CN110185118A - A kind of sewage conduct plugging device and its construction method - Google Patents

A kind of sewage conduct plugging device and its construction method Download PDF

Info

Publication number
CN110185118A
CN110185118A CN201910336535.9A CN201910336535A CN110185118A CN 110185118 A CN110185118 A CN 110185118A CN 201910336535 A CN201910336535 A CN 201910336535A CN 110185118 A CN110185118 A CN 110185118A
Authority
CN
China
Prior art keywords
preformed hole
rubber slab
steel plate
water blocking
borehole wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910336535.9A
Other languages
Chinese (zh)
Other versions
CN110185118B (en
Inventor
周雅斌
许玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI MUNICIPAL CONSTRUCTION Co Ltd
Original Assignee
SHANGHAI MUNICIPAL CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI MUNICIPAL CONSTRUCTION Co Ltd filed Critical SHANGHAI MUNICIPAL CONSTRUCTION Co Ltd
Priority to CN201910336535.9A priority Critical patent/CN110185118B/en
Publication of CN110185118A publication Critical patent/CN110185118A/en
Application granted granted Critical
Publication of CN110185118B publication Critical patent/CN110185118B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Pipe Accessories (AREA)

Abstract

The present invention relates to a kind of sewage conduct plugging device and its construction methods, the device is installed on the borehole wall of active well for blocking pipe, including the rubber slab, water blocking steel plate and preformed hole pipe set gradually, the rubber slab is bonded with the borehole wall, corresponding first preformed hole in position is respectively equipped on the water blocking steel plate and rubber slab, the preformed hole pipe is connected to first preformed hole.The present invention carries out main closure using water blocking steel plate, and bound rubber plate is sealed sealing, and plugging effect is preferable, can guarantee Job Operations area construction safety;Preformed hole pipe can be achieved sewage and persistently convey, without stopping the water inlet sewage transport of sewage treatment plant completely;Later period dismounting workload is small, effectively reduces the workload of underwater frogman, and reduce operating risk.

Description

A kind of sewage conduct plugging device and its construction method
Technical field
The present invention relates to the realm of building construction more particularly to a kind of sewage conduct plugging device and its construction methods.
Background technique
In down-stream processing engineering, usually require to carry out sewage conduct when the access of the old and new's fabric connectivity Temporary plugging, and construction period is cut in the cutting being connected to, the Inlet and outlet water sewage transport of sewage treatment plant cannot be stopped, i.e., Construction of cutting off the water supply is not can be carried out.The problems such as larger there may be flow rate of water flow due to old structure, improves diving early period and feels inspection The difficulty and security risk of work;And during construct matched equipment lifting, installation, it is possible to object can be caused to human body Body strike twines pressure, falls, running over and injure etc. and injuring, and is the very high events in operation of risk.
Method for blocking under existing not stoppage in transit state mainly includes following two:
1. the underwater plugging method of air bag:
Its construction characteristic is that speed is fast, and it is convenient to remove, but it is only applicable to pipeline middle and upper reaches does not have water, and water level is blocking The case where not changing afterwards, and suggest using in the case of temporary plugging is small no more than 5.
2. underwater closure of building a wall:
Its construction characteristic is high reliablity, guaranteed for personnel in the pit's operation, be block for a long time it is preferred, and on pipeline Trip can have water, but its construction period is longer than air bag blocking time, need 12 hours freezing periods, and when dismounting needs frogman's water It is lower broken.
Summary of the invention
The present invention provides a kind of sewage conduct plugging device and its construction method, to solve existing for existing blocking technology Construction time is long, the plugging action time is short, removes the problems such as inconvenient.
In order to solve the above technical problems, the present invention provides a kind of sewage conduct plugging device, it is installed on the borehole wall of active well It is upper to be used for blocking pipe, including the rubber slab, water blocking steel plate and preformed hole pipe set gradually, the rubber slab and the borehole wall Fitting, is respectively equipped with corresponding first preformed hole in position on the water blocking steel plate and rubber slab, the preformed hole pipe and described the The connection of one preformed hole.
Preferably, corresponding second preformed hole in position is respectively equipped on the water blocking steel plate and rubber slab, on the borehole wall Reserved bolt is installed, the position of second preformed hole is corresponding with the position of the reserved bolt.
Preferably, the reserved bolt uses setscrew.
Preferably, the reserved bolt uses chemical bolt.
Preferably, each preformed hole pipe is equipped with reserved port lid.
The present invention also provides a kind of construction methods of sewage conduct plugging device as described above, include the following steps:
S1: according to line size to be blocked, the prefabricated matched rubber slab, water blocking steel plate and preformed hole pipe;
S2: when installation, by rubber slab and water blocking described in the reserved screw bolt passes being arranged on the borehole wall of the active well The rubber slab and water blocking Interal fixation are installed on the borehole wall by steel plate by a nut;
S3: when dismounting, the dismounting that the nut completes the water blocking steel plate and rubber slab is removed.
Preferably, further including the steps that the smooth borehole wall before step S2.
Preferably, including: according to the rubber slab the step of the reserved bolt is arranged on the borehole wall of the active well Installation site, mounting hole is beaten using underwater pneumatic drilling machine, then in the mounting hole by the reserved bolt fixed installation.
Compared with prior art, sewage conduct plugging device provided by the invention and its construction method have the advantages that
1. the application carries out main closure using water blocking steel plate, bound rubber plate is sealed sealing, can be to larger Hole is blocked, and plugging effect is preferable, can guarantee Job Operations area construction safety;
2. rubber slab, water blocking steel plate and preformed hole pipe can be achieved prefabricated, without underwater field fabrication, substantially increase Working efficiency;
3. temporary pipeline can be connected by preformed hole pipe, realize that sewage persistently conveys, without stopping sewage treatment plant completely Water inlet sewage transport;
4. later period dismounting workload is small, the workload of underwater frogman is effectively reduced, and reduce operating risk.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of sewage conduct plugging device in the embodiment of the invention;
Fig. 2 is the scheme of installation of sewage conduct plugging device in the embodiment of the invention.
In figure: 10- active well, the 11- borehole wall, 12- pipeline, 13- reserve bolt;
20- rubber slab, the second preformed hole of 21-, 30- water blocking steel plate, 31- nut, 40- preformed hole pipe,
41- reserves port lid, 42- temporary pipeline.
Specific embodiment
In order to more state the technical solution of foregoing invention in detail, being exemplified below specific embodiment proves that technology is imitated Fruit;It is emphasized that these embodiments are not limited to limit the scope of the invention for illustrating the present invention.
Sewage conduct plugging device provided by the invention, referring to FIG. 1, and combine Fig. 2, be installed on the borehole wall of active well 10 Blocking pipe 12 is used on 11, including the rubber slab 20, water blocking steel plate 30 and preformed hole pipe 40 set gradually, the rubber slab 20 are bonded with the borehole wall 11, and corresponding first preformed hole in position is respectively equipped on the water blocking steel plate 30 and rubber slab 20 (not Diagram), the preformed hole pipe 40 is connected to first preformed hole.The water blocking steel plate 30 carries out main closure, the gear Water steel plate 30, which can be realized and build a wall, blocks similar plugging effect and reliability, and bound rubber plate 20 is sealed sealing, Reach better plugging effect, to guarantee Job Operations area construction safety;Temporary pipeline 42 can be connected by preformed hole pipe 40, It realizes that sewage persistently conveys, without stopping the water inlet sewage transport of sewage treatment plant completely, does not influence sewage treatment plant and normally make Industry.
In addition, rubber slab 20 is that steel can be used in rubber material (such as neoprene), water blocking steel plate 30 and preformed hole pipe 40 Material, the material of each component are non-special material, and low cost is easy to get;Wherein water blocking steel plate 30 and preformed hole pipe 40 can It is fixedly connected after can also being separately formed using integrated molding by modes such as welding.
Specifically, the rubber slab 20 can be plate identical with 30 size of water blocking steel plate, can also use and institute The frame-type plate that 30 outer edge of water blocking steel plate matches is stated, equally can be realized hermetic seal effect.
Preferably, it is corresponding to be respectively equipped with position on the water blocking steel plate 30 and rubber slab 20 please continue to refer to Fig. 1 and Fig. 2 The second preformed hole 21, reserved bolt 13 is installed, the position of second preformed hole 21 and described reserved on the borehole wall 11 The position of bolt 13 is corresponding.When installation, the rubber slab 20 and water blocking steel plate 30 can be sequentially passed through to the reserved bolt 13, then Three is fixedly connected using nut 31.
Preferably, the reserved bolt 31 can use setscrew, the frictional force generated using expansion reaches better Fixed effect;Chemical bolt can also be used, using solidification of the liquid medicine in pencil in mounting hole, improves fixed effect.
Preferably, with continued reference to FIG. 1, each preformed hole pipe 40 faces equipped with reserved port lid 41 without connection When Shi Guandao 42, preformed hole pipe 40 is blocked using reserved port lid 41.
Please continue to refer to Fig. 1 and Fig. 2, the present invention also provides a kind of constructions of sewage conduct plugging device as described above Method includes the following steps:
S1: according to 12 size of pipeline to be blocked, the prefabricated matched rubber slab 20, water blocking steel plate 30 and preformed hole Pipe 40, due to rubber slab 20, water blocking steel plate 30 and preformed hole pipe 40 be it is prefabricated, without underwater field fabrication, greatly improve Working efficiency, and matched each component can be made according to the size of pipeline 12 to be blocked, enable the method to be suitable for compared with The closure at big hole, does not influence plugging effect;
S2: when installation, the reserved bolt 13 being arranged on the borehole wall 11 of the active well 10 is sequentially passed through into the rubber slab 20 and water blocking steel plate 30, the rubber slab 20 and water blocking steel plate 30 be fixedly installed in by a nut 31 (hex nut) described On the borehole wall 11, in the present embodiment, the process embodiment is as follows: the reserved bolt 13 on the borehole wall 11 first being penetrated the rubber In the second preformed hole 21 on offset plate 20, then the water blocking steel plate 30 is hung in corresponding position, adjusts water blocking steel plate 30 After installation site, hex nut is screwed in, realizes the ne-leakage connection of steel plate closure site, can also screw in hex nut certainly Before, it is arranged gasket on reserved bolt 13, hex nut is avoided to fall off.During the installation process, diver can also pass through wired/nothing Line intercom is conversed, and installation situation is reported without delay.After installation is in place, carry out structures connection construction (as shown in Figure 2), The connection switching of the old and new's system is carried out after structure construction acceptance(check);
S3: when dismounting, removing the nut 31 can be completed the dismounting of the water blocking steel plate 30 and rubber slab 20, subtract significantly Small dismounting workload, effectively reduces the workload of underwater frogman, and reduce operating risk.
Using the above method, the smooth switching of the old and new's system connectivity access of sewage disposal system may be implemented, do not stopping Fortune state realizes that Structural Engineering connection and the old and new's operating system are docked and connected, and does not influence construction safety in handoff procedure and old The normal operation of sewage disposal system, this method can also shorten the construction time, promote switch speed.
Preferably, before step S2, further include the steps that the smooth borehole wall 11, such as to pre-installing rubber on the borehole wall 11 The position of offset plate 20 carries out decontamination cleaning, convenient for subsequent rubber slab 20 installation and improve sealing effect.
Preferably, including: according to described the step of reserved bolt 13 are arranged on the borehole wall 11 of the active well 10 The installation site of rubber slab 20 beats mounting hole using underwater pneumatic drilling machine, then the reserved bolt 13 is fixedly mounted on institute It states in mounting hole.
In conclusion sewage conduct plugging device provided by the invention and its construction method, the device are installed on active well Blocking pipe 12 is used on 10 borehole wall 11, including the rubber slab 20, water blocking steel plate 30 and preformed hole pipe 40 set gradually, institute It states rubber slab 20 to be bonded with the borehole wall 11, position corresponding first is respectively equipped on the water blocking steel plate 30 and rubber slab 20 in advance It boxes out, the preformed hole pipe 40 is connected to first preformed hole.The present invention carries out main closure using water blocking steel plate 30, knot It closes rubber slab 20 and is sealed sealing, plugging effect is preferable, can guarantee Job Operations area construction safety;Preformed hole pipe 40 can be real Existing sewage persistently conveys, without stopping the water inlet sewage transport of sewage treatment plant completely;Later period dismounting workload is small, effectively reduces The workload of underwater frogman, and reduce operating risk.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it Interior, then the invention is also intended to include including these modification and variations.

Claims (8)

1. a kind of sewage conduct plugging device, be installed on the borehole wall of active well for blocking pipe, which is characterized in that including according to Rubber slab, water blocking steel plate and the preformed hole pipe of secondary setting, the rubber slab are bonded with the borehole wall, the water blocking steel plate and rubber Corresponding first preformed hole in position is respectively equipped on offset plate, the preformed hole pipe is connected to first preformed hole.
2. sewage conduct plugging device as described in claim 1, which is characterized in that on the water blocking steel plate and rubber slab respectively Equipped with corresponding second preformed hole in position, reserved bolt is installed on the borehole wall, the position of second preformed hole with it is described The position of reserved bolt is corresponding.
3. sewage conduct plugging device as claimed in claim 2, which is characterized in that the reserved bolt uses setscrew.
4. sewage conduct plugging device as claimed in claim 2, which is characterized in that the reserved bolt uses chemical bolt.
5. sewage conduct plugging device as described in claim 1, which is characterized in that each preformed hole pipe is equipped with reserved Port lid.
6. a kind of construction method of sewage conduct plugging device according to any one of claims 1 to 5, which is characterized in that packet Include following steps:
S1: according to line size to be blocked, the prefabricated matched rubber slab, water blocking steel plate and preformed hole pipe;
S2: when installation, by rubber slab and water blocking steel plate described in the reserved screw bolt passes being arranged on the borehole wall of the active well, The rubber slab and water blocking Interal fixation are installed on the borehole wall by a nut;
S3: when dismounting, the dismounting that the nut completes the water blocking steel plate and rubber slab is removed.
7. construction method as claimed in claim 6, which is characterized in that further include the smooth borehole wall before step S2 Step.
8. construction method as claimed in claim 6, which is characterized in that the reserved spiral shell is arranged on the borehole wall of the active well The step of bolt includes: to beat mounting hole using underwater pneumatic drilling machine, then will be described reserved according to the installation site of the rubber slab Bolt is fixedly mounted in the mounting hole.
CN201910336535.9A 2019-04-25 2019-04-25 Sewage pipeline plugging device and construction method thereof Active CN110185118B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910336535.9A CN110185118B (en) 2019-04-25 2019-04-25 Sewage pipeline plugging device and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910336535.9A CN110185118B (en) 2019-04-25 2019-04-25 Sewage pipeline plugging device and construction method thereof

Publications (2)

Publication Number Publication Date
CN110185118A true CN110185118A (en) 2019-08-30
CN110185118B CN110185118B (en) 2024-05-24

Family

ID=67715009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910336535.9A Active CN110185118B (en) 2019-04-25 2019-04-25 Sewage pipeline plugging device and construction method thereof

Country Status (1)

Country Link
CN (1) CN110185118B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112246A (en) * 2020-09-22 2020-12-22 齐力建设集团有限公司 Temporary gate plate for large-scale sewage pipeline connection construction and construction method thereof
CN113202173A (en) * 2021-04-09 2021-08-03 中铁六局集团太原铁路建设有限公司 Construction method for temporarily replacing cross-foundation-pit concrete pipe with steel pipe in deep foundation pit construction
CN114855854A (en) * 2022-05-25 2022-08-05 广东省建筑工程机械施工有限公司 Construction protection structure and construction method for double open caisson connecting wall protection wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100827010B1 (en) * 2007-12-12 2008-05-02 (주)창민기술단 An apparatus of protection for being temporary water
CN205839681U (en) * 2016-07-28 2016-12-28 上海市城市建设设计研究总院 Floss hole temporary plugging structure
CN106885092A (en) * 2017-04-01 2017-06-23 成都市排水有限责任公司 A kind of differential blocking underwater pipeline device
CN210288621U (en) * 2019-04-25 2020-04-10 上海市政建设有限公司 Sewage pipeline plugging device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100827010B1 (en) * 2007-12-12 2008-05-02 (주)창민기술단 An apparatus of protection for being temporary water
CN205839681U (en) * 2016-07-28 2016-12-28 上海市城市建设设计研究总院 Floss hole temporary plugging structure
CN106885092A (en) * 2017-04-01 2017-06-23 成都市排水有限责任公司 A kind of differential blocking underwater pipeline device
CN210288621U (en) * 2019-04-25 2020-04-10 上海市政建设有限公司 Sewage pipeline plugging device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112246A (en) * 2020-09-22 2020-12-22 齐力建设集团有限公司 Temporary gate plate for large-scale sewage pipeline connection construction and construction method thereof
CN113202173A (en) * 2021-04-09 2021-08-03 中铁六局集团太原铁路建设有限公司 Construction method for temporarily replacing cross-foundation-pit concrete pipe with steel pipe in deep foundation pit construction
CN113202173B (en) * 2021-04-09 2023-03-10 中铁六局集团太原铁路建设有限公司 Construction method for temporarily replacing cross-foundation-pit concrete pipe with steel pipe in deep foundation pit construction
CN114855854A (en) * 2022-05-25 2022-08-05 广东省建筑工程机械施工有限公司 Construction protection structure and construction method for double open caisson connecting wall protection wall
CN114855854B (en) * 2022-05-25 2024-02-09 广东省建筑工程机械施工有限公司 Double open caisson connecting wall protection wall construction protection structure and construction method

Also Published As

Publication number Publication date
CN110185118B (en) 2024-05-24

Similar Documents

Publication Publication Date Title
CN110185118A (en) A kind of sewage conduct plugging device and its construction method
CN102606842A (en) Protecting device for forward water hammer
CN204671956U (en) Automatic suction filtration-the stripping device of a kind of silting blocking type for mud Quick drainage
CN205779012U (en) A kind of tunnel self-draining arrangement
CN205992164U (en) A kind of cable duct intelligence control system
CN100357532C (en) Living and fire--fighting common non-negative-pressure water supply system
CN107185921A (en) A kind of shield machine grouting equipment pipeline cleaning system
CN209061315U (en) Integrated sewage water Boosting pumping station bottom sludge remove device
CN208685635U (en) Facilitate the hood type waling of installing and dismounting
CN203020819U (en) Hand ash clearing device of deduster ash hopper
CN206608387U (en) Siphoning installation before a kind of pump
CN202022294U (en) Device for discharging accumulated-water of partitioned ship body
CN211339704U (en) Safety device for preventing liquid level of storage tank from being too high
CN203663613U (en) Power-assisted dust discharge device of dust remover
CN210288621U (en) Sewage pipeline plugging device
CN210482395U (en) Basement drainage blind ditch
CN107700786A (en) A kind of energy-saving water collecting floor and its collection device
CN106545163A (en) A kind of concrete water-retaining wall formwork seal structure
CN209443457U (en) A kind of vacuum preloading drainage arrangement with control function
CN207244778U (en) Vacuum equipment positive displacement gravity flow continuous blow down system
CN105972371B (en) Pressure vessel denoising device and pressure vessel detecting system
CN207013399U (en) A kind of shield machine grouting equipment pipeline cleaning system
CN108014524A (en) A kind of thickener underflow conveying and examination and repair system
CN216892479U (en) Foundation pit dewatering and drainage treatment system
CN211547783U (en) Vacuum automatic sewage discharge device for removing accumulated water in archaeological site

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant