, and the inventors may appropriately define the concept of terms in order to best explain the invention of their own. Based on the principle, it should be interpreted as meaning and concept corresponding to the technical idea of the present invention.

본 발명은 상하수도 공사에서 피씨 암거(100)를 연결하여 고정하는 공사를 할 때 내부로 흐르는 물로 인하여 공사가 불편한 점을 해결하기 위해 암거(100) 내부에 임시물막이를 하는 것으로서, 중앙본체판(10)의 좌우에 슬라이딩 가능하게 가로벌림판(30)이 고정되고, 중앙본체판(10)의 상부가 암거(100)의 내측면 상면에 지지되어 밀려 고정되며, 중앙본체판(10)의 상부는 길이조절봉(20)에 의해 길이 조절 가능하게 고정되고, 가로벌림판(30)은 회전작동구(40)에 의해 좌우 이동을 하게 되며, 배면에 밀림방지구(50)가 설치되어 임시물막이가 쓰러지는 것을 방지하고, 일정구간에 물이 들어오는 것을 막으려면 두개의 일시물막이 사이에 연결관(60)을 설치하여 물이 연결관(60)을 통해 지나가게 하는 것을 주요 구성으로 한다.The present invention is to make a temporary blockage in the interior of the culvert 100 in order to solve the inconvenience of construction due to the water flowing inside when the construction to connect the PC culvert 100 in the water and sewage construction, the central body plate (10) Horizontally open plate 30 is fixed to the left and right of sliding), the upper portion of the central body plate 10 is supported by the upper surface of the inner surface of the culvert 100 is pushed and fixed, the upper portion of the central body plate 10 The length adjustment rod 20 is fixed to be adjustable in length, the horizontal opening plate 30 is to be moved left and right by the rotation operation port 40, the anti-rolling device 50 is installed on the back surface temporary barrier To prevent the fall, and to prevent the water from coming in for a certain period, the main configuration is to install the connection pipe 60 between the two temporary barriers to allow the water to pass through the connection pipe (60).

중앙본체판(10)은 에프알피로 만들어진 사각의 판체(11) 배면에 두개의 가이드레일(16)이 상하부에 각각 횡으로 돌출 형성되고, 가이드레일(16) 사이에 연결관고정부(17)가 돌출 형성된다.The central body plate 10 has two guide rails 16 protruding horizontally from the top and bottom, respectively, on the back of the square plate 11 made of FRP, and connecting pipe fixing parts 17 between the guide rails 16. Is formed to protrude.

연결관고정부(17)는 중앙본체판(10)의 전후를 관통하는 연결관홀(17-1)이 형성되고, 연결관홀(17-1)의 둘레인 연결관고정부(17)의 단부를 따라 관홈(17-2)이 형성되어 연결관(60) 또는 커버가 삽입되어 고정된다. 연결관(60)은 두개의 임시물막이를 연결하여 그 사이 구간에 물이 흐르지 않게 할때 사용하고, 커버(미도시)는 하나으 임시물막이를 사용할 경우 연결관홀(17-1)을 막기 위해 사용한다.The connecting pipe fixing part 17 is formed with a connecting pipe hole 17-1 penetrating the front and rear of the central body plate 10, and along the end of the connecting pipe fixing part 17 which is the circumference of the connecting pipe hole 17-1. (17-2) is formed and the connection pipe 60 or the cover is inserted and fixed. The connector 60 is used to connect two temporary barriers so that no water flows between the sections, and a cover (not shown) is used to block the connector hole 17-1 when one temporary barrier is used. do.

연결관고정부(17)의 상부에는 핀홀(미도시)이 형성되어 고정핀(17-3)으로 삽입된 연결관(60)이나 커버의 단부에 형성되는 핀홀을 관통하여 고정시킨다.A pinhole (not shown) is formed at an upper portion of the connection pipe fixing part 17 to fix the pinhole formed at an end of the connection pipe 60 or the cover inserted into the fixing pin 17-3.

두개의 임시물막이가 설치될 때, 일정 구간 끝단에 각각 본 발명의 임시물막이가 설치되고, 각각의 연결관고정부(17)가 마주보도록 임시물막이가 설치되어 서로 마주보는 연결관고정부(17)에 연결관(60)의 양단을 삽입하여 고정한다. 그러면 일측 임시물막이에서 차오르는 물이 연결관(60)을 통해 반대편 임시물막이 앞으로 나가게 된다.When two temporary barriers are installed, temporary barriers of the present invention are installed at each end of a predetermined section, and temporary barriers are installed so that each connection tube 17 faces each other and connected to the connector tube 17 facing each other. Insert both ends of the tube 60 to fix it. Then, the water filling from one side of the temporary barrier through the connector (60), the other side of the temporary barrier goes forward.

중앙본체판(10)의 판체(11) 상단에 두개의 봉고정부(12)가 돌출 형성되되 봉고정부(12)는 상부가 개방된 육각형의 봉홀(13)이 판체(11) 내부까지 형성되고, 봉고정부(12)의 일측에 핀홀(14)이 전후 관통되게 형성된다. 봉고정부(12)는 중공의 육각기둥 형태의 관형 철물로 이루어지고, 그 내부 봉홀(13)이 판체(11) 내부까지 형성된다.Two bongo parts 12 are protruded from the top of the plate body 11 of the central body plate 10, the bongo part 12 is a hexagonal rod hole 13 is formed to the inside of the plate body 11, the top is open, The pinhole 14 is formed to penetrate back and forth on one side of the bongo part 12. The bongo part 12 is made of a tubular iron in the form of a hollow hexagonal column, and the inner rod hole 13 is formed to the inside of the plate body 11.

중앙본체판(10)의 저면에 고무판(18)이 볼트 등으로 고정되어 암거(100)의 내부 바닥면에 밀착되게 하여 수밀되게 한다.The rubber plate 18 is fixed to the bottom of the central body plate 10 with a bolt or the like to be in close contact with the inner bottom surface of the culvert 100 to be watertight.

중앙본체판(10)이 암거(100)의 내부 바닥면에 밀착되게 고정하기 위하여 길이조절봉(20)을 설치하는데, 길이조절봉(20)은 중앙본체판(10)의 봉홀(13)에 삽입되는 육각봉(21)의 일측에 다수개의 핀홀(23)이 일정 간격으로 형성된다.In order to fix the central body plate 10 to be in close contact with the inner bottom surface of the culvert 100, the length adjusting rod 20 is installed, the length adjusting rod 20 in the rod hole 13 of the central body plate 10 A plurality of pin holes 23 are formed at a predetermined interval on one side of the hexagonal bar 21 to be inserted.

육각봉(21)의 상단에 볼트홀(22)이 형성되어 압착판(24)이 회전가능하게 체결되어 고정되고, 압착판(24)의 하부에는 볼트봉(25)이 회전손잡이(26)에 의해 회전할 수 있게 형성된다. 압착판(24)의 상면에는 고무판이 부착되어 상면에 밀착되게 되고, 회전손잡이(26)를 돌리면 볼트봉(25)이 회전하여 체결되면서 압착판(24)을 상하이동하게 해준다.The bolt hole 22 is formed at the upper end of the hexagonal bar 21 so that the pressing plate 24 is rotatably fastened and fixed, and the lower portion of the pressing plate 24 has the bolt rod 25 at the rotary knob 26. It is formed so that it can rotate. A rubber plate is attached to the upper surface of the pressing plate 24 to be in close contact with the upper surface, and when the rotary knob 26 is rotated, the bolt rod 25 is rotated and fastened to allow the pressing plate 24 to move up and down.

육각봉(21)은 봉고정부(12)의 봉홀(13)에 삽입되어 봉고정부(12)의 핀홀(14)과 육각봉(21)의 핀홀(23)이 일치된 상태에서 고정핀(15)이 동시에 관통하여 대략적인 길이를 고정시키고, 전술한 회전손잡이(26)를 돌려 압착판(24)을 암거(100) 천정에 압착시킨다.The hexagon bar 21 is inserted into the rod hole 13 of the bongo part 12 so that the pinhole 14 of the bongo part 12 and the pin hole 23 of the hexagon bar 21 coincide with the fixing pin 15. At the same time, the rough length is fixed, and the rotary knob 26 is rotated to press the pressing plate 24 to the ceiling of the culvert 100.

가로벌림판(30)은 중앙본체판(10)의 양측으로 슬라이드 되게 두개가 설치되고, 암거(100)의 내측면과 동일 형상으로 일측면이 형성된 판체(31)의 배면 상부에 고정부(32)가 돌출 형성된다. 고정부(32)의 내경에 나사산이 형성된 결합홀(33)이 형성되고, 판체(31)의 저면과 외측면에 고무판(35)이 고정되어 암거 내측면과 밀착된다. 판체(31)의 전면에 레일홈(34)이 수평으로 형성되어 중앙본체판(10)의 가이드레일(16)이 슬라이딩되어 결합된다.Two horizontally open plate 30 is installed so as to slide to both sides of the central body plate 10, the fixing portion 32 in the upper upper side of the plate body 31, one side surface is formed in the same shape as the inner surface of the culvert 100 ) Is formed to protrude. A coupling hole 33 having a thread is formed in the inner diameter of the fixing part 32, and the rubber plate 35 is fixed to the bottom and outer surfaces of the plate body 31 to be in close contact with the inner side of the culvert. The rail groove 34 is horizontally formed on the front of the plate 31 so that the guide rail 16 of the central body plate 10 is slid and coupled.

회전작동구(40)는 좌우벌림판(30)을 좌우 이동시키게 하는 구성으로서, 중앙의 육각작동부(42) 양쪽으로 반대방향의 나사산을 가진 볼트봉(41)이 형성되고, 볼트봉(41)이 고정부(32)의 결합홀(33)에 체결되어 가로벌림판(30)을 좌우 이동시키게 된다. 육각작동부(42)는 육각렌치를 사용하여 돌리면 두개의 가로벌림판(30)이 서로 벌어지는 방향으로 이동하거나 모여지는 방향으로 이동한다.The rotary actuator 40 is configured to move the left and right opening plate 30 to the left and right, and a bolt rod 41 having threads in opposite directions is formed on both sides of the central hexagonal actuator 42, and the bolt rod 41 is formed. ) Is fastened to the coupling hole 33 of the fixing part 32 to move the horizontal opening plate 30 left and right. When the hexagonal operation part 42 is turned by using a hexagon wrench, the two horizontal opening plates 30 move in a direction in which they are separated from each other or move in a gathering direction.

밀림방지구(50)는 물이 차서 수압이 생겼을 때, 뒤로 밀리지 않게 다시 한번 잡아주는 구성으로, 중공의 제1관(51) 일측에 제2관(52)이 삽입되되 제2관(52)의 단부에 볼트부(54)가 형성되어 제1관(51) 내경의 나사산과 체결되어 고정된다.
제1관(51)의 단부 외경에는 손잡이(53)가 형성되고, 손잡이(53)를 돌리면 볼트부(54)의 체결정도가 바뀌면서 수평 길이가 늘어나거나 줄어들게 된다. 제1관(51)과 제2관(52)의 타단부에 각각 압착판(55)이 회전가능하게 고정되고, 압착판(55)의 일측에 지지단(56)이 형성되어 가로벌림판(30)의 배면에 닿아 지지하게 된다.
The anti-roll 50 is configured to hold once again so that water pressure does not push back when the water is filled, the second pipe 52 is inserted into one side of the first pipe 51 of the hollow, the second pipe 52 A bolt portion 54 is formed at the end of the first tube 51 and is fastened and fixed to the thread of the inner diameter of the first tube 51.
A handle 53 is formed at the outer diameter of the end of the first pipe 51, and when the handle 53 is turned, the horizontal length is increased or decreased as the fastening degree of the bolt portion 54 is changed. The pressing plate 55 is rotatably fixed to the other ends of the first tube 51 and the second tube 52, respectively, and a supporting end 56 is formed on one side of the pressing plate 55 to form a horizontal opening plate ( It comes in contact with the back of 30).

도 1은 본 발명의 상하수도 공사의 피씨 암거 임시물막이를 도시한 사시도.1 is a perspective view showing a PC culvert temporary closure of water and sewage construction of the present invention.

도 2는 본 발명의 상하수도 공사의 피씨 암거 임시물막이를 도시한 분해사시도.Figure 2 is an exploded perspective view showing a PC culvert temporary closure of water and sewage construction of the present invention.

도 3은 본 발명의 상하수도 공사의 피씨 암거 임시물막이에 연결관이 설치된 상태를 도시한 사시도.Figure 3 is a perspective view showing a state in which the connection pipe is installed in the PC culvert temporary barrier of water and sewage construction of the present invention.

도 4는 본 발명의 상하수도 공사의 피씨 암거 임시물막이의 연결관고정부를 확대도시한 사시도.Figure 4 is an enlarged perspective view showing the connection pipe fixing of the PC culvert temporary barrier of water and sewage construction of the present invention.

도 5는 본 발명의 상하수도 공사의 피씨 암거 임시물막이를 도시한 수직 단면도.5 is a vertical cross-sectional view showing a PC culvert temporary barrier of water and sewage construction of the present invention.

도 6은 본 발명의 상하수도 공사의 피씨 암거 임시물막이를 도시한 정면도.6 is a front view showing a PC culvert temporary barrier of water and sewage construction of the present invention.

도 7은 본 발명의 상하수도 공사의 피씨 암거 임시물막이가 설치된 상태를 도시한 사시도.Figure 7 is a perspective view showing a state in which the PC culvert temporary barrier of water and sewage construction of the present invention is installed.

도 8은 본 발명의 상하수도 공사의 피씨 암거 임시물막이의 사용 상태 개념도.8 is a conceptual view of the use state of the PC culvert temporary barrier of water and sewage construction of the present invention.

도 9는 종래의 임시 물막이를 도시한 사시도.9 is a perspective view showing a conventional temporary barrier.

< 도면의 주요 부분에 대한 부호의 간단한 설명 > <Brief description of symbols for the main parts of the drawings>

1 : 임시물막이 2 : 나무판재1: temporary film 2: wood board

3 : 지지대 4 : 걸림대3: support 4: hanger

10 : 중앙본체판 11 : 판체10: central body plate 11: plate body

12 : 봉고정부 13 : 봉홀12: Bongo Government 13: Bonhall

14 : 핀홀 15 : 고정핀14: pinhole 15: fixing pin

16 : 가이드레일 17 : 연결관고정부16: guide rail 17: connection government

17-1 : 연결관홀 17-2 : 관홈17-1: connector hole 17-2: tube groove

17-3 : 고정핀 18 : 고무판17-3: fixing pin 18: rubber plate

20 : 길이조절봉 21 : 육각봉20: length adjustment rod 21: hexagon bar

22 : 볼트홀 23 : 핀홀22: bolt hole 23: pin hole

24 : 압착판 25 : 볼트봉24: pressing plate 25: bolt rod

26 : 회전손잡이 30 : 가로벌림판26: rotation handle 30: horizontal spreading plate

31 : 판체 32 : 고정부31: plate 32: fixed part

33 : 결합홀 34 : 레일홈33: coupling hole 34: rail groove

40 : 회전작동구 41 : 볼트봉40: rotary operation port 41: bolt rod

42 : 육각작동부 50 : 밀림방지구42: hexagonal operation part 50: rolling prevention

51 : 제1관 52 : 제2관51: Hall 1 52: Hall 2

53 : 손잡이 54 : 볼트부53: handle 54: bolt portion

55 : 압착판 56 : 지지단55: press plate 56: support end

60 : 연결관 100 : 암거60: connector 100: culvert

Claims (2)

판체(11)의 배면에 두개의 가이드레일(16)이 상하부에 각각 횡으로 돌출 형성되고, 가이드레일(16) 사이에 연결관고정부(17)가 돌출 형성되며, 판체(11)의 상단에 두개의 봉고정부(12)가 돌출 형성되되 봉고정부(12)는 상부가 개방된 육각형의 봉홀(13)이 판체(11) 내부까지 형성되고, 봉고정부(12)의 일측에 핀홀(14)이 전후 관통되게 형성되며, 판체(11)의 저면에 고무판(18)이 고정되는 중앙본체판(10);Two guide rails 16 are formed on the rear surface of the plate body 11 at the upper and lower sides, and the connecting pipe fixing portion 17 is formed to protrude between the guide rails 16 and two at the top of the plate body 11. The bongo part 12 of the protrusion is formed, but the bongo part 12 is formed in the hexagonal rod hole 13 of the top is open to the inside of the plate body 11, the pinhole 14 on one side of the bongo part 12 A central body plate 10 formed to penetrate through which the rubber plate 18 is fixed to the bottom surface of the plate body 11; 중앙본체판(10)의 봉홀(13)에 삽입되는 육각봉(21)의 일측에 다수개의 핀홀(23)이 일정 간격으로 형성되고, 육각봉(21)의 상단에 볼트홀(22)이 형성되어 압착판(24)이 회전가능하게 체결되어 고정되며, 압착판(24)의 하부에는 볼트봉(25)이 회전손잡이(26)에 의해 회전할 수 있게 형성되고, 육각봉(21)이 봉고정부(12)의 봉홀(13)에 삽입되어 봉고정부(12)의 핀홀(14)과 육각봉(21)의 핀홀(23)이 일치된 상태에서 고정핀(15)이 동시에 관통하여 길이가 고정되는 길이조절봉(20);A plurality of pin holes 23 are formed at one side of the hexagon bar 21 inserted into the rod hole 13 of the central body plate 10 at regular intervals, and bolt holes 22 are formed at the top of the hexagon bar 21. The pressing plate 24 is rotatably fastened and fixed, the lower portion of the pressing plate 24 is formed so that the bolt rod 25 can be rotated by the rotary knob 26, the hexagonal bar 21 is a bongo The fixing pin 15 penetrates at the same time in the state where the pinhole 14 of the bongo part 12 and the pinhole 23 of the hexagon bar 21 coincide with each other and are inserted into the rod hole 13 of the government part 12. Length adjustment rod 20 being; 암거(100)의 내측면과 동일 형상으로 일측면이 형성된 판체(31)의 배면 상부에 고정부(32)가 돌출 형성되고, 고정부(32)에 내경에 나사산이 형성된 결합홀(33)이 형성되며, 판체(31)의 저면과 외측면에 고무판(35)이 고정되어 암거 내측면과 밀착되고, 판체(31)의 전면에 레일홈(34)이 수평으로 형성되어 중앙본체판(10)의 가이드레일(16)이 슬라이딩되어 결합되는 가로벌림판(30);The fixing part 32 is protruded and formed on the upper surface of the rear surface of the plate body 31 having one side in the same shape as the inner surface of the culvert 100, and the coupling hole 33 having a screw thread in the inner diameter of the fixing part 32 is formed. Is formed, the rubber plate 35 is fixed to the bottom and the outer surface of the plate body 31 is in close contact with the culvert inner surface, the rail groove 34 is formed horizontally on the front of the plate body 31 to the central body plate 10 The guide rail 16 of the transverse opening plate 30 is coupled to the sliding; 중앙의 육각작동부(42) 양쪽으로 반대방향의 나사산을 가진 볼트봉(41)이 형성되고, 볼트봉(41)이 고정부(32)의 결합홀(33)에 체결되어 가로벌림판(30)을 좌우 이동시키는 회전작동구(40);Bolt rods 41 having opposite threads are formed on both sides of the center hexagonal working part 42, and the bolt rods 41 are fastened to the coupling holes 33 of the fixing part 32 to form a horizontal opening plate 30. Rotating operation mechanism 40 to move left and right; 중공의 제1관(51) 일측에 제2관(52)이 삽입되되 제2관(52)의 단부에 볼트부(54)가 형성되어 제1관(51) 내경의 나사산과 체결되어 고정되고, 제1관(51)의 단부 외경에는 손잡이(53)가 형성되며, 제1관(51)과 제2관(52)의 타단부에 각각 압착판(55)이 회전가능하게 고정되고, 압착판(55)의 일측에 지지단(56)이 형성되어 가로벌림판(30)의 배면에 닿아 지지하는 밀림방지구(50) ; 로 구성되는 것을 특징으로 하는 상하수도 공사의 피씨 암거 임시물막이.The second tube 52 is inserted into one side of the first tube 51 of the hollow, and a bolt portion 54 is formed at the end of the second tube 52 to be fastened by being fixed with a screw thread of the inner diameter of the first tube 51. The outer end of the first tube 51, the handle 53 is formed, the pressing plate 55 is rotatably fixed to the other end of the first tube 51 and the second tube 52, respectively, A support end 56 is formed at one side of the plate 55 to support and support the rear surface of the lateral opening plate 30; PC culvert temporary barrier of water and sewage construction characterized by consisting of. 제 1 항에 있어서, 연결관고정부(17)는 중앙본체판(10)의 전후를 관통하는 연결관홀(17-1)이 형성되고, 연결관홀(17-1)의 둘레에 관홈(17-2)이 형성되어 연결관(60) 또는 커버가 삽입되어 고정되며, 연결관고정부(17)의 상부에 핀홀이 형성되어 고정핀(17-3)으로 삽입된 연결관(60)이나 커버를 고정시키고, 두개의 임시물막이가 일정 구간 끝단에 각각 설치되어 연결관고정부(17)에 고정되는 연결관(60)으로 흐르는 물을 통과시키게 구성되는 것을 특징으로 하는 상하수도 공사의 피씨 암거 임시물막이.The connector pipe fixing part 17 is formed with a connector hole 17-1 penetrating the front and rear of the central body plate 10, and the tube groove 17-2 around the connector hole 17-1. ) Is formed so that the connector 60 or the cover is inserted and fixed, a pinhole is formed on the upper part of the connector pipe fixing part 17 to fix the connector 60 or the cover inserted into the fixing pin 17-3. , PC temporary culvert of water and sewage construction, characterized in that two temporary barriers are respectively installed at the end of a predetermined section is configured to pass the water flowing to the connector 60 is fixed to the connection pipe fixing part (17).
KR1020070129051A 2007-12-12 2007-12-12 An apparatus of protection for being temporary water KR100827010B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070129051A KR100827010B1 (en) 2007-12-12 2007-12-12 An apparatus of protection for being temporary water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070129051A KR100827010B1 (en) 2007-12-12 2007-12-12 An apparatus of protection for being temporary water

Publications (1)

Publication Number Publication Date
KR100827010B1 true KR100827010B1 (en) 2008-05-02

Family

ID=39649538

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070129051A KR100827010B1 (en) 2007-12-12 2007-12-12 An apparatus of protection for being temporary water

Country Status (1)

Country Link
KR (1) KR100827010B1 (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100886787B1 (en) 2008-11-27 2009-03-04 봉화토건 합자회사 Method and apparatus for intercepting water in sewage culverts
KR20150128345A (en) * 2014-05-09 2015-11-18 주식회사 엠에스테크 A blocking device for repairing a sluice gate of an intake tower
KR20150130199A (en) * 2014-05-13 2015-11-23 최인환 A Stap gate method of a sewer pipe
KR101604535B1 (en) 2014-05-13 2016-03-17 최인환 A flowrate prevent structure of sewer pipe
KR20160039399A (en) 2014-10-01 2016-04-11 (주)포웰 Order structure of the dam body unit during sewer maintenance
KR101613272B1 (en) * 2015-05-13 2016-04-29 테크줌코리아 합자회사 Cutoff device for intercepting sewer and cutoff method using that
KR101639030B1 (en) * 2015-11-30 2016-07-12 테크줌코리아 합자회사 Cutoff device for intercepting sewer and cutoff method using that
KR101681132B1 (en) * 2014-05-09 2016-11-30 주식회사 엠에스테크 A process of replacement of a sluice gate using A blocking device in an intake tower
KR101681133B1 (en) * 2014-06-09 2016-11-30 주식회사 엠에스테크 A blocking device for repairing a sluice gate of an intake tower
KR101743643B1 (en) 2016-11-02 2017-06-05 이강원 construction method of constructing box type sewer
KR20170004135U (en) * 2017-11-29 2017-12-08 권두영 Water prevention device for repairing pipe
KR101939692B1 (en) 2018-04-13 2019-04-08 거야건설 주식회사 Floodgate type cutoff device for box sewer and cutoff method using that
KR101975527B1 (en) * 2018-09-27 2019-05-08 박창군 Fluid flow blocking apparatus for water pipe
CN110185118A (en) * 2019-04-25 2019-08-30 上海市政建设有限公司 A kind of sewage conduct plugging device and its construction method
KR102037249B1 (en) 2018-07-12 2019-10-29 이성연 Water prevention device for sewer pipe
KR20220111888A (en) * 2021-02-03 2022-08-10 (주)한국알앤디 Air circulation and water level detection system for sewaege pipe construction
KR102698407B1 (en) * 2023-11-30 2024-08-23 (주)다해컨스텍 Rolling finishers and how they can be used to repair concrete structures

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
null

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100886787B1 (en) 2008-11-27 2009-03-04 봉화토건 합자회사 Method and apparatus for intercepting water in sewage culverts
KR101681132B1 (en) * 2014-05-09 2016-11-30 주식회사 엠에스테크 A process of replacement of a sluice gate using A blocking device in an intake tower
KR20150128345A (en) * 2014-05-09 2015-11-18 주식회사 엠에스테크 A blocking device for repairing a sluice gate of an intake tower
KR101681127B1 (en) * 2014-05-09 2016-12-12 주식회사 엠에스테크 A blocking device for repairing a sluice gate of an intake tower
KR20150130199A (en) * 2014-05-13 2015-11-23 최인환 A Stap gate method of a sewer pipe
KR101580044B1 (en) 2014-05-13 2015-12-24 최인환 A Stap gate method of a sewer pipe
KR101604535B1 (en) 2014-05-13 2016-03-17 최인환 A flowrate prevent structure of sewer pipe
KR101681133B1 (en) * 2014-06-09 2016-11-30 주식회사 엠에스테크 A blocking device for repairing a sluice gate of an intake tower
KR20160039399A (en) 2014-10-01 2016-04-11 (주)포웰 Order structure of the dam body unit during sewer maintenance
KR101613272B1 (en) * 2015-05-13 2016-04-29 테크줌코리아 합자회사 Cutoff device for intercepting sewer and cutoff method using that
KR101639030B1 (en) * 2015-11-30 2016-07-12 테크줌코리아 합자회사 Cutoff device for intercepting sewer and cutoff method using that
KR101743643B1 (en) 2016-11-02 2017-06-05 이강원 construction method of constructing box type sewer
KR20170004135U (en) * 2017-11-29 2017-12-08 권두영 Water prevention device for repairing pipe
KR200488498Y1 (en) * 2017-11-29 2019-02-12 권두영 Water prevention device for repairing pipe
KR101939692B1 (en) 2018-04-13 2019-04-08 거야건설 주식회사 Floodgate type cutoff device for box sewer and cutoff method using that
KR102037249B1 (en) 2018-07-12 2019-10-29 이성연 Water prevention device for sewer pipe
KR101975527B1 (en) * 2018-09-27 2019-05-08 박창군 Fluid flow blocking apparatus for water pipe
CN110185118A (en) * 2019-04-25 2019-08-30 上海市政建设有限公司 A kind of sewage conduct plugging device and its construction method
CN110185118B (en) * 2019-04-25 2024-05-24 上海市政建设有限公司 Sewage pipeline plugging device and construction method thereof
KR20220111888A (en) * 2021-02-03 2022-08-10 (주)한국알앤디 Air circulation and water level detection system for sewaege pipe construction
KR102451236B1 (en) 2021-02-03 2022-10-07 (주)한국알앤디 Air circulation and water level detection system for sewaege pipe construction
KR102698407B1 (en) * 2023-11-30 2024-08-23 (주)다해컨스텍 Rolling finishers and how they can be used to repair concrete structures

Similar Documents

Publication Publication Date Title
KR100827010B1 (en) An apparatus of protection for being temporary water
EP3031990B1 (en) Floor drain
US5884439A (en) Concrete form with integral drain and adjustable stake therefor
US20160281417A1 (en) A drainage unit
CN218027704U (en) Deep basal pit caisson precipitation supporting device
CN113653066A (en) Foundation pit slope supporting structure
DE60012965T2 (en) SUSPENDED PUBLIC SANITARY DEVICE
KR100776413B1 (en) A bridge drain unit
FR2745325A1 (en) Pneumatic flood barrier for entrances to buildings and isolated constructions
KR101335182B1 (en) U-type waterway to divide the water easily
KR101975862B1 (en) Drainage conduit having inclined gradient control structure
KR100634186B1 (en) Manhole for catchment of drain-outlet road
KR101460758B1 (en) Landscape artificial ground drainage connecting system
CN215594051U (en) Foundation pit slope supporting structure
KR100481148B1 (en) Drainage System using Hexa-Tube Connector
KR101138023B1 (en) System for ground stabilization of reinforcement and drainage of fully compressed
CN212477760U (en) Pipeline groove supporting construction
CN112440068B (en) Support frame for welding cement pipe steel reinforcement framework
CN209923954U (en) Cofferdam for water conservancy construction
KR100433560B1 (en) Pipe for drainage of slope protection blocks
KR101767657B1 (en) Sluice valve protection barrel with built-in spindle
KR200430582Y1 (en) Structure of rainwater tank using pipe
KR102386350B1 (en) A closed water pipe
KR101978908B1 (en) Drainage conduit having inclined gradient control structure
KR20100010135A (en) Road drainer with branch pipe connection member for sewage pipe

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130417

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140217

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150424

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160425

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20170518

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20181023

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20190619

Year of fee payment: 12