KR100792674B1 - System for producing the topographic map and method therefor - Google Patents

System for producing the topographic map and method therefor Download PDF

Info

Publication number
KR100792674B1
KR100792674B1 KR1020070044146A KR20070044146A KR100792674B1 KR 100792674 B1 KR100792674 B1 KR 100792674B1 KR 1020070044146 A KR1020070044146 A KR 1020070044146A KR 20070044146 A KR20070044146 A KR 20070044146A KR 100792674 B1 KR100792674 B1 KR 100792674B1
Authority
KR
South Korea
Prior art keywords
information
unit
file
map
ascii
Prior art date
Application number
KR1020070044146A
Other languages
Korean (ko)
Inventor
이재환
Original Assignee
삼아항업(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼아항업(주) filed Critical 삼아항업(주)
Priority to KR1020070044146A priority Critical patent/KR100792674B1/en
Application granted granted Critical
Publication of KR100792674B1 publication Critical patent/KR100792674B1/en

Links

Images

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B29/00Maps; Plans; Charts; Diagrams, e.g. route diagram
    • G09B29/003Maps
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B29/00Maps; Plans; Charts; Diagrams, e.g. route diagram
    • G09B29/12Relief maps

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Processing Or Creating Images (AREA)
  • Instructional Devices (AREA)

Abstract

A topographic map making system and a manufacturing method thereof are provided to improve map making technology and to reduce the map making cost by automatically converting a DWG(Drawing) type CAD(Computer Aided Design) file formed by digitizing various topographic information on the basis of map drawing rules, into a postscript type file. A topographic map making system is composed of an interface unit(110) receiving a demand and a DWG type CAD file from a user; a memory unit(120) storing a sign marked on a map according to the map drawing rules in a database converted into postscript type ASCII(American Standard Code for Information Interchange) information; an information extracting unit(130) extracting numerical information of the DWG type CAD file and the ASCII information of the memory unit; a conversion unit(140) converting the numerical information and ASCII information extracted from the information extracting unit, into a postscript type file; an output unit(150) outputting the postscript type file converted through the conversion unit; and a central control unit(160) controlling the interface unit, the memory unit, the information extracting unit, the conversion unit, and the output unit.

Description

지형도 제작 시스템 및 그 방법{System for producing the topographic map and method therefor}System for producing the topographic map and method therefor}

도 1은 본 발명의 일실시예에 따른 지형도 제작 시스템에 관한 개략적인 구성도.1 is a schematic block diagram of a topographical map production system according to an embodiment of the present invention.

도 2는 본 발명의 일실시예에 따른 지형도 제작 시스템의 인터페이스부를 나타낸 도면.2 is a view showing an interface unit of the topographic map production system according to an embodiment of the present invention.

도 3은 본 발명의 일실시예에 따른 지형도 제작 시스템의 출력결과를 나타낸 도면.3 is a view showing the output of the topographic map production system according to an embodiment of the present invention.

도 4는 본 발명의 일실시예에 따른 지형도 제작 방법에 관한 전체흐름도. Figure 4 is a whole flow diagram for a topographical map manufacturing method according to an embodiment of the present invention.

도 5는 본 발명의 일실시예에 따른 지도도식규칙 규정에 따라 데이터베이스를 구축하는 단계에 대한 상세흐름도.Figure 5 is a detailed flowchart of the step of building a database in accordance with the rules of the schematic map according to an embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

110 : 인터페이스부 120 : 메모리부110: interface unit 120: memory unit

130 : 정보추출부 140 : 변환부130: information extraction unit 140: conversion unit

150 : 출력부 160 : 중앙제어부150: output unit 160: central control unit

본 발명은 지형도 제작 시스템 및 그 방법에 관한 것으로서, 특히, 지도도식규칙을 기반으로 지형, 지물, 지명 등의 각종 지형정보를 수치화하여 제작된 DWG형식파일을 자동으로 포스트스크립트 형식파일로 변환시키는 지형도 제작 시스템 및 그 방법에 관한 것이다.The present invention relates to a topographic map production system and a method thereof, and in particular, a topographic map for automatically converting a DWG format file produced by digitizing various terrain information such as terrain, features, place names, etc. based on a map schematic rule into a PostScript format file. A manufacturing system and method thereof are provided.

지도도식규칙 규정에서, 지형도는 지표면상의 상황에 대한 측량결과와 행정구역, 경계, 지명 등 필요한 사항을 축척에 따라 정확하고 상세하게 표현한 것으로서 국토의 이용개발과 각종 사업에 필요한 지도의 기본도면 및 교재 등으로 이용할 수 있도록 제작된 지도이다.In the rules of the Map Schematic, the topographic map is a precise and detailed representation of the survey results of the situation on the surface of the land, and the necessary matters such as administrative districts, boundaries, and place names, according to the scale. This map is designed to be used as a back light.

DWG형식파일은, 종이지도가 가지고 있는 정보를 점, 선, 면 형태의 기하학적 도형 요소나 벡터들의 집합으로 디지털화한 지도를 의미한다. The DWG format file refers to a map in which the information contained in a paper map is digitized into a set of geometric figure elements or vectors in the form of points, lines, and planes.

종래, 포스트스크립트 형식 파일의 제작은 DWG형식파일 지형도를 일러스트(Illustrator)로 불러 들여 스케일, 위치, 색깔 등을 수동으로 편집 제작하는 방법을 활용하여 막대한 시간과 경제적 손실을 유발하는 문제점이 있었다.Conventionally, the production of the PostScript format file has a problem of causing huge time and economic loss by using a method of manually editing a scale, position, color, etc. by importing a DWG format file topographic map as an illustrator.

본 발명의 목적은, 지도도식규칙을 기반으로 지형, 지물, 지명 등의 각종 지형정보가 수치화된 DWG형식의 캐드파일을 자동으로 포스트스크립트 형식파일로 변환시키는 지형도 제작 시스템 및 그 방법을 제공함에 있다.An object of the present invention is to provide a topographic map production system and method for automatically converting a DWG format CAD file into a PostScript format file, in which various topographic information such as terrain, features, and place names are digitized based on a map schematic rule. .

본 발명의 다른 목적은, 지도 제작 기술의 향상, 지도 제작의 비용감소 및 지도사용자들에게 고품질의 지형도 공급이 가능한 지형도 제작 시스템 및 그 방법 을 제공함에도 있다.Another object of the present invention is to provide a topographical map production system and method capable of providing a high-quality topographic map to a map user and improving the map production technology, reducing the cost of the map production.

본 발명은 지형도 제작 시스템에 있어서, 사용자로부터 요구사항 및 DWG형식의 캐드파일을 수신하는 인터페이스부(110); 지도도식규칙 규정에 따라 도상에 표시되는 기호를 포스트스크립트 형식 파일의 아스키 정보로 변환된 데이터베이스로 저장하는 메모리부(120); 상기 DWG형식 캐드파일의 수치정보를 추출하고, 메모리부의 아스키 정보를 추출하는 정보추출부(130); 상기 정보추출부로부터 추출된 수치정보 및 아스키 정보를 포스트스크립트(PostScript) 형식 파일로 변환시키는 변환부(140); 상기 변환부를 통해 변환된 포스트스크립트 형식 파일을 출력하는 출력부(150); 및 상기 인터페이스부, 메모리부, 정보추출부, 변환부 및 출력부를 중앙제어하는 중앙제어부(160); 를 포함한다.The present invention provides a topographic map production system, comprising: an interface unit (110) for receiving a requirement and a CAD file in DWG format from a user; A memory unit 120 for storing the symbols displayed on the diagram according to the rules of the map schematic into a database converted into ASCII information of a PostScript format file; An information extraction unit 130 for extracting numerical information of the DWG format CAD file and extracting ASCII information of the memory unit; A conversion unit 140 for converting the numerical information and the ASCII information extracted from the information extraction unit into a PostScript format file; An output unit 150 for outputting the converted PostScript format file through the conversion unit; And a central controller 160 for centrally controlling the interface unit, the memory unit, the information extracting unit, the converting unit, and the output unit. It includes.

바람직하게, 상기 인터페이스부(110)는 지형도를 제작할 DWG 도면 선택정보, 축적 선택정보, 난외주기 삽입 선택정보 및 저장위치 선택정보를 수신하는 것을 특징으로 한다.Preferably, the interface unit 110 receives DWG drawing selection information, accumulation selection information, ovulation period insertion selection information, and storage location selection information for producing a topographical map.

또한 바람직하게, 상기 지도도식규칙 규정에 따라 도상에 표시되는 기호는, 기호 및 주기, 지형, 지물, 색상표현, 선의 두께 종류, 난외주기 형태 및 위치, 기호의 모양 및 형태를 포함하는 것을 특징으로 한다.In addition, preferably, the symbols displayed on the map according to the rules of the Map Schematic may include symbols and periods, topography, features, color expressions, types of thickness of the lines, the shape and location of the extracorporeal cycle, and the shapes and shapes of the symbols. do.

또한 바람직하게, 상기 수치정보는 DWG형식 캐드파일의 수치화된 지형, 지물, 지명의 지형정보를 포함하는 것을 특징으로 한다.In addition, the numerical information is characterized in that it includes the topographic information of the digitized terrain, features, geographical names of the DWG format CAD file.

또한 바람직하게, 상기 변환부(140)는 상기 정보추출부(130)로부터 추출된 지형정보에 관한 DWG형식 캐드파일의 수치정보 및 상기 메모리부(120)에 구축된 데이터베이스의 아스키정보를 매칭시키고, 매칭시킨 수치정보 및 아스키정보를 포스트스크립트 형식 파일로 변환시키는 것을 특징으로 한다.Also preferably, the conversion unit 140 matches the numerical information of the DWG format CAD file related to the terrain information extracted from the information extraction unit 130 and the ASCII information of the database constructed in the memory unit 120, And converting the matched numerical information and the ASCII information into a PostScript format file.

한편, 지형도 제작 방법에 있어서, (a) DWG 도면 선택정보, 축적 선택정보, 난외주기정보 삽입 선택정보 및 저장위치 선택정보를 수신하는 단계; (b) 수신하는 DWG형식 캐드파일의 지형정보에 대한 수치정보 및 데이터베이스의 아스키 정보를 추출하는 단계; (c) 상기 수치정보 및 상기 아스키 정보를 이용하여 포스트스크립트 형식 파일로 변환시키는 단계; 및 (d) 변환된 포스트스크립트 형식 파일을 출력하는 단계; 를 포함한다.On the other hand, the method for producing a topographic map, the method comprising: (a) receiving DWG drawing selection information, accumulation selection information, outboard period information insertion selection information and storage location selection information; (b) extracting numerical information about the topographical information of the received DWG format CAD file and ASCII information of the database; (c) converting the numerical information and the ASCII information into a PostScript format file; And (d) outputting the converted PostScript format file; It includes.

바람직하게, 상기 제 (c) 단계는 (c-1) 상기 수치정보 및 상기 아스키 정보를 매칭시키는 단계; 및 (c-2) 상기 매칭시킨 수치정보 및 아스키 정보를 포스트스크립트 형식 파일로 변환시키는 단계; 를 포함하는 것을 특징으로 한다.Preferably, step (c) comprises: (c-1) matching the numerical information and the ASCII information; (C-2) converting the matched numerical information and the ASCII information into a PostScript format file; Characterized in that it comprises a.

또한 바람직하게, 상기 제 (a) 단계 이전에 (e) 지도도식규칙 규정에 따라 도상에 표시되는 기호를 데이터베이스로 구축하는 단계; 를 포함하는 것을 특징으로 한다.Also preferably, prior to the step (a), (e) constructing a symbol displayed on the diagram in accordance with the rules of the mapping scheme into a database; Characterized in that it comprises a.

더욱 바람직하게, 상기 제 (e) 단계는 (e-1) 지도도식규칙 규정에 따라 도상에 표시되는 기호를 수신하는 단계; (e-2) 상기 수신한 지도도식규칙 규정에 따라 도상에 표시되는 기호를 포스트스크립트 형식 파일로 변환시키는 단계; 및 (e-3) 상기 변환된 포스트스크립트 형식 파일의 아스키 정보를 데이터베이스로 구축하는 단계; 를 포함하는 것을 특징으로 한다.More preferably, step (e) comprises the steps of (e-1) receiving a symbol displayed on the diagram in accordance with the rules of the schematic diagram; (e-2) converting a symbol displayed on the graphic file into a PostScript format file according to the received map rule rule; (E-3) constructing ASCII information of the converted PostScript format file into a database; Characterized in that it comprises a.

본 발명의 특징 및 이점들은 첨부도면에 의거한 다음의 상세한 설명으로 더욱 명백해질 것이다. 이에 앞서 본 발명에 관련된 공지 기능 및 그 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는, 그 구체적인 설명을 생략하였음에 유의해야 할 것이다.The features and advantages of the present invention will become more apparent from the following detailed description based on the accompanying drawings. In the meantime, when it is determined that the detailed description of the known functions and configurations related to the present invention may unnecessarily obscure the subject matter of the present invention, it should be noted that the detailed description is omitted.

본 발명의 일실시예에 따른 에 관하여 도 1 내지 도 3을 참조하여 설명하면 다음과 같다.Referring to Figures 1 to 3 according to an embodiment of the present invention as follows.

도 1은 본 발명의 일실시예에 따른 지형도 제작 시스템에 관한 개략적인 구성도이고, 도 2는 본 발명의 일실시예에 따른 지형도 제작 시스템의 인터페이스부를 나타낸 도면이며, 도 3은 본 발명의 일실시예에 따른 지형도 제작 시스템의 출력결과물을 나타낸 도면이다.1 is a schematic configuration diagram of a topographical map production system according to an embodiment of the present invention, Figure 2 is a view showing an interface of the topographical map production system according to an embodiment of the present invention, Figure 3 is a view of the present invention A diagram showing an output result of the topographic map production system according to the embodiment.

본 발명의 일실시예에 따른 지형도 제작 시스템은 도 1에 도시된 바와 같이, 인터페이스부(110), 메모리부(120), 정보추출부(130), 변환부(140), 출력부(150) 및 중앙제어부(160)를 포함한다.As the topographic map production system according to an embodiment of the present invention, as shown in Figure 1, the interface unit 110, the memory unit 120, the information extraction unit 130, the conversion unit 140, the output unit 150 And a central controller 160.

인터페이스부(110)는 도 2에 도시된 바와 같이, 사용자로부터 요구사항을 수신하는 기능을 수행한다. 이러한 인터페이스부(110)는 사용자로부터 지형도를 제작할 DWG 도면 선택정보, 축적 선택정보, 지형도 또는 음영도 선택정보, 난외주기정보 삽입 선택정보 및 저장위치 선택정보를 수신한다.As shown in FIG. 2, the interface unit 110 performs a function of receiving a requirement from a user. The interface unit 110 receives DWG drawing selection information, accumulation selection information, topographical map or shadow level selection information, extracorporeal period information insertion selection information, and storage location selection information from the user.

또한, 메모리부(120)는 도상에 표시되는 모든 기호를 지도도식규칙 규정에 따라 데이터베이스로 저장하는 기능을 수행한다. 본 실시예에서 기호는, 기호, 주 기, 지형, 지물, 색상표현, 선의 두께 종류, 난외주기 형태 및 위치, 기호의 모양 및 형태로 설정하였지만, 본 발명이 이에 한정되는 것은 아니다.In addition, the memory unit 120 stores all the symbols displayed on the diagram as a database according to the rules of the map diagram rule. In the present embodiment, the symbol is set as a symbol, a period, a terrain, a feature, a color representation, the thickness of the line, the shape and position of the ovoid period, and the shape and form of the symbol, but the present invention is not limited thereto.

여기서, 지도도식규칙 규정에 따라 도상에 표시되는 모든 기호 및 주기, 지형, 지물, 색상표현, 선의 두께 종류, 난외주기 형태 및 위치, 기호의 모양 및 형태는 사용자로부터 인터페이스부(110)를 통해 기 제작되어 포스트스크립트 형식 파일로 변환되고, 변환된 포스트스크립트 형식 파일의 아스키(ASCII)정보가 데이터베이스로 구축된다.Here, all symbols and periods, topography, features, color representations, line thickness types, opacity period shape and location, and the shape and shape of the symbols displayed on the diagram according to the rules of the map schematic are displayed by the user through the interface unit 110. It is produced and converted into a PostScript format file, and ASCII information of the converted PostScript format file is built into a database.

이때, 지도도식규칙 규정은 측량성과로서 조제하는 지도와 측량성과를 이용하여 조제하는 지도의 도식에 관한 기준을 정하여 지물 기타에 관한 사상(事象)표시의 통일을 기하고 지도의 정확하고 용이한 판독에 기여함을 목적으로 한다. 이때, 도식이라 함은 지도에 표기하는 지형, 지물 및 지명 등을 나타내는 기호나 문자 등의 크기, 모양, 색상 및 그 배열 방식 등을 말한다.At this time, the rules of the Map Schematic shall establish the criteria for the map of maps prepared as survey results and maps prepared by using survey results, to unify the representation of events on features and others, and to accurately and easily read the maps. To contribute to In this case, the schematic refers to the size, shape, color, and arrangement of the symbols or characters representing the terrain, features, and names of the maps.

지도도식규칙 규정에 따른 기호 및 선의 종류는 지물의 실제현상 또는 상징물의 표현은 선 또는 기호로 하고, 선은 실선과 파선으로 구분하며, 등고선은 주곡선, 간곡선, 조곡선 및 계곡선으로 구분하여 표시된다. Symbols and types of lines according to the rules of the Map Schematic are the actual phenomena of the feature or the representation of the symbol as a line or a symbol, the line is divided into a solid line and a dashed line, and the contour line is divided into a main curve, an inter curve, a curve and a valley line. do.

또한 지도도식규칙 규정에 따른 지도의 도곽은 외도곽과 내도곽으로 구분되고, 지도의 외도곽에 도엽명, 도엽번호, 편집주기, 위치도표, 행정구역색인, 기호, 범례, 발행자, 발행일자 및 축적이 표시되며, 내도곽에는 좌표, 자연지물, 인공지물 및 그에 관한 주기가 표시된다. 이때 도곽은 지도의 내용을 둘러싸고 있는 2중의 구획선을 말한다.In addition, the map of the map according to the rules of the Map Schematic is divided into the outer and inner map, and the map name, leaf number, editing cycle, location chart, administrative index, symbol, legend, issuer, issue date and accumulation In the inner map, coordinates, natural features, artificial features, and periods thereof are displayed. In this case, the map refers to the double dividing line surrounding the contents of the map.

그리고 지도도식규칙 규정에 따른 주기는 한글, 한자, 영자 및 아라비아 숫자로 표시되고, 자획에 복잡한 한자에 있어서는 알기 쉬운 약자로 표시되며, 주기에 사용되는 문자의 서체는 한자와 한글에 있어서 명조체와 등선체로 아라비아숫자와 영자에 있어서는 로마체와 등선체로 하고, 자체는 직입체, 경사체 또는 종견체로 한다.In addition, the periods according to the rules of the Map Schematic are represented in Korean, Chinese, English and Arabic numerals, and the abbreviated abbreviations for Chinese characters complicated in the stroke. The Arabic numerals and English letters shall be in the form of a Roman body and an isolator.

또한, 정보추출부(130)는 인터페이스부(110)로부터 수신하는 DWG형식의 캐드파일에서 지형, 지물, 지명 등의 각종 지형정보에 관한 수치정보를 추출하고, 메모리부(120)에 데이터베이스화되어 저장된 아스키 정보를 추출하는 기능을 수행한다.In addition, the information extraction unit 130 extracts numerical information about various terrain information such as terrain, features, place names, etc. from the DWG format CAD file received from the interface unit 110, and is databased in the memory unit 120 Extracts stored ASCII information.

또한, 변환부(140)는 정보추출부(130)로부터 추출된 수치정보 및 아스키 정보를 포스트스크립트(PostScript) 형식 파일로 변환시키는 기능을 수행한다. 여기서, 포스트스크립트 형식 파일변환은 정보추출부(130)로부터 추출된 지형정보에 관한 DWG형식 캐드파일의 수치정보와 메모리부(120)에 구축된 데이터베이스의 아스키 정보를 매칭시키고, 포스트스크립트 형식 파일로 변환시킨다. In addition, the conversion unit 140 converts the numerical information and the ASCII information extracted from the information extraction unit 130 into a PostScript format file. Here, the PostScript format file conversion matches the numerical information of the DWG format CAD file related to the terrain information extracted from the information extraction unit 130 with the ASCII information of the database constructed in the memory unit 120, and converts it into a PostScript format file. Convert

여기서, 정보추출부(130)로부터 추출된 DWG형식 캐드파일의 수치정보와 메모리부(120)의 아스키 정보를 매칭시키는 것은 지도도식규칙 규정에 따라 도상에 표시되는 기호의 아스키 정보를 DWG형식 캐드파일의 수치정보를 이용하여, 포스트스크립트 파일 형식의 지형도에 대한 기호 및 주기 등의 위치를 조정하기 위함이다. 이때, 본 실시예에 따른 DWG형식 캐드파일의 수치정보는 수치화된 지형, 지물, 지명 등의 각종 지형정보로 설정하였으나, 본 발명이 이에 한정되는 것은 아니다.Here, matching the numerical information of the DWG format CAD file extracted from the information extracting unit 130 and the ASCII information of the memory unit 120 matches the ASCII information of the symbol displayed on the diagram according to the rules of the map diagram DWG format CAD file. This is to adjust the position of symbols and periods for the topographic map of the PostScript file format by using the numerical information of. In this case, the numerical information of the DWG format CAD file according to the present embodiment is set to various types of terrain information such as digitized terrain, features, and place names, but the present invention is not limited thereto.

또한, 출력부(150)는 변환부(140)를 통해 변환된 포스트스크립트 형식 파일 을 출력하는 기능을 수행한다. 이때, 인터페이스부(110)의 난외주기정보를 삽입 선택에 따라 삽입 또는 제외하여 출력한다. 도 3에 도시된 바와 같이, 포스트스크립트 형식 파일을 출력한다.In addition, the output unit 150 outputs the converted PostScript format file through the conversion unit 140. At this time, the extracorporeal period information of the interface unit 110 is inserted or excluded according to the insertion selection and output. As shown in Fig. 3, a PostScript format file is output.

그리고, 중앙제어부(160)는 인터페이스부(110), 메모리부(120), 정보추출부(130), 변환부(140) 및 출력부(150)를 중앙제어하는 기능을 수행한다.The central controller 160 performs a function of centrally controlling the interface unit 110, the memory unit 120, the information extracting unit 130, the converter 140, and the output unit 150.

한편, 상술한 구성으로 이루어진 지형도 제작 시스템을 이용한 방법(이하, '지형도 제작 방법')에 관한 전체적인 흐름을 도 3 내지 도 6을 참조하여 설명하면 다음과 같다.On the other hand, the overall flow of the method using the topographic map production system having the above-described configuration (hereinafter, 'topographical map production method') will be described with reference to FIGS.

도 4는 본 발명의 일실시예에 따른 지형도 제작 방법에 관한 전체흐름도이고, 도 5는 본 발명의 일실시예에 따른 지도도식규칙 규정에 따라 데이터베이스를 구축하는 단계에 대한 상세흐름도이다.FIG. 4 is a flowchart illustrating a method of manufacturing a topographic map according to an embodiment of the present invention, and FIG. 5 is a detailed flowchart of the step of constructing a database according to the rules of the schematic mapping according to an embodiment of the present invention.

본 발명의 일실시예에 따른 지형도 제작 방법에 관한 전체적인 흐름을 도 4을 참조하여 설명하면 다음과 같다.The overall flow of the method for manufacturing a topographical map according to an embodiment of the present invention will be described with reference to FIG. 4 as follows.

도 4에 도시된 바와 같이, 중앙제어부(160)는 인터페이스부(110)로부터 지도도식규칙 규정에 따라 도상에 표시되는 모든 기호 및 주기, 지형, 지물, 색상표현, 선의 두께 종류, 난외주기 형태 및 위치, 기호의 모양 및 형태를 메모리부(120)를 통해 데이터베이스로 구축한다(S2).As shown in FIG. 4, the central control unit 160 displays all symbols and periods, topography, features, color representations, thickness types of lines, ovoid period forms, and the like displayed from the interface unit 110 according to the rules of the map schematic rules. The position, the shape and the shape of the symbol is built into the database through the memory unit 120 (S2).

중앙제어부(160)는 인터페이스부(110)를 통해 사용자로부터 지형도를 제작할 DWG 도면 선택정보, 축적 선택정보, 지형도 또는 음영도 선택정보, 난외주기정보 삽입 선택정보 및 저장위치 선택정보를 수신한다(S4).The central control unit 160 receives DWG drawing selection information, accumulation selection information, topographical map or shadow level selection information, extracorporeal period information insertion selection information, and storage location selection information from the user through the interface unit 110 (S4). ).

중앙제어부(160)는 정보추출부(130)를 통해 DWG형식의 캐드파일로부터 지형, 지물, 지명 등의 각종 지형정보에 대한 수치정보 및 데이터베이스의 아스키 정보를 추출한다(S6).The central control unit 160 extracts the numerical information and the ASCII information of the database from the DWG format CAD file through the information extraction unit 130 for various terrain information such as terrain, features, and place names (S6).

중앙제어부(160)는 메모리부(120)에 구축된 데이터베이스의 아스키 정보와 제 S6 단계의 수치정보를 매칭시킨다(S8).The central controller 160 matches the ASCII information of the database constructed in the memory unit 120 with the numerical information of the step S6 (S8).

여기서, 제 S8 단계에서 수치정보를 메모리부(120)에 구축된 데이터베이스의 아스키 정보와 매칭시키는 것은 지도도식규칙 규정에 따라 도상에 표시되는 기호를 DWG형식 캐드파일의 수치정보를 이용하여, 포스트스크립트 파일 형식의 지형도에 대한 기호 및 주기 등의 위치를 조정하기 위함이다.Here, in step S8, matching the numerical information with the ASCII information of the database constructed in the memory unit 120 uses the PostScript format CAD file numerical information to display the symbols displayed on the map according to the rules of the mapping scheme. This is to adjust the position of symbols and periods for the topographic map of the file format.

중앙제어부(160)는 매칭시킨 아스키정보 및 수치정보를 변환부(140)를 통해 포스트스크립트 형식 파일로 변환시킨다(S10).The central control unit 160 converts the matched ASCII information and numerical information into a PostScript format file through the conversion unit 140 (S10).

중앙제어부(160)는 변환된 포스트스크립트 형식 파일을 출력부(150)를 통해 출력한다(S12).The central control unit 160 outputs the converted PostScript format file through the output unit 150 (S12).

다음으로, 본 발명의 일실시예에 따른 제 S2 단계인 지도도식규칙 규정에 따라 데이터베이스를 구축하는 단계에 대한 상세한 흐름을 도 5를 참조하여 설명하면 다음과 같다.Next, a detailed flow of the step of constructing the database according to the Schematic Rule rule, which is the second step S2 according to an embodiment of the present invention, will be described with reference to FIG. 5.

도 5에 도시된 바와 같이, 중앙제어부(160)는 사용자로부터 인터페이스부(110)를 통해 지도도식규칙 규정에 따라 도상에 표시되는 기호를 수신한다(S22).As shown in FIG. 5, the central control unit 160 receives a symbol displayed on the diagram according to the map rule rule from the user through the interface unit 110 (S22).

중앙제어부(160)는 제 S22 단계에서 수신한 지도도식규칙 규정에 따라 도상 에 표시되는 기호를 포스트스크립트 형식 파일로 변환한다(S24).The central control unit 160 converts the symbol displayed on the screen into a PostScript format file according to the map rule rule received in step S22 (S24).

중앙제어부(160)는 변환된 포스트스크립트 형식 파일의 아스키 정보를 데이터베이스로 구축한다(S26).The central control unit 160 builds ASCII information of the converted PostScript format file into a database (S26).

이상으로 본 발명의 기술적 사상을 예시하기 위한 바람직한 실시예와 관련하여 설명하고 도시하였지만, 본 발명은 이와 같이 도시되고 설명된 그대로의 구성 및 작용에만 국한되는 것이 아니며, 기술적 사상의 범주를 일탈함이 없이 본 발명에 대해 다수의 변경 및 수정이 가능함을 당업자들은 잘 이해할 수 있을 것이다. 따라서, 그러한 모든 적절한 변경 및 수정과 균등물들도 본 발명의 범위에 속하는 것으로 간주되어야 할 것이다.As described above and described with reference to a preferred embodiment for illustrating the technical idea of the present invention, the present invention is not limited to the configuration and operation as shown and described as described above, it is a deviation from the scope of the technical idea It will be understood by those skilled in the art that many modifications and variations can be made to the invention without departing from the scope of the invention. Accordingly, all such suitable changes and modifications and equivalents should be considered to be within the scope of the present invention.

상기와 같은 본 발명은, 지도도식규칙을 기반으로 지형, 지물, 지명 등의 각종 지형정보가 수치화된 DWG형식의 캐드파일을 자동으로 포스트스크립트 형식파일로 변환시키는 효과가 있다.As described above, the present invention has an effect of automatically converting a DWG format CAD file into which a variety of terrain information such as terrain, features, and place names are numerically converted into a PostScript format file based on a map schematic rule.

그리고, 지도 제작 기술의 향상, 지도 제작의 비용감소 및 지도사용자들에게 고품질의 지형도 공급이 가능한 효과가 있다.In addition, there is an effect of improving the cartography technology, reducing the cost of cartography and providing high quality topographic maps to the map users.

Claims (9)

지형도 제작 시스템에 있어서,In the topographic map production system, 사용자로부터 요구사항 및 DWG형식의 캐드파일을 수신하는 인터페이스부(110);An interface unit 110 for receiving a requirement and a CAD file in DWG format from a user; 지도도식규칙 규정에 따라 도상에 표시되는 기호를 포스트스크립트 형식 파일의 아스키 정보로 변환된 데이터베이스로 저장하는 메모리부(120);A memory unit 120 for storing the symbols displayed on the diagram according to the rules of the map schematic into a database converted into ASCII information of a PostScript format file; 상기 DWG형식 캐드파일의 수치정보를 추출하고, 메모리부의 아스키 정보를 추출하는 정보추출부(130);An information extraction unit 130 for extracting numerical information of the DWG format CAD file and extracting ASCII information of the memory unit; 상기 정보추출부로부터 추출된 수치정보 및 아스키 정보를 포스트스크립트(PostScript) 형식 파일로 변환시키는 변환부(140);A conversion unit 140 for converting the numerical information and the ASCII information extracted from the information extraction unit into a PostScript format file; 상기 변환부를 통해 변환된 포스트스크립트 형식 파일을 출력하는 출력부(150); 및An output unit 150 for outputting the converted PostScript format file through the conversion unit; And 상기 인터페이스부, 메모리부, 정보추출부, 변환부 및 출력부를 중앙제어하는 중앙제어부(160); 를 포함하는 것을 특징으로 하는 지형도 제작 시스템.A central controller 160 for centrally controlling the interface unit, the memory unit, the information extracting unit, the converting unit, and the output unit; Topographic map production system comprising a. 제 1 항에 있어서,The method of claim 1, 상기 인터페이스부(110)는,The interface unit 110, 지형도를 제작할 DWG 도면 선택정보, 축적 선택정보, 난외주기 삽입 선택정보 및 저장위치 선택정보를 수신하는 것을 특징으로 하는 지형도 제작 시스템.A topographical map production system comprising receiving DWG drawing selection information, accumulation selection information, extracorporeal period insertion selection information, and storage location selection information for producing a topographical map. 제 1 항에 있어서,The method of claim 1, 상기 지도도식규칙 규정에 따라 도상에 표시되는 기호는,Symbols displayed on the map according to the rules of the Map Schematic, 기호 및 주기, 지형, 지물, 색상표현, 선의 두께 종류, 난외주기 형태 및 위치, 기호의 모양 및 형태를 포함하는 것을 특징으로 하는 지형도 제작 시스템.A topographic map production system comprising a symbol and a cycle, a terrain, a feature, a color representation, a thickness type of a line, an eccentric cycle shape and a position, and a shape and a form of a symbol. 제 1 항에 있어서,The method of claim 1, 상기 수치정보는,The numerical information, DWG형식 캐드파일의 수치화된 지형, 지물, 지명의 지형정보를 포함하는 것을 특징으로 하는 지형도 제작 시스템.Topographic map production system, characterized in that containing the topographic information, digitized terrain, features, geographical names of the DWG format CAD file. 제 1 항에 있어서,The method of claim 1, 상기 변환부(140)는,The conversion unit 140, 상기 정보추출부(130)로부터 추출된 지형정보에 관한 DWG형식 캐드파일의 수치정보 및 상기 메모리부(120)에 구축된 데이터베이스의 아스키정보를 매칭시키고, 매칭시킨 수치정보 및 아스키정보를 포스트스크립트 형식 파일로 변환시키는 것을 특징으로 하는 지형도 제작 시스템. The numerical information of the DWG format CAD file related to the terrain information extracted from the information extraction unit 130 and the ASCII information of the database constructed in the memory unit 120 are matched, and the numerical value and the ASCII information matched with the PostScript format are matched. Topographic map production system, characterized in that for converting to a file. 지형도 제작 방법에 있어서,In the method of producing topographic maps, (a) 중앙제어부(160)가 인터페이스부(110)를 통해 DWG 도면 선택정보, 축적 선택정보, 난외주기정보 삽입 선택정보 및 저장위치 선택정보를 수신하는 단계;(a) the central controller 160 receiving the DWG drawing selection information, the accumulation selection information, the extracorporeal cycle information insertion selection information, and the storage location selection information through the interface unit 110; (b) 상기 중앙제어부가 정보추출부(130)를 통해 DWG형식 캐드파일의 지형정보에 대한 수치정보 및 데이터베이스의 아스키 정보를 추출하는 단계;(b) extracting, by the central control unit, numerical information about the topographical information of the DWG format CAD file and ASCII information of the database through the information extraction unit; (c) 상기 중앙제어부가 변환부(140)를 통해 상기 수치정보 및 상기 아스키 정보를 이용하여 포스트스크립트 형식 파일로 변환시키는 단계; 및(c) converting, by the central control unit, into a PostScript format file using the numerical information and the ASCII information through a conversion unit 140; And (d) 상기 중앙제어부가 출력부(150)를 통해 변환된 포스트스크립트 형식 파일을 출력하는 단계; 를 포함하는 것을 특징으로 하는 지형도 제작 방법.(d) outputting, by the central controller, the converted PostScript format file through the output unit 150; Topographic map production method comprising a. 제 6 항에 있어서,The method of claim 6, 상기 제 (c) 단계는,In step (c), (c-1) 상기 중앙제어부(160)가 상기 수치정보 및 메모리부(120)에 구축된 데이터베이스의 아스키 정보를 매칭시키는 단계; 및(c-1) the central controller 160 matching the numerical information with the ASCII information of the database constructed in the memory unit 120; And (c-2) 상기 중앙제어부가 변환부(140)를 통해 매칭시킨 수치정보 및 아스키 정보를 포스트스크립트 형식 파일로 변환시키는 단계; 를 포함하는 것을 특징으로 하는 지형도 제작 방법.(c-2) converting the numerical information and the ASCII information matched by the central control unit through the conversion unit 140 into a PostScript format file; Topographic map production method comprising a. 제 6 항에 있어서,The method of claim 6, 상기 제 (a) 단계 이전에,Before step (a), (e) 상기 중앙제어부(160)가 인터페이스부(110)를 통해 수신한 지도도식규칙 규정에 따라 도상에 표시되는 기호를 메모리부(120)를 통해 데이터베이스로 구축하는 단계; 를 더 포함하는 것을 특징으로 하는 지형도 제작 방법.(e) constructing, by the central control unit 160, a symbol displayed on the diagram as a database through the memory unit 120 according to the map rule rule received through the interface unit 110; Topographic map production method characterized in that it further comprises. 삭제delete
KR1020070044146A 2007-05-07 2007-05-07 System for producing the topographic map and method therefor KR100792674B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070044146A KR100792674B1 (en) 2007-05-07 2007-05-07 System for producing the topographic map and method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070044146A KR100792674B1 (en) 2007-05-07 2007-05-07 System for producing the topographic map and method therefor

Publications (1)

Publication Number Publication Date
KR100792674B1 true KR100792674B1 (en) 2008-01-09

Family

ID=39217097

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070044146A KR100792674B1 (en) 2007-05-07 2007-05-07 System for producing the topographic map and method therefor

Country Status (1)

Country Link
KR (1) KR100792674B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100896712B1 (en) 2008-11-24 2009-05-11 삼아항업(주) System for producing digital elevation model and digital terrain model using numerical map and method therefor
KR20210075506A (en) * 2019-12-13 2021-06-23 김홍래 Electronic map based dataset linked web page production system
CN113792241A (en) * 2021-09-26 2021-12-14 上海数慧系统技术有限公司 Method and related device for overlaying and browsing DWG (discrete wavelet packet) file on Web map

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04278981A (en) * 1991-02-07 1992-10-05 Mitsubishi Electric Corp Method and device for map display
JP2003066161A (en) 2001-08-21 2003-03-05 Foundation Of River & Basin Integrated Communications Japan Generation system for drainage area information
KR100495869B1 (en) * 2004-11-30 2005-06-17 공간정보기술 주식회사 System for automatically editing and reducing numerical map
KR20050094780A (en) * 2005-09-05 2005-09-28 (주)인하지아이에스 Method for manufacturing informality present state using air photograph
KR100570089B1 (en) * 2006-01-18 2006-04-12 새한항업(주) System for manufacturing the topography using the digital map and method therefor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04278981A (en) * 1991-02-07 1992-10-05 Mitsubishi Electric Corp Method and device for map display
JP2003066161A (en) 2001-08-21 2003-03-05 Foundation Of River & Basin Integrated Communications Japan Generation system for drainage area information
KR100495869B1 (en) * 2004-11-30 2005-06-17 공간정보기술 주식회사 System for automatically editing and reducing numerical map
KR20050094780A (en) * 2005-09-05 2005-09-28 (주)인하지아이에스 Method for manufacturing informality present state using air photograph
KR100570089B1 (en) * 2006-01-18 2006-04-12 새한항업(주) System for manufacturing the topography using the digital map and method therefor

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100896712B1 (en) 2008-11-24 2009-05-11 삼아항업(주) System for producing digital elevation model and digital terrain model using numerical map and method therefor
KR20210075506A (en) * 2019-12-13 2021-06-23 김홍래 Electronic map based dataset linked web page production system
KR102361405B1 (en) * 2019-12-13 2022-02-10 김홍래 Electronic map based dataset linked web page production system
CN113792241A (en) * 2021-09-26 2021-12-14 上海数慧系统技术有限公司 Method and related device for overlaying and browsing DWG (discrete wavelet packet) file on Web map

Similar Documents

Publication Publication Date Title
Stoter et al. Fully automated generalization of a 1: 50k map from 1: 10k data
CN103136371A (en) Subdivision identification generation method and data search method of multi-source space data
Tucci et al. Using spatial analysis and geovisualization to reveal urban changes: Milan, Italy, 1737–2005
KR100792674B1 (en) System for producing the topographic map and method therefor
CN102760160A (en) System for downsizing multi-scale geographic map in spatial information database
CN108491427A (en) PDF tile maps and production method
Tversky Cognitive principles of graphic displays
Medyńska-Gulij Map compiling, map reading, and cartographic design in" Pragmatic pyramid of thematic mapping"
CN112687007B (en) Stereoscopic grid chart generation method based on LOD technology
CN112991490A (en) Informatization chart production method and system
KR20010037981A (en) Method for converting map data to data for object_related geographic information system
KR20010044367A (en) Method for conversion from DXF file to GEOMania Data File
Bitelli et al. Digital processing and 3D modelling of an 18th century scenographic map of Bologna
KR100570089B1 (en) System for manufacturing the topography using the digital map and method therefor
KR100408969B1 (en) Method for conversion from GEOMania Data File to DXF file
JP2010060786A (en) Computer system for displaying location information on map, and map and coordinate using the same
KR20070070101A (en) A contour input device and method thereof
KR100980282B1 (en) Method for automatically manufacturing a raster map using a restoration illustrating technique, and a computer-readable media writing a program to implement the same method
Hardy et al. Mapping with Live Features-Object-Oriented Representation
Andrade Arnaut et al. A Geospatial and Geo-historical Library for a Space–Time Analysis of Catu Territory
WO2022172971A1 (en) Thematic drawing creation device, and thematic drawing creation method
JP5094659B2 (en) Region name extraction method and apparatus for extracting region name representing region
Tucci For an urban history of Milan, Italy: The role of GIScience
CN117931920A (en) Electronic chart data conversion method, system, equipment and storage medium
Fitzsimons et al. The changing look of maps within geography journals

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130102

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140102

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20141203

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20161222

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20180207

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20190114

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20191224

Year of fee payment: 13