KR100681882B1 - The precast kicker block and the method of construction using the same - Google Patents

The precast kicker block and the method of construction using the same Download PDF

Info

Publication number
KR100681882B1
KR100681882B1 KR1020060008656A KR20060008656A KR100681882B1 KR 100681882 B1 KR100681882 B1 KR 100681882B1 KR 1020060008656 A KR1020060008656 A KR 1020060008656A KR 20060008656 A KR20060008656 A KR 20060008656A KR 100681882 B1 KR100681882 B1 KR 100681882B1
Authority
KR
South Korea
Prior art keywords
kicker
wall
slab
reinforcement
formwork
Prior art date
Application number
KR1020060008656A
Other languages
Korean (ko)
Inventor
김재연
김기운
Original Assignee
주식회사 퍼스폼
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 퍼스폼 filed Critical 주식회사 퍼스폼
Priority to KR1020060008656A priority Critical patent/KR100681882B1/en
Application granted granted Critical
Publication of KR100681882B1 publication Critical patent/KR100681882B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A precast kicker block and a method of construction a wall using the same are provided to integrally form the connected area between the slab and the wall body and secure the structural stability by embedding the kicker block before installing the lower wall and the slab concrete. A precast kicker block is used as a kicker which a protrusion formed on the upper part of the slab with the predetermined height by forming a shape of the wall body before constructing the wall body of the reinforced concrete structure. A horizontal member(11) is manufactured according to the thickness of the slab, and a vertical member(12) is manufactured according to the width of the upper and lower wall bodies. The horizontal and vertical members are manufactured, wherein plural sleeves are embedded for distributing the reinforcing bars.

Description

프리캐스트 키커블럭 및 이를 이용한 벽체 축조공법{the precast kicker block and the method of construction using the same} Precast kicker block and the method of construction using the same}

도1은 본 발명에 따른 제1실시예를 도시한 사시도이다.1 is a perspective view showing a first embodiment according to the present invention.

도2는 본 발명에 따른 제2실시예를 도시한 사시도이다.2 is a perspective view showing a second embodiment according to the present invention.

도3의 본 발명에 따른 벽체 축조공법의 순서도이다.3 is a flowchart of the wall construction method according to the present invention.

도4는 본 발명에 따른 벽체 축조공법의 제3공정을 도시한 단면도이다.4 is a cross-sectional view showing a third step of the wall construction method according to the present invention.

도5는 본 발명에 따른 벽체 축조공법의 제5공정을 도시한 단면도이다.5 is a cross-sectional view showing a fifth step of the wall construction method according to the present invention.

도6는 본 발명에 따른 벽체 축조공법의 제3공정을 도시한 사시도이다.Figure 6 is a perspective view showing a third step of the wall construction method according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10 : 프리캐스트 키커블럭 11 : 프리캐스트 키커블럭의 가로단10: precast kicker block 11: cross-section of precast kicker block

12 : 프리캐스트 키커블럭의 세로단 13 : 슬리브12: Vertical end of the precast kicker block 13: Sleeve

20 : 하층벽체 거푸집 25 : 하층벽체 철근20: lower wall formwork 25: lower wall reinforcement

30 : 슬래브 거푸집 35 : 슬래브 철근30: slab formwork 35: slab rebar

40 : 동바리 50 : 하층벽체40: east group 50: lower wall

60 : 슬래브 70 : 상층벽체 거푸집60: slab 70: upper wall formwork

75 : 상층벽체 철근75: upper wall rebar

본 발명은 프리캐스트 키커블럭(precast kicker block) 및 이를 이용한 벽체 축조공법에 관한 것으로서, 더욱 상세하게는 복층의 철근콘크리트조 건축물 시공에 있어 하층벽체 및 슬래브 축조시 간단히 슬래브 거푸집에 고정시켜 상층벽체 축조에 이용할 수 있도록 미리 제작된 키커 블럭(kicker block) 및 상기 키커블럭을 이용함으로서 키커 거푸집 설치 단계를 생략하여 공기(工期)를 단축할 수 있도록한 벽체 축조공법에 관한 것이다.      The present invention relates to a precast kicker block and a wall construction method using the same, and more particularly, in the construction of a double-layer reinforced concrete building, an upper wall construction is simply fixed to a slab formwork when constructing a lower wall and a slab. The present invention relates to a kicker block prepared in advance for use in a kicker block and a wall construction method that can shorten the air by eliminating the step of installing the kicker formwork by using the kicker block.

키커(kicker)라 함은 벽 또는 기둥과 같은 수직 구조물이 설치되어질 위치에 그 수직 구조물의 형상에 맞추어 슬래브 콘크리트의 타설시에 미리 일정 높이 만큼 콘크리트를 타설함으로써 슬래브 상부에 형성되는 턱을 말하는 것이다. 이와 같은 키커를 설치하게 되면, 슬래브와 벽체와의 연결 부위가 일체적으로 형성되므로 구조적으로 안정적이고, 이미 타설된 키커가 상층 벽체의 거푸집 설치 위치를 표시해 주어 상기 키커의 측면을 따라 거푸집을 설치하기만 하면 되므로 슬래브 콘크리트가 양생된 후 상층벽체 시공용 거푸집 설치를 위한 마킹작업을 생략할 수 있다.       Kicker (kicker) refers to the jaw formed on the top of the slab by placing the concrete to a certain height at the time of placing the slab concrete in accordance with the shape of the vertical structure in the position where the vertical structure such as a wall or a column will be installed. When the kicker is installed, the connecting part between the slab and the wall is integrally formed, so it is structurally stable, and the already placed kicker displays the formwork installation position of the upper wall to install the formwork along the side of the kicker. Since only the slab concrete is cured, the marking work for installing the formwork for the upper wall construction can be omitted.

그러나, 상기와 같이 키커를 설치하려면 슬래브공사 완성 후 별도의 키커 거푸집을 설치하고, 여기에 콘크리트를 타설하여 양생한 후에야 비로소 상층벽체 시공에 돌입할 수 있으므로, 공사기간이 길어진다. 그리고 현장에서 키커거푸집을 설치함에 있어 작업에 많은 인력이 요구되고, 정밀한 시공이 어렵다. 또한 거푸집을 해체할 때에 거푸집에 손상이 많이 발생하여, 폐자재가 많아지고, 해체된 거푸집을 운반하는 데에도 많은 인력 및 비용이 소요되며, 거푸집 등의 자재를 보관하기 위한 보관장소도 필요하게 한다.       However, in order to install the kicker as described above, a separate kicker formwork is installed after the completion of the slab construction, and after the concrete is laid and cured, the construction of the upper wall can be started. And in the installation of the kicker formwork in the field requires a lot of manpower, precise construction is difficult. In addition, when the formwork is dismantled, the formwork is damaged a lot, which leads to a lot of waste materials, a lot of manpower and cost to transport the dismantled formwork, and also requires a storage place for storing materials such as formwork. .

본 발명은 상기한 바와 같은 종래의 문제점을 해결하기 위한 것으로서, 본 발명은 복층의 철근콘크리트조 건축물의 벽체 시공시 프리캐스트 키커블럭을 사용하여 상층벽체 시공용 거푸집 설치를 위한 마킹작업과 키커제작을 위한 별도의 거푸집 설치작업을 생략하여 공기(工期)를 단축시키고, 이에 따라 시공비를 절감할 수 있도록 한 프리캐스트 키커블럭과 이를 이용한 벽체 축조공법을 제공하기 위한 것이다.The present invention is to solve the conventional problems as described above, the present invention uses a precast kicker block when constructing the wall of the multi-layer reinforced concrete-like building marking work and the manufacture of the kicker for installing the formwork for the upper wall construction It is to provide a precast kicker block and a wall construction method using the same to shorten the air (工期) by omitting a separate formwork for the installation, thereby reducing the construction cost.

상기한 목적달성을 위해 본 발명은 철근콘크리트조 건축물의 벽체 제작 전에 상기 벽체의 형상에 맞추어 슬래브 상부에 미리 일정 높이 만큼 형성되는 턱인 키커(kicker)로 이용하기 위한 키커블럭에 있어서, +자 또는 ㅏ자의 콘크리트 부재 로서 가로단은 슬래브 두께에 맞추어 제작되고, 세로단은 상, 하층의 벽체 폭에 맞추어 제작된 프리캐스트 키커블럭을 제공한다.In order to achieve the above object, the present invention provides a kicker block for use as a kicker which is a jaw formed in a predetermined height on a slab in advance according to the shape of the wall before fabricating a wall of a reinforced concrete-like building. As the concrete member of the ruler, the transverse end is made to the slab thickness and the vertical end is provided with the precast kicker block made to the wall width of the upper and lower layers.

또한, 본 발명은 하층벽체 시공을 위해 벽체철근을 배근하고 하층벽체거푸집 설치하는 제1공정; 슬래브 시공을 위해 동바리 및 슬래브거푸집을 설치하는 제2공정; 상기 슬래브거푸집 위로 슬래브철근을 배근하고 제1항의 키커블럭을 다수 배치하되, 상기 키커블럭의 세로단을 상기 하층벽체거푸집 사이에 삽입시키면서 키커블럭의 가로단을 상기 슬래브거푸집에 걸치며 고정시키는 제3공정; 상기 하층벽체거푸집 및 슬래브거푸집에 콘크리트를 타설하고 양생하는 제4공정; 및 상부벽체 시공을 위해 벽체철근을 배근하고 상기 키커블럭의 가로단 위에서 상기 키커블럭의 세로단에 접하도록 상층 벽체거푸집을 설치하는 제5공정을 포함하여 이루어지는 프리캐스트 키커블럭을 이용한 벽체 축조공법을 제공한다.      In addition, the present invention is the first step of reinforcing the wall reinforcement and installing the lower wall formwork for the construction of the lower wall; A second step of installing copper bar and slab formwork for slab construction; A third step of placing the slab reinforcement over the slab formwork and arranging a plurality of kicker blocks of claim 1, while inserting the vertical end of the kicker block between the lower wall wall formwork while fixing the transverse end of the kicker block over the slab formwork ; A fourth step of placing and curing concrete in the lower wall formwork and the slab formwork; And a fifth step of installing a top wall formwork so as to reinforce the wall reinforcement for upper wall construction and contact the vertical end of the kicker block on the horizontal end of the kicker block. to provide.

이하, 첨부한 도면 및 바람직한 실시예에 따라 본 발명을 상세히 설명한다.       Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and preferred embodiments.

도1은 본 발명에 따른 프리캐스트 키커블럭의 제1실시예를 도시한 사시도이다. 가로단(11)의 높이는 슬래브 두께에 맞추어 제작되고, 세로단(12)의 넓이는 상, 하층의 벽체 폭에 맞추어 제작된 박편형 블럭으로서. (a)는 +자형, (b)는 ㅏ자형 블럭을 각각 나타낸 것이다. +자형 블럭은 슬래브가 벽체의 양방향으로 이어지는 부위에서 사용되고, ㅏ자형 블럭은 슬래브가 벽체의 일방향으로 이어지는 부위 에서 사용된다. 슬래브거푸집 설치 공정 후 상기 키커블럭의 가로단(11)은 슬래브에 걸쳐지며 고정된다. 또한 상기 키커블럭의 세로단(12) 하부는 하층벽체에 매입되고 상부는 상층벽체 시공을 위한 거푸집 제작 공정에서 상층벽체 거푸집의 설치 위치를 잡아주는 역할을 한다. 다시 말해 상기 키커블럭의 가로단(11)은 슬래브와 연결되어 상기 슬래브와 일체화 되고, 세로단(12) 하부는 하층벽체와 연결되고 상부는 상층벽체와 연결되어 상기 상, 하층벽체와 일체화되는 것이다.      1 is a perspective view showing a first embodiment of a precast kicker block according to the present invention. The height of the transverse end 11 is made according to the slab thickness, and the width of the longitudinal end 12 is a flaky block produced according to the wall width of the upper and lower layers. (a) shows a + -shape, and (b) shows a U-shape block. The + -shaped blocks are used where the slab extends in both directions of the wall, and the U-shaped blocks are used where the slab extends in one direction of the wall. After the slab formwork installation process, the transverse end 11 of the kicker block is fixed over the slab. In addition, the lower portion of the vertical end 12 of the kicker block is embedded in the lower wall and the upper serves to hold the installation position of the upper wall formwork in the formwork for the upper wall construction. In other words, the horizontal end 11 of the kicker block is connected to the slab to be integrated with the slab, and the lower end of the vertical end 12 is connected to the lower wall and the upper part is connected to the upper wall to be integrated with the upper and lower wall. .

도2은 본 발명에 따른 프리캐스트 키커블럭의 제2실시예를 도시한 사시도로서 (a)는 +자형, (b)는 ㅏ자형 블럭을 각각 나타내었다. 도2의 키커블럭은 도1에서 도시된 제1실시예와는 달리 박편형이 아니라 상당한 폭을 갖는 키커블럭이다. 상기 키커블럭의 폭은 슬래브거푸집 및 벽체거푸집의 철근 배근 간격보다 큰 것인데, 이로 인해 철근 배근을 위한 슬리브(13)가 필수적이다. 단 슬리브의 개수는 필요에 따라 조정가능하다. 상기 키커블럭의 가로단(11) 및 세로단(12)의 역할은 상기 제1실시예와 동일하나, 설치과정에는 차이가 있는바 이하에서 자세히 설명하기로 한다.Fig. 2 is a perspective view showing a second embodiment of the precast kicker block according to the present invention, in which (a) shows a + shape and (b) shows a U-shaped block, respectively. The kicker block of FIG. 2 is not a flaky, but a kicker block having a considerable width, unlike the first embodiment shown in FIG. The width of the kicker block is larger than the reinforcement spacing of the slab formwork and the wall formwork, which is why the sleeve 13 for the reinforcement is essential. However, the number of sleeves is adjustable as needed. The role of the horizontal end 11 and the vertical end 12 of the kicker block is the same as the first embodiment, but the installation process will be described in detail below.

도3은 본 발명에 따른 벽체 축조공법의 순서도이다. 제1공정에서 하층벽체(50) 시공을 위해 하층벽체거푸집(20)의 일면을 설치하고 벽체철근(25)을 배근한 후 하층벽체거푸집의 타면을 설치하고, 제2공정에서 슬래브 시공을 위해 동바리(40)를 설치한 후 그 위에 슬래브거푸집(30)을 설치한다. 제3공정에는 상기 슬래브 거푸집 위로 슬래브철근을 배근하고 제1항의 키커블럭을 다수 배치하되, 상기 키커블럭의 세로단을 상기 하층벽체거푸집 사이에 삽입시키면서 키커블럭의 가로단을 상기 슬래브거푸집에 걸치며 고정시킨다. 이후 제4공정에서 상기 하층벽체거푸집(20) 및 슬래브거푸집(30)에 콘크리트를 타설하고 양생하고 제5공정에서 상부벽체의 시공을 위해 상기 키커블럭(10)의 가로단(11) 위에 상부벽체거푸집(70)의 일면을 설치하되 상기 키커블럭의 세로단(12)에 접하도록 하고 상부벽체철근(75)을 배근하고 상기 벽체거푸집의 타면을 상기 일면과 동일한 방식으로 설치한다. 이 후로는 상기 제2공정부터 반복하여 복층의 벽체를 축조해 나갈 수 있다.3 is a flow chart of the wall construction method according to the invention. In order to install the lower wall formwork 20 in the first step, install one surface of the lower wall formwork 20, reinforce the wall reinforcement 25, and install the other side of the lower wall formwork, and in the second step, install the slab for slab construction. After installing 40, install the slab formwork 30 thereon. In the third step, the slab reinforcement is placed over the slab formwork, and a plurality of the kicker blocks of claim 1 are disposed, while the vertical ends of the kicker blocks are inserted between the lower wall formwork and the horizontal ends of the kicker blocks are fixed to the slab formwork. Let's do it. Thereafter, in the fourth process, concrete is poured into the lower wall formwork 20 and the slab formwork 30 and cured, and the upper wall is disposed on the horizontal end 11 of the kicker block 10 for the construction of the upper wall in the fifth process. One side of the formwork 70 is installed but in contact with the vertical end 12 of the kicker block, the upper wall reinforcement 75 is disposed and the other side of the wall formwork is installed in the same manner as the one side. After this, it is possible to construct a multilayer wall repeatedly from the second step.

도4는 제3공정을 상세히 도시하고 있다. 도4는 +자의 프리캐스트 키커블럭(10)이 슬래브거푸집(30)에 걸쳐지며 고정된 모습을 도시한 단면인데 상기 키커블럭은 매우 좁은 폭을 갖고 있으므로 벽체철근(25) 및 슬래브철근(35)의 배근 간격 사이로 삽입 설치될 수 있으며, 여러 개의 프리캐스트 키커블럭(10)을 삽입 설치하여 키커의 성능을 확보할 수 있다. 4 shows the third process in detail. Fig. 4 is a cross-sectional view showing the precast kicker block 10 of the + character spanning the slab formwork 30 and fixed. The kicker block has a very narrow width so that the wall reinforcement 25 and the slab reinforcement 35 are formed. It can be installed between the spacing of the reinforcement, by inserting a number of precast kicker block 10 can be installed to secure the performance of the kicker.

도5는 제5공정을 상세히 도시하고 있다. 상층벽체거푸집(70)은 하층벽체(50) 및 슬래브(60)의 양생 후에 설치되는데 상기 제4공정에 의해 하부벽체 및 슬래브와 일체화된 키커블럭(10)이 상부벽체거푸집(70)의 설치 위치를 잡아줄 수 있다. 5 shows the fifth process in detail. The upper wall formwork 70 is installed after curing the lower wall 50 and the slab 60. The kicker block 10 integrated with the lower wall and the slab by the fourth process is installed at the upper wall formwork 70. Can hold.

한편 도2에서 도시한 본 발명에 따른 프리캐스트 키커블럭의 제2실시예를 사 용한 벽체 축조공법은 상기 제3공정에서 상기 내용과 차이가 있다. 상기 제3공정에서 도2의 키커블럭을 사용하는 경우, 상기 제3공정은 상기 슬래브거푸집(30) 위로 슬래브철근(35)을 배근함에 있어 상기 키커블럭의 가로단 슬리브(13)를 관통하도록 하고, 하부벽체의 철근(25)은 상기 키커블럭의 세로단 슬리브(14)에 들어가도록 상기 키커블럭을 배치하는 공정을 포함한다.On the other hand, the wall construction method using the second embodiment of the precast kicker block according to the present invention shown in Figure 2 is different from the above contents in the third step. When the kicker block of FIG. 2 is used in the third process, the third process penetrates the cross sleeve 13 of the kicker block in reinforcing the slab reinforcement 35 on the slab formwork 30. The reinforcing bar 25 of the lower wall includes placing the kicker block to enter the longitudinal sleeve 14 of the kicker block.

이는 도2의 키커블럭의 가로(11)단과 세로단(12)은 그 폭이 슬래브철근(35) 또는 벽체철근(25)의 배근간격 이상이므로, 미리 매입된 슬리브(13, 14)에 슬래브철근과 벽체철근이 들어가도록 상기 키커블럭을 배치하는 것이다. This is because the width 11 and length 12 of the kicker block of FIG. 2 are more than the width of the reinforcement of the slab reinforcement 35 or the wall reinforcement 25. And the kicker block so as to enter the wall reinforcement.

도6은 상기 프리캐스트 키커블럭을 이용한 벽체 축조공법의 제3공정을 도시한 사시도이다. 도6에서는 본 발명에 따른 프리캐스트 키커블럭의 제1실시예와 제2실시예를 함께 사용한 모습을 도시하였다. 도시된 바와 같이 상기 제1실시예에 의하는 경우는 박편의 키커블럭을 슬래브 철근 및 하부벽체 철근의 배근간격 사이로 배치하며 제2실시예에 의하는 경우 상기 슬래브 철근 및 하부벽체 철근은 상기 키커블럭의 슬리브를 관통도록 설치된다.Fig. 6 is a perspective view showing a third step of the wall construction method using the precast kicker block. Figure 6 shows the appearance of using the first embodiment and the second embodiment of the precast kicker block according to the present invention. As shown in the first embodiment, the kicker block of the flake is disposed between the slab reinforcement and the reinforcement spacing of the lower wall reinforcement. In the second embodiment, the slab reinforcement and the lower wall reinforcement are the kicker block. It is installed to pass through the sleeve of the.

이상과 같은 본 발명에 따르면,According to the present invention as described above,

첫째, 하부벽체와 슬래브 콘크리트 타설전에 키커블럭이 매입되므로 슬래브와 벽체와의 연결 부위가 일체적으로 형성되어 구조적인 안정성을 증대시킨다.First, since the kicker block is embedded before the lower wall and the slab concrete is placed, the connection part between the slab and the wall is integrally formed to increase structural stability.

둘째, 매입된 키커가 상층벽체의 거푸집 설치 위치를 표시해 주어 상기 키커의 측면을 따라 거푸집을 설치하기만 하면 되므로 슬래브 콘크리트가 양생된 후 상층벽체 시공용 거푸집 설치를 위한 마킹작업을 생략할 수 있다.Second, since the embedded kicker displays the formwork installation position of the upper wall, simply install the formwork along the side of the kicker, so that the marking work for installing the formwork for the upper wall construction after the slab concrete is cured can be omitted.

셋째, 키커설치를 위한 별도의 거푸집제작이 불필요하므로 키커거푸집 설치, 콘크리트 양생, 키커거푸집 해체 필요한 공기(工期)가 단축된다.Third, since no separate formwork is required to install the kicker, the air required for installing the kicker, curing the concrete, and dismantling the kicker is shortened.

넷째, 현장에서 키커거푸집을 설치하려면 작업에 많은 인력이 요구되고, 정밀한 시공이 어려우나 프리캐스트 키커블럭을 사용함으로써 인건비를 절감하고 슬래브와 벽체가 이어지는 부위의 마감을 깔끔하게 처리할 수 있다.Fourth, the installation of the kicker formwork in the field requires a lot of manpower, precise construction is difficult, but by using a precast kicker block can reduce the labor cost and clean the finishing of the slab and wall connecting parts.

다섯째 프리캐스트 키커블럭을 사용함으로써 현장 작업시 발생하는 폐자재양을 대폭 줄일 수 있고, 키커거푸집 제작에 필요한 자재 운반이나 자재를 보관 등에 필요한 시간, 인력 및 장소가 불필요하게 된다.Fifth, by using the precast kicker block, it is possible to drastically reduce the amount of waste generated in the field work, and the time, manpower and place required for material transport or storage of materials required for manufacturing the kicker formwork are unnecessary.

Claims (4)

철근콘크리트조 건축물의 벽체 제작 전에 상기 벽체의 형상에 맞추어 슬래브 상부에 미리 일정 높이 만큼 형성되는 턱인 키커(kicker)로 이용하기 위한 키커블럭에 있어서,In the kicker block for use as a kicker (kicker) is formed in a predetermined height in the upper part of the slab in accordance with the shape of the wall before the wall of the reinforced concrete building, +자 또는 ㅏ자의 콘크리트 부재로서 가로단은 슬래브 두께에 맞추어 제작되고, 세로단은 상, 하층의 벽체 폭에 맞추어 제작된 프리캐스트 키커블럭.A precast kicker block made of + or-shaped concrete members whose transverse ends are made to the slab thickness, and the vertical ends are made to the wall widths of the upper and lower layers. 제1항에서,In claim 1, 상기 가로단과 세로단은 그 폭이 슬래브철근 또는 벽체철근의 배근간격 이상으로서, 철근 배근을 위한 다수개의 슬리브가 매립되도록 제작된 것을 특징으로 하는 프리캐스트 키커블럭.The width and length of the precast kicker block is characterized in that the width of the slab reinforcement or wall reinforcement than the reinforcement spacing, a plurality of sleeves for the reinforcement is made to be embedded. 하층벽체 시공을 위해 벽체철근을 배근하고 하층벽체거푸집 설치하는 제1공정;       A first step of reinforcing the wall reinforcement and installing the lower wall formwork for the lower wall construction; 슬래브 시공을 위해 동바리 및 슬래브거푸집을 설치하는 제2공정;      A second step of installing copper bar and slab formwork for slab construction; 상기 슬래브거푸집 위로 슬래브철근을 배근하고 제1항의 키커블럭을 다수 배치하되, 상기 키커블럭의 세로단을 상기 하층벽체거푸집 사이에 삽입시키면서 키커 블럭의 가로단을 상기 슬래브거푸집에 걸치며 고정시키는 제3공정;      A third process of placing slab reinforcement over the slab formwork and arranging a plurality of the kicker blocks of claim 1, wherein the vertical ends of the kicker blocks are inserted between the lower wall wall formwork and the horizontal ends of the kicker blocks are fixed to the slab formwork. ; 상기 하층벽체거푸집 및 슬래브거푸집에 콘크리트를 타설하고 양생하는 제4공정; 및      A fourth step of placing and curing concrete in the lower wall formwork and the slab formwork; And 상부벽체 시공을 위해 벽체철근을 배근하고 상기 키커블럭의 가로단 위에서 상기 키커블럭의 세로단에 접하도록 상층 벽체거푸집을 설치하는 제5공정;      A fifth step of installing the upper wall wall formwork so as to reinforce the wall reinforcement for the upper wall construction and to contact the vertical end of the kicker block on the horizontal end of the kicker block; 을 포함하여 이루어지는 프리캐스트 키커블럭을 이용한 벽체 축조공법.       Wall construction method using a precast kicker block comprising a. 제3항에서,       In claim 3, 상기 제3공정의 키커블럭은 가로단과 세로단의 폭이 슬래브철근 또는 벽체철근의 배근간격 이상으로서 상기 가로단과 세로단에 철근 배근을 위한 다수개의 슬리브가 매립되도록 제작된 프리캐스트 키커블럭으로서,        The kicker block of the third step is a precast kicker block fabricated so that a plurality of sleeves for reinforcement are embedded in the transverse end and the longitudinal end as the width of the transverse end and the longitudinal end is greater than the reinforcement spacing of the slab reinforcement or the wall reinforcement. 상기 제3공정은 상기 슬래브거푸집 위로 슬래브철근을 배근함에 있어 상기 키커블럭의 가로단 슬리브를 관통하도록 하고, 하부벽체의 철근은 상기 키커블럭의 세로단 슬리브에 들어가도록 상기 키커블럭을 배치하는 공정을 포함하는 것을 특징으로하는 프리캐스트 키커블럭을 이용한 벽체 축조공법. The third step is to pass through the cross sleeve of the kicker block in the reinforcement of the slab reinforcement over the slab formwork, and the reinforcement of the lower wall to arrange the kicker block so as to enter the longitudinal sleeve of the kicker block. Wall construction method using a precast kicker block comprising a.
KR1020060008656A 2006-01-27 2006-01-27 The precast kicker block and the method of construction using the same KR100681882B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060008656A KR100681882B1 (en) 2006-01-27 2006-01-27 The precast kicker block and the method of construction using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060008656A KR100681882B1 (en) 2006-01-27 2006-01-27 The precast kicker block and the method of construction using the same

Publications (1)

Publication Number Publication Date
KR100681882B1 true KR100681882B1 (en) 2007-02-12

Family

ID=38106215

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060008656A KR100681882B1 (en) 2006-01-27 2006-01-27 The precast kicker block and the method of construction using the same

Country Status (1)

Country Link
KR (1) KR100681882B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245817A (en) * 2016-09-20 2016-12-21 中国建筑第七工程局有限公司 A kind of fabricated shear wall vertical connection structure and installation method thereof
CN108868106A (en) * 2018-07-05 2018-11-23 上海建工七建集团有限公司 Prefabrication construction external scaffolding connects wall mechanism and construction method
CN110485634A (en) * 2019-08-16 2019-11-22 广西建工集团第五建筑工程有限责任公司 Constructional column top rebars pre-buried structure component and its method for constructional column top rebars installation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245817A (en) * 2016-09-20 2016-12-21 中国建筑第七工程局有限公司 A kind of fabricated shear wall vertical connection structure and installation method thereof
CN108868106A (en) * 2018-07-05 2018-11-23 上海建工七建集团有限公司 Prefabrication construction external scaffolding connects wall mechanism and construction method
CN110485634A (en) * 2019-08-16 2019-11-22 广西建工集团第五建筑工程有限责任公司 Constructional column top rebars pre-buried structure component and its method for constructional column top rebars installation

Similar Documents

Publication Publication Date Title
KR100903398B1 (en) Precast multi tee fiber and wiremesh slab
KR102171006B1 (en) Modular element in sintered expanded-polystyrene for building reinforced-concrete floors
KR100681849B1 (en) Fabricated Hollow Precast Concrete Slab
KR20200048596A (en) Precast concrete double wall for constructing shear wall, method for manufacturing the same and method for constructing shear wall using the same
KR101765334B1 (en) Construction methods of precast concrete slab having its connection part being concealed by coupled ribs and, precast concrete slab used therefor
KR100681882B1 (en) The precast kicker block and the method of construction using the same
KR100776774B1 (en) Method for constructing precast concrete pier segment having connecting structure using steel duct
KR101013235B1 (en) Manufacturing method of rainwater storage bath
KR20080004835U (en) A Precast Concrete Culvert
JP3735781B2 (en) Double bar spacer
KR20070119421A (en) Pier having precast concrete pipe and constructing method therefor
KR20170102729A (en) Multi precast wall structure and its construction method
KR100544368B1 (en) Precast transfer girder and method for constructing a structure by using of it
KR20140006226A (en) Concrete block assembly for arch type structure
CN110878609A (en) Construction method of unbonded prestressed waffle slab
KR20140132561A (en) Precast concrete slab and Precast concrete slab assembly
KR101442021B1 (en) Precast modulor making method for hollow slab, hollow precast modulor therewith, bridge construction method
KR101139144B1 (en) Concrete Slab Structure and Constructing Method for The Same
KR101532430B1 (en) Methods for manufacture and construction of hybrid-type rib slab having increased rib height
KR101059496B1 (en) Concrete slab structure and construction method
CN112095876A (en) Prefabricated laminated slab suitable for laying floor heating pipeline and preparation process
KR20140110526A (en) A fixing coupler used a burial slab of an outer wall of an underground construction and a burial slab construction method using it
KR20150042578A (en) Half PC void slabs and this construction technique
JP2009281141A (en) Hollow floor slab unit for prefabricated bridge, hollow floor slab for prefabricated bridge, and construction method of hollow floor slab bridge
JP3144183U (en) Concrete formwork for concrete block fence foundation rising part

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20091125

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee