KR100681843B1 - Structure for laying hume pipe under the ground for road - Google Patents

Structure for laying hume pipe under the ground for road Download PDF

Info

Publication number
KR100681843B1
KR100681843B1 KR1020060063831A KR20060063831A KR100681843B1 KR 100681843 B1 KR100681843 B1 KR 100681843B1 KR 1020060063831 A KR1020060063831 A KR 1020060063831A KR 20060063831 A KR20060063831 A KR 20060063831A KR 100681843 B1 KR100681843 B1 KR 100681843B1
Authority
KR
South Korea
Prior art keywords
concrete structure
fume pipe
fixing band
hinge
support
Prior art date
Application number
KR1020060063831A
Other languages
Korean (ko)
Inventor
김대하
김수보
Original Assignee
주식회사동일기술공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사동일기술공사 filed Critical 주식회사동일기술공사
Priority to KR1020060063831A priority Critical patent/KR100681843B1/en
Application granted granted Critical
Publication of KR100681843B1 publication Critical patent/KR100681843B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors
    • F16L1/11Accessories therefor, e.g. anchors for the detection or protection of pipes in the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors
    • F16L1/10Accessories therefor, e.g. anchors for aligning

Abstract

A structure for laying a hume pipe of a road is provided to prevent the hume pipe from being separated due to the differential settlement by mounting the concrete structure in the installation groove of the installation line and supporting the hume pipe at the upper end of the concrete structure. A structure for laying a hume pipe of a road comprises support projections(220) longitudinally projected to horizontally face each other; hinge holes(222) horizontally perforated along with the longitudinal direction of the concrete structure; floor supports(210) projected on the floor of the concrete structure and formed with a slope surface having steepness toward both walls; and fixing bands(300) formed with two hinge hole projections(320) with a regular gap. The hinge hole projections of the fixing band is rotatably hinge-combined with a hinge(400) at the rear end of the support projection. Combining wing parts(310) of the fixing band are closely contacted and coupled by bolts(500) and nuts(600).

Description

도로의 흄관매설구조{STRUCTURE FOR LAYING HUME PIPE UNDER THE GROUND FOR ROAD}STRUCTURE FOR LAYING HUME PIPE UNDER THE GROUND FOR ROAD}

도 1은 일반적으로 지면에 매설되는 흄관을 개략적으로 나타낸 도면이다. 1 is a view schematically showing a fume pipe buried in the ground in general.

도 2는 본 발명에 따른 흄관매설구조를 개략적으로 나타낸 분해사시도이다.Figure 2 is an exploded perspective view schematically showing a fume pipe buried structure according to the present invention.

도 3은 본 발명에 따른 흄관매설구조를 개략적으로 나타낸 결합사시도이다.3 is a schematic perspective view showing a fume pipe buried structure according to the present invention.

도 4는 본 발명에 따른 흄관이 설치된 상태를 개략적으로 나타낸 도면이다.4 is a view schematically showing a state in which a fume tube according to the present invention is installed.

도 5a는 본 발명에 따른 흄관매설구조를 개략적으로 나타낸 단면도이다.Figure 5a is a cross-sectional view schematically showing a fume pipe buried structure according to the present invention.

도 5b는 본 발명에 따른 흄관이 고정밴드에 안착되는 상태를 나타낸 도면이다.5b is a view showing a state in which the fume tube according to the present invention is seated on the fixing band.

도 5c는 본 발명에 따른 흄관이 매설된 상태를 나타낸 단면도이다. 5C is a cross-sectional view showing a state in which a fume tube is buried according to the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of Symbols for Main Parts of Drawings>

100 ; 설치홈 200 : 콘크리트구조물100; Installation groove 200: Concrete structure

210 : 바닥지지대 220 : 지지돌기210: floor support 220: support protrusion

222 : 힌지홀 300 : 고정밴드222: hinge hole 300: fixed band

310 : 결합날개부 320 : 힌지홀돌기310: coupling wing portion 320: hinge hole projection

400 : 힌지 700 : 흄관400: hinge 700: fume pipe

800 : 토사 800: earth and sand

본 발명은 도로의 지중에 매설되는 흄관매설구조에 관한 것으로, 보다 상세하게는 도로의 지중에 매설되는 수도관이나 하수관으로 사용되는 흄관이 지상으로부터 인가되는 충격에 의해 파손되지 않도록 견고하게 지하에 매설할 수 있는 흄관매설구조에 관한 것이다.The present invention relates to a fume pipe buried structure buried in the ground of the road, more specifically, to be buried underground firmly so that the fume pipe used as a water pipe or sewage pipe buried in the ground of the road is not damaged by the impact applied from the ground. To the fume pipe buried structure.

일반적으로 지하에 매설되어 상수도관이나 하수도관으로 이용되는 흄관의 경우 지면을 일정 깊이로 터파기를 하여 매설하게 된다.In general, in the case of a fume pipe which is buried underground and used as a water supply pipe or a sewer pipe, the ground is burrowed to a certain depth.

도 1은 일반적으로 지면에 매설되는 흄관을 개략적으로 나타낸 도면으로써, 도 1을 참조하여 설명하면, 상기 흄관(50)을 매설하기 위하여 지면(10)에 길게 구비되는 설치홈(20)의 경우 설치홈(20)의 측면이 15°정도 기울어져 바닥으로 내려갈수록 폭이 좁아지는 형상을 하며, 상기 흄관(50)이 접촉되는 바닥면의 경우 잡석층(40)을 형성시킨 후 잡석층(40)의 상면에는 콘크리트층(30)을 형성시키게 된다. 상기 잡석층(40)과 콘크리트층(30)으로 견고하게 다져진 바닥면에 흄관(50)이 설치된다.1 is a view schematically showing a fume pipe buried in the ground in general, and when described with reference to FIG. 1, in the case of the installation groove 20 provided in the ground 10 long to embed the fume pipe 50 The side of the groove 20 is inclined by about 15 ° and the width becomes narrower as it goes down to the bottom. In the case of the bottom surface where the fume pipe 50 is in contact, the rubble layer 40 is formed after the rubble layer 40 is formed. The upper surface of the concrete layer 30 will be formed. The fume pipe 50 is installed on the bottom surface firmly compacted by the rubble layer 40 and the concrete layer 30.

상기 흄관(50)의 경우 연결부(52)와 몸통(54)의 지름이 달라 연결부(52)의 사이에 공간이 형성되므로 콘크리트층(30)과 몸체(54)의 사이에는 지지벽돌(도시 안됨)을 끼움으로써 흄관(50)이 견고하게 고정되도록 한다.In the case of the fume pipe 50, the diameter of the connecting portion 52 and the body 54 is different, so that a space is formed between the connecting portion 52, the support brick (not shown) between the concrete layer 30 and the body 54 By inserting the fume pipe 50 is to be firmly fixed.

상기 흄관(50)이 설치홈(20)에 설치된 후에는 설치홈(20)을 토사로 채움으로 써 흄관(50)의 매설이 완료되고, 이러한 흄관(50)의 경우 흄관(50)의 상측에 무거운 물체가 위치하게 되면 흄관(50)의 연결부(52)의 결합력이 떨어져 상호 이탈되는 문제점이 있다. After the fume pipe 50 is installed in the installation groove 20, the installation of the fume pipe 50 is completed by filling the installation groove 20 with earth and sand, and in the case of the fume pipe 50, the upper side of the fume pipe 50. When a heavy object is located, there is a problem that the coupling force of the connecting portion 52 of the fume pipe 50 is separated from each other.

본 발명은 상기한 문제점을 해결하기 위하여 안출된 것으로, 본 발명의 목적은 수도관이나 하수관으로 사용되는 흄관이 지상으로부터 인가되는 충격에 의해 파손되지 않도록 견고하게 지하에 매설할 수 있는 도로의 흄관매설구조를 제공하는 데 있다.The present invention has been made to solve the above problems, an object of the present invention is the fume pipe buried structure of the road that can be buried underground firmly so that the fume pipe used as a water pipe or sewage pipe is not damaged by the impact applied from the ground To provide.

상기 목적을 달성하기 위하여 본 발명은 흄관이 설치되는 지면에 구비되는 설치홈의 바닥면과 측면에 착설되는 상면이 오픈된 사다리꼴 형상의 콘크리트구조물; 콘크리트구조물을 구성하는 양 측벽의 중간 높이에 각각 수평하게 돌출되도록 형성되고, 끝단의 양측면에는 콘크리트구조물의 길이방향으로 수평하게 관통되는 힌지홀이 구비되는 지지돌기; 지지돌기의 밑에 해당하는 콘크리트구조물의 바닥면에 중앙선을 기준으로 상호 마주하면서 일정 거리로 떨어지도록 착설되고, 상호 마주하는 일측면은 바닥면으로부터 일정 높이까지 수직으로 형성되면서 일정 높이에서부터는 양측벽을 향하여 일정 경사도의 경사면이 형성되는 바닥지지대; 그리고 흄관의 외주면에 밀착되도록 반원의 형상을 하고, 콘크리트구조물의 양측벽에 착설된 지지돌기의 끝단에 구비되는 힌지홀에 각각 힌지결합되도록 볼록면의 중간 위치에 힌지홀돌기가 두 개가 일정 간격으로 각각 형성되며, 상측에 위치하는 끝단에는 외측을 향해 일정 각도로 연장되면서 결합날개부가 형성되는 고정밴드로 이루어지 는 도로의 흄관매설구조를 제공한다. In order to achieve the above object, the present invention provides a trapezoidal concrete structure having an upper surface opened on a bottom surface and a side surface of an installation groove provided on a ground on which a fume pipe is installed; It is formed so as to protrude horizontally to the middle height of each side wall constituting the concrete structure, respectively, the support protrusions are provided with a hinge hole penetrates horizontally in the longitudinal direction of the concrete structure on both sides of the end; The floor surface of the concrete structure under the supporting protrusion is installed so as to be separated by a certain distance while facing each other with respect to the center line. The mutually opposite sides are formed vertically to a certain height from the floor surface, and both walls are formed from a certain height. A floor support having an inclined surface having a predetermined inclination toward the bottom; And the semi-circle shape to be in close contact with the outer circumferential surface of the fume pipe, and two hinge hole projections at regular intervals in the middle position of the convex surface so as to be hinged to the hinge holes provided at the ends of the supporting projections installed on both side walls of the concrete structure. Each end is formed, the upper end is provided with a fume pipe buried structure of the road consisting of a fixed band is formed with a coupling wing portion extending at an angle toward the outside.

지지돌기는 일측단이 티(T)자형상을 함으로써 콘크리트구조물의 벽에 일측단이 견고하게 매설되고, 고정밴드는 고정밴드의 볼록면 중간위치에 구비된 힌지홀돌기가 지지돌기의 끝단에 힌지와 함께 회전가능하게 힌지결합되어 흄관이 고정밴드의 오목면에 위치하면 고정밴드가 힌지를 축으로 회전하면서 흄관의 외주면에 고정밴드의 오목면이 밀착되어 콘크리트구조물의 양측벽에 구비된 각 고정밴드의 결합날개부가 상호 밀착되면서 볼트와 함께 결합되는 것을 특징으로 하는 도로의 흄관매설구조를 제공한다.One end of the supporting protrusion has a T-shape, so that one end is firmly embedded in the wall of the concrete structure. When the fume pipe is rotatably hinged together and the fume pipe is positioned on the concave surface of the fixing band, the fixing band rotates the hinge along the axis while the concave surface of the fixing band is in close contact with the outer circumferential surface of the fume pipe. Combination of the wing provides a fume pipe buried structure of the road, characterized in that coupled with the bolt while being in close contact with each other.

이하, 첨부된 도면을 참조하여 본 발명을 설명하면 다음과 같다.Hereinafter, the present invention will be described with reference to the accompanying drawings.

도 2는 본 발명에 따른 흄관매설구조를 개략적으로 나타낸 분해사시도이고, 도 3은 본 발명에 따른 흄관매설구조를 개략적으로 나타낸 결합사시도이고, 도 4는 본 발명에 따른 흄관이 설치된 상태를 개략적으로 나타낸 도면이고, 도 5a는 본 발명에 따른 흄관매설구조를 개략적으로 나타낸 단면도이고, 도 5b는 본 발명에 따른 흄관이 고정밴드에 안착되는 상태를 나타낸 도면이고, 도 5c는 본 발명에 따른 흄관이 매설된 상태를 나타낸 단면도이다.Figure 2 is an exploded perspective view schematically showing a fume pipe buried structure according to the present invention, Figure 3 is a combined perspective view schematically showing a fume pipe buried structure according to the present invention, Figure 4 schematically shows a state in which the fume pipe is installed according to the present invention 5A is a cross-sectional view schematically showing a fume pipe buried structure according to the present invention, FIG. 5B is a view showing a state in which a fume pipe according to the present invention is seated in a fixing band, and FIG. 5C is a fume pipe according to the present invention. It is sectional drawing which shows the state of embedding.

도 2 내지 도 5c를 참조하여 설명하면, 먼저, 상수도관이나 하수도관으로 이용되는 흄관(700)의 경우 지하에 일정 깊이와 넓이를 갖는 설치홈(100)을 터파기를 통해 설치라인을 따라 형성시킨 후 그 내부에 흄관(700)을 매설하게 된다.Referring to Figures 2 to 5c, First, in the case of the hume pipe 700 used as a water pipe or sewage pipe to form an installation groove 100 having a predetermined depth and width in the basement along the installation line through the trench After that, the fume pipe 700 is embedded therein.

상기 설치홈(100)은 양 측면이 15°정도 기울어져 바닥으로 내려갈수록 폭이 좁아지는 형상을 하며, 상기 설치홈(100)의 바닥면과 양 측면에 착설되는 콘크리트구조물(200)을 설치홈(100)을 따라 길게 설치한다. 상기 콘크리트구조물(200)의 단면은 바닥면측으로 폭이 좁아지는 상면이 오픈 된 사다리꼴 형상을 한다. The installation groove 100 has a shape in which both sides are inclined about 15 ° so that the width thereof becomes narrower to the bottom, and the concrete structure 200 installed on the bottom surface and both sides of the installation groove 100 is installed. Long installation along (100). The cross section of the concrete structure 200 has a trapezoidal shape in which the upper surface is narrowed to the bottom surface side is open.

상기 콘크리트구조물(200)의 양 측벽에는 각각 지지돌기(220)가 설치된다. 상기 지지돌기(220)은 일정 길이와 폭을 갖도록 형성되고, 상기 지지돌기(220)의 일측단은 티(T)자형상을 하고, 타측단에는 힌지홀(222)이 구비되며, 상기 지지돌기(220)의 일측단은 콘크리트구조물(200)의 벽체에 매설되면서 콘크리트구조물(200)의 벽체로부터 수평하게 돌출되도록 고정된다. Support protrusions 220 are installed on both sidewalls of the concrete structure 200, respectively. The support protrusion 220 is formed to have a predetermined length and width, one end of the support protrusion 220 has a tee (T) shape, the other end is provided with a hinge hole 222, the support protrusion One end of the 220 is buried in the wall of the concrete structure 200 is fixed to protrude horizontally from the wall of the concrete structure 200.

상기 지지돌기(220)의 하측에 해당하는 콘크리트구조물(200)의 바닥면에는 두 개가 한 쌍이 되는 바닥지지대(210)가 착설된다. 상기 바닥지지대(210)는 바닥면의 중간 위치로부터 일정 거리 떨어진 위치에 각각 착설된다. 상기 바닥지지대(210)는 중앙선을 중심으로 상호 마주하게 되며, 상호 마주하는 일측면은 바닥면으로부터 일정 높이까지 수직으로 형성되면서 일정 높이에서부터는 양 측벽을 향하여 일정 경사도로 경사진 경사면을 형성하게 된다. On the bottom surface of the concrete structure 200 corresponding to the lower side of the support protrusion 220, two pairs of floor support 210 are installed. The bottom support 210 is installed in a position separated by a predetermined distance from the middle position of the bottom surface. The floor supports 210 face each other with respect to a center line, and the opposite side surfaces are formed vertically from a bottom to a predetermined height to form a slope inclined at a predetermined slope toward both side walls from a certain height. .

상기 바닥지지대(210)의 경사면에는 흄관의 외주면이 밀착되어 흄관(700)이 안정적으로 콘크리트구조물(200)의 내부에 설치되도록 한다. 상기 바닥지지대(210)의 경사면에 흄관(700)의 설치되면 흄관(700)의 몸체 부분이 콘크리트구조물(200)로부터 떨어지고 흄관(700)의 연결부는 몸체보다 큰 지름을 가지므로 콘크리트구조물(200)의 바닥면에 근접 또는 접촉하게 된다. The inclined surface of the floor support 210 is in close contact with the outer circumferential surface of the fume pipe so that the fume pipe 700 is stably installed in the concrete structure 200. When the fume pipe 700 is installed on the inclined surface of the floor support 210, the body portion of the fume pipe 700 is separated from the concrete structure 200, and the connection portion of the fume pipe 700 has a larger diameter than the body, thus the concrete structure 200. It is in close contact with or in contact with the bottom surface.

상기 지지돌기(220)의 끝단에 구비되는 힌지홀(222)에는 고정밴드(300)가 힌 지(400)와 함께 힌지결합된다. 상기 흄관(700)의 외주면에 밀착되도록 반원의 형상을 하는 고정밴드(300)는 콘크리트구조물(200)의 양측벽에 구비된 지지돌기(220)에 각각 착설됨으로써 흄관(700)의 외주면에 좌우 양측에서 밀착된다. The fixing band 300 is hinged together with the hinge 400 in the hinge hole 222 provided at the end of the support protrusion 220. The fixing band 300 having a semicircle shape to be in close contact with the outer circumferential surface of the fume pipe 700 is installed on each of the support protrusions 220 provided on both side walls of the concrete structure 200, so that the left and right sides on the outer circumferential surface of the fume pipe 700 are fixed. Close contact.

상기 고정밴드(300)의 볼록면에는 중간 위치에 한 쌍으로 된 힌지홀돌기(320)가 일정 간격으로 착설되며, 한 쌍으로 된 힌지홀돌기(320)의 사이에 지지돌기(220)의 끝단이 위치된 상태에서 힌지홀돌기(320)와 지지돌기(220)의 끝단에 구비된 힌지홀(222)에 힌지(400)가 끼워짐으로써 지지돌기(220)의 끝단에 고정밴드(300)가 결합된다. On the convex surface of the fixing band 300, a pair of hinge hole protrusions 320 are installed at a predetermined interval in an intermediate position, and ends of the support protrusions 220 between the pair of hinge hole protrusions 320. FIG. The fixing band 300 is provided at the end of the support protrusion 220 by the hinge 400 is fitted into the hinge hole 222 provided at the end of the hinge hole protrusion 320 and the support protrusion 220 in this position. Combined.

상기 지지돌기(220)에 결합된 고정밴드(300)는 콘크리트구조물(200)의 양측벽에 각각 구비됨으로써 두 개의 고정밴드(300)가 상호 마주보면서 흄관(700)의 외주면에 밀착되어 흄관(700)을 고정밴드(300)가 지지해주게 된다.The fixing bands 300 coupled to the support protrusions 220 are provided on both side walls of the concrete structure 200, so that the two fixing bands 300 face each other and are in close contact with the outer circumferential surface of the fume pipe 700. The fixed band 300 is supported.

상기 고정밴드(300)의 일측 끝단에는 외측을 향해 일정 각도로 연장되면서 형성된 결합날개부(310)가 구비된다. 따라서, 상기 콘크리트구조물(200)의 양측벽에 각각 구비된 두 개의 고정밴드(300)가 흄관(700)에 밀착되면서 각각의 결합날개부(310)가 상호 밀착된다.One end of the fixing band 300 is provided with a coupling blade 310 formed while extending at an angle toward the outside. Therefore, the two fixing bands 300 provided on both side walls of the concrete structure 200 are in close contact with the fume pipe 700, and the respective coupling wing portions 310 are in close contact with each other.

상기 고정밴드(300)의 결합날개부(310)가 상호 밀착된 상태에서 볼트(500)와 너트(600)가 결합날개부(310)에 결합되므로 두 개의 고정밴드(300)가 결합날개부(310)에 착설되는 볼트(500)및 너트(600)에 의해 견고하게 흄관(700)의 외주면에 밀착되면서 결합된다.Since the bolt 500 and the nut 600 are coupled to the coupling blade 310 in a state in which the coupling blade 310 of the fixing band 300 is in close contact with each other, the two fixing bands 300 are coupled to the coupling blade 310. The bolt 500 and nut 600 installed on the 310 is firmly coupled to the outer circumferential surface of the fume pipe 700.

일 실시예를 통해 설명하면 다음과 같다.When described through an embodiment as follows.

먼저, 흄관(700)을 설치하기 위하여 설치홈(100)에는 콘크리트구조물(200)을 설치하여 설치홈(100)의 바닥면과 양 측벽을 견고하게 해준다. 상기 콘크리트구조물(200)의 바닥면에는 흄관(700)의 몸체의 외주면이 밀착되면서 흄관(700)을 지지해주는 바닥지지대(210)를 착설시키고, 상기 콘크리트구조물(200)의 양 측벽에는 콘크리트구조물(200)의 중심을 향해 수평하게 돌출되는 지지돌기(220)를 각각 착설시킨다.First, in order to install the fume pipe 700, the installation groove 100 to install a concrete structure 200 to ensure the bottom surface and both side walls of the installation groove (100). The bottom surface of the concrete structure 200 is installed in contact with the outer circumferential surface of the body of the hume pipe 700 while the floor support 210 for supporting the fume pipe 700 is installed, the concrete structure (200) on both side walls of the concrete structure ( Each of the support protrusions 220 protruding horizontally toward the center of the 200 is installed.

상기 지지돌기(220)는 콘크리트구조물(200)의 중앙에 설치되는 흄관(700)을 향해 돌축되도록 착설되며, 상기 지지돌기(220)의 끝단에는 흄관(700)의 외주면을 감싸면서 흄관(700)을 지지해주는 고정밴드(300)가 착설된다. 상기 고정밴드(300)는 지지돌기(220)의 끝단에 힌지결합되므로 지지돌기(220)의 끝단을 축으로 회전가능하게 된다.The support protrusion 220 is installed so as to be crushed toward the hume pipe 700 is installed in the center of the concrete structure 200, the end of the support projection 220 is wrapped around the outer circumferential surface of the fume pipe 700, the fume pipe 700 Fixed band 300 is installed to support the. The fixing band 300 is hinged to the end of the support protrusion 220 is rotatable around the end of the support protrusion 220.

상기 흄관(700)을 콘크리트구조물(200)의 내부에 설치하기 위하여 고정밴드(300)의 오목부가 상향을 하도록 한 후 흄관(700)의 외주면이 고정밴드(300)의 오목부에 안착되도록 하면서 바닥지지대(210)에 위치시키게 된다. 즉, 상기 고정밴드(300)의 오목부에 흄관(700)이 안착되면서 흄관(700)은 서서히 바닥지지대(210)를 향해 하강시키게 된다.In order to install the hume pipe 700 in the interior of the concrete structure 200, the concave portion of the fixing band 300 is to be upward, and then the outer circumferential surface of the hume tube 700 is seated on the concave portion of the fixing band 300 The support 210 is positioned. That is, as the fume pipe 700 is seated in the concave portion of the fixing band 300, the fume pipe 700 is gradually lowered toward the bottom support 210.

상기 흄관(700)이 바닥지지대(210)를 향해 하강되는 동안 고정밴드(300)가 지지돌기(220)를 축으로 회전하면서 흄관(700)의 외주면에 밀착되고, 상기 흄관(700)이 바닥지지대(210)에 접착하면 고정밴드(300)가 흄관(700)의 외주면에 밀착된다. While the fume pipe 700 is lowered toward the bottom support 210, the fixing band 300 is rotated about the axis of the support protrusion 220 while being in close contact with the outer circumferential surface of the fume pipe 700, and the fume pipe 700 is supported by the floor support. When bonded to 210, the fixing band 300 is in close contact with the outer peripheral surface of the fume pipe (700).

상기 콘크리트구조물(200)의 양 측벽에 구비된 두 개의 고정밴드(300)가 흄관(700)에 밀착되면 각 고정밴드(300)의 결합날개부(310)가 상호 밀착되면서 볼트(500)와 너트(600)와 함께 고정된다.When the two fixing bands 300 provided on both sidewalls of the concrete structure 200 are in close contact with the fume pipe 700, the coupling blades 310 of each of the fixing bands 300 are in close contact with each other, such that the bolt 500 and the nut are in close contact with each other. It is fixed with 600.

상기 고정밴드(300)와 함께 흄관(700)이 콘크리트구조물(200)에 안착되면 흄관(700)과 함께 콘크리트구조물(200)을 토사(800)로 덮음으로써 흄관(700)을 견고하게 매설하게 된다. When the fume pipe 700 together with the fixing band 300 is seated on the concrete structure 200, the fume pipe 700 is firmly embedded by covering the concrete structure 200 with the earth and sand 800 together with the fume pipe 700. .

이상 설명에서 알 수 있는 바와 같이, 본 발명은 흄관을 지하에 매설하기 위하여 일정 깊이와 넓이를 갖는 설치홈을 매설라인을 따라 길게 터파기를 통해 형성시키고, 상기 설치홈의 바닥면과 양측면에 착설되는 콘크리트구조물을 설치홈의 내측에 설치되며, 상기 콘크리트구조물의 바닥면 및 양 측벽에는 흄관을 지지해주는 지지수단을 설치함으로써 흄관이 콘크리트구조물과 지지수단에 의해 견고하게 지지 되어 흄관이 안전하게 된다.As can be seen from the above description, the present invention is to form an installation groove having a predetermined depth and width through the burrow long along the embedding line in order to embed the fume pipe underground, and is installed on the bottom surface and both sides of the installation groove The concrete structure is installed inside the installation groove, and by installing the support means for supporting the fume pipe on the bottom and both side walls of the concrete structure, the fume pipe is firmly supported by the concrete structure and the support means, so that the fume pipe is safe.

특히, 콘크리트 구조물이 매설라인의 설치홈에 안착되고 그 콘크리트 구조물 상단에 흄관을 지지할 수 있는 구조가 형성되는 바, 흄관의 견고한 지지는 물론, 연약 지반에 매설되는 흄관의 경우 부등 침하에 의한 흄관의 이탈을 방지할 수 있게 되며, 이에 하수의 누출에 따른 토양 오염을 방지하는 효과를 얻을 수 있다.In particular, the concrete structure is seated in the installation groove of the buried line and the structure that can support the fume pipe on the top of the concrete structure is formed, as well as the solid support of the fume pipe, and in the case of the fume pipe buried in the soft ground, the fume pipe due to uneven settlement It is possible to prevent the departure of, so that the effect of preventing soil contamination due to leakage of sewage can be obtained.

Claims (2)

흄관이 설치되는 지면에 구비되는 설치홈의 바닥면과 측면에 착설되고 바닥지지대가 형성된 콘크리트구조물; A concrete structure mounted on the bottom and side of the installation groove provided on the ground on which the fume pipe is installed and having a floor support; 콘크리트구조물에 안착되는 흄관의 이음부를 고정할 수 있도록 2개 1조로 구성되어 다수개가 연설된 흄관을 고정시키는 고정밴드; A fixing band for fixing a plurality of fume pipes composed of two pairs to fix a joint of a fume pipe seated on a concrete structure; 고정밴드의 결합날개부에 형성된 체결홀을 통해 흄관의 외측에 고정밴드를 고정시키는 볼트와 너트;를 포함하고, 토사를 되메우기 작업하여 시공되는 도로의 흄관매설구조에 있어서, In the fume pipe buried structure of the road including a bolt and nut for fixing the fixing band to the outside of the fume pipe through the fastening hole formed in the coupling blade portion of the fixing band, the construction work by refilling the soil 콘크리트구조물(100)은 상면이 오픈된 사다리꼴 형상으로 형성되되, 양 측벽의 중간 높이에 각각 수평하게 지지돌기(220)가 서로 마주보도록 길이방향을 따라 다수개가 돌출형성되고, 지지돌기(220) 끝단의 양측면에 콘크리트구조물(100)의 길이방향으로 수평하게 관통되는 힌지홀(222)이 구비되며, The concrete structure 100 is formed in a trapezoidal shape with an open top surface, a plurality of protrusions are formed along the longitudinal direction so that the support protrusions 220 face each other horizontally at the middle heights of both side walls, and the ends of the support protrusions 220. Hinge holes 222 which are horizontally penetrated in the longitudinal direction of the concrete structure 100 are provided on both sides of the 콘크리트구조물(100)의 바닥면에 돌출형성되는 바닥지지대(210)는 지지돌기(220)의 밑에 해당하는 콘크리트구조물(100)의 바닥면에 중앙선을 기준으로 상호 마주하면서 일정 거리로 떨어지도록 착설되고 상호 마주하는 일측면은 바닥면으로부터 일정 높이까지 수직으로 형성되면서 일정 높이에서부터는 양측벽을 향하여 일정 경사도의 경사면이 형성되며, The bottom support 210 protruding from the bottom surface of the concrete structure 100 is installed so as to fall to a certain distance while facing each other on the bottom surface of the concrete structure 100 corresponding to the bottom of the support protrusion 220 with respect to the center line. One side facing each other is formed vertically from the bottom to a certain height while a slope of a predetermined slope is formed toward a side wall from a certain height, 그리고 흄관(700)의 외주면에 밀착되도록 반원의 형상을 하고 콘크리트구조물(100)의 양측벽 지지돌기(220)의 끝단에 구비된 힌지홀(222)에 각각 힌지결합되는 고정밴드(300)는 볼록면의 중간 위치에 힌지홀 돌기(320) 두 개가 일정 간격으로 각각 형성되며, And fixing bands 300 are formed in the shape of a semi-circle so as to be in close contact with the outer peripheral surface of the fume pipe 700 and hinged to the hinge holes 222 provided at the ends of both side wall support protrusion 220 of the concrete structure 100 is convex. Two hinge hole protrusions 320 are formed at regular intervals on the surface, 지지돌기(220)는 일측단이 티(T)자 형상을 함으로써 콘크리트구조물(100)의 벽에 일측단이 견고하게 매설되고 고정밴드(300)는 고정밴드(300)의 힌지홀 돌기(320)가 지지돌기(220)의 끝단에 힌지(400)와 함께 회전가능하게 힌지결합되되,One end of the support protrusion 220 has a tee (T) shape so that one end is firmly embedded in the wall of the concrete structure 100 and the fixing band 300 is a hinge hole protrusion 320 of the fixing band 300. Is hinged rotatably coupled with the hinge 400 at the end of the support protrusion 220, 흄관(700)이 고정밴드(300)의 오목면에 위치하면 고정밴드(300)가 힌지(400)를 축으로 회전하면서 흄관(700)의 외주면에 고정밴드(300)의 오목면이 밀착되어 콘크리트구조물(100)의 양측벽에 구비된 각 고정밴드(300)의 결합날개부(310)가 상호 밀착되면서 볼트(500)와 너트(600)로 체결고정되는 것을 특징으로 하는 도로의 흄관매설구조.When the hume pipe 700 is located in the concave surface of the fixing band 300, the fixing band 300 rotates the hinge 400 to the axis while the concave surface of the fixing band 300 is in close contact with the outer peripheral surface of the hume pipe 700 The fume pipe buried structure of the road, characterized in that the coupling blades 310 of each of the fixing bands 300 provided on both side walls of the structure 100 are in close contact with each other and fastened by bolts 500 and nuts 600. 삭제delete
KR1020060063831A 2006-07-07 2006-07-07 Structure for laying hume pipe under the ground for road KR100681843B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060063831A KR100681843B1 (en) 2006-07-07 2006-07-07 Structure for laying hume pipe under the ground for road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060063831A KR100681843B1 (en) 2006-07-07 2006-07-07 Structure for laying hume pipe under the ground for road

Publications (1)

Publication Number Publication Date
KR100681843B1 true KR100681843B1 (en) 2007-02-12

Family

ID=38106200

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060063831A KR100681843B1 (en) 2006-07-07 2006-07-07 Structure for laying hume pipe under the ground for road

Country Status (1)

Country Link
KR (1) KR100681843B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101377017B1 (en) * 2011-07-04 2014-03-24 주식회사 수성엔지니어링 Supporting means for hume pipe and forming means for waterway and the construction method
CN109356353A (en) * 2018-11-28 2019-02-19 金螳螂精装科技(苏州)有限公司 A kind of ground layer mounting structure of subsided rest room
CN113339588A (en) * 2021-04-13 2021-09-03 张家港市永茂建筑工程有限公司 Pipeline frame and construction method for newly-built access well of drainage pipeline using pipeline frame

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200234533Y1 (en) * 2001-02-23 2001-09-28 (주)한석엔지니어링건축사사무소 Jacket preventing from escape of tube joint
KR20020034533A (en) * 2000-11-02 2002-05-09 박종섭 Method for debugging message regarding is-95b in mobile communication system
KR200318113Y1 (en) * 2003-03-13 2003-06-27 정진백 Pedestal member for hume pipe

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020034533A (en) * 2000-11-02 2002-05-09 박종섭 Method for debugging message regarding is-95b in mobile communication system
KR200234533Y1 (en) * 2001-02-23 2001-09-28 (주)한석엔지니어링건축사사무소 Jacket preventing from escape of tube joint
KR200318113Y1 (en) * 2003-03-13 2003-06-27 정진백 Pedestal member for hume pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
2002345330000

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101377017B1 (en) * 2011-07-04 2014-03-24 주식회사 수성엔지니어링 Supporting means for hume pipe and forming means for waterway and the construction method
CN109356353A (en) * 2018-11-28 2019-02-19 金螳螂精装科技(苏州)有限公司 A kind of ground layer mounting structure of subsided rest room
CN113339588A (en) * 2021-04-13 2021-09-03 张家港市永茂建筑工程有限公司 Pipeline frame and construction method for newly-built access well of drainage pipeline using pipeline frame

Similar Documents

Publication Publication Date Title
KR100243401B1 (en) A supporting structure for laying pipes under the ground
KR100681843B1 (en) Structure for laying hume pipe under the ground for road
JP5148001B1 (en) Steel pipe piles for preventing levitation of underground objects, and methods for preventing levitation of underground objects using the same
JP2012036720A (en) Open-cut excavation structure using lining panel, and open-cut excavation construction method
KR100982819B1 (en) A prefabricated drain-road
KR200407625Y1 (en) Hume pipe reinforce structure
KR100676680B1 (en) Hume pipe reinforce structure
KR100654327B1 (en) Structure of hanger using pipe
KR200409783Y1 (en) Supprot apparatus of drainage
KR100538981B1 (en) Waterworks pipe protection structure for soft ground installation
KR200318113Y1 (en) Pedestal member for hume pipe
KR100598769B1 (en) Drain line of hume pipe for smooth area
JP6542587B2 (en) Manhole levitation prevention method
KR100659397B1 (en) Connecting structure of drainpipe can be stand pressure
GB2568247A (en) Kerb drainage system
KR100619403B1 (en) Installing structure of water pipes for preventing from sinking the ground
KR200406776Y1 (en) Cushion mat support structure for preventing settlement of soft ground water and sewage pipe
KR100680247B1 (en) Device for adjusting the height of underground pipe and preventing it from inequablly sinking
KR200275363Y1 (en) The mold establishment necessit do not exist assembly road water pipe
KR101748776B1 (en) Portion Anti-settlement Apparatus for use of drain pipe of softground
KR100639253B1 (en) Sinking prevention construction of hume pipe for drainage line
KR100688617B1 (en) Drainpipe with a flat bottom
KR100748065B1 (en) Coupling structure for water pipe with rail-form
KR20200005841A (en) Rainwater storage tank construction method using top-down method
KR20090061868A (en) Assembling structure of arch-type precast culvert and method constructing the culvert

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
A302 Request for accelerated examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130221

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140206

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150123

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160225

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170125

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180320

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20200122

Year of fee payment: 14