KR100801573B1 - Precast concrete culvert boxes and method for constructing the same boxes - Google Patents

Precast concrete culvert boxes and method for constructing the same boxes Download PDF

Info

Publication number
KR100801573B1
KR100801573B1 KR1020070043970A KR20070043970A KR100801573B1 KR 100801573 B1 KR100801573 B1 KR 100801573B1 KR 1020070043970 A KR1020070043970 A KR 1020070043970A KR 20070043970 A KR20070043970 A KR 20070043970A KR 100801573 B1 KR100801573 B1 KR 100801573B1
Authority
KR
South Korea
Prior art keywords
culvert
steel wire
culvert box
box
hollow body
Prior art date
Application number
KR1020070043970A
Other languages
Korean (ko)
Inventor
신종덕
Original Assignee
신종덕
(주)대영
우민호
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=39342566&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR100801573(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 신종덕, (주)대영, 우민호 filed Critical 신종덕
Priority to KR1020070043970A priority Critical patent/KR100801573B1/en
Application granted granted Critical
Publication of KR100801573B1 publication Critical patent/KR100801573B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • E04C5/12Anchoring devices
    • E04C5/125Anchoring devices the tensile members are profiled to ensure the anchorage, e.g. when provided with screw-thread, bulges, corrugations
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • E04G21/125Reinforcement continuity box
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

A culvert box is provided to make construction simple, to shorten a period of construction and to cut down on the cost of construction by installing a pair of culvert boxes buried with anchor units to four corners or each side in a longitudinal direction, and inserting steel wires to steel wire passing holes of the culvert boxes and fixing to the anchor units simply. A culvert box(200) is composed of a first culvert box(210) and a second culvert box(220), and installed continuously to the appointed length at every section of the first culvert box and the second culvert box making a pair with tensile force supplied by anchor units(100), steel wires(130) and anchorages(140) of the first and second culverts. The first and second culvert boxes are formed in empty tunnel type hollow bodies(211,221) and provided with plural steel wire passing holes formed in the longitudinal direction of the hollow bodies, anchorage mounting grooves formed on ends of the steel wire passing holes to mount each anchorage, and anchor units formed between the steel wire passing holes of the hollow bodies, or, four corners or each side in the vicinity of the steel wire passing holes. In addition, a locker is inserted from one of the hollow bodies of the first and second culvert boxes to the other hollow body to prevent culvert boxes from sinking or being distorted by subsidence of ground, an alignment projection and an alignment groove are formed on ends of the hollow bodies of the first and second culvert boxes to align the first and second culvert boxes when connecting the hollow bodies of the first and second culvert boxes continuously and mortar lines are formed on ends of the hollow bodies of the first and second culvert boxes to inject mortar between the first and second culvert boxes which come in contact with each other under pressure and to keep airtight, and a composite waterstop is inserted between the first and second culvert boxes and unified with a hydrophilic waterstop having plural grooves and a rubber ring having excellent elasticity to prevent a leakage of water.

Description

암거박스 및 그 시공방법{precast concrete culvert boxes and method for constructing the same boxes}Culvert box and construction method {precast concrete culvert boxes and method for constructing the same boxes}

도 1은 본 발명의 암거박스에 적용된 일실시 예의 앵커유닛을 발췌하여 나타낸 조립 단면도,1 is an assembled cross-sectional view showing an extract of the anchor unit of one embodiment applied to the culvert box of the present invention;

도 2는 도 1의 앵커유닛에 대한 분해 사시도,Figure 2 is an exploded perspective view of the anchor unit of Figure 1,

도 3a 및 도 3b는 본 발명의 암거박스에 적용되는 앵커유닛의 다른 실시 예들을 나타낸 단면도,3a and 3b is a cross-sectional view showing another embodiment of the anchor unit applied to the culvert box of the present invention,

도 4는 본 발명에 따른 암거박스의 시공 상태를 나타낸 조립단면도,4 is an assembled cross-sectional view showing a construction state of the culvert box according to the present invention;

도 5 및 도 6은 도 4에서 한 쌍의 제1, 제2암거박스를 발췌하여 나타낸 분해 사시도,5 and 6 is an exploded perspective view showing an extract of a pair of first and second culvert box in FIG.

도 7a는 도 4의 "A"부에 대한 상세도,7A is a detailed view of the portion “A” of FIG. 4, FIG.

도 7b는 도 4의 "B"부에 대한 상세도, FIG. 7B is a detailed view of the portion “B” of FIG. 4; FIG.

도 8은 본 발명에 따른 암거박스의 다른 실시 예를 나타낸 일부 상세도,8 is a detailed view showing another embodiment of the culvert box according to the present invention;

도 9 및 도 10은 본 발명에 따른 암거박스의 또 다른 실시 예를 나타낸 분해 사시도이다. 9 and 10 are an exploded perspective view showing another embodiment of the culvert box according to the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100: 앵커유닛 110: 앵커파트 111: 앵커몸체100: anchor unit 110: anchor part 111: anchor body

112: 웨지 113: 신축성 링 114: 웨지안착홀112: wedge 113: elastic ring 114: wedge seating hole

115: 웨지안착부재 116: 스프링 120: 지압저항파트115: wedge seat member 116: spring 120: acupressure resistance part

121: 축 122: 지압판재 123,124: 판재121: shaft 122: pressure plate 123,124: plate

130: 강선 140: 정착구 200: 암거박스130: steel wire 140: anchorage 200: culvert box

210: 제1암거박스 211,221: 중공몸체 217: 몰탈라인210: first culvert box 211, 221: hollow body 217: mortar line

212,222: 강선통과구멍 213,223: 정착구안착홈 220: 제2암거박스212,222: steel wire through hole 213,223: anchorage seating groove 220: second culvert box

215: 맞춤정렬용 턱 216: 맞춤정렬용 홈 230: 로커215: jaw for alignment 216: alignment groove 230: rocker

231: 실린더 232: 피스톤 233: 호스231: cylinder 232: piston 233: hose

240: 복합형지수재 241: 수팽창지수재 242: 홈240: composite index 241: water expansion index 242: groove

243: 고무링243: rubber ring

본 발명은 암거박스 및 그 시공방법에 관한 것으로서, 더욱 상세하게는, 한쪽끝단의 4모서리나 각 변에 앵커유닛을 매설한 한 쌍의 암거박스를 마련하여 적어도 각각 하나의 암거박스로 한 쌍을 이루도록 길이방향으로 설치하고 한쪽의 강선통과구멍으로 강선을 삽입하기만 하면 강선이 앵커유닛에 간편하게 결합되며 상기 강선을 암거박스의 강선통과구멍의 삽입방향에서 긴장시킨 후 정착구로 정착시켜 암거박스에 프리스트레스를 부여하되 이러한 프리스트레스를 연속적으로 설치되는 암거박스에 균일하게 부여할 수 있는 암거박스 및 그 시공방법에 관한 것이다.The present invention relates to a culvert box and a construction method thereof, and more particularly, to provide a pair of culvert boxes in which anchor units are embedded at four corners or sides of one end thereof, and at least one culvert box is used. The steel wire is easily coupled to the anchor unit by simply installing it in the longitudinal direction and inserting the steel wire into one steel wire through hole. The wire is tensioned in the insertion direction of the steel wire through hole of the culvert box, and then settled as a fixing device to prestress the culvert box. The present invention relates to a culvert box and a method for constructing the same, wherein the prestress can be uniformly applied to a culvert box that is continuously installed.

일반적으로, 프리캐스트 콘크리트 암거박스(Precast Concrete Culvert box)는 상하수도, 전력통신구, 공동구 등의 시설물로 사용되는 것이며, 이는 암거박스의 길이방향으로 소정의 길이만큼 연속하여 설치하되 그 이음부분에 패킹 등의 기밀유지부재를 개재시켜 기밀이 유지되게 시공하고 있다.In general, the precast concrete culvert box is used as a facility for water and sewage, power communication districts, common wards, etc., which is installed continuously in the longitudinal direction of the culvert box by a predetermined length but packed in its joints. It is constructed so that airtightness is maintained through an airtight holding member such as the back.

그러나 암거박스가 시공되어진 지반은 대부분이 연약지반이어서 부등침하가 발생되기 쉬운데 이러한 경우 서로 이웃하는 암거박스 간의 연결부위가 이격되게 되고 이로 인하여 암거박스간의 기밀유지가 해제된다는 문제점이 있었다.However, most of the ground on which the culvert box is constructed is soft ground, so it is easy to cause inequality. In this case, there is a problem that the connection between the culvert boxes adjacent to each other is separated, thereby releasing the confidentiality between the culvert boxes.

상기와 같이 암거박스 간의 이격을 방지하기 위하여 암거박스들에 강선이나 철근 등을 관통시켜 그 양단을 파지하여 인장한 다음 강선의 끝단에 앵커나 정착구 등으로 인장력을 그대로 유지시킴으로써 암거박스 전체에 프리스트레스를 부여한 상태로 시공하고 있다.In order to prevent separation between the culvert boxes as described above, through the steel wires or reinforcing bars through the culvert boxes, grasping both ends and tension, and then pre-stressed throughout the culvert box by maintaining the tensile force in the end of the steel wire with anchors or anchorages, etc. We are constructing in state that we gave.

이러한 기술과 관련된 종래의 암거박스에 대한 다양한 기술들이 제시되어 있는데, 이들 중에서 몇 개만을 발췌하여 간단하게 설명하여 본다. Various techniques for the conventional culvert box related to this technique are presented, and only a few of them will be briefly described.

대한민국 실용신안등록 제0172843호에는 암거박스의 길이방향으로 연장되는 내부 공간을 가지면서 양쪽측벽의 각각에 하나 이상의 강선통과용 구멍이 형성되고 상기 양쪽측벽의 각각의 외면에 상기 강선통과용 구멍과 연통되는 방식으로 강선 장착부를 마련한 것이 그 특징이다.Korean Utility Model Registration No. 0172843 has one or more steel wire through holes formed on each side wall while having an inner space extending in the longitudinal direction of the culvert box, and communicating with the steel wire through holes on each outer surface of the side walls. The steel wire mounting part is provided in such a way that it is a characteristic.

상기와 같은 실용신안등록의 암거박스에 있어서는, 서로 이웃하는 암거박스의 강선통과용 구멍이 암거박스의 외면에 형성된 것인바, 암거박스의 크기가 작은 경우에도 강선에 의해 신뢰성 있는 방식으로 서로 견고하게 연결할 수 있으나 서로 이웃하는 암거박스의 강선통과용 구멍으로 강선을 삽입하고 암거박스 중간의 강선 장착부에서 강선의 양단을 인장시켜 정착구 등으로 고정시키는 시공작업이 번거롭고 이로 인하여 작업능률의 향상을 꾀할 수 없는 것이었다.In the culvert box of the utility model registration as described above, the steel wire passing holes of the culvert box adjacent to each other is formed on the outer surface of the culvert box, even if the size of the culvert box is small, each other in a reliable manner by the steel wire Although it is possible to connect the steel wires through the steel wire through holes of the culvert boxes that are adjacent to each other, the construction work of fixing the steel wires in the middle of the culvert box by tensioning both ends of the steel wires and fixing them with anchorages is inconvenient. Was.

대한민국 실용신안등록 제0216305호에는 길이방향으로 연속하여 연결되는 각 암거박스의 측벽부 내에 복수의 안내관부를 마련하고, 이 안내관부에 연결부재를 삽입하되 암거박스의 연결부위인 접촉영역에서 결합봉을 통해 연결되도록 설치한 다음 상기 연결부재의 다른 한쪽끝단을 암거박스의 긴장작업부에서 긴장부재로 긴장시켜 고정한 것이 그 특징이다. Republic of Korea Utility Model Registration No. 0216305 provides a plurality of guide tubes in the side wall of each culvert box connected in the longitudinal direction continuously, inserting a connecting member in the guide tube, the coupling rod in the contact area of the culvert box After installation to be connected through the other end of the connection member is characterized in that the tension is fixed by the tension member in the tension work of the culvert box.

상기와 같은 실용신안등록의 암거박스에 있어서는, 서로 이웃하는 암거박스의 안내관부에 각각 연결부재를 삽입한 후 중량물인 암거박스의 단부가 맞닿도록 하면서 서로 이웃하는 연결부재의 고리를 일치시킨 상태에서 결합봉으로 끼워 연결하고, 상기 연결부재의 다른 한쪽끝단을 암거박스의 긴장작업부에서 긴장부재로 긴장시켜 고정하는 것이 번거로워 작업성이 떨어지고 이로 인하여 시공작업의 능률향 상을 꾀할 수 없다는 문제점이 있었다.In the culvert box of the utility model registration as described above, after inserting the connecting member to the guide tube of the neighboring culvert box, respectively, while the ends of the culvert box, which is a heavy object, abut the ring of the connecting member adjacent to each other Inserted into the connecting rod and connected to the other end of the tension member in the tension working part of the culvert box tension to fix the troublesome work is difficult to work because there is a problem that can not improve the efficiency of construction work .

그리고 대한민국 특허 제0458951호에는 한쪽에서 다른 한쪽에 이르기까지 개방된 중공몸체로 되고 벽면에 길이방향의 강선관통구멍이 형성된 암거박스로 마련되되 수개의 암거박스를 그 길이방향으로 연결한 후 강선관통구멍을 통해 강선이 통과시켜 프리스트레스가 가해지도록 하여 정착하는 조립식 암거박스에 있어서, 상기 암거박스 양단의 강선통과구멍에 오목부가 형성되고 이 오목부에 강선의 긴장 정착을 위한 양방향 강선정착장치가 설치되며, 상기 양방향 강선정착장치는 중공의 커플링부재, 이 커플링부재의 양쪽에 결합되는 한 쌍의 웨지안착부재, 상기 강선의 단부를 파지하고 웨지안착부재에 삽입 안착되어 장착되는 웨지로 구성되며, 상기 오목부에는 한쪽방향에서 진입하는 강선이 양방향 강선정착장치의 한쪽에 정착되고 다른 한쪽엔 이웃하는 암거박스로부터 진입하는 다른 강선도 정착되어 양쪽의 강선이 하나로 연결된 상태로 이웃하는 암거박스와 조립하는 것이 그 특징이다.In addition, Korean Patent No. 0438951 is provided with a culvert box, which is a hollow body that is open from one side to the other, and has a steel wire through hole in the longitudinal direction on the wall, and after connecting several culvert boxes in the length direction, the steel wire through hole. In the prefabricated culvert box to which the steel wire is passed through the prestress is applied through the prefabricated culvert box, a recess is formed in the steel wire through hole at both ends of the culvert box, and the two-way steel wire fixing device for tension fixing of the steel wire is installed in the recess. The bidirectional steel wire fixing device is composed of a hollow coupling member, a pair of wedge seating members coupled to both sides of the coupling member, a wedge grips the end of the steel wire and is inserted and seated in the wedge seating member. In the recess, the steel wire entering from one direction is fixed to one side of the bidirectional steel wire fixing device, and the other Other steel wires entering from neighboring culvert boxes are also settled and assembled with neighboring culvert boxes with both wires connected as one.

또 다른 특징은 동시에 긴장하고자 하는 개수로 순차적으로 암거박스를 설치하고, 일단에 일방향 강선정착장치를 정착시킨 강선을 상기 암거박스 한쪽의 강선통과구멍으로 삽입하여 다른 한쪽의 암거박스 외부로 노출시킨 다음, 상기 강선이 암거박스의 접합면에서 긴장 정착되도록 상기 노출된 강선을 긴장시키되 상기 강선이 노출되어 있는 암거박스의 오목부에 양방향 강선정착장치를 이루는 웨지안착부재와 웨지를 이용하여 긴장된 강선을 정착하고 정착된 강선을 절단하며, 상기 강선이 정착된 웨지안착부재에 커플링부재를 결합하고 양방향 강선정착장치를 이루는 웨지안착부재와 웨지로 새로운 강선의 한쪽을 정착시키되 상기 커플링부재의 다른 한쪽에 웨지안착부재를 결합시킨 다음, 새로운 강선이 후속하여 조립하고자 하는 암거박스의 강선통과구멍으로 통과되도록 소정개수의 암거박스를 연속하여 설치하며, 자유롭게 노출되어 있는 강선의 단부를 긴장시키면서 다른 한쪽의 웨지안착부재 내의 웨지에 물려있던 강선이 당겨져서 웨지안착부재에 정착되도록 함으로써 이미 프리스트레스가 가해져 조립된 암거박스와 그에 후속하여 새로이 조립되는 암거박스에 프리스트레스를 가하는 강선이 연속하여 이어지도록 하여 암거박스를 일체로 조립하는 방법이 또 하나의 특징이다.Another feature is to install the culvert box in sequence to the number to be tensioned at the same time, and insert the steel wire with one-way steel wire fixing device at one end through the steel wire through hole of one side of the culvert box to expose the outside of the culvert box Tension the exposed steel wire so that the steel wire is tension-fixed at the joint surface of the culvert box, but use a wedge seating member and a wedge to form a bidirectional steel wire fixing device in the recess of the culvert box to which the steel wire is exposed to fix the tensioned steel wire. And cut the settled wire, and couple the coupling member to the wedge seating member in which the steel wire is fixed, and fix one side of the new steel wire to the wedge seating member and wedge which form a bidirectional steel wire fixing device, and to the other side of the coupling member. After joining the wedge seating members, the new steel wire is subsequently A predetermined number of culvert boxes are continuously installed to pass through the through-holes and holes, and the steel wires held by the wedges in the other wedge seating members are pulled and settled in the wedge seating members while tensioning the ends of the freely exposed steel wires. Another feature is the method of assembling the culvert box integrally so that the pre-stressed culvert box and the subsequently assembled culvert box are continuously connected to the pre-stressed steel wire.

상기와 같은 특허의 암거박스 및 그 시공방법은 한쪽방향에서 진입하는 강선이 양방향 강선정착장치의 한쪽에 정착되고 다른 한쪽엔 이웃하는 암거박스로부터 진입하는 다른 강선도 정착되어 양쪽의 강선이 하나로 연결된 상태로 이웃하는 암거박스와 조립하는 것이었다.The culvert box and its construction method of the above patent is a state in which the steel wire entering from one direction is settled on one side of the bidirectional steel wire fixing device, and the other steel wire entering from the neighboring culvert box on the other side is also settled so that both wires are connected as one. Assembling with the neighboring culvert box.

그러나 상기와 같은 특허의 암거박스 및 그 시공방법에 있어서는, 양방향 강선정착장치의 구조상 한쪽방향에서 진입하는 강선을 정착한 후 양방향 강선정착장치를 이루는 웨지안착부재와 웨지로 새로운 강선의 한쪽을 정착시킨 다음 이미 정착된 웨지안착부재에 커플링부재를 결합하고 이 커플링부재에 웨지안착부재를 결합시킨 상태에서 새로운 강선이 후속하여 조립하고자 하는 암거박스의 강선통과구멍으로 통과되도록 하는 강선삽입과정이 너무 번거롭고 곤란하며, 이렇게 번거롭고 곤란한 강선삽입과정을 소정개수만큼 암거박스를 연속하여 설치하는 암거박스의 연속적인 조립작업이 더욱 곤란하기 때문에 작업능률의 향상을 꾀할 수 없음은 물론 시공기간이 길어 공사비가 증대된다는 문제점이 있었다. However, in the culvert box of the above patent and its construction method, the steel wire entering from one direction is settled in the structure of the bidirectional steel wire fixing device, and then one side of the new steel wire is fixed by the wedge seating member and the wedge which constitute the bidirectional steel wire fixing device. Next, the wire insertion process is performed so that a new steel wire passes through the wire through hole of the culvert box to be subsequently assembled while coupling the coupling member to the already settled wedge seat member and the wedge seat member to the coupling member. It is cumbersome and difficult, and the continuous assembly work of the culvert box that installs the culvert box continuously by the predetermined number of times is more difficult and difficult to improve the work efficiency. There was a problem.

본 발명은 상기와 같은 종래의 제반 문제점을 해결하기 위해 연구 개발한 것으로서, 그 목적은 한쪽끝단의 4모서리나 각 변에 앵커유닛을 매설한 한 쌍의 암거박스를 마련함으로써 적어도 각각 하나의 암거박스로 한 쌍을 이루도록 길이방향으로 설치하고 암거박스 한쪽의 강선통과구멍으로 강선을 삽입하기만 하면 강선이 앵커유닛에 간편하게 체결 결합되며 이로 인하여 암거박스의 시공이 간편하고 시공기간이 단축되어 공사비를 줄일 수 있도록 한 암거박스를 제공하는데 있다.The present invention has been researched and developed in order to solve the above-mentioned conventional problems, the object is to provide at least one culvert box by providing a pair of culvert box embedded in the four corners or one side of the anchor unit at one end The steel wire is easily fastened to the anchor unit simply by inserting the steel wire into the steel wire through hole on one side of the culvert box, thereby simplifying the construction of the culvert box and reducing the construction cost. To provide one culvert box.

삭제delete

본 발명의 다른 목적은 적어도 각각 하나의 암거박스로 한 쌍을 이루도록 길이방향으로 설치한 후 암거박스 한쪽의 강선통과구멍으로 강선을 삽입하기만 하면 강선이 앵커유닛에 간편하게 결합되고 상기 강선을 암거박스의 강선통과구멍의 삽입방향에서 긴장시킨 후 정착구로 정착시킴으로써 암거박스에 프리스트레스를 부여할 수 있으며 이러한 과정을 통해 연속적으로 배열되는 암거박스에 균일한 프리스트레스를 부여할 수 있도록 한 암거박스의 시공방법을 제공하는데 있다.Another object of the present invention is to install a pair of at least one culvert box in the longitudinal direction to form a pair, and then simply insert the steel wire through the wire passage hole on one side of the culvert box, the steel wire is easily coupled to the anchor unit and the culvert box The pre-stress can be applied to the culvert box by tensioning in the direction of insertion of the steel wire through hole of the culvert box, and through this process, the construction method of the culvert box can be applied to the culvert box that is arranged continuously. To provide.

상기와 같은 목적을 달성하기 위한 본 발명에 따른 암거박스용 앵커유닛은 앵커몸체 내에 2개 이상으로 분할된 웨지가 신축성 링으로 조립되고 상기 앵커몸체에 웨지를 수용하여 안착되어 인장재인 강선을 파지하도록 웨지안착부재가 체결된 앵커파트; 이 앵커파트의 한쪽에 축이 마련되고 이 축의 한쪽끝단에 지압판재가 마련된 지압저항파트; 로 구성됨을 특징으로 한다.The anchor unit for the culvert box according to the present invention for achieving the above object is a wedge divided into two or more in the anchor body is assembled with an elastic ring and the wedge is accommodated in the anchor body is seated to grip the steel wire which is a tension member An anchor part to which a wedge seating member is fastened; An acupressure resistance part in which an axis is provided on one side of the anchor part and an acupressure plate member is provided on one end of the axis; Characterized in that consisting of.

본 발명에 따른 암거박스용 앵커유닛에 있어서, 상기 지압저항파트의 지압판재는 축 직경보다 넓은 형상이면 어떠한 형상이라도 무방하나 설계치의 지압저항력을 받을 수 있는 면적이면 족하고 축에 일체 혹은 분리형으로 마련할 수 있으며, 전방표면을 소정각도로 경사지게 마련한 판재나 적어도 1단 이상의 단을 갖는 판재로 마련하여도 무방하다.In the anchor unit for a culvert box according to the present invention, the pressure plate material of the acupressure resistance part may be any shape as long as it is wider than the shaft diameter, but may be provided integrally or separately on the shaft as long as it is an area capable of receiving acupressure resistance of the designed value. The front surface may be made of a plate provided to be inclined at a predetermined angle or a plate having at least one or more stages.

본 발명에 따른 암거박스용 앵커유닛에 있어서, 상기 앵커몸체 내부에는 인장재인 강선을 웨지안착부재로부터 삽입만 하면 웨지가 밀려들어가면서 확장되어 강선 외측주면을 타고 전진하고 상기 웨지가 웨지안착부재에 안착되면서 강선 외측주면을 파지하도록 스프링이 개재된 것을 특징으로 한다.In the anchor unit for a culvert box according to the present invention, when the steel wire is a tension member is inserted into the anchor body from the wedge seating member, the wedge is pushed in and expands to move forward along the outer circumferential surface of the steel wire and the wedge is seated on the wedge seating member. Spring is interposed to hold the outer peripheral surface of the steel wire.

또한 본 발명은 암거박스는 한쪽에서 다른 한쪽에 이르기까지 속이 빈 터널형의 중공몸체로 마련되며 이 중공몸체의 길이방향으로 복수의 강선통과구멍이 형성되고 이 강선통과구멍의 한쪽끝단엔 각각의 정착구가 안착되는 정착구안착홈이 형성되어 있는 암거박스에 있어서, 상기 중공몸체의 강선통과구멍들의 사이의 중간이나 강선통과구멍의 주위근처인 한쪽끝단인 4모서리나 각 변에 각각 앵커유닛이 마련되어 2개가 한 쌍을 이루는 제1, 제2암거박스로 구성되고, 상기 제1, 제2암거박스는 중공몸체의 강선통과구멍과 앵커유닛이 서로 반대로 바뀌어서 대응하는 위치에 형성되는 것을 특징으로 한다.In addition, the present invention is a culvert box is provided with a hollow hollow hollow body from one side to the other, a plurality of wire through holes are formed in the longitudinal direction of the hollow body, each anchorage at each end of the wire through holes In the culvert box in which the fixing fixture seating groove is formed, the anchor unit is provided at each of four corners or each side, which is in the middle between the steel wire through holes of the hollow body or near the periphery of the steel wire through holes. Consists of a pair of first and second culvert box, the first and second culvert box is characterized in that the steel wire through hole and the anchor unit of the hollow body is reversed to each other formed in a corresponding position.

상기 앵커유닛은 중공몸체의 강선통과구멍을 통해 선행하여 배열 시공한 암거박스에 설치되어있는 앵커파트의 웨지안착부재와 웨지로 인장재인 강선을 웨지안착부재로부터 삽입만 하면 스프링에 의해 탄력적으로 설치된 웨지가 강선의 외측주면을 파지하는 구조로 마련됨이 바람직하다.The anchor unit is elastically installed by a spring simply by inserting a steel wire, which is a tension member, into a wedge seat member and a wedge of an anchor part installed in a culvert box that has been previously constructed through a steel wire through hole of a hollow body. It is preferable that the structure is provided to grip the outer peripheral surface of the steel wire.

또한 본 발명에 따른 암거박스에 있어서, 상기 제1, 제2암거박스인 다른 한쪽의 중공몸체에는 지반침하로 인한 암거박스의 가라앉음이라든가 뒤틀림을 방지할 수 있도록 한쪽이 개방된 실린더와, 이 실린더 내에 설치되어 개방단부 측으로 소정의 길이만큼 돌출되게 피스톤이 설치된 로커가 마련되고, 상기 제1, 제2암거박스의 로커와 대응하는 제1, 제2암거박스 한쪽의 중공몸체에는 로커의 실린더에서 돌출되는 피스톤을 수용하는 피스톤수용홈이 형성되는 것을 특징으로 한다.In addition, in the culvert box according to the present invention, the first and second culvert box, the other hollow body and the cylinder is open on one side to prevent sinking or twisting of the culvert box due to ground subsidence, and the cylinder The inner rocker is provided with a rocker provided with a piston to protrude a predetermined length toward the open end side, and the hollow body on one side of the first and second culvert boxes corresponding to the rockers of the first and second culvert boxes protrudes from the cylinder of the rocker. It is characterized in that the piston receiving groove for receiving the piston is formed.

또한 본 발명에 따른 암거박스에 있어서, 상기 제1, 제2암거박스의 중공몸체에는 이들을 연속하여 연결할 때 직선으로 맞춤정렬이 이뤄지도록 한쪽엔 적어도 하부에 맞춤정렬용 턱이 형성되고 다른 한쪽엔 맞춤정렬용 턱과 대응하는 맞춤정렬용 홈이 형성되어 있으며, 상기 제1, 제2암거박스를 연속하여 연결 시공하였을 때 이들이 맞닿는 제1, 제2암거박스의 중공몸체 한쪽끝단에 오목한 몰탈라인을 형성함이 바람직하다.In the culvert box according to the present invention, the hollow body of the first and second culvert box is formed at least on one side of the alignment alignment jaw is formed at least on one side so that the alignment is made in a straight line when connecting them continuously The alignment jaws and the corresponding alignment alignment grooves are formed, and when the first and second culvert boxes are connected to each other in succession, a concave mortar line is formed at one end of the hollow body of the first and second culvert boxes that abut. It is preferable to.

그리고 본 발명은 강선통과구멍이 길이방향으로 형성된 중공몸체를 연속하 여 설치하되 서로 이웃하는 중공몸체의 강선통과구멍으로 강선을 관통시킨 후 그 끝단을 정착시켜 각각의 암거박스에 프리스트레스가 부여된 상태로 연속 시공하는 암거박스의 시공방법에 있어서, 먼저 중공몸체의 강선통과구멍들의 사이의 중간이나 강선통과구멍의 주위근처인 한쪽끝단인 4모서리나 각 변에 각각 앵커유닛이 마련된 제1암거박스를 설치하는 단계; 이 제1암거박스의 중공몸체 한쪽끝단에 다른 제2암거박스인 중공몸체의 다른 한쪽끝단이 맞닿아 서로 이웃하여 그 길이방향으로 배열되되 상기 제1암거박스의 앵커유닛엔 제2암거박스인 중공몸체에 형성된 강선통과구멍이 동심을 이루고 상기 제1암거박스의 강선통과구멍엔 제2암거박스인 중공몸체에 설치된 앵커유닛이 동심을 이루도록 제2암거박스를 설치하는 단계; 상기 제2암거박스인 중공몸체의 강선통과구멍을 통하여 제1암거박스의 중공몸체 측으로 강선을 삽입하여 강선의 선단이 제1암거박스를 이루는 앵커유닛의 앵커파트인 웨지와 웨지안착부재에 파지되도록 하는 단계; 상기 제2암거박스인 중공몸체의 강선통과구멍에서 연장된 강선에 정착구와 함께 인장실린더를 설치하여 소정의 인장력으로 인장시킨 상태로 정착구를 고정시키는 단계; 상기 제2암거박스의 중공몸체 한쪽에 제1암거박스인 중공몸체의 다른 한쪽끝단이 맞닿아 서로 이웃하여 그 길이방향으로 배열하되 상기 제2암거박스의 앵커유닛엔 제1암거박스인 중공몸체의 강선통과구멍이, 상기 제2암거박스의 강선통과구멍엔 제1암거박스인 중공몸체의 앵커유닛이 동심을 이루도록 제1암거박스를 설치하는 단계; 상기 제1암거박스인 중공몸체의 강선통과구멍을 통하여 제2암거박스의 중공몸체 측으로 강선을 삽입하여 강선의 선단이 제2암거박스를 이루는 앵커유닛의 앵커파트인 웨지와 웨지안착부재에 파지되도록 하는 단계; 상기 제1암거박스인 중공몸체의 강선통과구멍에서 연장된 강선에 정착구와 함께 인장실린더를 설치하여 소정의 인장력으로 인장시킨 상태로 정착구를 고정시키는 단계; 이후에 제2암거박스를 배열하는 이후의 과정을 반복하여 시공하고자 하는 개수만큼의 암거박스를 연속 시공하는 것을 특징으로 한다. And the present invention is provided with a continuous through-hole hollow body formed in the longitudinal direction of the steel wire through hole through the steel wire through the steel wire through hole of the neighboring hollow body and then set its ends to pre-stress is given to each culvert box In the method of constructing a culvert box for continuous construction, firstly, a first culvert box provided with an anchor unit at each corner or four edges, each of which is in the middle between the steel wire through holes of the hollow body or near the periphery of the steel wire through holes, is provided. Installing; One end of the hollow body of the first culvert box, the other end of the hollow body of the other second culvert box abuts each other and is arranged next to each other in the longitudinal direction, the anchor unit of the first culvert box is hollow Installing a second culvert box such that a steel wire through hole formed in the body is concentric and an anchor unit installed in the hollow body as a second culvert box is concentric with the steel wire through hole of the first culvert box; The steel wire is inserted into the hollow body of the first culvert box through the steel wire through hole of the hollow body, which is the second culvert box, so that the tip of the steel wire is gripped by the wedge and wedge seating members, which are anchor parts of the anchor unit forming the first culvert box. Making; Fixing the anchorage in a state in which the tension cylinder is tensioned with a predetermined tensile force by installing a tension cylinder along with the anchorage in the steel wire extending from the steel wire passage hole of the hollow body which is the second culvert box; The other end of the hollow body, which is the first culvert box, abuts on one side of the hollow body of the second culvert box and is arranged next to each other in the longitudinal direction, and the anchor unit of the second culvert box is the first culvert box of the hollow body. Installing the first culvert box such that the steel wire through hole is concentric with the anchor unit of the hollow body that is the first culvert box in the steel wire through hole of the second culvert box; The steel wire is inserted into the hollow body side of the second culvert box through the steel wire through hole of the hollow body, which is the first culvert box, so that the tip of the steel wire is gripped by the wedge and wedge seating members, which are anchor parts of the anchor unit forming the second culvert box. Making; Fixing the anchorage in a state where the tensioner is tensioned with a predetermined tensile force by installing a tension cylinder along with the anchorage in the steel wire extending from the steel wire passage hole of the hollow body which is the first culvert box; Thereafter, the following process of arranging the second culvert box is repeated, and as many constructions as the culvert boxes are desired to be constructed.

