KR100708252B1 - Fixing device of an insulating material for construction - Google Patents

Fixing device of an insulating material for construction Download PDF

Info

Publication number
KR100708252B1
KR100708252B1 KR1020060139176A KR20060139176A KR100708252B1 KR 100708252 B1 KR100708252 B1 KR 100708252B1 KR 1020060139176 A KR1020060139176 A KR 1020060139176A KR 20060139176 A KR20060139176 A KR 20060139176A KR 100708252 B1 KR100708252 B1 KR 100708252B1
Authority
KR
South Korea
Prior art keywords
insulating material
heat insulating
fixing
plate
screw rod
Prior art date
Application number
KR1020060139176A
Other languages
Korean (ko)
Inventor
양내문
양근영
Original Assignee
양내문
양근영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 양내문, 양근영 filed Critical 양내문
Priority to KR1020060139176A priority Critical patent/KR100708252B1/en
Application granted granted Critical
Publication of KR100708252B1 publication Critical patent/KR100708252B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/762Exterior insulation of exterior walls
    • E04B1/7637Anchoring of separate elements through the lining to the wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/762Exterior insulation of exterior walls
    • E04B1/7629Details of the mechanical connection of the insulation to the wall

Abstract

본 발명은 건축용 단열재 고정장치에 관한 것으로서, 콘크리트 슬라브(500)를 타설하기 위하여 알루미늄 재질인 거푸집(300)의 하부를 통해 관통되어 나사 결합되도록 하부측에 나사가 형성된 나사봉(210)과; 상기 나사봉(210)의 상부측이 삽입되도록 상부는 폐쇄되고 하부가 개구된 내부홀(111)이 형성된 관체부(110)와, 상기 관체부(110)의 상면에 일체로 형성된 원형의 소원판(120)과, 상기 관체부(110)의 하면에 일체로 형성됨과 동시에 상기 단열재(400)의 상면에 맞대어지는 상기 소원판(120)보다 더 큰 직경을 가진 대원판(130)과, 상기 대원판(300)의 하면에 서로 등 간격이면서 대원판(130)의 중심점으로부터도 등간격을 갖도록 다수개 하측으로 돌설되어 끝이 뾰족하게 형성된 고정돌기(140)로 구성된 단열재 고정구(100)를 포함하여 구성된 것을 특징으로 한다. 이와 같이 구성된 본 발명은 상기 나사봉(210)을 알루미늄 거푸집(300)에 하측으로부터 나사 결합하여 세워 알루미늄 거푸집(300) 위의 단열재(400)를 일차적으로 고정하고, 상기 단열재(400)의 상면으로 돌설된 나사봉(210)을 상기 단열재 고정구(100)의 관체부(110) 내부홀(111) 내에 삽입하면서 다수의 고정돌기(140)로 단열재(400)를 이차적으로 고정함으로써, 알루미늄 거푸집(300)과 함께 탈형될 때, 삽입되어 있던 단열재(400)에 홀이 형성되나 미세한 홀이 형성되므로, 단열재의 파손에 따른 단열 효과의 저하에 크게 영향을 미치지 못한다. 그리고, 상기 다수의 고정돌기(140)는 단열재의 두께만큼의 길이로 형성되어 단열재의 상면에서 하면까지 관통 고정함으로써, 단열재의 고정이 더 견 고한 효과가 있으며, 콘크리트 슬라브(500)에 매설되는 소원판(120)에는 다수개의 관통홀(121)이 형성되어 콘크리트 타설물이 삽입됨으로써, 콘크리트 슬라브(500) 내에 더 견고하게 매설되게 하는 역할을 한다.The present invention relates to a building insulation fixing device, the screw rod 210 is formed on the lower side to be screwed through the lower portion of the aluminum formwork 300 in order to pour the concrete slab 500; The upper part of the screw rod 210 is inserted into the upper part is closed and the lower part is formed with an inner hole 111 is formed, the circular element is formed integrally on the upper surface of the tubular part 110 120 and the circumferential plate 130 having a diameter larger than that of the small plate 120 which is integrally formed on the bottom surface of the tubular portion 110 and abuts on the top surface of the heat insulating material 400, and the daewon. Insulating material fixture 100 consisting of a fixing protrusion 140 is formed on the bottom of the plate 300 to be spaced apart from each other and evenly spaced from the center point of the base plate 130 to have a plurality of lower end is formed with a sharp end Characterized in that configured. According to the present invention configured as described above, the screw rod 210 is screwed to the aluminum formwork 300 from the lower side to be fixed to the heat insulating material 400 on the aluminum formwork 300, and to the upper surface of the heat insulating material 400. By inserting the protruding screw rod 210 into the inner portion 111 of the pipe part 110 of the heat insulating material fixture 100, by fixing the heat insulating material 400 with a plurality of fixing protrusions 140, aluminum formwork 300 When demolded together with), a hole is formed in the inserted heat insulating material 400, but a minute hole is formed, and thus does not significantly affect the deterioration of the heat insulating effect due to breakage of the heat insulating material. In addition, the plurality of fixing protrusions 140 are formed to have a length equal to the thickness of the heat insulating material, so that the fixing is penetrated from the upper surface to the lower surface of the heat insulating material, so that the fixing of the heat insulating material has a more robust effect, buried in the concrete slab 500 The plate 120 has a plurality of through-holes 121 are formed to insert the concrete pouring, thereby serving to be more firmly embedded in the concrete slab (500).

단열재 고정구, 브래킷Insulation fixtures, brackets

Description

건축용 단열재 고정장치{Fixing device of an insulating material for construction} Fixing device of an insulating material for construction

도1은 본 발명의 건축용 단열재 고정장치를 도시한 단면도,1 is a cross-sectional view showing a building insulation fixing device of the present invention,

도2는 본 발명의 건축용 단열재 고정장치의 거푸집을 도시한 분해단면도,Figure 2 is an exploded cross-sectional view showing the formwork of the building insulation fixing device of the present invention,

도3은 본 발명의 나사봉을 도시한 사시도,3 is a perspective view showing a screw rod of the present invention;

도4a는 본 발명의 단열재 고정구를 도시한 사시도,Figure 4a is a perspective view showing a heat insulating material fixture of the present invention,

도4b는 본 발명의 단열재 고정구를 도시한 저면도,Figure 4b is a bottom view showing the heat insulating material fixture of the present invention,

도5는 본 발명의 단열재 고정구를 도시한 일부 절개하여 분해 도시한 사시도,5 is an exploded perspective view showing a part of the insulator fixture of the present invention cut away;

도6은 종래의 단열재 고정장치를 상부에서 본 분리 사시도, 6 is an exploded perspective view of a conventional insulation fixing device viewed from above;

도7은 종래의 단열재 고정장치를 하부에서 본 분리 사시도,Figure 7 is an exploded perspective view of a conventional heat insulating material fixing device from the bottom,

도8은 종래의 단열재 고정장치를 도시한 조립 단면도이다.8 is an assembly cross-sectional view showing a conventional heat insulating material fixing device.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

100 : 단열재 고정구 110 : 관체부 100: heat insulating material fixture 110: pipe

111 : 내부홀 120 : 소원판111: inner hole 120: wish plate

121 : 관통홀 130 : 대원판 121: through hole 130: large disc

140 : 고정돌기 200 : 고정수단140: fixing protrusion 200: fixing means

210 : 나사봉 220 : 나비너트210: screw rod 220: butterfly nut

300 : 알루미늄 거푸집 400 : 단열재300: aluminum formwork 400: heat insulating material

500 : 콘크리트 슬라브500: Concrete Slab

본 발명은 알루미늄 거푸집에 파손되지 않도록 고정된 단열재 위에 콘크리트 슬라브를 타설할 때, 단열재가 밀리지 않도록 단열재를 견고하게 고정하도록 한 건축용 단열재 고정장치에 관한 것이다.The present invention relates to a building insulation fixing device for firmly fixing the insulation to prevent the insulation from being pushed when placing the concrete slab on the insulation fixed to not be damaged in the aluminum formwork.

일반적으로 콘크리트로 시공된 가옥이나 건물의 경우 동절기에는 영하의 외부 기온과 실내의 내부 기온의 온도차에 의해서 노점온도를 유지하는 벽체의 표면에 실내의 습공기가 접촉하면서 결로가 발생하게 된다.In general, in the case of houses or buildings constructed of concrete, dew condensation occurs when the indoor wet air contacts the surface of the wall maintaining the dew point temperature due to the temperature difference between the sub-zero temperature outside and the inside temperature inside.

이러한 결로현상을 방지하는 동시에 단열을 위한 목적으로 근자에 들어 실내 의 벽체에 발포성 합성수지로 형성되는 단열재를 설치하고, 상기 단열재의 내면에는 합성수지표면재를 고정하며, 상기 합성수지표면재의 표면에는 접착제를 이용하여 벽지를 부착하는 단열공법이 제안되고 있다.In order to prevent such condensation and at the same time, for the purpose of thermal insulation, a heat insulating material formed of a foamed synthetic resin is installed on the wall of the room, the synthetic resin surface is fixed to the inner surface of the heat insulating material, and an adhesive is used on the surface of the synthetic resin surface material. Insulation methods for attaching wallpaper have been proposed.

단열재를 고정할 수 있도록 알루미늄거푸집에 설치되는 것으로, 도6 내지 도8에서와 같이 알루미늄 거푸집(40)에 미리 고정 설치되는 다수의 브래킷 서포트(20)와, 상기 브래킷 서포트(20)에 끼워짐으로써 알루미늄거푸집(40) 상에 놓여진 단열재(70)를 고정해주는 고정캡(10)으로 구성된다.It is installed in the aluminum formwork to fix the heat insulating material, as shown in Figure 6 to 8 by being fitted to the plurality of bracket support 20 and the bracket support 20, which is pre-installed fixed to the aluminum formwork 40 It consists of a fixing cap 10 for fixing the heat insulating material 70 placed on the aluminum die (40).

상기 브래킷 서포트(20)는 알루미늄 거푸집(40)에 못이나 피스 등에 의해 고정될 수 있도록 양측에 체결공(22)이 형성되어 있는 바닥부(21)와, 상기 바닥부(21)의 중심에서 상부방향으로 돌출 형성된 끼움돌기(23)로 구성된다.The bracket support 20 has a bottom portion 21 having fastening holes 22 formed at both sides thereof so as to be fixed to an aluminum formwork 40 by a nail or a piece, and an upper portion at the center of the bottom portion 21. It consists of a fitting protrusion 23 formed to protrude in the direction.

한편 상기 고정캡(10) 하부면에 하부방향으로 형성되는 한편 상기 고정캡(10)은 하부면에 돌출부(14)가 형성되고, 이 돌출부(14)를 통해 상부방향으로 형성되는 끼움홈(15)을 구비하여 알루미늄 거푸집(40) 상에 놓여진 단열재(70)를 알루미늄 거푸집(40)으로 밀착시켜주는 누름판(11)과, 상기 끼움홈(15)의 내주면 둘레를 따라 일정간격으로 형성되고 끼움홈(15)의 깊이방향, 즉 상부방향으로 연장되도록 돌출 형성되는 다수의 리브(16)와, 상기 누름판(11)의 상부에 상부로 향할수록 둘레의 크기가 증가되도록 형성되는 상부돌출부(17)로 이루어진다.Meanwhile, the fixing cap 10 is formed in a lower direction on the lower surface of the fixing cap 10, and the fixing cap 10 has a protrusion 14 formed on the lower surface thereof, and a fitting groove 15 formed in the upper direction through the protrusion 14. And a pressing plate 11 for closely contacting the heat insulating material 70 placed on the aluminum formwork 40 with the aluminum formwork 40, and formed at regular intervals along the circumference of the inner circumferential surface of the fitting groove 15. A plurality of ribs 16 protruding to extend in the depth direction, that is, the upper direction of the (15), and the upper projections 17 formed to increase the size of the circumference toward the upper portion of the pressing plate 11 to the top Is done.

상기와 같이 상부돌출부(17)의 크기가 증가됨으로써 상부돌출부(17)와 누름판(11) 사이에 콘크리트가 채워지는 콘크리트 주입홈(18)이 형성되는 것이다.As the size of the upper protrusion 17 is increased as described above, the concrete injection groove 18 in which concrete is filled between the upper protrusion 17 and the pressing plate 11 is formed.

상기와 같이 구성되는 단열재 고정장치는 브래킷 서포트(20)의 끼움돌기(23) 에 상기 고정캡(10)의 끼움홈(15)이 끼워지도록 결합되어 상기 브래킷 서포트(20)와 고정캡(10) 사이에 개재되는 단열재(70)를 고정시켜 주게 되는 것이다.The insulating material fixing device configured as described above is coupled to the fitting groove 15 of the fixing cap 10 to the fitting protrusion 23 of the bracket support 20 to the bracket support 20 and the fixing cap 10. It is to fix the heat insulating material 70 interposed therebetween.

상기 누름판(11)은 상기 넓은 평면적을 가지는 것으로 단열재(70)를 알루미늄 거푸집(40)에 보다 용이하게 밀착시켜 주게 되는 것이다.The pressing plate 11 is to have a large planar area to be in close contact with the heat insulating material 70 to the aluminum formwork 40 more easily.

또한 상기 누름판(11)의 가장자리 둘레에는 하부방향으로 관통되는 다수의 관통홀(12)이 더 구비되어 있으며, 콘크리트 모르타르를 타설할 경우 상기 관통홀(12)을 통해 콘크리트 모르타르가 흘러들어 브래킷 서포트(20)와, 고정캡(10)의 결합에 의해 형성되는 콘크리트 주입홈(18)으로 주입됨으로써 단열재 고정장치가 콘크리트에 보다 견고히 고정되는 것이다.In addition, a plurality of through holes 12 penetrating downward in the circumference of the pressing plate 11 is further provided. When pouring concrete mortar, concrete mortar flows through the through holes 12 to support the bracket ( 20) and the insulator fixing device is more firmly fixed to the concrete by being injected into the concrete injection groove 18 formed by the combination of the fixing cap 10.

상기와 같이 구성된 종래의 단열재 고정장치에서, 벽체(50)와 슬래브(51)에 알루미늄 거푸집(40)의 설치가 완료되면, 벽체(50) 내외측의 온도차이가 큰 외벽이나 외벽과 연결되는 슬래브의 알루미늄 거푸집(40) 상에 단열재(70)를 부착하게 되는 바, 이때, 알루미늄 거푸집(40) 상에는 소정의 간격으로 부착된 브래킷 서포트(20)의 상면에 상기 단열재(70)를 눌러주면 상기 브래킷 서포트(20)의 끼움돌기(23)가 상기 단열재(70)를 관통하여 단열재(70)의 상부로 돌출된다.In the conventional heat insulating material fixing device configured as described above, when the installation of the aluminum formwork 40 on the wall 50 and the slab 51 is completed, the slab connected to the outer wall or outer wall having a large temperature difference between the inner and outer walls 50. When the heat insulating material 70 is attached to the aluminum formwork 40 of the bar, in this case, pressing the heat insulating material 70 on the upper surface of the bracket support 20 attached on the aluminum formwork 40 at predetermined intervals, the bracket The fitting protrusion 23 of the support 20 penetrates through the heat insulating material 70 and protrudes above the heat insulating material 70.

여기서 상기 단열재(70)는 통상의 스치로폼과 같은 연질의 재질로서, 알루미늄 거푸집(40) 상에 놓여진 상태에서 압력을 가해주면 단열재(70)가 뚫려지면서 단열재(70)의 상부로 끼움돌기(23)가 돌출되는 것이다. 이와 같이 끼움돌기(23)가 단열재(70)의 상부로 돌출되면, 상기 끼움돌기(23)에 상기 고정캡(10)의 끼움홈(15)이 끼워지도록 결합하여 브래킷 서포트(20)에 고정캡(10)이 결합되도록 한 다.Here, the heat insulating material 70 is a soft material such as a conventional styrofoam, and when the pressure is applied in a state placed on the aluminum formwork 40, the heat insulating material 70 is drilled and fitted into the upper part of the heat insulating material 70. Will protrude. When the fitting protrusion 23 protrudes to the upper portion of the heat insulating material 70 as described above, the fitting groove 23 of the fixing cap 10 is coupled to the fitting protrusion 23 so that the fixing cap is fixed to the bracket support 20. Let (10) be combined.

상기와 같이 고정캡(10)을 브래킷 서포트(20)에 결합함으로서 고정캡(10)과 브래킷 서포트(20) 사이에 개재되는 단열재(70)가 고정캡(10)에 의해 압박되어 유동이 방지되는 한편 상기 고정돌기(13)가 단열재(70)에 삽입됨으로써 단열재를 한번 더 고정시켜 주는 것이다.By coupling the fixing cap 10 to the bracket support 20 as described above, the heat insulating material 70 interposed between the fixing cap 10 and the bracket support 20 is pressed by the fixing cap 10 to prevent flow. Meanwhile, the fixing protrusion 13 is inserted into the heat insulating material 70 to fix the heat insulating material once more.

이렇게 결로를 방지하고자 하는 위치에 단열재(70)의 고정이 완료되면 알루미늄 거푸집(40)의 상부에 철근을 배근한 후 콘크리트(61)를 타설하고, 콘크리트(61)가 완전히 경화되면 알루미늄 거푸집(40)을 콘크리트(61)에서 분리한다. 이때 상기 알루미늄 거푸집(40)에 고정되어 있는 브래킷서포트(20)만 콘크리트(61)에서 분리되고 상기 고정캡(10)과 단열재(70)는 콘크리트(61)에 일체로 매설되는 것이다.When the fixing of the heat insulating material 70 is completed in the position to prevent condensation in this way, the reinforcing bar is placed on the upper part of the aluminum formwork 40 and the concrete 61 is poured, and when the concrete 61 is completely cured, the aluminum formwork 40 ) Is separated from the concrete (61). At this time, only the bracket support 20 fixed to the aluminum formwork 40 is separated from the concrete 61 and the fixing cap 10 and the heat insulating material 70 are embedded in the concrete 61 integrally.

여기서, 상기 고정캡(10)의 끼움홈(15)에 형성된 다수의 리브(16)에 의해 끼움홈(15)과 끼움돌기(23)의 접촉 단면적이 줄어들어 브래킷 서포트(20)와 고정캡(10)이 손쉽게 분리됨으로써 알루미늄거푸집(40)의 착탈이 용이하도록 구성되고 알루미늄 거푸집(40) 해체시 상기 고정캡(10)이 브래킷 서포트(10)에 끼워진 상태로 단열재(70)를 포함하여 동시에 분리되는 것을 방지하게 되는 것이다.Here, the contact cross-sectional area of the fitting groove 15 and the fitting protrusion 23 is reduced by the plurality of ribs 16 formed in the fitting groove 15 of the fixing cap 10, so that the bracket support 20 and the fixing cap 10 are reduced. ) Is easily separated by detaching the aluminum formwork 40, and when the aluminum formwork 40 is dismantled, the fixing cap 10 is detached at the same time including the insulating material 70 while being fitted to the bracket support 10. Will be prevented.

그러나, 도7에 도시된 바와 같이, 브래킷 서포트(20)의 끼움돌기(23)를 형성할 때, 프레스 가공으로 끼움돌기(23)를 형성하므로, 그 직경이 커지게 되어 이 끼움돌기(23)에 단열재(70)가 관통될 때, 그 관통홀이 크게 강제로 관통됨으로써, 단열재(70) 즉, 관통되는 홀의 주위가 파손되고, 이와 같이 파손된 상태에서, 단열 재(70)의 상부로 돌출된 끼움돌기(23)에 상기 고정캡(10)의 끼움홈(15)이 끼워질 때, 끼움돌기(23)의 주변 단열재(70)를 다시 한번 누르게 되므로, 단열재(70)가 재차 파손되어 단열효율이 저하되는 문제점이 있다. However, as shown in Fig. 7, when the fitting protrusion 23 of the bracket support 20 is formed, the fitting protrusion 23 is formed by pressing, so that the diameter of the fitting protrusion 23 becomes large. When the heat insulating material 70 penetrates, the through hole is forcibly penetrated, so that the periphery of the heat insulating material 70, that is, the hole to be penetrated is damaged, and in such a broken state, it protrudes to the top of the heat insulating material 70. When the fitting groove 15 of the fixing cap 10 is fitted to the fitted fitting 23, since the peripheral insulating material 70 of the fitting protrusion 23 is pressed once again, the insulating material 70 is broken again and is insulated. There is a problem that the efficiency is lowered.

따라서, 본 발명은 상기와 같은 문제점을 해결하기 위한 것으로써, 본 발명의 목적은 알루미늄 거푸집에 파손되지 않도록 고정된 단열재 위에 콘크리트 슬라브를 타설할 때, 단열재가 밀리지 않도록 단열재를 견고하게 고정하도록 한 건축용 단열재 고정장치를 제공하는 데 있다.Therefore, the present invention is to solve the above problems, an object of the present invention when building a concrete slab on a fixed insulation to prevent damage to the aluminum formwork, so that the insulation is firmly fixed so that the insulation is not pushed It is to provide an insulation fixing device.

따라서, 상기와 같은 목적을 실현하기 위하여 본 발명에 따른 건축용 단열재 고정장치는, 콘크리트 슬라브를 타설하기 위하여 알루미늄 재질인 거푸집의 하부를 통해 관통되어 나사 결합되도록 하부측에 나사가 형성된 나사봉과; 상기 브래킷의 돌기가 삽입되도록 상부는 폐쇄되고 하부가 개구된 내부홀이 형성된 관체부와, 상기 관체부의 상면에 일체로 형성된 원형의 소원판과, 상기 관체부의 하면에 일체로 형성됨과 동시에 상기 단열재의 상면에 맞대어지는 상기 소원판보다 더 큰 직경을 가진 대원판과, 상기 대원판의 하면에 서로 등 간격이면서 대원판의 중심점으로부터도 등간격을 갖도록 다수개 하측으로 돌설되어 끝이 뾰족하게 형성된 고정돌기로 구성된 단열재 고정구를 더 포함하는 것을 특징으로 한다.Therefore, in order to achieve the above object, the building insulation fixing device according to the present invention includes: a screw rod having a screw formed at a lower side thereof so as to be screwed through a lower portion of an aluminum formwork to cast concrete slabs; The upper part of the tube is closed and the lower part is opened so that the protrusion of the bracket is inserted, the circular element is formed integrally on the upper surface of the tube, and integrally formed on the lower surface of the tube and at the same time A large disc having a larger diameter than the small disc facing the upper surface, and a plurality of fixed protrusions protruded downwards with equal intervals from the center point of the large disc and evenly spaced from each other on the lower surface of the large disc It characterized in that it further comprises a heat insulating material fixture consisting of.

이하, 본 발명의 실시예를 첨부된 도면을 참조하면서 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도1은 본 발명의 건축용 단열재 고정구를 도시한 단면도이고, 도2는 본 발명 의 건축용 단열재 고정구의 거푸집을 도시한 분해단면도이며, 도3은 본 발명의 나사봉을 도시한 사시도이며, 도4a는 본 발명의 단열재 고정구를 도시한 사시도이며, 도4b는 본 발명의 단열재 고정구를 도시한 저면도이며, 도5는 본 발명의 단열재 고정구를 도시한 일부 절개 사시도이다.Figure 1 is a cross-sectional view showing the building insulation fastener of the present invention, Figure 2 is an exploded cross-sectional view showing the formwork of the building insulation fastener of the present invention, Figure 3 is a perspective view showing a screw rod of the present invention, Figure 4a is 4 is a bottom view illustrating the heat insulating material fixture of the present invention, and FIG. 5 is a partially cutaway perspective view of the heat insulating material fixture of the present invention.

콘크리트로서 시공되는 슬라브의 하부면 또는 벽체의 일측면에는 단열판재들이 일체로 부착되는 경우가 많다. 특히, 최근 아파트와 같은 건축물에는 상하층 또는 외부와의 단열성을 확보하기 위하여 판 형상의 단열재가 콘크리트 슬라브(500)의 하부면 또는 벽체의 측면에 일체로 부착하는 것이 보편적이다. Insulating plates are often integrally attached to the lower surface of the slab or one side of the wall constructed as concrete. In particular, in recent years, such as apartments, it is common that the plate-shaped insulation is integrally attached to the lower surface of the concrete slab 500 or the side surface of the wall in order to ensure insulation with the upper and lower floors or the outside.

도1 내지 도5에 도시된 바와 같이, 상기와 같은 콘크리트 슬라브(500)를 타설하기 위하여 알루미늄 재질인 거푸집(300)을 관통하여 단열재(400)를 고정하는 고정수단(200)을 설치하고, 상기 알루미늄 거푸집(300) 위에 단열재(400)를 깔고, 상기 단열재(400)의 상면에 등 간격으로 단열재 고정구(100)로 단열재(400)를 고정한다.As shown in Figure 1 to 5, in order to pour the concrete slab 500 as described above to install a fixing means 200 for fixing the heat insulating material 400 through the formwork 300 made of aluminum, Laying the heat insulating material 400 on the aluminum formwork 300, the heat insulating material 400 is fixed to the upper surface of the heat insulating material 400 by the heat insulating material fixture 100 at equal intervals.

상기 고정수단(200)은 콘크리트 슬라브(500)를 타설하기 위하여 알루미늄 재질인 거푸집(300)의 하부를 통해 관통되어 나사 결합되도록 하부측에 나사가 형성된 나사봉(210)과, 상기 알루미늄 거푸집(300)의 하측에서 나사봉(210)을 재차 고정하도록 나사 결합되는 나비너트(220)로 이루어진다.The fixing means 200 is a screw rod 210 formed with a screw on the lower side so as to penetrate through the lower portion of the aluminum formwork 300 in order to pour the concrete slab 500, and the aluminum formwork 300 It consists of a butterfly nut 220 is screwed to secure the screw rod 210 again at the lower side.

상기 나사봉(210)의 하단에는 드라이버로 돌려 알루미늄 거푸집(300)에 삽입할 수 있도록 십자형의 홈이 형성되어 있다. The lower end of the screw rod 210 has a cross-shaped groove is formed so that it can be inserted into the aluminum formwork 300 by a screwdriver.

상기 단열재 고정구(100)는 상기 브래킷(200)의 돌기(220)가 삽입되도록 상 부는 폐쇄되고 하부가 개구된 내부홀(111)이 형성된 관체부(110)와, 상기 관체부(110)의 상면에 일체로 형성된 원형의 소원판(120)과, 상기 관체부(110)의 하면에 일체로 형성됨과 동시에 상기 단열재(400)의 상면에 맞대어지는 상기 소원판(120)보다 더 큰 직경을 가진 대원판(130)과, 상기 대원판(300)의 하면에 서로 등 간격이면서 대원판(130)의 중심점으로부터도 등간격을 갖도록 다수개 하측으로 돌설되어 끝이 뾰족하게 형성된 고정돌기(140)로 구성된다. The heat insulating material fixture 100 has a pipe part 110 formed with an inner hole 111 having an upper part closed and an open bottom thereof so that the protrusion 220 of the bracket 200 is inserted therein, and an upper surface of the pipe part 110. A circle member having a diameter larger than that of the circle plate 120 integrally formed on the plate 120 and the plate plate 120 which is integrally formed on the bottom surface of the tubular portion 110 and abuts on the top surface of the heat insulating material 400. The plate 130 and the lower surface of the daepan 300 is composed of a fixed protrusion 140 is formed with a plurality of protruding to the lower side so as to have the same distance from the center point of the daepan 130, evenly spaced from each other. do.

상기 다수의 고정돌기(140)는 적어도 3개 이상이며, 상기 단열재(400)의 상면에서 하면까지 관통하는 길이를 가진다.The plurality of fixing protrusions 140 is at least three, and has a length penetrating from the upper surface to the lower surface of the heat insulating material 400.

상기 단열재 고정구(100)의 소원판(120)에는 상기 소원판(120)의 중심점을 중심으로 등 간격으로 다수개의 관통홀(121)이 형성되어 있는 바, 이 관통홀(121)내로 콘크리트 타설물이 채워져 단열재 고정구(100)가 콘크리트 슬라브(500) 내에 더 견고하게 매설되게 하는 역할을 한다.The plate 120 of the heat insulating material fixture 100 is formed with a plurality of through holes 121 at equal intervals about the center point of the plate 120, the concrete pours into the through hole 121 This fill serves to make the insulation fixture 100 more firmly embedded in the concrete slab 500.

상기한 바와 같은 본 발명의 단열재 고정장치는 콘크리트 슬라브(500)를 타설하기 위하여 알루미늄 재질인 거푸집(300) 위에 단열재(400)를 설치하고, 상기 알루미늄 거푸집(300)에 형성된 나사홀을 통하여 상기 나사봉(210)을 드라이버로 그 하단 십자형의 홈을 통해 삽입하여 단열재(400)를 일차적으로 고정한다. 상기 단열재(400)의 상면에 돌설된 나사봉(210)을 단열재 고정구(100)의 관체부(110)의 내부홀(111)에 삽입하면서 대원판(130)의 하단면에 하측으로 돌설 형성된 다수의 고정돌기(140)로 단열재(400)를 재차 고정한다.Insulating material fixing device of the present invention as described above to install the insulating material 400 on the aluminum formwork 300 in order to pour the concrete slab 500, and through the screw hole formed in the aluminum formwork 300 The four poles 210 are inserted through the grooves of the lower cross with a screwdriver to primarily fix the heat insulating material 400. While inserting the screw rod 210 protruding from the upper surface of the heat insulating material 400 into the inner hole 111 of the tubular part 110 of the heat insulating material fixture 100, a plurality of protrusions formed on the lower surface of the lower plate 130 downward The fixing protrusion 140 of the heat insulating material 400 is fixed again.

상기한 바와 같은 상태에서 단열재(400) 위에 콘크리트를 타설하게 되는 바, 타설되는 콘크리트 슬라브(500) 내에 상기 단열재 고정구(100)가 매설된다. 이 콘크리트가 경화되면서 상기 단열재 고정구(100)에 의해 콘크리트 슬라브(500)와 단열재(400)는 견고하게 부착된 상태가 된다. In the state as described above, the concrete is placed on the heat insulating material 400, the heat insulating material fixture 100 is embedded in the concrete slab 500 to be poured. As the concrete is hardened, the concrete slab 500 and the heat insulating material 400 are firmly attached by the heat insulating material fixture 100.

즉, 본 발명에 의한 단열재 고정구(100)의 대원판(130)의 하단면에 돌설된 다수의 고정돌기(140)가 단열재(400) 내에 삽입되어 있어, 더 견고하게 단열재(400)가 부착되고, 콘크리트가 경화된 후, 알루미늄 거푸집(300)을 하측으로 탈형하면, 알루미늄 거푸집(300)과 함께 고정수단(200)인 나사봉(210)이 함께 탈형된다.That is, the plurality of fixing protrusions 140 protruding from the bottom surface of the large plate 130 of the heat insulating material fixture 100 according to the present invention is inserted into the heat insulating material 400, the heat insulating material 400 is more firmly attached , After concrete is cured, when the aluminum die 300 is demolded downward, the screw rod 210 which is the fixing means 200 together with the aluminum die 300 is demolded together.

상기한 바와 같이 구성된 본 발명의 건축용 단열재 고정장치에 의하면, 상기 나사봉(210)을 알루미늄 거푸집(300)에 하측으로부터 나사 결합하여 세워 알루미늄 거푸집(300) 위의 단열재(400)를 일차적으로 고정하고, 상기 단열재(400)의 상면으로 돌설된 나사봉(210)을 상기 단열재 고정구(100)의 관체부(110) 내부홀(111) 내에 삽입하면서 다수의 고정돌기(140)로 단열재(400)를 이차적으로 고정함으로써, 알루미늄 거푸집(300)과 함께 탈형될 때, 삽입되어 있던 단열재(400)에 홀이 형성되나 미세한 홀이 형성되므로, 단열재의 파손에 따른 단열 효과의 저하에 크게 영향을 미치지 못한다. 그리고, 상기 다수의 고정돌기(140)는 단열재의 두께만큼의 길이로 형성되어 단열재의 상면에서 하면까지 관통 고정함으로써, 단열재의 고정이 더 견고한 효과가 있으며, 콘크리트 슬라브(500)에 매설되는 소원판(120)에는 다수개의 관통홀(121)이 형성되어 콘크리트 타설물이 삽입됨으로써, 콘크리트 슬라 브(500) 내에 더 견고하게 매설되게 하는 역할을 한다.According to the insulating device for fixing the building of the present invention configured as described above, by screwing the screw rod 210 to the aluminum formwork 300 from the lower side up and primarily to fix the heat insulating material 400 on the aluminum formwork 300 While inserting the screw rod 210 protruding from the upper surface of the heat insulating material 400 into the inner hole 111 of the pipe part 110 of the heat insulating material fixture 100, the heat insulating material 400 with a plurality of fixing protrusions 140. By secondary fixation, when demolded together with the aluminum formwork 300, holes are formed in the inserted heat insulating material 400, but minute holes are formed, and thus, do not significantly affect the reduction of the heat insulating effect due to breakage of the heat insulating material. In addition, the plurality of fixing protrusions 140 are formed to have a length as long as the thickness of the heat insulating material, so as to penetrate from the top surface to the bottom surface of the heat insulating material, so that the fixing of the heat insulating material has a more robust effect, the small plate embedded in the concrete slab 500 A plurality of through-holes 121 are formed in the 120 to insert concrete pouring, thereby serving to be more firmly embedded in the concrete slab 500.

Claims (4)

콘크리트 슬라브(500)를 타설하기 위하여 알루미늄 재질인 거푸집(300)의 하부를 통해 관통되어 나사 결합되도록 하부측에 나사가 형성된 나사봉(210)과;A screw rod 210 having a screw formed at a lower side thereof so as to penetrate through a lower portion of the aluminum formwork 300 in order to pour the concrete slab 500; 상기 나사봉(210)의 상부측이 삽입되도록 상부는 폐쇄되고 하부가 개구된 내부홀(111)이 형성된 관체부(110)와, 상기 관체부(110)의 상면에 일체로 형성된 원형의 소원판(120)과, 상기 관체부(110)의 하면에 일체로 형성됨과 동시에 상기 단열재(400)의 상면에 맞대어지는 상기 소원판(120)보다 더 큰 직경을 가진 대원판(130)과, 상기 대원판(300)의 하면에 서로 등 간격이면서 대원판(130)의 중심점으로부터도 등간격을 갖도록 다수개 하측으로 돌설되어 끝이 뾰족하게 형성된 고정돌기(140)로 구성된 단열재 고정구(100)를 포함하여 구성된 것을 특징으로 하는 건축용 단열재 고정장치.The upper part of the screw rod 210 is inserted into the upper part is closed and the lower part is formed with an inner hole 111 is formed, the circular element is formed integrally on the upper surface of the tubular part 110 120 and the circumferential plate 130 having a diameter larger than that of the small plate 120 which is integrally formed on the bottom surface of the tubular portion 110 and abuts on the top surface of the heat insulating material 400, and the daewon. Insulating material fixture 100 consisting of a fixing protrusion 140 is formed on the bottom of the plate 300 to be spaced apart from each other and evenly spaced from the center point of the base plate 130 to have a plurality of lower end is formed with a sharp end Building insulation fixing device characterized in that configured. 제1항에 있어서, 상기 알루미늄 거푸집(300)의 하측에서 나사봉(210)을 재차 고정하도록 나사 결합되는 나비너트(220)를 더 포함하는 것을 특징으로 하는 건축용 단열재 고정장치.According to claim 1, The building insulation fixing device further comprises a butterfly nut (220) screwed to secure the screw rod (210) again at the lower side of the aluminum formwork (300). 제1항에 있어서, 상기 다수의 고정돌기(140)는 적어도 3개 이상이며, 상기 단열재(400)의 상면에서 하면까지 관통하는 길이를 가진 것을 특징으로 하는 건축용 단열재 고정장치.According to claim 1, wherein the plurality of fixing projections 140 is at least three, the building insulation fixing device, characterized in that it has a length penetrating from the upper surface to the lower surface of the heat insulating material (400). 제3항에 있어서, 상기 단열재 고정구(100)의 소원판(120)에는 상기 소원판(120)의 중심점을 중심으로 등 간격으로 다수개의 관통홀(121)이 형성되어 있는 바, 이 관통홀(121)내로 콘크리트 타설물이 채워져 단열재 고정구(100)가 콘크리트 슬라브(500) 내에 더 견고하게 매설되게 하는 것을 특징으로 하는 건축용 단열재 고정장치.According to claim 3, The plate 120 of the heat insulating material fixture 100 has a plurality of through-holes 121 are formed at equal intervals around the center point of the plate 120, the through hole ( 121) The building insulation fixing device, characterized in that the concrete pours are filled to make the insulation fixture 100 more firmly embedded in the concrete slab (500).
KR1020060139176A 2006-12-30 2006-12-30 Fixing device of an insulating material for construction KR100708252B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060139176A KR100708252B1 (en) 2006-12-30 2006-12-30 Fixing device of an insulating material for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060139176A KR100708252B1 (en) 2006-12-30 2006-12-30 Fixing device of an insulating material for construction

Publications (1)

Publication Number Publication Date
KR100708252B1 true KR100708252B1 (en) 2007-04-16

Family

ID=38181497

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060139176A KR100708252B1 (en) 2006-12-30 2006-12-30 Fixing device of an insulating material for construction

Country Status (1)

Country Link
KR (1) KR100708252B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101008146B1 (en) 2009-09-30 2011-01-14 황선출 A mold insulator fixation
KR101019887B1 (en) 2009-03-30 2011-03-04 배용웅 Fixing tool of heat insulating material
KR101302626B1 (en) 2011-12-21 2013-09-03 양영진 Apparatus for fixing planar heat insulator
KR20160113808A (en) 2015-03-23 2016-10-04 프로텍코리아 주식회사 Fixing device of the vacuum insulation panel
KR101857014B1 (en) * 2018-01-08 2018-05-11 주식회사 휴다임건축사사무소 Insulation Fixture
CN110258832A (en) * 2019-05-16 2019-09-20 南京百汉居建设工程有限公司 A kind of built-up thermal insulation board fixing component auxiliary installation device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
02365874

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101019887B1 (en) 2009-03-30 2011-03-04 배용웅 Fixing tool of heat insulating material
KR101008146B1 (en) 2009-09-30 2011-01-14 황선출 A mold insulator fixation
KR101302626B1 (en) 2011-12-21 2013-09-03 양영진 Apparatus for fixing planar heat insulator
KR20160113808A (en) 2015-03-23 2016-10-04 프로텍코리아 주식회사 Fixing device of the vacuum insulation panel
KR101857014B1 (en) * 2018-01-08 2018-05-11 주식회사 휴다임건축사사무소 Insulation Fixture
CN110258832A (en) * 2019-05-16 2019-09-20 南京百汉居建设工程有限公司 A kind of built-up thermal insulation board fixing component auxiliary installation device
CN110258832B (en) * 2019-05-16 2021-03-16 南京百汉居建设工程有限公司 Auxiliary mounting device for fixing component of assembled insulation board

Similar Documents

Publication Publication Date Title
KR100708252B1 (en) Fixing device of an insulating material for construction
KR100859100B1 (en) Fixing device of an insulating material for construction
KR20090037721A (en) Device for fixing the sleeve for building
KR200431161Y1 (en) A fixing apparatus of heat insulating material
KR101075656B1 (en) Clean cap unit making use of aluminium wall form and method equipping an insulator with the cap unit
KR100745096B1 (en) a fixing instrument for insulating material
KR100730656B1 (en) Fixing device of a double insulating material
KR20090129043A (en) Unit insulation product for blocking thermal bridge
KR101899248B1 (en) Fixing tool of insulating materials for concrete wall
KR102025991B1 (en) insulation material clamp for insulated sandwich concrete wall structure
KR101022795B1 (en) Insert
KR100447474B1 (en) Insert for concrete slave
KR101816114B1 (en) Fixing tool of insulating materials for concrete wall
KR20090019232A (en) Heat insulator fixture for aluminum form
KR101680625B1 (en) Fixing structure for a outside panel of building and construction methods
KR100614839B1 (en) A heat insulator or construction materials catch which is established on aluminum form
KR200189515Y1 (en) Insulation bolt for fixing insulation material
KR200283437Y1 (en) Fixing implement of insulation for a floor
JP2006070558A (en) Heat-insulating material for external heat insulation for reinforced concrete wall and external heat-insulation construction method for reinforced concrete wall using heat-insulating material for external heat insulation
KR101302626B1 (en) Apparatus for fixing planar heat insulator
KR100536067B1 (en) Structure of outer insulation for foundation
KR101941847B1 (en) Fixing tool of insulating materials for concrete wall
KR101898914B1 (en) Fixing tool of insulating materials for concrete wall
EP3159460A2 (en) Binding element for a building wall structure having an insulation layer
KR200242493Y1 (en) A multi-sleeve unit for a structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120410

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee