KR100742901B1 KR1020010021094A KR20010021094A KR100742901B1 KR 100742901 B1 KR100742901 B1 KR 100742901B1 KR 1020010021094 A KR1020010021094 A KR 1020010021094A KR 20010021094 A KR20010021094 A KR 20010021094A KR 100742901 B1 KR100742901 B1 KR 100742901B1
Authority
KR
South Korea
Prior art keywords
moving
plate
steel sheet
welding
block
Prior art date
Application number
KR1020010021094A
Other languages
Korean (ko)
Other versions
KR20020081748A (en
Inventor
이석형
한용희
김완실
Original Assignee
주식회사 포스코
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 포스코 filed Critical 주식회사 포스코
Priority to KR1020010021094A priority Critical patent/KR100742901B1/en
Publication of KR20020081748A publication Critical patent/KR20020081748A/en
Application granted granted Critical
Publication of KR100742901B1 publication Critical patent/KR100742901B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B9/00Machines or devices designed for grinding edges or bevels on work or for removing burrs; Accessories therefor
    • B24B9/02Machines or devices designed for grinding edges or bevels on work or for removing burrs; Accessories therefor characterised by a special design with respect to properties of materials specific to articles to be ground
    • B24B9/04Machines or devices designed for grinding edges or bevels on work or for removing burrs; Accessories therefor characterised by a special design with respect to properties of materials specific to articles to be ground of metal, e.g. skate blades
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B15/00Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B15/0085Joining ends of material to continuous strip, bar or sheet

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Grinding And Polishing Of Tertiary Curved Surfaces And Surfaces With Complex Shapes (AREA)

Abstract

본 발명은 도금강판의 용접을 위한 용접부 도금층 연삭장치에 관한 것이다.The present invention relates to a weld plate grinding layer for welding a plated steel sheet.

그리고, 본 발명은 도금강판 이동경로상에 설치되는 베이스상에 모터 구동으로 전후 이동토록 설치되는 제 1 이동블록으로 구성된 제 1 이동부재;와, 상기 제 1 이동블록의 상부판에 설치된 레일부에 끼워져 상기 제 1 이동블록 상에서 좌우 이동토록 설치된 제 2 이동판으로 구성된 제 2 이동부재;와, 상기 제 2 이동판에 양측으로 수직하게 신장되고 중앙이 피봇축으로 연결된 2단 연결대의 상측에 설치되어 상기 제 2 이동판 상에 선회 가능토록 설치되는 제 3 이동판으로 구성된 제 3 이동부재;와, 상기 제 1 이동블록의 중앙으로 제 3 이동판까지 회전토록 설치되는 제 1 구동부재;와, 상기 제 2 및 제 3 이동판에 수직하게 상기 제 1 구동부재와 기어로서 회전토록 설치되며, 단부에는 가이드블록이 설치된 제 2 구동부재; 및, 상기 제 2 구동부재의 단부에 가이드블록의 내측으로 일체로 회전토록 고정되어 상기 도금강판의 모서리면을 연삭토록 설치되는 연삭부재로서 구성되어 있다.In addition, the present invention includes a first moving member composed of a first moving block which is installed to move back and forth by a motor drive on the base installed on the plated steel plate moving path; and a rail unit provided on the upper plate of the first moving block. A second moving member formed of a second moving plate installed on the first moving block to move left and right on the first moving block; and a second moving member extending vertically to both sides of the second moving plate, and installed at an upper side of the two-stage connecting unit connected to the center by a pivot shaft. A third moving member including a third moving plate installed on the second moving plate so as to be pivotable; and a first driving member rotatably installed to a third moving plate in the center of the first moving block; A second driving member installed to rotate as the first driving member and a gear perpendicular to the second and third moving plates, and having a guide block at an end thereof; And a grinding member fixed to the end of the second driving member to be integrally rotated inwardly of the guide block so as to grind the edge surface of the plated steel sheet.

따라서, 도금층 또는 이물질에 의한 강판의 용접불량을 방지시키어 연속공정에 투입되는 강판이 보다 안정적으로 제조되는 효과를 제공한다.Therefore, it is possible to prevent the welding failure of the steel sheet by the plated layer or foreign matter to provide a more stable production of the steel sheet introduced into the continuous process.

도금강판, 연속공정, 도금층, 도금층 연삭장치,강판Plated steel sheet, continuous process, plated layer, plated layer grinding device, steel sheet

Description

도금강판의 용접을 위한 용접부 도금층 연삭장치{APPARATUS FOR GRINDING PLATING LAYER ON WELDING PORTION OF PLATED STRIP FOR WELDING THE PLATED STRIPS} Welded part grinding device for welding welded plated steel plate {APPARATUS FOR GRINDING PLATING LAYER ON WELDING PORTION OF PLATED STRIP FOR WELDING THE PLATED STRIPS}             

도 1은 일반적인 도금강판의 용접작업시 용접부위의 도금층에 의한 용접불량상태를 설명하기 위하여 도시한 단면을 포함한 개략도1 is a schematic view including a cross-sectional view for explaining the welding failure state by the plating layer of the welded portion during the welding operation of a general plated steel sheet

도 2는 본 발명에 따른 도금강판의 용접을 위한 용접부 도금층 연삭장치를 도시한 사시도Figure 2 is a perspective view showing a welded plate grinding device for welding the plated steel sheet according to the present invention

도 3은 본 발명인 도금강판의 용접을 위한 용접부 도금층 연삭장치를 도시한 정면도 Figure 3 is a front view showing a welded plate grinding device for welding the plated steel plate of the present inventors

도 4는 본 발명인 도금강판의 용접을 위한 용접부 도금층 연삭장치를 도시한 측면도Figure 4 is a side view showing a welded plate grinding device for welding the plated steel plate of the present inventors

도 5는 본 발명인 도금강판의 용접을 위한 용접부 도금층 연삭장치를 도시한 분해 사시도5 is an exploded perspective view showing a welded plate grinding device for welding the plated steel sheet of the present invention;

도 6의 (a) 및 (b)는 본 발명인 도금강판의 용접을 위한 용접부 도금층 연삭장치의 연삭ㅂ재 교체작업을 도시한 정면도Figure 6 (a) and (b) is a front view showing the grinding material replacement operation of the weld plate plating layer grinding device for welding the plated steel plate of the present invention

도 7은 본 발명인 도금강판의 용접을 위한 용접부 도금층 연삭장치를 통한 도금층 연삭을 거친 강판의 용접상태를 도시한 요부도7 is a main view showing a welded state of the steel plate subjected to the plated layer grinding through the welded plate grinding device for welding the plated steel sheet of the present invention.

도 8의 (a) 및 (b)는 본 발명의 연삭장치에서 푸싱판에 의한 제 2 이동부재의 이동을 도시한 요부 정면도 및 평면도 8 (a) and (b) are a front view and a plan view of a main portion showing the movement of the second moving member by the pushing plate in the grinding apparatus of the present invention;

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1.... 도금층 연삭장치 10.... 베이스1 .... Plating Grinding Device 10 .... Base

12,32.... 레일부 16.... 스크류바아12,32. Rail part 16 .... Screw bar

20.... 제 1 이동블록 22.... 가이드홈20 .. The first moving block 22 .... Guide groove

24.... 연결부 30.... 제 2 이동판24 .... Connections 30 .... Second Moving Plate

34.... 피봇축 36.... 연결대34 .... pivot axis 36 .... connecting rod

38.... 고정대 39a.... 랙기어38 .... Fixture 39a .... Rack Gear

39b....피니언기어 39c.... 푸싱판39b .... Pinion Gear 39c .... Pushing Plate

40.... 제 3 이동판 50.... 제 1 구동축40 .... Third moving plate 50 .... First driving shaft

54a,54b.... 지지블록 56a,56b.... 제 1 기어54a, 54b .... Support blocks 56a, 56b .... first gear

60.... 가이드블록 62.... 자석60 .... Guide block 62 .... Magnet

64.... 가이드판 64a.... 연결편64 .. Guide plate 64a .... Connections

70.... 제 2 구동축 72a,72b.... 제 2 기어70 .... 2nd drive shaft 72a, 72b .... 2nd gear

80.... 연마지석 S.... 스프링 80 .... Grinding Wheel S .... Spring

본 발명은 제철공장에서 제조하는 냉연강판 또는 자동차강판등과 같은 도금강판을 연속공정에 투입하기 위하여 선행 및 후행강판을 용접하는 때에, 도금강판의 용접부위 도금층을 미리 연삭 제거함으로서, 도금강판의 용접을 보다 정밀하게 수행할 수 있어 도금강판의 연속제조 생산성을 향상시킬 수 있도록 한 도금강판의 용접을 위한 용접부 도금층 연삭장치에 관한 것이다.
In the present invention, when welding the preceding and the following steel plate in order to input the plated steel sheet, such as cold rolled steel sheet or automobile steel sheet manufactured in the steel mill in the continuous process, by welding grinding the plated layer of the plated steel sheet in advance, the welding of the plated steel sheet It can be performed more precisely to the welded plate layer grinding apparatus for welding the plated steel sheet to improve the continuous manufacturing productivity of the plated steel sheet.

일반적으로 냉연제품을 생산하는 라인에서는 여러 개의 핫코일을 연속적으로 연결시키어 연속작업으로 제품을 생산하는데, 통상 선행강판(코일)과 후행강판(코일)의 선,후단부를 용접으로 연결시키어 연속작업에 투입시키고, 이와 같은 선,후행 강판의 용접작업을 도 1에서 개략적으로 도시하고 있고, 이때 투입되는 강판의 표면에는 제품의 특성에 따라 아연도금, 주석도금등의 도금층이 형성되어 있다.In general, in the production line of cold rolled products, several hot coils are connected in series to produce the product by continuous operation. Usually, the wires and rear ends of the preceding steel plate (coil) and the following steel sheet (coil) are connected by welding and then put into continuous operation. The welding operation of such a line and a subsequent steel sheet is schematically shown in FIG. 1, and a plated layer of zinc plating, tin plating, etc. is formed on the surface of the steel sheet to be introduced at this time.

즉, 도 1 에서 도시한 바와 같이, 선행 및 후행 강판(100)(110)의 단부 를 겹쳐놓은 상태에서 도면에서는 개략적으로 도시하였지만, 용접기의 용접휠(120)을 각 강판(100)(110)의 폭방향으로 진행시키면서 고압의 전류를 인가하여 선,후행 강판(100)(110)의 용접작업을 수행하였다.That is, as shown in Figure 1, in the state in which the ends of the preceding and succeeding steel sheet 100, 110 is shown schematically in the drawing, the welding wheel 120 of the welder each steel sheet 100, 110 While proceeding in the width direction of the high-voltage current was applied to perform the welding operation of the line, trailing steel plate (100) (110).

그런데, 도 1에 포함된 요부 단면도에서 알수 있듯이, 상기 강판(100)(110)들의 표면에는 강판제품의 특성에 냉연강판(100)(110)의 외관을 미려하게 하기 위하여 아연을 도금하거나 또는, 특수한 사용처에 따라 전기강판 또는 자동차강판등을 위한 특수한 도금층(102)(112)이 형성된다. By the way, as can be seen in the cross-sectional view of the main part included in Figure 1, the surface of the steel sheet 100, 110 or plated with zinc in order to beautify the appearance of the cold rolled steel sheet (100, 110) to the characteristics of the steel sheet product, According to a special use, special plating layers 102 and 112 for electric steel sheets or automotive steel sheets are formed.                         

따라서, 도 1에서 도시한 바와 같이, 강판(100)(110)의 말단부 및 선단부를 용접기의 휠(120)로서 용접하는 경우에 상기 도금층(102)(112) 때문에, 도금강판의 정상적인 용접이 이루어 지지 않고 결국, 선,후행 강판(100)(110)을 연결시키는 용접부위(W)가 불안정하게 되는 것이다.Therefore, as shown in FIG. 1, when welding the distal end and the distal end of the steel sheets 100 and 110 as the wheel 120 of the welding machine, the normal welding of the plated steel sheet is performed because of the plating layers 102 and 112. Eventually, the welding site W connecting the line and trailing steel sheets 100 and 110 becomes unstable.

또한, 각 강판(100)(110)의 도금층(102)(112)이 아니더라도 강판(100)(110)의 말단부 및 선단부의 용접부위에 미세한 이물질(130)이 있어도 강판의 정상적인 용접작업이 이루어 지지 않고, 결국 선행 및 후행강판(100)(110)은 용접부위(W)에서 강판의 폭방향으로 일정하게 용접되지 않고 부분적인 용접상태가 상이하게 됨으로 인하여, 실제 연속라인에 투입되어 제조되는 선,후행 도금강판(100)(110)의 용접부위(W)가 취약하게 되고, 심한경우 용접부위가 떨어지면서 연속제조공정의 가동중단이 발생되어 연속라인의 생산성을 저하시키게 되는 것이다.In addition, even if the plated layer (102, 112) of each of the steel sheets 100, 110, even if there is a fine foreign material 130 in the welding portion of the distal end and the tip of the steel sheets 100, 110, the normal welding operation of the steel sheet is not made After all, the leading and trailing steel plates 100 and 110 are not welded in the width direction of the steel plate at the welded portion W, and the partial welding state is different, so that the line and the trailing line are manufactured and manufactured in the actual continuous line. The welded portion (W) of the plated steel sheet (100) 110 becomes weak, and in severe cases, the welded portion is dropped and the operation of the continuous manufacturing process occurs, thereby lowering the productivity of the continuous line.

따라서, 상기와 같은 용접부위(W)의 도금층(102)(112) 및 이물질(130)을 미리 연삭 제거시킨다면, 보다 견고한 용접작업을 수행할 수 있어 바람직할 것이다.
Therefore, if the plating layer (102) 112 and the foreign material 130 of the welding site (W) as described above grinding in advance, it will be preferable to perform a more robust welding operation.

본 발명은 상기와 같은 종래의 여러 문제점들을 개선시키기 위하여 안출된 것으로서 그 목적은, 도금층 또는 이물질에 의한 강판의 용접불량을 방지시키어 연속공정에 투입되는 강판이 보다 안정적으로 제조되도록 한 도금강판의 용접을 위한 용접부 도금층 연삭장치를 제공하는 데에 있다.
The present invention has been made in order to improve the various problems as described above, the purpose of the welding of the plated steel sheet to prevent the welding failure of the steel sheet by the plated layer or foreign matter to make the steel sheet introduced into the continuous process more stably manufactured. To provide a welded plate grinding layer for the device.

상기와 같은 목적을 달성하기 위한 기술적인 구성으로서 본 발명은, 도금강판 이동경로상에 설치되는 베이스;
상기 베이스상에 모터 구동으로 전후 이동토록 설치되는 제 1 이동블록으로 구성된 제 1 이동부재;
상기 제 1 이동블록의 상부판에 설치된 레일부에 끼워져 상기 제 1 이동블록 상에서 좌우 이동토록 설치된 제 2 이동판으로 구성된 제 2 이동부재;
상기 제 2 이동판에 양측으로 수직하게 신장되고 중앙이 피봇축으로 연결된 2단 연결대의 상측에 설치되어 상기 제 2 이동판 상에 선회 가능토록 설치되는 제 3 이동판으로 구성된 제 3 이동부재;
상기 제 1 이동블록의 중앙으로 제 3 이동판까지 회전토록 설치되는 제 1 구동부재;
상기 제 2 및 제 3 이동판에 수직하게 상기 제 1 구동부재와 기어로서 회전토록 설치되며, 단부에는 가이드블록이 설치된 제 2 구동부재; 및,
상기 제 2 구동부재의 단부에 가이드블록의 내측으로 일체로 회전토록 고정되어 상기 도금강판의 모서리면을 연삭토록 설치되는 연삭부재로서 구성된 도금강판의 용접을 위한 용접부 도금층 연삭장치를 제공한다.
The present invention as a technical configuration for achieving the above object, the base is installed on the plated steel plate movement path;
A first moving member comprising a first moving block installed on the base to move back and forth by driving a motor;
A second moving member fitted to a rail installed on the upper plate of the first moving block and configured to have a second moving plate installed on the first moving block to move left and right;
A third moving member including a third moving plate which is vertically extended to both sides of the second moving plate and is installed above the two-stage connecting rod connected to the center by a pivot shaft so as to be pivotable on the second moving plate;
A first driving member installed to rotate to a third moving plate toward the center of the first moving block;
A second driving member installed to rotate as the first driving member and a gear perpendicular to the second and third moving plates, and having a guide block at an end thereof; And,
It provides a welded plate layer grinding device for welding the plated steel sheet configured as a grinding member which is fixed to the end of the second drive member integrally to the inside of the guide block to be installed to grind the edge surface of the plated steel sheet.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

이하, 첨부된 도면에 의거하여 본 발명의 바람직한 실시예를 보다 상세하게 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2에서는 본 발명인 도금강판의 용접을 위한 용접부 도금층 연삭장치(1)의 전체 구성을 사시도로 도시하고 있고, 도 3 및 도 4에서는 정면도 및 측면도로 도시하고 있으며, 도 5에서는 분해 사시도로 도시하고 있는데, 이와 같은 본 발명인 도금강판의 용접을 위한 용접부 도금층 연삭장치(1)는 크게 베이스(10)와 상기 베이스(10)상에 전후, 좌우 및 선회토록 설치되는 복수의 제 1 - 3 이동부재들과, 상기 이동부재들에 수직방향으로 설치되는 제 1-2 구동부재 및, 상기 일 구동부재의 단부에 설치되어 강판(2)의 도금층 또는 이물질부분(2')을 연삭 제거하는 연삭부재로 나누어 지고, 이들 각각의 부재들의 구성을 상세하게 살펴보면 다음과 같다.In FIG. 2, the entire structure of the welded part grinding layer 1 for welding the plated steel sheet of the present invention is shown in a perspective view, shown in front and side views in FIGS. 3 and 4, and in an exploded perspective view in FIG. The welding part plating layer grinding device 1 for welding the plated steel sheet of the present invention is largely provided with a plurality of first to third moving members installed on the base 10 and the base 10 in front, rear, left, and right directions. And a first 1-2 driving member installed in a vertical direction to the moving members, and a grinding member installed at an end of the one driving member to grind away the plated layer or foreign matter portion 2 'of the steel plate 2. Divided and look at the configuration of each of these members in detail as follows.

먼저, 도 2 및 도 5에서 도시한 바와 같이, 상기 베이스(10)는 실제 이송되는 강판(2)의 모서리면에 형성된 도금층(2')부분을 연삭하도록 강판(2)의 이동경로에 인접하여 설치된다.First, as shown in FIGS. 2 and 5, the base 10 is adjacent to the moving path of the steel sheet 2 so as to grind a portion of the plating layer 2 ′ formed on the edge surface of the steel sheet 2 actually transferred. Is installed.

다음, 도 2 내지 도 5에서 도시한 바와 같이, 상기 제 1 이동부재는 상기 베이스(10)상에 전후 이동토록 설치되는데, 이와 같은 제 1 이동부재는, 상기 베이스(10)상에 형성된 레일부(12)에 맞물리는 가이드홈(22)이 저부에 일체로 형성되는 제 1 이동블록(20)으로 이루어 진다.Next, as shown in FIGS. 2 to 5, the first moving member is installed to move back and forth on the base 10, and the first moving member is a rail part formed on the base 10. Guide grooves 22 engaged with the (12) is made of a first moving block 20 formed integrally with the bottom.

그리고, 상기 베이스(10)의 중앙에는 상기 제 1 이동블록(20)의 저부 중앙에 수직하게 일체로 고정된 연결부(24)에 맞물리고, 베이스(10)상에 설치된 모터(14) 와 벨트(14a)로서 구동토록 설치된 스크류바아(16)가 상기 연결부(24)에 체결됨으로서, 상기 제 1 이동블록(20)은 상기 모터(14)의 구동시 레일부(12)를 따라 전후 이동토록 설치된다.The center of the base 10 is engaged with the connection part 24 fixedly integrally fixed to the center of the bottom of the first moving block 20, and the motor 14 and the belt installed on the base 10. As the screw bar 16 installed to be driven as 14a is fastened to the connection part 24, the first moving block 20 is installed to move back and forth along the rail part 12 when the motor 14 is driven. .

다음, 도 2 내지 도 5에서 도시한 바와 같이, 상기 제 2 이동부재는 상기 제 1 이동블록(20)상에 좌우 이동토록 설치되는데, 이와 같은 제 2 이동부재는 상기 제 1 이동블록(20)의 상부판(20a)에 설치된 레일부(32)에 끼워지는 제 2 이동판(30)으로 이루어 진다.Next, as shown in FIGS. 2 to 5, the second moving member is installed to move left and right on the first moving block 20, and the second moving member is the first moving block 20. It consists of a second moving plate 30 that is fitted to the rail portion 32 installed on the upper plate (20a).

다음, 상기 제 2 이동판(30)상에 선회 가능토록 설치되는 제 3 이동부재는, 상기 제 2 이동판(30)에 양측으로 수직하게 신장되고 중앙이 피봇축(34)으로 연결된 2단 연결대(36a)(36b)의 상측에 설치되는 제 3 이동판(40)으로 이루어 진다.Next, the third moving member installed to be pivotable on the second moving plate 30 is a two-stage connecting table that extends perpendicularly to both sides of the second moving plate 30 and whose center is connected to the pivot shaft 34. It consists of the 3rd moving board 40 provided in the upper side of 36a and 36b.

또한, 도 2 및 도 5에서 도시한 바와 같이, 상기 일측 연결대(36a)의 상기 피봇축(34)의 중앙에는 상기 베이스(10) 일측에 수직 설치된 고정대(38) 상부의 랙기어(39a)가 맞물리는 피니언기어(39b)가 장착되고, 상기 제 2 이동판(30) 사이에는 고정대(38)상에 수평 고정된 푸싱판(39c)(도 8)이 위치되어 제 1 이동블록(20)의 전후 이동시 상기 제 2 이동판(30) 및 제 3 이동판(40)은 좌우 이동 및 선회 이동토록 설치된다.In addition, as shown in FIGS. 2 and 5, the rack gear 39a of the upper part of the fixing stand 38 vertically installed on one side of the base 10 is formed at the center of the pivot shaft 34 of the one connecting rod 36a. An interlocking pinion gear 39b is mounted, and a pushing plate 39c (FIG. 8) horizontally fixed on the fixing stand 38 is positioned between the second moving plate 30 so that the first moving block 20 During the forward and backward movement, the second moving plate 30 and the third moving plate 40 are installed to move left and right and swing.

한편, 도 5 및 도 8에서 도시한 바와 같이, 상기 제 2 이동판(30)에는 상기 제 2 구동부재의 간섭을 피하기 위한 절개부(30')가 일체로 형성되어 있고, 마찬가지로 상기 푸싱판(39c)에는 상기 제 1 구동부재의 간섭을 피하기 위하여 절개부(39c')가 일체로 형성되어 있으며, 상기 푸싱판(39c)은 선단부 보다 후단부가 길이가 큰 마름모 형상으로 이루어 진다.Meanwhile, as shown in FIGS. 5 and 8, the second moving plate 30 is integrally formed with a cutout 30 ′ for avoiding interference of the second driving member. Similarly, the pushing plate ( 39c), a cutout 39c 'is integrally formed in order to avoid interference of the first driving member, and the pushing plate 39c has a rhombus shape having a rear end portion having a greater length than the front end portion.

또한, 상기 연결대(36)는 푸싱판(39c)이 후진하면 제 2 이동판(30)을 초기위치로 복귀시키기 위한 스프링(S)이 탄설되어 있다.In addition, the connecting table 36 is provided with a spring S for returning the second moving plate 30 to the initial position when the pushing plate 39c moves backward.

다음, 도 2 내지 도 5에서 도시한 바와 같이, 상기 제 1 구동부재는 상기 제 1 이동블록(20)의 중앙으로 제 3 이동판(40)까지 회전토록 설치되는데, 이와 같은 상기 제 1 구동부재는 상기 베이스(10)에 설치된 모터(52)와 연결되고 제 1 이동블록(20)의 상판(20a)에 수직 회전토록 지지되며 상기 제 1 이동블록(20)과 제 3 이동판(40)에 설치된 지지블록(54a)(54b)에 인접하여 위치되는 제 1 기어(56a)(56b)가 각각 장착된 제 1 구동축(50)으로 구성되어 있다.Next, as shown in Figures 2 to 5, the first drive member is installed to rotate to the third moving plate 40 to the center of the first moving block 20, such a first drive member Is connected to the motor 52 installed in the base 10 and supported so as to rotate vertically to the upper plate (20a) of the first moving block 20, the first moving block 20 and the third moving plate (40) It consists of the 1st drive shaft 50 in which the 1st gear 56a, 56b located adjacent to the support block 54a, 54b provided is mounted, respectively.

그리고, 도 2 내지 도 5에서 상기 제 2 구동부재를 도시하고 있는데, 이와 같은 제 2 구동부재는 상기 제 2 및 제 3 이동판(30)(40)에 수직하게 상기 제 1 구동축(50)과 기어로서 회전토록 설치되며, 단부에는 가이드블록(60)이 설치되어 있으며, 상기 제 2 구동부재는 상기 제 1 기어(56a)(56b)와 맞물리도록 지지블록(54a)(54b)에 설치되는 제 2 기어(72a)(72b)를 갖춘 제 2 구동축(70)으로 이루어 진다.2 to 5 illustrate the second driving member, and the second driving member is connected to the first driving shaft 50 perpendicular to the second and third moving plates 30 and 40. It is installed so as to rotate as a gear, the guide block 60 is provided at the end, the second drive member is made of the first block (56a, 56b) to be installed on the support blocks (54a, 54b) It consists of a second drive shaft 70 with two gears 72a and 72b.

다음, 도 2 내지 도 5에서 도시한 바와 같이, 상기 연삭부재는 상기 제 2 구동축(70)의 단부에 가이드블록(60)의 내측으로 일체로 회전토록 고정되어 상기 도금강판(2)의 모서리면을 연삭토록 설치된다.Next, as shown in Figures 2 to 5, the grinding member is fixed to the end of the second drive shaft 70 to be integrally rotated inwardly of the guide block 60 to the edge surface of the plated steel sheet (2) It is installed to grinding.

또한, 상기 연삭부재는 상기 제 2 구동축(70)의 상단 및 하단에 핀 고정되며 강판(2)의 모서리 상,하면을 연삭시키도록 일체로 회전하는 연마지석(80)으로 이루어 진다.In addition, the grinding member is made of a grinding wheel 80 is fixed to the upper and lower ends of the second drive shaft 70 and integrally rotated to grind the upper and lower surfaces of the steel sheet (2).

한편, 상기 연마지석(80)의 외곽으로 위치되는 상기 가이드블록(60)의 바디 (60a)의 내측에는 자석(62)이 설치되고, 상기 가이드블록(60)에는 필요시 선회되도록 연결편(64a)으로서 설치되는 복수의 가이드판(64)이 장착되며, 제 2 구동축(70)의 상단 및 하단에 설치되는 가이드블록(60)사이에는 강판 통과를 위한 안내공간 (66)이 형성되는 구성으로 이루어 진다.On the other hand, a magnet 62 is installed inside the body 60a of the guide block 60 positioned outside the abrasive grind 80, and the connecting piece 64a is pivoted if necessary in the guide block 60. A plurality of guide plate 64 is installed as is mounted, the guide block 60 is installed between the upper and lower guide shafts of the second drive shaft 70 is made of a configuration in which a guide space 66 for passing the steel sheet is formed. .

상기와 같은 구성으로 이루어 진 본 발명의 작용 및 효과를 보다 상세하게 설명하면 다음과 같다.Referring to the operation and effects of the present invention made in the above configuration in more detail as follows.

도 2 내지 도 8에서 도시한 바와 같이, 본 발명의 도금층 연삭장치(1)는 이송되는 강판 (2)의 이동경로상에 설치되어야 하는데, 정확하게는 한 쌍으로 이송되는 2개의 강판(2) 모서리면이 다음에 설명하는 연삭부재인 연마지석(80)을 통과하도록 위치가 조정되어야 하고, 동시에 강판이 용접기에 투입되기 전에 배치되어야 한다.As shown in Figures 2 to 8, the plated layer grinding apparatus 1 of the present invention should be installed on the movement path of the steel sheet 2 to be conveyed, exactly two corners of the steel sheet 2 to be conveyed in pairs. The position must be adjusted so that the surface passes through the abrasive grindstone 80, which is the grinding member described below, and at the same time, it is to be arranged before the steel sheet is fed into the welder.

따라서, 본 발명의 도금층 연삭장치(1)에서는 도 2 에서 도시한 바와 같이, 강판 모서리상,하면에 밀착되는 한쌍의 연마지석(80)들이 2개의 강판에 접촉하도록 좌우측으로 설치되어 있는데, 이하에서는 하나의 강판(2)이 본 발명의 도금층 연삭장치(1)로서 연삭되는 작용에 대하여 설명한다.Therefore, in the plating layer grinding apparatus 1 of the present invention, as shown in FIG. 2, a pair of abrasive grindstones 80 in close contact with the lower and upper edges of the steel sheet are provided on the left and right sides so as to contact the two steel sheets. The effect | action which one steel plate 2 grinds as the plating layer grinding apparatus 1 of this invention is demonstrated.

먼저, 앞에서 설명한 본 발명의 도금층 연삭장치(1)의 위치에 따라 설치된 베이스(10)에 형성된 레일부(12)에는 제 1 이동부재인 제 1 이동블록(20)의 가이드홈(22)이 끼워져 있고, 상기 제 1 이동블록(20)의 상측에 연결 장착된 상판(20a)에는 다시 레일부(32)가 형성되어 있어 그 내측으로 제 2 이동부재인 제 2 이동판(30)이 끼워져 있다.First, the guide groove 22 of the first moving block 20, which is the first moving member, is inserted into the rail portion 12 formed in the base 10 installed according to the position of the plating layer grinding apparatus 1 of the present invention described above. The upper plate 20a connected to the upper side of the first moving block 20 is again provided with a rail portion 32, and the second moving plate 30 serving as the second moving member 30 is fitted therein.

따라서, 상기 베이스(10)에 설치된 구동모터(14)를 가동시키면 벨트(14a)로서 연결된 스크류바아(16)가 베이스(10)상에서 회전 작동되고, 이에 상기 스크류바아(16)에 체결된 제 1 이동블록(20)의 연결부(24)는 스크류바아(16)의 회전방향에 따라 상기 제 1 이동블록(20)을 전후 방향으로 이동시키게 하는데, 이와 같은 제 1 이동블록(20)이 전후 방향으로 이동하도록 하는 이유는 다음에 상세하게 설명하겠지만 연삭부재인 연마지석(80)의 교체작업시 간편하게 하도록 하기 위해서이다.Accordingly, when the driving motor 14 installed in the base 10 is operated, the screw bar 16 connected as the belt 14a is rotated on the base 10, and thus the first screw fastened to the screw bar 16 is rotated. The connecting portion 24 of the moving block 20 moves the first moving block 20 in the front and rear directions according to the rotational direction of the screw bar 16. Such a first moving block 20 moves in the front and rear directions. The reason for the movement will be described in detail below, but to facilitate the replacement of the abrasive grindstone 80, which is a grinding member.

다음, 상기 제 1 이동블록(20)의 상판(20a)에는 베이스(10)에 수직 설치된 고정대(38)의 중앙부분에서 수평 고정된 푸싱판(39c)이 위치되어 있는데, 이때 상기 푸싱판(39c)은 선단부보다 후단부가 긴 마름모로 형성되어 있다.Next, a pushing plate 39c horizontally fixed at a center portion of the fixing stand 38 vertically installed on the base 10 is positioned on the upper plate 20a of the first moving block 20, wherein the pushing plate 39c is located. ) Is formed of a rhombus with a longer rear end than the front end.

결국, 도 8에서 도시한 바와 같이, 상기 마름모형상의 푸싱판(39c)은 고정상태이지만 그 양측부분이 제 2 이동부재인 제 2 이동판(30)의 후단부 모서리면에 접한 상태에서 상기 제 1 이동블록(20)과 일체로 그 상측의 제 2 이동판(30)이 후진하면 상기 제 2 이동판(30)은 좌우측으로 각각 레일부(32)를 따라 이동하게 되는 것이다.As a result, as shown in Figure 8, the rhombus-shaped pushing plate (39c) is fixed, but both sides thereof in contact with the edge of the rear end of the second moving plate 30, which is the second moving member 30 When the second moving plate 30 on the upper side of the first moving block 20 is integrated with the first moving block 20, the second moving plate 30 moves along the rails 32 to the left and right sides, respectively.

또한, 상기 제 1 이동블록(20)이 초기 위치로 복귀하여 푸싱판(39c)에 의한 제 2 이동판(30)에 가해지는 힘이 없어지면 상기 제 2 이동판(30)은 그 상측으로 수직 설치된 연결대(36)사이에 탄설된 스프링(S)에 의하여 초기 위치로 복귀되고, 이와 같은 제 2 이동판(30)의 좌우방향 이동은 다음에 상세하게 설명하는 연삭부재 인 연마지석(80)의 교체작업을 간편하게 한다.In addition, when the first moving block 20 returns to the initial position and no force is applied to the second moving plate 30 by the pushing plate 39c, the second moving plate 30 is vertically installed upward. It is returned to the initial position by the spring S installed between the connecting table 36, and the left and right movement of the second moving plate 30 is replaced by the abrasive grindstone 80, which is the grinding member described in detail below. Simplify your work

다음, 상기 제 2 이동판(30)의 일측단부 전후측에는 2개의 연결대(36a)(36b)가 2단으로 설치되어 있는데, 앞의 연결대(36a)에는 피봇축(34)이 연결되어 있고, 상기 피봇축(34)에는 피니언기어(39b)가 연결됨으로서, 상기 고정대(38) 상단에 형성된 랙기어(39a)는 제 1 이동블록(20)의 이동시 상기 랙기어(39a)는 피니언기어 (39b)를 회전시키고, 상기 전방측의 연결대(36a)는 상단부분이 선회작동하고, 이는 결국 상기 연결대(36a)(36b)상에 설치된 제 3 이동부재인 제 3 이동판(40)을 일체로 이동시키도록 하는 것이다.Next, two connecting rods 36a and 36b are installed in two stages on one side end front and rear of the second moving plate 30. A pivot shaft 34 is connected to the connecting rod 36a. The pinion gear 39b is connected to the pivot shaft 34 so that the rack gear 39a formed on the top of the fixing stand 38 is the rack gear 39a when the first moving block 20 moves. Rotate the upper end portion of the front connecting rod 36a, which eventually moves the third moving plate 40 which is the third moving member installed on the connecting rods 36a and 36b integrally. To do that.

다음, 상기 제 1 이동블록(20)에서 제 3 이동판(40)까지 제 1 이동블록(20) 상에 수직 설치되고 제 1 이동블록(20)의 상판(20a)을 통하여 베어링등으로 지지되어 있는 제 1 구동부재 즉, 제 1 구동축(50)은 하측으로 연결된 구동모터(52)를 구동시키면 일체로 구동되고, 그 상,하측의 제 1 기어(56a)(56b)들을 일체로 회전시킨다.Next, vertically installed on the first moving block 20 from the first moving block 20 to the third moving plate 40 and supported by a bearing or the like through the upper plate 20a of the first moving block 20. The first drive member, that is, the first drive shaft 50 is driven integrally by driving the drive motor 52 connected to the lower side, and rotates the first gear (56a) (56b) of the upper and lower sides integrally.

한편, 상기 제 1 기어(56a)(56b)에 인접하여 제 2 이동판(30)과 제 3 이동판(40)의 하부 및 상부에 고정된 지지블록(54a)(54b)의 내측에는 제 2 구동부재 즉, 제 2 구동축(70)에 고정되는 제 2 기어(72a)(72b)들이 상기 제 1 기어(56a) (56b)들과 맞물려 있어 상기 제 2 기어들의 회전으로 상기 제 2 구동축(70)들이 일체로 구동되고, 결국 상기 제 2 구동축(70)의 상단 및 하단으로 서로 이격된 상태로 고정핀으로서 고정된 연삭부재인 연마지석(80)들은 일체로 회전된다.On the other hand, a second inside the support blocks 54a and 54b fixed to the lower and upper portions of the second moving plate 30 and the third moving plate 40 adjacent to the first gears 56a and 56b. Drive gears, that is, second gears 72a and 72b fixed to the second drive shaft 70 are engaged with the first gears 56a and 56b so that the second drive shaft 70 is rotated by the rotation of the second gears. ) Are driven integrally, and the grinding grindstone 80, which is a grinding member fixed as a fixing pin while being spaced apart from each other to the upper and lower ends of the second drive shaft 70, is rotated integrally.

이에 따라서, 도 7에서 도시한 바와 같이, 상기 연마지석(80)들 사이로 통과하는 강판(2)의 모서리 상,하면들은 상기 연마지석(80)에 의하여 연삭되면서 도금층 또는 이물질이 제거되고, 이와 같은 도금층의 제거로 용접시 강판의 용접부위가 보다 견고하게 용접되면서 강판의 연속제조공정이 보다 안정적으로 수행되는 것이다.Accordingly, as shown in FIG. 7, the upper and lower surfaces of the steel plate 2 passing between the abrasive grinds 80 are removed by the abrasive grind 80 while the plating layer or the foreign matter is removed. As the welded portion of the steel sheet is welded more firmly by removing the plating layer, the continuous manufacturing process of the steel sheet is more stably performed.

그런데, 상기 제 2 구동축(70)의 하단에 고정된 연마지석(80)들의 외곽에는 가이드블록(60)이 설치되어 있어 상기 강판(2)의 연삭작동을 안정적으로 유지되도록 하고, 특히 상기 가이드블록(60)의 몸체(60a)에는 연결편(64a)으로서 가이드판 (64)들이 내측으로 탄설된 스프링(S)으로서 당겨지도록 되고, 상기 가이드판(64)의 상단부에는 총 4개의 봉형상의 자석(62)들이 설치되어 있어, 상기와 같은 연삭작동시 연삭된 도금가루 또는 이물질이 상기 자석(62)에 부착되어 비산되는 것을 방지시킨다.By the way, the guide block 60 is installed on the outside of the abrasive grind 80 fixed to the lower end of the second drive shaft 70 to maintain a stable grinding operation of the steel sheet (2), in particular the guide block The body 60a of the 60 has a guide plate 64 as a connecting piece 64a being pulled as a spring S which is inwardly charred, and a total of four rod-shaped magnets 62 are provided at the upper end of the guide plate 64. ) Is installed to prevent the ground powder or foreign matter from being attached to the magnet 62 and scattered during the grinding operation.

다음, 도 7에서 도시한 바와 같이, 앞에서 설명한 바와 같이 제 2 이동부재인 제 2 이동판(30)이 푸싱판(39c)으로서 이동하여 상측의 제 1기어(56b)와 제 2 기어(72b)가 이격되는 상태에서 연결대(36a)가 랙기어(39a)의 이동으로 회전하여 일측 연결대(36b)가 분리되어 상기 제 3 이동판(40)과 상측 연마지석(80), 제 2 구동축(70)들이 들려지고, 가이드블록(60)의 가이드판(64)들이 스프링(S)이 이탈되어 벌려지면 작업자는 마모된 연마지석(80)을 고정핀을 빼내어 극히 간편하게 교체할 수 있게 된다.Next, as shown in FIG. 7, as described above, the second moving plate 30, which is the second moving member, moves as the pushing plate 39c to move the upper first gear 56b and the second gear 72b. The connecting rod 36a is rotated by the movement of the rack gear 39a in the spaced apart state so that the one connecting rod 36b is separated, so that the third moving plate 40 and the upper grinding wheel 80 and the second driving shaft 70 are separated. Is lifted, and the guide plate 64 of the guide block 60 is opened when the spring (S) is separated and the operator can easily replace the worn abrasive grindstone 80 by removing the fixing pin.

이에 따라서, 강판을 연속공정에 투입시키기 전에 먼저 그 모서리면을 연마지석(80)으로서 먼저 연삭시킨후, 용접하도록 함으로서, 강판의 연속공정을 위한 선,후행 강판(2)들이 보다 안정적으로 용접된 상태에서 공정에 투입될 수 있는 것이다.Accordingly, before the steel sheet is put into the continuous process, the edge surface is first ground as the abrasive grindstone 80, and then welded, whereby the line and the following steel sheets 2 for the continuous process of the steel sheet are welded more stably. It can be put into the process in the state.

이와 같이 본 발명인 도금강판의 용접을 위한 용접부 도금층 연삭장치에 의하면, 연속공정에 투입되는 도금강판의 용접부위를 용접작업전에 자동적으로 연삭함으로서, 연속공정에 투입되기 위한 선,후행 강판의 용접부위가 보다 긴밀하게 용접되어 연속공정시 강판 용접부위의 파단을 완전하게 방지시키는 잇점이 있다.As described above, according to the welding part plating layer grinding device for welding the plated steel sheet according to the present invention, the welding part of the plated or trailing steel plate to be put into the continuous process is automatically ground by welding the welded portion of the plated steel sheet put into the continuous process before welding. More closely welded has the advantage of completely preventing fracture of the welded steel sheet during the continuous process.

결국, 냉연강판 또는 특수한 강판제품의 연속제조시 강판 용접부위의 파단으 로 인한 라인작동등과 같은 라인사고를 방지시키어 냉연강판 또는 특수한 도금강판의 제조 생산성을 가일층 향상시키는 우수한 효과를 제공하는 것이다.
As a result, it is possible to prevent line accidents such as line operation due to breakage of the welded steel sheet during continuous manufacturing of cold rolled steel sheet or special steel sheet product, thereby providing an excellent effect of further improving the production productivity of cold rolled steel sheet or special plated steel sheet.

본 발명은 특정한 실시예에 관련하여 도시하고 설명하였지만, 이하의 특허청구범위에 의해 마련되는 본 발명의 정신이나 분야를 벗어나지 않는 한도내에서 본 발명이 다양하게 개조 및 변화될수 있다는 것을 당업계에서 통상의 지식을 가진자는 용이하게 알수 있음을 밝혀두고자 한다. While the invention has been shown and described with respect to specific embodiments thereof, it will be apparent to those skilled in the art that various changes and modifications can be made without departing from the spirit or scope of the invention as set forth in the claims below. I would like to know that those who have knowledge of this can easily know.

Claims (6)

도금강판(2) 이동경로상에 설치되는 베이스(10);A base 10 installed on the plated steel plate 2; 상기 베이스(10)상에 모터 구동으로 전후 이동토록 설치되는 제 1 이동블록(20)으로 구성된 제 1 이동부재;A first moving member composed of a first moving block 20 installed on the base 10 to move back and forth by driving a motor; 상기 제 1 이동블록(20)의 상부판(20a)에 설치된 레일부(32)에 끼워져 상기 제 1 이동블록 상에서 좌우 이동토록 설치된 제 2 이동판(30)으로 구성된 제 2 이동부재;A second moving member comprising a second moving plate 30 fitted to a rail part 32 installed on the upper plate 20a of the first moving block 20 so as to move left and right on the first moving block; 상기 제 2 이동판(30)에 양측으로 수직하게 신장되고 중앙이 피봇축(34)으로 연결된 2단 연결대(36)의 상측에 설치되어 상기 제 2 이동판 상에 선회 가능토록 설치되는 제 3 이동판(40)으로 구성된 제 3 이동부재;A third movement extending vertically to both sides of the second moving plate 30 and installed at an upper side of the second stage connection table 36 connected to the pivot shaft 34 so as to be pivotable on the second moving plate; A third moving member composed of a plate 40; 상기 제 1 이동블록(20)의 중앙으로 제 3 이동판(40)까지 회전토록 설치되는 제 1 구동부재;A first driving member installed to rotate to the third moving plate 40 toward the center of the first moving block 20; 상기 제 2 및 제 3 이동판(30)(40)에 수직하게 상기 제 1 구동부재와 기어로서 회전토록 설치되며, 단부에는 가이드블록이 설치된 제 2 구동부재; 및,A second driving member installed to rotate as the first driving member and a gear perpendicular to the second and third moving plates 30 and 40, and having a guide block at an end thereof; And, 상기 제 2 구동부재의 단부에 가이드블록(60)의 내측으로 일체로 회전토록 고정되어 상기 도금강판(2)의 모서리면을 연삭토록 설치되는 연삭부재로서 구성되는 것을 특징으로 하는 도금강판의 용접을 위한 용접부 도금층 연삭장치Welding of the plated steel sheet, characterized in that it is configured as a grinding member which is fixed to the end of the second drive member integrally to the inside of the guide block 60 to be installed to grind the edge surface of the plated steel sheet (2) Plate Grinding Machine for Welding 제 1항에 있어서, 제 1 이동블록(20)의 저부에는 상기 베이스(10)상에 형성된 레일부(12)에 맞물리는 가이드홈(22)이 형성되며, 상기 베이스(10)의 중앙에는 상기 제 1 이동블록(20)의 저부 연결부(24)에 맞물리는 모터(14)로서 구동되는 스크류바아(16)가 설치되어 상기 제 1 이동블록(20)은 모터 구동으로 전후 이동토록 구성된 것을 특징으로 하는 도금강판의 용접을 위한 용접부 도금층 연삭장치According to claim 1, The bottom of the first movable block 20 is formed with a guide groove 22 for engaging the rail portion 12 formed on the base 10, the center of the base 10 A screw bar 16 driven as a motor 14 engaged with the bottom connecting portion 24 of the first moving block 20 is installed so that the first moving block 20 is configured to move back and forth by driving the motor. Welded layer grinding device for welding welded plated steel sheets 삭제delete 제 1항에 있어서, 상기 연결대(36)의 상기 피봇축(34) 중앙에는 베이스(10) 일측에 수직 설치된 고정대(38) 상부의 랙기어(39a)가 맞물리는 피니언기어(39b)가 장착되고, 상기 제 2 이동판(30) 사이에는 고정대(38)상에 수평 고정된 푸싱판 (39c)이 위치되어 제 1 이동블록(20)의 전후 이동시 상기 제 2 이동판(30) 및 제 3 이동판(40)은 좌우 이동 및 선회 이동토록 구성되는 것을 특징으로 하는 도금강판의 용접을 위한 용접부 도금층 연삭장치The pinion gear (39b) of claim 1, wherein the rack gear (39a) of the upper portion of the fixing stand (38) installed vertically on one side of the base (10) is mounted at the center of the pivot shaft (34) of the connecting table (36). The second moving plate 30 and the third moving plate 30 are horizontally fixed on the fixing plate 38 between the second moving plate 30 so that the second moving plate 30 and the third moving when moving forward and backward of the first moving block 20. Plate 40 is welded plated layer grinding device for welding the plated steel sheet, characterized in that configured to move left and right and swing 제 1항에 있어서, 상기 제 1 구동부재는 상기 베이스(10)에 설치된 모터(52)와 연결되고 상기 제 1 이동블록(20)의 상판(20a)에 수직 회전토록 지지되며 상기 제 1 이동블록(20)과 제 3 이동판(40)에 설치된 지지블록(54a)(54b)에 인접하여 위치되는 제 1 기어(56a)(56b)가 각각 장착된 제 1 구동축(50)으로 이루어 지고, According to claim 1, wherein the first drive member is connected to the motor 52 installed in the base 10 and is supported so as to rotate vertically on the upper plate (20a) of the first moving block 20 and the first moving block It consists of a first drive shaft (50) mounted with a first gear (56a, 56b) positioned adjacent to the support blocks (54a, 54b) provided on the 20 and the third moving plate (40), 상기 제 2 구동부재는 상기 제 1 기어(56a)(56b)와 맞물리도록 지지블록(54a)(54b)에 설치되는 제 2 기어(72a)(72b)를 갖춘 제 2 구동축(70)으로 구성되는 것을 특징으로 하는 도금강판의 용접을 위한 용접부 도금층 연삭장치The second drive member is composed of a second drive shaft 70 having second gears 72a and 72b mounted to the support blocks 54a and 54b to engage the first gears 56a and 56b. Welded plated layer grinding device for welding plated steel sheet, characterized in that 제 1항에 있어서, 상기 연삭부재는 제 2 구동부재인 제 2 구동축(70)의 상단 및 하단에 핀 고정되며 강판(2)의 모서리 상,하면을 연삭시키도록 일체로 회전하는 연마지석(80)으로 형성되고, 상기 연마지석(80)의 외곽으로 위치되는 가이드블록(60)의 바디(60a) 내측에는 자석(62)이 설치되고, 상기 가이드블록(60)에는 필요시 선회되도록 연결편(64a)으로서 설치되는 복수의 가이드판(64)이 장착되며, 제 2 구동축(70)의 상단 및 하단에 설치되는 가이드블록(60)사이에는 강판 통과를 위한 안내공간(66)이 형성되는 것을 특징으로 하는 도금강판의 용접을 위한 용접부 도금층 연삭장치The grinding wheel 80 of claim 1, wherein the grinding member is pinned to the upper and lower ends of the second driving shaft 70, which is the second driving member, and rotates integrally to grind the upper and lower edges of the steel plate 2. A magnet 62 is formed inside the body 60a of the guide block 60, which is formed at the outer side of the abrasive grindstone 80, and is connected to the guide block 60 so as to pivot when necessary. A plurality of guide plate 64 is installed as is mounted, between the guide block 60 is installed on the upper and lower ends of the second drive shaft 70, characterized in that the guide space 66 for passing the steel sheet is formed Welded layer grinding device for welding plated steel sheet
KR1020010021094A 2001-04-19 2001-04-19 Apparatus for grinding plating layer on welding portion of plated strip for welding the plated strips KR100742901B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020010021094A KR100742901B1 (en) 2001-04-19 2001-04-19 Apparatus for grinding plating layer on welding portion of plated strip for welding the plated strips

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020010021094A KR100742901B1 (en) 2001-04-19 2001-04-19 Apparatus for grinding plating layer on welding portion of plated strip for welding the plated strips

Publications (2)

Publication Number Publication Date
KR20020081748A KR20020081748A (en) 2002-10-30
KR100742901B1 true KR100742901B1 (en) 2007-07-25

Family

ID=27701756

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020010021094A KR100742901B1 (en) 2001-04-19 2001-04-19 Apparatus for grinding plating layer on welding portion of plated strip for welding the plated strips

Country Status (1)

Country Link
KR (1) KR100742901B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100859582B1 (en) * 2007-05-14 2008-09-23 설동우 Spray guide of zinc coated steel pipe and eliminating device of spray residue
KR101977480B1 (en) * 2017-09-12 2019-05-10 주식회사 포스코 Apparatus for grinding
KR102295955B1 (en) * 2020-07-06 2021-09-02 주식회사 삼우에코 Welding device and method of plated steel sheet

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6161756A (en) * 1984-08-30 1986-03-29 Kawasaki Steel Corp Grinding method of butt welding part by means of laser beam for special steel trip and device thereof
JPH03169483A (en) * 1989-11-30 1991-07-23 Kawasaki Steel Corp Method and equipment for butt welding of metallic strips
JPH04300020A (en) * 1991-03-27 1992-10-23 Mitsubishi Materials Corp Device for shaping groove part in tubing device
JPH09253864A (en) * 1996-03-21 1997-09-30 Kawasaki Steel Corp Metal strip joining device
KR20010064197A (en) * 1999-12-24 2001-07-09 이구택 Device for removing spatter of strip in welding line
KR20020043682A (en) * 2000-12-02 2002-06-12 이구택 Welding point manufacturing device of strip
KR20020052890A (en) * 2000-12-26 2002-07-04 이구택 Grinder in welder

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6161756A (en) * 1984-08-30 1986-03-29 Kawasaki Steel Corp Grinding method of butt welding part by means of laser beam for special steel trip and device thereof
JPH03169483A (en) * 1989-11-30 1991-07-23 Kawasaki Steel Corp Method and equipment for butt welding of metallic strips
JPH04300020A (en) * 1991-03-27 1992-10-23 Mitsubishi Materials Corp Device for shaping groove part in tubing device
JPH09253864A (en) * 1996-03-21 1997-09-30 Kawasaki Steel Corp Metal strip joining device
KR20010064197A (en) * 1999-12-24 2001-07-09 이구택 Device for removing spatter of strip in welding line
KR20020043682A (en) * 2000-12-02 2002-06-12 이구택 Welding point manufacturing device of strip
KR20020052890A (en) * 2000-12-26 2002-07-04 이구택 Grinder in welder

Also Published As

Publication number Publication date
KR20020081748A (en) 2002-10-30

Similar Documents

Publication Publication Date Title
KR200489598Y1 (en) Pre-grinding machine for cold-drawn steel bars for rack bars
JP5889471B1 (en) Surface treatment equipment
US2541080A (en) Endless belt stretching, truing, and smoothing apparatus
TW380073B (en) Apparatus and method for grinding card clothings
KR20140041177A (en) Cutting apparatus for material
CN108311997A (en) A kind of four side edge polisher of glass and its edging method
KR101307837B1 (en) Simultaneous upper and lower edge of the plate chamfering chamfering device capable of processing
KR100742901B1 (en) Apparatus for grinding plating layer on welding portion of plated strip for welding the plated strips
CN210435711U (en) Numerical control production line for U-rib components for bridges
JP5800775B2 (en) Rail head straightener and self-propelled rail head straightener
KR19990012559U (en) Foreign body automatic removal device for iron roll
CN115106880A (en) Burr grinding device for steel plate machining
CN113290463B (en) Scraper bowl carries grinding device
CN211490826U (en) Burr removing device for precision stainless steel production
KR100770324B1 (en) Apparatus for changing and fixing the welding wheels of strip seam welding machine
CN217191878U (en) Raw material bending machine for guardrail machining
US2762170A (en) Apparatus for reconditioning chain saw bars
KR20020001436A (en) Apparatus for removing burr on edges of strips
KR100885205B1 (en) Welder
JP5881874B2 (en) Rail head straightener and self-propelled rail head straightener
US1891279A (en) Marble and granite shaping machine
KR100775264B1 (en) An apparatus for grinding electrode wheel of a strip welding machine
CN113084265B (en) Gear grinding device
CN212044049U (en) Strip steel edge deburring device
KR200215191Y1 (en) An apparatus for brushing iron dust from the edge of coil

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120702

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20130719

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140721

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150720

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160719

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170720

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180719

Year of fee payment: 12