KR100788942B1 - Construction structure for artificial mat and method thterof - Google Patents

Construction structure for artificial mat and method thterof Download PDF

Info

Publication number
KR100788942B1
KR100788942B1 KR1020070006994A KR20070006994A KR100788942B1 KR 100788942 B1 KR100788942 B1 KR 100788942B1 KR 1020070006994 A KR1020070006994 A KR 1020070006994A KR 20070006994 A KR20070006994 A KR 20070006994A KR 100788942 B1 KR100788942 B1 KR 100788942B1
Authority
KR
South Korea
Prior art keywords
artificial mat
artificial
wire
anchor
mat
Prior art date
Application number
KR1020070006994A
Other languages
Korean (ko)
Inventor
최은성
Original Assignee
최은성
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최은성 filed Critical 최은성
Priority to KR1020070006994A priority Critical patent/KR100788942B1/en
Application granted granted Critical
Publication of KR100788942B1 publication Critical patent/KR100788942B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/06Pavings made in situ, e.g. for sand grounds, clay courts E01C13/003
    • E01C13/065Pavings made in situ, e.g. for sand grounds, clay courts E01C13/003 at least one in situ layer consisting of or including bitumen, rubber or plastics
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S273/00Amusement devices: games
    • Y10S273/13Artificial grass

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A construction method and a construction method of an artificial mat are provided to use an artificial mat for a long time by constructing the artificial mat on the ground of a reservoir firmly without floating. A construction structure of an artificial mat for constructing an artificial mat(130) with artificial piles(131) on the ground where an aggregate layer(110) and a stone powder layer(120) are piled up in order includes an anchor inserted to the aggregate layer not to be floated by earth pressure, a pressure body(150) provided at the top of the artificial mat, and a wire(W) connecting the anchor and the pressure body tensely via the artificial mat, so that the artificial mat is constructed on the ground of a reservoir firmly. A construction method of the artificial mat structure comprises the steps of: placing anchors fixed with a wire on the ground of a reservoir; forming a concrete layer by placing concrete on the ground to bury the anchors with the wire; setting artificial piles on the concrete layer and placing an artificial mat with through holes(130a); placing pressure bodies on the top of the artificial mat and drawing out the wire exposed to the top of the concrete layer through the through holes of the artificial mat, and then connecting with the pressure bodies tensely; and cutting off the wire exposed to the top of a fixing clip(152) of the pressure body and placing fillers composed of sand and rubber chips between the artificial piles of the artificial mat.

Description

인조매트 시공구조 및 그 방법{CONSTRUCTION STRUCTURE FOR ARTIFICIAL MAT AND METHOD THTEROF}Artificial mat construction structure and its method {CONSTRUCTION STRUCTURE FOR ARTIFICIAL MAT AND METHOD THTEROF}

도1은 종래의 인조매트 시공구조의 단면도이며,1 is a cross-sectional view of a conventional artificial mat construction structure,

도2는 본 발명에 따른 인조매트 시공구조의 바람직한 일예를 도시한 단면도이며, Figure 2 is a cross-sectional view showing a preferred example of the artificial mat construction structure according to the present invention,

도3 및 도4는 본 발명에 따른 인조매트 시공구조에 사용될 수 있는 바람직한 앵카의 일례를 도시한 사시도이며,3 and 4 are perspective views showing an example of the preferred anchors that can be used in the artificial mat construction structure according to the present invention,

도5a 내지 도5d는 도3의 앵카를 사용하여 인조매트를 시공하는 방법을 도시한 도면이며,5A to 5D are views illustrating a method of constructing an artificial mat using the anchor of FIG. 3,

도6a 내지 도6d는 도4의 앵카를 사용하여 인조매트를 시공하는 방법을 도시한 도면이며,6A to 6D are views illustrating a method of constructing an artificial mat using the anchor of FIG. 4,

도7은 본 발명에 따른 인조매트 시공구조의 다른 실시예를 도시한 단면도이며, 7 is a cross-sectional view showing another embodiment of the artificial mat construction structure according to the present invention;

도8a 내지 도8d는 도7의 시공구조에 따른 인조매트를 시공하는 방법을 도시한 도면이다.8A to 8D are views illustrating a method of constructing an artificial mat according to the construction structure of FIG. 7.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

110: 골재층 120: 석분층110: aggregate layer 120: stone layer

130: 인조매트 131: 인조파일130: artificial mat 131: artificial pile

140: 앵카 150: 가압체140: anchor 120: pressurized body

151: 가압판 152: 고정클립151: pressure plate 152: fixing clip

160: 타격봉 170: 충진재160: batting rod 170: filling material

180: 콘크리트층 W: 와이어 180: concrete layer W: wire

본 발명은 인조매트 시공구조 및 그 방법에 관한 것으로, 보다 상세하게는 유수지에 시공된 인조매트가 부력에 의해 부상하지 않고 견고하게 시공되어 장시간 사용할 수 있는 인조매트 시공구조 및 그 방법에 관한 것이다.The present invention relates to an artificial mat construction structure and a method thereof, and more particularly, to an artificial mat construction structure and method that can be used for a long time without being floated by buoyancy to be constructed firmly.

유수지는 일시적으로 홍수량의 일부를 저수하는 곳으로서 홍수된 물을 잠시 저수하였다가 배수하기 위한 시설이다. 이러한 유수지는 일년 중 장마기간인 15일 정도만 홍수된 물이 저수되고 나머지 기간에는 황무지로 방치되어 도시의 혐오시설로 인식되었으나, 근래들어 유수지에 인조매트를 시공하여 장마기간을 제외한 나머지 기간에는 주민들이 여가생활을 할 수 있는 자연친화적 체육공원으로 만들어지고 있다.Reservoir is a place that temporarily stores a part of the flood volume, and is a facility to temporarily store and drain the flooded water. These reservoirs have been recognized as a city's hate facility because they are flooded with only about 15 days of rainy season and left as wasteland during the rest of the year. It is a nature-friendly sports park for leisure.

도1에는 유수지에 시공되는 종래의 인조매트 시공구조가 도시되어 있다. 이를 참조하면 종래의 인조매트 시공구조는 유수지의 지반상에 골재로 이루어진 골재층(10)을 형성하고, 상기 골재층(10) 상부에는 석분으로 이루어진 석분층(20)을 형성한다. 그리고 상기 석분층(30)의 상부에는 다수의 인조파일(31)이 식모된 인조매트(30)를 적당하게 배치시킨 다음, 인접한 인조매트(30)의 가장자리를 접착테이프(B)를 통해 서로 부착시켜 고정시켜 시공을 완성하였다.Figure 1 shows a conventional artificial mat construction structure that is constructed in the reservoir. Referring to this, the conventional artificial mat construction structure forms the aggregate layer 10 made of aggregate on the ground of the reservoir, and the aggregate layer 10 made of stone powder is formed on the aggregate layer 10. In addition, an artificial mat 30 having a plurality of artificial piles 31 planted is appropriately disposed on the top of the stone powder layer 30, and then the edges of adjacent artificial mats 30 are attached to each other through an adhesive tape B. Fixed to complete the construction.

하지만, 이러한 인조매트 시공구조는 접착테이프를 통해 인조매트와 인조매트만이 서로 부착고정되어 있었을 뿐 유수지 지반과의 시공구조는 전무하였기 때문에 홍수시 유수지에 저수된 물의 부력에 의해 인조매트가 유수지 지반에서 부상되어 인조매트가 변형되거나 파손되어 장시간 사용할 수 없다는 문제점이 있었다.However, since the artificial mat construction structure was only fixed to each other through adhesive tape, only the artificial mat and the artificial mat were fixed to each other, and there was no construction structure with the reservoir ground. There was a problem that can not be used for a long time because the artificial mat is deformed or damaged due to injury.

본 발명은 상기 문제점을 해결하기 위해 안출된 것으로, 본 발명의 목적은 유수지에 시공된 인조매트가 부력에 의해 부상하지 않고 견고하게 시공되어 장시간 사용할 수 있는 인조매트 시공구조 및 그 방법을 제공하는 것이다.The present invention has been made to solve the above problems, an object of the present invention is to provide an artificial mat construction structure and method that can be used for a long time without being floated by buoyancy buoyant mat constructed in the reservoir. .

상기 본 발명의 목적은 골재층과 석분층이 순차적으로 적층된 유수지 지반상 에 인조파일이 식모된 인조매트를 시공하는 인조매트 시공구조에 있어서, 상기 인조매트 시공구조는 상기 골재층에 삽입되어 토압에 의해 부상이 억제되는 앵카와; 상기 인조매트 상단에 마련된 가압체와; 상기 인조매트를 관통하여 앵카와 가압체를 긴장되게 연결하는 와이어를 포함하여 구성되어, 상기 앵카와 가압체에 연결된 와이어에 의해 인조매트가 견고하게 유수지 지반상에 시공될 수 있도록 한 것을 특징으로 하는 인조매트 시공구조를 제공함으로써 달성될 수 있다.The object of the present invention is an artificial mat construction structure for constructing an artificial mat in which artificial piles are planted on an oil reservoir ground in which an aggregate layer and a stone layer are sequentially stacked, wherein the artificial mat construction structure is inserted into the aggregate layer to be earth pressure Anca which injury is suppressed by; A press body provided on an upper end of the artificial mat; It is configured to include a wire through the artificial mat to tightly connect the anchor and the pressure body, characterized in that the artificial mat is firmly constructed on the reservoir ground by a wire connected to the anchor and the pressure body. It can be achieved by providing an artificial mat construction structure.

또한, 골재층과 석분층이 순차적으로 적층된 유수지 지반상에 인조파일이 식모되며 관통공이 형성된 인조매트를 배치시키는 인조매트 배치단계와; 와이어가 고정된 앵카를 상기 인조매트의 관통공을 통해 타격하여 앵카를 상기 골재층 하단에 배치시키는 앵카 타격단계와; 상기 인조매트 상단에는 가압체를 배치시키고, 상기 앵카에 고정된 와이어를 상기 가압체와 긴장되게 연결하는 와이어 연결단계를 포함하여 구성되어, 상기 앵카와 가압체에 고정된 와이어에 의해 인조매트가 견고하게 유수지 지반상에 시공될 수 있도록 한 것을 특징으로 하는 인조매트 시공방법을 제공함으로써 달성될 수 있다.In addition, the artificial mat arrangement step of placing the artificial mat is formed in the through-hole and the artificial pile is planted on the reservoir ground on which the aggregate layer and the stone layer are sequentially stacked; An anchoring step of striking an anchored wire through a through hole of the artificial mat to place the anchor at the bottom of the aggregate layer; And a wire connection step of arranging a pressing body on the top of the artificial mat and tensioning the wire fixed to the anchor with the pressing body, and the artificial mat is firmly formed by the wire fixed to the anchor and the pressing body. It can be achieved by providing an artificial mat construction method characterized in that it can be installed on the reservoir ground.

상술한 본 발명의 목적은 첨부된 도면을 참조하여 후술되는 본 발명의 바람직한 실시예로부터 더욱 명확해질 것이다.The object of the present invention described above will become more apparent from the preferred embodiment of the present invention described below with reference to the accompanying drawings.

이하, 첨부된 도면을 참고하여 본 발명에 따른 인조매트 시공구조 및 그 방법에 대해 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail with respect to the artificial mat construction structure and method thereof.

첨부된 도2는 본 발명에 따른 인조매트 시공구조의 바람직한 일례를 도시한 단면도이고, 도3 및 도4는 본 발명에 따른 인조매트 시공구조에 사용될 수 있는 바람직한 앵카의 일례를 도시한 사시도이다.2 is a cross-sectional view showing a preferred example of the artificial mat construction structure according to the present invention, Figures 3 and 4 is a perspective view showing an example of a preferred anchor can be used in the artificial mat construction structure according to the present invention.

도2를 참고하면, 본 발명에 따른 인조매트 시공구조는 골재층(110)과 석분층(120)이 순차적으로 적층된 유수지 지반상에 인조파일(131)이 식모된 인조매트(130)를 시공하는 인조매트 시공구조에 있어서, 상기 골재층(110)에 삽입되어 토압에 의해 부상이 억제되는 앵카(140)와, 상기 인조매트 상단에 마련된 가압체(150)와, 상기 인조매트(130)를 관통하여 앵카(140)와 가압체(150)를 긴장되게 연결하는 와이어(W)를 포함하여 구성되어, 상기 앵카(140)와 가압체(150)에 고정된 와이어(W)에 의해 인조매트(130)가 견고하게 유수지 지반상에 시공될 수 있도록 한 것을 특징으로 한다.Referring to FIG. 2, the artificial mat construction structure according to the present invention constructs an artificial mat 130 in which an artificial pile 131 is planted on an oil reservoir ground in which an aggregate layer 110 and a stone powder layer 120 are sequentially stacked. In the artificial mat construction structure, the anchor 140 is inserted into the aggregate layer 110, the injury is suppressed by the earth pressure, the press body 150 provided on the top of the artificial mat, and the artificial mat 130 It comprises a wire (W) for penetrating and connecting the anchor (140) and the pressure member 150, the artificial mat (w) by the wire (W) fixed to the anchor (140) and the pressure member (150) 130) is characterized in that it can be firmly constructed on the reservoir ground.

즉, 본 발명에서는 인조매트와 유수지지반을 와이어 앵카를 매개로 서로 연결시킴으로써 물의 부력에 의해 인조매트가 유수지 지반에서 부상되는 것을 방지하게 되는 것이다.That is, in the present invention, the artificial mat and the oil support base are connected to each other through a wire anchor, thereby preventing the artificial mat from being floated on the oil reservoir ground by buoyancy of water.

여기서, 상기 앵카(140)는 골재층에 삽입되어 토압에 의해 부상이 억제될 수 있는 형상이라면 특별히 한정되지 않지만, 도3에 도시된 바와 같이 원추형으로 형성되어 골재층(110)까지 용이하게 박힐 수 있으며, 앵카(141)의 평평한 상면으로 토압에 견고하게 지탱될 수 있다는 점에서 바람직하다. 또한, 상기 앵카(141)의 상단 중앙에는 타격봉(160)이 삽입되는 끼움홈(141a)이 형성되는 것이 바람직한 데, 이는 후술하는 시공방법에서 설명하겠지만, 타격봉(160)을 통해 앵카(141)를 타격할 때 타격봉(160)이 앵카 상면에서 슬립되지 않도록 한 것이며, 끼움홈 대신 끼움돌기를 형성하여도 무방할 것이다. 또한, 상기 끼움홈(141a) 상면에는 와이어(W)의 일단이 고정되는 고정고리(141b)가 형성된다.Here, the anchor 140 is not particularly limited as long as it is inserted into the aggregate layer and the shape of the injury can be suppressed by the earth pressure, but is formed in a conical shape as shown in FIG. And, it is preferable in that the flat upper surface of the anchor 141 can be firmly supported by earth pressure. In addition, it is preferable that the fitting groove 141a into which the striking rod 160 is inserted is formed at the center of the upper end of the anchor 141, which will be described later in the construction method. The striking rod 160 will not slip on the upper surface of the anchor when it hits), and may form a fitting protrusion instead of the fitting groove. In addition, a fixing ring 141b to which one end of the wire W is fixed is formed on an upper surface of the fitting groove 141a.

또한, 상기 앵카(140)의 바람직한 다른 일례로, 도4에 도시된 바와 같이 원추형으로 형성되되, 상단 중앙에는 타격봉(160)이 삽입되는 끼움홈(142a)이 형성되며, 상단 측면에는 와이어(W)가 고정될 수 있는 고정고리(142b)가 형성된다. 본 실시예에 따른 앵카(142)와 도3에 도시된 앵카(141)의 상이점은 고정고리가 형성위치가 상이한 것으로, 이는, 후술하겠지만, 와이어(W)를 긴장시키기 위해 와이어(W)를 잡아 당길 때 편심된 와이어 고정위치로 인해 앵카(142)가 비틀어지게 하여 토압에 보다 견고하게 지탱할 수 있도록 한 것이다.In addition, as another preferred example of the anchor (140), as shown in Figure 4 is formed in a conical shape, the upper center is formed a fitting groove 142a is inserted into the impact rod 160, the upper side of the wire ( A fixing ring 142b to which W) can be fixed is formed. The difference between the anchor 142 and the anchor 141 shown in FIG. 3 according to the present embodiment is that the fixing ring is formed at a different position, which will be described later, but the wire W is held to tension the wire W. Due to the eccentric wire fixing position when pulled, the anchor (142) is to be twisted to more firmly support the earth pressure.

한편, 상기 가압체(150)는 인조매트(130) 상단에 마련되며 상기 골재층(110) 에 박혀 있는 앵카(140)와 와이어(W)를 통해 서로 연결된다. 즉, 앵카(140)의 고정고리에 고정되어 있는 와이어(W)의 타단이 상기 가압체(150)에 긴장되게 고정된다. 이에 의해, 상기 가압체(150)는 인조매트(130) 상면을 가압하여 물의 부력에 의해 부상되는 것이 방지되는 것이다.On the other hand, the pressing body 150 is provided on the top of the artificial mat 130 is connected to each other through the anchor (140) and the wire (W) that is embedded in the aggregate layer (110). That is, the other end of the wire (W) that is fixed to the fixing ring of the anchor 140 is fixed to the pressing body 150 in tension. As a result, the pressing body 150 is to press the upper surface of the artificial mat 130 to prevent the floating by the buoyancy of the water.

여기서, 상기 가압체(150)는 와이어(W)의 긴장력에 의해 인조매트(130) 상단을 가압하며 와이어(W)가 통과하는 통과공(151a)이 형성된 가압판(151)과, 상기 가압판(151)을 통과한 와이어(W)를 고정하도록 상기 가압판(151) 상부에 마련되는 고정클립(152)을 포함하여 구성되는 것이 바람직하다. 즉, 일단이 앵카(W)에 고정되어 있는 와이어(W)의 타단을 잡아당겨서 와이어(W)가 긴장되게 한 상태에서 고정클립(152)으로 와이어(W)를 고정하게 되면, 와이어(W)의 긴장력에 의해 가압판(151)은 인조매트(130)의 상단을 가압하게 되는 것이다. 여기서, 상기 가압판(151)은 상대적으로 넓은 면적으로 형성되어, 가압력의 분산을 통해 인조매트(130)가 찢어지는 것을 방지하는 것이 바람직하다.Here, the press body 150 pressurizes the upper end of the artificial mat 130 by the tension force of the wire (W) and the pressure plate 151 is formed with a through hole (151a) through which the wire (W) passes, and the pressure plate (151) It is preferable to include a fixing clip 152 is provided on the pressing plate 151 to fix the wire (W) passing through). That is, when one end of the wire (W) is fixed to the anchor (W) by pulling the other end of the wire (W) to fix the wire (W) with the fixing clip 152 in a state of tension, the wire (W) By the tension of the pressing plate 151 is to press the top of the artificial mat 130. Here, the pressing plate 151 is formed in a relatively large area, it is preferable to prevent the artificial mat 130 is torn through the dispersion of the pressing force.

이와 같이 구성된 본 발명에 따른 인조매트 시공구조는 앵카와 가압체에 연결된 와이어에 의해 인조매트가 유수지 지반상에 견고하게 시공되는 효과가 있다.The artificial mat construction structure according to the present invention configured as described above has an effect that the artificial mat is firmly constructed on the resin ground by a wire connected to the anchor and the pressure body.

이하, 본 발명에 따른 인조매트 시공방법를 설명하는 데, 예시적으로 도3에 도시된 앵카(141) 및 도4에 도시된 앵카(142)를 사용하여 유수지 지반에 인조매트 를 시공하는 방법을 설명하기로 한다.Hereinafter, a method for constructing an artificial mat according to the present invention will be described. For example, a method of constructing an artificial mat on the surface of an oil reservoir using an anchor 141 illustrated in FIG. 3 and an anchor 142 illustrated in FIG. 4 will be described. Let's do it.

먼저 도5a 내지 도5d를 참조하여 도3에 도시된 앵카(141)를 사용하여 유수지 지반에 인조매트를 시공하는 방법을 살펴본다.First, with reference to FIGS. 5A to 5D, a method of constructing an artificial mat in an oil reservoir ground using the anchor 141 shown in FIG. 3 will be described.

유수지 지반상에 골재층(110)과 석분층(120)이 순차적으로 적층시킨 다음, 상기 석분층(120) 상부에 인조파일(131)이 식모되며 관통공(130a)이 형성된 인조매트(130)를 배치시킨다. 여기서 종래와 마찬가지로 인접한 인조매트(130)의 가장자리는 접착테이프(B)를 통해 서로 부착 고정시키는 것이 바람직하다.After the aggregate layer 110 and the stone powder layer 120 are sequentially stacked on the reservoir ground, the artificial pile 130 is formed with the artificial pile 131 planted on the top of the stone powder layer 120 and the through-hole 130a is formed. Place it. Here, as in the prior art, it is preferable that the edges of the adjacent artificial mats 130 are attached to and fixed to each other through an adhesive tape (B).

그 후, 도5a 및 도5b에 도시된 바와 같이 와이어(W)가 고정된 앵카(141)를 상기 인조매트의 관통공(130a)을 통해 타격하여 앵카(141)를 상기 골재층(130) 하단으로 삽입시킨다. 여기서 상기 앵카(141)를 골재층(130)에 용이하게 박기 위해 타격봉(160)을 사용하는 것이 바람직한데, 상기 타격봉(160)은 일정한 길이로 형성되고 내부가 빈 중공형상으로 마련된다. 즉, 상기 앵카(141)에 고정된 와이어(W)의 타단을 상기 타격봉(160)의 하단에서 끼워 내부를 통해 상단로 관통시켜 배출시킨 후, 타격봉(160)의 하단을 앵카(141)의 중앙에 형성된 끼움홈(141a)에 끼운다. 그리고 타격봉(160)의 상단을 해머 등으로 타격하면, 앵카(141)는 인조매트의 관통공(130a)을 통해 골재층(110)에 용이하게 박혀 골재층(110) 하단에 배치되는 것이다. 그리고, 상기 앵카(141)가 상기 골재층(110)의 하단에 배치되면, 상기 삽입 봉(160)을 인조매트의 관통공(210)을 통해 배출시켜 앵카(141)에서 분리시킨다. 이때, 삽입봉(160)이 삽입되었던 부분은 석재층(120)과 골재층(110)에 의해 덮여지게 되고, 앵카(141)는 토압에 의해 골재층(110)내에 견고하게 고정된다.Thereafter, as shown in FIGS. 5A and 5B, the anchor W having the wire W fixed thereon is hit through the through hole 130a of the artificial mat to lower the anchor 141 to the bottom of the aggregate layer 130. Insert it. Here, it is preferable to use the striking rod 160 to easily drive the anchor 141 to the aggregate layer 130, the striking rod 160 is formed in a constant length and is provided in a hollow hollow shape. That is, the other end of the wire (W) fixed to the anchor (141) is inserted through the lower end of the striking rod (160) to penetrate through the upper end and discharged, and then the lower end of the striking rod (160) an anchor (141) Inserts into the fitting groove (141a) formed in the center of the. And when hitting the upper end of the striking rod 160 with a hammer or the like, an anchor 141 is easily embedded in the aggregate layer 110 through the through hole 130a of the artificial mat is disposed on the aggregate layer 110 bottom. When the anchor 141 is disposed at the lower end of the aggregate layer 110, the insertion rod 160 is discharged through the through hole 210 of the artificial mat to be separated from the anchor 141. At this time, the insertion rod 160 is inserted portion is covered by the stone layer 120 and the aggregate layer 110, the anchor 141 is firmly fixed in the aggregate layer 110 by earth pressure.

그 후, 도5c 및 도5d에 도시된 바와 같이, 상기 인조매트(130) 상단에는 가압체(150)를 배치시키고, 상기 앵카(141)에 고정된 와이어(W)를 상기 가압체(150)와 긴장되게 연결한다.Thereafter, as shown in FIGS. 5C and 5D, the press body 150 is disposed on an upper end of the artificial mat 130, and the wire W fixed to the anchor 141 is placed on the press body 150. Tension with

여기서, 가압체(150)는 와이어(W)의 긴장력에 의해 인조매트(130) 상단을 가압하며 와이어(W)가 통과하는 통과공(151a)이 형성된 가압판(151)과, 상기 가압판(151)을 통과한 와이어(W)를 고정하도록 상기 가압판(151) 상부에 마련되는 고정클립(152)을 포함하여 구성된다. 즉, 일단이 앵카(141)에 고정되어 있는 와이어(W)의 타단을 잡아당겨서 와이어(W)가 긴장되게 한 상태에서 고정클립(152)으로 와이어(W)를 고정하게 되면, 와이어(W)의 긴장력에 의해 가압판(151)은 인조매트(130) 상단을 가압하여, 인조매트(130)가 물의 부력에 의해 부상되는 것이 방지되도록 고정되는 것이다.Here, the press body 150 pressurizes the upper end of the artificial mat 130 by the tension force of the wire (W) and the pressure plate 151 having a through hole 151a through which the wire W passes, and the pressure plate 151. It comprises a fixing clip 152 is provided on the pressing plate 151 to fix the wire (W) passed through. That is, when one end of the wire (W) is fixed to the anchor (141) by pulling the other end of the wire (W) to fix the wire (W) with the fixing clip 152 in a state of tension, the wire (W) By the tension force of the pressing plate 151 is to press the top of the artificial mat 130, it is fixed so that the artificial mat 130 is prevented from being floated by the buoyancy of water.

그 후, 고정클립(152) 상단으로 노출된 와이어(W)를 절단하고, 시공된 인조매트의 인조파일(131)들 사이에 모래(171)와 고무칩(172) 구성되는 충진재(170)를 채워주면 본 발명에 따른 인조매트 시공이 완료된다.Thereafter, the wire W exposed to the upper end of the fixing clip 152 is cut, and the filler 170 including the sand 171 and the rubber chip 172 is formed between the artificial piles 131 of the constructed artificial mat. When filled, the construction of the artificial mat according to the present invention is completed.

다음으로, 도6a 내지 도6d를 참조하여 도4에 도시된 앵카(142)를 사용하여 유수지 지반에 인조매트를 시공하는 방법을 살펴본다. 여기서 본 실시예에 따른 앵카(142)를 사용하여 인조매트를 시공하는 경우에도 상술한 앵카(141)를 사용하여 인조매트를 시공하는 경우와 동일하게 인조매트 배치단계, 앵카 타격단계 및 와이어 연결단계를 통해 인조매트를 시공하는 것은 동일하다.Next, a method of constructing an artificial mat on the reservoir ground using the anchor 142 shown in FIG. 4 will be described with reference to FIGS. 6A to 6D. Here, even when constructing the artificial mat using the anchor 142 according to the present embodiment, the artificial mat arrangement step, the anchor hitting step and the wire connection step in the same manner as when the artificial mat is constructed using the above-described anchor 141 The construction of artificial mats through is the same.

다만, 본 실시예의 앵커(142)는 와이어(W)가 고정되는 고정고리(142b)가 앵커(142)의 상단 측면에 형성되어 있기 때문에, 도6a 및 도6b에 도시된 바와 같이, 앵카(142)의 중앙에 형성된 끼움홈(142b)에 타격봉(160)의 하단을 끼운 후, 와이어(W)를 타격봉(160) 내부로 관통시키지 않고 타격봉(160)과 나란하게 배치한다. 그리고 타격봉(160)의 상단을 해머 등으로 타격하면, 앵카(142)는 인조매트의 관통공(130a)을 통해 골재층(110)에 박혀 골재층(110) 하단에 배치된다. 물론, 상기 앵카(142)가 상기 골재층(110)의 하단에 배치되면, 상기 삽입봉(160)을 인조매트의 관통공(130a)을 통해 배출시켜 앵카(142)에서 분리시킨다.However, in the anchor 142 of the present embodiment, since the fixing ring 142b to which the wire W is fixed is formed at the upper side of the anchor 142, as shown in FIGS. 6A and 6B, the anchor 142 is fixed. After inserting the lower end of the striking rod 160 in the fitting groove 142b formed in the center of the), the wire (W) is disposed parallel to the striking rod 160 without penetrating into the striking rod 160. And when hitting the upper end of the striking rod 160 with a hammer or the like, the anchor (142) is embedded in the aggregate layer 110 through the through hole 130a of the artificial mat is disposed in the aggregate layer 110 bottom. Of course, when the anchor 142 is disposed at the lower end of the aggregate layer 110, the insertion rod 160 is discharged through the through hole 130a of the artificial mat to be separated from the anchor 142.

그리고 도6c 및 도6d에 도시된 바와 같이, 상기 인조매트(130) 상단에는 가압판(151)과 고정클립(152)으로 구성된 가압체(150)를 배치시킨다. 그리고 일단이 앵카(142)에 고정되어 있는 와이어(W)의 타단을 잡아당겨서 와이어(W)가 긴장되게 한 상태에서 고정클립(152)으로 와이어(W)를 고정시키면, 와이어(W)의 긴장력에 의 해 가압판(151)은 인조매트(130) 상단을 가압하여 인조매트(130)가 고정된다. 이때, 일단이 앵카(142)에 고정되어 있는 와이어(W)의 타단을 잡아당겨서 와이어(W)가 긴장되게 하면 앵카(142)에 편심되게 고정된 와이어(W) 위치로 인해 앵카(142)가 비틀어지면서 골재층(110)에 고정되어 토압에 보다 견고하게 지탱된다.6C and 6D, the pressing member 150 including the pressing plate 151 and the fixing clip 152 is disposed on the top of the artificial mat 130. And when one end of the wire (W) is fixed to the anchor (142) by pulling the other end of the wire (W) to fix the wire (W) with a fixing clip 152 in a tensioned state, the tension force of the wire (W) The pressing plate 151 presses the upper end of the artificial mat 130 to fix the artificial mat 130. At this time, when one end pulls the other end of the wire W fixed to the anchor 142 and the wire W is tensioned, the anchor 142 is moved due to the position of the wire W eccentrically fixed to the anchor 142. As it is twisted, it is fixed to the aggregate layer 110 to be more firmly supported by earth pressure.

이 후, 고정클립(152) 상단으로 노출된 와이어(W)를 절단하고, 시공된 인조매트의 인조파일(131)들 사이에 모래(171)와 고무칩(172) 구성되는 충진재(170)를 채워주면, 본 실시예에 따른 인조매트 시공이 완료된다.Thereafter, the wire W exposed to the upper end of the fixing clip 152 is cut, and the filler 170 including the sand 171 and the rubber chip 172 is formed between the artificial piles 131 of the constructed artificial mat. If filled, the construction of the artificial mat according to the present embodiment is completed.

한편, 첨부된 도7에는 본 발명에 따른 인조매트 시공구조의 다른 실시예의 단면도가 도시되어 있다.On the other hand, Figure 7 is a cross-sectional view of another embodiment of the artificial mat construction structure according to the present invention.

도7를 참고하면, 본 실시예에 따른 인조매트 시공구조는 콘크리트층(180)이 형성된 유수지 지반상에 인조파일(131)이 식모된 인조매트(130)를 시공하는 인조매트 시공구조에 있어서, 상기 인조매트 시공구조는 상기 콘트리트층(180)에 매립고정되는 앵카(140)와, 상기 인조매트 상단에 마련된 가압체(150)와, 일단은 상기 앵카(140) 연결되어 매립되고 타단은 상기 콘크리트층(180)의 상단으로 배출되어 상기 인조매트(130)를 관통한 후 상기 앵카(140)와 가압체(150)를 긴장되게 연결하는 와이어(W)를 포함하여 구성되어, 상기 앵카(140)와 가압체(150)에 연결된 와이어(W)에 의해 인조매트가 견고하게 유수지 지반상에 시공될 수 있도록 한 것을 특 징으로 한다.Referring to FIG. 7, the artificial mat construction structure according to the present embodiment includes an artificial mat construction structure in which an artificial mat 130 in which an artificial pile 131 is implanted is implanted on an oil reservoir ground on which a concrete layer 180 is formed. The artificial mat construction structure is an anchor 140 buried in the concrete layer 180, the press body 150 provided on the top of the artificial mat, one end is embedded and connected to the anchor (140) and the other end is the concrete It is discharged to the top of the layer 180 and penetrates the artificial mat 130 and comprises a wire (W) for tension connecting the anchor (140) and the press body 150, the anchor (140) And by the wire (W) connected to the pressing body 150 is characterized in that the artificial mat can be firmly constructed on the reservoir ground.

즉, 본 실시예에서는 인조매트와 콘크리트층에 매립 고정되는 앵카를 와이어를 매개로 서로 연결시킴으로써 물의 부력에 의해 인조매트가 유수지 지반에서 부상되는 것을 방지하게 되는 것이다.That is, in this embodiment, by connecting the anchor mat embedded in the artificial mat and the concrete layer to each other via a wire, the artificial mat is prevented from being floated in the reservoir ground by buoyancy of water.

여기서, 상기 앵카(140)는 콘크리트층(180)에 매립되어 고정될 수 있는 형상이라면 특별히 한정되지 않으며, 앵카(140)의 일측에 와이어(W)의 일단이 고정되는 구조를 갖으면 된다.Here, the anchors 140 are not particularly limited as long as the anchors 140 are embedded in the concrete layer 180 and may have a structure in which one end of the wire W is fixed to one side of the anchors 140.

한편, 상기 가압체(150)는 인조매트(130) 상단에 마련되며 상기 콘크리트층(180)에 매립고정되는 앵카(140)와 와이어(W)를 통해 서로 연결된다. 즉, 앵카(140)의 일측에 고정되어 있는 와이어(W)의 타단이 상기 가압체(150)에 긴장되게 고정된다. 이에 의해, 상기 가압체(150)는 인조매트(130) 상면을 가압하여 물의 부력에 의해 부상되는 것이 방지되는 것이다.On the other hand, the pressing body 150 is provided on the top of the artificial mat 130 and is connected to each other through the anchor (140) and the wire (W) is buried in the concrete layer 180. That is, the other end of the wire (W) that is fixed to one side of the anchor (140) is fixed to the pressing body 150 in tension. As a result, the pressing body 150 is to press the upper surface of the artificial mat 130 to prevent the floating by the buoyancy of the water.

여기서, 상기 가압체(150)는 상술한 일실시예와 마찬가지로 와이어(W)의 긴장력에 의해 인조매트(130) 상단을 가압하며 와이어(W)가 통과하는 통과공(151a)이 형성된 가압판(151)과, 상기 가압판(151)을 통과한 와이어(W)를 고정하도록 상기 가압판(151) 상부에 마련되는 고정클립(152)을 포함하여 구성되는 것이 바람직하 다.Here, the pressing body 150 presses the upper end of the artificial mat 130 by the tension force of the wire (W) as in the above-described embodiment, the pressing plate 151 having a through hole 151a through which the wire W passes. ) And a fixing clip 152 provided on the pressing plate 151 to fix the wire W passing through the pressing plate 151.

이와 같이 구성된 본 실시예에 따른 인조매트 시공구조는 콘크리트층에 매립고정된 앵카와 가압체에 연결된 와이어에 의해 인조매트가 유수지 지반상에 견고하게 시공되는 효과가 있다.The artificial mat construction structure according to the present embodiment configured as described above has an effect that the artificial mat is firmly constructed on the reservoir ground by the wire connected to the anchor and the press body fixed in the concrete layer.

이하, 첨부된 도8a 내지 도8d를 참조하여 본 실시예에 따른 인조매트 시공방법를 설명한다. Hereinafter, the artificial mat construction method according to the present embodiment will be described with reference to FIGS. 8A to 8D.

먼저, 도8a 및 도8b에 도시된 바와 같이 유수지 지반상에 와이어(W)가 고정된 앵카(140)를 배치시킨다. 그리고 상기 유수지 지반상에 콘크리트를 타설하여 상기 와이어(W)가 고정된 앵카(140)가 매립고정되도록 콘크리트층(180)을 형성시킨다. 이때, 콘크리트층(180)의 상단으로는 앵카(140)에 연결된 와이어(W)가 후술할 가압체(150)에 연결될 수 있도록 와이어(140)의 일부를 노출시켜 콘크리트층을 형성시킨다. First, as shown in FIGS. 8A and 8B, an anchor 140 having a fixed wire W is disposed on the reservoir ground. The concrete layer 180 is formed to pour concrete on the reservoir ground to anchor the anchors 140 to which the wires W are fixed. At this time, the upper portion of the concrete layer 180 to form a concrete layer by exposing a portion of the wire 140 so that the wire (W) connected to the anchor (140) can be connected to the pressing body 150 to be described later.

그리고, 도8c 및 도8d에 도시된 바와 같이, 상기 콘크리트층(180)상에 인조파일(131)이 식모되며 관통공(130a)이 형성된 인조매트(130)를 배치시킨다. 그리고, 상기 인조매트(130) 상단에는 가압체(150)를 배치시킨 후, 상기 콘크리트층(180)의 상단으로 노출된 와이어(W)를 상기 인조매트의 관통공(130a)을 통해 배 출시킨 다음 상기 가압체(150)와 긴장되게 연결한다.8C and 8D, the artificial pile 131 is planted on the concrete layer 180 and an artificial mat 130 having a through hole 130a is disposed. And, after placing the pressing body 150 on the top of the artificial mat 130, the wire (W) exposed to the top of the concrete layer 180 is discharged through the through hole 130a of the artificial mat. Next, the pressure body 150 is connected in tension.

여기서, 가압체(150)는 와이어(W)의 긴장력에 의해 인조매트(130) 상단을 가압하며 와이어(W)가 통과하는 통과공(151a)이 형성된 가압판(151)과, 상기 가압판(151)을 통과한 와이어(W)를 고정하도록 상기 가압판(151) 상부에 마련되는 고정클립(152)을 포함하여 구성된다. 즉, 상기 콘크리트층(180)에 매립고정된 앵카(140)에 연결된 와이어(W)를 긴장되게 한 상태에서 고정클립(152)으로 와이어(W)를 고정하게 되면, 와이어(W)의 긴장력에 의해 가압판(151)은 인조매트(130) 상단을 가압하여, 인조매트(130)가 물의 부력에 의해 부상되는 것이 방지되도록 고정되는 것이다.Here, the press body 150 pressurizes the upper end of the artificial mat 130 by the tension force of the wire (W) and the pressure plate 151 having a through hole 151a through which the wire W passes, and the pressure plate 151. It comprises a fixing clip 152 is provided on the pressing plate 151 to fix the wire (W) passed through. That is, when the wire (W) is fixed with the fixing clip 152 while the wire (W) connected to the anchor (140) buried in the concrete layer 180 is tensioned, the tension of the wire (W) The pressing plate 151 presses the upper end of the artificial mat 130, and is fixed to prevent the artificial mat 130 from being floated by buoyancy of water.

그 후, 고정클립(152) 상단으로 노출된 와이어(W)를 절단하고, 시공된 인조매트의 인조파일(131)들 사이에 모래(171)와 고무칩(172) 구성되는 충진재(170)를 채워주면 본 실시예에 따른 인조매트 시공이 완료된다.Thereafter, the wire W exposed to the upper end of the fixing clip 152 is cut, and the filler 170 including the sand 171 and the rubber chip 172 is formed between the artificial piles 131 of the constructed artificial mat. If it is filled, the construction of the artificial mat according to this embodiment is completed.

이상에서 설명한 바와 같이, 본 발명에 따른 인조매트 시공구조 및 그 방법은 유수지에 시공된 인조매트가 부력에 의해 부상하지 않고 견고하게 시공되어 장시간 사용할 수 있다는 효과가 있다.As described above, the artificial mat construction structure and the method according to the present invention has the effect that the artificial mat constructed in the resin can be used for a long time without being floated by buoyancy.

Claims (10)

골재층과 석분층이 순차적으로 적층된 유수지 지반상에 인조파일이 식모된 인조매트를 시공하는 인조매트 시공구조에 있어서, 상기 인조매트 시공구조는 In the artificial mat construction structure for constructing an artificial mat in which artificial piles are implanted on an oil reservoir ground in which an aggregate layer and a stone layer are sequentially stacked, the artificial mat construction structure is 상기 골재층에 박혀서 토압에 의해 부상이 억제되는 앵카와; Anca is embedded in the aggregate layer and the injury is suppressed by the earth pressure; 상기 인조매트 상단에 마련된 가압체와; A press body provided on an upper end of the artificial mat; 상기 인조매트를 관통하여 앵카와 가압체를 긴장되게 연결하는 와이어를 포함하여 구성되어, It comprises a wire penetrating the artificial mat to tension the anchor and the pressure body, 상기 앵카와 가압체에 연결된 와이어에 의해 인조매트가 견고하게 유수지 지반상에 시공될 수 있도록 한 것을 특징으로 하는 인조매트 시공구조.The artificial mat construction structure characterized in that the artificial mat can be firmly installed on the reservoir ground by a wire connected to the anchor and the pressing body. 제1항에 있어서,The method of claim 1, 상기 앵카는 원추형으로 형성되되, 상단 중앙에는 타격봉이 삽입되는 끼움홈가 형성되며, 상기 끼움홈 상면에는 와이어가 고정될 수 있는 고정고리가 형성된 것을 특징으로 하는 인조매트 시공구조.The anchor is formed in a conical shape, the fitting groove is formed in the center of the top is inserted into the hitting rod, the artificial groove construction structure, characterized in that the fixing ring is formed on the upper surface of the fitting groove can be fixed. 제1항에 있어서,The method of claim 1, 상기 앵카는 원추형으로 형성되되, 상단 중앙에는 타격봉이 삽입되는 끼움홈 또는 끼움돌기가 형성되며, 상단 측면에는 와이어가 고정될 수 있는 고정고리가 형성된 것을 특징으로 하는 인조매트 시공구조The anchor is formed in a conical shape, the upper center is formed a fitting groove or a fitting projection is inserted into the striking rod, the upper side is an artificial mat construction structure characterized in that the fixing ring for fixing the wire is formed 제1항 내지 제3항 중 어느 한항에 있어서, 상기 가압체는 The press body according to any one of claims 1 to 3, wherein 와이어의 긴장력에 의해 인조매트 상단을 가압하며 와이어가 통과하는 통과공이 형성된 가압판과;A pressing plate which presses the upper end of the artificial mat by a tension force of the wire and has a through hole through which the wire passes; 상기 가압판을 통과한 와이어를 고정하도록 상기 가압판 상부에 마련되는 고정클립을 포함하여 구성되는 것을 특징으로 하는 인조매트 시공구조.Artificial mat construction structure comprising a fixing clip provided on the pressure plate to fix the wire passing through the pressure plate. 골재층과 석분층이 순차적으로 적층된 유수지 지반상에 인조파일이 식모되며 관통공이 형성된 인조매트를 배치시키는 인조매트 배치단계와;An artificial mat arranging step of arranging an artificial mat in which artificial piles are implanted and a through hole is formed on an oil reservoir ground in which an aggregate layer and a stone layer are sequentially stacked; 와이어가 고정된 앵카를 상기 인조매트의 관통공을 통해 타격하여 앵카를 상기 골재층 하단에 배치시키는 앵카 타격단계와;An anchoring step of striking an anchored wire through a through hole of the artificial mat to place the anchor at the bottom of the aggregate layer; 상기 인조매트 상단에는 가압체를 배치시키고, 상기 앵카에 고정된 와이어를 상기 가압체와 긴장되게 연결하는 와이어 연결단계를 포함하여 구성되어, It is configured to include a wire connecting step of placing a pressing body on the top of the artificial mat, the wire fixed to the anchor in tension with the pressing body, 상기 앵카와 가압체에 고정된 와이어에 의해 인조매트가 견고하게 유수지 지반상에 시공될 수 있도록 한 것을 특징으로 하는 인조매트 시공방법.Artificial mat construction method characterized in that the artificial mat can be firmly installed on the reservoir ground by the wire fixed to the anchor and the pressing body. 제5항에 있어서, 상기 가압체는The method of claim 5, wherein the pressing body 와이어의 긴장력에 의해 인조매트 상단을 가압하며 와이어가 통과하는 통과공이 형성된 가압판과;A pressing plate which presses the upper end of the artificial mat by a tension force of the wire and has a through hole through which the wire passes; 상기 가압판을 통과한 와이어를 고정하도록 상기 가압판 상부에 마련되는 고정클립을 포함하여 구성되는 것을 특징으로 하는 인조매트 시공방법.Artificial mat construction method characterized in that it comprises a fixing clip provided on the pressure plate to secure the wire passed through the pressure plate. 콘크리트층이 형성된 유수지 지반상에 인조파일이 식모된 인조매트를 시공하는 인조매트 시공구조에 있어서, 상기 인조매트 시공구조는 In the artificial mat construction structure for constructing the artificial mat in which the artificial pile is implanted on the reservoir ground on which the concrete layer is formed, the artificial mat construction structure is 상기 콘트리트층에 매립고정되는 앵카와; An anchors buried in the concrete layer; 상기 인조매트 상단에 마련된 가압체와; A press body provided on an upper end of the artificial mat; 일단은 상기 앵카 연결되어 매립되고 타단은 상기 콘크리트층의 상단으로 배출되어 상기 인조매트를 관통한 후 상기 앵카와 가압체를 긴장되게 연결하는 와이어를 포함하여 구성되어, One end is embedded and connected to the anchor and the other end is discharged to the upper end of the concrete layer is configured to include a wire connecting the anchor and the pressure body after passing through the artificial mat, 상기 앵카와 가압체에 연결된 와이어에 의해 인조매트가 견고하게 유수지 지반상에 시공될 수 있도록 한 것을 특징으로 하는 인조매트 시공구조.The artificial mat construction structure characterized in that the artificial mat can be firmly installed on the reservoir ground by a wire connected to the anchor and the pressing body. 제7항에 있어서, 상기 가압체는 The method of claim 7, wherein the pressing body is 와이어의 긴장력에 의해 인조매트 상단을 가압하며 와이어가 통과하는 통과공이 형성된 가압판과;A pressing plate which presses the upper end of the artificial mat by a tension force of the wire and has a through hole through which the wire passes; 상기 가압판을 통과한 와이어를 고정하도록 상기 가압판 상부에 마련되는 고정클립을 포함하여 구성되는 것을 특징으로 하는 인조매트 시공구조.Artificial mat construction structure comprising a fixing clip provided on the pressure plate to fix the wire passing through the pressure plate. 유수지 지반상에 와이어가 고정된 앵카를 배치시키는 앵카 배치단계와,An anchor arrangement step of arranging anchors in which wires are fixed on the reservoir ground; 상기 유수지 지반상에 콘크리트를 타설하여 상기 와이어가 고정된 앵카가 매립고정되도록 하는 콘크리트층 형성단계와,A concrete layer forming step of placing concrete on the reservoir ground so that the anchor anchored with the wire is fixed in landfill; 상기 콘크리트층이 적층된 유수지 지반상에 인조파일이 식모되며 관통공이 형성된 인조매트를 배치시키는 인조매트 배치단계와;An artificial mat arranging step of arranging an artificial mat in which artificial piles are formed and a through hole is formed on the resin ground on which the concrete layers are laminated; 상기 인조매트 상단에는 가압체를 배치시키고, 상기 앵카에 고정된 와이어를 상기 관통공을 통해 배출시켜 상기 가압체와 긴장되게 연결하는 와이어 연결단계를 포함하여 구성되어, And a wire connection step of disposing a pressing body on the top of the artificial mat and discharging the wire fixed to the anchor through the through hole to connect the pressing body with tension. 상기 앵카와 가압체에 고정된 와이어에 의해 인조매트가 견고하게 유수지 지반상에 시공될 수 있도록 한 것을 특징으로 하는 인조매트 시공방법.Artificial mat construction method characterized in that the artificial mat can be firmly installed on the reservoir ground by the wire fixed to the anchor and the pressing body. 제9항에 있어서, 상기 가압체는 The method of claim 9, wherein the pressing body 와이어의 긴장력에 의해 인조매트 상단을 가압하며 와이어가 통과하는 통과 공이 형성된 가압판과;A pressing plate which presses the upper end of the artificial mat by a tension force of the wire and has a passage hole through which the wire passes; 상기 가압판을 통과한 와이어를 고정하도록 상기 가압판 상부에 마련되는 고정클립을 포함하여 구성되는 것을 특징으로 하는 인조매트 시공방법.Artificial mat construction method characterized in that it comprises a fixing clip provided on the pressure plate to secure the wire passed through the pressure plate.
KR1020070006994A 2007-01-23 2007-01-23 Construction structure for artificial mat and method thterof KR100788942B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070006994A KR100788942B1 (en) 2007-01-23 2007-01-23 Construction structure for artificial mat and method thterof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070006994A KR100788942B1 (en) 2007-01-23 2007-01-23 Construction structure for artificial mat and method thterof

Publications (1)

Publication Number Publication Date
KR100788942B1 true KR100788942B1 (en) 2007-12-27

Family

ID=39148086

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070006994A KR100788942B1 (en) 2007-01-23 2007-01-23 Construction structure for artificial mat and method thterof

Country Status (1)

Country Link
KR (1) KR100788942B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009088791A1 (en) * 2007-12-31 2009-07-16 Dedicated Operational Contracting, Llc. Method for reinforcing and reinforced synthetic turf inlays and seams
KR200454179Y1 (en) 2009-11-23 2011-06-21 이예순 Earth wire anchor
ITVT20110010A1 (en) * 2011-05-23 2011-08-22 Mauro Contili SYSTEM FOR ECONOMIC AND ECO-FRIENDLY REALIZATION OF GOLF CAMPS WITH ARTIFICIAL SURFACES
WO2015009088A1 (en) * 2013-07-18 2015-01-22 주식회사 보림 Underground buried pile
KR20190132856A (en) * 2018-05-21 2019-11-29 문광호 Construction method for ultra eco-mat anchoring gutter

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5150549A (en) 1992-01-03 1992-09-29 Chen Chin Lung Anchor pile and concrete protection wall construction using said anchor pile
KR20030038894A (en) * 2001-11-07 2003-05-17 김일신 Plant tree structure for surface of slope surface
KR20030038893A (en) * 2001-11-07 2003-05-17 김일신 Anchor for engineering works
KR20030086233A (en) * 2003-04-09 2003-11-07 주식회사 오륙개발 execution method of landscape architecture for cutting ground using blasting stone and structure of landscape architecture for the same
KR200419598Y1 (en) 2006-04-10 2006-06-21 신천희 Vegetation mat fixing structure
KR100593196B1 (en) 2005-12-09 2006-06-28 극동엔지니어링(주) Lawn vegetation block of slope road

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5150549A (en) 1992-01-03 1992-09-29 Chen Chin Lung Anchor pile and concrete protection wall construction using said anchor pile
KR20030038894A (en) * 2001-11-07 2003-05-17 김일신 Plant tree structure for surface of slope surface
KR20030038893A (en) * 2001-11-07 2003-05-17 김일신 Anchor for engineering works
KR20030086233A (en) * 2003-04-09 2003-11-07 주식회사 오륙개발 execution method of landscape architecture for cutting ground using blasting stone and structure of landscape architecture for the same
KR100593196B1 (en) 2005-12-09 2006-06-28 극동엔지니어링(주) Lawn vegetation block of slope road
KR200419598Y1 (en) 2006-04-10 2006-06-21 신천희 Vegetation mat fixing structure

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009088791A1 (en) * 2007-12-31 2009-07-16 Dedicated Operational Contracting, Llc. Method for reinforcing and reinforced synthetic turf inlays and seams
US7838096B2 (en) 2007-12-31 2010-11-23 Doc Sports Surface Contractors, Llc Reinforced synthetic inlays and seams
KR200454179Y1 (en) 2009-11-23 2011-06-21 이예순 Earth wire anchor
ITVT20110010A1 (en) * 2011-05-23 2011-08-22 Mauro Contili SYSTEM FOR ECONOMIC AND ECO-FRIENDLY REALIZATION OF GOLF CAMPS WITH ARTIFICIAL SURFACES
WO2015009088A1 (en) * 2013-07-18 2015-01-22 주식회사 보림 Underground buried pile
KR101545189B1 (en) 2013-07-18 2015-08-20 주식회사 보림 Linked holding anchor
KR20190132856A (en) * 2018-05-21 2019-11-29 문광호 Construction method for ultra eco-mat anchoring gutter
KR102159178B1 (en) * 2018-05-21 2020-09-23 문광호 Construction method for ultra eco-mat anchoring gutter

Similar Documents

Publication Publication Date Title
KR100788942B1 (en) Construction structure for artificial mat and method thterof
KR101785677B1 (en) Construction method of retaining wall using precast slope panel
ES2669619T3 (en) Support plate for installing tiles
JP2014020079A (en) Slope reinforcing structure and slope reinforcing method
KR100802338B1 (en) Execution method for structure raising the ground level with a landscape architecture stone
KR101077949B1 (en) Block for reinforcement and construction method
CA2551712C (en) Void form for constructing post-tensioned foundation piles
KR100999186B1 (en) A Nailing Anchor Device For Soil Reinforcement
CA2804702C (en) A fence post assembly
KR100818504B1 (en) Tension soil nail and construction method of precast concrete panel using the same
KR100557010B1 (en) Earth anchor including a duplex grouting pipe and the earth anchor construction method using the same
US20080008539A1 (en) Void form for constructing post-tensioned foundation piles
JP2015121030A (en) Construction method of cell structure and cell structure
KR100921405B1 (en) Structure outer wall waterproofing method and adhere instrument of therein
US1449236A (en) Method of providing anchorages
JP4614928B2 (en) Lightweight embankment method
JP6668051B2 (en) Bamboo earth retaining structure
ES2584069T3 (en) Method to manufacture a concrete element and elastic sole for it
KR100972106B1 (en) Fixing unit for gabion mat
KR20090082061A (en) The grouting building method of anchor
KR102081038B1 (en) Bamboo fixing pin for vegetable mat and construction method using it
KR101809978B1 (en) Strike type one body drain structure body for ground and construction method thereof
KR100996190B1 (en) The stabilization method of construction using the slope stabilization equipment for soil nail, and this
JP2005350884A (en) Method for widening road and the like, and wall surface panel
KR20000041500A (en) Method of reinforcing earth using waste tire

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee