KR100704172B1 - A method and device of filter riprap construction for bottom protection using riprap bag in harbor revetment construction - Google Patents

A method and device of filter riprap construction for bottom protection using riprap bag in harbor revetment construction Download PDF

Info

Publication number
KR100704172B1
KR100704172B1 KR1020060078892A KR20060078892A KR100704172B1 KR 100704172 B1 KR100704172 B1 KR 100704172B1 KR 1020060078892 A KR1020060078892 A KR 1020060078892A KR 20060078892 A KR20060078892 A KR 20060078892A KR 100704172 B1 KR100704172 B1 KR 100704172B1
Authority
KR
South Korea
Prior art keywords
stone
bag
installing
filter
seat
Prior art date
Application number
KR1020060078892A
Other languages
Korean (ko)
Inventor
이호순
Original Assignee
주식회사 세일종합기술공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 세일종합기술공사 filed Critical 주식회사 세일종합기술공사
Priority to KR1020060078892A priority Critical patent/KR100704172B1/en
Application granted granted Critical
Publication of KR100704172B1 publication Critical patent/KR100704172B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

본 발명은 항만의 호안 또는 방조제 축조시 지반의 세굴을 방지하고 필터사석설치를 간단 용이하게 할 수 있도록 한 사석백을 이용한 바닥 보호사석의 필터 사석 시공방법 및 장치에 관한 것으로서, 더욱 상세하게는 항만 호안 및 방조제를 축조할 위치에 원지반을 형성하기 위해 통상의 방법으로 저면 매트를 설치하는 단계와; 원지반의 저면매트에 바위돌과 같이 직경이 큰 바닥보호사석을 2m두께로 설치하는 단계와; 바닥보호사석 상부에 제체사석을 적층하고 바다측에는 피복석을 형성하며 저수측에는 차수시트를 설치하여 차수층을 형성하는 방조제 축조 단계에 있어서,The present invention relates to a method and a device for constructing a filter seat of a floor protector using a stone bag to prevent scouring of the ground and to simplify the installation of a filter seat when constructing a harbor revetment or embankment. Installing a bottom mat in a conventional manner to form a base at a position to build a revetment and a seawall; Installing a floor protective stone having a large diameter such as a rock stone on the bottom mat of the base plate to a thickness of 2 m; In the step of building a shelter for laminating the carcass seat on top of the floor protection seat, forming the seating stone on the sea side and installing the order sheet on the water storage side,

저수측 방조제 하부면의 바닥보호사석 일측에 크레인과 들대를 이용하여 1차 사석백을 설치하는 단계와; 1차 사석백에 대응되도록 잠수부를 이용하여 부직시트가 펼쳐지도록 설치하는 단계와; 펼쳐진 부직시트 일면에 크레인과 들대를 이용하여 2차 사석백을 적층하고 잠수부를 이용하여 설치된 부직시트가 2차 사석백이 씌워져 피복되도록 필터사석을 설치하는 단계와; 부직시트가 씌워진 필터사석 일측에 대응되도록 소정의 거리로 바닥보호석을 설치한 후 방조제 상부면을 평탄하게 고른 다음 포장하는 단계로 이루어지는 항만 호안 및 방조제 축조시 사석백을 이용한 바닥 보호사석의 필터 사석 시공방법 및 장치에 관한 것이다.Installing a primary sandstone bag by using a crane and a pole on one side of the bottom protective stone of the bottom surface of the water reservoir; Installing the nonwoven sheet to expand by using a diver so as to correspond to the first four stone bags; Stacking secondary sandbags using cranes and poles on one side of the unwoven sheet and installing filter seats such that the nonwoven sheet installed by using a diver is covered with secondary sandstone bags; Construction of filter seats for floor protective seats using sandstone bags during harbor revetment and shelter construction, after installing floor protection seats at a predetermined distance to correspond to one side of filter seats covered with nonwoven sheets A method and apparatus are disclosed.

바닥보호사석, 사석백, 방조제, 항만 호안, 부직시트 Floor protector, stone bag, embankment, harbor shelter, nonwoven sheet

Description

항만 호안 및 방조제 축조시 사석백을 이용한 바닥 보호사석의 필터 사석 시공방법 및 장치{A method and device of filter riprap construction for bottom protection using riprap bag in harbor revetment construction}A method and device of filter riprap construction for bottom protection using riprap bag in harbor revetment construction}

도 1은 본 발명의 필터시공방법으로 시공된 방조제 전체구성도.1 is an overall configuration diagram of the aid made by the filter construction method of the present invention.

도 2a는 본 발명의 필터사석 시공방법에 의해 실시된 사석백과 부직포 시트의 설치구성도.Figure 2a is a configuration diagram of the sandbag bag and non-woven fabric sheet carried out by the filter seat construction method of the present invention.

도 2b는 도2a의 다른 실시 예로서, 2장의 부직시트로 사석백을 피복한 상태를 나타낸 설치구성도. FIG. 2B is a view illustrating an installation of another example of FIG. 2A, in which a nonwoven sheet is covered with a sandstone bag; FIG.

도 3은 본 발명의 필터사석 시공을 위해 크레인과 들대를 이용한 사석백 설치 예시도.Figure 3 is an exemplary view showing the installation of a stone bag using a crane and a pole for the construction of filter seats of the present invention.

도 4는 본 발명의 사석백을 설치하기 위한 들대 구성도.Figure 4 is a configuration of the pole for installing the sandstone bag of the present invention.

도 5는 본 발명의 들대를 나타낸 종단면 구성도. Figure 5 is a longitudinal cross-sectional view showing the pillar of the present invention.

도 6은 본 발명의 사석백 외형도.Figure 6 is an appearance of a quartet bag of the present invention.

도 7은 본 발명의 사석백을 이용한 방조제 및 필터사석 단계별 시공 공정도.Figure 7 is a step-by-step construction process diagram of the stone repellent and filter seat using the sandstone bag of the present invention.

도 8은 본 발명의 다른 실시 예의 들대를 나타낸 구성도이다. 8 is a configuration diagram showing a pillar of another embodiment of the present invention.

<도면의 주요 부분에 대한 부호 설명><Description of the symbols for the main parts of the drawings>

1: 방조제 2:원지반1: embankment 2: original ground

3:바닥보호사석 4:필터사석3: floor protection seat 4: filter seat

5:부직시트 10:들대5: nonwoven sheet 10: rod

11:스틸파이프 12:보강편11: Steel Pipe 12: Reinforcement

13:샤클 14:스틸후크13: Shackles 14: Steel hook

20:크레인 21:와이어 로프20: crane 21: wire rope

30:바지선 4:잠수부30: pants 4: diving

본 발명은 항만의 호안, 방조제 축조시 지반의 세굴을 방지와 사석백을 이용한 필터사석 시공방법에 관한 것이다. 더욱 상세하게는 지반의 세굴을 방지하기 위해 바닥에 바위 돌 크기의 바닥 보호사석을 2m로 설치하고 축조되는 방조제 내측 바닥보호사석에 필터사석을 설치하여 호안에 부지를 조성하기 위한 준설토가 유실되는 것을 방지하는 동시에 필터사석 설치시 크레인과 들대를 이용하여 사석백을 설치함으로서 유속에 의하여 사석이 유실되는 것을 방지할 수 있도록 한 항만 호안 및 방조제 축조시 사석백을 이용한 바닥 보호사석의 필터사석 시공방법 및 장치에 관한 것이다. The present invention relates to a method for constructing a filter sandstone using a sandstone bag to prevent scouring of the ground during construction of a revetment of a harbor and a seawall. More specifically, in order to prevent ground scour, the dredged soil for laying the ground in the lake is lost by installing a rock stone-sized floor protective stone at the bottom of 2m and installing a filter seat on the inner protective surface of the building. The method of constructing filter seats for floor protection seats using the sandbags when constructing harbor shelter and embankment to prevent the loss of sand due to the flow rate by installing sandstone bags using cranes and poles when installing filter seats Relates to a device.

종래에는 항만의 호안 및 방조제를 설치하기 위해 바닥에 저면매트를 형성한 후 그 상면에 바윗돌크기의 사석을 투하시켜 바닥보호사석을 설치한 후 그 상면에 바다 측에는 사석을, 호안이 조성되는 매립지 측에는 토석을 이용하여 호안 또는 방조재를 축조하였다.Conventionally, a bottom mat is formed on the bottom to install a harbor revetment and a seawall, and then a rock-seat size stone is dropped on the upper surface thereof, and then a floor protective stone is installed on the top surface of the sea. Earthenware was used to build a shelter or tidal flat.

기존의 방조제 축조 시공방법을 살펴보면 바윗돌과 같이 직경이 큰 사석을 바다의 바닥에 투기하면서 그 상부에 직경이 작은 사석을 적층시키는 방법으로 방조제를 축조하고 내측에 형성되는 호안 또는 저수지측의 방조제 측에 차수시트를 형성하여 차수층을 형성하였다. 이와 같이 방조제를 축조시 저수측에 차수시트를 설치하여 저수측에서 바다측으로 사석 및 토사가 유실되는 것을 방지토록 하였다.Looking at the existing method of construction of the dike construction method, by dumping a large-diameter sandstone, such as rock, on the bottom of the sea, laminating the small-diameter sandstone on top of it, and constructing the dike on the side of the seashore or reservoir on the side of the revetment formed on the inside An order sheet was formed to form an order layer. In this way, when the seawall was built, a water sheet was installed on the water storage side to prevent the loss of sandstone and earth and sand from the water storage side to the sea side.

상기와 같이 방조제 또는 항만의 호안 축조시 해상 위로 노출되는 부분에는 차수시트를 설치하는데 아무런 문제점이 없으나, 수중의 바닥에 위치하는 바닥보호석은 바위와 같이 직경이 큰 돌을 사용함으로서 호안 및 저수측의 물이 바다측으로 이동이 되면서 사석과 사석 사이에는 큰홀이 형성되어 벤츄리와 같은 작용을 함으로 유속이 빠르게 진행되는 문제점이 있다. 이 경우 유속을 차단하지 않으면 방조제 내측에 조성되는 호안을 매립시 투기되는 준설토가 유실될 뿐만 아니라 필터사석을 설치하기 위해 직경이 작은 사석을 투기할 경유 유실되는 양이 많아 골재의 낭비와 필터사석을 설치하는 공사기간이 길어져 공사비용이 향상되는 문제점과 축조된 방조제가 세굴되어 방조제가 유실되는 문제점이 있었다. As described above, there is no problem in installing the order sheet on the part exposed to the sea when constructing the shelter or harbor shore, but the floor protector located at the bottom of the water uses a large diameter stone, such as rock, As the water moves to the sea side, a large hole is formed between the sandstone and the sandstone, so that the flow rate is rapidly progressed by acting like a venturi. In this case, if the flow velocity is not blocked, the dredged soil that is dumped when the revetment is made inside the embankment is lost, and the amount of diesel oil that is dumped through the small-diameter sand to install the filter sand is largely lost. There was a problem in that the construction cost is increased due to the length of the installation period, and the loss of the repellent is produced by scrubbing the built repellent.

즉, 종래에는 저수측의 방조제 내면과 일치되는 저면의 바닥보호석 단부에 필터사석을 형성하기 위해 바지선에 Φ100㎜이하의 사석을 덤프트럭으로 적재하여 해상 위치까지 이동시킨 후 G.P.S에 의하여 지정된 위치에 굴삭기 등을 이용하여 필터사석을 설계규격 및 구배로 수중에 투하하는 방법으로 시공하여 왔으나, 사석 이 투하중에 유속에 의해 정 위치에 투하되지 못할 뿐만 아니라 유실되는 문제점이 있었다. That is, in the prior art, in order to form a filter seat at the bottom protective stone end of the bottom surface coinciding with the inner surface of the water repellent on the water storage side, a dump truck of Φ100 mm or less is loaded on a barge and moved to the sea position, and then the excavator is positioned at the designated position by GPS. It has been constructed by dropping the filter seats in the water by design specifications and gradients, etc., but there was a problem that the seats could not be dropped in place due to the flow rate and were lost.

또한 통상적으로 축조되는 방조제의 구조 살펴보면 해면간척지에서는 바다로부터 농지를 보호하기 위하여 방조제를 쌓는데, 간척 전 공사비의 50~70 %를 차지하며 간척지의 생명선이 된다. 축제선(築堤線)은 지반의 고저 및 양부(良否), 조위(潮位), 풍향, 인접지의 배수계통 등을 고려하여 단위 면적당의 제방연장이 최소화 되도록 선정한다. In addition, if you look at the structure of the commonly built dike, in the reclaimed land reclaimed in order to protect the farmland from the sea, it takes 50 ~ 70% of the construction cost before reclaimed land becomes the lifeline of the reclaimed land. Festive ships are selected to minimize the dike extension per unit area in consideration of the elevation of the ground and the level, the tide, the wind direction, and the drainage system of adjacent areas.

방조제의 구조는 지반의 상태, 간척규모, 바람, 조류, 축제재료, 시공법 등에 따라 다르나, 통상적으로 실시되는 방조제의 형태는 다음과 같다. The structure of the seawall depends on the condition of the ground, reclaimed scale, wind, algae, festival materials, construction methods, etc., but the types of seawalls that are commonly implemented are as follows.

① 성토(盛土)를 주제체(主堤體)로 하고 앞면을 급경사로 형성하되 이를 석축(石築)으로 보호한다. ① The land is the main body, and the front surface is formed with a steep slope, and it is protected by a stone shaft.

② 성토를 주제체로 하고 앞면을 완만한 경사면으로 하고 장석 등으로 보호한다. ② The main body is filled with soil, and the front side is made with a gentle slope and protected with feldspar.

③ 급경사의 돌쌓기를 주제체로 하고 누수 방지를 위해 배면(背面)에 성토하는 것이 기본적이다. ③ It is basic to build steep slopes and cover the back to prevent leakage.

또한, 제방의 높이는 그믐의 평균 조위보다 4~5 m 높게 하고, 정폭(頂幅)은 최소 1.8 m, 보통은 3~4 m, 최대 6 m로 한다. 제방의 안전성은 기초지반의 지지력의 크기에 따라 좌우되므로 조사하여 그 시공법을 결정하는 것이 기존의 방조제 축조방법으로서 주변의 바위 돌로 기초한 후 흙이나 자갈등의 골재를 투기하여 성토하였으나 이때 많은 양의 흙과 골재가 유실되는 문제점이 있었다. In addition, the height of the levee is 4-5 m higher than the average tide of the group, and the width is at least 1.8 m, usually 3-4 m, and at most 6 m. Since the safety of the dike depends on the size of the bearing capacity of the foundation, the construction method is investigated and the construction method is the existing method of constructing the dike. The foundation is based on the surrounding rock stones and dumped with aggregate such as soil or gravel. There was a problem with the loss of aggregate.

본 발명은 이와 같은 문제점을 감안한 것으로서, 방조제 축조시 저수측의 바닥보호사석 일측에 크레인과 들대를 이용하여 다수의 사석백을 설치하여 필터사석을 형성함으로서, 저수측의 부지 매립을 위한 준설토 투기시 자갈과 토사가 유속에의해 유실되는 것을 방비하는 목적과, 또 다른 목적으로는 사석백을 형성하여 크레인과 들대를 이용하여 필터사석을 형성함으로서 작업이 간단 용이 함과 동시에 공기를 단축할 수 있도록 함을 목적으로 한 것이다.The present invention has been made in view of the above problems, by constructing a filter seat by installing a number of sandbag bags using a crane and a pole on one side of the bottom protection seat on the water storage side when constructing the embankment, when dumping dredged soil for landfill on the water storage side The purpose is to prevent the loss of gravel and soil due to the flow rate, and another purpose is to form a sandstone bag to form a filter sandstone using cranes and poles to simplify the work and shorten the air. It is for the purpose.

이와 같은 목적을 갖는 본 발명은 사석을 담은 사석백을 형성하고, 사석백을 들어 옮길 수 있도록 샤클과 스틸 후크를 갖는 들대를 형성하여 다수의 사석백을 들대의 스틸후크에 걸어 크레인으로 필터사석을 설치할 수 있도록 한 것이다.The present invention having such a purpose forms a stone bag containing a stone, and formed a pole having a shackle and a steel hook to carry the stone bag to hang a large number of stone bags on the steel hook of the pole to filter the filter seat with a crane It is intended to be installed.

상기와 같이 설치되는 필터사석은 유속에 의한 사석의 유실 없이 설계도에 규정된 위치에 정확하게 설치하는 동시에 필터사석의 공사기간을 단축할 수 있도록 한 항만 호안 및 방조제 축조시 사석백을 이용한 바닥 보호사석의 필터 사석 시공방법 및 장치를 제공할 수 있도록 한 것이다. The filter seats installed as above are installed at the location specified in the design without loss of the seats due to the flow rate, and at the same time, the construction period of the filter seats can be shortened. It is to provide a method and apparatus for the construction of filter seats.

이하 본 발명의 실시 예를 상세히 설명하면 다음과 같다. Hereinafter, an embodiment of the present invention will be described in detail.

항만 호안 및 방조제를 축조할 위치에 원지반을 형성하기 위해 통상의 방법으로 저면 매트를 설치하는 단계와;Installing a bottom mat in a conventional manner to form a base at a position to build a harbor shelter and a seawall;

원지반의 저면매트에 바윗돌과 같이 직경이 큰 바닥보호사석을 2m두께로 설치하는 단계와; Installing a floor protective stone having a large diameter such as rock stone on the bottom mat of the base plate to a thickness of 2 m;

바닥보호사석 상부에 제체사석을 적층하고 바다측에는 피복석을 형성하고 저수측에는 차수시트를 설치하여 차수층을 형성하는 방조제 축조 단계에 있어서,In the step of building a shelter for laminating the carcass seat on top of the floor protective seat, forming the seating stone on the sea side, and the order sheet is installed on the water storage side,

저수측 방조제 하부면의 바닥보호사석 일측에 크레인과 들대를 이용하여 1차 사석백을 설치하는 단계와;Installing a primary sandstone bag by using a crane and a pole on one side of the bottom protective stone of the bottom surface of the water reservoir;

1차 사석백에 대응되도록 잠수부를 이용하여 부직시트가 펼쳐지도록 설치하는 단계와;Installing the nonwoven sheet to expand by using a diver so as to correspond to the first four stone bags;

펼쳐진 부직시트 일면에 크레인과 들대를 이용하여 2차 사석백을 적층하고 잠수부를 이용하여 설치된 부직시트가 2차 사석백이 씌워져 피복되도록 필터사석을 설치하는 단계와;Stacking secondary sandbags using cranes and poles on one side of the unwoven sheet and installing filter seats such that the nonwoven sheet installed by using a diver is covered with secondary sandstone bags;

부직시트가 씌워진 필터사석 일측에 대응되도록 소정의 거리로 바다보호석을 설치한 후 방조제 상부면을 평탄하게 고른 다음 포장하는 시공단계로 이루어진다. After installing the sea protection stone at a predetermined distance so as to correspond to one side of the filter seat covered with the non-woven sheet is made of a construction step to evenly flatten the top surface of the seawall.

상기 부직시트는 2장으로 이루어져 한장은 1차 사석백에 대응시키고 다른 한장은 2차 사석백 외면에 대응시켜 2차 사석백이 피복되도록 필터 사석을 형성하는 단계로 이루어진다. The non-woven sheet is composed of two sheets, one sheet corresponds to the first four stone bags, and the other sheet corresponds to the secondary stone bag outer surface is formed by the step of forming a filter sand stone so that the secondary stone bag is coated.

상기 사석백을 설치하기 위한 필터사석 시공장치를 설명하면 다음과 같다. Referring to the filter seats factory plant for installing the sand bags are as follows.

소정의 길이를 갖고 외주면에 다수의 보강편(12)이 용착된 스틸파이프(11)와;A steel pipe 11 having a predetermined length and a plurality of reinforcing pieces 12 welded to the outer circumferential surface thereof;

크레인(20)의 와이어 로프(21)와 연결될 수 있도록 상부측의 보강편(12)에 다수 설치된 샤클(13)과;A plurality of shackles 13 installed on the reinforcing pieces 12 on the upper side so as to be connected to the wire rope 21 of the crane 20;

샤클(13)이 설치된 하단부의 수직선상의 보강편(12)에 설치되어 사석백(5)을 걸을 수 있도록 다수의 스틸 후크(14)가 형성된 들대(10)로 구성된다. The shackle 13 is installed on the reinforcing piece 12 on the vertical line of the lower end is provided is composed of a pole (10) formed with a plurality of steel hooks 14 to walk the sand bag (5).

이와 같이 구성된 본 발명의 필터사석 시공방법과 필터사석 시공장치를 상세히 설명하기로 한다.The filter seat construction method and the filter seat factory plant of the present invention configured as described above will be described in detail.

제 1 단계: 원지반을 위한 저면매트 설치Step 1: Install the Bottom Mat for the Base

항만 호안 및 방조제를 축조할 위치에 원지반(2)을 형성하기 위해 바닥에 통상의 방법으로 저면 매트를 설치한다.A bottom mat is installed on the bottom in a conventional manner in order to form the base 2 at a position to build a harbor shelter and a seawall.

상기 저면매트는 방조제(1) 또는 항만의 호안이 설치되는 위치의 수중 바닥에 설치되는 것으로 철망, 합성수지 망, 콘크리트 구조물 등 여러 가지 재질 중 하나를 선택하여 원지반이 형성될 수 있도록 저면매트를 통상적인 방법으로 설치한다.The bottom mat is installed on the bottom of the water at the position where the seawall (1) or the harbor revetment is installed, and the bottom mat is generally selected so that the base can be formed by selecting one of various materials such as a wire mesh, a synthetic resin net, and a concrete structure. How to install

상기 저면매트는 방조제를 설치하는 지역의 환경과 지질구조에 따라서 설치유무가 달라질 수 있는 것으로 바닥의 지층구조가 단단한 암반지역의 경우에는 저면매트를 설치할 필요가 없으며 연약지반의 경우 설치되는데 통상적으로 콘크리트 말뚝을 타설하여 원지반(2)이 형성되도록 한다.The bottom mat may be installed or not according to the environment and geological structure of the area where the scavenger is installed. In the case of a rock area with a hard bottom structure, it is not necessary to install the bottom mat. Place the pile so that the base (2) is formed.

제 2 단계: 비닥보호사석 설치Step 2: install the protective paving stone

저면매트를 이용하여 원지반(2)을 형성한 후에는 원지반 상면에 바윗돌과 같이 직경이 큰 바닥보호사석(3)을 2m 높이로 설치한다.After the base 2 is formed by using the bottom mat, a bottom protective stone 3 having a large diameter, such as rock, is installed on the top of the base at a height of 2 m.

바닥보호 사석(3)은 통상적 2m 높이로 형성하고 폭은 방조제 설치 구조의 현 장여건에 따라서 설정되면 길이 방향의 양 측면은 소정의 경사면으로 이루어지도록 축조된다.If the floor protection stone 3 is usually formed 2m high and the width is set in accordance with the site conditions of the masonry installation structure, both sides in the longitudinal direction is constructed to be made of a predetermined inclined surface.

또한 바닥보호사석(3)은 바위돌과 같은 크기의 사석을 사용하여 수중에 투하시 유실되지 않는 크기를 사용한다. In addition, the floor protection stone (3) uses a size that is the same size as the rock stone to use the size that is not lost when dropped in water.

제 3 단계: 방조제 축조   Third Step: Constructing Embankment

상기 제 2 단계에서 바닥보호사석(3)이 완성되면 상부에 제체사석을 적층한다.When the bottom protective seat 3 is completed in the second step, stacking the dead body seat on the top.

이때 방조제의 제체는 제방형상 및 제체투수계수가 제체누수에 미치는 영향 등을 고려하여 설계되며 설계도에 지정한 규격의 사석을 사용하여 축조하게 된다.At this time, the body of the embankment is designed in consideration of the effect of the embankment shape and the body permeability coefficient on the body leakage, and is constructed using the sandstone of the specification specified in the design.

이렇게 제체사석으로 축조되는 방조제는 통상적으로 바다측에는 다단의 경사면이 형성되도록 하고 외면에는 소정의 크기를 갖는 사석으로 피복석을 형성하며, 저수측에는 직선 경사면을 이루되 내측 일정부위에 차수시트 또는 콘크리트로 이루어진 차수벽을 형성하고 그 외면을 사토등으로 축조하여 차수층을 형성한다. As such, the embankment is constructed by the body of the dead body to form a multi-sloped inclined surface on the sea side, and to form a coated stone with a stone stone having a predetermined size on the outer surface, a straight inclined surface on the water storage side made of order sheets or concrete The order wall is formed, and the outer surface is constructed with sand, etc. to form the order layer.

방조제 및 항만의 호안을 축조시 저수측에 차수층을 형성는 것은 방조제의 경우 저수측의 물이 바다측으로 이동되는 과정에서 방조제의 유실과 세굴현상이 발생되므로 이를 방지하게 되고 항만을 호안과 같이 매립지로 형성하기 위해 준설토를 투기시 토사가 유실되는 것을 방지할 수 있도록 한다. Forming a layer on the reservoir side when constructing the revetment and the revetment of the harbor prevents the loss and scour of the repellent in the process of moving water to the sea side in the case of the repellent and prevents it and forms the port as a landfill To prevent the loss of sediment when dumping dredged soil.

제 4 단계: 1차 사석백 설치Fourth Step: Install the Primary Stone Bag

상기 바닥보호사석(3)을 설치한 후 제 1 단계 내지 제 3 단계의 시공방법에 의하여 방조제(1)가 시공되는 동시에 방조제 또는 항만 호안의 저수측 바닥보호사 석(3) 일측에는 도1 내지 도2b와 같이 필터사석(4)을 설치하게 된다.After installing the bottom protective seat 3, the first aiding method is constructed by the construction method of the first step to the third step, and at the same time, the water-repellent side or the bottom side of the bottom protective seat 3 of the harbor shelter in the harbor, Fig. 1 to Fig. As shown in 2b, the filter seat 4 is installed.

상기 축조된 바닥보호사석(3)은 수중에 있는 상태이고 사석의 크기는 바위돌과 같이 직경이 큰 사석을 사용한 관계로 사석과 사석 사이에는 큰 구멍이 형성되어 홀을 이루게 된다. 이렇게 형성된 홀은 벤츄리관과 같은 작용을 하게 됨으로서 유속이 빠르게 이루어져 Φ100㎜이하의 사석은 투하되는 즉시 유실될 뿐만 아니라 필터사석(4)을 설치하고자 하는 위치에 설치되지 않게 된다.The built-up floor protector (3) is in the state of water and the size of the dead stone is a large hole is formed between the stone and the stone because the size of the stone used a large diameter stone, such as a rock stone to form a hole. The hole formed as described above acts like a venturi tube, so that the flow rate is fast, so that the sand of Φ100 mm or less is lost immediately after being dropped, and is not installed at the position where the filter seat 4 is to be installed.

따라서 본 발명에서는 Φ100㎜이하의 사석을 자루형태의 사석백(5)에 담아 필터사석(4)이 설치되는 위치에 설치하게 된다.Therefore, in the present invention, the stiffener of Φ100 mm or less is placed in the sack-shaped sandbag bag 5 and installed at the position where the filter seat 4 is installed.

이를 더욱 상세하게 설명하면,In more detail,

먼저 사석백(5)을 들어서 이동시킬 수 들대(10)를 형성하되, 들대(10)는 원형의 스틸 파이프(11)로 이루어지고 스틸 파이프(11)의 휨을 방지하기 위해 외주면에 등간격으로 8개의 보강편(12)을 길이 방향으로 용착하였다.First, to form a lifting pole (10) to be moved by lifting the sandbag bag (5), the pole 10 is made of a circular steel pipe (11) and 8 at equal intervals on the outer peripheral surface to prevent bending of the steel pipe (11) Two reinforcing pieces 12 were welded in the longitudinal direction.

상기 보강편(12)은 스틸파이프(11) 외주면에 중심축과 일직선이 되도록 용착되므로 스틸파이프(11) 외주면에 45도 각도로 8개가 설치된다. 상기 스틸파이프 외주면에 설치되는 보강편은 사석백을 이송시 휨이 발생하는 것을 방지토록 설치하는 것으로서 스틸파이프의 강도에 따라서 다소 차이는 있으나 필요에 따라서 4개 이상 설치할 수 있다.Since the reinforcing pieces 12 are welded so as to be in line with the central axis on the outer circumferential surface of the steel pipe 11, eight pieces are installed at a 45 degree angle on the outer circumferential surface of the steel pipe 11. The reinforcing pieces installed on the outer circumferential surface of the steel pipe are installed so as to prevent warpage from occurring during transfer of the sandstone bag, but may be slightly different depending on the strength of the steel pipe.

상기와 같이 스틸 파이프(11) 외주면에 다수의 스틸 보강편(12)을 설치한 후에는 상부 수직선상에 설치된 보강편(12)에 크레인(20)의 외아어 로프(21)와 연결될 수 있도록 샤클(13)을 설치하되 샤클(13)은 안전성을 위해 중앙부와 양측에 각각 형성하여 3개를 형성한다.(도5 및 도6참조) After installing a plurality of steel reinforcing pieces 12 on the outer circumferential surface of the steel pipe 11 as described above, the shackle to be connected to the outer wire rope 21 of the crane 20 to the reinforcing pieces 12 installed on the upper vertical line Install 13, but shackle 13 is formed on the center and both sides for safety to form three (see Figs. 5 and 6).

상기 샤클(13)의 개수는 반드시 3개로 한정하는 것은 아니나 양측 2곳에만 설치할 경우 사석백(5)의 무게가 중앙으로 집중되는 문제점이 있으며 3개 이상을 설치할 경우 안전성은 있으나 필요 이상 설치되므로, 들대(10)를 형성하는 스틸파이프(11)의 길이는 10m로 하고 그 중심부인 중앙과 양측 단부의 3곳에 샤클(13)을 설치하는 것이 바람직하다. The number of the shackles 13 is not necessarily limited to three, but when installed only on two sides, there is a problem that the weight of the four stone bags (5) is concentrated in the center. It is preferable that the length of the steel pipe 11 forming 10 is 10 m, and the shackle 13 is provided in three places of the center and both ends of the center.

상기와 같이 상부에 용착된 보강편(12)에 다수의 샤클(13)을 설치한 후에는 샤클이 설치된 보강편(12)과 수직선상에 위치하는 스틸파이프(11) 저면에 위치한 보강편(12)에 다수의 스틸후크(14)를 설치하여 사석백(5)을 걸을 수 있도록 한다.After the plurality of shackles 13 are installed on the reinforcing pieces 12 welded to the upper part as described above, the reinforcing pieces 12 located on the bottom surface of the steel pipe 11 positioned on the vertical line with the reinforcing pieces 12 provided with the shackles. ) A number of steel hooks (14) to be installed so that you can walk on the sand bag (5).

상기 저면에 위치하는 스틸 보강편에 설치치되는 스틸후크(14)는 스틸파이프(11)의 길이가 10m로 형성되므로 1m당 1개를 설치하는 방법으로 10개를 설치하게 된다.Since the steel hooks 14 installed on the steel reinforcing pieces positioned on the bottom face are formed with the length of the steel pipe 11 to 10 m, 10 steel rods are installed in a method of installing one per m.

상기 스틸후크(14)는 보강편(12)에 용착하는 방법으로 고정하거나 또는 리벳팅, 볼트 등으로 고정할 수 있다.The steel hook 14 may be fixed by welding to the reinforcing piece 12 or may be fixed by riveting or bolts.

또한 스틸후크의 고리형태는 사석백(5)을 걸었을 때 빠지지 않고 사석백(5)을 설치한 다음 스틸후크에서 사석백 끈을 이탈시키기 용이하도록 형성한다.In addition, the hook shape of the steel hook is formed so as not to fall off when the seat bag (5) is installed so that it is easy to detach the seat bag strap from the steel hook.

또한 본 발명의 다른 실시 예로서, 도 8과 같이 스틸파이프(11)는 상하부 외주면 수직선상의 상하부에 각각 한개의 보강편(12)을 설치하고 상부 보강편에는 와이어 로프를 연결하는 다수의 샤클(13)을 설치하고, 저면의 보강편(12에는 사석백(5)을 걸을 수 있도록 된 다수의 스틸후크(14)를 형성할 수 있다.In addition, as another embodiment of the present invention, as shown in Figure 8, the steel pipe 11 is provided with a plurality of shackles 13 to install one reinforcing piece 12 in the upper and lower portions on the vertical line of the upper and lower outer peripheral surface, respectively, and to connect the wire rope to the upper reinforcing piece ), And a plurality of steel hooks 14 can be formed on the reinforcing piece 12 of the bottom surface so that the sandbag bag 5 can be walked.

상기 스틸파이프에 보강편을 설치하지 않고 직접 샤클과 스틸후크를 설치할 경우에는 강도가 강한 스틸파이프를 사용하여 사석백을 걸어 이동시 휨이 발생하지 않는다는 조건을 전제로 하는 것이다. When installing the shackle and steel hook directly without installing the reinforcing piece in the steel pipe is to assume the condition that the bending does not occur when moving the sand bag back using a strong steel pipe.

상기와 같이 사석백을 설치할 수 있도록 들대가 완성되면 바지선(30)에 크레인(20)과 사석이 담겨진 사석백(5), 들대(10)를 적재한 후 바닥보호사석(3),필터사석(4)을 설치할 위치로 이동한다.When the pole is completed to install the stone bag as described above, after loading the stone bag (5), the pole (10) loaded with the crane (20) and the dead stone on the barge (30), the bottom protective stone (3), filter seat ( 4) Move to the location to install.

물론 필터사석(4)치된 위치와 바지선(30)되는 위치는 GPS를 이용하여 위치를 선정할 수 있으며, 필요에 따라서 측량으로 위치를 지정하여 작업을 할 수 있다.Of course, the filter seat (4) position and the position of the barge 30 can be selected by using a GPS, the position can be specified by surveying as necessary to work.

상기와 같이 사석백(5)을 설치할 장치가 준비되면 도4와 같이 크레인(20)의 와이어 로프(21)에 들대(10) 상부 보강편(12)에 설치된 샤클(13)을 연결한 후 저부에 위치한 스틸 후크(14)에 사석백(5)을 걸어 크레인(20)으로 들어올려 필터사석(4) 위치에 10개의 사석백(5)을 설치하게 된다.When the device for installing the sandbag bag 5 is prepared as described above, the bottom portion is connected to the wire rope 21 of the crane 20 and the shackle 13 installed at the upper reinforcing piece 12 of the crane 20 as shown in FIG. Hanging the stone bag (5) on the steel hook 14 located in the crane 20 is lifted up to install the 10 stone bags (5) in the filter seat 4 position.

이때 필터사석 위치에 사석백(5)에 정확하게 위치하도록 잠수부(40)가 잠수하여 크레인 운전자에게 신호를 보내게 된다.At this time, the diver part 40 is submerged to send a signal to the crane driver so that the filter seat position on the seat bag (5) accurately.

상기 사석백은 도7과 같이 사방 100㎝의 넓이에 높이 67㎝의 크기로 이루어지고 상단부의 끈은 PP 로프로 이루어진 것으로 유속에 유실되지 않도록 한 것이다.The sandstone bag is made of a size of 67cm in height in an area of 100cm in all directions as shown in FIG. 7, and the upper end of the strap is made of PP rope so as not to be lost in the flow rate.

상기 사석백(5)의 형상은 원형, 사각, 타원, 삼각, 다각등 다양한 형태로 형성할 수 있다. The shape of the dead stone bag 5 may be formed in various forms such as a circle, a square, an ellipse, a triangle, and a polygon.

따라서 필터사석을 구성하는 사석백을 크레인을 이용하여 10개를 바닥부에 위치시킨 다음 그 상부에 경사면을 따라 10개의 사석백(5)을 적층 방법으로 1차 사석백이 설치된다.Therefore, the seats constituting the filter seats are placed in the bottom 10 using a crane, and then the first seating bag is installed by stacking 10 seats 5 along the inclined surface on the top thereof.

이때 방조제 또는 항만 호안의 길이에 따라서 연장되도록 1차 사석백을 설치한다. At this time, the primary sandstone bag is installed to extend along the length of the embankment or harbor shore.

제 5 단계: 부직시트 설치Step 5: install the nonwoven sheet

상기 제 4단 계에서 1차 사석백(5)을 설치한 후에는 사석백(5)의 일면, 즉, 저수측의 사석백(5) 일면에 부직시트(6)가 펼쳐지도록 설치한다. 이때 부직시트(6)는 하단부가 바닥에 깔리도록한 후 1차 설치된 사석백의 일면과 대응되도록 펼친 후 타단은 여유있게 남겨둔 상태로 설치한다.After the first stepping stone bag 5 is installed in the fourth step, the nonwoven sheet 6 is installed so as to be spread on one surface of the stone bag 5, that is, on one surface of the stone bag 5 on the reservoir side. At this time, the non-woven sheet (6) is to be laid on the bottom, and then unfolded to correspond to one side of the first four stone bags installed, and then install the other end with a margin.

상기 부직시트(6)는 바다의 수중에서 이루어지는 관계로 잠수부(40)가 설치한다. 본 발명에서 1차 사석백을 설치한 후에 부직시트(6)를 설치하는 이유는 바닥보호사석(3)에 직접 접촉되도록 부직시트(6)를 설치하게 되면 유속에 의해 바닥보호사석(3)과 대응된 부직 시트(6)가 찢어지는 관계로 1차 사석백을 설치한 후 그 일면에 부직시트가 펼쳐지도록 설치하는 것이 바람직하다.The nonwoven sheet 6 is installed by the diver 40 because it is made in the water of the sea. The reason for installing the nonwoven sheet 6 after installing the primary sandbag bag in the present invention is that when the nonwoven sheet 6 is installed to be in direct contact with the bottom protective seat 3, the bottom protective seat 3 by the flow rate. Since the corresponding nonwoven sheet 6 is torn, it is preferable to install the primary sandstone bag so that the nonwoven sheet is spread on one surface thereof.

제 6 단계: 2차 사석백 설치치Step 6: Install the Second Stone Bag

제 4 단계와 제 5 단계의 작업공정을 실시하여 1차 사석백과 부직시트를 설치한 후에 2차 사석백을 제 4 단계와 같은 방법으로 설치하되 2차 설치되는 사석백은 부직시트 일측 단부가 바닥에 깔린 상태로 그 위에 설치된다. 2차 사석백 역시 1차 사석백과 대응되도록 비닥에 1층을 설치한 후 그 상부에 경사면을 따라서 적층되도록 2차 사석백을 도2a 및 2b와 같이 설치한다. 상기와 같이 2차 사석백(5)을 1 차 사석백 높이까지 설치한 다음 설치된 부직시트(5)의 상부 여유단을 2차 사석백이 씌워지도록 하여 상단부가 바닥에 깔린 하단부와 대응되도록 포갠 다음 그 상면에 바닥보호사석(3)을 대응시키면 필터사석(4)이 완성된다.After the 4th and 5th step of the work process, the first bag and the nonwoven sheet are installed, and then the second bag is installed in the same way as the fourth step. Installed on it. Secondary stone bag is also installed on the base to correspond to the primary stone bag, and then install the secondary stone bag to be stacked along the inclined surface on the top as shown in Figures 2a and 2b. As described above, after installing the secondary sack bag (5) to the height of the primary sack bag, the upper spare end of the installed nonwoven sheet (5) is covered so that the secondary sack bag is covered so that the upper part corresponds to the lower part laid on the floor. When the bottom protective seat 3 is made to correspond to the upper surface, the filter seat 4 is completed.

제 7 단계: 포장 마무리Step 7: finish packing

상기와 같이 저수측의 바닥보호석에 필터사석을 설치한 후에는 방조제 또는 항만 호안의 상부면을 평탄작업 후 포장한다.After the filter seat is installed on the bottom protective seat on the water storage side as described above, the top surface of the embankment or harbor shelter is packed after flattening.

상기와 같이 방조제의 포장공사가 마무리되면 저수측에 부지를 조성하기 위해 준설토를 투기하여 매립한다.As described above, when the paving work of the seawall is finished, the dredged soil is dumped in order to form a site on the reservoir side.

이때 저수측이 매립되면서 바닥보호사석을 통하여 물은 배수되고 토사와 잔골재는 필터사석에 의해 필터링 되므로 토사의 유실을 방지할 수 있게 된다.At this time, as the reservoir side is buried, the water is drained through the floor protection stone, and the soil and the fine aggregate are filtered by the filter stone, thereby preventing the loss of the soil.

또한, 본 발명의 다른 실시 예로서, 필터사석은 방조제 축조시 바닥보호사석에 설치할 수도 있지만 필요에 따라서 방조제 축조시 사석으로 축조하고 저수측의 방조제 면에 1차 사석백을 설치한 후 그 외면에 부직시트를 설치한 후 다시 2차 사석백을 설치한 후 2차 사석백 외면에 토석층을 형성하는 방법으로 방조제를 축조할 수 있다.In addition, as another embodiment of the present invention, the filter seat may be installed on the floor protection stone when the embankment is constructed, but if necessary, the filter seat is constructed as a sandstone during the construction of the embankment, and the primary sandstone bag is installed on the surface of the embankment on the reservoir side. After the nonwoven sheet is installed, the secondary sandstone bag can be installed again, and a silicide can be constructed by forming a soil layer on the outer surface of the secondary sandstone bag.

이와 같이 이루어지는 본 발명은 방조제 축조시 제체면에 필터사석 설치하는 방식으로 방조제를 축조할 경우 별도의 차수벽을 설치하지 않고 방조제 또는 항만 호안 시공을 할 수 있게 된다.The present invention made as described above can be installed in the embankment or harbor revetment without installing a separate order wall when constructing the embankment by installing a filter seat on the body surface during the construction of the embankment.

이하 첨부도면을 간단히 살펴보기로 한다.Hereinafter, the accompanying drawings will be described briefly.

도 1은 본 발명의 필터시공방법으로 시공된 방조제 전체구성도로서, 하단에 는 원지반(2)을 설치하기 위해 저면매트를 형성하고 원지반(2) 상면에는 바닥보호사석(3)을 설치하고 그 상면에는 제체사석을 적층하여 방조제(1)를 설치한다. 상기 바닥보호사석(3)을 설치하고 그 상부에 사석의 규격을 달리하여 방조제를 축조하는 것은 통상의 방법으로 축조된 것이다.1 is an overall configuration diagram of the fabric of the fabric of the invention according to the filter construction method of the present invention, the bottom mat to form a bottom mat to install the base plate (2) and the bottom protective seat (3) is installed on the top surface of the base plate (2) On the upper surface of the body masonry stacking is provided with a backing agent (1). Installing the floor protection seat 3 and the construction of the embankment by varying the specification of the seat on the top is constructed in the usual way.

상기와 같이 축조된 방조제의 저부에 설치된 바닥보호사석(3) 일측에는 필터사석(4)을 설치하여 저수측을 매립하기 위하여 준설토를 투기시 토사가 유실되지 않도록 한 것이다.One side of the bottom protective stone (3) installed on the bottom of the masonry to be built as described above is to install a filter seat (4) so that the soil is not lost when dumping the dredged soil to bury the reservoir side.

도 2a는 본 발명의 필터사석 시공방법에 의해 실시된 사석백과 부직포 시트의 설치구성도로서, 방조제(1) 하부의 저수측 바닥보호사석(3) 일측에 형성되는 필터사석(4)을 1차 사석백으로 적층하고 그 외면에 부직시트(6)를 설치한 후 2차 사석백을 적층시켜 부직시트로 포삽시켜 필터사석(4)을 완성한 것이다.Figure 2a is a block diagram of the installation of the sand bag and the non-woven fabric sheet carried out by the filter seat construction method of the present invention, the filter seat 4 is formed on one side of the bottom protective stone (3) of the lower side of the seawall (1) After laminating with a sandstone bag and installing the nonwoven sheet 6 on the outer surface thereof, the secondary sandstone bag is laminated and inserted into the nonwoven sheet to complete the filter seat 4.

도 2b는 도2a의 다른 실시 예로서, 2장의 부직시트로 사석백을 피복한 상태를 나타낸 설치구성도로서, 도2a에서는 한장의 부직시트를 사용하여 2차 사석백을 씌워 피복한 것인데 반하여 도2b에서는 2장의 부직시트를 이용하되 한장은 1차 사석백이 정층된 외면에 펼쳐 대응시킨 다음 2차 사석백을 적층시킨 후 그 외면을 단른 한장의 부직시트를 이용하여 2차 사석백을 덮어 필터사석(4)을 형성한 것이다. Figure 2b is an installation configuration showing a state in which the non-seat bag is covered with two sheets of non-woven sheet as another embodiment of Figure 2a, in Figure 2a is a second non-seat bag is covered using a non-woven sheet in Fig. 2a In 2b, two nonwoven sheets are used, but one sheet is applied to the outer surface where the primary bag is laid out, and then the second bag is laminated. (4) was formed.

도 3은 본 발명의 필터사석 시공을 위해 크레인과 들대를 이용한 사석백 설치 예시도로서, 필터사석(4)을 시공하기 위해 바지선(30)에 크레인(20)과 사석백(5)을 적재하여 방조제의 필터사석(4)을 시공하는 위치에 정박한 후 크레인 와이어 로프(21)를 들대(10)의 상부에 형성된 3개의 샤클(13)과 연결시킨 후 들대의 저 부에 구비된 10개의 스틸후크(14)에는 준비된 사석백(5)을 매달아 크레인(20)으로 들어서 필터사석(4)이 설치되는 위치에 정확하게 적층할 수 있게 된다.Figure 3 is an exemplary view showing the installation of a sandbag bag using a crane and a pole for the construction of the filter seat of the present invention, by loading the crane 20 and the seat bag (5) on the barge 30 to construct the filter seat 4 After anchoring the filter seat 4 of the seawall, the crane wire rope 21 is connected with the three shackles 13 formed on the top of the pole 10 and ten steels provided at the bottom of the pole. The hook 14 is suspended from the prepared stone bag 5 to the crane 20 so that the filter seat 4 can be accurately stacked at the position where it is installed.

이와 같이 크레인을 이용하여 들대로 사석백(5)을 들어 적층함으로서 유속에의해 사석이 유실되는 것을 방지하고 설계위치에 정확하게 적층할 수 있도록 함과 동시에 공기를 단축할 수 있도록 한 것이다.Thus, by stacking the sandstone bag (5) by using the crane as described above to prevent the loss of the sandstone by the flow rate and to be laminated at the design position and to shorten the air at the same time.

도 4는 본 발명의 사석백을 설치하기 위한 들대 구성도로서, 들대의 크기는 제작에 따라서 달리할 수 있으나 본 발명에서는 들대를 구성하는 스틸파이프의 길이를 10m로 형성하고 그 외주면에는 다수의 보강편을 용착한 후 상부의 보강편에 양측에 각 1개 중앙부에 1개의 샤클(13)을 형성하여 크레인의 와이어 로프와 연결되도록 함으로서 들대를 이용하여 크레인으로 사석백(5)을 들을 때 양단부와 중앙부를 와이어 로프로 지지함으로 들대 저부에 매달린 사석백의 하중에 대한 반력을 골고루 분산시켜 들게 됨으로 들대(10)에 가해지는 편심력에 의한 휨을 방지할 수 있도록 한다. Figure 4 is a configuration of the pole for installing the sandstone bag of the present invention, the size of the pole can be different depending on the production in the present invention, the length of the steel pipe constituting the pole in the form of 10m and a number of reinforcement on the outer peripheral surface After welding the pieces, one shackle (13) is formed at each center on one side of the reinforcing piece on the upper side so as to be connected with the wire rope of the crane. By supporting the center portion with a wire rope, the reaction force against the load of the sandstone bag suspended on the bottom of the pole is evenly distributed so as to prevent bending due to the eccentric force applied to the pole 10.

도 5는 본 발명의 들대를 나타낸 종단면 구성도로서, 들대(10)를 구성하는 스틸파이프(11) 외주면에 다수의 보강편(12)을 용착함으로서 사석백(5)을 들을때 하중에 의해 휨이 발생되는 것을 방지하도록 설치된 것이다.FIG. 5 is a longitudinal cross-sectional view illustrating the rod of the present invention, wherein a plurality of reinforcing pieces 12 are welded to the outer circumferential surface of the steel pipe 11 constituting the rod 10 so as to bend under load when the bag 5 is lifted. It is installed to prevent this from happening.

또한 본 발명에서는 스틸파이프 외주면에 8개의 보강편을 용착하였으나, 스틸파이프의 직경과 강도에 따라서 보강편의 개수를 적게 용착할 수있다. In the present invention, eight reinforcing pieces are welded to the outer circumferential surface of the steel pipe, but the number of reinforcing pieces can be welded less depending on the diameter and strength of the steel pipe.

도 6은 본 발명의 사석백 외형도로서, 사방 1m의 폭을 갖는 자루형태의 사석백으로 형성된 것이다. 본 발명의 사석백은 유속이 빠른 곳에 투기하더라도 유실되 지 않고 정 위치를 유지하며 사석의 낭비를 방지할 수 있다.Figure 6 is an appearance of a sackcloth bag of the present invention, it is formed of a sackcloth bag having a width of 1m square. Even if the dumping bag of the present invention is dumped at a high flow rate is not lost and maintains the position and can prevent the waste of the sand.

도 7은 본 발명의 사석백을 이용한 방조제 및 필터사석 단계별 시공 공정도로서, 상기의 작업별 단계에서 설명한 바와 같이 방조제를 축조하기 위해 원지반을 형성하기 위한 저면매트 설치 → 바닥보호사석 설치 → 방조제 또는 항만 호안 축조 → 저수측의 바닥보호사석에 일차 사석백 적층 → 1차 사석백에 부직시트설치 →1차 사석백에 대응되도록 부직시트 설치 →부직시트 상면에 2차 사석백 적층하고 일측의 부직시트로 2차 사석백을 씌워 피복하는 순서로 반조제와 필터사석이 완성된다. 7 is a construction process step-by-step construction process and filter seats using the sandstone bag of the present invention, as described in the steps for each operation, the bottom mat to form a base for the construction of the rudder → installation of a floor protective stone → faucet or harbor Hoan construction → Laminated primary sand bags on the bottom side of the reservoir → Nonwoven sheet installed on the primary sand bag → Nonwoven sheet installed to correspond to the primary sand bag → Laminated secondary sand bags on the upper surface of the nonwoven sheet Semi-preparative and filter seats are completed in order to cover the secondary bag.

도 8은 본 발명의 다른 실시 예의 들대를 나타낸 구성도로서, 들대를 구성하는 스틸파이프 외주면 상하부의 수직선상에 보강편을 각각 용착하고 상단의 보강편에는 3개의 샤클을 형성하고 스틸파이프 저면에 형성된 보강편에는 다수의 스틸후크를 설치하여 사석백을 이송 설치할 수 있도록 한 것이다.FIG. 8 is a configuration diagram illustrating a pillar of another embodiment of the present invention, in which a reinforcing piece is welded on vertical lines of upper and lower portions of the outer circumferential surface of the steel pipe, and three shackles are formed on the upper reinforcing piece and formed on the bottom of the steel pipe. The reinforcing piece is to install a number of steel hooks to transport the sand bag back.

상기와 같이 이루어진 본 발명은 방조제 또는 항만 호안을 축조시 사석백을 들대를 이용하여 크레인으로 설치함에 따라서 필터사석 설치시 매트로 이용되는 부지시트의 훼손을 방지하는 효과를 가지며, 필터사석을 설치시 유속에 의한 사석의 유실을 방지하고 정확한 위치에 간단 용이하게 설치할 수 있게 된 효과를 가지며, 사석백을 이용하여 필터사석을 설치함으로서 작업의 공기를 단축하는 효과를 가지며, 사석백으로 필터사석을 형성함으로 설치후 유실될 염려가 없으며 필터링 효과 를 향상시킬 수 있게 된 장점이 있는 것이다.The present invention made as described above has the effect of preventing damage to the site sheet used as a mat when installing the filter seat according to the installation of the sand stone bag using the crane pole when constructing the embankment or harbor revetment, when installing the filter seat It has the effect of preventing the loss of dead stone due to the flow rate and simply and easily installing it at the correct position.It has the effect of shortening the air of work by installing the filter seat using the sand bag. Therefore, there is no risk of loss after installation, which has the advantage of improving the filtering effect.

Claims (5)

항만 호안 및 방조제를 축조할 위치에 원지반을 형성하기 위해 통상의 방법으로 저면 매트를 설치하는 단계와;Installing a bottom mat in a conventional manner to form a base at a position to build a harbor shelter and a seawall; 원지반의 저면매트에 바위돌과 같이 직경이 큰 바닥보호사석을 2m두께로 설치하는 단계와; Installing a floor protective stone having a large diameter such as a rock stone on the bottom mat of the base plate to a thickness of 2 m; 바닥보호사석 상부에 제체사석을 적층하고 바다측에는 피복석을 형성하고 저수측에는 차수시트를 설치하여 차수층을 형성하는 방조제 축조 단계에 있어서,In the step of building a shelter for laminating the carcass seat on top of the floor protective seat, forming the seating stone on the sea side, and the order sheet is installed on the water storage side, 저수측 방조제 하부면의 바닥보호사석 일측에 크레인과 들대를 이용하여 1차 사석백을 설치하는 단계와;Installing a primary sandstone bag by using a crane and a pole on one side of the bottom protective stone of the bottom surface of the water reservoir; 1차 사석백에 대응되도록 잠수부를 이용하여 부직시트가 펼쳐지도록 설치하는 단계와;Installing the nonwoven sheet to expand by using a diver so as to correspond to the first four stone bags; 펼쳐진 부직시트 일면에 크레인과 들대를 이용하여 2차 사석백을 적층하고 잠수부를 이용하여 설치된 부직시트가 2차 사석백이 씌워져 피복되도록 필터사석을 설치하는 단계로 이루어진 것을 특징으로 하는 항만 호안 및 방조제 축조시 사석백을 이용한 바닥 보호사석의 필터사석 시공방법.Laying the secondary sand bags using the crane and the stretcher on one side of the unwoven sheet and installing the filter seat so that the nonwoven sheet installed by using the diver is covered with the second sand bags. Construction method of filter seat of floor protector using sand bag. 제1항에 있어서,The method of claim 1, 부직시트는 2장으로 이루어져 한장은 1차 사석백에 대응시키고 다른 한장은 2차 사석백 외면에 대응시켜 2차 사석백이 피복되도록 필터사석을 형성하는 단계로 이루어진 것을 특징으로 하는 항만 호안 및 방조제 축조시 사석백을 이용한 바닥 보호사석의 필터사석 시공방법.The nonwoven sheet consists of two pieces, one of which corresponds to the primary sandstone bag and the other to correspond to the outer surface of the secondary sandstone bag, forming a filter seat so that the secondary sandstone bag is covered. Construction method of filter seat of floor protector using sand bag. 삭제delete 삭제delete 삭제delete
KR1020060078892A 2006-08-21 2006-08-21 A method and device of filter riprap construction for bottom protection using riprap bag in harbor revetment construction KR100704172B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060078892A KR100704172B1 (en) 2006-08-21 2006-08-21 A method and device of filter riprap construction for bottom protection using riprap bag in harbor revetment construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060078892A KR100704172B1 (en) 2006-08-21 2006-08-21 A method and device of filter riprap construction for bottom protection using riprap bag in harbor revetment construction

Publications (1)

Publication Number Publication Date
KR100704172B1 true KR100704172B1 (en) 2007-04-09

Family

ID=38160977

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060078892A KR100704172B1 (en) 2006-08-21 2006-08-21 A method and device of filter riprap construction for bottom protection using riprap bag in harbor revetment construction

Country Status (1)

Country Link
KR (1) KR100704172B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0860637A (en) * 1994-08-24 1996-03-05 Nippon Kaijo Koji Kk Protection method of coastal slope in artificial seaside/ and protection mat for the slope
KR200387407Y1 (en) 2005-03-28 2005-06-17 주식회사 벽진인터내셔날 Marine civil granular structure reinforced with floating geo-mat contained granulars on bottom and slopes of structure and floating geo-mat

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0860637A (en) * 1994-08-24 1996-03-05 Nippon Kaijo Koji Kk Protection method of coastal slope in artificial seaside/ and protection mat for the slope
KR200387407Y1 (en) 2005-03-28 2005-06-17 주식회사 벽진인터내셔날 Marine civil granular structure reinforced with floating geo-mat contained granulars on bottom and slopes of structure and floating geo-mat

Similar Documents

Publication Publication Date Title
CN103233444B (en) Underwater dumped rockfill bedding and side slope Anti-scouring structure and construction method thereof
KR100993335B1 (en) Revetment protection works using gabion and construction method thereof
CN108999142A (en) The construction method of dome rectangular light-duty caisson and pile foundation combined type deep water breakwater
JP5210197B2 (en) Water control system and construction method
AU2019203298A1 (en) A method and system for underwater scour prevention
KR200387407Y1 (en) Marine civil granular structure reinforced with floating geo-mat contained granulars on bottom and slopes of structure and floating geo-mat
KR100704460B1 (en) Device for harbor revetment construction
CN111778922A (en) Construction method of river basin flood control dam
KR20020024136A (en) Erosion control structures of coastal area and the construction methodology of erosion control structure and embankment by this structure
KR20110046209A (en) Method Of Construction For Scour Prevension And Reinforcement Of Bridge Pier, And Structure Of The Same
JP4131447B2 (en) Wall structure and method for forming the same
JPH0540103Y2 (en)
KR100704172B1 (en) A method and device of filter riprap construction for bottom protection using riprap bag in harbor revetment construction
JP2019073964A (en) Prevention structure for outflow of shore protecting reclamation sediment
KR102231145B1 (en) Crane and Structure Construction Method Using the Crane
CN208965494U (en) The rectangular light-duty caisson of dome and pile foundation combined type breakwater
Heibaum Scour countermeasures using geosynthetics and partially grouted riprap
CN208857762U (en) Semi-circular caisson and pile foundation combined type breakwater
Pilarczyk Geotextiles and geosystems in dike and coastal design
JP3425477B2 (en) Sand mound foundation construction method by mat covering
CN109024470A (en) The rectangular light-duty caisson of dome and pile foundation combined type breakwater
KR101404471B1 (en) Embankment constuction by buoyancy and water pressure on the part prevention of injury and in the force functioning bottom, a mat and execution method for filter
JP4482859B2 (en) Stabilization method behind the revetment
CN218375721U (en) Building retaining wall
Heibaum Cost effective construction methods using geosynthetic containers

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
A302 Request for accelerated examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130215

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140224

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20141222

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160322

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170208

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20190121

Year of fee payment: 13