또한 본 발명에 따른 암거박스의 시공방법에 있어서, 제1, 제2암거박스의 사이에는 이들 사이에서 누수됨을 방지하기 위한 복합형지수재가 삽입 개재됨이 바람직하며, 상기 복합형지수재는 단면이 장방형인 긴 띠의 양쪽측면에 길이방향으로 수개의 홈을 형성시킨 수팽창지수재와 이 수팽창지수재의 하단에 탄력이 좋은 고무링이 일체로 형성된 것이다.In addition, in the construction method of the culvert box according to the present invention, it is preferable that a composite index material is inserted between the first and second culvert boxes to prevent leakage between them, and the composite index material has a rectangular cross section. The water-expandable index member having several grooves formed in the longitudinal direction on both sides of the long strip and the rubber ring having good elasticity are integrally formed at the lower end of the water-expandable index member.

또한 본 발명에 따른 암거박스의 시공방법에 있어서, 시공하고자 하는 개수만큼의 제1, 제2암거박스를 연속 시공한 이후에는 상기 제1, 제2암거박스의 중공몸체 다른 한쪽에 마련된 로커의 실린더로 유체나 에어(air) 또는 고압가스를 공급하여 피스톤이 돌출되어 제1, 제2암거박스의 중공몸체 한쪽에 마련된 피스톤수용홈으로 삽입 록킹되도록 한 다음, 중공몸체 끝단의 몰탈라인을 통해 가압 주입하여 제1, 제2암거박스 사이의 기밀유지가 유지되도록 마무리하는 단계가 부가됨이 바람직하다.In addition, in the construction method of the culvert box according to the present invention, after the continuous construction of the number of the first, the second culvert box as many as you want to construct the cylinder of the rocker provided on the other side of the hollow body of the first, second culvert box By supplying fluid, air or high pressure gas to the piston, the piston protrudes to be inserted and locked into the piston receiving groove provided on one side of the hollow body of the first and second culvert boxes, and then pressurized through the mortar line at the end of the hollow body. The finishing step is preferably added to maintain the airtightness between the first and second culvert box.

그리고 본 발명에 따른 암거박스의 시공방법에 있어서, 상기에서 제1암거박스를 먼저 설치한 후 제2암거박스를 설치하는 것은 편의상 그렇게 설명한 것일 뿐인바 제2암거박스를 제1암거박스보다 먼저 설치하여도 무방하며, 특히 작업시점에서 하나의 제1, 제2암거박스를 설치한 이후의 상기 제1, 제2암거박스를 설치단계에 서 제1, 제2암거박스를 2개 이상 연속하여 배열한 후 다음 단계를 수행할 수도 하는 것을 특징으로 한다.And in the construction method of the culvert box according to the present invention, the installation of the first culvert box first, and then the installation of the second culvert box is only that described for convenience, the second culvert box is installed before the first culvert box In particular, at the time of operation, the first and second culvert boxes after the installation of one first and second culvert boxes are arranged in successively two or more first and second culvert boxes. After that, the following steps may be performed.

이하, 본 발명에 따른 암거박스를 첨부도면에 의거하여 상세하게 설명하고자 한다.Hereinafter, the culvert box according to the present invention will be described in detail based on the accompanying drawings.

도 1은 본 발명의 암거박스에 적용된 일실시 예의 앵커유닛을 발췌하여 나타낸 조립 단면도이고, 도 2는 도 1의 앵커유닛에 대한 분해 사시도이며, 도 3a 및 도 3b는 본 발명의 암거박스에 적용되는 앵커유닛의 다른 실시 예들을 나타낸 단면도이다.1 is an assembled cross-sectional view showing an embodiment of the anchor unit applied to the culvert box of the present invention, Figure 2 is an exploded perspective view of the anchor unit of Figure 1, Figures 3a and 3b is applied to the culvert box of the present invention Sectional view showing other embodiments of the anchor unit.

도면에 나타낸 바와 같이, 앵커유닛(100)은 한쪽에 웨지를 포함하는 앵커파트(110)와, 이 앵커파트(110)의 다른 한쪽에 지압저항력의 증대를 위한 지압저항파트(120)로 마련된다.As shown in the figure, the anchor unit 100 is provided with an anchor part 110 including a wedge on one side, and an acupressure resistance part 120 for increasing the acupressure resistance on the other side of the anchor part 110. .

상기 앵커파트(110)는 앵커몸체(111) 내에 3개로 분할된 콘형의 웨지(112)가 신축성 링(113)으로 조립되고 상기 앵커몸체(111)에 웨지(112)를 수용하여 안착되어 인장재인 강선(130)을 파지하도록 웨지안착부재(115)가 체결되어 있으며, 상기 앵커몸체(111)의 내부에는 웨지(112)를 탄력적으로 지지하면서 웨지안착부재(115) 측으로 밀어 넣는 스프링(116)이 설치되어 있다. 상기 웨지안착부재(115)는 앵커몸체(111)에 나사 결합되며 중심선상에 콘형의 웨지(112)가 안착되는 콘형의 웨지안착홀(114)이 형성되어 있다.The anchor part 110 is a cone-shaped wedge 112 divided into three in the anchor body 111 is assembled with an elastic ring 113 and the wedge 112 is accommodated in the anchor body 111 is seated in tension The wedge seat member 115 is fastened to hold the steel wire 130, and the spring 116 is pushed toward the wedge seat member 115 while elastically supporting the wedge 112 in the anchor body 111. It is installed. The wedge seating member 115 is screw-coupled to the anchor body 111, and a cone-shaped wedge seating hole 114 in which a cone-shaped wedge 112 is seated on a center line is formed.

상기 스프링(116)은 웨지안착부재(115)의 웨지안착홀(114) 끝단에서 웨지(112)가 돌출되지 않는 길이로 마련되어야 하는데, 그 이유는 웨지(112)가 웨지안착부재(115)의 웨지안착홀(114) 끝단에서 돌출되면 강선을 삽입할 때 웨지로 삽 입될 수 없기 때문이다. The spring 116 should be provided with a length such that the wedge 112 does not protrude from the end of the wedge seating hole 114 of the wedge seating member 115, because the wedge 112 of the wedge seating member 115 If the wedge seating hole 114 is protruded from the end because it can not be inserted into the wedge when the steel wire is inserted.

상기와 같이 웨지(112)가 웨지안착부재(115)의 웨지안착홀(114) 끝단에서 돌출되지 않는 상태로 스프링(116)에 의해 탄력적으로 지지되어 있으므로 상기 인장재인 강선(130)을 웨지안착부재(115)로부터 삽입만 하면 웨지(112)가 밀려들어가면서 확장되어 순간적으로 강선(130) 외측주면을 타고 전진하여 상기 웨지(112)가 웨지안착부재(115)에 안착되면서 강선(130) 외측주면을 견고하게 파지한다.As described above, the wedge 112 is elastically supported by the spring 116 in a state in which the wedge 112 does not protrude from the end of the wedge seating hole 114 of the wedge seating member 115. If it is inserted only from 115, the wedge 112 is pushed in and expands to move forward on the outer circumferential surface of the steel wire 130, so that the wedge 112 is seated on the wedge seating member 115 and the outer circumferential surface of the steel wire 130 is inserted. Hold firmly.

상기 지압저항파트(120)는 한쪽끝단에 지압판재(122)를 갖는 긴 축(121)을 앵커몸체(111)에 결합되어 있은 것이며, 상기 지압판재(122)는 축(121) 직경보다 넓은 형상이면 어떠한 형상이라도 무방하나 설계치의 지압저항력을 받을 수 있는 면적이면 족하고 축에 일체 혹은 분리형으로 마련할 수 있다. 또한 상기 지압판재(122)는 도 1과 같이 전방표면을 소정각도로 경사지게 마련할 수도 있고 도 3a와 같이 평탄한 판재(123)나 도 3b와 같이 적어도 하나의 단을 갖는 계단형상의 판재(124)로 마련할 수도 있다.The acupressure resistance part 120 is a long shaft 121 having acupressure plate material 122 at one end is coupled to the anchor body 111, the acupressure plate material 122 is a shape larger than the diameter of the shaft 121 It may be any shape as long as it is an area capable of receiving acupressure resistance of the designed value, and may be provided integrally or separately on the shaft. In addition, the acupressure plate member 122 may be provided with the front surface inclined at a predetermined angle as shown in FIG. 1, and a flat plate member 123 as shown in FIG. 3A or a stepped plate member 124 having at least one end as shown in FIG. 3B. You can also arrange.

도 4는 본 발명에 따른 암거박스의 시공 상태를 나타낸 조립단면도이고, 도 5 및 도 6은 도 4에서 한 쌍의 제1, 제2암거박스를 발췌하여 나타낸 분해 사시도이며, 도 7a는 도 4의 "A"부에 대한 상세도이고, 도 7b는 도 4의 "B"부에 대한 상세도이다. Figure 4 is an assembled cross-sectional view showing a construction state of the culvert box according to the present invention, Figure 5 and Figure 6 is an exploded perspective view showing an extract of a pair of first and second culvert box in Figure 4, Figure 7a is Figure 4 FIG. 7B is a detail view of the “B” part of FIG. 4.

여기서, 암거박스(200)는 2개가 한 쌍을 이루는 제1, 제2암거박스(210,220)로 구성되되 이들이 각각 한 쌍을 이루는 구간마다 제1, 제2암거박스(210,220)의 앵커유닛(100), 강선(130) 및 정착구(140)에 의해 인장력이 부여된 상태로 반복하 여 연속적으로 소정의 길이만큼 설치되어 있다. Here, the culvert box 200 is composed of two pairs of first and second culvert boxes (210, 220), each of the pairs of pairs of anchor units (100) of the first, second culvert boxes (210, 220) ), The steel wire 130 and the fixing device 140 is repeatedly provided in a predetermined length by a predetermined length continuously.

상기 제1, 제2암거박스(210,220)는 모두 한쪽에서 다른 한쪽에 이르기까지 속이 빈 터널형의 중공몸체(211,221)로 마련되되 이 중공몸체(211,221)의 길이방향으로 복수의 강선통과구멍(212,222)이 형성되어 있고 이 강선통과구멍(212,222)의 한쪽끝단엔 각각의 정착구(140)가 안착되는 정착구안착홈(213,223)이 형성되어 있으며, 상기 중공몸체(211,221)의 강선통과구멍(212,222)들의 사이의 중간이나 강선통과구멍(212,222)의 주위근처인 한쪽끝단인 4모서리나 각 변에 각각 앵커유닛(100)이 마련된다. 다만, 상기 제1, 제2암거박스(210,220)의 차이는 중공몸체(211,221)의 강선통과구멍(212,222)과 앵커유닛(100)이 서로 반대로 바뀌어서 반대의 대응 위치에 형성된다는 점이다.The first and second culvert boxes 210 and 220 are all provided with hollow tunnel-shaped hollow bodies 211 and 221 from one side to the other, but have a plurality of steel wire passing holes 212 and 222 in the longitudinal direction of the hollow bodies 211 and 221. Is formed, and at one end of the steel wire passing holes 212 and 222, fixing fixture seating grooves 213 and 223, into which each anchor 140 is seated, are formed, and the steel wire through holes 212 and 222 of the hollow bodies 211 and 221 are formed. An anchor unit 100 is provided at each of four edges or each side, which is one end, which is near the middle of the line or the line passing holes 212 and 222, respectively. However, the difference between the first and second culvert boxes 210 and 220 is that the steel wire passing holes 212 and 222 and the anchor unit 100 of the hollow bodies 211 and 221 are reversed to be formed at opposite positions.

상기 앵커유닛(100)은 위에서 설명한 암거박스용 앵커유닛이므로 그 구성이 동일한바 그 구체적인 설명은 생략하기로 한다.Since the anchor unit 100 is the anchor unit for the culvert box described above, the configuration thereof is the same and a detailed description thereof will be omitted.

인장재인 강선(130)은 PC(Prestress Concrete)강선이며 1회에 인장하여 제1, 제2암거박스(210,220)에 프리스트레스를 부여하고자 하는 길이에다가 여유분의 길이를 더하여 충분한 길이로 마련된다. Steel wire 130, which is a tension member, is a prestress concrete (PC) steel wire and is provided with a sufficient length by adding a length of a margin to a length to be tensioned once and prestressing the first and second culvert boxes 210 and 220.

상기 정착구(140)는 앵커유닛(100)에 정착된 인장재인 강선(130)의 한쪽끝단에 장착되는 것이며, 통상 2개 이상으로 균등 분할되고 신축성 링(142)으로 조립된 웨지(141)와, 이 웨지(141)가 강선(130)의 외측주면을 파지한 상태에서 안착되는 웨지안착부재(143)로 구성된다.The fixing unit 140 is mounted to one end of the steel wire 130, which is a tension member fixed to the anchor unit 100, usually divided into two or more wedges 141 and assembled with an elastic ring 142, The wedge 141 is composed of a wedge seating member 143 that is seated in a state in which the outer peripheral surface of the steel wire 130 is gripped.

상기와 같이 구성된 본 발명에 따른 일실시예의 암거박스를 참고로 하여 그 시공방법을 상세하게 설명하여보기로 한다.With reference to the culvert box of one embodiment according to the present invention configured as described above will be described in detail the construction method.

먼저, 중공몸체(211)의 각 변 중앙에 길이방향으로 강선통과구멍(212)이 형성되고 이 강선통과구멍(212)들 사이의 중간인 한쪽끝단의 4모서리에 각각 앵커유닛(100)이 마련된 제1암거박스(210)를 설치한다. First, a steel wire through hole 212 is formed in the center of each side of the hollow body 211 in the longitudinal direction, and the anchor unit 100 is provided at each of four corners at one end which is intermediate between the steel wire through holes 212. Install the first culvert box (210).

이미 설치된 제1암거박스(210)의 중공몸체(211) 한쪽끝단에 다른 제2암거박스(220)인 중공몸체(221)의 다른 한쪽끝단이 서로 맞닿아 접하도록 그 길이방향으로 제2암거박스(220)를 설치하되, 제1암거박스(210)의 앵커유닛(100)엔 제2암거박스(220)인 중공몸체(221)에 형성된 강선통과구멍(222)이 동심을 이루고 상기 제1암거박스(210)의 강선통과구멍(212)엔 제2암거박스(220)인 중공몸체(221)에 설치된 앵커유닛(100)이 동심을 이루도록 설치되어야 한다.The second culvert box in the longitudinal direction such that the other end of the hollow body 221, which is another second culvert box 220, abuts on one end of the hollow body 211 of the first culvert box 210 already in contact with each other The installation unit 220, but the anchor unit 100 of the first culvert box 210, the steel wire through hole 222 formed in the hollow body 221, which is the second culvert box 220 is concentric with the first culvert In the steel wire passing hole 212 of the box 210, the anchor unit 100 installed in the hollow body 221 that is the second culvert box 220 should be installed to be concentric.

상기 제2암거박스(220)는 제1암거박스(210)의 강선통과구멍(211)과 앵커유닛(100)의 위치가 서로 바뀌어 그 위치를 달리는 것일 뿐이다. The second culvert box 220 is only the position of the steel wire passing hole 211 and the anchor unit 100 of the first culvert box 210 is changed to each other.

상기와 같이 제1암거박스(210)에 제2암거박스(220)가 접하도록 1열로 설치한 후, 제2암거박스(220)의 중공몸체(221)에 형성된 각각의 강선통과구멍(222)을 통하여 제1암거박스(210)의 중공몸체(211) 측으로 강선(130)을 삽입하여 강선(130)의 선단이 제1암거박스(210)를 이루는 앵커유닛(100)의 앵커파트(110)에 파지시킨다. 상기 강선(130)의 파지과정은 인장재인 강선(130)이 앵커파트(110)의 웨지안착부재(115)로부터 삽입되면 상기 강선(130)에 의해 웨지(112)가 밀려들어가면서 확장되고 상기 웨지(112)가 강선(130) 직경보다 크게 확장되는 순간 강선(130) 외측주면을 타고 전진하면서 상기 웨지(112)가 웨지안착부재(115)에 안착됨으로 인해 강 선(130) 외측주면을 확실하게 파지한다.As described above, after the first culvert box 210 is installed in one row such that the second culvert box 220 is in contact with each other, the respective wire passing holes 222 formed in the hollow body 221 of the second culvert box 220 are provided. Anchor part 110 of the anchor unit 100 by inserting the steel wire 130 to the hollow body 211 side of the first culvert box 210 through the first culvert box 210 through Grip on. The gripping process of the steel wire 130 is expanded when the steel wire 130, which is a tension member, is inserted from the wedge seating member 115 of the anchor part 110 and the wedge 112 is pushed by the steel wire 130 and the wedge ( As the wedge 112 is seated on the wedge seating member 115 as the wedge 112 is seated on the outer circumferential surface of the steel wire 130, the gripper securely grips the outer circumferential surface of the steel wire 130 at the moment when the diameter of the steel wire 130 extends larger than the diameter of the steel wire 130. do.

이와 같이 상기 제2암거박스(220)인 중공몸체(221)의 강선통과구멍(222)에서 연장된 강선(130)에 정착구(140)를 삽입 설치하여 정착구안착홈(223)에 안착시키고, 상기 정착구(140)에다가 인장실린더(도시되지 않음)를 연속 설치한 다음, 연장실린더를 작동시켜 강선(130)을 소정의 인장력으로 인장시키되 상기 소정의 인장력이 그대로 유지시킨 강선(130)에 정착구(140)를 파지시켜 고정시킨다. 이렇게 정착구(140)가 강선(130)에 부여된 인장력을 그대로 유지시키기 때문에 상기 제1, 제2암거박스(210,220)에는 소정의 프리스트레스가 부여된다. 이때, 강선(130)은 제2암거박스(220)의 중공몸체(221) 끝단보다 돌출되지 않게 정착구안착홈(223)에서 절단하여야 한다.As such, the fixing unit 140 is inserted into and installed in the steel wire 130 extending from the steel wire passing hole 222 of the hollow body 221, which is the second culvert box 220, and seated in the fixing unit seating groove 223. After the tension cylinder (not shown) is continuously installed in the anchorage 140, the extension cylinder is operated to tension the steel wire 130 with a predetermined tensile force, but the anchorage 140 is formed in the steel wire 130 where the predetermined tensile force is maintained as it is. Gripping) to fix it. Since the fixing unit 140 maintains the tensile force applied to the steel wire 130 as it is, a predetermined prestress is applied to the first and second culvert boxes 210 and 220. At this time, the steel wire 130 should be cut in the fixing fixture seating groove 223 so as not to protrude from the end of the hollow body 221 of the second culvert box 220.

상기 제2암거박스(220)의 중공몸체(221) 한쪽에 제1암거박스(210)인 중공몸체(211)의 다른 한쪽끝단이 서로 맞닿아 접하도록 그 길이방향으로 제1암거박스(210)를 설치하되, 상기 제2암거박스(220)의 앵커유닛(100)엔 제1암거박스(210)인 중공몸체(211)의 강선통과구멍(212)이 동심을 이루고, 상기 제2암거박스(220)의 강선통과구멍(222)엔 제1암거박스(210)인 중공몸체(211)의 앵커유닛(100)이 동심을 이루도록 설치한다.The first culvert box 210 in its longitudinal direction such that the other end of the hollow body 211, which is the first culvert box 210, abuts on one side of the hollow body 221 of the second culvert box 220. To install, but the anchor unit 100 of the second culvert box 220, the steel wire through hole 212 of the hollow body 211, which is the first culvert box 210 is concentric, the second culvert box ( The anchor line 100 of the hollow body 211 which is the first culvert box 210 is installed in the steel wire passing hole 222 of the 220 to be concentric.

상기 제1암거박스(210)는 위에서 설명하였듯이, 제2암거박스(220)의 강선통과구멍(222)과 앵커유닛(100)의 위치가 서로 바뀌어 그 위치를 달리는 것일 뿐이다. As described above, the first culvert box 210 has only the position of the steel wire passing hole 222 of the second culvert box 220 and the anchor unit 100 that are interchanged with each other.

상기와 같이 제2암거박스(220)에 제1암거박스(210)가 접하도록 1열로 설치한 후, 제1암거박스(210)의 중공몸체(211)에 형성된 각각의 강선통과구멍(212)을 통하여 제2암거박스(220)의 중공몸체(221) 측으로 강선(130)을 삽입하여 이 강선(130)의 선단이 제2암거박스(220)를 이루는 앵커유닛(100)의 앵커파트(110)에 파지시킨다. 상기 강선(130)의 파지과정은 위에서 설명한 바와 동일하게 이뤄지므로 그 구체적인 설명은 생략한다.After the first culvert box 210 is installed in a row so that the second culvert box 220 is in contact with the second culvert box 220 as described above, the respective wire passing holes 212 formed in the hollow body 211 of the first culvert box 210 are provided. The steel wire 130 is inserted into the hollow body 221 side of the second culvert box 220 through the anchor part 110 of the anchor unit 100 of which the tip of the steel wire 130 forms the second culvert box 220. Grip). Since the gripping process of the steel wire 130 is made in the same manner as described above, a detailed description thereof will be omitted.

이와 같이 상기 제1암거박스(210)인 중공몸체(211)의 강선통과구멍(212)에서 연장된 강선(130)에 정착구(140)를 정착시키고 인장력을 부여한 상태로 고정시키는 과정 또한 상기에서 설명한 바와 동일하므로 그 구체적인 설명은 생략한다.As described above, the process of fixing the anchorage 140 to the steel wire 130 extending from the steel wire passing hole 212 of the hollow body 211, which is the first culvert box 210, and applying the tensile force, is also described above. Since the description is the same as that, detailed description thereof is omitted.

이후에는 상기에서 설명한 제2암거박스(220)를 배열하는 과정부터 제1암거박스(210)를 배열하는 과정을 반복하여 시공하고자 하는 개수만큼의 제1, 제2암거박스(210,220)를 연속 시공하면 된다. After that, the process of arranging the second culvert box 220 described above and the process of arranging the first culvert box 210 are repeated to continuously construct the first and second culvert boxes 210 and 220 as many times as desired. Just do it.

도 8은 본 발명에 따른 암거박스의 다른 실시 예를 나타낸 일부 상세도이다. 여기서는, 상기 제1, 제2암거박스(210,220)를 이루는 각 중공몸체(211,221)의 한쪽에 지반침하로 인한 암거박스의 가라앉음이라든가 뒤틀림을 방지할 수 있도록 서로 이웃하는 한쪽의 중공몸체(211,221)에서 다른 한쪽의 중공몸체(211,221)로 삽입되어 걸을 수 있는 로커(230)가 더 부가된 것이다.8 is a detailed view showing another embodiment of the culvert box according to the present invention. Here, the hollow bodies 211 and 221 which are adjacent to each other so as to prevent sinking or twisting of the culvert box due to ground subsidence on one side of each of the hollow bodies 211 and 221 constituting the first and second culvert boxes 210 and 220. In the other one of the hollow body 211,221 is inserted into the rocker 230 which can walk is further added.

상기 로커(230)는 한쪽이 개방된 실린더(231)와, 이 실린더(231) 내에 설치되어 개방단부 측으로 소정의 길이만큼 돌출되는 피스톤(232)으로 마련되며, 상기 실린더(231)에는 그 내부로 유체나 에어, 또는 고압가스를 공급할 수 있도록 공급호스(233)가 연결되어 있다. The rocker 230 is provided with a cylinder 231 having one side opened and a piston 232 installed in the cylinder 231 and protruding by a predetermined length toward the open end side, and inside the cylinder 231 therein. The supply hose 233 is connected to supply fluid, air, or high pressure gas.

상기 제1, 제2암거박스(210,220)의 로커(230)와 대응하는 제1, 제2암거박스(210,220) 한쪽의 중공몸체(211,221)에는 로커(230)의 실린더(231)에서 돌출되는 피스톤(232)을 수용하는 피스톤수용홈(214,224)이 형성되어 있다.A piston protruding from the cylinder 231 of the rocker 230 in the hollow bodies 211 and 221 of one side of the first and second culvert boxes 210 and 220 corresponding to the rockers 230 of the first and second culvert boxes 210 and 220. Piston accommodating grooves 214 and 224 for accommodating 232 are formed.

상기와 같은 다른 실시예의 암거박스에 의하면, 시공하고자 하는 개수만큼의 제1, 제2암거박스(210,220)를 연속 시공한 후, 상기 제1, 제2암거박스(210,220)의 중공몸체(211,221) 한쪽에 마련된 로커(230)의 실린더(231)로 유체나 에어(air) 또는 고압가스 등을 공급함으로써 실린더(231) 내의 피스톤(232)이 돌출되어 제1, 제2암거박스(210,220)인 중공몸체(211,221)의 다른 한쪽에 마련된 피스톤수용홈(214,224)으로 삽입 록킹되며, 이로 인하여 제1, 제2암거박스(210,220)의 중공몸체(211,221)가 서로 지지되므로 지반침하로 인한 제1, 제2암거박스(210,220)의 가라앉음이라든가 뒤틀림을 방지할 수 있는 것이다.According to the culvert box of another embodiment as described above, after the first and second culvert boxes 210,220 as much as the number of construction to be installed continuously, the hollow body (211,221) of the first, second culvert boxes (210, 220) By supplying fluid, air, or high pressure gas to the cylinder 231 of the rocker 230 provided at one side, the piston 232 in the cylinder 231 protrudes to form the first and second culvert boxes 210 and 220. It is inserted and locked into the piston receiving grooves 214 and 224 provided on the other side of the bodies 211 and 221. As a result, the hollow bodies 211 and 221 of the first and second culvert boxes 210 and 220 are supported by each other, so that the first and the second due to ground subsidence. 2 It is possible to prevent sinking or twisting of the culvert boxes (210,220).

도 9는 본 발명에 따른 암거박스의 또 다른 실시 예를 나타낸 일부 상세도이다. 여기서는, 상기 제1, 제2암거박스(210,220)의 중공몸체(211,221)에 이들을 연속하여 연결할 때 직선으로 맞춤정렬이 이뤄지도록 한쪽끝단엔 적어도 하부에 맞춤정렬용 턱(215)이 형성되고 다른 한쪽끝단엔 맞춤정렬용 턱(215)과 대응하여 걸리는 맞춤정렬용 홈(216)이 형성되어 있으며, 상기 제1, 제2암거박스(210,220)의 중공몸체(211,221) 한쪽끝단에는 이들을 연속하여 연결 시공하였을 때 서로 맞닿는 제1, 제2암거박스(210,220) 사이에 몰탈을 가압 주입하여 기밀유지를 꾀하기 위한 오목한 몰탈라인(217)이 형성되어 있다.9 is a detailed view showing another embodiment of the culvert box according to the present invention. Here, the alignment alignment jaw 215 is formed at least at one end of the first and second culvert boxes 210 and 220 at least at one end thereof so that the alignment is performed in a straight line when they are continuously connected to the hollow bodies 211 and 221 of the first and second culvert boxes 210 and 220. At the end, the alignment alignment grooves 216 are formed to correspond to the alignment alignment jaws 215, and one or both ends of the hollow bodies 211 and 221 of the first and second culvert boxes 210 and 220 are continuously connected to each other. When the mortar line 217 is formed between the first and second culvert boxes 210 and 220 in contact with each other to pressurize the mortar to maintain airtightness.

상기와 같은 또 다른 실시예의 암거박스에 의하면, 상기 제1암거박스(210)인 중공몸체(211) 끝단의 맞춤정렬용 턱(215)에다 제2암거박스(220)인 중공몸체(221) 끝단의 맞춤정렬용 홈(216)을 올려놓으면 상기 맞춤정렬용 턱(215)과 맞춤정렬용 홈(216)의 구조에 의해 직선으로 맞춤정렬이 이뤄지게 된다. According to another embodiment of the culvert box as described above, the end of the hollow body 221 of the second culvert box 220 to the aligning jaw 215 of the end of the hollow body 211 that is the first culvert box (210). When placing the alignment alignment groove 216 of the alignment alignment is made in a straight line by the structure of the alignment alignment jaw 215 and alignment alignment groove 216.

상기 제1암거박스(210)에 그 길이방향으로 제2암거박스(220)를 배열하기만 하면, 제1암거박스(210)의 앵커유닛(100)엔 제2암거박스(220)인 중공몸체(221)의 강선통과구멍(222)이 동심을 이루고 상기 제1암거박스(210)의 강선통과구멍(212)엔 제2암거박스(220)인 중공몸체(221)의 앵커유닛(100)이 동심을 이루고 설치되므로 시공 작업이 간편하게 된다.Just by arranging the second culvert box 220 in the longitudinal direction to the first culvert box 210, the hollow body that is the second culvert box 220 in the anchor unit 100 of the first culvert box 210 The steel wire through hole 222 of the 221 is concentric, and the anchor unit 100 of the hollow body 221 that is the second culvert box 220 is formed in the steel wire through hole 212 of the first culvert box 210. Concentric and installed, simplifying construction work.

상기와 같이 제1, 제2암거박스(210,220)를 연속적으로 시공한 후에 중공몸체(211,221) 끝단의 몰탈라인(217)으로 시멘트몰탈을 가압 주입하여 양생시킴으로써 제1, 제2암거박스(210,220) 사이의 기밀유지를 꾀할 수도 있다.After the first and second culvert boxes 210 and 220 are continuously constructed as described above, the cement mortar is injected into the mortar line 217 at the ends of the hollow bodies 211 and 221 to cure the first and second culvert boxes 210 and 220. You can also try to maintain confidentiality between them.

도 10은 본 발명에 따른 암거박스의 또 다른 실시 예를 나타낸 일부 상세도이다. 여기서는, 상기 제1, 제2암거박스(210,220)의 사이에 이들 사이에서 누수됨을 방지하기 위한 복합형지수재(240)가 삽입 개재되되, 상기 복합형지수재(240)는 단면이 장방형인 긴 띠의 양쪽측면에 길이방향으로 수개의 홈(242)을 형성시킨 수팽창지수재(241)와, 이 수팽창지수재(241)의 하단에 탄력이 좋은 고무링(243)이 일체로 형성된 것이다.10 is a detailed view showing another embodiment of the culvert box according to the present invention. Here, the composite index member 240 is inserted between the first and second culvert boxes 210 and 220 to prevent leakage between them, and the composite index member 240 has a long cross section having a rectangular cross section. The water-expandable index member 241 in which several grooves 242 are formed in the longitudinal direction on both sides and the rubber ring 243 with good elasticity are integrally formed at the lower end of the water-expandable index member 241.

상기와 같은 구성의 암거박스에 의하면, 제1, 제2암거박스(210,220)인 중공몸체(211,221) 한쪽끝단을 이루는 벽체를 따라 복합형지수재(240)를 부착한다. 다시 말해서, 중공몸체(211,221)의 단면형상이 사각형이므로 한글의 미음자형인 폐쇄 된 형상으로 부착된다. According to the culvert box configured as described above, the composite index 240 is attached along the wall forming one end of the hollow bodies 211 and 221 which are the first and second culvert boxes 210 and 220. In other words, since the cross-sectional shapes of the hollow bodies 211 and 221 are rectangular, they are attached in a closed shape, which is a Korean alphabet.

이렇게 제1, 제2암거박스(210,220)의 중공몸체(211,221) 사이에 복합형지수재(240)가 삽입 개재되어 있어 제1, 제2암거박스(210,220)에 부여되는 프리스트레스로 인해 고무링(243)이 압축되면서 제1, 제2암거박스(210,220) 사이의 맞닿는 면과 밀착되고 수팽창지수재(241)는 시공이후에 수분이 유입되더라도 수개의 홈(242)에 의해 차단됨은 물론 이렇게 유입된 수분을 수팽창지수재(241)가 머금을수록 팽창되면서 보다 확실한 기밀이 유지되게 된다.Thus, the composite index member 240 is interposed between the hollow bodies 211 and 221 of the first and second culvert boxes 210 and 220 so that the rubber ring 243 is formed due to the prestress applied to the first and second culvert boxes 210 and 220. ) Is compressed and is in close contact with the contact surface between the first, second culvert box (210, 220) and the water expansion index 241 is blocked by several grooves 242 even if water is introduced after construction, as well as introduced As the water-expandable index 241 is filled with water, it is expanded while maintaining a more reliable airtightness.

이상에서 상세하게 설명한 바와 같이, 본 발명에 따른 암거박스는 한쪽끝단인 4모서리나 각 변에 앵커유닛을 매설한 한 쌍의 암거박스를 마련함으로써 적어도 각각 하나의 암거박스로 한 쌍을 이루도록 길이방향으로 설치하고 암거박스 한쪽의 강선통과구멍으로 강선을 삽입하기만 하면 강선이 앵커유닛에 간편하게 체결 결합되며 이로 인하여 암거박스의 시공이 간편하고 시공기간이 단축되어 공사비를 줄일 수 있는 효과를 가진다.As described in detail above, the culvert box according to the present invention has a pair of culvert boxes, each of which has four corners at one end or an anchor unit embedded in each side thereof, so that at least one culvert box is formed in a lengthwise direction. The steel wire is simply fastened and coupled to the anchor unit by simply installing and inserting the steel wire into the steel wire through hole on one side of the culvert box, thereby simplifying the construction of the culvert box and reducing the construction period.

삭제delete

본 발명에 따른 암거박스의 시공방법은 적어도 각각 하나의 암거박스로 한 쌍을 이루도록 길이방향으로 설치한 후 암거박스 한쪽의 강선통과구멍으로 강선을 삽입하기만 하면 강선이 앵커유닛에 간편하게 결합되고 상기 강선을 암거박스의 강선통과구멍의 삽입방향에서 긴장시킨 후 정착구로 정착시킴으로써 암거박스에 프리스트레스를 부여할 수 있으며 이러한 과정을 통해 연속적으로 배열되는 암거박스에 균일한 프리스트레스를 부여할 수 있는 유용한 발명이다. The construction method of the culvert box according to the present invention is installed in the longitudinal direction to form a pair of at least one culvert box, and then simply insert the steel wire into the steel wire through hole on one side of the culvert box, the steel wire is easily coupled to the anchor unit and Prestress can be applied to the culvert box by tensioning the wire in the insertion direction of the wire passage hole of the culvert box and then fixing it with a fixing device.This process is a useful invention that can give uniform prestress to the culvert boxes that are arranged continuously. .

Claims (12)

삭제delete 삭제delete 삭제delete 삭제delete 한쪽에서 다른 한쪽에 이르기까지 속이 빈 터널형의 중공몸체로 마련되며 이 중공몸체의 길이방향으로 복수의 강선통과구멍이 형성되고 이 강선통과구멍의 한쪽끝단엔 각각의 정착구가 안착되는 정착구안착홈이 형성되어 있는 암거박스에 있어서, It is provided with a hollow tunnel-shaped hollow body from one side to the other, and a plurality of steel wire through holes are formed in the longitudinal direction of the hollow body, and at each end of the steel wire through holes, a fixing unit seating groove is provided. In the culvert box formed, 상기 중공몸체의 강선통과구멍들 사이의 중간이나 강선통과구멍의 주위근처인 4모서리나 각 변에 각각 앵커유닛이 마련되어 2개가 한 쌍을 이루는 제1, 제2암거박스로 구성되고 상기 제1, 제2암거박스는 중공몸체의 강선통과구멍과 앵커유닛이 서로 반대로 바뀌어서 대응하는 위치에 형성되며,An anchor unit is provided at each of four corners or sides of the steel wire through holes of the hollow body or around the steel wire through holes, and includes two pairs of first and second culvert boxes. The second culvert box is formed in a position corresponding to the steel wire through hole and the anchor unit of the hollow body is reversed to each other, 상기 앵커유닛은 앵커몸체 내에 3개 이상으로 분할된 콘형의 웨지가 신축성 링으로 조립되고 상기 앵커몸체에 웨지를 수용하여 안착되어 강선을 파지하도록 웨지안착부재가 체결되며 상기 앵커몸체의 내부에 웨지를 탄력적으로 지지하면서 웨지안착부재 측으로 밀어 넣는 스프링이 설치된 앵커파트와, 이 앵커파트의 한쪽에서 축이 연장되고 이 축의 한쪽끝단에 축 직경보다 넓은 형상의 지압판재가 마련된 지압저항파트로 구성되며,The anchor unit has a cone-shaped wedge divided into three or more in the anchor body is assembled with an elastic ring, and the wedge seating member is fastened so as to be seated by holding the wedge on the anchor body so as to grasp the steel wire, and the wedge inside the anchor body. It is composed of an anchor part provided with a spring that is elastically supported and pushed toward the wedge seating member, and an acupressure resistance part having a shaft extending from one side of the anchor part and a pressure plate having a shape larger than the shaft diameter at one end of the shaft. 상기 제1, 제2암거박스의 중공몸체 사이에는 이들을 연속하여 연결할 때 기밀이 유지되도록 단면이 장방형인 긴 띠의 양쪽측면에 길이방향으로 수개의 홈을 형성시킨 수팽창지수재와, 이 수팽창지수재의 하단에 탄력이 좋은 고무링이 일체로 형성된 복합형지수재가 부가 설치되어 있는 것을 특징으로 하는 암거박스.The water-expandable index member formed several grooves in the longitudinal direction on both sides of a rectangular long strip of cross section so that airtightness is maintained between the hollow bodies of the first and second culvert boxes, and this water expansion The culvert box, characterized in that the bottom of the index material is provided with a composite index material integrally formed with a good rubber ring. 제5항에 있어서, The method of claim 5, 상기 제1, 제2암거박스인 다른 한쪽의 중공몸체에는 지반침하로 인한 암거박스의 가라앉음이라든가 뒤틀림을 방지할 수 있도록 한쪽이 개방된 실린더와, 이 실린더 내에 설치되어 개방단부 측으로 소정의 길이만큼 돌출되게 피스톤이 설치된 로커가 마련되고, 상기 제1, 제2암거박스의 로커와 대응하는 제1, 제2암거박스 한 쪽의 중공몸체에는 로커의 실린더에서 돌출되는 피스톤을 수용하는 피스톤수용홈이 형성되는 것을 특징으로 하는 암거박스.The hollow body on the other side of the first and second culvert boxes has a cylinder open on one side to prevent sinking or twisting of the culvert box due to ground subsidence, and is installed in the cylinder by a predetermined length toward the open end side. A rocker provided with a piston is provided to protrude, and the hollow body of one side of the first and second culvert boxes corresponding to the rockers of the first and second culvert boxes is provided with a piston accommodating groove for accommodating the piston protruding from the cylinder of the rocker. A culvert box, characterized in that formed. 삭제delete 삭제delete 삭제delete 중공몸체의 강선통과구멍들 사이의 중간이나 강선통과구멍의 주위근처인 4모서리나 각 변에 각각 앵커유닛이 마련된 제1암거박스를 설치하는 단계; 이 제1암거박스의 중공몸체 한쪽끝단에 다른 제2암거박스인 중공몸체의 다른 한쪽끝단이 맞닿아 서로 이웃하여 그 길이방향으로 배열되되 상기 제1암거박스의 앵커유닛엔 제2암거박스인 중공몸체에 형성된 강선통과구멍이 동심을 이루고 상기 제1암거박스의 강선통과구멍엔 제2암거박스인 중공몸체에 설치된 앵커유닛이 동심을 이루도록 제2암거박스를 설치하는 단계; 상기 제2암거박스인 중공몸체의 강선통과구멍을 통하여 제1암거박스의 중공몸체 측으로 강선을 삽입하여 강선의 선단이 제1암거박스를 이루는 앵커유닛의 앵커파트인 웨지와 웨지안착부재에 파지되도록 하는 단계; 상기 제2암거박스인 중공몸체의 강선통과구멍에서 연장된 강선에 정착구와 함께 인장실린더를 설치하여 소정의 인장력으로 인장시킨 상태로 정착구를 고정시키는 단계; 상기 제2암거박스의 중공몸체 한쪽에 제1암거박스인 중공몸체의 다른 한쪽끝단이 맞닿아 서로 이웃하여 그 길이방향으로 배열하되 상기 제2암거박스의 앵커유닛엔 제1암거박스인 중공몸체의 강선통과구멍이, 상기 제2암거박스의 강선통과구멍엔 제1암거박스인 중공몸체의 앵커유닛이 동심을 이루도록 제1암거박스를 설치하는 단계; 상기 제1암거박스인 중공몸체의 강선통과구멍을 통하여 제2암거박스의 중공몸체 측으로 강선을 삽입하여 강선의 선단이 제2암거박스를 이루는 앵커유닛의 앵커파트인 웨지와 웨지안착부재에 파지되도록 하는 단계; 상기 제1암거박스인 중공몸체의 강선통과구멍에서 연장된 강선에 정착구와 함께 인장실린더를 설치하여 소정의 인장력으로 인장시킨 상태로 정착구를 고정시키는 단계; 이후에 제2암거박스를 배열하는 이후의 과정을 반복하여 시공하고자 하는 개수만큼의 암거박스를 연속 시공하는 단계로 된 암거박스의 시공방법에 있어서,Installing a first culvert box provided with an anchor unit at each of four corners or sides of the hollow wire through holes of the hollow body or near the periphery of the wire through holes; One end of the hollow body of the first culvert box, the other end of the hollow body of the other second culvert box abuts each other and is arranged next to each other in the longitudinal direction, the anchor unit of the first culvert box is hollow Installing a second culvert box such that a steel wire through hole formed in the body is concentric and an anchor unit installed in the hollow body as a second culvert box is concentric with the steel wire through hole of the first culvert box; The steel wire is inserted into the hollow body of the first culvert box through the steel wire through hole of the hollow body, which is the second culvert box, so that the tip of the steel wire is gripped by the wedge and wedge seat member, which are anchor parts of the anchor unit forming the first culvert box. Making; Fixing the anchorage in a state in which the tension cylinder is tensioned with a predetermined tensile force by installing a tension cylinder along with the anchorage in the steel wire extending from the steel wire passage hole of the hollow body which is the second culvert box; The other end of the hollow body, which is the first culvert box, abuts on one side of the hollow body of the second culvert box and is arranged next to each other in the longitudinal direction, and the anchor unit of the second culvert box is the first culvert box of the hollow body. Installing the first culvert box such that the steel wire through hole is concentric with the anchor unit of the hollow body that is the first culvert box in the steel wire through hole of the second culvert box; The steel wire is inserted into the hollow body side of the second culvert box through the steel wire through hole of the hollow body, which is the first culvert box, so that the tip of the steel wire is gripped by the wedge and wedge seating members, which are anchor parts of the anchor unit forming the second culvert box. Making; Fixing the anchorage in a state where the tensioner is tensioned with a predetermined tensile force by installing a tension cylinder along with the anchorage in the steel wire extending from the steel wire passage hole of the hollow body which is the first culvert box; In the construction method of the culvert box, comprising the step of continuously constructing as many culvert boxes as you want to construct by repeating the subsequent process of arranging the second culvert box, 시공하고자 하는 개수만큼의 제1, 제2암거박스를 연속 시공한 이후에는 상기 제1, 제2암거박스의 중공몸체 다른 한쪽에 마련된 로커의 실린더로 유체나 에어(air) 또는 고압가스를 공급하여 피스톤이 돌출되어 제1, 제2암거박스의 중공몸체 한쪽에 마련된 피스톤수용홈으로 삽입 록킹되도록 한 다음, 중공몸체 끝단의 몰탈라인을 통해 가압 주입하여 제1, 제2암거박스 사이의 기밀유지가 유지되도록 마무리하는 단계가 부가된 것을 특징으로 하는 암거박스의 시공방법.After continuously constructing the first and second culvert boxes as many times as you want to install, supply fluid, air or high pressure gas to the cylinder of the rocker provided on the other side of the hollow body of the first and second culvert boxes. The piston protrudes to be inserted and locked into the piston receiving groove provided on one side of the hollow body of the first and second culvert boxes, and then pressurized and injected through the mortar line at the end of the hollow body to maintain the airtightness between the first and second culvert boxes. Construction method of the culvert box, characterized in that the finishing step is added to maintain. 삭제delete 삭제delete
KR1020070043970A 2007-05-07 2007-05-07 Precast concrete culvert boxes and method for constructing the same boxes KR100801573B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070043970A KR100801573B1 (en) 2007-05-07 2007-05-07 Precast concrete culvert boxes and method for constructing the same boxes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070043970A KR100801573B1 (en) 2007-05-07 2007-05-07 Precast concrete culvert boxes and method for constructing the same boxes

Publications (1)

Publication Number Publication Date
KR100801573B1 true KR100801573B1 (en) 2008-02-05

Family

ID=39342566

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070043970A KR100801573B1 (en) 2007-05-07 2007-05-07 Precast concrete culvert boxes and method for constructing the same boxes

Country Status (1)

Country Link
KR (1) KR100801573B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914968A (en) * 2018-09-13 2018-11-30 中冶长天国际工程有限责任公司 A kind of pipe gallery and its installation method with waterproof connector
CN111139753A (en) * 2019-11-23 2020-05-12 北京市市政二建设工程有限责任公司 Prefabricated square culvert convenient to connect and construction process thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10252123A (en) 1997-03-10 1998-09-22 Haneda Concrete Kogyo Kk Joint structure of conduit
KR100458951B1 (en) 2001-11-16 2004-12-03 주식회사 토암산업 Precast Concrete Box Culvert Using Dual Directional Prestressed Tendon Anchoring Apparatus and Assembling Structure and Method in Precast Concrete Box Culvert
KR100692913B1 (en) 2006-07-12 2007-03-12 (주) 이삼이엔지 Tendon anchoring apparatus
KR100732554B1 (en) 2006-09-06 2007-06-28 (주) 이삼이엔지 Tendon anchoring apparatus, connecting structure of culvert using the same and connecting method of culvert using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10252123A (en) 1997-03-10 1998-09-22 Haneda Concrete Kogyo Kk Joint structure of conduit
KR100458951B1 (en) 2001-11-16 2004-12-03 주식회사 토암산업 Precast Concrete Box Culvert Using Dual Directional Prestressed Tendon Anchoring Apparatus and Assembling Structure and Method in Precast Concrete Box Culvert
KR100692913B1 (en) 2006-07-12 2007-03-12 (주) 이삼이엔지 Tendon anchoring apparatus
KR100732554B1 (en) 2006-09-06 2007-06-28 (주) 이삼이엔지 Tendon anchoring apparatus, connecting structure of culvert using the same and connecting method of culvert using the same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108914968A (en) * 2018-09-13 2018-11-30 中冶长天国际工程有限责任公司 A kind of pipe gallery and its installation method with waterproof connector
CN108914968B (en) * 2018-09-13 2023-10-27 中冶长天国际工程有限责任公司 Utility tunnel with waterproof connector and installation method thereof
CN111139753A (en) * 2019-11-23 2020-05-12 北京市市政二建设工程有限责任公司 Prefabricated square culvert convenient to connect and construction process thereof
CN111139753B (en) * 2019-11-23 2024-04-05 北京市市政二建设工程有限责任公司 Prefabricated square culvert convenient to connect and construction process thereof

Similar Documents

Publication Publication Date Title
KR100692913B1 (en) Tendon anchoring apparatus
ES2243365T3 (en) PRETENSED CABLE RECEIVER DUCT WITH LONGITUDINAL CHANNELS.
KR100458951B1 (en) Precast Concrete Box Culvert Using Dual Directional Prestressed Tendon Anchoring Apparatus and Assembling Structure and Method in Precast Concrete Box Culvert
KR100952207B1 (en) Connection Structure and Connecting Method between Precast Pier and Foundation
US6843031B1 (en) Bonded monostrand post-tension system
KR19990072472A (en) Method, member, and tendon for constructing an anchoring device
KR100732554B1 (en) Tendon anchoring apparatus, connecting structure of culvert using the same and connecting method of culvert using the same
KR100662699B1 (en) The sleeve for architecture
KR100934608B1 (en) A steel wire anchoring device and precast box, the method of assembling precast box using the same
KR100801573B1 (en) Precast concrete culvert boxes and method for constructing the same boxes
KR101023882B1 (en) cylinder for wire tension and a method
JP2007039898A (en) Arch member for tunnel
KR100990682B1 (en) one touch jointing type culvert box
KR101021184B1 (en) Connecting Structure and Connecting method for Precast Concrete Box Culvert
KR100557341B1 (en) Prestress apparatus and manufacturing method for prestressed construction structure thereof
KR20110115687A (en) Precast concrete culvert boxes
KR20070106410A (en) The Assembled Precast Reinforced Concrete Culverts of Connectting with Steel Bar.
JPH09273246A (en) Construction method of prestress assembly structure
CN210049237U (en) Prestressed reinforced concrete hollow support pile
KR20180115098A (en) Prefabricated culvert
JP3375585B2 (en) Method of introducing prestress into cylindrical body of cylindrical concrete structure
KR200268366Y1 (en) Dual Directional Prestressed Tendon Anchoring Apparatus, Precast Concrete Box Culvert Using the Same, Assembling Structure in Precast Concrete Box Culvert
KR102588517B1 (en) Reinforcing device inside the pipe with adjustable inner diameter
KR200268365Y1 (en) Dual Directional Prestressed Tendon Anchoring Apparatus
JP2913461B2 (en) Concrete member connection structure

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
G170 Publication of correction
FPAY Annual fee payment

Payment date: 20120131

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140128

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150204

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20151218

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee