KR100776964B1 - underground wall earth retaining structure by prestressed steel pipe and excavation construction method of having used this - Google Patents

underground wall earth retaining structure by prestressed steel pipe and excavation construction method of having used this Download PDF

Info

Publication number
KR100776964B1
KR100776964B1 KR1020060023189A KR20060023189A KR100776964B1 KR 100776964 B1 KR100776964 B1 KR 100776964B1 KR 1020060023189 A KR1020060023189 A KR 1020060023189A KR 20060023189 A KR20060023189 A KR 20060023189A KR 100776964 B1 KR100776964 B1 KR 100776964B1
Authority
KR
South Korea
Prior art keywords
continuous wall
steel pipe
underground continuous
compressed steel
excavation
Prior art date
Application number
KR1020060023189A
Other languages
Korean (ko)
Other versions
KR20070093255A (en
Inventor
강현준
Original Assignee
(주)범양이엔씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)범양이엔씨 filed Critical (주)범양이엔씨
Priority to KR1020060023189A priority Critical patent/KR100776964B1/en
Publication of KR20070093255A publication Critical patent/KR20070093255A/en
Application granted granted Critical
Publication of KR100776964B1 publication Critical patent/KR100776964B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/18Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections using screw-thread elements
    • F16B7/182Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections using screw-thread elements for coaxial connections of two rods or tubes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/18Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections using screw-thread elements
    • F16B7/187Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections using screw-thread elements with sliding nuts or other additional connecting members for joining profiles provided with grooves or channels
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/09Arrangements for giving variable traffic instructions
    • G08G1/095Traffic lights

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

본 발명은 H빔을 사용하지 않고, 대신에 직경이 약 500~1500mm 정도의 대구경 압축강관을 사용하여 지하연속벽의 토압과 수압에 대하여 저항하는 방식으로써, 상대적으로 큰 좌굴장에서도 압축력에 대한 높은 안정성을 확보할 수 있으며, 상대적으로 설치수량을 적게 하여도 지하연속벽의 안정성을 유지할 수 있도록 한 압축강관을 이용한 지하 연속벽 흙막이 구조체 및 굴토방법을 제공하는데 그 목적이 있다.The present invention does not use an H beam, but instead uses a large diameter compressed steel pipe of about 500 to 1500 mm in diameter to resist against earth pressure and water pressure in a continuous continuous wall. The purpose of the present invention is to provide an underground continuous wall mud structure and a method of excavation using compressed steel pipe that can ensure stability and maintain stability of the underground continuous wall even with a relatively small amount of installation.

상기한 목적을 달성하기 위한 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 구조체는 대상지반의 경계선을 따라 소정의 두께 및 깊이로 일체로 형성되는 지하연속벽과; 상기 지하연속벽에 다수 개가 앵커볼트를 매개로 고정 설치되는 정착부와; 상기 정착부간을 가로질러 용접 설치됨과 동시에 압축강관으로 이루어진 지보재로 구성됨을 특징으로 한다.Underground continuous wall mud structure using the compressed steel pipe according to the present invention for achieving the above object is an underground continuous wall integrally formed with a predetermined thickness and depth along the boundary of the target ground; A plurality of fixing units installed in the basement continuous wall via anchor bolts; At the same time welded across the fixing unit is characterized in that the support material consisting of a compression steel pipe.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 굴토방법은 대상지반의 경계면을 따라 안내벽을 설치하는 단계(Ⅰ); 상기 안내벽을 기준으로 내측을 굴착장비를 이용하여 소정의 깊이로 굴착하여 굴착공을 형성하는 단계(Ⅱ); 상기 굴착공내를 안정액으로 안정화 처리하는 단계(Ⅲ); 상기 굴착공에 철근조립체를 양중장치를 이용하여 삽입하는 단계(Ⅳ); 상기 철근조립체가 삽입된 굴착공내에 트레미관을 삽입한 후, 상기 트레미관을 굴착공 바닥으로부터 상향으로 인발하면서 콘크리트를 타설하여 지하연속벽을 형성하는 단계(Ⅴ ); 상기 지하연속벽의 상단에 H빔을 설치하여 캐핑부를 형성하는 단계(Ⅵ)로 구성되는 지하연속벽 흙막이 굴토방법에 있어서, 상기 지하연속벽에 정착부를 다수 개 고정 설치하는 단계(Ⅶ); 상기 정착부간을 가로질러 압축강관으로 이루어진 지보재를 고정 설치하는 단계(Ⅷ)로 이루어짐을 특징으로 한다. In addition, the underground continuous wall oyster excavation method using a compressed steel pipe according to the present invention for achieving the above object comprises the steps of installing a guide wall along the boundary of the target ground (I); Excavating an inner side of the guide wall to a predetermined depth by using an excavation equipment to form an excavation hole (II); Stabilizing the inside of the excavation hole with a stabilizer (III); Inserting a reinforcing bar assembly into the excavation hole by using a lifting device (IV); (V) forming an underground continuous wall by inserting a trem tube into the excavation hole into which the reinforcing bar assembly is inserted, and drawing concrete while drawing the trem tube upwards from the bottom of the excavation hole; In the underground continuous wall mudstone gulting method comprising the step (VI) of installing the H beam on the upper end of the underground continuous wall, the step of fixing a plurality of fixing parts to the underground continuous wall (Ⅶ); It characterized in that the step (Ⅷ) of fixing the support material made of compressed steel pipe across the fixing unit.

압축강관, 지하 연속벽, 흙막이 구조체, 굴토방법 Compressed steel pipe, underground continuous wall, earth block structure, gulting method

Description

압축강관을 이용한 지하 연속벽 흙막이 구조체 및 굴토방법{underground wall earth retaining structure by prestressed steel pipe and excavation construction method of having used this}Underground wall earth retaining structure by prestressed steel pipe and excavation construction method of having used this}

도 1은 본 발명에 따른 지하연속벽과 압축강관을 콘크리트블록으로 접합한 상태를 도시한 평면도,1 is a plan view showing a state of joining the underground continuous wall and the compressed steel pipe with a concrete block according to the present invention,

도 2는 도 1의 A-A선 단면도,2 is a cross-sectional view taken along the line A-A of FIG.

도 3은 도 2의 B-B선 단면도,3 is a cross-sectional view taken along the line B-B of FIG.

도 4는 도 1의 "A" 부분을 확대 도시한 상세도,4 is an enlarged detailed view of a portion “A” of FIG. 1;

도 5는 도 4의 A-A선 단면도,5 is a cross-sectional view taken along the line A-A of FIG.

도 6은 도 5의 B-B선 단면도,6 is a cross-sectional view taken along the line B-B of FIG.

도 7은 도 1의 "B" 부분을 확대 도시한 상세도,7 is an enlarged detailed view of a portion “B” of FIG. 1;

도 8은 도 7의 A-A선 단면도,8 is a cross-sectional view taken along the line A-A of FIG.

도 9는 도 8의 B-B선 단면도,9 is a cross-sectional view taken along line B-B of FIG. 8;

도 10은 도 7의 C-C선 단면도,10 is a cross-sectional view taken along the line C-C of FIG.

도 11은 도 10의 D-D선 단면도,11 is a cross-sectional view taken along the line D-D of FIG. 10;

도 12는 도 1의 "C" 부분을 확대 도시한 상세도,12 is an enlarged detailed view of a portion “C” of FIG. 1;

도 13은 도 12의 A-A선 단면도,FIG. 13 is a cross-sectional view taken along the line A-A of FIG. 12; FIG.

도 14는 도 1의 "D" 부분을 확대 도시한 상세도,14 is an enlarged detailed view of a portion “D” of FIG. 1;

도 15는 본 발명에 따른 지하연속벽에 설치되는 철근조립체를 도시한 정면도,15 is a front view showing a reinforcing bar assembly installed on the continuous underground wall according to the present invention,

도 16은 본 발명에 따른 지하연속벽에 설치되는 철근조립체를 도시한 평면도,16 is a plan view showing a reinforcing bar assembly installed on the continuous wall of the underground according to the present invention,

도 17은 도 15의 A-A선 단면도,17 is a cross-sectional view taken along the line A-A of FIG. 15;

도 18a 내지 도 18h는 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 시공을 단계별로 도시한 공정도,18a to 18h is a process diagram showing step by step construction of underground continuous wall retaining wall using a compressed steel pipe according to the present invention,

도 19는 본 발명에 따른 지하연속벽과 압축강관을 철골로 접합한 상태를 도시한 입면도,19 is an elevation view showing a state of joining the underground continuous wall and the compressed steel pipe with steel frame according to the present invention,

도 20은 본 발명에 따른 지하연속벽과 압축강관을 철골로 접합한 상태를 도시한 평면도,20 is a plan view showing a state of joining the underground continuous wall and the compressed steel pipe with steel frame according to the present invention,

도 21은 본 발명에 따른 지하연속벽과 압축강관을 철골로 접합한 상태를 도시한 단면도.Figure 21 is a cross-sectional view showing a state of joining the underground continuous wall and the compressed steel pipe with steel frame according to the present invention.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

100: 지하연속벽 200: 정착부100: continuous continuous wall 200: fixing unit

210: 철근콘크리트블록 212: 철근210: reinforced concrete block 212: rebar

214: 콘크리트 220: 연결부214: concrete 220: connection

222: 브라켓 230: 플랫잭222: bracket 230: flat jack

233: 플랫잭 받침판 240: 플레이트233: flat jack support plate 240: plate

250: 앵커볼트 300: 정착부250: anchor bolt 300: fixing unit

310: 철골부재 320: 플레이트310: steel member 320: plate

322: 원형공 330: 연결재322: circular hole 330: connecting member

350: 앵커볼트 400: 지보재350: anchor bolt 400: support

410: 압축강관410: compressed steel pipe

B: H빔 C: 캐핑부B: H beam C: capping part

G: 지반 GW: 안내벽G: Ground GW: Guide Wall

H: 굴착공 L: 안정액H: Excavator L: Stabilizer

S: 철근조립체 T: 트레미관 S: Rebar assembly T: Tremi tube

본 발명은 압축강관을 이용한 지하 연속벽 흙막이 구조체 및 굴토방법에 관한 것으로, 특히 지보재로 H빔을 사용하지 않고 대신에 직경이 약 500~1500mm 정도의 대구경 압축강관을 사용하여 지하연속벽의 토압과 수압에 대하여 저항하도록 한 압축강관을 이용한 지하 연속벽 흙막이 구조체 및 굴토방법에 관한 것이다.The present invention relates to an underground continuous wall retaining structure and a method of excavation using compressed steel pipe, and in particular, does not use the H beam as a support material, and instead of using a large diameter compressed steel pipe having a diameter of about 500-1500 mm, The present invention relates to an underground continuous wall retaining structure using a compressed steel pipe that is resistant to hydraulic pressure, and a method of excavation.

일반적으로 이용되는 흙막이 가시설의 지보형식은 크게 다음과 같은 세 가지 형식으로 구분될 수 있다.There are three main types of support for earthquake temporary installations.

첫 번째 형식으로 H빔 형식을 이용한 일반 지보형식과, 두 번째 형식으로 지중앵커(ANCHOR)를 이용하는 지보형식 및 세 번째 형식으로 슬래브(SLAB)를 이용하는 지보형식으로 구분된다.The first type is divided into general support type using H beam type, second type support type using ANCHOR, and third type support type using SLAB.

여기서, 상기한 흙막이 벽체 지보형식 중 두 번째 지보형식인 지중앵커를 이용하는 지보형식은 현장의 다양한 주변 지반조건 및 인접구조물의 유무 등에 많은 제한 요인이 있어 사용을 기피하고 있으며, 세 번째 지보형식인 슬래브를 이용하는 지보형식은 경제적인 측면에서 불리하며, 첫 번째 지보형식인 H빔을 이용한 지보형식이 일반적으로 가장 널리 사용하고 있다.Here, the support type using the underground anchor, which is the second support type of the wall support type, is avoided because there are many limiting factors such as various surrounding ground conditions and the presence or absence of adjacent structures in the site, and the third support type slab The support type using the H-beam is disadvantageous in terms of economics, and the first support type using the H beam is generally the most widely used.

그러나 상기한 H빔을 이용한 지보형식은 단면의 형상이 면적에 비하여 상대적으로 작은 단면계수를 갖게 되므로, 작용 압축력에 대한 저항력이 좌굴장에 불리하게 작용하여 일반적으로 30m 미만 정도의 지간거리에 주로 적용되며, 50~60m 이상의 상대적으로 장지간에는 H빔의 사용상 제한이 따르고 있는 실정이다. However, since the shape of the cross section has a relatively small cross-sectional coefficient compared to the area, the H-beam support type is mainly applied to a distance of less than 30m because the resistance against applied compressive force adversely affects the buckling field. In addition, the use of H-beams is relatively long between more than 50 ~ 60m.

또한, 상기 H빔의 좌굴장을 감소시키고 스트러트의 자중을 견디게 하기 위하여 스트러트를 배치하기에 앞서 일정간격으로 포스트파일을 선행적으로 시공하여야 함으로 전반적인 철골부재의 사용량이 증가되어 공사비가 증가되는 원인이 되고 있다. In addition, in order to reduce the buckling length of the H beam and to withstand the weight of the strut, the post pile should be pre-installed at a predetermined interval prior to arranging the strut. It is becoming.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로서, H빔을 사용하지 않고, 대신에 직경이 약 500~1500mm 정도의 대구경 압축강관을 사용하여 지하연속벽의 토압과 수압에 대하여 저항하는 방식으로써, 상대적으로 큰 좌굴장에서도 압축력에 대한 높은 안정성을 확보할 수 있으며, 상대적으로 설치수량을 적게 하여도 지하연속벽의 안정성을 유지할 수 있도록 한 압축강관을 이용한 지하 연속벽 흙막이 구조체 및 굴토방법을 제공하는데 그 목적이 있다.Therefore, the present invention was devised to solve the problems described above, and does not use the H beam, but instead of using the large diameter compressed steel pipe of about 500 to 1500mm in diameter to the earth pressure and water pressure of the continuous wall underground As a resistive method, it is possible to secure high stability against compressive force even in a relatively large buckling field, and underground continuous wall mud structure using compressed steel pipe to maintain the stability of the underground continuous wall even if the installation quantity is relatively small. And to provide a method of gulting its purpose.

상기한 목적을 달성하기 위한 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 구조체는 대상지반의 경계선을 따라 소정의 두께 및 깊이로 일체로 형성되는 지하연속벽과; 상기 지하연속벽에 다수 개가 앵커볼트를 매개로 고정 설치되는 정착부와; 상기 정착부간을 가로질러 용접 설치됨과 동시에 압축강관으로 이루어진 지보재로 구성됨을 특징으로 한다.Underground continuous wall mud structure using the compressed steel pipe according to the present invention for achieving the above object is an underground continuous wall integrally formed with a predetermined thickness and depth along the boundary of the target ground; A plurality of fixing units installed in the basement continuous wall via anchor bolts; At the same time welded across the fixing unit is characterized in that the support material consisting of a compression steel pipe.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 굴토방법은 대상지반의 경계면을 따라 안내벽을 설치하는 단계(Ⅰ); 상기 안내벽을 기준으로 내측을 굴착장비를 이용하여 소정의 깊이로 굴착하여 굴착공을 형성하는 단계(Ⅱ); 상기 굴착공내를 안정액으로 안정화 처리하는 단계(Ⅲ); 상기 굴착공에 철근조립체를 양중장치를 이용하여 삽입하는 단계(Ⅳ); 상기 철근조립체가 삽입된 굴착공내에 트레미관을 삽입한 후, 상기 트레미관을 굴착공 바닥으로부터 상향으로 인발하면서 콘크리트를 타설하여 지하연속벽을 형성하는 단계(Ⅴ); 상기 지하연속벽의 상단에 H빔을 설치하여 캐핑부를 형성하는 단계(Ⅵ)로 구성되는 지하연속벽 흙막이 굴토방법에 있어서, In addition, the underground continuous wall oyster excavation method using a compressed steel pipe according to the present invention for achieving the above object comprises the steps of installing a guide wall along the boundary of the target ground (I); Excavating an inner side of the guide wall to a predetermined depth by using an excavation equipment to form an excavation hole (II); Stabilizing the inside of the excavation hole with a stabilizer (III); Inserting a reinforcing bar assembly into the excavation hole by using a lifting device (IV); (V) forming an underground continuous wall by inserting a trem tube into the excavation hole into which the reinforcing bar assembly is inserted, and drawing concrete while drawing the trem tube upward from the bottom of the excavation hole (V); In the underground continuous wall mud excavation method comprising the step (VI) to form a capping portion by installing an H beam on the upper end of the underground continuous wall,

상기 지하연속벽에 정착부를 다수 개 고정 설치하는 단계(Ⅶ); 상기 정착부간을 가로질러 압축강관으로 이루어진 지보재를 고정 설치하는 단계(Ⅷ)로 이루어 짐을 특징으로 한다.(Iv) fixing a plurality of fixing units to the underground continuous wall; It characterized in that the step (Ⅷ) of fixing the support material made of compressed steel pipe across the fixing unit.

이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.

도 1은 본 발명에 따른 지하연속벽과 압축강관을 콘크리트블록으로 접합한 상태를 도시한 평면도이며, 도 2는 도 1의 A-A선 단면도이며, 도 3은 도 2의 B-B선 단면도이며, 도 4는 도 1의 "A" 부분을 확대 도시한 상세도이며, 도 5는 도 4의 A-A선 단면도이며, 도 6은 도 5의 B-B선 단면도이며, 도 7은 도 1의 "B" 부분을 확대 도시한 상세도이며, 도 8은 도 7의 A-A선 단면도이며, 도 9는 도 8의 B-B선 단면도이며, 도 10은 도 7의 C-C선 단면도이며, 도 11은 도 10의 D-D선 단면도이며, 도 12는 도 1의 "C" 부분을 확대 도시한 상세도이며, 도 13은 도 12의 A-A선 단면도이며, 도 14는 도 1의 "D" 부분을 확대 도시한 상세도이며, 도 15는 본 발명에 따른 지하연속벽에 설치되는 철근조립체를 도시한 정면도이며, 도 16은 본 발명에 따른 지하연속벽에 설치되는 철근조립체를 도시한 평면도이며, 도 17은 도 15의 A-A선 단면도이다.1 is a plan view showing a state of joining the underground continuous wall and the compressed steel pipe with a concrete block according to the present invention, Figure 2 is a cross-sectional view taken along line AA of Figure 1, Figure 3 is a cross-sectional view taken along line BB of Figure 2, Figure 4 1 is an enlarged view of portion "A" of FIG. 1, FIG. 5 is a cross-sectional view taken along line AA of FIG. 4, FIG. 6 is a cross-sectional view taken along line BB of FIG. 5, and FIG. FIG. 8 is a sectional view taken along the line AA of FIG. 7, FIG. 9 is a sectional view taken along the line BB of FIG. 8, FIG. 10 is a sectional view taken along the line CC of FIG. 7, and FIG. 11 is a sectional view taken along the line DD of FIG. 10. FIG. 12 is an enlarged view of portion "C" of FIG. 1, FIG. 13 is a cross-sectional view taken along line AA of FIG. 12, FIG. 14 is an enlarged view of portion "D" of FIG. 1, and FIG. Reinforcing bar assembly is installed in the basement continuous wall according to the present invention is a front view, Figure 16 is a plan view showing the reinforcing bar assembly installed in the basement continuous wall according to the present invention , Figure 17 is a cross-sectional view taken along the line A-A of Fig.

이들 도면에 도시된 바와 같이, 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 구조체는 대상지반(G)의 경계선을 따라 소정의 두께 및 깊이로 일체로 형성되는 지하연속벽(100)과; 상기 지하연속벽(100)에 다수 개가 앵커볼트(250, 350)를 매개로 고정 설치되는 정착부(200, 300)와; 상기 정착부(200, 300)간을 가로질러 용접 설치됨과 동시에 압축강관(410)으로 이루어진 지보재(400)로 구성된다.As shown in these drawings, the underground continuous wall mud structure using the compressed steel pipe according to the present invention includes an underground continuous wall (100) integrally formed with a predetermined thickness and depth along the boundary line of the target ground (G); A plurality of fixing units 200 and 300 installed on the base continuous wall 100 through a plurality of anchor bolts 250 and 350; At the same time welding is installed across the fixing unit (200, 300) is composed of a support member 400 made of a compressed steel pipe (410).

즉, 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 구조체는 지하연 속벽(100)과, 정착부(200) 및 지보재(400)가 유기적으로 결합되어 이루어진 구조이다.That is, the underground continuous wall retaining structure using the compressed steel pipe according to the present invention is a structure in which the underground continuous continuous wall 100, the fixing unit 200 and the support member 400 are organically combined.

여기서, 상기 지하연속벽(100)은 대상지반(G)의 경계면을 따라 안내벽(GW)을 설치하고, 상기 안내벽(GW)을 기준으로 내측을 굴착장비를 이용하여 소정의 깊이로 굴착하여 굴착공(H)을 형성한 후 상기 굴착공(H)내를 벤토나이트와 같은 안정액(L)으로 안정화 처리한 후, 상기 굴착공(H)에 철근조립체(S)를 양중장치를 이용하여 삽입한 후, 상기 굴착공(H)내에 트레미관(T)을 삽입한 후, 상기 트레미관(T)을 굴착공(H) 바닥으로부터 상향으로 인발하면서 콘크리트를 타설하여 양생된 벽체로서, 터파기할 때 지반의 붕괴를 방지한다.Here, the underground continuous wall 100 is installed to the guide wall (GW) along the boundary surface of the target ground (G), by excavating the inside of the guide wall (GW) to a predetermined depth using the excavation equipment After the excavation hole (H) is formed, the excavation hole (H) is stabilized with a stabilizing liquid (L) such as bentonite, and then the rebar assembly (S) is inserted into the excavation hole (H) using a lifting device. Then, after inserting the tremi tube (T) in the excavation hole (H), and cast the concrete while drawing up the tremi tube (T) upward from the bottom of the excavation hole (H), when cured as a wall Prevent the collapse of the ground.

또한, 상기 정착부(200)는 내부에 철근(212)이 내장됨과 동시에 일정한 두께 및 폭으로 갖는 단면형상으로 콘크리트(214)가 타설 양생되어 형성된 철근콘크리트블록(210)과; 상기 철근콘크리트블록(210)상에 고정 설치되며, 양측에 브라켓(222)이 형성된 연결부(220)와; 상기 연결부(220) 표면에 배치되며, 소정의 압력(가압범위 300∼700ton)을 행사하는 플랫잭(230)과; 상기 플랫잭(230)의 하부에 배치되는 플랫잭 받침판(233) 및 상기 플랫잭(230)상에 용접 설치되는 플레이트(240)로 구성된다.In addition, the fixing unit 200 includes a reinforced concrete block 210 formed by pouring concrete 214 in a cross-sectional shape having a predetermined thickness and width at the same time as the reinforcing bar 212 is embedded therein; A connection part 220 fixedly installed on the reinforced concrete block 210 and having brackets 222 formed at both sides thereof; A flat jack 230 disposed on the surface of the connection part 220 and exerting a predetermined pressure (pressure range 300 to 700 tons); It consists of a flat jack support plate 233 disposed below the flat jack 230 and a plate 240 welded on the flat jack 230.

즉, 상기한 정착부(200)는 철근콘크리트블록(210), 연결부(220), 플랫잭(230) 및 플레이트(240)가 유기적으로 결합된 후, 지하연속벽(100)에 설치되어 압축강관(410)을 고정 지지시키는 역할을 한다.That is, the fixing unit 200 is the reinforced concrete block 210, the connecting portion 220, the flat jack 230 and the plate 240 is organically coupled, and then installed in the underground continuous wall 100 is compressed steel pipe 410 serves to fix and support.

여기서, 상기 철근콘크리트블록(210)은 철근(212)과 콘크리트(214)의 조합으 로 이루어진 구조로서, 콘크리트로 만으로 블록을 제작할 경우에는 콘크리트는 인장측에 약하기 때문에 이를 구조적으로 보강하기 위하여 인장력을 받는 부분에 철근을 매입하여 외력에 대해서 일체로 작용하도록 한 구조이다.Here, the reinforced concrete block 210 is a structure consisting of a combination of the reinforcing bars 212 and concrete 214, when the block is made of concrete only, because the concrete is weak to the tension side to increase the structural strength Reinforcing bar is inserted in the receiving part and it is structured to work integrally with external force.

특히 상기 철근콘크리트블록(210)은 이동이 되지 않도록 지하연속벽(100)에 고정시켜야 하며, 지하연속벽(100)에 작용하는 하중이 철근콘크리트블록(210)으로 분배 전달되도록 하여야 한다.In particular, the reinforced concrete block 210 should be fixed to the underground continuous wall 100 so as not to move, and the load acting on the underground continuous wall 100 should be distributed to the reinforced concrete block 210.

또한, 상기 연결부(220)는 양측에 브라켓(222)이 형성된 강구조물로, 상기 철근콘크리트블록(210) 상에 고정 설치되어, 압축강관(410)을 지지해 주는 기능을 한다.In addition, the connection portion 220 is a steel structure having a bracket 222 formed on both sides, and is fixed on the reinforced concrete block 210, and serves to support the compressed steel pipe 410.

그리고 상기 플랫잭(230)은 두 장의 얇은 연강판을 맞붙인 밀폐 원형의 잭으로, 프리스트레스력의 도입을 위해 압축강관(410)을 배치한 연결부(220)와 플레이트(240) 사이에 배치토록 하고, 유압펌프에 연결하여 임의압력으로 가압과 동시에 강관을 압착시키도록 하며, 또한 작동시킨 채로 고정할 필요가 있을 때에는 무수축 모르타르나 에폭시 수지를 주입한다.In addition, the flat jack 230 is a sealed circular jack that joins two thin mild steel plates, and is disposed between the connecting portion 220 and the plate 240 in which the compressed steel pipe 410 is disposed for the introduction of the prestressing force. In order to press the steel pipe at the same time and pressurize it at a certain pressure by connecting it to the hydraulic pump, and when it is necessary to fix it while it is in operation, the non-shrink mortar or epoxy resin is injected.

즉, 상기 플랫잭(230)은 강관(410)을 압축하면서 별도의 지보재 없이도 강관(410) 양단의 지하연속벽(100)이 강관(410)을 고정시켜 주는 구조인 동시에 지하연속벽(100)에서 작용하는 토압과 수압에 대한 반력을 조정하기 위함이다.That is, the flat jack 230 compresses the steel pipe 410 and has a structure in which the underground continuous wall 100 at both ends of the steel pipe 410 is fixed to the steel pipe 410 without a separate support material. This is to adjust the reaction force against earth pressure and water pressure acting in the.

또한, 상기 플랫잭(230)은 일반적으로 압축강관(410) 양끝 중에서 어느 한쪽에만 설치하여도 동일한 작용력을 발휘할 수 있도록 하여 경제적인 배치구조이다.In addition, the flat jack 230 is an economical arrangement structure so that the same action force can be exerted even if only installed on either end of the compression steel pipe 410 in general.

그리고 상기 플레이트(240)는 일반적인 사각형 강판이다. The plate 240 is a general rectangular steel sheet.

한편, 상기 지보재(400)는 직경이 약 500~1500mm 정도의 대구경 압축강관(410)이 다수 개 설치된 구조이다.On the other hand, the support material 400 is a structure in which a plurality of large diameter compressed steel pipe 410 of about 500 ~ 1500mm in diameter is installed.

이와 같은 지보재(400)는 지하연속벽(100)간에 설치된 정착부(200)간을 가로질러 정착부(200)에 압축강관(410)의 양단이 고정 설치되어, 지하연속벽(100)이 토압에 의해서 전도 또는 붕괴되는 것을 막는 버팀대 역할을 한다.Such support material 400 is fixed to both ends of the compressed steel pipe 410 is fixed to the fixing unit 200 across the fixing unit 200 provided between the underground continuous wall 100, the underground continuous wall 100 is earth pressure It acts as a brace to prevent falling or collapsing.

이하, 상기한 바와 같은 구성으로 이루어진 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 시공에 대해서 설명한다.Hereinafter, the construction of the underground continuous wall mud using the compressed steel pipe according to the present invention having the configuration as described above.

도 18a 내지 도 18h는 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 시공을 단계별로 도시한 공정도이다.18A to 18H are process diagrams showing step-by-step construction of underground continuous wall retaining wall using compressed steel pipe according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 굴토방법은 대상지반(G)의 경계면을 따라 안내벽(GW)을 설치하는 단계(Ⅰ); 상기 안내벽(GW)을 기준으로 내측을 굴착장비를 이용하여 소정의 깊이로 굴착하여 굴착공(H)을 형성하는 단계(Ⅱ); 상기 굴착공(H)내를 안정액(L)으로 안정화 처리하는 단계(Ⅲ); 상기 굴착공(H)에 철근조립체(S)를 양중장치를 이용하여 삽입하는 단계(Ⅳ); 상기 철근조립체(S)가 삽입된 굴착공(H)내에 트레미관(T)을 삽입한 후, 상기 트레미관(T)을 굴착공(H) 바닥으로부터 상향으로 인발하면서 콘크리트를 타설하여 지하연속벽(100)을 형성하는 단계(Ⅴ); 상기 지하연속벽(100)의 상단에 H빔(B)을 설치하여 캐핑부(C)를 형성하는 단계(Ⅵ)로 구성되는 지하연속벽 흙막이 굴토방법에 있어서, As shown in these drawings, the underground continuous wall mud excavation method using the compressed steel pipe according to the present invention comprises the steps of installing the guide wall (GW) along the boundary surface of the target ground (G); Forming an excavation hole (H) by digging an inner side of the guide wall (GW) to a predetermined depth by using an excavation equipment; Stabilizing the inside of the excavation hole (H) with a stabilizer (III); Inserting reinforcing bar assembly S into the excavation hole H using a lifting device (IV); After inserting the tremi tube (T) into the excavation hole (H) into which the reinforcing bar assembly (S) is inserted, while pouring the tremi tube (T) upward from the bottom of the excavation hole (H), the concrete continuous wall Forming (100) (V); In the underground continuous wall mud excavation method comprising the step (VI) of forming the capping portion (C) by installing the H beam (B) on the upper end of the underground continuous wall (100),

상기 지하연속벽(100)에 정착부(200, 300)를 다수 개 고정 설치하는 단계(Ⅶ); 상기 정착부(200, 300)간을 가로질러 압축강관(410)으로 이루어진 지보재(400)를 고정 설치하는 단계(Ⅷ)로 이루어진다.(Ⅶ) fixing a plurality of fixing units (200, 300) to the underground continuous wall (100); It consists of a step (Ⅷ) of fixing the support member 400 made of a compressed steel pipe 410 across the fixing unit (200, 300).

여기서, 상기 정착부(200) 설치단계(Ⅶ)는 내부에 철근(212)이 내장됨과 동시에 일정한 두께 및 폭으로 갖는 단면형상으로 콘크리트(214)가 타설 양생되어 형성된 철근콘크리트블록(210)의 상면에 양측에 브라켓(222)이 형성된 연결부(220)를 설치하고, 상기 연결부(220) 표면에 소정의 압력을 행사하는 플랫잭(230)을 설치하며, 상기 플랫잭(230)상에 플레이트(240)를 용접 설치한 후, 상기 철근콘크리트블록(210)을 앵커볼트(250)로 지하연속벽(100)에 고정 설치한다.Here, the installation step (설치) of the fixing unit 200 is the upper surface of the reinforced concrete block 210 formed by curing the concrete 214 in the cross-sectional shape having a predetermined thickness and width at the same time as the reinforcing bar 212 is embedded therein Install the connecting portion 220, the bracket 222 is formed on both sides in the installation, and install the flat jack 230 to exert a predetermined pressure on the surface of the connecting portion 220, the plate 240 on the flat jack 230 After welding), the reinforced concrete block 210 is fixed to the underground continuous wall 100 by the anchor bolt 250.

또한, 상기 지보재(400) 설치단계(Ⅷ)는 정착부(200)의 플레이트(240)에 압축강관(410)을 용접 설치하고, 상기 정착부(200)의 플랫잭(230)에 압력을 높여 압축강관(310)을 지지하면서 별도의 받침보 또는 지보말뚝(Post Pile) 필요없이, 고정 설치한다.In addition, in the installation step (Ⅷ) of the support material 400, the compressed steel pipe 410 is welded to the plate 240 of the fixing unit 200, and the pressure is increased to the flat jack 230 of the fixing unit 200. While supporting the compressed steel pipe 310 is fixed installation, without the need for a separate support beam or post pile (Post Pile).

즉, 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 굴토방법은 대상지반(G)의 경계면을 따라 안내벽(GW)을 설치하고, 상기 안내벽(GW)을 기준으로 내측을 굴착장비를 이용하여 소정의 깊이로 굴착하여 굴착공(H)을 형성한 후, 상기 굴착공(H)내를 벤토나이트 등과 같은 안정액(L)으로 안정화 처리한 후, 상기 굴착공(H)에 철근조립체(S)를 양중장치를 이용하여 삽입한 후, 상기 철근조립체(S)가 삽입된 굴착공(H)내에 트레미관(T)을 삽입한 후, 상기 트레미관(T)을 굴착공(H) 바닥으로부터 상향으로 인발하면서 콘크리트를 타설하여 지하연속벽(100)을 형성하 고, 상기 지하연속벽(100)의 상단에 H빔(B)을 설치하여 캐핑부(C)를 형성한 후, That is, the underground continuous wall mud excavation method using the compressed steel pipe according to the present invention is installed guide wall (GW) along the boundary surface of the target ground (G), using the excavation equipment on the inside based on the guide wall (GW) After excavating to a predetermined depth to form an excavation hole (H), and stabilizes the excavation hole (H) with a stabilizer (L), such as bentonite, and then the reinforcing bar (S) in the excavation hole (H) After inserting using a lifting device, insert the tremi tube (T) into the excavation hole (H) in which the reinforcing bar assembly (S) is inserted, and then raise the tremi tube (T) from the bottom of the excavation hole (H) After pouring concrete to form a continuous wall (100) to form an underground, H-beam (B) is installed on the upper end of the underground continuous wall 100 to form a capping part (C),

상기 지하연속벽(100)에 정착부(200)를 설치하되, 내부에 철근(212)이 내장됨과 동시에 일정한 두께 및 폭으로 갖는 단면형상으로 콘크리트(214)가 타설 양생되어 형성된 철근콘크리트블록(210)의 상면에 양측에 브라켓(222)이 형성된 연결부(220)를 설치하고, 상기 연결부(220) 표면에 소정의 압력을 행사하는 플랫잭(230)를 설치하며, 상기 플랫잭(230)상에 플레이트(240)를 용접 설치한 후, 상기 철근콘크리트블록(210)을 앵커볼트(250)로 지하연속벽(100)에 고정 설치한 후, Reinforced concrete block 210 is installed in the basement continuous wall 100, the reinforcement concrete block 210 is formed by the concrete 214 is poured into a cross-sectional shape having a predetermined thickness and width at the same time the reinforcing bar 212 is embedded therein On the upper surface of the) is installed a connecting portion 220, the bracket 222 is formed on both sides, and installs a flat jack 230 for exerting a predetermined pressure on the surface of the connecting portion 220, on the flat jack 230 After the welding of the plate 240, the reinforced concrete block 210 is fixed to the underground continuous wall 100 by anchor bolts 250,

상기 정착부(200, 300)간을 가로질러 압축강관(410)으로 이루어진 지보재(400)를 고정 설치하되, 정착부(200)의 플레이트(240)에 압축강관(410)을 용접 설치하고, 상기 정착부(200)의 플랫잭(230)에 압력을 높여 압축강관(310)을 지지하면서 고정 설치하여 시공한다.While fixing the support member 400 made of the compressed steel pipe 410 across the fixing unit 200, 300, the welding of the compressed steel pipe 410 to the plate 240 of the fixing unit 200, The pressure is applied to the flat jack 230 of the fixing unit 200 to be fixed and installed while supporting the compressed steel pipe 310.

상기한 바와 같은 구성 및 시공으로 이루어진 압축강관을 이용한 지하 연속벽 흙막이 구조체 및 굴토방법은 단계별 굴토공사에 앞서 플랫잭(230)으로 약 200~300톤/개소 이상의 대규모 프리스트레스 하중을 가하여 압축강관(410) 지보재(400)의 축방향으로 압축력을 발생시켜, 지보재(400)인 압축강관(410)이 지하연속벽(100) 사이에 설치되었을 때 자중에 의하여 아래로 처지는 현상을 방지함과 동시에 지하연속벽(100) 내부의 지하굴토공사 중 압축강관(410) 자체의 무게로 인하여 지하연속벽(100)으로부터 압축강관(410) 지보재(400)가 이탈되는 것을 방지한다. Underground continuous wall retaining structure and oyster method using the compressed steel pipe made of the configuration and construction as described above is a compressed steel pipe 410 by applying a large prestressed load of about 200 ~ 300 tons / place to the flat jack 230 prior to the stepped pit By generating a compressive force in the axial direction of the support member 400, when the compressed steel pipe 410, which is the support member 400 is installed between the underground continuous wall 100 to prevent sagging down by its own weight, Due to the weight of the compressed steel pipe 410 itself during the underground excavation work inside the wall 100 prevents the compressed steel pipe 410 support material 400 is separated from the underground continuous wall 100.

또한, 상기 압축강관(410) 지보재(400)에 가해진 초기압축력은 굴토공사 중 발생하는 지하연속벽(100)의 거동을 최소화하여 더욱 안전한 굴토공사가 이루어지 는 작용효과가 있다.In addition, the initial compressive force applied to the compressed steel pipe 410 support material 400 has the effect of making the safe gulto work by minimizing the behavior of the continuous underground wall 100 generated during the pitwork.

이하, 본 발명을 실시예를 예로 들어 좀 더 상세히 설명한다.Hereinafter, the present invention will be described in more detail with reference to Examples.

도 19는 본 발명에 따른 지하연속벽과 압축강관을 철골로 접합한 상태를 도시한 입면도이며, 도 20은 본 발명에 따른 지하연속벽과 압축강관을 철골로 접합한 상태를 도시한 평면도이며, 도 21은 본 발명에 따른 지하연속벽과 압축강관을 철골로 접합한 상태를 도시한 단면도이다.19 is an elevation view showing a state of joining the underground continuous wall and the compressed steel pipe with steel frame according to the present invention, Figure 20 is a plan view showing a state of joining the underground continuous wall and the compressed steel pipe according to the present invention with steel frame, 21 is a cross-sectional view showing a state where the underground continuous wall and the compressed steel pipe are bonded with steel frame according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 구조체는 대상지반(G)의 경계선을 따라 소정의 두께 및 깊이로 일체로 형성되는 지하연속벽(100)과; 상기 지하연속벽(100)에 다수 개가 앵커볼트(250, 350)를 매개로 고정 설치되는 정착부(200, 300)와; 상기 정착부(200, 300)간을 가로질러 용접 설치됨과 동시에 압축강관(410)으로 이루어진 지보재(400)로 구성된 점에 있어서는 본 발명의 기본예와 기술적 사상이 동일함을 밝혀둔다.As shown in these drawings, the underground continuous wall mud structure using the compressed steel pipe according to the present invention includes an underground continuous wall (100) integrally formed with a predetermined thickness and depth along the boundary line of the target ground (G); A plurality of fixing units 200 and 300 installed on the base continuous wall 100 through a plurality of anchor bolts 250 and 350; At the same time the weld is installed across the fixing unit (200, 300) and composed of the support member 400 made of a compressed steel pipe 410, it turns out that the basic example and the technical idea of the present invention is the same.

다만, 상기 정착부(300)는 지하연속벽(100)의 표면을 따라 고정설치되는 철골부재(310)와; 상기 철골부재(310)의 표면에 용접 설치되는 연결재(330)와; 상기 연결재(330)의 표면에 용접 설치되며, 소정의 두께 및 폭을 가지며 가운데에 원형공(322)이 형성된 플레이트(320)로 구성된다.However, the fixing unit 300 and the steel frame member 310 is installed fixed along the surface of the underground continuous wall 100; A connecting member 330 welded to the surface of the steel member 310; The welding member is installed on the surface of the connecting member 330, and has a predetermined thickness and width, and includes a plate 320 having a circular hole 322 formed therein.

상기한 바와 같은 구성으로 이루어진 상기한 바와 같은 구성으로 이루어진 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 시공에 대해서 설명한다.It will be described with respect to the construction of the underground continuous wall mud using the compressed steel pipe according to the present invention having the configuration as described above made of the configuration as described above.

본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 굴토방법은 대상지반(G)의 경계면을 따라 안내벽(GW)을 설치하는 단계(Ⅰ); 상기 안내벽(GW)을 기준으 로 내측을 굴착장비를 이용하여 소정의 깊이로 굴착하여 굴착공(H)을 형성하는 단계(Ⅱ); 상기 굴착공(H)내를 안정액(L)으로 안정화 처리하는 단계(Ⅲ); 상기 굴착공(H)에 철근조립체(S)를 양중장치를 이용하여 삽입하는 단계(Ⅳ); 상기 철근조립체(S)가 삽입된 굴착공(H)내에 트레미관(T)을 삽입한 후, 상기 트레미관(T)을 굴착공(H) 바닥으로부터 상향으로 인발하면서 콘크리트를 타설하여 지하연속벽(100)을 형성하는 단계(Ⅴ); 상기 지하연속벽(100)의 상단에 H빔(B)을 설치하여 캐핑부(C)를 형성하는 단계(Ⅵ)로 구성되는 지하연속벽 흙막이 굴토방법에 있어서, Underground continuous wall mud pit excavation method using a compressed steel pipe according to the present invention comprises the steps of installing the guide wall (GW) along the boundary surface of the target ground (G); Forming an excavation hole (H) by digging an inner side of the guide wall (GW) to a predetermined depth by using an excavation equipment; Stabilizing the inside of the excavation hole (H) with a stabilizer (III); Inserting reinforcing bar assembly S into the excavation hole H using a lifting device (IV); After inserting the tremi tube (T) into the excavation hole (H) into which the reinforcing bar assembly (S) is inserted, while pouring the tremi tube (T) upward from the bottom of the excavation hole (H), the concrete continuous wall Forming (100) (V); In the underground continuous wall mud excavation method comprising the step (VI) of forming the capping portion (C) by installing the H beam (B) on the upper end of the underground continuous wall (100),

상기 지하연속벽(100)에 정착부(200, 300)를 다수개 고정 설치하는 단계(Ⅶ); 상기 정착부(200, 300)간을 가로질러 압축강관(410)으로 이루어진 지보재(400)를 고정 설치하는 단계(Ⅷ)로 이루어지는 점에서는 본 발명의 기본예와 동일한 단계로 이루어진다.(Ⅶ) fixing a plurality of fixing units (200, 300) to the underground continuous wall (100); It consists of the same steps as the basic example of the present invention in that it consists of a step (고정) of fixing the support member 400 made of the compressed steel pipe 410 across the fixing unit (200, 300).

다만, 상기 정착부(300)를 설치단계(Ⅶ)는 지하연속벽(100)의 면을 따라 철골부재(310)의 표면에 소정의 두께 및 폭을 가지며 가운데에 원형공(322)이 형성된 플레이트(320)를 용접 설치하고, 상기 플레이트(320)의 표면에 연결재(330)를 용접 설치한 후, 상기 철골부재(310)를 앵커볼트(350)로 지하연속벽(100)에 고정 설치하는 철골 방식으로 시공한다.However, in the installation step (Ⅶ) of the fixing unit 300 has a predetermined thickness and width on the surface of the steel frame member 310 along the surface of the continuous wall 100, the plate is formed with a circular hole 322 in the center The steel frame 320 is welded and the connecting member 330 is welded on the surface of the plate 320, and then the steel frame 310 is fixed to the underground continuous wall 100 by anchor bolts 350 to be installed. Construct in the way.

이상에서 설명한 바와 같이, 본 발명에 따른 압축강관을 이용한 지하 연속벽 흙막이 구조체 및 굴토방법은 다음과 같은 효과가 있다.As described above, the underground continuous wall retaining structure and the excavation method using the compressed steel pipe according to the present invention has the following effects.

첫째, 본 발명은 압축강관 지보재의 개당 허용압축력이 크게 증대되어 일반 적인 가설 지보재인 H빔 형식의 설치간격에 비하여 보다 넓은 수평 및 수직 배치간격을 유지할 수 있는 이점이 있다. First, the present invention has an advantage in that the permissible compressive force per compressed steel pipe support member is greatly increased, so that a wider horizontal and vertical arrangement interval can be maintained than the installation interval of H beam type, which is a general temporary support member.

둘째, 본 발명은 압축강관 지보재의 거취를 위한 별도의 포스트파일 설치가 불필요하게 됨에 따라 강관지보재의 수량이 현격히 감소되어 경제적인 이점이 있다.Secondly, the present invention is economically advantageous because the number of steel pipe retainers is significantly reduced as a separate post-file installation is unnecessary for the takeover of the compressed steel pipe retainers.

셋째, 본 발명은 굴토공사 중 압축강관 지보재 배치수량 및 설치단계를 감소시켜 전반적인 굴토공사 기간을 대폭 단축할 수 있는 이점이 있다.Third, the present invention has the advantage that can significantly shorten the overall period of the excavation work by reducing the amount of installation and installation step of the compressed steel pipe support material during the excavation work.

넷째, 본 발명은 압축강관의 선행 프리스트레스력을 발휘하여, 약 개당 300ton 이상의 압축강관력이 추가 굴토공사 이전에 지하연속벽에 작용하여 지하연속벽의 기 변형량과 이후 변형량을 감소시키거나, 최소화하여 굴토공사가 이루어지는 주변 구조물과 인접 도로 등에 미치는 침하영향을 억제하는 보다 안정적인 이점이 있다. Fourth, the present invention exhibits the pre-stressing force of the compressed steel pipe, the compression steel pipe of about 300ton or more acts on the underground continuous wall before the additional pit excavation work to reduce or minimize the base strain and subsequent deformation of the underground continuous wall There is a more stable advantage of suppressing the settlement effect on the surrounding structures and adjacent roads that the gulting work is made.

Claims (7)

대상지반(G)의 경계선을 따라 소정의 두께 및 깊이로 일체로 형성되는 지하연속벽(100)과; 상기 지하연속벽(100)에 다수 개가 앵커볼트(250, 350)를 매개로 고정 설치되는 정착부(200, 300)와; 상기 정착부(200, 300)간을 가로질러 용접 설치됨과 동시에 압축강관(410)으로 이루어진 지보재(400)으로 구성되는 압축강관을 이용한 지하 연속벽 흙막이 구조체에 있어서,An underground continuous wall (100) integrally formed with a predetermined thickness and depth along a boundary line of the target ground (G); A plurality of fixing units 200 and 300 installed on the base continuous wall 100 through a plurality of anchor bolts 250 and 350; In the underground continuous wall mud structure using a compressed steel pipe consisting of a support material 400 made of a welded steel pipe 410 and installed at the same time across the fixing unit (200, 300), 상기 정착부(200)는 내부에 철근(212)이 내장됨과 동시에 일정한 두께 및 폭으로 갖는 단면형상으로 콘크리트(214)가 타설 양생되어 형성된 철근콘크리트블록(210)과; 상기 철근콘크리트블록(210)상에 고정 설치되며, 양측에 브라켓(222)이 형성된 연결부(220)와; 상기 연결부(220) 표면에 배치되며, 소정의 압력을 행사하는 플랫잭(230)과; 상기 플랫잭(230)상에 용접 설치되는 플레이트(240)로 구성됨을 특징으로 하는 압축강관을 이용한 지하 연속벽 흙막이 구조체.The fixing unit 200 is a reinforced concrete block (210) formed by placing the cured concrete 214 in a cross-sectional shape having a predetermined thickness and width at the same time the reinforcing bar 212 is embedded therein; A connection part 220 fixedly installed on the reinforced concrete block 210 and having brackets 222 formed at both sides thereof; A flat jack 230 disposed on a surface of the connection part 220 and exerting a predetermined pressure; Underground continuous wall mud structure using a compressed steel pipe, characterized in that consisting of a plate 240 is welded on the flat jack 230. 삭제delete 제 1항에 있어서,The method of claim 1, 상기 정착부(300)는 지하연속벽(100)의 표면을 따라 고정설치되는 철골부재(310)와; 상기 철골부재(310)의 표면에 용접 설치되는 연결재(330)와; 상기 연결재(330)의 표면에 용접 설치되며, 소정의 두께 및 폭을 가지며 가운데에 원형공(322)이 형성된 플레이트(320)로 구성됨을 특징으로 하는 압축강관을 이용한 지하 연속벽 흙막이 구조체.The fixing unit 300 is a steel frame member 310 is fixed along the surface of the continuous underground wall 100; A connecting member 330 welded to the surface of the steel member 310; The underground continuous wall mud structure using a compressed steel pipe, which is welded to the surface of the connecting member 330 and has a predetermined thickness and width and is formed of a plate 320 having a circular hole 322 formed in the center thereof. 대상지반(G)의 경계면을 따라 안내벽(GW)을 설치하는 단계(Ⅰ); 상기 안내벽(GW)을 기준으로 내측을 굴착장비를 이용하여 소정의 깊이로 굴착하여 굴착공(H)을 형성하는 단계(Ⅱ); 상기 굴착공(H)내를 안정액(L)으로 안정화 처리하는 단계(Ⅲ); 상기 굴착공(H)에 철근조립체(S)를 양중장치를 이용하여 삽입하는 단계(Ⅳ); 상기 철근조립체(S)가 삽입된 굴착공(H)내에 트레미관(T)을 삽입한 후, 상기 트레미관(T)을 굴착공(H) 바닥으로부터 상향으로 인발하면서 콘크리트를 타설하여 지하연속벽(100)을 형성하는 단계(Ⅴ); 상기 지하연속벽(100)의 상단에 H빔(B)을 설치하여 캐핑부(C)를 형성하는 단계(Ⅵ)로 구성되는 지하연속벽 흙막이 굴토방법에 있어서,Installing the guide wall GW along the boundary surface of the target ground G; Forming an excavation hole (H) by digging an inner side of the guide wall (GW) to a predetermined depth by using an excavation equipment; Stabilizing the inside of the excavation hole (H) with a stabilizer (III); Inserting reinforcing bar assembly S into the excavation hole H using a lifting device (IV); After inserting the tremi tube (T) into the excavation hole (H) into which the reinforcing bar assembly (S) is inserted, while pouring the tremi tube (T) upward from the bottom of the excavation hole (H), the concrete continuous wall Forming (100) (V); In the underground continuous wall mud excavation method comprising the step (VI) of forming the capping portion (C) by installing the H beam (B) on the upper end of the underground continuous wall (100), 상기 지하연속벽(100)에 정착부(200, 300)를 다수개 고정 설치하는 단계(Ⅶ); (Ⅶ) fixing a plurality of fixing units (200, 300) to the underground continuous wall (100); 상기 정착부(200, 300)간을 가로질러 압축강관(410)으로 이루어진 지보재(400)를 고정 설치하는 단계(Ⅷ)로 이루어지며,Comprising the step (지) of fixing the support member 400 made of the compressed steel pipe 410 across the fixing unit (200, 300), 상기 정착부(200) 설치단계(Ⅶ)는 내부에 철근(212)이 내장됨과 동시에 일정한 두께 및 폭으로 갖는 단면형상으로 콘크리트(214)가 타설 양생되어 형성된 철근콘크리트블록(210)의 상면에 양측에 브라켓(222)이 형성된 연결부(220)를 설치하고, 상기 연결부(220) 표면에 소정의 압력을 행사하는 플랫잭(230)를 설치하며, 상기 플랫잭(230)상에 플레이트(240)를 용접 설치한 후, 상기 철근콘크리트블록(210)을 앵커볼트(250)로 지하연속벽(100)에 고정 설치함을 특징으로 하는 압축강관을 이용한 지하 연속벽 흙막이 굴토방법.The fixing unit 200 is installed (Ⅶ) both sides on the upper surface of the reinforced concrete block 210 is formed by the concrete 214 is cast and cured in a cross-sectional shape having a predetermined thickness and width at the same time as the reinforcing bar 212 is embedded therein A connecting portion 220 having a bracket 222 formed thereon, and a flat jack 230 exerting a predetermined pressure on a surface of the connecting portion 220, and a plate 240 on the flat jack 230. After welding, the underground concrete wall oyster excavation method using a compressed steel pipe, characterized in that the reinforced concrete block 210 is fixed to the underground continuous wall 100 by anchor bolts 250. 삭제delete 제 4항에 있어서, The method of claim 4, wherein 상기 지보재(400) 설치단계(Ⅷ)는 정착부(200)의 플레이트(240)에 압축강관(410)을 용접 설치하고, 상기 정착부(200)의 플랫잭(230)에 압력을 높여 압축강관(310)을 지지하면서, 별도의 받침보 또는 지보말뚝(Post Pile) 필요없이 고정 설치함을 특징으로 하는 압축강관을 이용한 지하 연속벽 흙막이 굴토방법.In the installation step (Ⅷ) of the support material 400, the compressed steel pipe 410 is welded to the plate 240 of the fixing unit 200, and the compressed steel pipe is increased by increasing the pressure in the flat jack 230 of the fixing unit 200. While supporting (310), underground continuous wall mud excavation method using a compressed steel pipe, characterized in that the fixed installation without the need for a separate support beam or post pile (Post Pile). 삭제delete
KR1020060023189A 2006-03-13 2006-03-13 underground wall earth retaining structure by prestressed steel pipe and excavation construction method of having used this KR100776964B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060023189A KR100776964B1 (en) 2006-03-13 2006-03-13 underground wall earth retaining structure by prestressed steel pipe and excavation construction method of having used this

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060023189A KR100776964B1 (en) 2006-03-13 2006-03-13 underground wall earth retaining structure by prestressed steel pipe and excavation construction method of having used this

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020060006733U Division KR200418823Y1 (en) 2006-03-13 2006-03-13 underground wall earth retaining structure by prestressed steel pipe

Publications (2)

Publication Number Publication Date
KR20070093255A KR20070093255A (en) 2007-09-18
KR100776964B1 true KR100776964B1 (en) 2007-11-27

Family

ID=38687590

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060023189A KR100776964B1 (en) 2006-03-13 2006-03-13 underground wall earth retaining structure by prestressed steel pipe and excavation construction method of having used this

Country Status (1)

Country Link
KR (1) KR100776964B1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774641B (en) * 2012-10-17 2015-09-16 上海中技桩业股份有限公司 A kind of bucket hobboing cutter wheel composite stirring cement-soil stone Gravity Wall construction method
CN103290851B (en) * 2013-06-28 2015-05-20 上海强劲地基工程股份有限公司 Prestressed steel support used for controlling internal and external differential displacement of foundation pit enclosure wall and construction method
CN108760745A (en) * 2018-04-12 2018-11-06 上海建工集团股份有限公司 Diaphram wall seam leakage inspector and method
CN110485431A (en) * 2019-07-24 2019-11-22 青岛理工大学 A kind of interlocking pile combines foundation pit supporting construction with ground-connecting-wall
CN111560959A (en) * 2020-06-01 2020-08-21 中铁十四局集团大盾构工程有限公司 Excavation and supporting method for shield starting well foundation pit adjacent to subway
CN114370063A (en) * 2020-10-14 2022-04-19 湖南嘉晟住建科技有限公司 Steel bar supporting method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040012290A (en) * 2002-08-02 2004-02-11 삼성물산 주식회사 shoring structure using prestressed retaining wall and building construction method using the same
KR100534079B1 (en) * 2002-06-17 2005-12-16 (주)핸스건설 Construction method of strut

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100534079B1 (en) * 2002-06-17 2005-12-16 (주)핸스건설 Construction method of strut
KR20040012290A (en) * 2002-08-02 2004-02-11 삼성물산 주식회사 shoring structure using prestressed retaining wall and building construction method using the same

Also Published As

Publication number Publication date
KR20070093255A (en) 2007-09-18

Similar Documents

Publication Publication Date Title
KR102393645B1 (en) Thrust pile with prestress and self-supporting type pile construction using it
CN100489198C (en) Prestressed scaffolding system
KR100776964B1 (en) underground wall earth retaining structure by prestressed steel pipe and excavation construction method of having used this
KR100991208B1 (en) Prestress composite wale for earth retaining scaffolding and this construction technique
KR102162467B1 (en) Thrust pile with prestress and self-supporting type pile construction using it
WO2010097642A1 (en) Hydraulic tie rod for construction projects
JP5046742B2 (en) Retaining wall and its supporting method
JP3071402B2 (en) Lifting method of structure, jack engaging structure and bracket used in the method
CN112982432A (en) Prestressed concrete foundation pit supporting structure and construction method
KR20110060291A (en) Made of iron soil retaining plate and its support structure for form and retaining-wall vertical reinforcement
KR102626433B1 (en) Temporary earth retaining facility using guide bracket and ground anchor and its construction method
KR200418823Y1 (en) underground wall earth retaining structure by prestressed steel pipe
KR102555541B1 (en) Temporary retaining facility using guide bracket and ground anchor for step-by-step support of deep excavation and its construction method
KR100646178B1 (en) temporary facilities using steel pipe
KR20120100052A (en) Bridge leg correcting method using oil compressure jack and broken parts compensation structure
KR102558051B1 (en) Thumb piles introduced with inclined and crossed prestress and construction method for self-supporting temporary retaining using the same
KR100880351B1 (en) Steel invert connection structure for tunnel capable of controlling a prestress
KR102197109B1 (en) Slab unit implanted with means for pressing pile and the method for carrying out the construction of the retaining wall using it
KR100807507B1 (en) Excavating method under the existing foundation
KR20040051182A (en) Temporary soil sheathing using prestress and pile thereof
CN218206725U (en) Pipe shed supporting device for water delivery tunnel construction
KR20200012602A (en) Improved retaining wall pre-stress method
KR102587627B1 (en) Thumb pile using upper cap-type guide bracket and ground anchor and method of constructing temporary retaining facility using the same
CN113700004B (en) Deep foundation pit combined support construction device and method thereof
KR102626432B1 (en) Temporary retaining facility using guide bracket and ground anchor for step-by-step support of deep excavation and its construction method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121109

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20130830

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20141110

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20151109

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20161027

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20180911

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190829

Year of fee payment: 13