Prior art date
Application number
KR1020060041285A
Other languages
Korean (ko)
Inventor
민병창
Original Assignee
민병창
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 민병창 filed Critical 민병창
Priority to KR1020060041285A priority Critical patent/KR100727321B1/en
Priority to PCT/KR2007/002252 priority patent/WO2007129855A1/en
Application granted granted Critical
Publication of KR100727321B1 publication Critical patent/KR100727321B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/12Tube and panel arrangements for ceiling, wall, or underfloor heating
    • F24D3/122Details
    • F24D3/127Mechanical connections between panels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/12Tube and panel arrangements for ceiling, wall, or underfloor heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/10Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/12Tube and panel arrangements for ceiling, wall, or underfloor heating
    • F24D3/14Tube and panel arrangements for ceiling, wall, or underfloor heating incorporated in a ceiling, wall or floor
    • F24D3/141Tube mountings specially adapted therefor
    • F24D3/142Tube mountings specially adapted therefor integrated in prefab construction elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Floor Finish (AREA)

Abstract

An assembly type floor heating system and a construction method thereof are provided to maintain the same level basically by controlling the level of each location through a leveling member even if a foundation floor is uneven. An assembly type floor heating system includes a leveling member(1), a bottom member(2), a heat conducting pipe(4), a top member(5), and a soundproof and insulation member(6). The leveling member controls a height to maintain the same level on a foundation floor. The bottom member is assembled with the leveling member and separated from the foundation floor making a space for supporting, and includes a pipe installing concave(22) for installation of the heat conducting pipe and maintains the same level. The heat conducting pipe is inserted into the pipe installing concave of the bottom member. The top member is formed on a top of the bottom member, and includes the heat conducting pipe at a pipe installing concave(52). The soundproof and insulation member is filled into the space between the foundation floor and the bottom member.

Description

조립식 온돌시스템 및 그 시공방법{Prefabrication Type Floor Heating System and the Construction Method thereof}Prefabrication Type Floor Heating System and the Construction Method

도 1은 본 발명에 대한 바람직한 일례로서 요부 분해 사시도,1 is an exploded perspective view of main parts as a preferred example of the present invention;

도 2는 도 1의 조립 상태 종단면도,2 is a longitudinal cross-sectional view of the assembled state of FIG.

도 3은 본 발명에 채택되는 수평조절부재의 일례를 예시한 분해 사시도,Figure 3 is an exploded perspective view illustrating an example of the horizontal adjustment member adopted in the present invention,

도 4는 도 3의 조립 상태를 나타낸 확대 종단면도,4 is an enlarged longitudinal sectional view showing the assembled state of FIG. 3;

도 5는 도 1 내지 도 4에 있어서 하부부재와 열매체파이프가 시공된 상태를 보여주는 평면 예시도,5 is a planar illustration showing a state in which the lower member and the heat medium pipe are constructed in FIGS. 1 to 4;

도 6은 도 2에 예시한 실시예의 변형례를 예시한 종단면도,6 is a longitudinal sectional view illustrating a modification of the embodiment illustrated in FIG. 2;

도 7은 다른 변형례를 예시한 종단면도,7 is a longitudinal sectional view illustrating another modification;

도 8은 또 다른 변형례를 예시한 종단면도.8 is a longitudinal sectional view illustrating yet another modification.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1: 수평조절부재, 2: 하부부재,1: leveling member, 2: lower member,

3: 축열부재, 4: 열매체파이프,3: heat storage member, 4: heat medium pipe,

5: 상부부재, 6:차음단열부재,5: upper member, 6: sound insulation,

7: 표면마감부재7: surface finishing member

본 발명은 조립식 온돌시스템 및 그 시공방법에 관한 것으로, 특히 주택난방 부품의 제조, 조립, 부분보수, 점검, 해체 등의 시공이 용이하여 빠른 시공으로 공사기간을 단축하며 실내 바닥으로 열전달이 이루어지는 난방효율을 보다 향상시키고 흡음에 의한 층간 소음의 발생을 억제하고 단열 및 차음의 역할을 수행할 수 있도록 하는 조립식 온돌시스템 및 그 시공방법에 관한 것이다.The present invention relates to a prefabricated ondol system and a construction method thereof, and in particular, the construction, manufacturing, assembly, partial repair, inspection, and dismantling of home heating parts is easy, so that the construction period is shortened by rapid construction and heat is transferred to the indoor floor. The present invention relates to a prefabricated ondol system and a method for constructing the same, which further improves efficiency, suppresses the occurrence of interlayer noise due to sound absorption, and performs the role of insulation and sound insulation.

일반적으로 종래에 있어서 실내 난방을 목적으로 설치되는 시공방식으로서는 옥내의 기초 바닥에 단열재를 깔고 그 위에 합성수지 관체(일명, "엑스엘파이프"라 함)나 동관 형태로 이루어진 온수파이프를 지그 재그 형으로 배치한 다음에 자갈이나 모래와 같은 세골재로 이들 온수파이프 사이를 온수파이프 높이만큼 채워 놓은 다음에 그 상부에 모르타르를 시공하는 방식이 주종을 이루고 있다.In general, the construction method installed for the purpose of indoor heating in the prior art is to install a heat insulating material on the base of the indoor floor, and a hot water pipe made of a synthetic resin tube (also called "X-EL pipe") or a copper tube in a zigzag form. The main method is to fill the space between these hot pipes by the height of hot water pipes with fine aggregates such as gravel or sand, and then install mortar on the upper part.

그러나, 이러한 시공방식은 전체적으로 시공이 이루어지는 공정이 복잡하고 모르타르가 경화되어 다음의 작업을 수행하기까지 많은 시간이 소요되게 되어 시공비용이 많이 소요되고 공사기간이 길어지게 되어 시공 경쟁력을 저하시키는 주요 요인이 되고 있다. 더욱이 내장되는 온수파이프가 서로 이격되어 있으면서도 온수파이프를 이루게 되는 전체 재질이 단일의 동일한 재질로 제작이 이루어지게 되므로 전 방향에 걸쳐 동일하게 열전도가 이루어지게 되고, 다른 인접된 부위에 축열 내지 손실이 발생하게 되며 결국 실내의 난방 내지 온도조절을 위하여 사용되게 되는 순수한 열은 모르타르라고 하는 전도성이 극히 낮은 매질을 통과하여야만 실내 난방의 목적으로 활용할 수 있게 되어 난방에 많은 시간이 소요되고 열효율도 낮은 폐단이 발생되고 있다.However, this construction method is a major factor that deteriorates the competitiveness of construction as the construction process is complicated and the mortar is hardened and it takes a lot of time to carry out the next work. It is becoming. In addition, since the hot water pipes are spaced apart from each other and the entire material forming the hot water pipes is made of a single material, heat conduction is uniformly performed in all directions, and heat storage or loss occurs in other adjacent parts. In the end, pure heat, which is used for heating or controlling the temperature of the room, must pass through a very low conductive medium called mortar, which can be used for the purpose of heating the room. It is becoming.

위와 같은 문제점을 일부 해소하기 위하여 모르타르 시공을 행하는 대신에 온수파이프를 수용할 수 있는 상,하부 조립식 패널을 구성하여 시공하는 방식이 제안되어 있으나, 이 경우에는 건축물의 기초 바닥이 전체적으로 평평하게 고른 시공이 이루어져 있지 아니하여 이를 채택하기 위하여는 바닥을 평평하게 재시공을 행한 다음에 설치작업이 가능하기 때문에 결국 기초 바닥의 평평한 상태로 시공을 행하는데 별도의 비용이 소요되는 단점과 함께, 패널의 강도가 그다지 높지 않아 별도의 보강을 위한 대책이 수립되어야 하고 열전도율이 낮아 발생되는 문제점은 지속적으로 발생되고 있어 실용화가 어려운 실정이다.In order to solve some of the problems described above, instead of performing mortar construction, a method of constructing a top and bottom prefabricated panel capable of accommodating hot water pipes has been proposed. In this case, however, the foundation floor of the building is flat evenly. In order to adopt this, since it is possible to install the floor after re-installing the floor flatly, it is necessary to additionally cost the construction work on the flat state of the foundation floor. Since it is not so high, measures for additional reinforcement have to be established, and problems caused by low thermal conductivity have been continuously generated, making it difficult to put into practice.

그 이외에도 국내 등록특허공보 등록번호 10-0402205호인 "무배관 방식의 모듈화 패널의 온돌시스템"에 관한 선행기술이 개시되어 있으나, 이 경우에는 시공이 이루어지는 바닥패널 자체를 온수순환용 배관 대신에 활용하여 무배관에 의한 시공을 행한다는 장점이 있는 반면에 이를 시공하기 위한 건축물의 기초 바닥면이 평평하고 고르게 수평을 유지하여야만 시공이 가능하나 실제로는 그렇지 못하여 별도의 바닥시공이 이루어진 다음에나 시공이 가능한 정도로서 이러한 기술을 채택하기 위하여는 별도의 바닥시공이 선행되어야만 하는 폐단이 있고, 층간 소음에 대한 대책과 같은 별도의 문제를 해소할 수 없는 단점이 있다.In addition, the prior art related to the "Ondol system of a non-piping modular panel", which is registered in Korea Patent Publication No. 10-0402205, is disclosed, but in this case, by using the floor panel itself is constructed instead of hot water circulation piping On the other hand, the construction can be done only when the foundation floor of the building is flat and evenly level, but in reality it is not possible to do it after the separate floor construction. In order to adopt such a technology, there is a disadvantage that a separate floor construction must be preceded, and a separate problem such as countermeasures for interlayer noise cannot be solved.

본 발명은 이와 같은 종래의 문제점을 해소하기 위하여 다음과 같은 목적을 가지고 연구 개발이 이루어진 것이다.The present invention has been made with the following objectives in order to solve such a conventional problem.

본 발명의 첫째 목적은 조립 시공이 용이하고 시공시간을 단축시킬 수 있고 난방효율을 향상시킬 수 있도록 하고자 함에 있다.The first object of the present invention is to facilitate the assembly construction, shorten the construction time and improve the heating efficiency.

본 발명의 둘째 목적은 건축물의 실내 기초 바닥의 높낮이가 고르지 않고 수평상태를 유지하지 못한 경우에도 각 부위별로 높이 조절에 의하여 기초적으로 수평상태를 유지할 수 있도록 하고자 함에 있다.The second object of the present invention is to maintain the horizontal state basically by adjusting the height of each part even if the height of the indoor foundation floor of the building is uneven and the level is not maintained.

본 발명의 셋째 목적은 층간소음의 발생을 적게 하고 소음이 발생하는 경우에 흡음 내지 차음이 가능하도록 하여 온돌시공 이외에도 부수적인 효과를 기대할 수 있도록 하고자 함에 있다.A third object of the present invention is to reduce the occurrence of interlayer noise and to enable sound absorption to sound insulation when noise is generated, so that ancillary effects can be expected in addition to the ondol construction.

본 발명의 넷째 목적은 시공시 기초바닥과 하부부재 사이 공간을 각종 파이프의 배관, 전원의 배선 등 작업구나 공동구의 목적으로 활용할 수 있는 각종 유틸리티 공간으로도 활용할 수 있도록 하여 기존의 난방시스템과 차별화가 가능하고 다목적으로 활용할 수 있도록 하고자 함에 있다.The fourth object of the present invention is to differentiate the space from the existing heating system by allowing the space between the base and the lower member to be used as a utility space that can be utilized for the purpose of work tools and joint tools such as piping of various pipes, power supply, and the like. It is intended to be possible and versatile.

본 발명은 위와 같은 목적들을 달성하기 위하여, 기초 바닥 위에 설치되고 수평을 유지하기 위한 높이조절기능을 갖는 수평조절부재와, 상기 수평조절부재와 결합되고 기초바닥으로부터 이격되어 공간이 있는 상태로 지지역할을 가지며 열매체파이프를 설치하기 위한 파이프설치요부가 마련되고 수평상태를 유지하도록 설치되는 하부부재와, 상기 하부부재의 파이프설치요부에 끼워 설치되는 열매체파이프와, 상기 하부부재의 상부에 위치하고 상기 열매체파이프를 파이프설치요부에 끼워 설치되는 상부부재와, 그리고 상기 기초바닥과 상기 하부부재의 사이 공간에 채워지는 차음단열부재를 포함하여 이루어지는 조립식 온돌시스템을 제공한다.In order to achieve the above objects, the present invention provides a horizontal adjustment member installed on the base floor and having a height adjustment function for maintaining a horizontal level, and coupled with the horizontal adjustment member and spaced apart from the base floor. The lower member is provided with a pipe mounting recess for installing the heat medium pipe, and is installed to maintain a horizontal state, the heat medium pipe is fitted to the pipe mounting recess of the lower member, and located above the lower member, the heat medium pipe It provides a prefabricated ondol system comprising an upper member which is inserted into the pipe installation recess, and a sound insulating insulation member filled in the space between the base bottom and the lower member.

또한, 상기 하부부재와 상기 상부부재의 사이로서 상기 열매체파이프의 하부에 별도의 축열부재를 설치하여 이루어지는 조립식 온돌시스템을 제공한다.In addition, there is provided a prefabricated ondol system formed by installing a separate heat storage member in the lower portion of the heat medium pipe between the lower member and the upper member.

또한, 상기 하부부재와 기초바닥 사이의 공간에 별도의 유틸리티공간을 확보하여 이루어지는 조립식 온돌시스템을 제공한다.In addition, the prefabricated ondol system is provided by securing a separate utility space in the space between the lower member and the base floor.

또한, 기초바닥의 상부에 다수의 하부부재를 설치하되 상기 하부부재와 결합되는 수평조절부재에 의하여 높이를 조절하여 수평을 유지하도록 시공하는 1단계, 상기 하부부재의 상부에 열매체파이프를 끼워 결합하여 시공하는 2단계, 상기 하부부재와 상기 열매체파이프를 결합한 상태에서 상부부재를 그 상부에 결합하고 상기 수평조절부재를 고정 설치하는 3단계, 그리고 상기 기초바닥과 상기 하부부재와의 사이 공간에 차음 및 단열이 우수한 수지를 발포하여 차음단열부재를 채워 넣는 4단계를 포함하여 이루어지는 조립식 온돌시스템의 시공방법을 제공한다.In addition, in the first step of installing a plurality of lower members on the upper part of the base bottom to maintain the level by adjusting the height by the horizontal adjusting member coupled to the lower member, by inserting the heat pipe in the upper portion of the lower member Two steps of construction, three steps of coupling the upper member to the upper part and fixing the horizontal adjusting member in the state in which the lower member and the heat medium pipe are combined, and the sound insulation in the space between the base bottom and the lower member and It provides a construction method of a prefabricated ondol system comprising a four step of filling the sound insulating insulation member by foaming the excellent heat insulating resin.

더욱이, 상기 2단계가 상기 하부부재의 상부에 별도의 축열부재를 결합 설치하고 상기 축열부재의 상부에 열매체파이프를 끼워 결합하여 시공하는 단계로 이루어지는 조립식 온돌시스템의 시공방법을 제공한다.Furthermore, the second step is to provide a construction method of the prefabricated ondol system consisting of a step of coupling and installing a separate heat storage member on the upper portion of the lower member and inserting the heat medium pipe on the top of the heat storage member.

이하, 첨부된 도면에 의하여 본 발명인 조립식 온돌시스템에 대하여 먼저 살펴보기로 한다.Hereinafter, with reference to the accompanying drawings, a first look on the prefabricated ondol system of the present invention.

도 1 내지 도 8에 도시한 바와 같이, 기초 바닥 위에 설치되고 수평을 유지하기 위한 높이조절기능을 갖는 수평조절부재(1)와, 상기 수평조절부재(1)와 결합 되고 기초바닥으로부터 이격되어 공간이 있는 상태로 지지역할을 가지며 열매체파이프(4)를 설치하기 위한 파이프설치요부(22)가 마련되고 수평상태를 유지하도록 설치되는 하부부재(2)와, 상기 하부부재(2)의 파이프설치요부(22)에 끼워 설치되는 열매체파이프(4)와, 상기 하부부재(2)의 상부에 위치하고 상기 열매체파이프(4)를 파이프설치요부(52)에 끼워 설치되는 상부부재(5)와, 그리고 상기 기초바닥과 상기 하부부재(2)의 사이 공간에 채워지는 차음단열부재(6)를 포함하여 이루어지게 된다.As shown in Figures 1 to 8, the horizontal adjustment member (1) installed on the base floor and having a height adjustment function for maintaining the horizontal, the space is coupled to the horizontal adjustment member (1) and spaced apart from the base floor The lower member (2) is provided with a pipe mounting recess (22) for installing the heat medium pipe (4) and installed to maintain a horizontal state, and the pipe mounting recess of the lower member (2) is provided in the state of A heat medium pipe 4 fitted to the 22, an upper member 5 positioned above the lower member 2 and fitted into the pipe installation recess 52, and It is made to include a sound insulation layer 6 is filled in the space between the base bottom and the lower member (2).

또한, 상기 하부부재(2)와 상기 상부부재(5)의 사이로서 상기 열매체파이프(4)의 하부에 별도의 축열부재(3)를 설치하여 그 구성이 이루어지도록 할 수도 있다.In addition, a separate heat storage member 3 may be installed in the lower portion of the heat medium pipe 4 between the lower member 2 and the upper member 5 so that the configuration may be achieved.

이때, 상기 수평조절부재(1)는 나사부재(10)의 하부에 방진쿠션부재(12)를 결합 설치하고 하부 위치엔 하부너트(16)를 나사 결합하여 하부부재(2)의 높낮이를 조절하여 수평상태를 유지할 수 있게 하고, 상부 위치엔 상부너트(14)를 나사 결합하여 나중에 상부부재(5)와 서로 결합 고정할 수 있게 구성된다.At this time, the horizontal adjustment member (1) by installing the anti-vibration cushion member 12 in the lower portion of the screw member 10 and by screwing the lower nut 16 in the lower position to adjust the height of the lower member (2) It is possible to maintain the horizontal state, the upper position is configured to be screwed to the upper nut 14 and later coupled to the upper member 5 and fixed to each other.

상기 방진쿠션부재(12)는 시공이 이루어진 후에 기초바닥과의 사이에서 충격을 흡수하고 충격의 발생시에 하부로 전달되는 것을 감소시키게 되며 하부부재(2)와 기초바닥과의 사이를 상기 수평조절부재(1)에 의하여 이격시키는 역할을 수행하여 층간 소음의 전달을 차단하는 차음 역할을 수행하게 된다.The dustproof cushion member 12 absorbs the shock between the foundation floor after construction and reduces the transmission to the lower side when the impact occurs, and the horizontal adjustment member between the lower member 2 and the foundation floor. By performing the role of spaced apart by (1) to play the role of sound insulation to block the transmission of noise between floors.

상기 하부부재(2)는 도 2 및 도 6에 예시한 바와 같이 프리캐스트 콘크리트(Precast Concrete)나 합성수지에 의한 사출품의 형태로 제작하거나 아니면 도 7 에 예시한 바와 같이 철판과 같은 금속판재를 이용하여 이를 프레스 가공하여 제작한 형태를 사용하게 되는데, 공통적으로 상기 수평조절부재(1)를 끼울 수 있도록 다수의 체결공(20)을 마련하고 상부에는 상기 열매체파이프(4)를 설치하기 위한 파이프설치요부(22)를 마련하여 이루어진다.The lower member 2 is manufactured in the form of an injection molded product by precast concrete or synthetic resin as illustrated in FIGS. 2 and 6 or by using a metal plate such as an iron plate as illustrated in FIG. 7. It is to use the form produced by pressing the process, in common to provide a plurality of fastening holes 20 to fit the horizontal adjustment member (1) and the pipe installation for installing the heat pipe (4) in the upper The recess 22 is provided.

상기 축열부재(3)는 도 6에 예시한 바와 같이 철판을 포함하여 축열효과가 우수한 금속판을 이용하여 프레스 성형하여 제작이 이루어지게 되고, 상기 수평조절부재(1)를 끼울 수 있도록 다수의 체결공(30)을 마련하고 상부에는 상기 열매체파이프(4)를 설치하기 위한 파이프설치요부(32)를 마련하여 이루어지되, 이때 상기 축열부재(3)를 채택하여 조립 설치가 이루어지는 하부부재(2)의 파이프설치요부(22)는 상기 축열부재(3)의 파이프설치요부(32)가 끼워 결합될 수 있도록 그 크기를 좀 더 크게 구성하게 된다.The heat accumulating member 3 is produced by press molding using a metal plate having an excellent heat storage effect, including an iron plate as illustrated in FIG. 6, and a plurality of fastening holes to fit the horizontal adjusting member 1. 30 is provided and the pipe mounting recess 32 for installing the heat medium pipe 4 is provided on the upper part, wherein the heat storage member 3 is adopted to assemble and install the lower member 2. Pipe mounting recess 22 is configured to be larger in size so that the pipe mounting recess 32 of the heat storage member 3 can be fitted.

상기 열매체파이프(4)는 기존의 엑스엘파이프나 아니면 다른 열매체용으로 사용되는 각종 파이프를 채택하여 활용하게 된다.The heat medium pipe (4) is to take advantage of the conventional X-El pipe or various pipes used for other heat medium.

상기 상부부재(5)는 프리캐스트 콘크리트(Precast Concrete)나 합성수지에 의한 사출품의 형태로 제작하여 사용하게 되는데, 공통적으로 상기 수평조절부재(1)를 끼울 수 있도록 다수의 체결공(50)을 마련하고 하부에는 상기 열매체파이프(4)를 설치하기 위한 파이프설치요부(52)를 마련하며, 상기 체결공(50)의 상부 위치에는 개방홈(54)을 형성하여 수평조절부재(1)와의 결합시에 상부너트(14)를 고정 설치할 수 있도록 하고, 상부너트(14)를 고정한 다음엔 상기 개방홈(54)에 마감캡(56)을 끼워 고정하게 된다.The upper member 5 is produced in the form of an injection molded product by precast concrete or synthetic resin, and is used in common, and a plurality of fastening holes 50 can be commonly fitted to the horizontal adjusting member 1. It is provided with a pipe installation recess 52 for installing the heat pipe (4) in the lower portion, and the upper position of the fastening hole 50 to form an open groove 54 to be coupled with the horizontal control member (1) When the upper nut 14 is to be fixedly installed, and the upper nut 14 is fixed, the closing cap 56 is fitted into the opening groove 54 to be fixed.

차음단열부재(6)는 기초바닥과 하부부재(2)의 사이 공간에 채워지도록 하여 구성되는데, 폴리우레탄 등의 발포성 수지를 활용하여 발포시켜 골고루 채워져 시공이 이루어져 단열효과는 물론 차음효과를 우수하게 발휘할 수 있도록 하게 된다.The sound insulating insulation member 6 is configured to be filled in the space between the base bottom and the lower member 2, and is foamed by using a foaming resin such as polyurethane to be evenly filled and constructed to provide excellent insulation and sound insulation effect. Will be able to exercise.

더욱이, 도 8에 예시한 바와 같이 하부부재(2)와 기초바닥과의 사이 공간에 미리 유틸리티 공간(U)을 확보하여 각종 파이프의 배관, 전원의 배선 등 작업구나 공동구의 목적으로 활용할 수 있도록 할 수 있다.Furthermore, as illustrated in FIG. 8, the utility space U is secured in advance in the space between the lower member 2 and the foundation floor so as to be utilized for the purpose of a work tool or a common tool such as piping of various pipes and wiring of power supply. Can be.

상기 상부부재(5)의 상부에는 필요한 경우 표면마감부재(7)를 시공하게 되는데, 인테리어의 마감재로서 얇은 패널 형태로서 소재는 목재나 석재를 가공하여 제작한 형태, 인조석이나 합성수지로 성형하는 경우에는 열전도율이 상승되도록 금속분말 또는 천연광물질의 분말을 혼합하여 성형하는 패널 형태, 최근 각광을 받고 있는 건강증진용의 황토, 숯 등의 소재를 분말화하여 자체 또는 다른 물질과 혼합하여 성형하는 형태 등 다양한 소재의 것을 활용하여 제작한 것을 선택하여 활용할 수 있고, 장판을 그대로 시공하여 활용할 수도 있겠다.If necessary, the surface finishing member 7 is constructed on the upper part of the upper member 5, which is a thin panel form as a finishing material of the interior, and the material is formed by processing wood or stone, and when molded of artificial stone or synthetic resin Panel forms for mixing metal powder or powder of natural minerals to increase thermal conductivity, and powders for shaping clay, charcoal, etc. It is possible to select and utilize the one produced by using the material, and to use the construction as it is.

다음은 위와 같이 이루어지는 본 발명인 조립식 온돌시스템을 시공하는 과정을 살펴보기로 한다.Next, look at the process of construction of the present invention prefabricated ondol system made as described above.

본 발명인 시공방법을 기초로 하여 살펴보면, 기초바닥의 상부에 다수의 하부부재(2)를 설치하되 상기 하부부재(2)와 결합되는 수평조절부재(1)에 의하여 높이를 조절하여 수평을 유지하도록 시공하는 1단계, 상기 하부부재(2)의 상부에 열매체파이프(4)를 끼워 결합하여 시공하는 2단계, 상기 하부부재(2)와 상기 열매체파이프(4)를 결합한 상태에서 상부부재(5)를 그 상부에 결합하고 상기 수평조절부 재(1)를 고정 설치하는 3단계, 그리고 상기 기초바닥과 상기 하부부재(2)와의 사이 공간에 차음 및 단열이 우수한 수지를 발포하여 차음단열부재(6)를 채워 넣는 4단계를 포함하게 되는데, 이를 순차적으로 상세하게 살펴보면 다음과 같다.Looking at the basis of the construction method of the present invention, while installing a plurality of lower members 2 on the upper portion of the base bottom to adjust the height by the horizontal adjustment member (1) coupled with the lower member (2) to maintain a horizontal First step of construction, the second step of the construction by fitting the heat medium pipe (4) to the upper portion of the lower member 2, the upper member (5) in the state in which the lower member 2 and the heat medium pipe (4) combined 3 is coupled to the upper and fixed to the horizontal adjustment member (1), and the sound insulating material (6) by foaming the excellent sound insulation and heat insulation in the space between the base bottom and the lower member (2) ), Which includes four steps of filling, which are described in detail below.

1단계(Stage 1( 하부부재의Of lower part 수평유지시공단계) Horizontal maintenance construction stage)

기초바닥의 상부에 다수의 하부부재(2)를 설치하되 상기 하부부재(2)와 결합되는 수평조절부재(1)에 의하여 높이를 조절하여 수평을 유지하도록 시공하는 단계로서, 하부너트(16)를 나사부재(10)의 적정 위치에 위치시킨 상태에서 수평조절부재(1)의 나사부재(10)를 하부부재(2)의 체결공(20)에 각각 끼워넣고 하부너트(16)를 조절하여 하부부재(2)의 설치위치 및 높이를 맞추고 기초바닥의 상태에 따라 하부너트(16)를 조절하여 수평상태를 유지할 수 있도록 시공한다.Installing a plurality of lower members (2) in the upper portion of the base floor to adjust the height by the horizontal adjustment member (1) coupled with the lower member (2) to maintain the horizontal, the lower nut (16) The screw member 10 of the horizontal adjusting member 1 into the fastening hole 20 of the lower member 2 in the state where the screw member 10 is positioned at the proper position, and adjusts the lower nut 16, respectively. The installation position and height of the lower member (2) is matched, and the construction to maintain the horizontal state by adjusting the lower nut 16 according to the state of the base floor.

2단계(Step 2 ( 열매체파이프Heat pipe 시공단계) Construction stage)

상기 하부부재(2)의 상부에 열매체파이프(4)를 끼워 결합하여 시공하는 단계로서, 엑수엘파이프나 기타 열매체를 위한 파이프를 이용하여 하부부재(2)의 파이프설치요부(22)를 활용하여 끼워 결합하여 시공을 행하되, 도 2에 도시한 바와 같이 하부부재(2)의 전체에 걸쳐 상부에 시공을 행하게 된다.Inserting and heating the heat pipe (4) in the upper portion of the lower member (2), by using the pipe installation recess 22 of the lower member 2 by using a pipe for the exel pipe or other heat medium The installation is performed by fitting, but as shown in FIG. 2, the construction is performed over the entire lower member 2.

물론, 축열부재(3)를 채택하여 활용하는 경우에는 상기 열매체파이프(4)의 시공이 이루어지기 전에 하부부재(2)의 상부에 축열부재(3)를 결합 설치하되, 체결공(30)엔 수평조절부재(1)를 끼우고 파이프설치요부(32)는 하부부재(2)의 파이프설치요부(22)에 끼워 결합한 상태에서 열매체파이프(4)를 상기 파이프설치요부(32)의 내측에 끼워 결합하여 시공을 수행하게 된다.Of course, when the heat storage member 3 is adopted and utilized, the heat storage member 3 is coupled to the upper portion of the lower member 2 before the construction of the heat medium pipe 4 is made, but the fastening hole 30 yen Fit the horizontal adjustment member (1) and the pipe mounting recess 32 is fitted to the pipe mounting recess 22 of the lower member 2, the heat pipe (4) is fitted inside the pipe mounting recess (32) Construction will be performed in combination.

3단계(Step 3 ( 상부부재의Upper member 결합단계) Joining step)

상기 하부부재(2)와 상기 열매체파이프(4)를 결합한 상태에서 상부부재(5)를 그 상부에 결합하고 상기 수평조절부재(1)를 고정 설치하는 시공단계로서, 상부부재(5)의 파이프설치요부(52)에는 열매체파이프(4)의 상부부분을 끼워 결합하고 체결공(50)에는 수평조절부재(1)의 나사부재(10)를 각각 끼워 결합하고 상부로부터 상부너트(14)를 나사결합하며 상기 상부너트(14)가 끼워 결합되는 개방홈(54)의 나머지 부위는 마감캡(56)을 결합하여 상,하부부재(5,2), 열매체파이프(4), 수평조절부재(1)의 상호간 결합이 이루어지고 축열부재(3)를 채택하는 경우에는 축열부재(3)까지 포함하는 결합이 이루어져 시공이 이루어지는 단계이다.A construction step of coupling the upper member 5 to the upper portion and fixing the horizontal adjustment member 1 in the state in which the lower member 2 and the heat medium pipe 4 are combined, the pipe of the upper member (5) The mounting recess 52 is fitted with the upper portion of the heat pipe (4), the fastening hole 50 is fitted with the screw member 10 of the horizontal adjustment member 1, respectively, and the upper nut 14 is screwed from the top The remaining portion of the opening groove 54 to which the upper nut 14 is fitted is coupled to the upper and lower members 5 and 2, the heat pipe 4, and the horizontal adjusting member 1 by combining the closing cap 56. ) Are mutually coupled and when the heat accumulating member 3 is adopted, the coupling is performed including the heat accumulating member 3.

4단계(Step 4 ( 차음단열부재Sound insulation 시공단계) Construction stage)

상기 기초바닥과 상기 하부부재(2)와의 사이 공간에 차음 및 단열이 우수한 수지를 발포하여 차음단열부재(6)를 채워 넣는 시공단계로서, 폴리우레탄을 포함하는 발포성 수지를 활용하여 상,하부부재(5,2), 열매체파이프(4), 수평조절부재(1)및 축열부재(3)까지 포함하는 결합이 이루어진 상태에서 하부부재(2)와 기초바닥의 사이 공간에 발포작업을 수행하여 채워 넣음으로서 차음단열부재(6)를 시공하여 열매체파이프(4)로부터 발생되는 열기가 하부에 위치하게 되는 차음단열부재(6)에 의하여 차단되어 열효율을 향상시키고, 상부부재(5) 또는 표면마감부재(7)의 상부에서 발생되는 소음 등을 막아 차음효과를 향상시키도록 하는 시공공정이다. 이때, 상기 차음단열부재(6)를 시공하기에 앞서 유틸리티 공간(U)을 미리 확보하고 나서 시공을 수행하면 나중에 다양한 형태의 작업구나 공동구로서 활용이 가능하게 된 다.As a construction step of filling the sound insulation layer 6 by foaming a resin having excellent sound insulation and heat insulation in the space between the base bottom and the lower member 2, upper and lower members by using a foam resin containing polyurethane (5,2), the heat medium pipe (4), the horizontal adjustment member (1) and the heat storage member (3) in the state consisting of a combination consisting of the lower member (2) and the bottom of the base by filling the foaming operation to fill By inserting the sound insulation insulation member 6, the heat generated from the heat medium pipe 4 is blocked by the sound insulation insulation member 6 which is located at the bottom to improve the thermal efficiency, and the upper member 5 or the surface finishing member. It is a construction process to improve the sound insulation effect by preventing the noise generated from the upper part of (7). In this case, if the utility space (U) is secured in advance before the construction of the sound insulation layer (6), and the construction is performed later, it can be utilized as various types of work tools or joint tools.

위와 같은 제1공정 내지 제4공정을 통하여 본 발명인 온돌시스템과 그 시공방법이 이루어지게 된다.The ondol system of the present invention and its construction method are made through the first to fourth processes as described above.

위와 같이 시공이 완료되게 되면, 열매체파이프(4)를 통하여 열매체를 공급하여 난방작동을 수행하게 되는데, 이와 같이 난방작동이 이루어지게 되면 열매체파이프(4)를 통하여 발산되는 열기는 상, 하부 전체 방향으로 전달이 이루어지게 되지만 하부 위치에는 차음단열부재(6)가 위치하게 되어 열전달이 차단되는 단열효과가 발휘하게 되어 대부분이 상향으로 전달되어 상부부재(5)를 경유 실내 난방을 위한 작동이 이루어지게 되어 열효율을 향상시킬 수 있게 된다.When the construction is completed as described above, the heating medium is supplied through the heating medium pipe 4 to perform the heating operation. When the heating operation is made in this way, the heat emitted through the heating medium pipe 4 is upper and lower directions. Although the transfer is made in the lower position, the sound insulation unit 6 is positioned at the lower position to exert a heat insulation effect that the heat transfer is blocked, so that most of the transfer is performed upward to operate for heating the room via the upper member 5. It is possible to improve the thermal efficiency.

더욱이 축열부재(3)를 채택하는 경우에는 열매체파이프(4)들의 상호 사이에서 열전달이 고른 분포를 형성하게 되므로 상부부재(5)의 상부에 위치하게 되는 실내의 전 부위에서 고르게 열의 발산이 이루어져 실내 바닥의 온도가 고르게 유지될 수 있게 되어 더욱 바람직하다.In addition, when the heat storage member 3 is adopted, heat transfer is evenly distributed between the heat pipes 4 so that heat is distributed evenly in all parts of the room located on the upper part of the upper member 5. It is more preferable that the temperature of the bottom can be kept even.

이상 살펴본 바와 같이, 본 발명인 조립식 온돌시스템 및 그 시공방법에 의하면, 수평조절부재(1)에 의하여 하부부재(2)를 전 부위에 걸쳐 수평을 이루도록 조립시공을 먼저 행하고 나서, 하부부재(2)의 상부에는 축열부재(3)를 포함하여 열매체파이프(4)의 시공을 행하고 상부부재(5)를 시공한 다음에는 차음단열부재(6)의 시공이 순차적으로 이루어져, 조립 시공이 용이하고 시공기간을 크게 단축시킬 수 있으며 차음단열부재(6)를 시공하여 난방효율을 향상시킬 수 있게 된다.As described above, according to the present inventors prefabricated ondol system and its construction method, the lower member 2 is first assembled by the horizontal adjusting member 1 so that the lower member 2 is horizontally spread over the entire area, and then the lower member 2. In the upper part of the heat pipe (4) including the heat storage member (3) and the construction of the upper member (5) after the construction of the sound insulating insulation member (6) is made sequentially, easy to assemble and construction period It can greatly shorten and to improve the heating efficiency by constructing the sound insulation layer (6).

또한, 본 발명은 건축물의 실내 기초 바닥의 높낮이가 고르지 않고 수평상태를 유지하지 못한 경우에도 수평조절부재(1)에 의하여 각 부위별로 높이 조절에 의하여 기초적으로 수평상태를 유지하면서 수평조절부재(1)의 상기 방진쿠션부재(12)는 시공이 이루어진 후에 기초바닥과의 사이에서 충격을 흡수하고 충격의 발생시에 하부로 전달되는 것을 감소시키고 차음단열부재(6)의 시공에 의하여 층간 소음의 전달을 차단하는 차음 역할을 수행하고, 시공시 기초바닥과 하부부재(2) 사이 공간에 유틸리티 공간(U)을 확보하여 각종 파이프의 배관, 전원의 배선 등 작업구나 공동구의 목적으로 활용할 수 있어 기존의 난방시스템과 차별화가 가능하고 다목적으로 활용할 수 있는 부수적인 효과를 기대할 수 있는 등의 우수한 효과를 갖는다.In addition, the present invention, even if the height of the floor of the indoor foundation of the building is uneven and the horizontal state is not maintained, the horizontal adjustment member (1) while maintaining the horizontal state basically by the height adjustment for each part by the horizontal adjustment member (1) The dustproof cushion member 12) absorbs the impact between the foundation floor after the construction and reduces the transmission to the lower side when the impact occurs, and transmits the interlayer noise by the construction of the sound insulation layer 6. It functions as a sound insulation to cut off and secures utility space (U) in the space between the base floor and the lower member (2) during construction, and can be used for the purpose of work or common tools such as piping of various pipes and power supply. It can be distinguished from the system and has excellent effects such as expecting side effects that can be used for multi-purpose.

Claims (13)

기초 바닥 위에 설치되고 수평을 유지하기 위한 높이조절기능을 갖는 수평조절부재(1)와,A horizontal adjusting member (1) installed on the foundation floor and having a height adjusting function for maintaining a level; 상기 수평조절부재(1)와 결합되고 기초바닥으로부터 이격되어 공간이 있는 상태로 지지역할을 가지며 열매체파이프(4)를 설치하기 위한 파이프설치요부(22)가 마련되고 수평상태를 유지하도록 설치되는 하부부재(2)와,The lower portion which is combined with the horizontal control member 1 and is spaced apart from the base bottom, has a local area in a spaced state, and is provided with a pipe installation recess 22 for installing the heat medium pipe 4 and maintains a horizontal state. The member 2, 상기 하부부재(2)의 파이프설치요부(22)에 끼워 설치되는 열매체파이프(4)와,Heat pipe (4) is fitted to the pipe mounting recess 22 of the lower member (2), 상기 하부부재(2)의 상부에 위치하고 상기 열매체파이프(4)를 파이프설치요부(52)에 끼워 설치되는 상부부재(5)와, 그리고An upper member 5 disposed above the lower member 2 and installed by inserting the heat pipe 4 into the pipe installation recess 52; and 상기 기초바닥과 상기 하부부재(2)의 사이 공간에 채워지는 차음단열부재(6)를 포함하여 이루어지는 것을 특징으로 하는 조립식 온돌시스템.Prefabricated ondol system, characterized in that it comprises a sound insulating insulation member (6) which is filled in the space between the base bottom and the lower member (2). 제1항에 있어서,The method of claim 1, 상기 하부부재(2)와 상기 상부부재(5)의 사이로서 상기 열매체파이프(4)의 하부에 별도의 축열부재(3)를 설치하여 그 구성이 이루어지는 것을 특징으로 하는 조립식 온돌시스템.Prefabricated ondol system, characterized in that the configuration is made by installing a separate heat storage member (3) in the lower portion of the heat medium pipe (4) between the lower member (2) and the upper member (5). 제1항에 있어서,The method of claim 1, 상기 수평조절부재(1)는 나사부재(10)의 하부에 방진쿠션부재(12)를 결합 설치하고 하부 위치엔 하부너트(16)를 나사 결합하여 하부부재(2)의 높낮이를 조절하여 수평상태를 유지할 수 있게 하고, 상부 위치엔 상부너트(14)를 나사 결합하여 상부부재(5)와 서로 결합 고정할 수 있게 구성되어 이루어지는 것을 특징으로 하는 조립식 온돌시스템.The horizontal adjustment member (1) is installed in the lower part of the screw member 10, the dust-proof cushion member 12 is installed in a lower position, the lower nut 16 is screwed in the lower position by adjusting the height of the lower member (2) in a horizontal state Prefabricated ondol system, characterized in that the upper position (14) is configured to be coupled to the upper member (5) and to be fixed to each other by maintaining the upper position and screwed in the upper position. 제1항에 있어서,The method of claim 1, 상기 하부부재(2)는 프리캐스트 콘크리트 형태로 제작하고, 상기 수평조절부재(1)를 끼울 수 있도록 다수의 체결공(20)을 마련하고 상부에는 상기 열매체파이프(4)를 설치하기 위한 파이프설치요부(22)를 마련하여 이루어지는 것을 특징으로 하는 조립식 온돌시스템.The lower member 2 is manufactured in the form of precast concrete, and provides a plurality of fastening holes 20 so as to fit the horizontal adjustment member 1 and pipe installation for installing the heat pipe 4 on the upper portion. Prefabricated ondol system, characterized in that provided by the recess (22). 제1항에 있어서,The method of claim 1, 상기 하부부재(2)는 합성수지에 의한 사출품의 형태로 제작하고, 상기 수평조절부재(1)를 끼울 수 있도록 다수의 체결공(20)을 마련하고 상부에는 상기 열매체파이프(4)를 설치하기 위한 파이프설치요부(22)를 마련하여 이루어지는 것을 특징으로 하는 조립식 온돌시스템.The lower member 2 is manufactured in the form of an injection molded product by synthetic resin, and provides a plurality of fastening holes 20 to fit the horizontal adjusting member 1 and installs the heating medium pipe 4 at the top thereof. Prefabricated ondol system, characterized in that the pipe mounting recess 22 is provided for. 제1항에 있어서,The method of claim 1, 금속판재를 이용하여 프레스 가공하여 제작한 형태로 구성하고, 상기 수평조 절부재(1)를 끼울 수 있도록 다수의 체결공(20)을 마련하고 상부에는 상기 열매체파이프(4)를 설치하기 위한 파이프설치요부(22)를 마련하여 이루어지는 것을 특징으로 하는 조립식 온돌시스템.Consists of a press fabricated form using a metal plate material, and provides a plurality of fastening holes 20 to fit the horizontal control member (1) and the pipe for installing the heat pipe (4) in the upper portion Prefabricated ondol system, characterized in that provided by the installation recess 22. 제2항에 있어서,The method of claim 2, 상기 축열부재(3)는 금속판을 이용하여 프레스 성형하여 제작하고, 상기 수평조절부재(1)를 끼울 수 있도록 다수의 체결공(30)을 마련하고 상부에는 상기 열매체파이프(4)를 설치하기 위한 파이프설치요부(32)를 마련하여 이루어지되,The heat storage member 3 is manufactured by press molding using a metal plate, and provides a plurality of fastening holes 30 so as to fit the horizontal adjusting member 1, and to install the heat pipe 4 on the top. It is made by providing a pipe installation recess (32), 상기 축열부재(3)를 채택하여 조립 설치가 이루어지는 하부부재(2)의 파이프설치요부(22)는 상기 축열부재(3)의 파이프설치요부(32)가 끼워 결합될 수 있도록 그 크기를 크게 구성하는 것을 특징으로 하는 조립식 온돌시스템.The pipe mounting recess 22 of the lower member 2, which is assembled and installed by adopting the heat storage member 3, has a large size so that the pipe mounting recess 32 of the heat storage member 3 can be fitted. Prefabricated ondol system, characterized in that. 제1항에 있어서,The method of claim 1, 상기 상부부재(5)는 프리캐스트 콘크리트 형태로 이루어지고,The upper member 5 is made of a precast concrete form, 상기 수평조절부재(1)를 끼울 수 있도록 다수의 체결공(50)을 마련하고 하부에는 상기 열매체파이프(4)를 설치하기 위한 파이프설치요부(52)를 마련하며,A plurality of fastening holes 50 are provided to fit the horizontal adjustment member 1, and a pipe installation recess 52 for installing the heat pipe 4 is provided at the bottom thereof. 상기 체결공(50)의 상부 위치에는 개방홈(54)을 형성하여 수평조절부재(1)와의 결합시에 상부너트(14)를 고정 설치할 수 있도록 하고,An opening groove 54 is formed at an upper position of the fastening hole 50 so that the upper nut 14 can be fixedly installed at the time of engagement with the horizontal adjusting member 1, 상부너트(14)를 고정하고 상기 개방홈(54)에 마감캡(56)을 끼워 고정하는 것을 특징으로 하는 조립식 온돌시스템.Prefabricated ondol system characterized in that the fixing the upper nut (14) by fitting a closing cap (56) in the opening groove (54). 제1항에 있어서,The method of claim 1, 상기 상부부재(5)는 합성수지에 의한 사출품의 형태로 구성하되,The upper member 5 is configured in the form of an injection molded product by synthetic resin, 상기 수평조절부재(1)를 끼울 수 있도록 다수의 체결공(50)을 마련하고 하부에는 상기 열매체파이프(4)를 설치하기 위한 파이프설치요부(52)를 마련하며,A plurality of fastening holes 50 are provided to fit the horizontal adjustment member 1, and a pipe installation recess 52 for installing the heat pipe 4 is provided at the bottom thereof. 상기 체결공(50)의 상부 위치에는 개방홈(54)을 형성하여 수평조절부재(1)와의 결합시에 상부너트(14)를 고정 설치할 수 있도록 하고,An opening groove 54 is formed at an upper position of the fastening hole 50 so that the upper nut 14 can be fixedly installed at the time of engagement with the horizontal adjusting member 1, 상부너트(14)를 고정하고 상기 개방홈(54)에 마감캡(56)을 끼워 고정하는 것을 특징으로 하는 조립식 온돌시스템.Prefabricated ondol system characterized in that the fixing the upper nut (14) by fitting a closing cap (56) in the opening groove (54). 제1항에 있어서,The method of claim 1, 차음단열부재(6)는 기초바닥과 하부부재(2)의 사이 공간에 채워지도록 하되, 발포성 수지를 활용하여 발포시켜 골고루 채워져 시공이 이루어지도록 하는 것을 특징으로 하는 조립식 온돌시스템.Sound insulating insulation member (6) is to be filled in the space between the base bottom and the lower member (2), prefabricated ondol system, characterized in that the construction is made evenly filled by foaming by using a foaming resin. 제1항에 있어서,The method of claim 1, 하부부재(2)와 기초바닥과의 사이 공간에 미리 유틸리티 공간(U)을 확보하여 이루어지는 것을 특징으로 하는 조립식 온돌시스템.Prefabricated ondol system characterized in that the utility space (U) is secured in advance in the space between the lower member (2) and the base floor. 기초바닥의 상부에 다수의 하부부재(2)를 설치하되 상기 하부부재(2)와 결합 되는 수평조절부재(1)에 의하여 높이를 조절하여 수평을 유지하도록 시공하는 1단계,Installing a plurality of lower members (2) in the upper portion of the base floor, the first step of construction to maintain the level by adjusting the height by the horizontal adjusting member (1) coupled to the lower member (2), 상기 하부부재(2)의 상부에 열매체파이프(4)를 끼워 결합하여 시공하는 2단계,Step 2 by fitting the heat pipe (4) to the upper portion of the lower member 2 for construction 상기 하부부재(2)와 상기 열매체파이프(4)를 결합한 상태에서 상부부재(5)를 그 상부에 결합하고 상기 수평조절부재(1)를 고정 설치하는 3단계, 그리고Three steps of coupling the upper member 5 to the upper part and fixing the horizontal adjusting member 1 in a state in which the lower member 2 and the heat pipe 4 are combined; and 상기 기초바닥과 상기 하부부재(2)와의 사이 공간에 차음 및 단열이 우수한 수지를 발포하여 차음단열부재(6)를 채워 넣는 4단계를 포함하여 이루어지는 것을 특징으로 하는 조립식 온돌시스템의 시공방법.And a four step of filling the sound insulation layer (6) by foaming a resin having excellent sound insulation and heat insulation in the space between the base bottom and the lower member (2). 제12항에 있어서,The method of claim 12, 상기 2단계가 상기 하부부재(2)의 상부에 별도의 축열부재(3)를 결합 설치하고 상기 축열부재(3)의 상부에 열매체파이프(4)를 끼워 결합하여 시공하는 단계로 구성되고,The second step is composed of a step of coupling and installing a separate heat storage member (3) on the upper portion of the lower member (2) and by fitting the heat pipe (4) on the top of the heat storage member (3), 상기 4단계가 상기 기초바닥과 상기 하부부재(2)와의 사이 공간 유틸리티 공간(U)을 미리 확보하고 차음단열부재(6)를 채워 넣는 시공 단계로 이루어지는 것을 특징으로 하는 조립식 온돌시스템의 시공방법.The construction step of the prefabricated ondol system, characterized in that the four steps comprises a construction step to secure the space utility space (U) between the base bottom and the lower member (2) in advance and to fill the sound insulating insulation member (6).
KR1020060041285A 2006-05-09 2006-05-09 Prefabrication type floor heating system and the construction method thereof KR100727321B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020060041285A KR100727321B1 (en) 2006-05-09 2006-05-09 Prefabrication type floor heating system and the construction method thereof
PCT/KR2007/002252 WO2007129855A1 (en) 2006-05-09 2007-05-08 Prefabrication type floor heating system and the construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060041285A KR100727321B1 (en) 2006-05-09 2006-05-09 Prefabrication type floor heating system and the construction method thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020060012275U Division KR200421896Y1 (en) 2006-05-09 2006-05-09 Prefabrication Type Floor Heating System

Publications (1)

Publication Number Publication Date
KR100727321B1 true KR100727321B1 (en) 2007-06-12

Family

ID=38359105

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060041285A KR100727321B1 (en) 2006-05-09 2006-05-09 Prefabrication type floor heating system and the construction method thereof

Country Status (2)

Country Link
KR (1) KR100727321B1 (en)
WO (1) WO2007129855A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100827426B1 (en) 2007-09-10 2008-05-07 주식회사 씨밀레테크 Ondol floor structure for reducing noise between floors of apartment house and construction method thereof
KR101375446B1 (en) * 2013-08-13 2014-03-17 민병창 Prefabrication type floor heating and floor noise vibration prevention system
KR101485265B1 (en) * 2013-11-26 2015-01-21 민병창 Prefabrication panel type floor heating and floor noise vibration prevention system
KR101619726B1 (en) * 2016-01-06 2016-05-10 군산대학교산학협력단 Energy storage system constructuon methiod for high temperature using concrete
CN109798577A (en) * 2018-12-28 2019-05-24 浙江琦远科技有限公司 It is a kind of can according to people it is highly automated adjust super bath height mounting device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200267555Y1 (en) 2001-11-21 2002-03-13 박종웅 Prefabricated Hypocaust Block
JP2003106543A (en) 2001-10-02 2003-04-09 Inter Central:Kk Floor panel device for floor radiation and air- conditioning cooling and heating device
KR20050031186A (en) * 2003-09-29 2005-04-06 김 다니엘 Underlaying structure for hot water boiler and construction method therefor
KR200411735Y1 (en) 2005-12-28 2006-03-16 민병창 Prefabrication Type Floor Heating System

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003106543A (en) 2001-10-02 2003-04-09 Inter Central:Kk Floor panel device for floor radiation and air- conditioning cooling and heating device
KR200267555Y1 (en) 2001-11-21 2002-03-13 박종웅 Prefabricated Hypocaust Block
KR20050031186A (en) * 2003-09-29 2005-04-06 김 다니엘 Underlaying structure for hot water boiler and construction method therefor
KR200411735Y1 (en) 2005-12-28 2006-03-16 민병창 Prefabrication Type Floor Heating System

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100827426B1 (en) 2007-09-10 2008-05-07 주식회사 씨밀레테크 Ondol floor structure for reducing noise between floors of apartment house and construction method thereof
KR101375446B1 (en) * 2013-08-13 2014-03-17 민병창 Prefabrication type floor heating and floor noise vibration prevention system
KR101485265B1 (en) * 2013-11-26 2015-01-21 민병창 Prefabrication panel type floor heating and floor noise vibration prevention system
KR101619726B1 (en) * 2016-01-06 2016-05-10 군산대학교산학협력단 Energy storage system constructuon methiod for high temperature using concrete
CN109798577A (en) * 2018-12-28 2019-05-24 浙江琦远科技有限公司 It is a kind of can according to people it is highly automated adjust super bath height mounting device

Also Published As

Publication number Publication date
WO2007129855A1 (en) 2007-11-15

Similar Documents

Publication Publication Date Title
KR200421896Y1 (en) Prefabrication Type Floor Heating System
KR100727321B1 (en) Prefabrication type floor heating system and the construction method thereof
KR20080004185U (en) Prefabrication Type Floor Heating
CN206189685U (en) Integrated floor of modularization and house
KR100691783B1 (en) Prefabricated floor panel for apartment house
KR101830681B1 (en) Hot prefabricated panels
KR100633383B1 (en) Ondol heating system and construction method thereof
KR200411735Y1 (en) Prefabrication Type Floor Heating System
KR100687652B1 (en) Prefabrication type floor heating system
KR200236412Y1 (en) Soundproofing Board for Floor of a Structure
CN209801591U (en) Ground heating structure
KR100467536B1 (en) A floor system of access-floor type with an iron sheet and a glass-ondol and the construction method of it
KR100237497B1 (en) Improved built-up type heating panel system
KR200405599Y1 (en) Material with space adjusting Level of Floor for storey structure of floor
KR100837500B1 (en) The prefabricated heating floor panel and flat part structure using the same
CN110006085B (en) Prefabricated geothermal heating structure and installation method thereof
KR20160063667A (en) Dry Construction Korean Floor Heating System having Double Flooring Sturcture suitable for Long-life House
KR20070021423A (en) Material with space adjusting Level of Floor for storey structure of floor
KR101984610B1 (en) Substructure of detached house and there of building method
KR100550155B1 (en) Floors in buildings Low noise, dustproof, dry, ondol steel foam prefabricated flooring
KR100603947B1 (en) Detached structure system of horizon adjustable panel
KR200315204Y1 (en) Detachable structure for fixing korean under panels
KR100663693B1 (en) Construction method of dry hot water ondool
CN210369728U (en) Dry type heating raised floor
CN111829045A (en) Ground heating structure

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
G170 Publication of correction
FPAY Annual fee payment

Payment date: 20100604

Year of fee payment: 4