KR100791456B1 - The both end-spring environmental timber retaining wall supporting by prestress cab beam and soil timber nailing, and the construction method of this - Google Patents

The both end-spring environmental timber retaining wall supporting by prestress cab beam and soil timber nailing, and the construction method of this Download PDF

Info

Publication number
KR100791456B1
KR100791456B1 KR1020060047478A KR20060047478A KR100791456B1 KR 100791456 B1 KR100791456 B1 KR 100791456B1 KR 1020060047478 A KR1020060047478 A KR 1020060047478A KR 20060047478 A KR20060047478 A KR 20060047478A KR 100791456 B1 KR100791456 B1 KR 100791456B1
Authority
KR
South Korea
Prior art keywords
timber
cable
retaining wall
vertical
pile
Prior art date
Application number
KR1020060047478A
Other languages
Korean (ko)
Inventor
홍석희
Original Assignee
홍석희
동부엔지니어링 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 홍석희, 동부엔지니어링 주식회사 filed Critical 홍석희
Priority to KR1020060047478A priority Critical patent/KR100791456B1/en
Application granted granted Critical
Publication of KR100791456B1 publication Critical patent/KR100791456B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0241Retaining or protecting walls comprising retention means in the backfill the retention means being reinforced earth elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0071Wood

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A two-end support environmental timber retaining wall and a construction method of a two-end support environmental timber retaining wall are provided to increase the height of a retaining wall using a prestressed cam beam and a soil timber nailing. A two-end support environmental timber retaining wall(W) supported by a soil timber nailing includes a vertical timber pile(10) installed on two ends in the appointed width and formed by driving vertical timber in the earth, a horizontal timber panel(20) formed by piling up timber between two ends of the vertical timber pile, and a soil timber nailing(30) fixed to the horizontal timber panel at the appointed height and penetrated to the backside of back-filling part, and a construction method of a two-end support environmental timber retaining wall supported by a soil timber nailing comprises the steps of: forming a vertical timber pile by driving vertical timber in the earth at regular intervals; forming a horizontal timber panel by installing timber to the vertical timber pile horizontally; supporting the retaining wall with a soil timber nailing by fixing timber to the horizontal timber panel at the appointed height; and back-filling on the backside and vegetating on the top of each step. A two-end support environmental timber retaining wall supported by a prestressed cam beam includes a vertical timber pile placed vertically and provided with a PS cable holding groove, a PS cable connecting anchorage device formed by placing a soil nailing fixing a ground anchor unit of a PS cable on two ends of the vertical timber pile, a sheath duct fixed across the inside of a PS cable holding groove and a PS cable soil-nailed in the sheath duct on the whole section of the vertical timber pile, tensing the PS cable using a tensioning jack and coupling with an anchorage, a prestressed cam beam applying prestress to the PS cable and a PS cable protecting cap installed to the surface of the PS cable to protect the PS cable, and a construction method of a two-end support environmental timber retaining wall supported by a prestressed cam beam comprises the steps of: forming a vertical timber pile by driving vertical timber in a line at regular intervals; forming a PS cable connecting anchorage device by forming a soil nailing fixing a ground anchor unit of a PS cable on two ends of the vertical timber pile, placing a sheath duct across the inside of a PS cable holding groove, extending and placing the PS cable soil-nailed in the sheath duct, tensing the PS cable using a tensioning jack and coupling with an anchorage; and installing a prestressed cam beam for prestressing the PS cable and a PS cable protecting cap for protecting the PS cable on the surface of the PS cable.

Description

양단지지 환경 목재옹벽 및 이의 시공방법{The both end-spring environmental timber retaining wall supporting by prestress cab beam and soil timber nailing, and the construction method of this}The both end-spring environmental timber retaining wall supporting by prestress cab beam and soil timber nailing, and the construction method of this}

도 1은 종래의 목재를 이용하여 흙막이용 벽으로 사용한 것을 도시한 단면도,1 is a cross-sectional view showing the use of a conventional wall using a timber,

도 2는 본 발명에 따른 수직목재 말뚝과 수평목재패널 및 쏘일 팀버 네일링을 이용한 양단지지 환경 목재옹벽을 도시한 사시도,Figure 2 is a perspective view showing both ends of the environment wood retaining wall using a vertical timber pile and horizontal wood panel and the saw timber nailing according to the present invention,

도 3은 본 발명에 따른 수직목재 말뚝과 수평목재패널 및 쏘일 팀버 네일링을 이용한 양단지지 환경 목재옹벽을 도시한 정면도,Figure 3 is a front view showing a two-sided support environment wood retaining wall using a vertical timber pile and a horizontal wood panel and the saw timber nailing according to the present invention,

도 4는 본 발명에 따른 수직목재 말뚝과 수평목재패널 및 쏘일 팀버 네일링을 이용한 양단지지 환경 목재옹벽을 도시한 단면도,Figure 4 is a cross-sectional view showing an environmental timber retaining wall for both ends using the vertical timber pile and the horizontal timber panel and the saw timber nailing according to the present invention,

도 5는 본 발명에 따른 수직목재 말뚝과 수평목재패널 및 쏘일 팀버 네일링을 이용한 양단지지 환경 목재옹벽의 시공상태를 도시한 측면도,Figure 5 is a side view showing the construction state of both ends support environment wood retaining wall using the vertical timber pile and horizontal wood panel and the saw timber nailing according to the present invention,

도 6은 본 발명에 따른 프리스트레스 캠빔을 이용한 양단지지 환경 목재옹벽을 도시한 사시도,Figure 6 is a perspective view showing a two-sided support environment wood retaining wall using a prestressed cam beam according to the present invention,

도 7은 본 발명에 따른 프리스트레스 캠빔을 이용한 양단지지 환경 목재옹벽 을 도시한 단면도,7 is a cross-sectional view showing a two-sided support environment wood retaining wall using a prestressed cam beam according to the present invention;

도 8은 본 발명에 따른 양단지지 환경 목재옹벽의 시공상태를 도시한 측면도,8 is a side view showing a construction state of both ends of the support environment wooden retaining wall according to the invention,

도 9는 본 발명에 따른 프리스트레스 캠빔을 구성하기 위해 PS케이블을 수직목재말뚝 사이에서 긴장 정착 연결하는 상태를 도시한 예시도 1,9 is an exemplary view illustrating a state in which the PS cable is tension-tightly connected between vertical wood piles to form a prestressed cam beam according to the present invention.

도 10은 본 발명에 따른 프리스트레스 캠빔을 구성하기 위해 PS케이블을 수직목재말뚝 사이에서 긴장 정착 연결하는 상태를 도시한 예시도 2,10 is an exemplary view illustrating a state in which the PS cable is tensioned and connected between vertical wood piles to form a prestressed cam beam according to the present invention.

도 11은 본 발명에 따른 양단지지 환경 목재옹벽의 쏘일 네일링 거치상태를 도시한 단면도,11 is a cross-sectional view showing the nail nailing state of the both ends of the support environment wooden retaining wall according to the present invention,

도 12는 도 11의 정착부를 상세히 도시한 단면도,12 is a cross-sectional view showing in detail the fixing unit of FIG.

도 13은 도 11의 쏘일 팀버 네일링의 지압마찰력을 상승시키기 위하여 설치하는 마찰지압 쐐기나이프를 펼치기 전 상태를 도시한 예시도,FIG. 13 is an exemplary view showing a state before the friction acupressure wedge knife is installed to increase the acupressure friction force of the saw timber nailing of FIG. 11;

도 14는 도 11의 쏘일 팀버 네일링의 지압마찰력을 상승시키기 위하여 설치하는 마찰지압 쐐기나이프를 펼친 상태를 도시한 예시도,14 is an exemplary view showing a state in which the friction acupressure wedge knife installed to increase the acupressure friction force of the saw timber nailing of FIG. 11 is unfolded;

도 15는 본 발명에 따른 양단지지 환경 목재옹벽중 수직목재말뚝 상단에 수평캠빔목재로 지지된 환경 목재옹벽을 도시한 정면도,Figure 15 is a front view showing an environmental wood retaining wall supported by a horizontal cam beam wood on the top of the vertical timber pile of both end support environmental wood retaining wall according to the present invention,

도 16은 본 발명에 따른 양단지지 환경 목재옹벽중 수직목재말뚝 상단에 수평캠빔목재로 지지된 환경 목재옹벽을 도시한 단면도,16 is a cross-sectional view showing an environmental wood retaining wall supported by a horizontal cam beam wood on the top of the vertical timber pile of the both ends of the environmental wood retaining wall according to the present invention;

도 17은 본 발명에 따른 쏘일 팀버 네일링을 목재로 사용한 경우를 도시한 단면도.17 is a cross-sectional view showing the case of using the timber timber nailing according to the present invention.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10: 수직목재말뚝 12: 기초콘크리트10: vertical wood pile 12: foundation concrete

20: 수평목재패널 22: 수평캠빔목재20: horizontal wood panel 22: horizontal cam beam wood

30: 쏘일 팀버 네일링 32: 타이백30: Soil Timber Nailing 32: Tieback

34: PS케이블 36: 뒷채움34: PS cable 36: backfill

38: 그라우팅 40: 어스앵커 정착장치38: grouting 40: earth anchor fixing device

42: 정착용 브라켓 44: 정착콘42: fixing bracket 44: fixing cone

46: 굴곡용 강관 48: 정착용 지압부재46: bending steel pipe 48: anchoring member for fixing

49: 정착용 볼트, 너트 50: PS케이블 연결정착장치49: fixing bolt, nut 50: PS cable connection fixing device

54: 정착구 55: 정착클램프54: fixing unit 55: fixing clamp

56: 정착연결 보호캡 57: 인장 장비용 잭56: fixing connection protective cap 57: jack for tension equipment

58: 압축링 59: 정착 루프강선58: compression ring 59: fixing loop steel wire

60: 프리스트레스 캠빔 62: PS케이블 거치홈60: prestressed cam beam 62: PS cable mounting groove

64: PS케이블 보호용캡 66: 쉬이스 덕트64: PS cable protective cap 66: sheath duct

72: 지압력 74: 마찰력72: bearing pressure 74: friction

76: 인발력 80: 식재76: attractiveness 80: food

82: 마찰지압 강화용 쐐기나이프 82: Wedge Knife for Friction Strengthening

84: 그라우트튜브 및 마찰쐐기 나이프 인장선84: grout tube and friction wedge knife tension line

86: 천공홀 W: 양단지지 환경 목재옹벽86: perforation hole W: end support environment wooden retaining wall

본 발명은 프리스트레스 캠빔과 쏘일 팀버 네일링을 이용하여 옹벽높이를 대폭 상승시키는 양단지지 환경 목재옹벽 및 이의 시공방법에 관한 것으로, 일정높이(약 3.0m)까지는 수직목재를 일정간격마다 설치한 후, 그에 수평방향으로 지지시키는 수평목재를 설치하여 사면을 보호하고, 옹벽의 안정을 추구하기 위하여 일정 간격마다 쏘일 팀버 네일링을 뒷채움 배면의 지중에 설치하여, 옹벽이 토압에 의해 활동되는 힘에 대해 쏘일 팀버 네일링의 마찰력에 의해 저항하도록 한 쏘일 팀버 네일링을 이용한 양단지지 환경 목재옹벽을 구축하는 방법과 상기 목재옹벽 적용높이 이상의 경우는 수직목재 말뚝 하부는 지중에 근입시키고, 그 상단에는 프리스트레스가 도입된 PS케이블을 지지시켜 프리스트레스 캠빔을 구성함으로써 양단이 스프링으로 지지되는 구조 시스템으로 대폭 개선하여 그 적용높이를 더욱 상승시키는 프리스트레스 캠빔을 이용한 양단지지 환경 목재옹벽 및 이의 시공방법에 관한 것이다.The present invention relates to a two-sided support environment wood retaining wall and a construction method thereof that significantly increases the retaining wall height by using prestressed cam beams and saw timber nailing, and after installing vertical timber at regular intervals up to a predetermined height (about 3.0 m), To protect the slope by installing horizontal timber supporting it in the horizontal direction, the timber nailing is installed in the ground of the back filling to be stabilized at regular intervals in order to pursue the stability of the retaining wall, so that the retaining wall is shot against the force acting by earth pressure A method of constructing a double-sided support environment wood retaining wall using a timber nailing that is resisted by the frictional force of timber nailing. Both ends are supported by spring by supporting pre-stressed cam cable The significant improvement in the structural system relates to both ends of the supporting environment timber retaining walls and methods for their construction using the prestressing kaembim to further increase the height of its application.

일반적으로 옹벽은 절성토 지반의 도로, 철도, 단지, 하천 등을 조성하는데 있어, 용지제한, 사면안정, 토공량 축소, 환경피해를 최소화하기 위해서 일정한 절성토면에 흙막이용 및 사면보호용으로 축조하는 구조물이다.In general, retaining walls are used to construct roads, railroads, complexes, and rivers in cut soil, and to construct soils and protect slopes on a certain cut surface to minimize site limitations, slope stability, earthwork reduction, and environmental damage. to be.

여기서, 상기한 종래의 옹벽으로는 철근콘크리트 옹벽, 보강토 옹벽, 쏘일철근네일링 및 쇼크리트 보강한 옹벽, 콘크리트 블록식 옹벽 등이 있다.Here, the conventional retaining wall includes a reinforced concrete retaining wall, a reinforcement earth retaining wall, a reinforced steel nailing and a retaining wall reinforced with concrete, a concrete block retaining wall, and the like.

상기한 대부분의 옹벽이 철근콘크리트 성형, 무기재료 블록으로 축조 및 지반강화용으로 쏘일네일링 및 쇼크리트 등에 의해 시공하므로 공사비용 증가, 공기증가, 환경피해, 자연지형과 부조화, 환경 복원성 결여, 미관저해, 색상의 퇴색화, 우수시 퇴적 및 환경오염, 자연생태계가 파괴되는 문제점이 있다.Most of the retaining walls mentioned above are constructed by reinforced concrete molding and inorganic material blocks for construction and soil reinforcement, so as to increase construction cost, increase air, environmental damage, natural topography and incongruity, lack of environmental resilience, and aesthetics. Inhibition, color fading, rain and sedimentation and environmental pollution, there is a problem that the natural ecosystem is destroyed.

또한, 보강토 등으로 옹벽을 구축할 경우에는 식물의 식재가 곤란한 문제와, 옹벽의 전면에 블록을 쌓고 그 배면에 일정 높이마다 활동방지용 지오그리드 설치와 뒷채움 다짐 시공하는 공법으로 자연지형과 절연하고, 환경복원성과 연약지반에 적용하기가 곤란한 문제점이 있다.In addition, when building the retaining wall with reinforcement soil, etc., it is difficult to plant the plant, and by laying blocks on the front of the retaining wall and installing geogrids to prevent backfilling and backfilling at certain heights, it is insulated from the natural topography and the environment. There is a problem that is difficult to apply to the stability and soft ground.

그리고, 상기한 바와 같은 제반 문제점 외에 최근에는 사람들이 보다 질 높은 생활의 일환으로 청계천 복원과 같은 보다 인공미가 덜한 자연적이고 환경친화적인 구조물을 선호하는 욕구가 증가하고 있는 추세이다. In addition to the problems described above, in recent years, as part of a higher quality of life, there is an increasing demand for people to prefer natural and environmentally friendly structures with less artificial beauty, such as restoration of Cheonggyecheon.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로써, 일정높이(약 3.0m)까지는 수직목재를 일정간격마다 설치한 후, 그에 수평방향으로 지지시키는 수평목재를 가로 설치하여 사면을 보호하고, 옹벽의 안정을 추구하기 위하여 일정 간격마다 쏘일 팀버 네일링을 뒷채움 배면의 지중에 설치하여, 옹벽이 토압에 의해 활동되는 힘에 대해 쏘일 팀버 네일링의 마찰력에 의해 저항하도록 한 쏘일 팀버 네일링을 이용한 양단지지 환경 목재옹벽을 구축하는 방법과 상기 목재옹벽 적용높이 이상의 경우는 수직목재 말뚝 하부는 지중에 근입시키고, 그 상단에는 프리스트레스가 도입된 PS케이블을 지지시켜 프리스트레스 캠빔을 구성함으로써 양단이 스프링으로 지지되는 구조 시스템으로 대폭 개선하여 그 적용높이를 더욱 상승시키도록 한 양단지지 환경 목재옹벽 및 이의 시공방법을 제공하는데 그 목적이 있다.Therefore, the present invention has been devised to solve the problems described above, by installing a vertical timber at a predetermined interval up to a certain height (about 3.0m), and then horizontally install a horizontal timber to support it horizontally To protect the slope and to stabilize the retaining wall, the timber nailing which is to be shot at regular intervals is installed in the back ground, so that the retaining wall is resisted by the friction force of the timber nailing to be fired against the force acting by earth pressure. The method of constructing the timber retaining wall in both ends using timber nailing, and in the case of the height above the timber retaining wall, the lower part of the vertical timber pile is placed in the ground, and the prestress cam beam is constructed by supporting the PS cable introduced with the prestress on the upper part. It is a structural system with both ends supported by a spring, which greatly improves its application height. The object of the present invention is to provide a wooden support wall for both ends and a construction method thereof.

상기한 목적을 달성하기 위한 본 발명에 따른 양단지지 환경 목재옹벽 및 이의 시공방법은 절성토 사면의 흙막이 높이가 일정한 높이 이하인 경우에는 수직목재를 일정간격마다 설치한 후, 그에 수평방향으로 지지시키는 수평목재를 가로 설치하여 사면을 보호하고, 옹벽의 안정을 추구하기 위하여 일정 간격마다 쏘일 팀버 네일링을 뒷채움 배면의 지중에 설치하여, 옹벽이 토압에 의해 활동되는 힘에 대해 쏘일 팀버 네일링의 마찰력에 의해 저항하도록 한 쏘일 팀버 네일링을 이용한 양단지지 환경 목재옹벽을 구축하는 방법으로 하고, 일정한 높이 이상인 경우에는 구조계산서에서 요구되는 만큼 수직목재의 말뚝 하부를 지중에 근입시키고, 상단에는 캠빔 수평목재로 지지하거나 토압에 의한 활동 수평력이 클 경우는 프리스트레스가 도입된 PS케이블을 설치하여 자립식 목재옹벽이 양단 경계조건을 갖도록 하는 바, 즉 하부는 지반지지 탄성계수 경계조건으로 지지하고, 상부는 프리스트레스 캠빔의 강성 탄성계수와 PS케이블에 프리스트레스힘이 작용하는 경계조건을 갖추도록 한 기술이다.Both ends support environmental wood retaining wall and its construction method according to the present invention for achieving the above object, if the soil wall height of the cut soil is less than a certain height, after installing the vertical timber at regular intervals, horizontally supporting it In order to protect the slope by installing wood horizontally and to stabilize the retaining wall, the timber nailing that is to be fired at regular intervals is installed in the back ground, so that the retaining wall can be fired against the friction force It is a method of constructing both retaining environment wood retaining walls using the soil timber nailing, which is made to resist.In case of more than a certain height, the lower part of the vertical timber is entered into the ground as required by the structural statement, and the cam beam horizontal wood is applied to the top. PS-K with prestress introduced when support or earth pressure is large To install the self-supporting wood retaining wall at both ends, i.e., the lower part is supported by the ground support elastic modulus boundary condition, and the upper part is connected to the rigid elastic modulus of the prestressed cam beam and the boundary condition where the prestressing force acts on the PS cable. It is a technique to equip.

이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.

도 2는 본 발명에 따른 수직목재 말뚝과 수평목재패널 및 쏘일 팀버 네일링을 이용한 양단지지 환경 목재옹벽을 도시한 사시도이며, 도 3은 본 발명에 따른 수직목재 말뚝과 수평목재패널 및 쏘일 팀버 네일링을 이용한 양단지지 환경 목재옹벽을 도시한 정면도이며, 도 4는 본 발명에 따른 수직목재 말뚝과 수평목재패널 및 쏘일 팀버 네일링을 이용한 양단지지 환경 목재옹벽을 도시한 단면도이며, 도 5는 본 발명에 따른 수직목재 말뚝과 수평목재패널 및 쏘일 팀버 네일링을 이용한 양단지지 환경 목재옹벽의 시공상태를 도시한 측면도이다.Figure 2 is a perspective view showing a vertical timber pile and horizontal timber panel and both ends support environmental timber retaining wall using a saw timber nailing according to the present invention, Figure 3 is a vertical timber pile and a horizontal timber panel and a saw timber nail according to the present invention Fig. 4 is a cross-sectional view showing a double-sided support environmental wooden retaining wall using a ring, and Fig. 4 is a cross-sectional view of a double-sided support environmental wooden retaining wall using a vertical timber pile and a horizontal wood panel and a saw timber nailing according to the present invention. Figure 2 is a side view showing the construction state of the two-sided support environment wood retaining wall using a vertical timber pile, a horizontal timber panel and a saw timber nailing according to the invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 양단지지 환경 목재옹벽(W)중 쏘일 팀버 네일링(30)으로 지지하는 양단지지 환경 목재옹벽(W)은 양단부간에 일정한 폭을 두고, 수직목재가 지반에 타입되어 이루어진 수직목재말뚝(10)과; 상기 수직목재말뚝(10)의 양단부 간의 배면을 가로질러서 목재가 적층되어 이루어진 수평목재패널(20)과; 상기 수평목재패널(20)의 일정높이별로 상하간에 목재의 일측면이 고정되고, 타측면은 뒷채움(36) 배면에 근입되는 쏘일 팀버 네일링(30)으로 지지되고, 그 배면에 뒷채움(36)을 실시하고, 각 단의 상부에 식재(80)를 조성한 구조이다.As shown in these figures, of both end support environmental wood retaining wall (W) according to the present invention, both end support environmental wood retaining wall (W) supported by the saw timber nailing 30 has a constant width between both ends, and vertical wood is A vertical wood pile 10 formed on the ground; A horizontal wood panel 20 formed by stacking wood across the back surface between both ends of the vertical wood pile 10; One side of the wood is fixed up and down by a predetermined height of the horizontal timber panel 20, the other side is supported by the saw timber nailing (30) to be joined to the back fill 36, the back fill (36) It is a structure which provided the planting material 80 in the upper part of each step.

여기서, 상기 목재옹벽(W)을 구축하기 위한 목재는 원목, 폐목, 가공목, 반원목, 아무 톱밥과 플라스틱류 화합물의 조성 목재 중 어느 하나로 구성되며, 상기한 목재는 내구성을 확보하여 곰팡이나 벌레가 서식하지 못하도록 구리, 비소, 크롬, 타날리스(tanalith), CuAz (구리, 붕산, 테부코나졸(Tebuconazole))의 화합물의 수용액으로 목재에 도포, 침전 또는 가압하여 내구성, 방식성 및 방충성 목재로 이루어진 구조이다.Here, the wood for building the wood retaining wall (W) is composed of any one of wood, waste wood, processed wood, semi-solid wood, the composition wood of any sawdust and plastic compounds, the wood is to ensure durability and mold or insects Durable, anticorrosive and insect repellent woods by coating, precipitating or pressing wood with aqueous solutions of compounds of copper, arsenic, chromium, tanalith and CuAz (copper, boric acid and Tebuconazole) It consists of a structure.

상기한 바와 같은 구성으로 이루어진 양단지지 환경 목재옹벽(W)중 쏘일팀버네일링(30)으로 지지하는 양단지지 환경목재옹벽(W)의 시공은 수직목재를 일정한 간격마다 지중에 근입시켜 수직목재말뚝(10)을 형성하는 단계; 상기 수직목재말뚝(10)에 수평방향으로 가로질러 목재를 설치하여 수평목재패널(20)을 형성하는 단계; 상기 수평목재패널(20)의 일정높이별로 상하간에 목재를 고정 설치하여 쏘일 팀버 네일링(30)으로 지지하는 단계; 그 배면에 뒷채움(36)을 실시하고, 각 단의 상부에 식재(80)를 조성하는 단계를 순차적으로 시행하여 목재옹벽(W)을 시공함을 특징으로 한다.Construction of both ends of the environmental timber retaining wall (W) supported by the saw timber nailing 30 of the two end supporting environmental wood retaining wall (W) having the configuration as described above is vertical wood pile into the ground at regular intervals Forming (10); Forming a horizontal wood panel 20 by installing wood across the vertical wood pile in a horizontal direction; Fixing timber between the top and bottom by a predetermined height of the horizontal wood panel 20 to support the saw timber nailing 30; The back filling 36 is carried out on the back, and the step of forming the planting 80 on the upper end of each step is characterized in that the construction of the wood retaining wall (W).

즉, 본 발명에 따른 양단지지 환경 목재옹벽(W) 중 쏘일 팀버 네일링(30)으로 지지하는 양단지지 환경 목재옹벽(W)은 원목, 폐목, 반원목, 가공목 등의 목재를 조립하여 이루어진 구조로, That is, both ends of the support environment wood retaining wall (W) of the both ends support environment wood retaining wall (W) according to the present invention, both ends support environment wood retaining wall (W) is made by assembling wood, such as solid wood, waste wood, semi-solid wood, processed wood With structure,

절성토 높이가 어느 정도 이상이면 수직목재말뚝(10)으로만 옹벽(W)으로서 자립이 곤란할 것으로 예상되는바, 다소 높은 절성토의 경우에는 적정간격으로 수직목재를 타입하여 수직목재말뚝(10)을 형성하고, 상기 수직목재말뚝(10)에 수평방향으로 목재를 적층시키면서 적정간격마다 쏘일 팀버 네일링(30)를 고정하고, 상기 쏘일 팀버 네일링(30)를 뒷채움(36)의 배면에 근입시켜서 이 쏘일 팀버 네일링(30)상에 마찰력에 의한 토압에 의한 활동 수평력을 제어하는 것을 특징으로 한다. If the height of the cut soil is more than a certain degree, it is expected that it will be difficult to stand as a retaining wall (W) only by the vertical wood pile (10). In the case of a rather high cut soil, the vertical wood pile (10) by vertical wood type at an appropriate interval Forming, fixing the timber nailing 30 to be fired at appropriate intervals while stacking the wood in the horizontal direction on the vertical wood pile 10, the saw timber nailing 30 is indented to the back of the back filling 36 It is characterized by controlling the horizontal force of the action by the earth pressure caused by the friction force on the saw timber nailing (30).

도 6은 본 발명에 따른 프리스트레스 캠빔을 이용한 양단지지 환경 목재옹벽을 도시한 사시도이며, 도 7은 본 발명에 따른 프리스트레스 캠빔을 이용한 양단지지 환경 목재옹벽을 도시한 단면도이며, 도 8은 본 발명에 따른 양단지지 환경 목재옹벽의 시공상태를 도시한 측면도이며, 도 9는 본 발명에 따른 프리스트레스 캠빔을 구성하기 위해 PS케이블을 수직목재말뚝 사이에서 긴장 정착 연결하는 상태를 도시한 예시도 1이며, 도 10은 본 발명에 따른 프리스트레스 캠빔을 구성하기 위해 PS케이블을 수직목재말뚝 사이에서 긴장 정착 연결하는 상태를 도시한 예시도 2이다.Figure 6 is a perspective view showing a two-sided support environment wood retaining wall using a prestressed cam beam according to the present invention, Figure 7 is a cross-sectional view showing a two-sided support environment wood retaining wall using a prestressed cam beam according to the present invention, Figure 8 is Figure 9 is a side view showing the construction state of the two-sided support environment wood retaining wall, Figure 9 is an exemplary view showing a state in which the PS cable is tension-fixed connection between the vertical timber pile to constitute a prestressed cam beam according to the present invention, Figure FIG. 10 is an exemplary view illustrating a state in which the PS cable is tension-tightly connected between vertical wood piles to form a prestressed cam beam according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 양단지지 환경 목재옹벽(W)중 프리스트레스 캠빔(60)으로 지지된 양단지지 환경 목재옹벽(W)은 절성토 높이가 높은 경우에 적용할 수 있는 공법으로 수직목재말뚝(10)을 일렬로 수직으로 배치되며, 상기 수직목재말뚝(10) 상단에 PS케이블 거치홈(62)이 형성된 수직목재말뚝(10)과; 일정구간의 수직목재말뚝(10)의 양단에 PS케이블(34)의 지반정착부를 그라우팅(38)으로 고정한 쏘일네일링과, 상기 PS케이블 거치홈(62)내를 가로질러 고정 설치되는 쉬이스덕트(66)와, 상기 쉬이스덕트(66)내에 상기 쏘일 네일링 된 PS케이블(34)을 연장, 일정구간별 수직목재말뚝(10) 전구간을 횡단 배치하고, 그 중앙에서 PS케이블(34)의 일측과 타측을 상호 인장 장비용 잭(57)을 이용하여 긴장하여 프리스트레스가 도입되도록 정착구(54)로 강결시켜 PS케이블 연결 정착장치(50)를 구성하거나,
PS케이블(34)의 일측과 타측의 단부에 압축링(58)이 설치된 상태에서 정착클램프(55)와 정착 루프강선(59)이 설치되어 상호 긴장하여 체결 연결하여 프리스트레스가 도입되도록 강결하여 PS케이블연결정착장치(50)를 형성함으로써,
PS케이블(34)에 프리스트레스가 도입되도록 한 프리스트레스캠빔(60)과, 상기 PS케이블(34)을 보호해주도록 PS케이블(34)의 표면에 설치되는 PS케이블보호용캡(64)로 이루어진다.
As shown in these figures, the two-sided support environment wood retaining wall (W) supported by the prestressed cam beam 60 of the two-end support environment wood retaining wall (W) according to the present invention can be applied to the case of high cut soil height Vertical wood piles 10 are arranged vertically in a row, and vertical wood piles 10 having PS cable mounting grooves 62 formed on top of the vertical wood piles 10; Soil nailing fixing the ground fixing part of the PS cable 34 by the grouting 38 at both ends of the vertical wood pile 10 in a predetermined section, and a sheath duct fixedly installed across the PS cable mounting groove 62. (66) and the sawed nailed PS cable (34) in the sheath duct (66), extending across the entire section of vertical timber piles (10), and at the center of the PS cable (34) One side and the other side are tensioned using the jack 57 for mutual tension equipment to tighten the fixing unit 54 so that the prestress is introduced to form a PS cable connection fixing apparatus 50,
In the state in which the compression ring 58 is installed at one end and the other end of the PS cable 34, the fixing clamp 55 and the fixing loop steel wire 59 are installed so as to be tensioned and connected to each other so that the prestress is introduced and the PS cable is connected. By forming the fixing device 50,
The prestressed cam beam 60 for introducing the prestress into the PS cable 34 and the PS cable protection cap 64 installed on the surface of the PS cable 34 to protect the PS cable 34.

상기한 바와 같은 구성으로 이루어진 본 발명에 따른 양단지지 환경 목재옹벽(W)중 프리스트레스 캠빔(60)으로 지지된 양단지지 환경 목재 옹벽(W)은 절성토 높이가 높은 경우에 적용할 수 있는 공법은 적정간격으로 일렬로 수직목재를 타입하여 수직목재말뚝(10)을 형성하고, 상기 일정구간의 수직목재말뚝(10) 양단에 PS케이블(34)의 지반정착부는 그라우팅(38)으로 고정한 쏘일네일링을 만들고, 상기 PS케이블 거치홈(62)내를 가로질러 쉬이스덕트(66)를 배치하고, 상기 쉬이스덕트(66)내에 상기 쏘일 네일링 된 PS케이블(34)을 연장 배치하고, 그 중앙에서 PS케이블(34)을 상호 인장 장비용 잭(57)을 이용하여 긴장하여 정착구(54)로 강결시켜 PS케이블 연결 정착장치(50)를 설치하거나 PS케이블(34) 단부에 정착클램프(55)와 정착 루프강선(59)을 만들어 상호 긴장하여 연결하여 PS케이블 연결정착장치(50)을 형성함으로써 PS케이블(34)에 프리스트레스가 도입되도록 한 프리스트레스캠빔(60)과, 상기 PS케이블(34)을 보호해주도록 PS케이블(34)의 표면에 PS케이블보호용캡(64)을 설치하여 프리스트레스캠빔(60)을 시공한다.Of the two end support environmental wood retaining wall (W) according to the present invention having the configuration as described above, the two end support environmental wood retaining wall (W) supported by the prestress cam beam 60 is applicable to the case of high cut soil height The vertical timber piles 10 are formed by arranging vertical timbers in a row at appropriate intervals, and the ground fixing portion of the PS cable 34 is fixed to the grouting 38 at both ends of the vertical timber piles 10. And arrange the sheath duct 66 across the PS cable mounting groove 62, and extend the sawed nailed PS cable 34 in the sheath duct 66, The PS cable 34 is tensioned using the jack 57 for mutual tension equipment to be firmly tightened with the fixing unit 54 to install the PS cable connection fixing device 50 or the fixing clamp 55 at the end of the PS cable 34. And anchoring loop steel wire (59) to make tension By forming the PS cable connection fixing device 50, the prestress cam beam 60 in which prestress is introduced into the PS cable 34, and the PS cable on the surface of the PS cable 34 to protect the PS cable 34. The protective cap 64 is installed to construct the prestressed cam beam 60.

도 11은 본 발명에 따른 양단지지 환경 목재옹벽의 쏘일 네일링 거치상태를 도시한 단면도이며, 도 12는 도 11의 정착부를 상세히 도시한 단면도이며, 도 13은 도 11의 쏘일 팀버 네일링의 지압마찰력을 상승시키기 위하여 설치하는 마찰지압 쐐기나이프를 펼치기 전 상태를 도시한 예시도이며, 도 14는 도 11의 쏘일 팀버 네일링의 지압마찰력을 상승시키기 위하여 설치하는 마찰지압 쐐기나이프를 펼친 상태를 도시한 예시도이다.FIG. 11 is a cross-sectional view illustrating a nail nailing state of both end support environment wooden retaining walls according to the present invention, FIG. 12 is a cross-sectional view illustrating in detail the fixing unit of FIG. 11, and FIG. 13 is acupressure of the saw timber nailing of FIG. 11. It is an exemplary view showing the state before the friction acupressure wedge knife is installed to increase the frictional force, Figure 14 is a state in which the friction acupressure wedge knife installed to increase the acupressure friction force of the saw timber nailing of FIG. This is an example.

이들 도면에 도시된 바와 같이, 본 발명에 따른 양단지지 환경 목재옹벽(W)의 쏘일 네일링(30)은 지반에 천공홀(86)을 형성한 후, 수직목재말뚝(10)을 지지하는 프리스트레스 캠빔(60)용 PS케이블(34)을 연장하여 지반정착부에 근입시키며, 상기 PS케이블(34)에는 마찰지압 강화용 쐐기나이프(82)와 그라우트튜브 및 마찰쐐기 나이프인장선(84)을 부착하여 조립된 PS케이블(34)을 상기 천공홀(86)에 삽입하고, 상기 그라우트튜브 및 마찰쐐기 나이프인장선(84)을 당겨 마찰지압 강화용 쐐기나이프(82)가 펼쳐져 천공홀(86) 이상으로 확대시켜 지압면적 범위를 확대시키며, 상기 천공홀(86)에 그라우팅(38)을 실시하여 PS케이블(34)의 지반정착부가 확실하게 형성되도록 하며, PS케이블(34)의 지반 노출면에는 정착용 지압부재(48)를 설치하고, 정착용 브라켓(42)과 도 9에 도시된 바와 같은 정착구(54)로 완전히 앵커링하여 강결 경계조건을 형성하고, 상기 PS케이블(34)을 일정구간의 수직목재말뚝(10)에 지지되도록 연장하는데 있어, 수직목재말뚝(10) 지지 프리스트레스 캠빔(60)의 PS케이블(34)의 선형과 기능을 유지하도록 벤딩이 유연하게 그 모서리에 굴곡용 강관(46)을 설치한다.As shown in these drawings, the saw nail nail 30 of the support wood (W) in both ends of the support environment according to the present invention after forming a hole (86) in the ground, prestress supporting the vertical timber pile 10 The PS cable 34 for the cam beam 60 is extended to enter the ground fixing part, and the PS cable 34 is attached with a wedge knife for strengthening the frictional pressure 82, a grout tube, and a friction wedge knife tensile line 84. And insert the assembled PS cable 34 into the drilling hole 86, pull the grout tube and the friction wedge knife tensioning line 84, the wedge knife 82 for frictional pressure reinforcement is unfolded and more than the drilling hole 86 To enlarge the acupressure area range, and to grind 38 the boring hole 86 so that the ground fixing portion of the PS cable 34 is surely formed, and to the ground exposed surface of the PS cable 34. The pressure bearing member 48 is installed, and the fixing bracket 42 is shown in FIG. In order to form a rigid boundary condition by completely anchoring the anchorage 54 as described above, and extending the PS cable 34 to be supported by the vertical wood pile 10 of a predetermined section, the vertical wood pile 10 is supported by a prestressed cam beam ( Bending is flexibly installed at the corner of the bending steel pipe 46 to maintain the linearity and function of the PS cable 34 of 60).

도 15는 본 발명에 따른 양단지지 환경 목재옹벽중 수직목재말뚝 상단에 수평캠빔목재로 지지된 환경 목재옹벽을 도시한 정면도이며, 도 16은 본 발명에 따른 양단지지 환경 목재옹벽중 수직목재말뚝 상단에 수평캠빔목재로 지지된 환경 목재옹벽을 도시한 단면도이며, 도 17은 본 발명에 따른 쏘일 팀버 네일링을 목재로 사용한 경우를 도시한 단면도이다.Figure 15 is a front view showing an environmental wood retaining wall supported by a horizontal cam beam wood on the top of the vertical timber pile of the two end support environmental wood retaining wall according to the present invention, Figure 16 is a top of the vertical wood pile of both end support environmental wood retaining wall according to the present invention Fig. 17 is a cross-sectional view showing an environmental timber retaining wall supported by a horizontal cam beam timber in Fig. 17, and Fig. 17 is a cross-sectional view illustrating the use of the saw timber nailing according to the present invention as wood.

이들 도면에 도시된 바와 같이, 본 발명에 따른 양단지지 환경 목재옹벽(W)중 수직목재말뚝(10) 상단에 수평캠빔목재(22)로 지지된 환경 목재옹벽(W)은 수직목재말뚝(10)을 일렬로 수직으로 배치되며, 수직목재말뚝(10) 상단에 수평캠빔목재(22)가 밀착되도록 표면을 정리한 수직목재말뚝(10)과; 상기 수직목재말뚝(10)의 상단으로부터 일정한 간격으로 두고 가로방향으로 배치되는 수평캠빔목재(22)와; 상기 수평캠빔목재(22)의 양단에 각각 PS케이블(34)를 고정 정착시키는 어스앵커정착장치(40)로 구성된다.As shown in these figures, the environmental timber retaining wall (W) supported by the horizontal cam beam timber 22 on top of the vertical timber pile (10) of the end-supporting environmental timber retaining wall (W) according to the present invention is a vertical timber pile (10) ) Vertically arranged in a row, the vertical timber pile (10) to arrange the surface so that the horizontal cam beam timber 22 is in close contact with the vertical timber pile 10; A horizontal cam beam timber 22 disposed in the horizontal direction at regular intervals from an upper end of the vertical timber pile 10; It is composed of an earth anchor fixing device 40 for fixing and fixing the PS cable 34 at both ends of the horizontal cam beam wood (22).

상기한 바와 같은 구성으로 이루어진 본 발명에 따른 양단지지 환경 목재옹벽(W)중 수직목재말뚝(10) 상단에 수평캠빔목재(22)로 지지된 환경 목재옹벽(W)의 시공은 상기 수직목재말뚝(10)의 상단간을 가로질러서 수평캠빔목재(22)를 설치하되, 수직목재말뚝(10)의 상단으로부터 일정한 간격을 두고 수평캠빔목재(22)를 설치하고, 상기 수평캠빔목재(22)의 양단에 각각 PS케이블(34)로 지지시키고, 그 PS케이블(34)이 고정되도록 어스앵커정착장치(40)를 설치한다.The construction of the environmental wood retaining wall (W) supported by the horizontal cam beam timber 22 on the top of the vertical timber pile (10) of the two end support environmental wooden retaining wall (W) made of a configuration as described above is the vertical wood pile The horizontal cam beam timber 22 is installed across the upper end of the upper portion 10, but the horizontal cam beam timber 22 is installed at regular intervals from the upper end of the vertical timber pile 10, and the horizontal cam beam timber 22 of the Each end is supported by a PS cable 34, and an earth anchor fixing device 40 is installed so that the PS cable 34 is fixed.

또한, 쏘일 팀버 네일링(30)은 그 단부에 타이백(32)이 장착용 볼트너트(49)로 고정되어, 지압력(72)에 의해 활동에 지지하도록 지반 내에 설치된 구조이다.In addition, the saw timber nailing 30 is a structure that is installed in the ground so that the tie back 32 is fixed to the end by the mounting bolt nut 49, the support is supported by the bearing pressure 72.

이상에서 설명한 바와 같이, 본 발명에 따른 양단지지 환경 목재옹벽은 사면의 지형에 대한 적응성이 콘크리트 옹벽, 보강토 옹벽 등에 비해 유연성이 높고, 식물이나 동물의 통로 및 서식이 가능하여 환경 친화적이며, 조경성이 뛰어나며, 폐목이나 고사목의 재활용이 가능하며, 필요에 따라 옹벽 제거시 옹벽제거에 따른 사면의 환경복원성이 뛰어난 이점이 있다.As described above, both end support environmental wood retaining wall according to the present invention is more flexible to the topography of the slope than the concrete retaining wall, reinforced earth retaining wall, etc., and it is environmentally friendly by allowing the passage and habitat of plants and animals, It is excellent, it is possible to recycle waste wood or dead wood, there is an advantage of excellent environmental resilience of the slope according to the removal of retaining wall when removing the retaining wall, if necessary.

또한, 본 발명은 경제적이고 공사기간이 상당히 단축되고, 자중이 비교적 가볍기 때문에 인력운반이 가능하고 별도의 중장비의 사용이 필요치 않으며, 옹벽에 별도의 투수를 위한 특수기능공이 필요치 않으며, 고랭지나 동절기 등에 관계없이 시공이 가능하며, 법면 공극이 많기 때문에 배수처리가 용이한 이점이 있다.In addition, the present invention is economical and the construction period is considerably shortened, and because the weight is relatively light, it is possible to transport the manpower and do not need the use of a separate heavy equipment, do not need a special function for a separate pitcher on the retaining wall, high cold or winter Regardless of the construction, there are advantages of easy drainage due to the large number of voids on the surface.

그리고, 본 발명은 연성구조이므로 부등침하 및 지진에 의한 변형 및 손상 등이 없으며, 옹벽의 법면 공극에는 초지 녹화가 가능하므로 자연환경과 조화를 이루며, 옹벽을 구성하는 목재는 별도로 방부처리하므로 25-50년 정도의 내구성을 가지며, 저독성의 목재를 사용하므로 수질오염방지에 일조하며, 폐목이나 고사목, 기타 벌목재를 유용하게 이용함으로 환경친화적이고, 재활용이 가능한 이점이 있다. In addition, since the present invention is a flexible structure, there is no deformation and damage due to sedimentation and earthquake, and the surface voids of the retaining wall enable grass greening, so that it is in harmony with the natural environment. It has a durability of about 50 years, and uses low-toxic wood, which helps to prevent water pollution, and has the advantage of being environmentally friendly and recyclable by using waste wood, dead wood, and other logging materials usefully.

Claims (10)

프리스트레스캠빔(60)과 쏘일네일링으로 지지하는 양단지지 환경 목재 옹벽(W)은 수직목재말뚝(10)을 일렬로 수직으로 배치되며, 상기 말뚝 상단에 PS케이블 거치홈(62)이 형성된 수직목재말뚝(10)과; 일정구간의 수직목재말뚝(10)의 양단에 PS케이블(34)의 지반정착부가 그라우팅(38)으로 고정하고, 상기 PS케이블 거치홈(62)내를 가로질러 고정 설치되는 쉬이스덕트(66)와, 상기 쉬이스덕트(66)내에 상기 쏘일 네일링 된 PS케이블(34)을 연장 배치하고, 그 중앙에서 PS케이블(34)의 일측과 타측을 상호 인장 장비용 잭(57)을 이용하여 긴장하여 프리스트레스가 도입되도록 정착구(54)로 강결시켜 PS케이블 연결 정착장치(50)를 구성하거나 PS케이블(34)의 일측과 타측 단부에 압축링(58)이 설치된 상태에서 정착클램프(55)와 정착 루프강선(59)이 설치되어 상호 긴장하여 체결 연결하여 프리스트레스가 도입되도록 강결하여 PS케이블연결정착장치(50)를 형성함으로써 프리스트레스캠빔(60)을 이루고, 상기 PS케이블(34)을 보호해주도록 PS케이블(34)의 표면에 설치되는 PS케이블보호용캡(64)으로 구성됨을 특징으로 하는 양단지지 환경 목재옹벽. Both ends support environment wood retaining wall (W) supported by the prestressed cam beam 60 and the soil nailing is vertically arranged vertically in the vertical pile (10), the vertical wood with PS cable mounting groove 62 is formed on the top of the pile Pile 10; The ground duct of the PS cable 34 is fixed to the both ends of the vertical wood pile 10 by a grouting 38, and the sheath duct 66 is fixedly installed across the PS cable mounting groove 62. And extends and arranges the sawed nailed PS cable 34 in the sheath duct 66, and tensions one side and the other side of the PS cable 34 at the center thereof using the jack 57 for mutual tension equipment. To the pre-stress to be introduced into the fixing unit 54 to form the PS cable connection fixing device 50 or the fixing clamp 55 and the fixing loop in the state in which the compression ring 58 is installed on one side and the other end of the PS cable 34. A steel wire 59 is installed to tighten and connect to each other so that the prestress can be introduced to form a PS cable soft crystal bonding device 50 to form the prestressed cam beam 60, and to protect the PS cable 34. PS Kay installed on the surface of 34) Both ends of the supporting environment timber retaining wall characterized in that consists of a protective cap (64). 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020060047478A 2006-05-26 2006-05-26 The both end-spring environmental timber retaining wall supporting by prestress cab beam and soil timber nailing, and the construction method of this KR100791456B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060047478A KR100791456B1 (en) 2006-05-26 2006-05-26 The both end-spring environmental timber retaining wall supporting by prestress cab beam and soil timber nailing, and the construction method of this

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060047478A KR100791456B1 (en) 2006-05-26 2006-05-26 The both end-spring environmental timber retaining wall supporting by prestress cab beam and soil timber nailing, and the construction method of this

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020060014251U Division KR200424148Y1 (en) 2006-05-26 2006-05-26 The both end-spring environmental timber retaining wall supporting by prestress cab beam and soil timber nailing

Publications (1)

Publication Number Publication Date
KR100791456B1 true KR100791456B1 (en) 2008-01-03

Family

ID=39216629

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060047478A KR100791456B1 (en) 2006-05-26 2006-05-26 The both end-spring environmental timber retaining wall supporting by prestress cab beam and soil timber nailing, and the construction method of this

Country Status (1)

Country Link
KR (1) KR100791456B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831748A (en) * 2015-05-13 2015-08-12 江创葵 Wall body and rapid and simple series-connection construction method thereof
CN106113203A (en) * 2016-07-27 2016-11-16 国家林业局北京林业机械研究所 Anchor system for bamboo original-state multidirectional recombinant material

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200398756Y1 (en) 2005-07-12 2005-10-18 한림에코텍 주식회사 Support Wood Block for an incline plane

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200398756Y1 (en) 2005-07-12 2005-10-18 한림에코텍 주식회사 Support Wood Block for an incline plane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831748A (en) * 2015-05-13 2015-08-12 江创葵 Wall body and rapid and simple series-connection construction method thereof
CN106113203A (en) * 2016-07-27 2016-11-16 国家林业局北京林业机械研究所 Anchor system for bamboo original-state multidirectional recombinant material

Similar Documents

Publication Publication Date Title
US5921715A (en) Retaining wall and method
US7377725B2 (en) Arched soil nail wall
US6666625B2 (en) Retaining wall support posts
US5551810A (en) Retaining wall with an outer face and method of forming the same
US5794921A (en) Masonry fence system
JPH07300820A (en) Close contact type protective construction method against falling rock and rope/net anchor structure thereof
JP2005232858A (en) Road widening method and method of preventing stone from falling
EP3225746B1 (en) A bearing structure
KR100726984B1 (en) Temporary system for land-side protection wall
KR100791456B1 (en) The both end-spring environmental timber retaining wall supporting by prestress cab beam and soil timber nailing, and the construction method of this
KR100842372B1 (en) Pretension soil nail method of top-down
KR100414779B1 (en) Reinforcing structure for a slope of ground cutted area
US3503589A (en) Construction unit
KR100467234B1 (en) Retaining wall and its construction method of steel panel
KR102111153B1 (en) Retaining Wall Panel Structure using PC Strand
GB2314860A (en) Post support
KR200424148Y1 (en) The both end-spring environmental timber retaining wall supporting by prestress cab beam and soil timber nailing
KR20010086663A (en) A method and apparatus for reinforcing slope stability using connecting wire
JP2005350884A (en) Method for widening road and the like, and wall surface panel
KR101224872B1 (en) Natural wall using fiber reinforcement
JP3244324B2 (en) Mountain retaining method
KR100964721B1 (en) Block for road extension
KR101198871B1 (en) Transverse supporting apparatus for standing underground retaining walls being given the earth pressure of backfill
KR20040051182A (en) Temporary soil sheathing using prestress and pile thereof
JPH1082057A (en) Method of earthquake-resisting pile foundation construction

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
J201 Request for trial against refusal decision
B701 Decision to grant
GRNT Written decision to grant
G170 Publication of correction
FPAY Annual fee payment

Payment date: 20121217

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20131217

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20141216

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20161219

Year of fee payment: 10

LAPS Lapse due to unpaid annual fee