KR100714436B1 - Cover stone structure of fill dam - Google Patents

Cover stone structure of fill dam Download PDF

Info

Publication number
KR100714436B1
KR100714436B1 KR1020060096082A KR20060096082A KR100714436B1 KR 100714436 B1 KR100714436 B1 KR 100714436B1 KR 1020060096082 A KR1020060096082 A KR 1020060096082A KR 20060096082 A KR20060096082 A KR 20060096082A KR 100714436 B1 KR100714436 B1 KR 100714436B1
Authority
KR
South Korea
Prior art keywords
stone
wire
anchor
rubble
anchor plate
Prior art date
Application number
KR1020060096082A
Other languages
Korean (ko)
Inventor
임종아
Original Assignee
주식회사 삼안
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 삼안 filed Critical 주식회사 삼안
Priority to KR1020060096082A priority Critical patent/KR100714436B1/en
Application granted granted Critical
Publication of KR100714436B1 publication Critical patent/KR100714436B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

본 발명은 필댐 돌붙임 구조에 관한 것으로서, 특히 차수벽과, 여과층과, 중간벽 및 잡석이 순차적으로 형성되고, 저수측 상기 잡석 위에 붙임용 돌을 형성하는 필댐 돌붙임 구조에 있어서; 직사각 판 형태로 형성되고, 상기 중간벽 내에 다단으로 일정 간격을 갖으며 고정 설치되며, 두 개의 제 1관통홀을 구비하는 앵커 플레이트와; V자 형태로 형성되고, 양단에 제 1나사산이 형성되어 상기 앵커 플레이트의 제 1관통홀을 관통하여 너트에 의해 고정되는 고정 앵커와; 직사각 판 형태로 형성되고, 상기 중간벽의 상단과 하단에 일정 간격을 갖으며 고정 설치되며, 중앙에 1개의 제 2관통홀을 구비하는 와이어 앵커 플레이트와; 양단에 제 2나사산이 형성되어 양단이 상기 와이어 앵커 플레이트의 제 2관통홀을 관통하여 너트에 의해 고정되고, 고정 앵커의 내부를 관통하여 설치되는 결속 와이어; 및 U자 형으로 형성되어 상기 붙임용 돌을 상기 결속 와이어에 결속시키도록 상기 붙임용 돌에 고정 설치되는 결속 고리를 포함하는 것을 특징으로 한다.The present invention relates to a pildam masonry structure, and more particularly, to a pildam masonry structure in which the order wall, the filtration layer, the intermediate wall and the rubble are sequentially formed, and form the gluing stone on the reservoir side of the rubble; An anchor plate which is formed in a rectangular plate shape, is fixedly installed at regular intervals in multiple stages in the intermediate wall, and has two first through holes; A fixed anchor formed in a V shape and having first screw threads formed at both ends thereof and penetrating the first through hole of the anchor plate and fixed by a nut; A wire anchor plate which is formed in a rectangular plate shape, is fixedly installed at regular intervals at the top and bottom of the intermediate wall, and has a second through hole at its center; A binding wire formed at both ends with a second screw thread, the both ends of which are fixed by a nut through the second through hole of the wire anchor plate and installed through the inside of the fixing anchor; And a binding ring formed in a U shape and fixed to the attachment stone to bind the attachment stone to the binding wire.

상기와 같은 본 발명에 따르면 붙임용 돌을 결속 와이어에 고정시키고, 다시 결속 와이어를 중간벽에 앵커 플레이트를 통해 결속함으로서 붙임용 돌간의 틈새가 벌어져 잡석의 밀림 현상이 발생되는 것을 방지할 수 있다.According to the present invention as described above by fixing the sticking stone to the binding wire, and again binding the binding wire through the anchor plate on the intermediate wall can be prevented from the occurrence of the rubble of the rubble between the gap between the sticking stones open.

필댐, 돌붙임, 와이어, 결속, 잡석  Phildam, Glue, Wire, Bonding

Description

필댐 돌붙임 구조{Cover stone structure of fill dam}Cover stone structure of fill dam}

도 1은 종래의 필댐의 구조를 나타낸 도면,1 is a view showing the structure of a conventional dam dam,

도 2는 본 발명에 따른 필댐 돌붙임 구조가 적용된 필댐의 구성을 나타낸 측단면도,Figure 2 is a side cross-sectional view showing the configuration of a peel dam applied to the peel dam stone structure according to the invention,

도 3은 본 발명에 따른 필댐 돌붙임 구조를 설명하기 위한 설치 상태다. 3 is an installation state for explaining the peeling stone structure according to the present invention.

<도면의 주요 부분에 관한 부호의 설명><Explanation of symbols on main parts of the drawings>

17 : 잡석 19 : 붙임용 돌17: rubble 19: stone for attachment

110 : 앵커 플레이트 120 : 고정 앵커110: anchor plate 120: fixed anchor

130 : 와이어 앵커 플레이트 140 : 결속 와이어130: wire anchor plate 140: binding wire

150 : 결속 고리150: binding ring

본 발명은 필댐 돌붙임 구조에 관한 것으로서, 상세하게는 붙임용 돌을 결속 와이어에 고정시키고, 다시 결속 와이어를 중간벽에 앵커 플레이트를 통해 결속하는 필댐 돌붙임 구조에 관한 것이다.The present invention relates to a pill dam sticking structure, and more particularly, to a pill dam sticking structure for fixing a sticking stone to a binding wire and binding the binding wire to an intermediate wall through an anchor plate.

댐은 하천을 가로질러 저수(貯水)·취수(取水)·토사유출방지(土砂流出防止) 등의 목적을 위해 축조하는 구조물로서, 각각의 목적에 따라 저수댐·취수댐·사방댐으로 불리는데 일반적으로는 저수댐을 말한다. 저수댐의 목적은 하천 유량의 변동을 인위적으로 조절하는 것으로, 유량이 많을 때 물을 가두어 갈수시(渴水時)에 댐으로부터 물을 방류, 농업·발전(發電)·수도·공업·운송 등에 필요한 물을 공급한다. 또한 홍수유량의 일부 혹은 전부를 저수해서 하류의 홍수유량을 감소시키고 홍수재해를 막기 위해서도 이용된다. 이와 같이 저수댐은 여러 가지 목적으로 쓰이는데, 이중 하나의 목적에만 쓰이는 것을 전용댐, 둘 이상의 목적에 이용되는 것을 다목적댐이라고 한다. 취수댐은 하천수를 용수로로 끌어들이기 위해 수위를 높이는 것이 목적인 댐으로, 높이가 낮은 것이 많다. 사방댐은 산지와 계곡에서 유출되는 토사를 막아 하류로의 유출토사량을 감소시키기 위해 만들어진 댐이다.Dams are structures that are constructed for the purpose of water storage, intake, and sediment spillage across rivers, and are called reservoir, intake and four-sided dams for each purpose. Says a reservoir dam. The purpose of the reservoir dam is to artificially control the fluctuations in the flow of the river, and to confine the water when the flow rate is high, to discharge the water from the dam at the time of drainage, agriculture, power generation, water supply, industry, transportation, etc. Supply the necessary water. It is also used to save some or all of the flood flow, to reduce downstream flood flow and to prevent flood disasters. As such, the reservoir dam is used for various purposes, of which only one purpose is used as a dedicated dam, and more than one purpose is called a multipurpose dam. Intake dams are dams whose purpose is to raise the water level in order to draw river water into the waterways. Four-sided dams are dams designed to reduce the amount of spilled soil downstream by blocking the outflow of soil from mountain and valley.

댐은 건설자재에 따라 콘크리트댐과 필댐(fill dam)으로 분류된다. 필댐에는 다시 흙을 재료로 하는 흙댐(earth dam)과, 석괴(石塊)를 재료로 하는 사력댐(rockfill dam) 등이 있다. 콘크리트댐은 구조에 따라 중력댐·중공중력(中空重力)댐·부벽댐(buttress dam) 및 아치댐으로 분류된다. Dams are classified into concrete dams and fill dams according to construction materials. The fill dams include earth dams made of soil and rockfill dams made of stone. Concrete dams are classified into gravity dams, heavy gravity dams, buttress dams and arch dams, depending on their structure.

도 1에서와 같이, 상기와 같은 필댐중 사력댐(10)은 차수벽(11)의 양측에 여과층(13)과 중간벽(15)이 순차적으로 형성되고, 중간벽(15)의 양측에 잡석(17)이 적층되고, 저수측 잡석(17) 위에 붙임용 돌(19)을 통해 돌붙임 시공되는 구조를 갖는다.As shown in FIG. 1, the history dam 10 of the pillars as described above is sequentially formed with a filtration layer 13 and an intermediate wall 15 on both sides of the order wall 11, and rubble on both sides of the intermediate wall 15. (17) is laminated | stacked, and it has a structure which sticks and constructs through the sticking stones 19 on the water storage side rubble 17.

그러나, 사력댐은 석괴, 즉 잡석과 붙임용 돌이 결속력이 없는 상태에서 단순히 적층되는 구조를 갖기 때문에 저수된 물의 파랑 등에 의해 붙임용 돌간의 틈 새가 벌어지고, 이로 인해 잡석의 밀림 현상이 발생되는 하자가 발생되고, 이로 인해 댐의 안전성에 큰 영향을 미치는 문제점이 있다.However, since the power dam has a structure in which the stone blocks, that is, the rubble and the sticking stones are simply stacked in the absence of a binding force, the gap between the sticking stones is opened by the blue water of the stored water, which causes the rubble of the rubble. Defects are generated, which causes a problem that greatly affects the safety of the dam.

본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 붙임용 돌을 결속 와이어에 고정시키고, 다시 결속 와이어를 중간벽에 앵커 플레이트를 통해 결속함으로서 붙임용 돌간의 틈새가 벌어져 잡석의 밀림 현상이 발생되는 것을 방지하도록 하는 필댐 돌붙임 구조를 제공하는데 그 목적이 있다.The present invention is to solve the above problems, by fixing the attachment stone to the binding wire, and again binding the binding wire through the anchor plate on the middle wall, the gap between the attachment stone is opened to cause the rubble of rubble. It is an object of the present invention to provide a pildam stone structure to prevent it.

상기와 같은 목적을 달성하기 위한 본 발명의 특징은,Features of the present invention for achieving the above object,

차수벽과, 여과층과, 중간벽 및 잡석이 순차적으로 형성되고, 저수측 상기 잡석 위에 붙임용 돌을 형성하는 필댐 돌붙임 구조에 있어서; 직사각 판 형태로 형성되고, 상기 중간벽 내에 다단으로 일정 간격을 갖으며 고정 설치되며, 두 개의 제 1관통홀을 구비하는 앵커 플레이트와; V자 형태로 형성되고, 양단에 제 1나사산이 형성되어 상기 앵커 플레이트의 제 1관통홀을 관통하여 너트에 의해 고정되는 고정 앵커와; 직사각 판 형태로 형성되고, 상기 중간벽의 상단과 하단에 일정 간격을 갖으며 고정 설치되며, 중앙에 1개의 제 2관통홀을 구비하는 와이어 앵커 플레이트와; 양단에 제 2나사산이 형성되어 양단이 상기 와이어 앵커 플레이트의 제 2관통홀을 관통하여 너트에 의해 고정되고, 고정 앵커의 내부를 관통하여 설치되는 결속 와이어; 및 U자 형으로 형성되어 상기 붙임용 돌을 상기 결속 와이어에 결속시키도록 상기 붙임용 돌에 고정 설치되는 결속 고리를 포함하는 것을 특징으로 한 다.In a pillar dam attaching structure, in which a water-order wall, a filtration layer, an intermediate wall, and rubble are sequentially formed, and forming a rock for attaching on the water-side rubble; An anchor plate which is formed in a rectangular plate shape, is fixedly installed at regular intervals in multiple stages in the intermediate wall, and has two first through holes; A fixed anchor formed in a V shape and having first screw threads formed at both ends thereof and penetrating the first through hole of the anchor plate and fixed by a nut; A wire anchor plate which is formed in a rectangular plate shape, is fixedly installed at regular intervals at the top and bottom of the intermediate wall, and has a second through hole at its center; A binding wire formed at both ends with a second screw thread, the both ends of which are fixed by a nut through the second through hole of the wire anchor plate and installed through the inside of the fixing anchor; And a binding ring formed in a U shape and fixed to the attachment stone to bind the attachment stone to the binding wire.

여기에서, 상기 고정 앵커는 상기 붙임용 돌을 지지하도록 상기 붙임용 돌과 붙임용 돌의 사이에 위치한다.Herein, the fixing anchor is positioned between the attaching stone and the attaching stone to support the attaching stone.

이하, 본 발명에 따른 필댐 돌붙임 구조를 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings, the pildam stone structure according to the present invention will be described in detail.

하기에서 본 발명을 설명함에 있어, 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략할 것이다. 그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.In the following description of the present invention, if it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted. Terms to be described later are terms defined in consideration of functions in the present invention, and may be changed according to intentions or customs of users or operators. Therefore, the definition should be made based on the contents throughout the specification.

도 2는 본 발명에 따른 필댐 돌붙임 구조가 적용된 필댐의 구성을 나타낸 측단면도이고, 도 3은 본 발명에 따른 필댐 돌붙임 구조를 설명하기 위한 설치 상태도이다. 도 2에 있어서 종래와 동일 구성에 대해서는 동일 부호를 부여하고, 그 중복 설명은 생략한다.Figure 2 is a side cross-sectional view showing the configuration of a pillar dam structure applied to the pillar dam stone structure according to the invention, Figure 3 is an installation state diagram for explaining the pillar dam stone structure according to the present invention. In FIG. 2, the same code | symbol is attached | subjected about the same structure as before, and the duplication description is abbreviate | omitted.

도 2 및 도 3을 참조하면, 본 발명에 따른 필댐 돌붙임 구조(100)는, 앵커 플레이트(110)와, 고정 앵커(120)와, 와이어 앵커 플레이트(130)와, 결속 와이어(140)와, 결속 고리(150)로 구성된다.Referring to FIGS. 2 and 3, the pillar-damping structure 100 according to the present invention includes an anchor plate 110, a fixed anchor 120, a wire anchor plate 130, a binding wire 140, and the like. , The binding ring 150 is configured.

먼저, 앵커 플레이트(110)는 금속 또는 콘크리트 재질로 직사각 판 형태로 형성되고, 중간벽(15) 내에 다단으로 일정 간격을 갖으며 고정 설치되며, 두 개의 제 1관통홀(111)을 구비한다.First, the anchor plate 110 is formed in the shape of a rectangular plate made of metal or concrete material, is fixedly installed at regular intervals in multiple stages in the intermediate wall 15, and has two first through holes 111.

그리고, 고정 앵커(120)는 철근과 같은 금속 재질로 V자 형태로 형성되고, 양단에 제 1나사산(121)이 형성되어 앵커 플레이트(110)의 제 1관통홀(111)을 관통하여 너트(101)에 의해 고정된다. 여기에서, 고정 앵커(120)는 붙임용 돌(19)을 지지하도록 붙임용 돌(19)과 붙임용 돌(19)의 사이에 위치한다.In addition, the fixing anchor 120 is formed in a V-shape made of a metal material such as reinforcing bar, and the first screw thread 121 is formed at both ends thereof to penetrate through the first through hole 111 of the anchor plate 110 to obtain a nut ( 101). Here, the fixing anchor 120 is located between the sticking stone 19 and the sticking stone 19 to support the sticking stone 19.

또한, 와이어 앵커 플레이트(130)는 금속 또는 콘크리트 재질로 직사각 판 형태로 형성되고, 중간벽(15)의 상단과 하단에 일정 간격을 갖으며 고정 설치되며, 중앙에 1개의 제 2관통홀(131)을 구비한다.In addition, the wire anchor plate 130 is formed in a rectangular plate shape of a metal or concrete material, is fixedly installed at a predetermined interval on the top and bottom of the intermediate wall 15, one second through hole 131 in the center ).

또, 결속 와이어(140)는 금속 재질로 양단에 제 2나사산(141)이 형성되어 양단이 와이어 앵커 플레이트(130)의 제 2관통홀(131)을 관통하여 너트(101)에 의해 고정되고, 고정 앵커(120)의 내부를 관통하여 설치된다.In addition, the binding wire 140 is formed of metal material at both ends of the second screw thread 141 and both ends thereof are fixed by the nut 101 through the second through hole 131 of the wire anchor plate 130. It is installed through the inside of the fixing anchor 120.

한편, 결속 고리(150)는 금속 재질로 U자 형으로 형성되어 붙임용 돌(19)을 결속 와이어(140)에 결속시키도록 붙임용 돌(19)의 중앙부에 고정 설치된다.On the other hand, the binding ring 150 is formed of a U-shaped metal material is fixed to the central portion of the attachment stone 19 to bind the attachment stone 19 to the binding wire 140.

이하, 본 발명에 따른 필댐 돌붙임 구조의 시공 과정 및 작용을 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings the construction process and operation of the pildam stone structure according to the present invention will be described in detail.

먼저, 저수측 중간벽(15)을 타설시 중간벽(15)의 상단과 하단에 와이어 앵커 플레이트(130)를 삽입 설치한다. 이때, 와이어 앵커 플레이트(130)에는 결속 와이어(140)의 양단이 각각 체결된 상태에서 결속된다.First, the wire anchor plate 130 is inserted into the upper and lower ends of the intermediate wall 15 when installing the water storage side intermediate wall 15. At this time, the wire anchor plate 130 is bound in a state in which both ends of the binding wire 140 are fastened, respectively.

그리고, 와이어 앵커 플레이트(130) 사이에 일정 간격으로 앵커 플레이트(110)를 삽입 설치한다. 이때, 앵커 플레이트(110)에는 고정 앵커(120)의 양단이 각각 체결된 상태에서 결속되고, 고정 앵커(120)의 내부 끝단에 결속 와이어(140)가 걸리도록 설치한다. 또한, 와이어 앵커 플레이트(130) 및 앵커 플레이트(110)는 중간벽을 블록 아웃시킨 후 삽입하고, 몰탈을 채워 삽입 설치할 수도 있다.Then, the anchor plate 110 is inserted and installed at regular intervals between the wire anchor plates 130. At this time, the anchor plate 110 is bound in a state in which both ends of the fixing anchor 120 is fastened, respectively, and is installed so that the binding wire 140 is caught on the inner end of the fixing anchor 120. In addition, the wire anchor plate 130 and the anchor plate 110 may be inserted after the intermediate wall is blocked out and inserted into the mortar.

그런 다음, 잡석(17)을 1개의 붙임용 돌(19)의 높이, 즉 고정 앵커(120)의 하단까지 적층한 후 잡석(17)의 측면에 붙임용 돌(19)을 설치한 후 붙임용 돌(19)에 결속 고리(150)를 삽입하는 데, 결속 고리(150)에 결속 와이어(140)가 걸리도록 설치한다. 이때, 잡석(17)과 붙임용 돌(19)을 적층시 바닥면에는 기초 잡석층과 받침돌이 형성되는 것이 바람직하다. 또한, 붙임용 돌(19)이 고정 앵커(120)에 의해 지지되도록 한다.Then, the rubble (17) is laminated to the height of one of the sticking stones (19), that is, the lower end of the fixing anchor 120, and then install the sticking stones (19) on the side of the rubble (17) for sticking Inserting the binding ring 150 to the stone 19, it is installed so that the binding wire 140 is caught on the binding ring 150. At this time, it is preferable that the base rubble layer and the supporting stone are formed on the bottom surface when the rubble 17 and the sticking stone 19 are laminated. In addition, the attaching stone 19 is supported by the fixing anchor 120.

그리고, 다시 상기와 같은 방법으로 잡석(17)을 적층하고, 붙임용 돌(19)을 결속 고리(150)를 이용하여 결속 와이어(140)에 고정시킨다.Then, the rubble (17) is laminated in the same manner as above, and the sticking stone (19) is fixed to the binding wire (140) by using the binding ring (150).

한편, 저수측의 반대면의 중간벽(15)의 측면에는 잡석(17)만을 적층시킨다.On the other hand, only the rubble 17 is laminated | stacked on the side surface of the intermediate | middle wall 15 of the opposite surface of a water storage side.

따라서, 붙임용 돌을 결속 와이어에 고정시키고, 붙임용 돌이 고정 앵커에 의해 하단으로 밀리는 것을 방지함으로써 붙임용 돌간의 틈새가 벌어지는 것을 막을 수 있다.Therefore, by fixing the sticking stone to the binding wire and preventing the sticking stone from being pushed to the lower end by the fixing anchor, it is possible to prevent the gap between the sticking stones from opening.

상기와 같이 구성되는 본 발명인 필댐 돌붙임 구조에 따르면, 붙임용 돌을 결속 와이어에 고정시키고, 다시 결속 와이어를 중간벽에 앵커 플레이트를 통해 결속함으로서 붙임용 돌간의 틈새가 벌어져 잡석의 밀림 현상이 발생되는 것을 방지할 수 있는 이점이 있다.According to the pill dam stone structure of the present invention configured as described above, by fixing the gluing stone to the binding wire, and binding the bundling wire through the anchor plate on the middle wall again, the gap between the gluing stones is opened to generate the rubble of rubble. There is an advantage that can be prevented.

본 발명은 다양하게 변형될 수 있고 여러 가지 형태를 취할 수 있으며 상기 발명의 상세한 설명에서는 그에 따른 특별한 실시 예에 대해서만 기술하였다. 하지만 본 발명은 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 이해되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.As those skilled in the art would realize, the described embodiments may be modified in various ways, all without departing from the spirit or scope of the present invention. It is to be understood, however, that the present invention is not limited to the specific forms referred to in the description, but rather includes all modifications, equivalents, and substitutions within the spirit and scope of the invention as defined by the appended claims. Should be.

Claims (2)

차수벽과, 여과층과, 중간벽 및 잡석이 순차적으로 형성되고, 저수측 상기 잡석 위에 붙임용 돌을 형성하는 필댐 돌붙임 구조에 있어서;In a pillar dam attaching structure, in which a water-order wall, a filtration layer, an intermediate wall, and rubble are sequentially formed, and forming a rock for attaching on the water-side rubble; 직사각 판 형태로 형성되고, 상기 중간벽 내에 다단으로 일정 간격을 갖으며 고정 설치되며, 두 개의 제 1관통홀을 구비하는 앵커 플레이트와;An anchor plate which is formed in a rectangular plate shape, is fixedly installed at regular intervals in multiple stages in the intermediate wall, and has two first through holes; V자 형태로 형성되고, 양단에 제 1나사산이 형성되어 상기 앵커 플레이트의 제 1관통홀을 관통하여 너트에 의해 고정되는 고정 앵커와;A fixed anchor formed in a V shape and having first screw threads formed at both ends thereof and penetrating the first through hole of the anchor plate and fixed by a nut; 직사각 판 형태로 형성되고, 상기 중간벽의 상단과 하단에 일정 간격을 갖으며 고정 설치되며, 중앙에 1개의 제 2관통홀을 구비하는 와이어 앵커 플레이트와;A wire anchor plate which is formed in a rectangular plate shape, is fixedly installed at regular intervals at the top and bottom of the intermediate wall, and has a second through hole at its center; 양단에 제 2나사산이 형성되어 양단이 상기 와이어 앵커 플레이트의 제 2관통홀을 관통하여 너트에 의해 고정되고, 고정 앵커의 내부를 관통하여 설치되는 결속 와이어; 및A binding wire formed at both ends with a second screw thread, the both ends of which are fixed by a nut through the second through hole of the wire anchor plate and installed through the inside of the fixing anchor; And U자 형으로 형성되어 상기 붙임용 돌을 상기 결속 와이어에 결속시키도록 상기 붙임용 돌에 고정 설치되는 결속 고리를 포함하는 것을 특징으로 하는 필댐 돌붙임 구조.And a binding ring which is formed in a U shape and is fixed to the attachment stone to bind the attachment stone to the binding wire. 제 1 항에 있어서,The method of claim 1, 상기 고정 앵커는,The fixing anchor, 상기 붙임용 돌을 지지하도록 상기 붙임용 돌과 붙임용 돌의 사이에 위치하 는 것을 특징으로 하는 필댐 돌붙임 구조.Peeling stone structure, characterized in that positioned between the stone for attaching and the stone for supporting the attachment stone.
KR1020060096082A 2006-09-29 2006-09-29 Cover stone structure of fill dam KR100714436B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060096082A KR100714436B1 (en) 2006-09-29 2006-09-29 Cover stone structure of fill dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060096082A KR100714436B1 (en) 2006-09-29 2006-09-29 Cover stone structure of fill dam

Publications (1)

Publication Number Publication Date
KR100714436B1 true KR100714436B1 (en) 2007-05-04

Family

ID=38269673

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060096082A KR100714436B1 (en) 2006-09-29 2006-09-29 Cover stone structure of fill dam

Country Status (1)

Country Link
KR (1) KR100714436B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015377A (en) * 2013-01-15 2013-04-03 中国水电顾问集团西北勘测设计研究院 Separation-type toe board structure of riverbed of faceplate dam on covering layer
CN103122627A (en) * 2013-03-20 2013-05-29 大连理工大学 Impervious face slab anti-seismic structure of concrete rock-fill dam and construction method thereof
CN103437326A (en) * 2013-09-05 2013-12-11 中国水电顾问集团中南勘测设计研究院 Composite material dam
CN105064288A (en) * 2015-08-04 2015-11-18 中国电建集团华东勘测设计研究院有限公司 Concrete dam and earth and rockfill dam mixed dam type structure and construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11310913A (en) 1998-02-26 1999-11-09 Kankyo Kogaku Kk Civil engineering structure construction stone, using method thereof, and civil engineering structure
JP2002081039A (en) 1998-02-26 2002-03-22 Kankyo Kogaku Kk Construction stone for civil engineering structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11310913A (en) 1998-02-26 1999-11-09 Kankyo Kogaku Kk Civil engineering structure construction stone, using method thereof, and civil engineering structure
JP2002081039A (en) 1998-02-26 2002-03-22 Kankyo Kogaku Kk Construction stone for civil engineering structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015377A (en) * 2013-01-15 2013-04-03 中国水电顾问集团西北勘测设计研究院 Separation-type toe board structure of riverbed of faceplate dam on covering layer
CN103122627A (en) * 2013-03-20 2013-05-29 大连理工大学 Impervious face slab anti-seismic structure of concrete rock-fill dam and construction method thereof
CN103437326A (en) * 2013-09-05 2013-12-11 中国水电顾问集团中南勘测设计研究院 Composite material dam
CN105064288A (en) * 2015-08-04 2015-11-18 中国电建集团华东勘测设计研究院有限公司 Concrete dam and earth and rockfill dam mixed dam type structure and construction method

Similar Documents

Publication Publication Date Title
AU2014229305B2 (en) Stream debris restraining structure
KR100714436B1 (en) Cover stone structure of fill dam
KR101662063B1 (en) Bridges and bridge scour scour prevention methods to prevent the ball
JP2004316081A (en) Mudflow type debris flow catching erosion control dam
US8052348B2 (en) Erosion control system
CN109680657B (en) Spillway and construction method thereof
JP5405939B2 (en) Inclined ground reinforcement structure and construction method
JP4678893B1 (en) Intake mechanism of Sabo Dam
JPH1150435A (en) Semi-permeation-type erosion control dam
CN202214710U (en) Overflowing-drainage integrated brake weir
KR100640763B1 (en) Ecological embankment construction for river
CN102383401A (en) Overflow water drainage integral type sluice weir
KR100841081B1 (en) Closes the small valley a debris barrier which uses wire rope
JP2002173957A (en) Rover surface water intake structure with inclined intake screen installed in groundsill
KR100433653B1 (en) Constructing method for the filling out abutement of bridge
KR101529176B1 (en) Ring type micro block debris barrier
KR100743550B1 (en) Scour prevention block
JP2003261924A (en) Sediment flushing method for water reservoir and sediment flushing equipment
JP2003138545A (en) Permeable type check dam
KR100513269B1 (en) A rainwater-way for preventing break small-rivers valley and method for constructing it
KR101685153B1 (en) River foundation with eco-corridor
KR200429763Y1 (en) Scour prevention block
KR100497537B1 (en) Scour protection
KR102420792B1 (en) A device for eco-friendly construction of debris barrier without pouring concrete
RU2050433C1 (en) Redundant spillway of earth retaining construction

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
N231 Notification of change of applicant
FPAY Annual fee payment
FPAY Annual fee payment
FPAY Annual fee payment

Payment date: 20160401

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170328

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180328

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190328

Year of fee payment: 13