KR100750702B1 - A vegetation block and a method for constructing the building area using - Google Patents

A vegetation block and a method for constructing the building area using Download PDF

Info

Publication number
KR100750702B1
KR100750702B1 KR1020060048750A KR20060048750A KR100750702B1 KR 100750702 B1 KR100750702 B1 KR 100750702B1 KR 1020060048750 A KR1020060048750 A KR 1020060048750A KR 20060048750 A KR20060048750 A KR 20060048750A KR 100750702 B1 KR100750702 B1 KR 100750702B1
Authority
KR
South Korea
Prior art keywords
building block
ecological building
ecological
block
slope
Prior art date
Application number
KR1020060048750A
Other languages
Korean (ko)
Inventor
김영선
Original Assignee
중앙콘크리트(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 중앙콘크리트(주) filed Critical 중앙콘크리트(주)
Priority to KR1020060048750A priority Critical patent/KR100750702B1/en
Application granted granted Critical
Publication of KR100750702B1 publication Critical patent/KR100750702B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

A construction method for a banking area using an ecological building block is provided to protect a banking ground and a slope. The construction method for a banking area using an ecological building block comprises the steps of: selecting a banking area for the construction of a retaining wall, forming a slope on the end of the banking ground, forming a foundation by tamping the ground on which ecological building blocks are constructed horizontally, arranging reinforcing bars and placing a first ecological building block horizontally and placing concrete, and installing perforated pipes on the slope and filling up the banking ground connected to the slope with earth; placing a second ecological building block on the top of the first ecological building block formed on the foundation in tiers to secure a vegetation space(15) to the maximum and filling up the vegetation space of the second ecological building block, the slope and the banking ground with earth; placing a third ecological building block on the top of the second ecological building block and filling up the slope and the banking ground with earth, and inserting and connecting a reinforcing bar(20) through an insertion groove(13a) of the ecological building block and an insertion hole(60a) of a resistance(60); and repeating above mentioned steps to the uppermost part, placing concrete on the top of the uppermost ecological building block and a concrete placing hole(14) formed on a concrete block(100) to form a concrete column on the inside of the ecological building block.

Description

생태축조블록을 이용한 성토부 축조방법{A Vegetation block and a method for constructing the building area using}A Vegetation block and a method for constructing the building area using}

도 1은 본 발명에 따른 생태축조블록 및 이를 이용한 성토부 축조방법 중 생태축조블록의 사시도1 is a perspective view of an ecological building block of the ecological building block and a fill section construction method using the same according to the present invention

도 2는 본 발명에 따른 생태축조블록 및 이를 이용한 성토부 축조방법의 시공진행중인 상태를 나타낸 사시도Figure 2 is a perspective view showing the construction in progress of the ecological building block and the fill section construction method using the same according to the present invention

도 3은 본 발명에 따른 생태축조블록 및 이를 이용한 성토부 축조방법의 수직 적층된 상태의 측면도Figure 3 is a side view of the vertically stacked state of the ecological construction block and the fill section construction method using the same according to the present invention

도 4는 도 4는 도3의 일부분 확대도FIG. 4 is a partially enlarged view of FIG. 3.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

100: 생태축조블록 10: 전면벽100: ecological building block 10: front wall

11: 굴곡면 12a, 12b: 측면11: curved surface 12a, 12b: side

12a-1, 12b-1: 이음돌기 12a-2, 12b-2: 이음홈12a-1, 12b-1: joint protrusion 12a-2, 12b-2: joint groove

13: 후면벽 13a: 삽입홈13: Back wall 13a: Insertion groove

14: 콘크리트 타설공 15: 식생공간14: concrete pouring 15: vegetation space

20: 철근 30: 성토부20: Rebar 30: Filling section

40: 사면 50: 유공관40: slope 50: merit pipe

60: 저항체 60a: 삽입공60: resistor 60a: insertion hole

70: 성토지반70: Filled soil

본 발명은 도로의 신설 및 확장공사 또는 택지개발시 가용면적을 인위적으로 확장하기 위하여 조성된 성토지반을 보호하여 주며 식생가능한 생태축조블록 및 이를 이용한 성토부 축조방법에 관한 것이다.The present invention relates to the construction of ecological building blocks that protect vegetation grounds for artificially expanding the available area during the construction and construction of roads, or the development of residential lands, and the method of building landfills using the same.

옹벽은 원 지반을 절개하여서 드러난 절토사면 또는 원 지반의 경사면에 덧붙여져서 성토되는 성토지반을 안정적으로 보호하기 위한 구조물로 인식되어 있는바, 이전에는 해당위치의 지중에 철근콘크리트로서 수평하게 바닥판을 설치하고, 바닥판과 일체가 되도록 철근콘크리트로서 수직으로 세워지는 버팀벽을 설치하여서 된 철근콘크리트 옹벽을 구축하여 절취사면 또는 성토지반을 보호하여 주도록 하였다.Retaining wall is recognized as a structure to reliably protect the embankment surface that is exposed by cutting the original ground or added to the slope of the original ground. Previously, the retaining wall was placed horizontally as reinforced concrete in the ground at the location. Reinforced concrete retaining wall was constructed by installing a support wall that was erected vertically as reinforced concrete so as to be integrated with the floor plate to protect the cut slope or the soil.

이러한 철근콘크리트 옹벽은 수직벽에 직접적으로 작용되는 전도모멘트 보다 지중에 매립되는 바닥판에 의한 저항모멘트가 커서 절취사면 또는 성토지반을 안정적으로 보호하여 주는 장점을 가지는 것이 사실이나, 철근콘크리트로서 바닥판과 버팀벽을 성형하고 양생하는 데 따른 공사비용과 공사기간이 과도하게 소요되는 결함이 있었다.This reinforced concrete retaining wall has the advantage that the resistance moment due to the bottom plate buried in the ground is larger than the conducting moment acting directly on the vertical wall, so that it has the advantage of stably protecting the cut slope or the ground of the soil. There was a defect that excessive construction time and construction time were required for forming and curing the overwall.

상기한 결함을 보완하고자 최근에는 해당위치에 앵커볼트가 일체로 된 기성블록을 조적하면서 그 기성블록의 내측에 토사를 채우고 다짐하는 작업을 반복하여서 축조하는 조적식 옹벽공법이 개발되어 있다. 이러한 조적식 옹벽은 기성블록을 조적하여서 축조하게 되므로 공사비용과 공사기간을 감축시켜주는 장점을 가지게 되었다.Recently, an masonry retaining wall method has been developed to repeatedly construct a compacted block of anchor bolts at a corresponding position while filling the soil and compacting the soil. Since the masonry retaining wall is constructed by building a ready-made block, it has the advantage of reducing the construction cost and construction period.

그러나, 이와 같은 조적식 옹벽은 개개의 기성블록이 토사 내에 단순 매립되는 앵커볼트로 지지되도록 설치되어서 전토모멘트에 대한 내구력이 취약하기 때문에, 시공된 이후에 토사에 의하여 작용되는 전도모멘트를 감당하지 못하고 변위가 발생되거나 붕괴되는 심각한 문제점이 있었다. 더욱이, 조적식 옹벽을 구축하는 과정에서 내측에 채워진 토사를 과도하게 다짐하여 조적된 기성블록에 변위가 발생된 경우에, 내측에 채워진 토사를 걷어내고 변위가 발생된 기성블록이 제 위치에 놓여지도록 수정한 후에, 그 기성블록의 내측에 다시 토사를 채우고 다짐하여야 하는 어려움을 겪게 되는 문제점 등이 있었다.However, such a masonry retaining wall is installed so that each ready-made block is supported by anchor bolts that are simply buried in the soil, so that the durability against the soil moment is weak, so that it cannot bear the conduction moment acted by the soil after construction. There was a serious problem of displacement or collapse. Furthermore, in the process of constructing the masonry retaining wall, when the soil filled in the inner block is excessively compacted and the displacement occurs in the assembled block, the soil in the inner layer is removed and the ready-made block in which the displacement occurs is put in place. After the correction, there was a problem in that it was difficult to fill and reclaim soil inside the ready-made block.

본 발명은 상기와 같은 사정을 고려하여 이루어진 것으로, 그 목적은 각층에 형성되는 블록에 각각 별도의 철근을 삽입하고 이 철근을 연장하여 성토지반까지 매설하고 별도의 저항체에 고정한 상태에서 다짐하는 축성방법을 이용하여 시공함으로써 성토지반 및 사면을 확실하게 보호하는 데 있다.The present invention has been made in consideration of the above circumstances, and the object thereof is to insert a separate reinforcing bar into each block formed in each layer and extend the reinforcing bar to fill the ground soil and compacted in a state fixed in a separate resistor It is to reliably protect the soil and slope by constructing it using

본 발명은 상기와 같은 목적을 달성하기 위해 양측으로 굴곡진 굴곡면이 형성된 전면벽, 상기 전면벽 양측에 이음돌기와 이음홈이 각각 형성된 측벽, 철근의 일측이 삽입되는 홈이 형성된 후면벽, 및 내측 중앙부분에 콘크리트 타설공과 식생공간이 형성된 생태축조블록을 제공함에 있다. The present invention is a front wall formed with a curved surface curved to both sides in order to achieve the above object, a side wall formed with a joint protrusion and a joint groove on both sides of the front wall, a rear wall formed with a groove is inserted into one side of the reinforcement, and the inner side It is to provide an ecological building block with concrete placing hole and vegetation space in the center part.

다음 본 발명의 실시 예를 도면에 의거하여 구체적으로 설명하겠다.Next, embodiments of the present invention will be described in detail with reference to the drawings.

도 1은 본 발명에 따른 생태축조블록 및 이를 이용한 성토부 축조방법중 생태축조블록의 사시도이고, 도 2는 본 발명에 따른 생태축조블록 및 이를 이용한 성토부 축조방법의 시공진행중인 상태를 나타낸 사시도이며, 도 3은 본 발명에 따른 생태축조블록 및 이를 이용한 성토부 축조방법의 수직 적층된 상태의 측면도이고, 도 4는 도3의 일부분 확대도이다.1 is a perspective view of an ecological building block and an ecological building block using the same according to the present invention, and Fig. 2 is a perspective view showing a construction in progress of the ecological building block and a landfill construction method using the same according to the present invention. 3 is a side view of a vertically stacked state of an ecological building block and a filling part construction method using the same according to the present invention, and FIG. 4 is a partially enlarged view of FIG. 3.

본 발명의 축조방법에 사용되는 생태축조블록은 도 1에 나타난 바와 같이 Ecological building blocks used in the building method of the present invention as shown in FIG.

앞측에는 전면벽(10)의 양측에 내측으로 굴곡진 굴곡면(11)이 형성되고, 이 굴곡면(11)의 양측으로 측면(12a, 12b)이 각각 형성되는데 상기 측면(12a, 12b)에는 다른 블록(100')의 측면(12a', 12b')이 밀착되어 결합되도록 이음돌기(12a-1, 12b-1)와 이음홈(12a-2, 12b-2)이 각각 형성되며 이 이음돌기(12b-1)가 다른 블록(100')의 이음홈(12a-2')에 일부 삽입되는 형태로 연결하여 축조된다.On the front side, curved surfaces 11 which are curved inwardly are formed on both sides of the front wall 10, and side surfaces 12a and 12b are formed on both sides of the curved surface 11, respectively, on the side surfaces 12a and 12b. Joints 12a-1 and 12b-1 and joint grooves 12a-2 and 12b-2 are formed so that side surfaces 12a ′ and 12b ′ of other blocks 100 ′ are closely coupled to each other. (12b-1) is constructed by connecting in a form that is partially inserted into the joint groove (12a-2 ') of the other block (100').

또한, 후측에는 철근(20)의 일측이 삽입되도록 삽입홈(13a)이 각각 형성된 후면벽(13)이 형성되고, 블록(100)의 중앙부분에는 축조시 내부에 콘크리트가 타설되는 콘크리트 타설공(14)과 식물이 생육하는 식생공간(15)이 형성되어 있는 생태축조블록(100)이다.In addition, the rear side is formed with a rear wall 13 formed with insertion grooves 13a respectively so that one side of the reinforcing bar 20 is inserted in the rear side, and a concrete pour hole in which concrete is poured in the middle part of the block 100 during construction. 14) and the ecological building block 100 in which the vegetation space 15 in which the plants grow is formed.

또한, 상기 철근(20)의 타측 끝부분으로는 저항체(60)를 결합하여 형성하는 데, 상기 저항체(60)는 길이방향의 중앙부분에 삽입공(60a)이 형성되어 철근(20)의 끝부분이 결합되며 이 저항체(60)는 성토지반(70)에 삽입된 상태로 블록과 연결되어 블록의 변형 및 이동을 방지한다.In addition, the other end portion of the reinforcing bar 20 is formed by coupling the resistor 60, the resistor 60 is the insertion hole 60a is formed in the central portion in the longitudinal direction of the end of the rebar 20 The part is coupled and the resistor 60 is connected to the block while being inserted into the fill ground 70 to prevent deformation and movement of the block.

상기에서 설명한 생태축조블록을 이용한 성토부 축조방법을 도면을 참조하여 단계별로 설명하면 다음과 같다.Referring to the fill section construction method using the ecological construction block described above with reference to the drawings as follows.

1. 사면 및 기초면 형성단계(S1)1. Slope and foundation surface forming step (S1)

옹벽을 축조할 성토부(30)를 선정한 다음 성토지반(70)의 끝부분에 사면(40)을 형성한 후 생태축조블록이 축조될 위치의 지면을 수평으로 다진 후 철근을 양생하고 위에 생태축조블록의 전면을 전방을 향하도록 한 상태에서 횡방향으로 연이어 안착한 후 콘크리트를 타설하여 기초면(A)을 형성함과 동시에 1단 축성하고 사면(40)측으로 통상의 유공관(50)을 설치한 후 사면(40)과 이어진 성토지반(70)에 매립토를 매립하여 생태축조블록의 상면 높이와 동일한 높이까지 축성한다.After selecting the filling part 30 to build the retaining wall, and forming a slope 40 at the end of the filling ground 70, chopping the ground horizontally at the position where the ecological building block will be constructed, curing the reinforcing bar, and then building the ecological building on it. After seating in the transverse direction with the front face of the block facing forward, the concrete is laid and the foundation surface A is formed, and at the same time, the first stage is laid and the ordinary perforated pipe 50 is installed on the slope 40 side. The landfill soil is buried in the slope 40 and the land foundation 70 connected thereto to build up to the same height as the top surface of the ecological construction block.

2. 생태축조블록 2단 축성단계(S2)2. Ecological building block two-stage building stage (S2)

기초면(A)위에 형성된 1단생태축조블록(A1)의 상면에 생태축조블록과 생태축조블록사이에 놓이도록 2단생태축조블록(A2)을 축성하는데, 이때, 밀착된 생태축조블록과 생태축조블록 사이에 측면을 일치시키고 1차 축성된 생태축조블록보다 사면측으로 이동하여 계단식으로 적층되게 함으로써 식생공간(15)을 최대한 확보하며, 2단생태축조블록(A2)의 식생공간(15)과 사면(40) 및 성토지반(70)에 매립토를 매설하여 생태축조블록의 높이와 동일하게 사면 및 성토지반을 채워 축성한다.A two-stage ecological construction block (A2) is constructed on the upper surface of the first-stage ecological construction block (A1) formed on the base surface (A) so as to be located between the ecological construction block and the ecological construction block, wherein the close ecological construction block and the ecology The vegetation space (15) of the second-stage ecological building block (A2) is secured to the maximum by securing the vegetation space (15) by matching the sides between the building blocks and moving to the slope side than the first built ecological building block. The landfill soil is embedded in the slope 40 and the fill soil 70 to fill the slope and the fill soil in the same manner as the height of the ecological construction block.

3. 침하방지구조 축성단계(S3)3. Settling prevention structure layering step (S3)

상기와 같이 2단생태축조블록(A2)이 축성된 상면에 동일한 방법으로 3단생태축조블록(A3)을 축성하며 이어 형성된 사면(40)과 성토지반(70)에 매립토로 매립한 후 성토지반(70)의 상부에 저항체(60)를 삽입 후 다짐하고 생태축조블록에 형성된 삽입홈(13a)과 저항체(60)의 삽입공(60a)에 철근(20)의 양끝부분을 삽입·연결하여 3단생태축조블록(A3)을 축성한다.As described above, the three-stage ecological building block (A2) is built on the upper surface of the three-stage ecological building block (A3) in the same manner, and the land slope (40) and the land soil (70) formed thereafter are embedded with landfill soil. After inserting the resistor 60 into the upper portion of the 70, the compaction and inserting and connecting both ends of the reinforcing bar 20 to the insertion groove (13a) and the insertion hole (60a) of the resistor 60 formed in the ecological building block 3 A short ecological building block (A3) is built up.

4. 마감단계(S4)4. Finishing step (S4)

상기의 2단계와 3단계의 축성과정을 연속 반복하여 최상부까지 축성한 후 최상부의 생태축조블록 상면에 콘크리트를 타설하여 마감하는데 이때, 콘크리트를 블록(100)에 형성된 콘크리트 타설공(14)에도 타설하여 콘크리트가 하부로 적층된 각각의 생태축조블록 콘크리트 타설공(14)으로 유입되어 생태축조블록의 내부에 콘크리트 기둥이 형성하여 생태축조블록의 유동이나 이동을 저지한다.After repeating the steps 2 and 3 of the layering process in succession to the top, and then to the top of the ecological building block by pouring concrete finishes, at this time, concrete is placed in the concrete pour hole 14 formed in the block 100 Thus, the concrete flows into each ecological building block concrete pouring hole 14 stacked below, and concrete pillars are formed inside the ecological building block to prevent the flow or movement of the ecological building block.

이상과 같이 본 발명의 축조방법에 따라 성토부에 생태축조블록을 시공함으로써 블록의 엇갈리게 축성함으로써 입체적인 조형미를 연출할 수 있으며, 블록에 형성된 식생공간을 최대한 사용할 수 있는 효과가 있는 동시에 시공상에서도 블록의 내부에 콘크리트 봉상체가 수직으로 형성되고, 또한, 성토지반으로도 여러개의 철근이 삽입되어 각층의 블록을 보호함으로써 확실하게 적층상태를 유지할 수 있으며 내측의 성토지반을 압축토체화하여 안정화시켜 주는 효과가 있다. As described above, by constructing the ecological construction block in the fill part according to the construction method of the present invention, it is possible to produce a three-dimensional molding beauty by staggering the blocks alternately, and has the effect of maximizing the use of the vegetation space formed in the block and at the same time in the construction. Concrete rods are formed vertically, and several reinforcing bars are inserted into the soil to protect the blocks of each layer to ensure the stacking state, and the effect of stabilizing the soil inside by compressing soil is stabilized. have.

Claims (2)

삭제delete 옹벽이 축성될 성토부를 설정하고 이 위치에 지면을 수평으로 다진 후 철근배근하고 1단생태축조블록(A1)을 안착한 상태에서 콘크리트를 타설하고 내측에 형성된 사면(40)에 유공관(50)을 설치한 후 사면(40)과 성토지반(70)에 매립토를 다짐하여 기초면(A)을 형성하는 사면 및 기초면 형성단계(S1)와;Set the retaining wall where the retaining wall is to be built, and chop the ground horizontally at this position, reinforce the reinforcement, install concrete in the state where the first stage ecological construction block (A1) is placed, and install the perforated pipe 50 on the slope 40 formed on the inner side. After that, the slope 40 and the ground surface 70 to form a ground to form a landfill by filling up the soil (S1) and the base surface forming step (S1); 상기 사면 및 기초면 형성단계(S1)에서 축성된 생태축조블록(A1) 상면에 2차생태축조블록(A2)을 생태축조블록과 생태축조블록 사이에 놓이도록 축성하되 1차축성된 생태축조블록보다 사면측으로 이동하여 계단식으로 적층하고 인접한 생태축조블록과 생태축조블록사이에 측면을 일치시켜 횡으로 축성하여 중앙부분의 식생공간(15)을 최대한 확보하고, 상기 식생공간(15)과 사면(40) 및 성토지반(70)에 매립토를 매립하고 다짐하는 생태축조블록 2단 축성단계(S2)와;The second ecological building block (A2) on the upper surface of the ecological building block (A1) formed in the slope and base surface forming step (S1) to be laid between the ecological building block and the ecological building block, but the primary built-up ecological building block Move to the slope side more and stacked in a stepwise and the side between the adjacent ecological building blocks and the ecological building blocks are built laterally to secure the maximum vegetation space (15) of the central portion, the vegetation space (15) and the slope (40) ) And ecological building block two-stage building step (S2) to bury and reclaim the landfill soil in the fill soil (70); 상기 생태축조블록 2단 축성단계(S2)의 과정을 반복하여 생태축조블록을 축성한 후 성토지반(70)의 매립면 상부에 저항체(60)를 삽입한 후 다짐하고 생태축조블록에 형성된 삽입홈(13a)과 저항체(60)의 삽입공(60a)을 철근(20)으로 연결하는 침하방지구조 축성단계(S3)와;After repeating the process of the ecological building block two-stage building step (S2) to build the ecological building block, inserting the resistor 60 in the upper portion of the buried surface of the filling soil 70 and then compacted and inserted groove formed in the ecological building block (3a) a settlement preventing structure layering step (S3) for connecting the insertion hole 60a of the resistor 60 with the reinforcing bar 20; 상기의 생태축조블록 2단 축성단계(S2)와 침하방지구조 축성단계(S3)의 축성과정을 반복하여 시공한 후 최상부의 생태축조블록 상면에 콘크리트를 타설하여 마감하는데 하부로 적층된 각각의 생태축조블록 콘크리트 타설공(14)으로 유입되어 생태축조블록의 내부에 콘크리트 기둥이 형성하여 마감하는 마감단계(S4)를 포함하는 것을 특징으로 하는 생태축조블록 및 이를 이용한 성토부 축조방법.After repeating the construction process of the above-mentioned ecological building block two-stage building step (S2) and sinking prevention structure building step (S3), the concrete is placed on the top of the top ecological building block and finished to finish. Ecological construction block and fill construction method using the same, characterized in that it comprises a finishing step (S4) is introduced into the concrete block concrete pouring hole (14) to form a concrete pillar inside the ecological construction block.
KR1020060048750A 2006-05-30 2006-05-30 A vegetation block and a method for constructing the building area using KR100750702B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060048750A KR100750702B1 (en) 2006-05-30 2006-05-30 A vegetation block and a method for constructing the building area using

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060048750A KR100750702B1 (en) 2006-05-30 2006-05-30 A vegetation block and a method for constructing the building area using

Publications (1)

Publication Number Publication Date
KR100750702B1 true KR100750702B1 (en) 2007-08-22

Family

ID=38614941

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060048750A KR100750702B1 (en) 2006-05-30 2006-05-30 A vegetation block and a method for constructing the building area using

Country Status (1)

Country Link
KR (1) KR100750702B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965577A (en) * 2019-12-25 2020-04-07 黄河勘测规划设计研究院有限公司 Construction method of chain lock type ecological block retaining wall
CN112392067A (en) * 2020-11-30 2021-02-23 吉林建筑科技学院 Clamping lock type inclined building block assembly retaining wall
CN115075289A (en) * 2022-02-22 2022-09-20 金中天水利建设有限公司 Rapid construction method for assembled arc ecological frame retaining wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200216362Y1 (en) 2000-10-06 2001-03-15 주식회사만영엔지니어링 A breast wall for reinforced ground
KR200361081Y1 (en) 2004-05-21 2004-09-06 김영선 Block for building terrace and breeding plant
KR100451429B1 (en) 2002-03-14 2004-10-06 주식회사 피아이에이 Combination system of block type reinforced retaining wall used waste concrete and waste limestone and constructing method thereof
KR200376572Y1 (en) 2004-11-25 2005-03-10 최진희 A breast wall block
KR20050024809A (en) * 2003-09-04 2005-03-11 (주) 녹지원 Method of reinforceing stone wall construction having a possible planting trees
KR200414869Y1 (en) 2006-02-07 2006-04-25 대성산업(주) Revetment block

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200216362Y1 (en) 2000-10-06 2001-03-15 주식회사만영엔지니어링 A breast wall for reinforced ground
KR100451429B1 (en) 2002-03-14 2004-10-06 주식회사 피아이에이 Combination system of block type reinforced retaining wall used waste concrete and waste limestone and constructing method thereof
KR20050024809A (en) * 2003-09-04 2005-03-11 (주) 녹지원 Method of reinforceing stone wall construction having a possible planting trees
KR200361081Y1 (en) 2004-05-21 2004-09-06 김영선 Block for building terrace and breeding plant
KR200376572Y1 (en) 2004-11-25 2005-03-10 최진희 A breast wall block
KR200414869Y1 (en) 2006-02-07 2006-04-25 대성산업(주) Revetment block

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965577A (en) * 2019-12-25 2020-04-07 黄河勘测规划设计研究院有限公司 Construction method of chain lock type ecological block retaining wall
CN110965577B (en) * 2019-12-25 2021-04-30 黄河勘测规划设计研究院有限公司 Construction method of chain lock type ecological block retaining wall
CN112392067A (en) * 2020-11-30 2021-02-23 吉林建筑科技学院 Clamping lock type inclined building block assembly retaining wall
CN115075289A (en) * 2022-02-22 2022-09-20 金中天水利建设有限公司 Rapid construction method for assembled arc ecological frame retaining wall
CN115075289B (en) * 2022-02-22 2023-11-17 金中天水利建设有限公司 Rapid construction method for assembled arc ecological frame retaining wall

Similar Documents

Publication Publication Date Title
CN103410167B (en) Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method
CN102966119B (en) Geogrid reinforced wall and construction method thereof
CN110042716B (en) Widening construction method for high-fill roadbed with foamed light soil
KR101254145B1 (en) Gravity type concrete precast modular retaining wall utilizing shear key and connected steel bar and constructing method thereof
KR101118263B1 (en) Rain retaining facility and constructing method thereof using precast concrete block
CN111749288B (en) Load-reducing heightening structure of existing retaining wall and construction method thereof
KR100824713B1 (en) Ledge type revetment using a pc wall plate and construction method thereof
KR100750702B1 (en) A vegetation block and a method for constructing the building area using
KR100750703B1 (en) A vegetation block and a method for constructing the cut ground using
KR101271290B1 (en) Underground reclamation type water storage tank having a assembling structure
KR100468034B1 (en) Construction Method of Reinforced Earth Retaining-Wall for using Anchoring
CN217324788U (en) Abrupt slope roadbed structure convenient to prefabrication installation
JPH05230845A (en) L-shaped block retaining wall structure and construction method thereof
KR100815837B1 (en) Method for constructing environmental affinity reinforcement soil retaining wall using environmental affinity block with lower open portion and side plate rear portion
KR101235826B1 (en) The method of constructing block for wall
KR200263961Y1 (en) Sectional block for retaining wall building
KR100451429B1 (en) Combination system of block type reinforced retaining wall used waste concrete and waste limestone and constructing method thereof
KR20090073330A (en) Revetment structure using natural stones
KR100995097B1 (en) Method for constructing wall block
KR100647071B1 (en) The method of constructing bloclk for wall
KR100665338B1 (en) Latticed assembly of retaing wall with soil nailing and anchor
CN114086505A (en) River course slope protection structure for hydraulic engineering and laying construction method
KR100601126B1 (en) Anchoring structure of afforestation Retaining-Wall
KR102605191B1 (en) Upper part reinforcement type retaining wall structure and retaining wall construction method
KR20100059380A (en) Retaining wall making method using the wire mesh bag

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120530

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20130531

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150629

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee